| 2 Pursuant to 10 CFR 50.55a(g)(5), if the licensee determines that conformance with an examina-tion requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission in support of that determination and a request made for relief from the ASME Code requirement. After evaluation of the determination, pursuant to 10 CFR 50.55a(g)(6)(l), the Commission may grant relief and may impose attemative require- ' | | 2 Pursuant to 10 CFR 50.55a(g)(5), if the licensee determines that conformance with an examina-tion requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission in support of that determination and a request made for relief from the ASME Code requirement. After evaluation of the determination, pursuant to 10 CFR 50.55a(g)(6)(l), the Commission may grant relief and may impose attemative require- ' |
| monts that are determined to be authorized by law, will not endanger life, property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed. | | monts that are determined to be authorized by law, will not endanger life, property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed. |
| By letter dated January 29,1998 Entergy Operations, Inc., the licensee for the Entergy sites, requested relief from the requirements of the 1992 Edition,1993 Addenda of the ASME Boiler and Pressure Vessel Code, Section XI, in regard to corrective measures for system pressure i tests, as stated in Subsection IWA 5250 (a)(2). | | By {{letter dated|date=January 29, 1998|text=letter dated January 29,1998}} Entergy Operations, Inc., the licensee for the Entergy sites, requested relief from the requirements of the 1992 Edition,1993 Addenda of the ASME Boiler and Pressure Vessel Code, Section XI, in regard to corrective measures for system pressure i tests, as stated in Subsection IWA 5250 (a)(2). |
| The staff has reviewed and evaluated the licensee's request and the supporting infcrmation on the proposed relief request 1S12-08 for the Entergy sites pursuant to the provisions of 10 CFR l | | The staff has reviewed and evaluated the licensee's request and the supporting infcrmation on the proposed relief request 1S12-08 for the Entergy sites pursuant to the provisions of 10 CFR l |
| 50.55a(s)(3)(i). | | 50.55a(s)(3)(i). |
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20212L1141999-10-0101 October 1999 Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20212F5261999-09-22022 September 1999 SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1 ML20211F4281999-08-25025 August 1999 Safety Evaluation Concluding That Licensee Provided Acceptable Alternative to Requirements of ASME Code Section XI & That Authorization of Proposed Alternative Would Provide Acceptable Level of Quality & Safety ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D8951999-07-23023 July 1999 Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20195J8951999-06-17017 June 1999 Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) ML20207E8631999-06-0303 June 1999 Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 ML20207E7231999-06-0202 June 1999 Safety Evaluation Authorizing Proposed Alternative Exam Methods Proposed in Alternative Exam 99-0-002 to Perform General Visual Exam of Accessible Areas & Detailed Visual Exam of Areas Determined to Be Suspect ML20206M7711999-05-11011 May 1999 SER Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 ML20206F0691999-04-29029 April 1999 Safety Evaluation Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 ML20206A2111999-04-21021 April 1999 Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 ML20205M6941999-04-12012 April 1999 Safety Evaluation Granting Relief for Second 10-yr Inservice Inspection Interval for Plant,Unit 1 ML20205D6061999-03-31031 March 1999 Safety Evaluation Supporting Licensee Proposed Approach Acceptable to Perform Future Structural Integrity & Operability Assessments of Carbon Steel ML20205D5481999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) ML20205D4711999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Employ Alternative Welding Matls of Code Cases 2142-1 & 2143-1 for Reactor Coolant System to Facilitate Replacement of Steam Generators at Arkansas Nuclear One,Unit 2 ML20205A6331999-03-25025 March 1999 SER Accepting Request to Use Mechanical Nozzle Seal Assemblies as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Applications at Plant,Unit 3 ML20204B1861999-03-15015 March 1999 Safety Evaluation Authorizing Licensee Request for Alternative to Augmented Exam of Certain Reactor Vessel Shell Welds,Per Provisions of 10CFR50.55a(g)(6)(ii)(A)(5) ML20203H8591999-02-17017 February 1999 Safety Evaluation Accepting Licensee Second Ten Year ISI Program & Associated Relief Requests for Plant,Unit 3 ML20199H6261999-01-21021 January 1999 Safety Evaluation Accepting Classification of Instrument Air Tubing & Components for Safety Related Valve Top Works.Staff Recommends That EOI Revise Licensing Basis to Permit Incorporation of Change ML20198M7841998-12-29029 December 1998 SER Accepting Util Proposal to Use ASME Code Case N-578 as Alternative to ASME Code Section Xi,Table IWX-2500 for Arkansas Nuclear One,Unit 2 ML20196F4911998-12-0101 December 1998 SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20155H3491998-11-0303 November 1998 Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 ML20154J2471998-10-0909 October 1998 SER Accepting Inservice Testing Program,Third ten-year Interval for License DPR-51,Arkansas Nuclear One,Unit 1 ML20151S5421998-09-0303 September 1998 Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp ML20237C5661998-08-17017 August 1998 Safety Evaluation Accepting Licensee Request for Exemption from Section Iii.O of Appendix R to 10CFR50 ML20236S9031998-07-22022 July 1998 SER Accepting Rev 19 to Quality Assurance Program for Waterford Steam Electric Station,Unit 3 ML20249A6431998-06-12012 June 1998 SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) ML20248D7491998-05-28028 May 1998 Safety Evaluation Accepting Licensee Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping ML20217Q6701998-05-0606 May 1998 SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles ML20217A7211998-04-17017 April 1998 Safety Evaluation Supporting Proposed Alternative for ANO-1 to Implement Code Case N-533 (w/4 H Hold Time at Test Conditions Prior to VT-2 Visual Exam) ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) ML20217P0381998-04-0606 April 1998 Safety Evaluation Supporting Amend 135 to License NPF-29 ML20216J4211998-03-18018 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Grand Gulf Nuclear Station ML20216D6111998-03-12012 March 1998 Safety Evaluation Supporting Amend 188 to License NPF-6 ML20203E9371997-12-0909 December 1997 Safety Evaluation Granting Relief Request,Per 10CFR50.55a(g) (I) ML20202F0191997-11-28028 November 1997 Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 ML20199F3431997-11-18018 November 1997 SER Accepting Rev 15 of Operational Quality Assurance Manual for Grand Gulf Nuclear Station,Unit 1 ML20216E9921997-09-0404 September 1997 Safety Evaluation Accepting 970623 Request for Relief Re Authorization for Use of ASME Code Case N-416-1 & N-532,ISI Program for Listed Plants ML20141H8411997-07-30030 July 1997 Safety Evaluation Accepting Use of Code Case N-508-1 for All Four Plants for Rotation of Serviced Snubbers & Pressure Relief Valves for Purpose of Testing in Lieu of ASME Code ML20141F3881997-06-30030 June 1997 Safety Evaluation Authorizing Licensee Request for Extension of First ISI Interval to 970924 ML20148H1271997-06-0505 June 1997 Supplemental Safety Evaluation Re Conformance to Reg Guide 1.97,Entergy Operations,Inc,Waterford Steam Electric Station Unit 3 ML20138K0561997-05-0505 May 1997 SER Approving Licensees IPE Process Capable of Identifying Severe Accidents & Severe Accident Vulnerabilities,For Plant,Unit 2 ML20138C8501997-04-28028 April 1997 Safety Evaluation Authorizing Proposed Alternative to Vibration Measurement Requirements of OM-6,paragraph 4.6.4 (B),For Standby Svc Water Pumps & Diesel Fuel Oil Transfer Pumps,Per 10CFR50.55a(a)(3)(ii) ML20147H4371997-03-31031 March 1997 Safety Evaluation Accepting Proposed P-T Limits for Heatup, Cooldown,Inservice Leak & Hydrostatic Testing & Core Criticality ML20134C5671997-01-30030 January 1997 SER Denying Request for Exemption from 10CFR50.55a Entergy Operating,Inc Et Al,Grand Gulf Nuclear Station,Unit 1 ML20149M4221996-12-12012 December 1996 Safety Evaluation Supporting Update Insvc Insp Programs to 1992 & Portions of 1993 ASME Boiler & Pressure Vessel Code, Sect XI for Licenses DPR-51,NPF-6,NPF-38,NPF-29 & NPF-47. Technical Ltr Rept Encl 1999-09-23
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8931999-10-31031 October 1999 Rev 1 to BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20217F2891999-10-13013 October 1999 Drill 99-08 Emergency Preparedness Exercise on 991013 ML20212L1141999-10-0101 October 1999 Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with 0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20217G7211999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with ML20217F9921999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20216J6271999-09-27027 September 1999 Rev 0 to CALC-98-R-1020-04, ANO-1 Cycle 16 Colr ML20212F5641999-09-23023 September 1999 SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits ML20212F5261999-09-22022 September 1999 SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1 ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr ML20211Q3171999-09-0909 September 1999 Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20216E4881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With 0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with ML20211Q2141999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With ML20211F4281999-08-25025 August 1999 Safety Evaluation Concluding That Licensee Provided Acceptable Alternative to Requirements of ASME Code Section XI & That Authorization of Proposed Alternative Would Provide Acceptable Level of Quality & Safety RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With 0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with ML20210Q6361999-07-31031 July 1999 Corrected Monthly Operating Rept for July 1999 for Waterford 3 ML20210S0581999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Waterford 3.With ML20211A6921999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With ML20210K8831999-07-29029 July 1999 Non-proprietary Addendum B to BAW-2346P,Rev 0 Re ANO-1 Specific MSLB Leak Rates ML20210D8951999-07-23023 July 1999 Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 ML20209J1961999-07-12012 July 1999 Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr ML20196K4981999-07-0101 July 1999 Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable ML20209G0691999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with ML20209H3781999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Waterford 3 Ses. with ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr ML20195J8951999-06-17017 June 1999 Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) ML20207E8631999-06-0303 June 1999 Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 ML20207E7231999-06-0202 June 1999 Safety Evaluation Authorizing Proposed Alternative Exam Methods Proposed in Alternative Exam 99-0-002 to Perform General Visual Exam of Accessible Areas & Detailed Visual Exam of Areas Determined to Be Suspect ML20196A0191999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20196A6251999-05-31031 May 1999 Non-proprietary Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20195K3391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Waterford 3 Ses.With ML20196A1161999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With ML20195C3041999-05-28028 May 1999 Annual Rept on Abb CE ECCS Performance Evaluation Models ML20195D1991999-05-28028 May 1999 Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14 ML20206M7711999-05-11011 May 1999 SER Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With 0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with ML20206S7401999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Waterford 3.With ML20206Q4831999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With ML20206J1201999-04-30030 April 1999 Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators 1999-09-09
[Table view] |
Text
-
fpitc\
p- t UNITED STATES E
fE NUCLEAR REGULATORY COMMISSION i WASHINGTON, D.C. 2006H001
- f SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR PEGULA RELATED TO REQUEST FOR RELIEF NO.lSl2-08 ENTERGY OPERATIONS. INC.
ARKANSAS NUCLEAR ONE. UNITS 1 AND 2. GRAND GULF NUCLEAR ST RIVER BEND STATION. AND WATERFORD STEAM ELECTRIC STATION.
DOCKET NUMBERS: 50-313. 50-368. 50-416. 50-458. 50-382
- 1. INTRODUCTION !
The Technical Specifications for Arkansas Nuclear One, Units 1 and 2, Grand Gulf Nuclear Station, River Bend Station, and Waterford Steam Electric Station, Unit 3 (Entergy sites), sta that the inservice inspection and testing of the American Society of Mechanical Engineers ,
(ASME) Code Class 1,2, and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(l). The 10 CFR 50.55a(a)(3) states that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (i) the proposed attematives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1,2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, Rules for Inservice inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first ten-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated reference in 10 CFR 50.55a(b) on the date twelve months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The applicable edition of the ASME Code,Section XI, for the Entergy sites, is the 1992 edition and portions of the 1993 Addenda. The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein and subject to Commission approval.
t P
~
2 Pursuant to 10 CFR 50.55a(g)(5), if the licensee determines that conformance with an examina-tion requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission in support of that determination and a request made for relief from the ASME Code requirement. After evaluation of the determination, pursuant to 10 CFR 50.55a(g)(6)(l), the Commission may grant relief and may impose attemative require- '
monts that are determined to be authorized by law, will not endanger life, property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed.
By letter dated January 29,1998 Entergy Operations, Inc., the licensee for the Entergy sites, requested relief from the requirements of the 1992 Edition,1993 Addenda of the ASME Boiler and Pressure Vessel Code,Section XI, in regard to corrective measures for system pressure i tests, as stated in Subsection IWA 5250 (a)(2).
The staff has reviewed and evaluated the licensee's request and the supporting infcrmation on the proposed relief request 1S12-08 for the Entergy sites pursuant to the provisions of 10 CFR l
50.55a(s)(3)(i).
2.0 EVALUATION
Code Reauirement: ASME Section XI,1992 Edition,1993 Addenda, Subartic'e IWA-5250(a)(2) states that if leakage occurs at a bolted connection during a system test, one bolt closest to the !
leak shall be removed, VT-3 examined, and evaluated for degradation in accordance with IWA-3100.
Licensee's Code Relief.. Request Pursuant to 10 CFR 50.55a(a)(3)(i), the licensee requests altomative relief to perform the actions specified in IWA-5250(a)(2) on bolts if leakage occurs at a bolted connection only if a systematic evaluation concludes that a bolt removalis warranted.
Licensee's Basis for Reauestino Relief: Leaking conditions at a bolted connection may be an important variable in the degradation of fasteners. However, leakage is not the only variable, and in some cases may not be the degradation mechanism. Other variables or factors to be )
j considered are: Joint botting materials, service age of joint bolting materials, location of the leakage, history of leakage at the joint, evidence of corrosion with the joint assembled, '
corrosiveness of process fluid, and plant / industry studies of similar botting materials in a similar j
environment. These variables are important to consider before disassembling a bolted '
connection for a visual VT-3 examination. Removal of botting at a mechanical connection may not be the most prudent decision. Entergy considers the requirement to be unnecessarily prescriptive and restrictive.
Licensee's Proposed Altemative Examination: (as stated)
"When leakage is identified at bolted connections by visual VT 2 examination during system pressure testing, an evaluation will be performed. The evaluation will determine the susceptibility ;
of the botting to corrosioa, assess the potential for failure, and identify appropriate corrective ;
actions. The following factors will be considered, as necessary, when evaluating the leakage:
- 1) Bolting materials
- 2) Corrosiveness of the process fluid 4
4
~
3
- 3) Leakage location
- 4) Leakage history at connection
- 5) Visual evidence of corrosion at connection (connection assembled)
- 6) Industry studies and history of similar bolting in similar environment
- 7) Condition and leakage histoty of adjacent components Furthermore if the initial evaluation indicates the need for a more in-depth evaluation, the actions specified in IWA-5250(a)(2) shall be performed."
Evaluation /
Conclusions:
in accordance with the 1992 edition of the ASME Code,Section XI, in regard to corrective measures for system pressure tests, as stated in the 1993
, Addends, Subsection IWA-5250(a)(2), when leakage occurs at bolted connections, one bolt closest to the leak is required to be removed for VT-3 visual examination, in lieu of the code-required removal of botting to perform a VT-3 visual examination, the licensee has proposed to perform an evaluation of the bolted connection to determine the susceptibility of the bolting to corrosion and the potential for failure. If the initial evaluation indicates the need for a more in-depth evaluation, the actions specified in lWA-5250(a)(2) snall be performed, i.e., the bolt closest to the source of leakage will be removed, VT-3 examined, and evaluated in accordance with IWA-3100(a). This altomative allows the licensee to utilize a systematic approach and sound .
engineering judgement, provided that as a minimum, all of the seven evaluation factors listed in the licensee's proposed altemative are considered. As a result, the licensee's attemative to the code-required removal of bolting at a joint when leakage occurs will provide an acceptable level of quality and safety, as the integrity of the joint will be maintained. Therefore, the staff concludes that the licensee's proposed altemative is authorized pursuant to 10 CFR 50.55a(a)(3)(i).
Principal Contributors: P.' Patnaik D. Wigginton Date: April 7, 1998 l