IR 05000087/1987001

From kanterella
Jump to navigation Jump to search
Forwards Physical Security & Matl Control & Accountability Insp Rept 50-087/87-01 on 870318-19.No Violations Noted. NRC Should Be Informed If Understanding Re Resolution of Previous Findings Incorrect.Rept Withheld (Ref 10CFR2.790)
ML20205R836
Person / Time
Site: 05000087
Issue date: 04/01/1987
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Scholand G
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8704060459
Download: ML20205R836 (2)


Text

v

.

N APR 011988 Docket No. 50-87 Westinghouse Electric Corporation ATTN:

Mr. G. W. Scholand, Manager Westinghouse Nuclear Training Center 505 Shiloh Boulevard Zion, IL 60099 Gentlemen:

This refers to the routine physical security and Material Control and Accountability inspection conducted by Mr. G. L. Pirtle of this office on March 18-19, 1987, of activities at the Westinghouse Nuclear Training Reactor authorized by NRC License No. R-119 and to the discussion of our findings with Mr. K. Hamrick and other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.

No violations of NRC requirements were identified during the course of this inspection.

Sections 2.f, 2.g, 5 and 6 of the Report Details identify commitments to resolve previous inspection findings or concerns noted during this inspection.

Please advise in writing, within 30 days, if our understanding of your commitments is incorrect.

Areas examined during the inspection concern a subject matter which is exempt from disclosure according to Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Consequently, our report of this inspection will not be placed in the NRC Public Document Room.

ATTACHE::: conyggy;57\\

87040 hS INNSTm?

-

p PDR w9

.

FN 0 1 1987 Westinghouse Electric Corporation

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. L. Axelso, Chief Nuclear Materials Safety and Safeguards Branch Enclosure:

Inspection Report

No. 50-087/87001(DRSS)

(PART 2.790(d) INFORMATION)

cc w/ enclosure:

Ms. K. Rueter, Manager, WNTP,

A. T. Sabo, Director, Licensing

Safeguards & Safety

A. Joseph Nardi, Manager

NES License Administration

DCS/R$B (RIDS)

cc w/ enclosure, w/o PART 2.790(d)

INFORMATION:

Licensing Fee Management Branch

II

RIII

M

RII

h

{

tle/ib

. reed

.

Ax

on

,

{

ATTAC WENT CONTAINS N

10 CFR 2.790 zygogyggyng