Submits Addl Info to Support Application for Amend to License R-119 Re Facility Dismantling Plan.Encl Revised Pages to Dismantling Plan Delete Refs to Physical Security Plan
ML20237K805
Person / Time
Site: 05000087
Issue date: 08/31/1987
From: Nardi A
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Office of Nuclear Reactor Regulation
References
LA-87-61, NUDOCS 8709080030
Download: ML20237K805 (5)


Text

>

f

' ' / \.i i _

1

( u- /  ;

l I i

Westinghouse Electric Corporation Power Systems [jlygg.,g. , m ,.

, 73 37,g l

l August 31, 1987-U. S. Dr.lcar It.1,ulatory c.innission Office of Mr:lenr Reactnr Esgulation Division of Licensing '

Washin,$:rt, D. C. 20S55 Gentlemen:

Subject:

Submittal of Additiomi Infontation to Application for a l License Amendment to License R-119 (Docket 50-87) to Approve Facility Disrentlirq Plan

Reference:

Westinghouse Ict ter NLmloer IA 87-44, dated July 8, M87 frun A. J.. Nar:li to USNRC l The Westinghouse Electric Corporation henb/ subnits this additional j information to support our application (referenced above) for an amndment  !

to License R-119 to approvtt the facility dismantlirq plan. In accordance with d3scussions held with Ytr T. S. Michaels, these revised pages are intended to delete references to the Physical Security Plan since all S!M has been removed from the facility. Attached to this lutter are revised pages to the dm=nt tmnsmitted with the above referenced lettret. The revised pages are all marked as Revision 1 ard a bar has been placrd in the margin to identify where the changes have been made.

If you have any questims concerning this submittal, please contact me by telephone on (412) 374-4652 or by letter at the above address. )

Very truly youm , ,

ci r4 A. p. N i, . ger License Administration Enc.

Copies Transmitted: 3 mtarized & 19 conformed CittDNhTALTH OF PDMSYLVANIA) ss CDUtDy OF ALUDENY)

Sworn ard shibed before me this

/ /1,dayof / #/7)H M W / 1987 t'~7 7 t /}flL.- fn/ID% , . , ..

O 1g Notary Public s 'AS

,< u. ll0 87090B0030 870831 , .

PDR ADDCK 05000007 k' I P PDR

g . , . .

REVISION I TO DISMANTLING PLAN 8/31/87 Page Change

.16 Delete References to Security Officer and Security Plan for NTR Coordinator.

29 Delete reference to Physical Security Plan.

Substitute wording specifying no need for such a plan.

Title Page Title page to " Appendices". Delete Physical Security Plan, and rename Appendix B

" Environmental Report".

Remove " Physical Security Plan" (Original Appendix B) from the Dismantling P?an.

f l

REVISION I - 8/31/87 i

1.5 Dismantling Organization and Responsibilities The organization for the dismantling of the WNTR will be essentially the same as the organization responsible for the the R-119 license and the safe operation of the Facility in compliance with federal and license requirements. Personnel experienced in reactor operation and radioactive material handling will be responsible for all dismantling activities. Figure 13 indicates the organizational ,

i structure. The following paragraphs describe each position's responsibility.

Per the NTR Technical Specifications, the Manager of the Nuclear I

Training Reactor is responsible for the safe conduct of operations at the Facility. The NTR Manager will serve as the Dismantling /

Manager and be responsible for the overall planning and direction of the dismantling operation. The NTR Manager is responsible for planning the day-to-day dismantling operations and is responsible for these operations being conducted in a safe manner and within the prescribed limits of the Facility license, federal and state regulations, and Westinghouse regulations. The NTR Manager reports directly to the Manager, Trair.ing and Operational Services West, Westinghouse Nuclear Services Integration Division.

The Training Reactor Coordinator is responsible for the implementation and administration of the dismantling plan and procedures. He is responsible for overseeing daily dismantling activities, maintaining dismantling activity records, and dismantling staff training.

The Reactor Lead Engineer is respo.nsible for the operation and maintenance of the NTR Facility equipment, including the reactor components and reactor support systems. He is very familiar with the construction of all reactor hardware and components. The Lead Engineer will contribute significantly to the planning of the REVISION I - 8/31/87 16 0151N

i l

i i

.. i 1

1 2

3.4 Safe Storace i

i There will be no requirement for Safe Storage since all radioactivity has been or will be removed from the Facility 4.0 SAFEGUARDS AND PHYSICAL SECURITY l i

Since all Special Nuclear Material has been removed f rom the NTR j Facility, a Physical Security Plan is no longer required. Areas within the Facility in which licensed material is present will be secured to meet the requirements of 10CFR20. 1 1

5.0 RADIOLOGICAL ACCIDENT ANALYSES No radiological accident analysis is required since all reactor fuel has been removed from the NTR Facility.

6.0 RADI0 ACTIVE MATERIALS AND WASTE MANAGEMENT 6.1 Fuel Disoosal All reactor fuel has been shipped off site to DOE Facilities under the present NTR operating license.

6.2 Radioactive Waste Processing No gaseous or liquid radioactive wastes are present in the NTR Facility or expected to be generated during the dismantling process.

Most of the solid radioactive byproduct materials composed of irradiated stainless steel and graphite will have been shipped to a burial waste site for disposal. Any reactor components which do not l

meet the free release criteria established in this plan will be REVISION I - 8/31/87 29 0151N

~

'~'

L- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

4 APPENDICES A NTR Technical Specifications for " Possession Only" B Environmental Report i

REVISION I - 8/31/87 1

r w -

I 1

I 0151N l -

\

t - _ _ _ _ _ _ _ _ i