ML20137S306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project =
| stage = Other
}}
}}



Latest revision as of 09:16, 13 December 2021

Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S306
Person / Time
Site: 05000087
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Scholand G
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8602180016
Download: ML20137S306 (2)


Text

'

I

o. .

FEB 11 1535 Docket No. 50-87 Westinghouse Electric Corporation ATTN: Mr. G. W. Scholand, Manager Westinghouse Nuclear Training Center 505 Shiloh Boulevard Zion, IL 60099 R Gentlemen:

Enclosed is a copy of the revised NRC Form 398. This revised form requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need.to indicate the additional training received since the last application under Item 15. Please note that the training section will no longer be cumulti.ive. Other changes are detailed in Enclosure 2. Enclosure 3 is a set of instcuctions for the completion of all items on the NRC Form 398.

Please ensure that all applications for licenses received after April 1,1986, are submitted on this revised form. On that date, the NRC Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Comission, Document Management Branch, Mail Stop W-548, Washington, DC 20555.

A meeting will be held with all Region III licensees in late March or early April to discuss this and other operator licensing matters. You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

_ ORIGINAL SIGNED BY LUIS A. REYES 8602180016 860211 ADOCK O 7 Luis A. Reyes, Chief (DR Operations Branch

Enclosures:

As stated See Attached Distribution RIII RIII RII p b RWorthy/mab (chillen e 02/11/86 y p[% , / ye d1'I ffWh llh

- ;4 -

s. - u.

3 1 EES Westinghouse Electric Corporation 2 Distribution:

'cc w/ enclosures:

Karen Rueter,~ Reactor Manager cc w/o' enclosures:

C. Bach, Manager Instruction (Fundamentals) and Training Reactor A. T.'Sabo, Director, Licensing Safeguards & Safety A. Joseph Nardi, Manager NES License Administration DCS/RSB (RIDS)

' Licensing Fee Management Branch