ML111810280: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML111810280
| number = ML111810280
| issue date = 06/29/2011
| issue date = 06/29/2011
| title = 06/20/2011-Summary of Public Meeting with Tennessee Valley Authority on Watts Bar Nuclear Plant Unit 2 Construction Project
| title = Summary of Public Meeting with Tennessee Valley Authority on Watts Bar Nuclear Plant Unit 2 Construction Project
| author name = Haag R
| author name = Haag R
| author affiliation = NRC/RGN-II/DCP/CPB2
| author affiliation = NRC/RGN-II/DCP/CPB2
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:June 29, 2011  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 29, 2011 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
 
Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  


==SUBJECT:==
==SUBJECT:==
Line 24: Line 22:


==SUMMARY==
==SUMMARY==
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT


==Dear Mr. Bhatnagar:==
==Dear Mr. Bhatnagar:==


This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on June 20, 2011 , at 12:00 p.m.
This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on June 20, 2011, at 12:00 p.m. The meeting's purpose was to give Tennessee Valley Authority (TVA) the opportunity to present their updated schedule of the Watts Bar Unit 2 construction project to the NRC.
The meeting's purpose was to give Tennessee Valley Authority (TVA) the opportunity to present their updated schedule of the Watts Bar Unit 2 construction project to the NRC.  
On June 20, 2011, the NRCs Director of Construction Projects, held a Category 1 meeting in which TVA provided a presentation about the current progress and scheduling plans for the Watts Bar Nuclear (WBN) Unit 2 construction project. The NRC staff presented information on the current status of the NRCs construction inspection program for WBN Unit 2. Additional topics related to the WBN Unit 2 construction project were discussed between the NRC and TVA. Following these presentations and discussions, members of the public had an opportunity to provide comments and ask questions. The list of attendees (Enclosure 1), the TVA presentation material used for discussions (Enclosure 2), and the NRC presentation material used for discussions (Enclosure 3) are attached to this letter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).


On June 20, 2011, the NRC's Director of Construction Projects, held a Category 1 meeting in which TVA provided a presentation about the current progress and scheduling plans for the Watts Bar Nuclear (WBN) Unit 2 construction project. The NRC staff presented information on the current status of the NRC's construction inspection program for WBN Unit 2. Additional topics related to the WBN Unit 2 construction project were discussed between the NRC and TVA. Following these presentations and discussions, members of the public had an opportunity to provide comments and ask questions. The list of attendees (Enclosure 1), the TVA presentation material used for discussions (Enclosure 2), and the NRC presentation material used for discussions (Enclosure 3) are attached to this letter.  
TVA                                             2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506.
Sincerely,
                                                /RA/
Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
==Enclosures:==
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
: 1. List of Attendees
: 2. Presentation - TVA Slides
: 3. Presentation - NRC Slides


TVA 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506
TVA                                                         2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506.
. Sincerely,         /RA/ Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects
Sincerely,
                                                                    /RA/
Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Presentation - TVA Slides 3. Presentation - NRC Slides  
: 2. Presentation - TVA Slides
: 3. Presentation - NRC Slides 9 PUBLICLY AVAILABLE                G NON-PUBLICLY AVAILABLE      G SENSITIVE    9 NON-SENSITIVE ADAMS: G Yes    ACCESSION NUMBER: -ML111810280 G SUNSI REVIEW COMPLETE OFFICE            RII:DCP          RII:DCP          RII:DCP SIGNATURE RCH              JBB              CJE NAME              RHaag            JBaptist        CEven DATE                  6/28/2011        6/28/2011        6/28/2011 E-MAIL COPY?        YES        NO YES          NO YES          NO OFFICIAL  RECORD        COPY        DOCUMENT      NAME:      G:\CCI\DCP\CPB3\WATTS  BAR  2\PUBLIC MEETINGS\MEETING


-ML111810280 G  SUNSI REVIEW COMPLETE TVA 3  cc w/encl:
==SUMMARY==
Mr. Gordon P. Arent Manager New Generation Licensing Nuclear Generation Development  and Construction WBN Nuclear Plant P.O. Box 2000 Spring City, Tennessee 37381
6-20-2011.DOCX
 
Mr. David Stinson Vice President WBN Unit Two WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. C.J. Riedl, Manager Licensing and Industry Affairs WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. Preston D. Swafford Chief Nuclear Officer  and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Place Chattanooga, Tennessee 37402-2801 County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321 Mr. W. D. Crouch, Manager WBN Unit 2 Licensing  Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. Gregory A. Boerschig Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. J. Neissen General Manager Quality Assurance Nuclear Generation and Development and Construction 1101 Market Street Blue Ridge 3A Chattanooga, Tennessee 37402-2801


Mr. R. M. Krich Vice President Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, Tennessee 37402 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Health & Conservation Division of Radiological Health 3rd Floor, L&C Annex 401 Church Street Nashville, TN 37243-1532 Mr. D. E. Grissette Site Vice President WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 County Mayor P.O. Box 156 Decatur, Tennessee 37322 TVA 4  cc email distribution w/encl:
TVA                              3 cc w/encl:
Greg Scott Tennessee Valley Authority Electronic Mail Distribution
Mr. Gordon P. Arent                Mr. T. J. Neissen Manager                            General Manager New Generation Licensing            Quality Assurance Nuclear Generation Development      Nuclear Generation and Development and and Construction                  Construction WBN Nuclear Plant                  1101 Market Street P.O. Box 2000                      Blue Ridge 3A Spring City, Tennessee 37381        Chattanooga, Tennessee 37402-2801 Mr. David Stinson                  Mr. R. M. Krich Vice President                     Vice President WBN Unit Two                        Nuclear Licensing WBN Nuclear Plant                  Tennessee Valley Authority Tennessee Valley Authority          3R Lookout Place P.O. Box 2000                      1101 Market Street Spring City, Tennessee 37381        Chattanooga, Tennessee 37402-2801 Mr. C.J. Riedl, Manager            Mr. E. J. Vigluicci Licensing and Industry Affairs      Assistant General Counsel WBN Nuclear Plant                  Tennessee Valley Authority Tennessee Valley Authority         6A West Tower P.O. Box 2000                      400 West Summit Hill Drive Spring City, Tennessee 37381        Knoxville, Tennessee 37402 Mr. Preston D. Swafford            Mr. Lawrence E. Nanney, Director Chief Nuclear Officer              Tennessee Department of Environmental and Executive Vice President        Health & Conservation Tennessee Valley Authority          Division of Radiological Health 3R Lookout Place                    3rd Floor, L&C Annex 1101 Market Place                  401 Church Street Chattanooga, Tennessee 37402-2801  Nashville, TN 37243-1532 County Executive                    Mr. D. E. Grissette 375 Church Street                  Site Vice President Suite 215                          WBN Nuclear Plant Dayton, Tennessee 37321            Tennessee Valley Authority P.O. Box 2000 Mr. W. D. Crouch, Manager          Spring City, Tennessee 37381 WBN Unit 2 Licensing Watts Bar Nuclear Plant            County Mayor Tennessee Valley Authority          P.O. Box 156 P.O. Box 2000                      Decatur, Tennessee 37322 Spring City, Tennessee 37381 Mr. Gregory A. Boerschig Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381


Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution  
TVA                          4 cc email distribution w/encl:
Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution


Letter to Ashok S. Bhatnagar from Robert C. Haag dated June 29, 2011.  
Letter to Ashok S. Bhatnagar from Robert C. Haag dated June 29, 2011.


==SUBJECT:==
==SUBJECT:==
Line 59: Line 65:


==SUMMARY==
==SUMMARY==
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT Distribution w/encl
FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT Distribution w/encl:
: L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS E. Guthrie, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable)
L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS E. Guthrie, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable)
PUBLIC}}
PUBLIC}}

Latest revision as of 03:13, 6 December 2019

Summary of Public Meeting with Tennessee Valley Authority on Watts Bar Nuclear Plant Unit 2 Construction Project
ML111810280
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/29/2011
From: Haag R
NRC/RGN-II/DCP/CPB2
To: Bhatnagar A
Tennessee Valley Authority
Shared Package
ML111810265 List:
References
Download: ML111810280 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 29, 2011 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT

Dear Mr. Bhatnagar:

This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on June 20, 2011, at 12:00 p.m. The meeting's purpose was to give Tennessee Valley Authority (TVA) the opportunity to present their updated schedule of the Watts Bar Unit 2 construction project to the NRC.

On June 20, 2011, the NRCs Director of Construction Projects, held a Category 1 meeting in which TVA provided a presentation about the current progress and scheduling plans for the Watts Bar Nuclear (WBN) Unit 2 construction project. The NRC staff presented information on the current status of the NRCs construction inspection program for WBN Unit 2. Additional topics related to the WBN Unit 2 construction project were discussed between the NRC and TVA. Following these presentations and discussions, members of the public had an opportunity to provide comments and ask questions. The list of attendees (Enclosure 1), the TVA presentation material used for discussions (Enclosure 2), and the NRC presentation material used for discussions (Enclosure 3) are attached to this letter.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

TVA 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506.

Sincerely,

/RA/

Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects

Enclosures:

1. List of Attendees
2. Presentation - TVA Slides
3. Presentation - NRC Slides

TVA 2 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506.

Sincerely,

/RA/

Robert C. Haag, Chief Construction Projects Branch 2 Division of Construction Projects

Enclosures:

1. List of Attendees
2. Presentation - TVA Slides
3. Presentation - NRC Slides 9 PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE 9 NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER: -ML111810280 G SUNSI REVIEW COMPLETE OFFICE RII:DCP RII:DCP RII:DCP SIGNATURE RCH JBB CJE NAME RHaag JBaptist CEven DATE 6/28/2011 6/28/2011 6/28/2011 E-MAIL COPY? YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\CCI\DCP\CPB3\WATTS BAR 2\PUBLIC MEETINGS\MEETING

SUMMARY

6-20-2011.DOCX

TVA 3 cc w/encl:

Mr. Gordon P. Arent Mr. T. J. Neissen Manager General Manager New Generation Licensing Quality Assurance Nuclear Generation Development Nuclear Generation and Development and and Construction Construction WBN Nuclear Plant 1101 Market Street P.O. Box 2000 Blue Ridge 3A Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 Mr. David Stinson Mr. R. M. Krich Vice President Vice President WBN Unit Two Nuclear Licensing WBN Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 3R Lookout Place P.O. Box 2000 1101 Market Street Spring City, Tennessee 37381 Chattanooga, Tennessee 37402-2801 Mr. C.J. Riedl, Manager Mr. E. J. Vigluicci Licensing and Industry Affairs Assistant General Counsel WBN Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A West Tower P.O. Box 2000 400 West Summit Hill Drive Spring City, Tennessee 37381 Knoxville, Tennessee 37402 Mr. Preston D. Swafford Mr. Lawrence E. Nanney, Director Chief Nuclear Officer Tennessee Department of Environmental and Executive Vice President Health & Conservation Tennessee Valley Authority Division of Radiological Health 3R Lookout Place 3rd Floor, L&C Annex 1101 Market Place 401 Church Street Chattanooga, Tennessee 37402-2801 Nashville, TN 37243-1532 County Executive Mr. D. E. Grissette 375 Church Street Site Vice President Suite 215 WBN Nuclear Plant Dayton, Tennessee 37321 Tennessee Valley Authority P.O. Box 2000 Mr. W. D. Crouch, Manager Spring City, Tennessee 37381 WBN Unit 2 Licensing Watts Bar Nuclear Plant County Mayor Tennessee Valley Authority P.O. Box 156 P.O. Box 2000 Decatur, Tennessee 37322 Spring City, Tennessee 37381 Mr. Gregory A. Boerschig Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

TVA 4 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution

Letter to Ashok S. Bhatnagar from Robert C. Haag dated June 29, 2011.

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY ON WATTS BAR NUCLEAR PLANT UNIT 2 CONSTRUCTION PROJECT Distribution w/encl:

L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS E. Guthrie, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable)

PUBLIC