Forwards Rev 1 to Physical Security Plan as Addl Info to Support 870619 Application for Amend to License R-119 for Possession Only License.Rev Deletes Refs to Physical Security Plan Since All SNM Removed from Facility
ML20236H137
Person / Time
Site: 05000087
Issue date: 07/30/1987
From: Nardi A
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Office of Nuclear Reactor Regulation
References
LA-87-51, NUDOCS 8708050070
Download: ML20236H137 (14)


Text

. . . _ . . . . _ _ _ . .

f 3

Westinghouse Power Systems [?s/je Pennsmania maa 0355 Electric Corporation 73 37_31 July 30, 1987 U, S. Nuclear Regulatory N 4=nion Office of Nuclear Reactor Regulation Division of Licensirg Washington, D. C. 20555 Gentismn:

Subject:

Submittal of Additional Information to Application for a License Ameninent to License R-119 (Docket 50-87) to change to a Possession only License

Reference:

Westinghouse letter Number IA 87-39, dated June 19, 1987 fram A. J. Nardi to USNRC The Westinghouse Electric Corporation hereby suhnits this additional information to support our application (referenced above) for an ameninent to License R-119 to change to a possession only license. In accordance with dic = cians held with Mr. T. S. Michaels, these revised pages are intended to delete references to the Physical Security Plan since all SIM has been removed from the facility. Attachment 1 to this letter provides instructions for the replacement of the pages contained in Attachment 2.

The revised pages are all marhed as Revision 1 and a bar has been placed in the margin to identify where the changes have been made.

If you have any questions concerning this submittal, please contact re by telephone on (412) 374-4652 or by letter at the above address.

Very truly yours, A. N , Manager License Administration Enc.

Cbpies Transmitted: 3 notarized & 19 conformed CCt@OtMFAL'IH OF PD{NSYLVANIA) ss COUNIY OF ALUDGHE21Y)

Sworn and subscribed before me this

_ d 4 day of htcl4 1987 h< a u,M. h As .o Notary Public 8708050070 870730'.

h -

PDR ADOCK 05000087 P PDR

a ATDGMDTI 1 TO IEITER IATED 7/30/87 INSTRUCTICES FOR INSERTION OF REFIACDENT PAGES Old New Page Page i No. No. Instructions / Reason I-3 I-3, Rev. 1 Replace old page. Deleted reference to Physical Security Plan.

III-4 III-4, Rev. 1 Replace old page. Revised 5.6 to note deletion of Physical Security Plan.

III-7 III-7, Rev. 1 Raplace old page. Revised Figure Title.

III-48 III-48, Rev. 1 Replace old page. Added ermnitment to TID l pXalrig frequency.

III-49 III-49, Rev. 1 Replace old page. Revised terminology to delete references to " controlled a sa." j III-50 III-50, Rev. 1 Replace old page. Deleted reference to mysical i Security Plan. i III-55 III-55, Rev. 1 Replace old page. Revised Figure Title.

III-66 III-66, Rev. 1 Replace old page. Deleted Section 5.6.

III-67 III-67, Rev. 1 Replace old page. Deleted Section 5.6.

Appendix A, Add new page. Added Section 7.7 to sW Page 11, Rev. 1 Technical Specifications to provide facility en-ity requia,w.um4t.

Appendix D, Appendix D, Replace old page. Deleted mysical Security Plan.

Title Page Title Page I Rev. 1 Appendix D, -

Remove and discard all these pages.

Pages i thru 15 I

l ATIACHNr 2 70 IETIER IRTED 7/30/87 Replacement Pages for Ndon into Applicatico for License Amendment to License R-119 (Docket 50-87) to Charge to a Pessessian Only License.

O

~

O

d

~ ~

(3)(11) Corporate Officials:

( See Westinghouse Electric Corporation Letter -

(

" Corporate Information for Licenses" Dated December 2,1979, A.J. Nardi to Mr. John G. l Davis and Mr. Harold R. Denton (e) This application is for amendment of Facifity License R-119, i

a class 104 License originally issued January 28, 1972 and renewed November 27, 1984 as amendment No. 8 until January 28, 2002. This amendment to a " Possession Only" Facility-License will require modification of the FSAR (Section III) and Technical Specifications (Appendices A to the FSAR). The Facility has reduced its SNM inventory to zero under its present license and wishes to maintain the O Facility as a " Possession Only" Facility until the NRC terminates the license. An application for a dismantling plan will' be submitted for NRC approval at an early date.

l l

Use of the Facility:  ;

1 The Facility will be utilized for the safe storage of the-reactor components and other licensed material until the -j dismantling offort has been completed and the license terminated.

I

, Duration of the License:

  • I-3 >

0181N Rev. 1, 7/30/87

]

f 5.1.2.3 Reactor Lead Engineer 5.2 Technical Support 5.3 Reactor Safeguards Consnittee 5.3.1 RSC Organization and General Practices )

t 5.3.2 RSC Responsibilities and Duties 5.4 Facility Operations - Revisej 5.4.1 General l

5.4.2 Operating Procedures 5.5 Radiation Safety Practices 5.6 Facility Security - Deleted j 5.7 Emergency Plans

6. Initial Reactor Testing and Reactor Operations - Deleted l

l

7. Safety Analysis t

7.1 General - Revised 7.2 Environmental Conditions and Analysis - Revised 7.2.1 Flood 7.2.2 Earthquake 7.2.3 Windstorm j 7.2.4 Fire 7.2.5 Riot and Strike 7.2.6 Sabotage 7.3 Operational Conditions and Analysis - Deleted III-4 0181N Rev. 1, 7/30/87

LIST OF FIGURES

)

3.2.1 General Site Topography -l 3.2.2 Site Aerial Photograph 3.2.3 Zion Site 3.9.1 Regional Earthquate Events 4.1.1 Reactor Assembly 4.1.5 Graphite Reflector Rod 4.2.1 Facility Layout j 4.2.2 Electrical Distribution 5.1.1 Corporate Organization 5.1.2 facility Organization i

1 III-7

. 0181N Rev.1, 7/30/87

~ '

The minimum portable instruments which must be present in the k -

facility are: -

Detector Ranae 1

6-y Detector 0-20 mR/hr 8-y Detector 0-5 R/hr Y Detector 1- > 100 R/hr i e Detector 0- > 100,000 CPM A small radiation safety laboratory exists in the facility in which f l

routine analysis of air, water, and smear surveys are conducted.

[l Laboratory radiation detector systems are available for measuring j l

a, B, and y radiation.

1 Each member of the operating staff is issued a g-7 sensitive l' thermoluminescent dosimeter (TLD) and a direct readout ion l chamber dosimeter which must be worn whenever they are in the i

facility. The TLD's will be sent to a commercial processing agent for reading on a quarterly interval. Visitors in the facility are either issued TLD's or pocket dosimeters, or they are provided with an escort having personnel monitoring devices.

Proper storage containers are kept o0 hand to store suspect radioactive waste materials until they are shipped of f for disposal.

III-48 i

/

t )

\m/

0181N =

Rev. I, 7/30/87

4.2 FACILITY AND SUPPORT SYSTEMS 4.2.1 NTR Facility The NTR Facility is located in the south wing of the Nuclear Training Center building. The main construction of this building consists of poured concrete, concrete block and steel supports.

Figure 4.2.1 de' scribes the Facility layout.

The Facility building consists of the reactor room, console room, equipment room and other support areas. The Facility building enclosure is approximately 70 feet x 45 feet.

The facility which is approximately 90 feet x 100 feet, is enclosed either by a 10 foot cyclone fence with barbed wire on the top or by building walls. The minimum distance from the facility boundary to the reactor center?ine is 44 feet. Entrance to the facility can be norna11y gained through the main entrance door in the south corridor of the Training Center or through eitht4 of two norna11y locked, 20 foot, fence gates.

i

)

III-49 0181N Rev. 1, 7/30/87 J

l .

The 27 foot square, 27 foot high reactor room is constructed of; 8 inch concrete tiock walls and has.a 5 inch thick concrete floor. -

k The reactor dump tank and concrete pit are centered in the room.

Two access doors lead into the reactor room. The 3 x 9-5/6 foot exterior door, which is set in 10 x 7-1/6 foot opening can only be

~

unlocked from the inside and may be used as an emergency exit. The panels supporting this door and closing the remainder of the 10 x 7-1/6 foot opening can be removed from the inside to serve as a large equipment entrance. The interior door, which has a 3 x 9-5/6 foot opening, provides the main access into and out of the reactor room.

l Access to the Facility and Reactor Room will be controlled I as required for radiation )

protection in accordance with 10 CFR 20.

4.2.2 Utilities 4.2.2.1 Water and Sewer Service The water and sanitary sewer service is supplied by the Lake County Public Water District through the City of Zion system.

4.2.2.2 Electrical Service Electric service is provided.by Commonwealth Edison. A substation -

with a 1000 kVA transformer is located on the Nuclear Training 111-50 0181N Rev. 1 7/30/87

l I

, I p'

l {

j u z nm 5

l' K OFF SC E 8100W

< s

\

LAS ELECTm0Nic W4CWIN[ gMQP sa0 6 N ( s a .

>N I

l i ACActon I CONim0L gmEFlesG ROOM OFFICE M

m00w- A00w I

n i

_____< , W uit .

a--- rrwet , , , ute lp ,

=Au. > ,  ;

. 1

' 8 E GENERAL EDITERANCE wat l

= = a -

_ = _ __________..)

FIGURE 4.2.1: FACILITY LAYOUT r

I  !!!-55 i W

~

0181N Rev. 1, 7/30/87

1

. The radiation safety and protection procedures which are followed l tm -

include the following items:

(

1 (1) Personnel monitoring, dose limitations and exposure records. j 1

(2) Environmental monitoring and records thereof. l (3) Periodic and routine radiation and contamination surveys and records thereof.

(4) Radioactive materici handling, inventory, storage, receipt 1

and shipment and records thereof. i (5) Radioactive waste storage and disposal and records thereof. I' i

5.6 FACILITY SECURITY l

NA - A physical security plan is no longer required since all SNM has D been removed from the site. Areas within the facility in which licensed material'is present will be secured to meet the require-ments of 10CFR20.

l 1

(

b III-66 Rev. 1, 7/30/87

~

l l

, 1

~

5.7 EMERGENCY PLANS Written emergency procedures are prepared to guide facility personnel in the event of unusual occurrences which endanger their -

lives. These procedures are included in the Facility Operating Manual and a shortened version is posted. The plans include all creditable emergencies and the proper use of the local emergency i support groups,. including:

1

1. Medical Aid and Hospitals
2. State and Local Police
3. Fire Department 1

)

C I III-67 0181N ]

Rev.1, 7/30/87 '

a1

l 7.7 > Facility Access Contro1 f Access to the NTR facility shall be controlled by the Facility Manager and his/her designees. The facility shall be maintained locked except during normal working f 1

hours.

1 l

q I

l l

l O

v I

i l

l l

11 Rev. 1, 7/30/87

\

l l

FSAR APPENDIX D FACILITY LICENSE NO. R-119 PHYSICAL SECURITY PLAN FOR THE I WESTINGHOUSE NUCLEAR TRAINING REACTOR-DOCKET NO. 50-87 O 1 1

1 DELETED BECAUSE ALL SNM HAS BEEN REMOVED'FROM FACILITY.

i

.