ML100960367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:April 8, 2010  
{{#Wiki_filter:April 8, 2010 Mr. Randall K. Edington Executive Vice President, Nuclear Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
 
Mr. Randall K. Edington Executive Vice President, Nuclear Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034  


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255, AND ME0256)
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255, AND ME0256)


==Dear Mr. Edington:==
==Dear Mr. Edington:==


By letter dated December 11, 2008, as supplemented by letter dated April 14, 2009, Arizona Public Service Company (APS) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 to renew Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, respectively. The staff is reviewing the information contained in the license renewal application and has identified in the enclosure areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.  
By letter dated December 11, 2008, as supplemented by letter dated April 14, 2009, Arizona Public Service Company (APS) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 to renew Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, respectively. The staff is reviewing the information contained in the license renewal application and has identified in the enclosure areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
 
A mutually agreeable date for your response, as discussed with Angela Krainik of APS staff, was determined to be 21 calendar days from the date of this letter. If you have any questions, please contact me at 301-415-6223 or by e-mail at David.Drucker@nrc.gov.
A mutually agreeable date for your response, as discussed with Angela Krainik of APS staff, was determined to be 21 calendar days from the date of this letter. If you have any questions, please contact me at 301-415-6223 or by e-mail at David.Drucker@nrc.gov. Sincerely,       /RA/   David M. Drucker, Sr. Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530  
Sincerely,
                                              /RA/
David M. Drucker, Sr. Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530


==Enclosure:==
==Enclosure:==


As stated cc w/encl: See next page
As stated cc w/encl: See next page


ML100960367 OFFICE PM:RPOB:DLR LA:DLR BC:RPOB:DLR PM:RBOB:DLR  
ML100960367 OFFICE       PM:RPOB:DLR           LA:DLR                 BC:RPOB:DLR         PM:RBOB:DLR NAME        DDrucker                                    JRobinson            DDrucker DATE        4/  /10              4/  /10              4/  /10            4/  /10


NAME  DDrucker  JRobinson DDrucker DATE  4/      /10 4/      /10 4/      /10 4/      /10 Letter to R. Edington from D. Drucker dated April 08, 2010  
Letter to R. Edington from D. Drucker dated April 08, 2010


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255 AND ME0256)
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255 AND ME0256)
DISTRIBUTION
DISTRIBUTION:
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail ------------- LRegner DDrucker RHall BMizuno, OGC RTreadway, RIV GPick, RIV Palo Verde Nuclear Generating Station, Units 1, 2 and 3 cc:  Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ  85007 Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA  91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 40 Buckeye, AZ  85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX  76011-4125 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ  85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 S. 40th Street Phoenix, AZ  85040 Mr. Ron Barnes, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ  85072-2034 Mr. Dwight C. Mims, Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ  85072-2034
HARD COPY:
 
DLR RF E-MAIL:
Mr. John C. Taylor Director, Nuclear Generation  El Paso Electric Company 340 E. Palm Lane, Suite 310 Phoenix, AZ  85004
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail
 
-------------
Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM  87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy., Bldg. D21 San Clemente, CA  92672 Mr. Robert Henry Salt River Project 6504 E. Thomas Road Scottsdale, AZ  85251 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX  79901
LRegner DDrucker RHall BMizuno, OGC RTreadway, RIV GPick, RIV
 
Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA  90051-0100
 
Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 N. Congress Avenue Austin, TX  78701-3326


ENCLOSURE PALO VERDE NUCLEAR GENERATING STATION  LICENSE RENEWAL APPLICATION  REQUEST FOR ADDITIONAL INFORMATION
Palo Verde Nuclear Generating Station, Units 1, 2 and 3 cc:
Mr. Steve Olea                          Mr. John C. Taylor Arizona Corporation Commission          Director, Nuclear Generation 1200 W. Washington Street                El Paso Electric Company Phoenix, AZ 85007                        340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter Senior Counsel                          Mr. James Ray Southern California Edison Company      Public Service Company of New Mexico Law Department, Generation Resources    2401 Aztec NE, MS Z110 P.O. Box 800                            Albuquerque, NM 87107-4224 Rosemead, CA 91770 Mr. Geoffrey M. Cook Senior Resident Inspector                Southern California Edison Company U.S. Nuclear Regulatory Commission      5000 Pacific Coast Hwy., Bldg. D21 P.O. Box 40                              San Clemente, CA 92672 Buckeye, AZ 85326 Mr. Robert Henry Regional Administrator, Region IV        Salt River Project U.S. Nuclear Regulatory Commission      6504 E. Thomas Road 612 E. Lamar Blvd., Suite 400            Scottsdale, AZ 85251 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman                                Assistant General Counsel Maricopa County Board of Supervisors    El Paso Electric Company 301 W. Jefferson, 10th Floor            Mail Location 167 Phoenix, AZ 85003                        123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency      Mr. Eric Tharp 4814 S. 40th Street                      Los Angeles Department of Water & Power Phoenix, AZ 85040                        Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Ron Barnes, Director                Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station    Mr. Brian Almon Mail Station 7636                        Public Utility Commission P.O. Box 52034                          William B. Travis Building Phoenix, AZ 85072-2034                  P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President      Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034


In order to complete its evaluation and address the risk associated with security/terrorist events, additional information is needed regarding plant-specific evaluations and mitigative measures. The staff requests the following information be provided. Please note that no classified information, or safeguards information, or Sensitive Unclassified Non-Safeguards Information (SUNSI) is requested or to be provided:
PALO VERDE NUCLEAR GENERATING STATION LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION In order to complete its evaluation and address the risk associated with security/terrorist events, additional information is needed regarding plant-specific evaluations and mitigative measures.
: a.         A listing of the significant security-related assessments performed subsequent to the events of 09/11/2001. Significant assessments performed by/for Arizona Public Service Company (e.g., self-assessments, contractor assessments), industry (e.g., Electric Power Research Institute (EPRI), Nuclear Energy Institute (NEI)), and government (e.g., U.S. Nuclear Regulatory Commission and Department of Homeland Security) should be included in the listing.
The staff requests the following information be provided. Please note that no classified information, or safeguards information, or Sensitive Unclassified Non-Safeguards Information (SUNSI) is requested or to be provided:
: b.         A summary of the key results and findings from the assessments identified in item (a) above, including the results of any offsite consequence assessment for security-related events.
: a.     A listing of the significant security-related assessments performed subsequent to the events of 09/11/2001. Significant assessments performed by/for Arizona Public Service Company (e.g., self-assessments, contractor assessments),
: c.         A summary or listing of the enhancements to plant hardware, personnel, or procedures as a result of the assessments.}}
industry (e.g., Electric Power Research Institute (EPRI), Nuclear Energy Institute (NEI)), and government (e.g., U.S. Nuclear Regulatory Commission and Department of Homeland Security) should be included in the listing.
: b.     A summary of the key results and findings from the assessments identified in item (a) above, including the results of any offsite consequence assessment for security-related events.
: c.     A summary or listing of the enhancements to plant hardware, personnel, or procedures as a result of the assessments.
ENCLOSURE}}

Latest revision as of 21:06, 13 November 2019

Request for Additional Information for the Review of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application (TAC Nos. ME0254, ME0255, and ME0256)
ML100960367
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/08/2010
From: David Drucker
NRC/NRR/DLR/RPOB
To: Edington R
Arizona Public Service Co
Drucker D, NRR/PMDA/HCB, 415-6223
References
TAC ME0240, TAC ME0255, TAC ME0256
Download: ML100960367 (5)


Text

April 8, 2010 Mr. Randall K. Edington Executive Vice President, Nuclear Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255, AND ME0256)

Dear Mr. Edington:

By letter dated December 11, 2008, as supplemented by letter dated April 14, 2009, Arizona Public Service Company (APS) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 to renew Operating License Nos. NPF-41, NPF-51, and NPF-74 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, respectively. The staff is reviewing the information contained in the license renewal application and has identified in the enclosure areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.

A mutually agreeable date for your response, as discussed with Angela Krainik of APS staff, was determined to be 21 calendar days from the date of this letter. If you have any questions, please contact me at 301-415-6223 or by e-mail at David.Drucker@nrc.gov.

Sincerely,

/RA/

David M. Drucker, Sr. Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosure:

As stated cc w/encl: See next page

ML100960367 OFFICE PM:RPOB:DLR LA:DLR BC:RPOB:DLR PM:RBOB:DLR NAME DDrucker JRobinson DDrucker DATE 4/ /10 4/ /10 4/ /10 4/ /10

Letter to R. Edington from D. Drucker dated April 08, 2010

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION (TAC NOS. ME0254, ME0255 AND ME0256)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail


LRegner DDrucker RHall BMizuno, OGC RTreadway, RIV GPick, RIV

Palo Verde Nuclear Generating Station, Units 1, 2 and 3 cc:

Mr. Steve Olea Mr. John C. Taylor Arizona Corporation Commission Director, Nuclear Generation 1200 W. Washington Street El Paso Electric Company Phoenix, AZ 85007 340 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. Douglas Kent Porter Senior Counsel Mr. James Ray Southern California Edison Company Public Service Company of New Mexico Law Department, Generation Resources 2401 Aztec NE, MS Z110 P.O. Box 800 Albuquerque, NM 87107-4224 Rosemead, CA 91770 Mr. Geoffrey M. Cook Senior Resident Inspector Southern California Edison Company U.S. Nuclear Regulatory Commission 5000 Pacific Coast Hwy., Bldg. D21 P.O. Box 40 San Clemente, CA 92672 Buckeye, AZ 85326 Mr. Robert Henry Regional Administrator, Region IV Salt River Project U.S. Nuclear Regulatory Commission 6504 E. Thomas Road 612 E. Lamar Blvd., Suite 400 Scottsdale, AZ 85251 Arlington, TX 76011-4125 Mr. Jeffrey T. Weikert Chairman Assistant General Counsel Maricopa County Board of Supervisors El Paso Electric Company 301 W. Jefferson, 10th Floor Mail Location 167 Phoenix, AZ 85003 123 W. Mills El Paso, TX 79901 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency Mr. Eric Tharp 4814 S. 40th Street Los Angeles Department of Water & Power Phoenix, AZ 85040 Southern California Public Power Authority P.O. Box 51111, Room 1255-C Mr. Ron Barnes, Director Los Angeles, CA 90051-0100 Regulatory Affairs Palo Verde Nuclear Generating Station Mr. Brian Almon Mail Station 7636 Public Utility Commission P.O. Box 52034 William B. Travis Building Phoenix, AZ 85072-2034 P.O. Box 13326 1701 N. Congress Avenue Mr. Dwight C. Mims, Vice President Austin, TX 78701-3326 Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034

PALO VERDE NUCLEAR GENERATING STATION LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION In order to complete its evaluation and address the risk associated with security/terrorist events, additional information is needed regarding plant-specific evaluations and mitigative measures.

The staff requests the following information be provided. Please note that no classified information, or safeguards information, or Sensitive Unclassified Non-Safeguards Information (SUNSI) is requested or to be provided:

a. A listing of the significant security-related assessments performed subsequent to the events of 09/11/2001. Significant assessments performed by/for Arizona Public Service Company (e.g., self-assessments, contractor assessments),

industry (e.g., Electric Power Research Institute (EPRI), Nuclear Energy Institute (NEI)), and government (e.g., U.S. Nuclear Regulatory Commission and Department of Homeland Security) should be included in the listing.

b. A summary of the key results and findings from the assessments identified in item (a) above, including the results of any offsite consequence assessment for security-related events.
c. A summary or listing of the enhancements to plant hardware, personnel, or procedures as a result of the assessments.

ENCLOSURE