{{#Wiki_filter:A-N-1-R   Exelon Nuclear Job Performance Measure
{{#Wiki_filter:Exelon Nuclear Job Performance Measure PERFORM CALCULATED DRYWELL LEAKRATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By:
Instructor                Date Approved By:
Facility Representative    Date A-N-1-R


PERFORM CALCULATED DRYWELL LEAKRATE JPM Number: A
-N-1-R  Revision Number: 0 0  Date: 0 9/10        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-1-R  Page 2 of 7 Revision Record (Summary)  Revision 00 Modified for 2010 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
A-N-1-R                                                   Page 2 of 7
 
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION Markup a copy of Appendix 'A'.
DOCUMENT PREPARATION Markup a copy of Appendix A.
A-N-1-R                                                  Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 4 of 7 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 3 NSO. 2. Unit 3 is operating at rated conditions.
: 1. You are the Unit 3 NSO.
: 3. The previous shift NSO s ha ve completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re
: 2. Unit 3 is operating at rated conditions.
-performed.           INITIATING CUE S 1. Perform the required calculations and ensure the acceptance criteria have been met.
: 3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed.
INITIATING CUES
: 1. Perform the required calculations and ensure the acceptance criteria have been met.
: 2. When complete, give the completed paperwork to the Unit Supervisor for approval.
: 2. When complete, give the completed paperwork to the Unit Supervisor for approval.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use: UNSAT requires written comments on respective step.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 5 of 7 JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT      Comment #
_________ STANDARDS SAT UNSAT Comment # Provide the examinee the copy of Appendix X, with the times and gallons pumped completed. NOTE:
PERFORMANCE CHECKLIST                     STANDARDS                 SAT NOTE:
* 1. Complete Appendix A, page(s) Completes Appendix A, page(s), with the results matching those on the provided KEY.
Provide the examinee the copy of Appendix X, with the times and gallons pumped completed.
_____         _____         _____
* 1. Complete Appendix A,      Completes Appendix A, page(s)                   page(s), with the results matching those on the provided KEY.                   _____     _____     _____
* 2. Informs the Unit Supervisor that Acceptance Criteria has been exceeded for Floor Drain Leakage on FRI 1600 HOURS (5.10 gpm).
* 2. Informs the Unit       Notifies Unit Supervisor.
Notifies Unit Supervisor.
Supervisor that Acceptance Criteria has been exceeded for                                     _____      _____      _____
_____        _____        _____
Floor Drain Leakage on FRI 1600 HOURS (5.10 gpm).
CUE:
Acknowledge report.
Acknowledge report.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
: _________
A-N-1-R                                                                Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 6 of 7 Operator's Name:
Operators Name:
Job Title:    RO
Job


JPM Title:
==Title:==
Perform Calculated Drywell Leak Rate JPM Number: A-N-1-R  Revision Number: 0 1 Task Number and Title: 29800LP013, Perform the duties of a Unit NSO including monitoring the unit,
RO JPM


answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover
==Title:==
.
Perform Calculated Drywell Leak Rate JPM Number: A-N-1-R                                              Revision Number: 01 Task Number and
K/A Number and Importance: Generic.2.1.
 
18     3.6 / 3.8 Suggested Testing Environment:Simulator Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Testing Method:
29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.
Simulate Alternate Path
K/A Number and Importance: Generic.2.1.18         3.6 / 3.8 Suggested Testing Environment:Simulator Actual Testing Environment:               Simulator     Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes             No Perform                 SRO Only:       Yes             No Time Critical:       Yes           No Estimated Time to Complete: 16 minutes               Actual Time Used:             minutes
: Yes No   Perform SRO Only: Yes No   Time Critical:
Yes No Estimated Time to Complete:
16 minutes Actual Time Used:
minutes


==References:==
==References:==
 
Appendix A, Rev 124 EVALUATION  
Appendix A, Rev 1 24  EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                     Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                     (Print)
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Evaluators Signature:                                                   Date:
Satisfactory Unsatisfactory Comments:                   Evaluator's Name:
A-N-1-R                                                                        Page 6 of 7
(Print)   Evaluator's Signature:
Date:  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R  Page 7 of 7 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 3 NSO.
: 1. You are the Unit 3 NSO.
: 2. Unit 3 is operating at rated conditions.
: 2. Unit 3 is operating at rated conditions.
: 3. The previous shift NSO s ha ve completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re
: 3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed.
-performed.
INITIATING CUES
INITIATING CUE S 1. Perform the required calculations and ensure the acceptance criteria have been met. 2. When complete, give the completed paperwork to the Unit Supervisor for approval.
: 1. Perform the required calculations and ensure the acceptance criteria have been met.
Exelon Nuclear Job Performance Measure
: 2. When complete, give the completed paperwork to the Unit Supervisor for approval.
A-N-1-R                                                              Page 7 of 7
 
Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative        Date


PERFORM OFF-SITE SOURCES AVAILAB LE  JPM Number:
Job Performance Measure (JPM)
A-N-2-R Revision Number: 0 5  Date: 09/10     
Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
A-N-2-R                                                 Page 2 of 8


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-2-R  Page 2 of 8  Revision Record (Summary) Revision 0 4 Bank JPM. Revision 0 5 Revised for 2010 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup. 2. Insert the following override:
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
IOR acd231ab OFF DOCUMENT PREPARATION
: 2. Insert the following override:
* IOR acd231ab OFF DOCUMENT PREPARATION
: 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.
: 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.
A-N-2-R                                                                Page 3 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 and Unit 3 are operating at near rated power
: 2. Unit 2 and Unit 3 are operating at near rated power.
. 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has just directed you to verify off
: 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X ONLY, as required by T.S 3.8.1 action condition B.1
: 2. The Unit 3 assist NSO has already collected the data for Unit 3.
. 2. The Unit 3 assist NSO has already collected the data for Unit 3
: 3. Inform the Unit Supervisor when the task is complete.
. 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.  
Some operations that are performed from outside of the control room may require multiple steps.
 
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R                                                                        Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X.
Provide the examinee with the provided copy of Appendix X.
NOTE: 1. Record & initial Bus 24
: 1. Record & initial Bus 24-1 &     Examinee records OPEN Bus 34-1 Tie ACB (902-8)       position.
-1 & Bus 34-1 Tie ACB (902
position.                                                     _____       _____        _____
-8) position. Examinee records OPEN position. _____         _____        _____
: 2. Record & initial Bus 24 & Bus   Examinee records 24-1 Tie GCB (902-8)           CLOSED position.
: 2. Record & initial Bus 24 & Bus 24-1 Tie GCB (902
position.                                                     _____       _____        _____
-8) position. Examinee records CLOSED position.
: 3. Record & initial TR 22 to Bus   Examinee records 24 GCB (902-8) position.        CLOSED position.
_____         _____        _____
: 4. Record & initial Bus 24 & Bus  Examinee records 24-1 Tie GCB (902-8)           CLOSED position.
: 3. Record & initial TR 22 to Bus 24 GCB (902
position.                                                     _____      _____        _____
-8) position.
: 5. Record & initial Bus 24-1 &    Examinee records OPEN Bus 34-1 Tie ACB (902-8)        position.
Examinee records CLOSED position.
position.                                                      _____      _____        _____
_____        _____        _____
* 6. Record & initial Bus 23-1 &    Examinee records actual Bus 24-1 Volts, by selecting    voltage (~4160 Volts).
: 4. Record & initial Bus 24 & Bus  
Bus 23-1.                                                      _____      _____        _____
NOTE:
The candidate may select the A/B phase in any of the three flowing steps.
When the A/B phase is selected, it will read 0 (malfunction in setup).
* 7. Record & initial Bus 23-1 &    Examinee discovers that Bus 24-1 Volts, by selecting    the A/B phase reads 0 Bus 24-1.                      and reports to the Unit Supervisor that a local        _____      _____        _____
reading will be required.
CUE:
The local voltage reading for Bus 23-1 & Bus 24-1 Volts, phase A/B, is 4155 volts.
A-N-2-R                                                                      Page 5 of 8


24-1 Tie GCB (902
Job Performance Measure (JPM)
-8) position. Examinee records CLOSED position.
UNSAT    Comment PERFORMANCE CHECKLIST                        STANDARDS                  SAT
_____        _____        _____
: 8. Directs EO or Field              Directs EO or Field Supervisor to take local        Supervisor to take local reading for Bus 23-1 & Bus       reading.                     _____   _____     _____
: 5. Record & initial Bus 24
24-1 Volts, phase A/B.
-1 & Bus 34-1 Tie ACB (902
* 9. Record & initial Bus 23 & Bus   Examinee records actual 24 Volts, by selecting Bus 23. voltage (~4160 Volts).
-8) positi on. Examinee records OPEN position. _____         _____         _____
* 10. Record & initial Bus 23 & Bus     Examinee records actual 24 Volts, by selecting Bus 24. voltage (~4160 Volts).
* 6. Record & initial Bus 23
* 11. Indicate acceptance criteria      Examinee circles YES for met.                            acceptance criteria.
-1 & Bus 24-1 Volts, by selecting Bus 23-1. Examinee records actual voltage (~4160 Volts).
: 12. Enter signature, date, and         Examinee enters time, for Performed By.       signature, current date, and current time, for        _____   _____     _____
_____        _____        _____
Performed By.
The candidate may select the A/B phase in any of the three flowing steps
: 13. Informs Unit Supervisor task      Examinee notifies the Unit is complete.                    Supervisor.
. NOTE: When the A/B phase is selected, it will read "0" (malfunction in setup).
* 7. Record & initial Bus 23
-1 & Bus 24-1 Volts, by selecting Bus 24-1. Examinee discovers that the A/B phase reads "0" and reports to the Unit Supervisor that a local reading will be required.
_____         _____         _____
The local voltage reading for Bus 23-1 & Bus 24
-1 Volts, phase A/B, is 4155 volts.
CUE:
CUE:
Job Performance Measure (JPM)
A-N-2-R  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  8. Directs EO or Field Supervisor to take local reading for Bus 23-1 & Bus 24-1 Volts, phase A/B.
Directs EO or Field Supervisor to take local reading. _____        _____        _____
* 9. Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 23.
Examinee records actual voltage (~4160 Volts).
_____        _____
_____
* 10. Record & initial Bus 23 & Bus 24 Volts, by selecting Bus 24.
Examinee records actual voltage (~4160 Volts).
_____        _____        _____
* 11. Indicate acceptance criteria met. Examinee circles "YES" for acceptance criteria.
_____        _____        _____
: 12. Enter signature, date, and time, for "Performed By".
Examinee enters signature, current date, and current time, for "Performed By".
_____        _____        _____
: 13. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
_____        _____        _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
A-N-2-R                                                                    Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    RO JPM Title: PERFORM OFF-SITE SOURCES AVAILAB LE Revision Number: 0 5 JPM Number:  A-N-2-R  Task Number and Title: 299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.
Job
K/A Number and Importance: Generic.2.1.31    4.6 / 4.3


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
RO JPM
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
PERFORM OFF-SITE SOURCES AVAILABLE Revision Number: 05 JPM Number: A-N-2-R Task Number and
Yes No Estimated Time to Complete:
 
20 minutes Actual Time Used:
==Title:==
minutes
299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.
K/A Number and Importance: Generic.2.1.31      4.6 / 4.3 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 20 minutes           Actual Time Used:           minutes


==References:==
==References:==
Appendix X, rev 30 EVALUATION


Appendix X, rev 30  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-2-R                                                                    Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 and Unit 3 are operating at near rated power
: 2. Unit 2 and Unit 3 are operating at near rated power.
. 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a faile d surveillance
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has just directed you to verify off
: 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1
: 2. The Unit 3 assist NSO has already collected the data for Unit 3.
. 2. The Unit 3 assist NSO has already collected the data for Unit 3
: 3. Inform the Unit Supervisor when the task is complete.
. 3. Inform the Unit Supervisor when the task is complete.
A-N-2-R                                                                Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number:
Job Performance Measure (JPM)
A-N-3-R Revision Number: 0 2 Date: 09/10   
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
A-N-3-R                                                 Page 2 of 7


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-3-R  Page 2 of 7  Revision Record (Summary)
Revision 0 1 Bank JPM. Revision 0 2 Revised for 2010 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 6600-02.
: 1. Provide a marked up copy of DOS 6600-02.
A-N-3-R                                                    Page 3 of 7
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you. 4. The NLO reported all surveillance requirements were within specifications
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
. INITIATING CUE
: 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
: 1. Perform calculation verification and ensure paperwork is correct
: 4. The NLO reported all surveillance requirements were within specifications.
. 2. Inform the Unit Supervisor when the task is complete.
INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. Some operations that are performed from outside of the control room may require multiple steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 6600-02. NOTE:
Provide the examinee with the provided copy of DOS 6600-02.
* 1. Candidate should identify step I.5 has a mathematical error. Identifies differential pressure should read 4. _____         _____         _____
* 1. Candidate should identify         Identifies differential step I.5 has a mathematical       pressure should read 4.
* 2. Candidate should identify step I.15 OR step I.16 is signed off as verified dP of <6 (actual is 7).
error.                                                          _____   _____     _____
Identifies incorrect verification of dP <6.
* 2. Candidate should identify         Identifies incorrect step I.15 OR step I.16 is         verification of dP <6.
_____        _____        _____
signed off as verified dP of <6                                 _____    _____      _____
* 3. Candidate should identify that steps I.21.a & b have been initialed by the same person performing the surveillance and were NOT independently verifi ed. Identifies step NOT independently verified.
(actual is 7).
_____        _____        _____
* 3. Candidate should identify that   Identifies step NOT steps I.21.a & b have been       independently verified.
: 4. Notify Unit Supervisor of discrepancies.
initialed by the same person                                   _____    _____      _____
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.
performing the surveillance and were NOT independently verified.
_____        _____        ___
: 4. Notify Unit Supervisor of         Notifies Unit Supervisor, discrepancies.                    may dispatch Operators to verify/correct issues, also   _____    _____      _____
__ Acknowledge report of task completion.
may initiate IR.
CUE:  END   JPM Stop Time
CUE:
:_________
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-R                                                                      Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:     RO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 0 2
Job
JPM Number: A-N-3-R Task Number and Title:
 
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12     3.
==Title:==
7 / 4.1 Suggested Testing Environment:
RO JPM
Simulator Actual Testing Environment:
 
Simulator Control Room In-Plant Testing Method:
==Title:==
Simulate Alternate Path
VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 02 JPM Number: A-N-3-R Task Number and
: Yes No   Perform SRO Only: Yes No Time Critical:
 
Yes No Estimated Time to Complete:
==Title:==
10 minutes Actual Time Used:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12       3.7 / 4.1 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:           Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes             Actual Time Used:           minutes
minutes


==References:==
==References:==
DOS 6600-02, rev 19 EVALUATION


DOS 6600-02 , rev 19  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-3-R                                                                      Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R  Page 7 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
. 4. The NLO reported all surveillance requirements were within specifications
: 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
. INITIATING CUE
: 4. The NLO reported all surveillance requirements were within specifications.
: 1. Perform calculation verification and ensure paperwork is corre ct. 2. Inform the Unit Supervisor when the task is complete.
INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-3-R                                                              Page 7 of 7


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative        Date


PERFORM CCSW ACTIVITY CALCULATION JPM Number:
Job Performance Measure (JPM)
A-N-4-R Revision Number: 0 1  Date: 09/10     
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-4-R                                                 Page 2 of 7


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-R  Page 2 of 7  Revision Record (Summary) Revision 0 0 New JPM. Revision 0 1 Revised for 2010 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
Line 314: Line 316:
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.
A-N-4-R                                                            Page 3 of 7
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an on-shift Operator
: 1. You are an on-shift Operator.
. 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
INITIATING CUE
: 1. Complete DOS 1500
: 1. Complete DOS 1500-08.
-08. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
* Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08. NOTE: The following steps can be performed in any order.
Provide the examinee with the provided copy of DOS 1500-08.
* 1. Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). See attached key.
The following steps can be performed in any order.
_____         _____         _____
* 1. Examinee fills out running       See attached key.
* 2. Examinee calculates Dilution flow (1,017,000 gpm).
pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).                                                 _____   _____     _____
See attached key.
* 2. Examinee calculates Dilution     See attached key.
_____        _____        _____
flow (1,017,000 gpm).
: 3. Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
: 3. Examinee enters dilution flow     See attached key.
See attached key.
(from above) to calculate CCSW Activity Limit.                                           _____   _____     _____
_____         _____         _____
* 4. Examinee calculates CCSW         See attached key.
* 4. Examinee calculates CCSW Activity Limit (2.91 x 10
                                  -5 Activity Limit (2.91 x 10 ).
-5). See attached key.
: 5. Recommends to the Unit           Makes recommendation to Supervisor that the calculated   Unit Supervisor.
_____        _____        _____
sample limit exceeds the allowable discharge.                                           _____   _____     _____
: 5. Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge. Makes recommendation to Unit Supervisor.
: 6. Informs Unit Supervisor task     Examinee notifies the Unit is complete.                      Supervisor.
_____         _____         _____
CUE:
: 6. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
_____        _____        _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
A-N-4-R                                                                    Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:     RO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 0 1
Job
JPM Number: A-N-4-R Task Number and Title:
 
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance
==Title:==
. K/A Number and Importance: Generic.2.3.11    3.8 / 4.3
RO JPM
 
==Title:==
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-R Task Number and


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
Simulator Control Room In-Plant Testing Method:
K/A Number and Importance: Generic.2.3.11      3.8 / 4.3 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes


==References:==
==References:==
DOS 1500-08, rev 17 EVALUATION


DOS 1500-08 , rev 1 7 EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-4-R                                                                    Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R  Page 7 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an on
: 1. You are an on-shift Operator.
-shift Operator.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons. INITIATING CUE
INITIATING CUE
: 1. Complete DOS 1500
: 1. Complete DOS 1500-08.
-08. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
A-N-4-R                                                            Page 7 of 7


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


REPORTABILITY DETERMINATION  JPM Number:
Job Performance Measure (JPM)
A-N-1-S Revision Number: 0 0  Date: 09/10     
Revision Record (Summary)
Revision 00 New JPM developed for2010 NRC exam.
A-N-1-S                                               Page 2 of 7


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-1-S  Page 2 of 7  Revision Record (Summary)
Revision 0 0 New JPM developed for2010 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. None.
: 1. None.
A-N-1-S                                                    Page 3 of 7
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor
: 1. You are the Unit 3 Unit Supervisor.
. 2. The following timeline occurred: 1500 - a rented backhoe was released by Dresden station to the vendor's off
: 2. The following timeline occurred:
-site facility. 1600 - at the vendor's off
* 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination. 1700 - corporate issues a press release to notify the public of the released contaminated backhoe
* 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
. 3. The time is now 17 [[estimated NRC review hours::15 hours]]. INITIATING CUE
* 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
: 1. Utilizing the Reportability Manual, determine the reportability requirements
: 3. The time is now 1715 hours.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
INITIATING CUE
Information For Evaluator's Use:
: 1. Utilizing the Reportability Manual, determine the reportability requirements.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
. Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Candidate locates a copy of Reportability Manual LS
Candidate locates a copy of Reportability Manual LS-AA-1110.
-AA-1110. NOTE:
* 1. Determines the event is        Determines the event is reportable per SAF 1.9.         reportable per SAF 1.9, News Release or Notification of Other           _____    _____      _____
* 1. Determines the event is reportable per SAF 1.9. Determines the event is reportable per SAF 1.9 , News Release or Notification of Other Government Agency
Government Agency.
. _____        _____        _____
* 2. Determines the time limit to   Determines the time limit Notify the NRC Operations       to Notify the NRC Center via the ENS within       Operations Center via the four hours of the occurrence. ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has         _____    _____      _____
* 2. Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence
been or will be made.
. Determines the time limit to Notify the NRC Operations Center via the ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made
END JPM Stop Time:_________
.       _____        _____        _____
A-N-1-S                                                                      Page 5 of 7
END   JPM Stop Time
 
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 6 of 7  Operator's Name:       Job Title:
Operators Name:
SRO      JPM Title: REPORTABILITY DETERMINATION
Job


Revision Number: 0 0
==Title:==
JPM Number:  A-N-1-S Task Number and Title:
SRO JPM
299L001, Determine Reportability requirements as outlined in station Reportability manual.


K/A Number and Importance: Generic.2.1.
==Title:==
2    4.1 / 4.4
REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
299L001, Determine Reportability requirements as outlined in station Reportability manual.
Simulator Control Room In-Plant Testing Method: Simulate Alternate Path
K/A Number and Importance: Generic.2.1.2      4.1 / 4.4 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 10 minutes           Actual Time Used:           minutes
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete: 10 minutes Actual Time Used:
minutes


==References:==
==References:==
Reportability Manual LS-AA-1110, rev 15 EVALUATION


Reportability Manual LS
==SUMMARY==
-AA-1110 , rev 1 5  EVALUATION
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-1-S                                                                      Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S  Page 7 of 7  INITIAL CONDITIONS 1. You are the Unit 3 Unit Supervisor.
INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor.
: 2. The following timeline occurred:
: 2. The following timeline occurred:
1500 - a rented backhoe was released by Dresden station to the vendor's off-site facility.
* 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
1600 - at the vendor's off
* 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination
* 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
. 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
: 3. The time is now 1715 hours.
: 3. The time is now [[estimated NRC review hours::1715 hours]].
INITIATING CUE
INITIATING CUE
: 1. Utilizing the Reportability Manual, determine the reportability requirements
: 1. Utilizing the Reportability Manual, determine the reportability requirements.
.
A-N-1-S                                                                    Page 7 of 7
Exelon Nuclear Job Performance Measure
 
Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By:
Instructor                      Date Approved By:
Facility Representative          Date
 
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 03 Bank JPM.
Revision 04 Revised for 2010 NRC exam.
A-N-2-S                                                  Page 2 of 7


REVIEW OFF
Job Performance Measure (JPM)
-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number:
SIMULATOR SETUP INSTRUCTIONS
A-N-2-S  Revision Number: 0 4  Date: 09/10        Developed By:
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
Instructor Date    Approved By:
DOCUMENT PREPARATION
Facility Representative Date Job Performance Measure (JPM
)  A-N-2-S  Page 2 of 7  Revision Record (Summary)
Revision 0 3 Bank JPM. Revision 0 4 Revised for 2010 NRC exam
.
Job Performance Measure (JPM
)  A-N-2-S  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup. DOCUMENT PREPARATION
: 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.
: 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.
A-N-2-S                                                                Page 3 of 7


Job Performance Measure (JPM
Job Performance Measure (JPM)
)  A-N-2-S  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Supervisor
: 1. You are the Unit 2 Supervisor.
. 2. Unit 2 and Unit 3 are at near rated power
: 2. Unit 2 and Unit 3 are at near rated power.
. 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
. 4. An NSO collected data for verifying off
: 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
: 1. Review the data and complete the paperwork.
: 1. Review the data and complete the paperwork
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S                                                                        Page 4 of 7


Job Performance Measure (JPM
Job Performance Measure (JPM)
)  A-N-2-S  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix X with a completed Attachment 3
Provide the examinee with the provided copy of Appendix X with a completed Attachment 3.
. NOTE:
* 1. Verifies data all entered.     Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT
* 1. Verifies data all entered.
                                          > 3851 Volts.                   _____     _____       _____
Notes Bus 23-1 & Bus 24-1 Volts, (Bus 2 4-1) is NOT > 3851 Volts.
* 2. Verifies data all entered.     Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT >
_____         _____         _____
3851 Volts.                     _____     _____       _____
* 2. Verifies data all entered.
* 3. Verify data is accurate, by     Verifies Voltmeter Bus 23-reading Voltmeter.              1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus         _____    _____        _____
Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT > 3851 Volts.
23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct value, CUE:
_____         _____         _____
If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections.
* 3. Verify data is accurate, by reading Voltmeter.
END JPM Stop Time:_________
Verifies Voltmeter Bus 23
A-N-2-S                                                                     Page 5 of 7
-
 
1 & Bus 24-1 Volts (Bus 2 4-1) and Voltmeter Bus 23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/datin g incorrect value (~4160) and replacing with correct value, _____        _____        _____
Job Performance Measure (JPM)
If Candidate states the he/she would return surveillance to the NSO for corrections,                           inform the Examinee to make any corrections
Operators Name:
. CUE:  END   JPM Stop Time
Job
:_________
 
Job Performance Measure (JPM
==Title:==
A-N-2-S Page 6 of 7 Operator's Name:
SRO JPM
Job Title:
SRO       JPM Title: REVIEW OFF
-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 0 4
JPM Number:  A-N-2-S Task Number and Title:
299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.


K/A Number and Importance: Generic.2.1.31    4.2 / 3.9
==Title:==
REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 04 JPM Number: A-N-2-S Task Number and


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.
Simulator Control Room In-Plant Testing Method:
K/A Number and Importance: Generic.2.1.31      4.2 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes


==References:==
==References:==
Appendix X, rev 30 EVALUATION


Appendix X , rev 30  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-2-S                                                                    Page 6 of 7


==SUMMARY==
Job Performance Measure (JPM)
:
INITIAL CONDITIONS
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM
)  A-N-2-S  Page 7 of 7  INITIAL CONDITIONS
: 1. You are the Unit 2 Supervisor.
: 1. You are the Unit 2 Supervisor.
: 2. Unit 2 and Unit 3 are at near rated power
: 2. Unit 2 and Unit 3 are at near rated power.
. 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
. 4. An NSO collected data for verifying off
: 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
: 1. Review the data and complete the paperwork.
: 1. Review the data and complete the paperwork.
A-N-2-S                                                                  Page 7 of 7


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number:
Job Performance Measure (JPM)
A-N-3-S Revision Number: 0 0  Date: 09/10     
Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
A-N-3-S                                                   Page 2 of 7


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-3-S  Page 2 of 7  Revision Record (Summary)
Revision 0 0 Modified for 2010 NRC exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of Appendix 'A'.
: 1. Provide a marked up copy of Appendix A.
A-N-3-S                                                    Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Unit Supervisor
: 1. You are the Unit 2 Unit Supervisor.
. 2. Unit 2 is operating at rated conditions.
: 2. Unit 2 is operating at rated conditions.
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
. INITIATING CUE
INITIATING CUE
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
. 2. Correct any discrepancies noted (if any). Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
: 2. Correct any discrepancies noted (if any).
Information For Evaluator's Use:
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performe d. The timeclock starts when the candidate acknowledges the initiating cue.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT      Comment PERFORMANCE CHECKLIST                           STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of Appendix 'A'.
Provide the examinee with the provided copy of Appendix A.
NOTE: If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.
If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.
* 1. Determine Calculated Floor Drain Leakage is correct.
* 1. Determine Calculated Floor      Determines Floor Drain Drain Leakage is correct.       leakage for THU 1200 hours should be 4.50 gpm.           _____       _____         _____
Determines Floor Drain leakage for THU [[estimated NRC review hours::1200 hours]] should be 4.5 0 gpm. _____         _____         _____
* 2. Determine Calculated Floor       Determines TOTAL leakage Drain Leakage is correct.       for FRI 2000 hours should be 12.13 gpm.
* 2. Determine Calculated Floor Drain Leakage is correct.
NOTE:
Determines TOTAL leakage for FRI 2 [[estimated NRC review hours::000 hours]] should be 1 2.13 gpm. _____        _____        _____
If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.
If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.
NOTE:
* 3. Determine Calculated Floor      Determines Floor Drain Drain Leakage is correct.       leakage for FRI 1200 hours should be 5.15 gpm (TS).       _____       _____         _____
* 3. Determine Calculated Floor Drain Leakage is correct
* 4. References Tech Specs.           References Tech Spec 3.4.4 and recognizes
. Determines Floor Drain leakage for FRI 1 2 [[estimated NRC review hours::00 hours]] should be 5.15 gpm (TS). _____         _____         _____
                                                * >5 gpm unidentified leakage for FRI 1600 hours.
* 4. References Tech Specs.
Recognizes in Cond A.
References Tech Spec 3.4.4 and recognizes   >5 gpm unidentified leakage for FRI [[estimated NRC review hours::1600 hours]]. Recognizes in Cond A.
: 5. Reports discrepancies.           Examinee reports discrepancies noted.
_____        _____        _____
CUE:
: 5. Reports discrepancies
Acknowledge report of task completion.
. Examinee reports discrepancies noted.
END JPM Stop Time:_________
_____        _____        _____
A-N-3-S                                                                        Page 5 of 7
Acknowledge report of task completio
 
: n. CUE:  END   JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:
Job
SRO      JPM Title: REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 0 1
JPM Number:  A-N-3-S Task Number and Title:
29900LK108, Discuss the Unit Supervisor's responsibilities for plant                                        operation.


K/A Number and Importance: Generic.2.2.
==Title:==
40    3.4 / 4.7
SRO JPM


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 01 JPM Number: A-N-3-S Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:   Yes No Estimated Time to Complete:
29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.
15 minutes Actual Time Used:
K/A Number and Importance: Generic.2.2.40      3.4 / 4.7 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
minutes


==References:==
==References:==
Appendix A, rev 124 EVALUATION


Appendix 'A', rev 1 2 4  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-3-S                                                                    Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-S  Page 7 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Unit Supervisor.
: 1. You are the Unit 2 Unit Supervisor.
: 2. Unit 2 is operating at rated conditions.
: 2. Unit 2 is operating at rated conditions.
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 ,
. INITIATING CUE
AND 3 REACTOR COOLANT LEAKAGE LOG.
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG. 2. Correct any discrepancies noted (if any).
INITIATING CUE
Exelon Nuclear Job Performance Measure
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
: 2. Correct any discrepancies noted (if any).
A-N-3-S                                                            Page 7 of 7


PERFORM CCSW ACTIVITY CALCULATION JPM Number:
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By:
A-N-4-S Revision Number: 0 1  Date: 09/10    
Instructor                  Date Approved By:
Facility Representative        Date
 
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-4-S                                                  Page 2 of 7


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-S  Page 2 of 7  Revision Record (Summary) Revision 0 0 New JPM. Revision 0 1 Revised for 2010 NRC exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 3 of 7  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
Line 669: Line 660:
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.
A-N-4-S                                                            Page 3 of 7
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 4 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an on
: 1. You are an on-shift Operator.
-shift Operator.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500
-08, then had to leave shift for medical reasons.
INITIATING CUE
INITIATING CUE
: 1. Complete DOS 1500
: 1. Complete DOS 1500-08.
-08. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
* Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S                                                                        Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 5 of 7  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS               SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOS 1500-08. NOTE: The following steps can be performed in any order.
Provide the examinee with the provided copy of DOS 1500-08.
* 1. Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). See attached key.
The following steps can be performed in any order.
_____         _____         _____
* 1. Examinee fills out running       See attached key.
* 2. Examinee calculates Dilution flow (1,017,000 gpm).
pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps).                                                 _____   _____     _____
See attached key.
* 2. Examinee calculates Dilution     See attached key.
_____        _____        _____
flow (1,017,000 gpm).
: 3. Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
: 3. Examinee enters dilution flow     See attached key.
See attached key.
(from above) to calculate CCSW Activity Limit.                                           _____   _____     _____
_____         _____         _____
* 4. Examinee calculates CCSW         See attached key.
* 4. Examinee calculates CCSW Activity Limit (2.91 x 10
                                  -5 Activity Limit (2.91 x 10 ).
-5). See attached key.
: 5. Recommends to the Unit           Makes recommendation to Supervisor that the calculated   Unit Supervisor.
_____        _____        _____
sample limit exceeds the allowable discharge.                                           _____   _____     _____
: 5. Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge. Makes recommendation to Unit Supervisor
: 6. Informs Unit Supervisor task     Examinee notifies the Unit is complete.                      Supervisor.
. _____         _____         _____
CUE:
: 6. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
_____        _____        _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
A-N-4-S                                                                    Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 6 of 7  Operator's Name:
Operators Name:
Job Title:
Job
SRO       JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 0 1
 
JPM Number: A-N-4-S Task Number and Title:
==Title:==
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance
SRO JPM
. K/A Number and Importance: Generic.2.3.11    3.8 / 4.3
 
==Title:==
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-S Task Number and


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
Simulator Control Room In-Plant Testing Method:
K/A Number and Importance: Generic.2.3.11      3.8 / 4.3 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator     Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
15 minutes Actual Time Used:
minutes


==References:==
==References:==
DOS 1500-08, rev 16 EVALUATION


DOS 1500-08 , rev 16  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-4-S                                                                    Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S  Page 7 of 7  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an on
: 1. You are an on-shift Operator.
-shift Operator.
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500
INITIATING CUE
-08, then had to leave shift for medical reasons. INITIATING CUE
: 1. Complete DOS 1500-08.
: 1. Complete DOS 1500
: 2. Inform the Unit Supervisor when the task is complete.
-08. 2. Inform the Unit Supervisor when the task is complete.
A-N-4-S                                                            Page 7 of 7


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By:
Instructor                Date Approved By:
Facility Representative    Date


AUTHORIZE USE OF KI JPM Number:
Job Performance Measure (JPM)
A-N-5-S Revision Number: 0 1  Date: 09/10     
Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-5-S                                                 Page 2 of 9


Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-5-S  Page 2 of 9  Revision Record (Summary)
Revision 00 Bank JPM. Revision 01 Revised for 2010 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 3 of 9  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1. This is a tabletop JPM utilizing simulator procedures.
: 2. No Simulator setup needed.
: 2. No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Two (2) marked up copies of EP
: 1. Two (2) marked up copies of EP-AA-113-F-02.
-AA-113-F-02. 2. Blank copy of EP
: 2. Blank copy of EP-AA-113.
-AA-1 13. 3. Blank copy of EP
: 3. Blank copy of EP-AA-113-F-03.
-AA-113-F-03.
A-N-5-S                                                    Page 3 of 9
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 4 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Station Emergency Director.
: 1. You are the Station Emergency Director.
: 2. A General Emergency has been declared.
: 2. A General Emergency has been declared.
: 3. There is an offsite release in progress.
: 3. There is an offsite release in progress.
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
. 5. Containment is currently being challenged.
: 5. Containment is currently being challenged.
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared.
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared.
: 7. An Emergency life saving operation MUST be performed.
: 7. An Emergency life saving operation MUST be performed.
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 9. The operation requires two people to enter the field.
: 9. The operation requires two people to enter the field.
: 10. Clay Morrow , Employee ID
: 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
# 123456 and Jax Teller Employee ID
: 11. Clay and Jax have NEVER received an emergency exposure before.
# 891011 have volunteered.
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
: 11. Clay and Jax have NEVER received an emergency exposure before. 12. Authorization for Emergency Exposure (EP
INITIATING CUES
-AA-113-F-02 forms) have been filled out for Clay and Jax. INITIATING CUES
: 1. Execute section 4.4 of EP-AA-113.
: 1. Execute section 4.4 of EP
A-N-5-S                                                                Page 4 of 9
-AA-113.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 5 of 9  Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S                                                                        Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 6 of 9  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the Examinee the provided copies of:
Provide the Examinee the provided copies of:
NOTE: EP-AA-113-F-02, EP-AA-113, and E P-AA-113-F-03 1. Applicant determines need for emergency action.
EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03
Emergency action is needed per initiating cue.
: 1. Applicant determines need for   Emergency action is emergency action.               needed per initiating cue.
_____        _____        _____
CUE:
If asked, Clay and Jax do NOT have any adverse reactions to KI.
If asked, Clay and Jax do NOT have any adverse reactions to KI.
CUE: 2. Applicant recognizes per the initiating cue that authorization to take KI must also be completed prior to the emergency workers entering the space.
: 2. Applicant recognizes per the     Recognizes that initiating cue that             authorization to take KI authorization to take KI must   must also be completed.
Recognizes that authorization to take KI must also be completed.
also be completed prior to the                               _____        _____      _____
_____        _____        _____
emergency workers entering the space.
* 3. Determines there is or has been a Loss of Fuel Clad Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.
* 3. Determines there is or has       Determines KI must be been a Loss of Fuel Clad         issued.
Determines KI must be issued.      _____        _____        _____
Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.
* 4. Documents the decision to issue KI using THYROID BLOCKING AGENT AUTHORIZATION Form   (EP-AA-113-F-03). BOTH individuals being authorized for KI and entering the space must be listed with their correct names and employee ID numbers: Clay Morrow            
* 4. Documents the decision to       BOTH individuals being issue KI using THYROID           authorized for KI and BLOCKING AGENT                   entering the space must be AUTHORIZATION Form               listed with their correct (EP-AA-113-F-03).               names and employee ID numbers:
* Clay Morrow               _____        _____      _____
123456
* Jax Teller 891011 A-N-5-S                                                                    Page 6 of 9


123456  Jax Teller 891011      _____         _____         _____
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                      STANDARDS                SAT NOTE:
If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.
: 5. Notifies Occupational Health  Examinee states that (Medical) Services            he/she would notify OHS.
Department promptly that KI                                _____       _____       _____
is to be issued to Exelon Nuclear personnel or contractors.
NOTE:
JPM is complete when applicant notifies OHS of KI use.
END JPM Stop Time:_________
A-N-5-S                                                                  Page 7 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 7 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment If asked for Radiation Protection Manager to sign and date EP
Operators Name:
-AA-113-F-03,                                  enter name as "TIG TRAGER" and today's date in the appropriate blanks
Job
. NOTE: 5. Notifies Occupational Health (Medical) Services Department promptly that KI is to be issued to Exelon Nuclear personnel or contractors.
 
Examinee states that he/she would notify OHS
==Title:==
. _____        _____        _____
SRO JPM
JPM is complete when applicant notifies OHS of KI use
 
. NOTE: END  JPM Stop Time
==Title:==
:_________
AUTHORIZE USE OF KI Revision Number: 01 JPM Number: A-N-5-S Task Number and
Job Performance Measure (JPM)
A-N-5-S  Page 8 of 9  Operator's Name:
Job Title:    SRO JPM Title: AUTHORIZE USE OF KI Revision Number: 0 1
JPM Num ber: A-N-5-S Task Number and Title: 29900LK150 , Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
K/A Number and Importance: Generic.2.4.
4 0    2.7 / 4.5


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
Simulator Control Room In-Plant Testing Method:
K/A Number and Importance: Generic.2.4.40        2.7 / 4.5 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 20 minutes Actual Time Used:                 minutes
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
20 minutes Actual Time Used:
minutes


==References:==
==References:==
EP-AA-113, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 10 EVALUATION


EP-AA-1 13, rev B; EP-AA-113-F-03, rev D; EP-AA-113 , rev 10  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
A-N-5-S                                                                      Page 8 of 9


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S  Page 9 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Station Emergency Director.
: 1. You are the Station Emergency Director.
: 2. A General Emergency has been declared.
: 2. A General Emergency has been declared.
: 3. There is an offsite release in progress.
: 3. There is an offsite release in progress.
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS. 5. Containment is currently being challenged.
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared. 7. An Emergency life saving operation MUST be performed.
: 5. Containment is currently being challenged.
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared.
: 7. An Emergency life saving operation MUST be performed.
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
: 9. The operation requires two people to enter the field.
: 9. The operation requires two people to enter the field.
: 10. Clay Morrow , Employee ID
: 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
# 123456 and Jax Teller Employee ID
# 891011 have volunteered.
: 11. Clay and Jax have NEVER received an emergency exposure before.
: 11. Clay and Jax have NEVER received an emergency exposure before.
: 12. Authorization for Emergency Exposure (EP
: 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
-AA-113-F-02 forms) have been filled out for Clay and Jax. INITIATING CUES
INITIATING CUES
: 1. Execute section 4.4 of EP
: 1. Execute section 4.4 of EP-AA-113.
-AA-113.
A-N-5-S                                                                Page 9 of 9
Exelon Nuclear Job Performance Measure


SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number:
Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By:
S-N-a Revision Number: 0 0  Date: 0 9/10 Developed By:
Instructor                     Date Approved By:
Instructor Date     Approved By:
Facility Representative         Date
Facility Representative Date Job Performance Measure (JPM)
 
S-N-a  Page 2 of 8  Revision Record (Summary)
Job Performance Measure (JPM)
Revision 0 0 Modified for 2010 NRC exam.
Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
S-N-a                                                    Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-a  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:       It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Insert following Malfunctions and/or Remotes:
: 2. Insert following Malfunctions and/or Remotes:
IMF CIRWCUAP (2-1201-1 valve failure to close
* IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
- and allows manual closure). IMF CIRWCUBP (2-1201-2 valve failure to close
* IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
- and allow s manual closure). 3. Setup the following Triggers:
: 3. Setup the following Triggers:
None. DOCUMENT PREPARATION DOP 1100-02 hardcard
* None.
.
DOCUMENT PREPARATION DOP 1100-02 hardcard.
S-N-a                                                                            Page 3 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-a  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred, resulting in an ATWS
: 2. A transient has occurred, resulting in an ATWS.
. 3. The Unit Supervisor has authorized the use of Hard Cards
: 3. The Unit Supervisor has authorized the use of Hard Cards.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-a                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-a  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Examinee should locate the hard card, then provide the included copy
Examinee should locate the hard card, then provide the included copy.
. NOTE:
* 1. Place the SBLC INJECTION           Turns the SBLC CONTROL keylock switch to           INJECTION CONTROL the SYS 1 OR SYS 2                  keylock switch to either the position.                           intermediate right OR         _____    _____      _____
* 1. Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 ORTurns the SBLC INJECTION CONTROL keylock switch to SYS 2 position. either  the intermediate right OR intermediate left position.
intermediate left position.
_____        _____        _____
: 2. Verifies applicable SQUIB           SQUIB A or B light off.
: 2. Verifies applicable SQUIB pilot light NOT lit. SQUIB "A" or "B" light off.
pilot light NOT lit.
_____        _____        _____
: 3. Verifies applicable PUMP           PUMP 1 or PUMP 2 light pilot light lit.                    on.
: 3. Verifies applicable PUMP pilot light lit.
: 4. Verifies FLOW pilot light lit.     WHITE light illuminated.
PUMP 1 or PUMP 2 light  
: 5. SBLC SQUIB VLV CKT                 Annunciator 902-5 H-6 FAILURE annunciator alarms          illuminated.
 
(902-5 H-6).                                                       _____   _____     _____
on. _____        _____        _____
: 4. Verifies FLOW pilot light lit.
WHITE light illuminated.
_____        _____        _____
: 5. SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6). Annunciator 902
-5 H-6 illuminated.
_____         _____         _____
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 6. Verifies RWCU valve 2-1201-1 closed. Examinee recognizes that valve 2-1201-1 valve did NOT close. _____         _____         _____
* 6. Verifies RWCU valve                 Examinee recognizes that 2-1201-1 closed.                   valve 2-1201-1 valve did NOT close.                     _____   _____     _____
* 7. Verifies RWCU valve              
* 7. Verifies RWCU valve                 Takes manual action for a 2-1201-1 closed.                    failed automatic action and closes 2-1201-1 valve, by      _____    _____      _____
placing c/s in the CLOSED position.
: 8. Verifies RWCU valve                GREEN light illuminated.
2-1201-1A closed.
* 9. Verifies RWCU valve                Examinee recognizes that 2-1201-2 closed.                    valve 2-1201-2 valve did NOT close.                    _____    _____      _____
S-N-a                                                                          Page 5 of 8


2-1201-1 closed. Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position. _____        _____        _____
: 8. Verifies RWCU valve 2-1201-1A closed.
GREEN light illuminated.
_____        _____        _____
* 9. Verifies RWCU valve             
2-1201-2 closed. Examinee recognizes that valve 2-1201-2 valve did NOT close. _____        _____        _____
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-a  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT
* 10. Closes RWCU valve 2-1201-2 closed. Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position. _____         _____         _____
* 10. Closes RWCU valve               Takes manual action for a 2-1201-2 closed.               failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED     _____   _____     _____
: 11. Verifies RWCU valve 2-12 01-3 closed. GREEN light illuminated.
position.
_____        _____        _____
: 11. Verifies RWCU valve             GREEN light illuminated.
: 12. Verifies RWCU valve 2-1201-7 closed. RED light illuminated.
2-1201-3 closed.
_____        _____        _____
: 12. Verifies RWCU valve             RED light illuminated.
: 13. Informs Unit Supervisor task is complete.
2-1201-7 closed.
Reports SBLC is injecting and valves 2
: 13. Informs Unit Supervisor task   Reports SBLC is injecting is complete.                    and valves 2-1201-2 and 2-1201-3 failed to close automatically.                 _____   _____     _____
-1201-2 and 2-1201-3 failed to close automatically.
CUE:
_____         _____         _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-a                                                                      Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-a  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    RO SRO      JPM Title: SBLC - INJECTION WITH RWCU ISOLATION FAILURE Revision Number: 00
Job


JPM Number: S
==Title:==
-N-a  Task Number and Title: 211L002, Injection of Standby Liquid Control System
RO            SRO JPM


K/A Number and Importance: 211000
==Title:==
.A4.08    4.2 / 4.2
SBLC - INJECTION WITH RWCU ISOLATION FAILURE Revision Number: 00 JPM Number: S-N-a Task Number and


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08        4.2 / 4.2 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 9 minutes             Actual Time Used:           minutes
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
9 minutes Actual Time Used:
minutes


==References:==
==References:==
DOP 1100-02, rev 18 EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-a                                                                        Page 7 of 8


DOP 1100-02, rev 1 8  EVALUATION SUMMA RY: Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):
Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-a  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred, resulting in an ATWS.
: 2. A transient has occurred, resulting in an ATWS.
Line 978: Line 958:
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
S-N-a                                                            Page 8 of 8
Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


Exelon Nuclear Job Performance Measure
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
S-N-b                                                    Page 2 of 10


CORE SPRAY
- PERFORM PUMP TEST WITH PUMP TRIP  JPM Number:
S-N-b  Revision Number: 0 5  Date: 09/10 Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-b  Page 2 of 10  Revision Record (Summary)
Revision 0 4 Bank JPM. Revision 0 5 Revised for 20 10 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-b  Page 3 of 10  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:       It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Start the LPCI/CS room cooler fans.
: 2. Start the LPCI/CS room cooler fans.
: 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:
: 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:
NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
trgset 1 "cssbkppb .and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402
* trgset 1 "cssbkppb .and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON)
-4B OPEN light turns ON
* ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip)
ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip
* ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip)
ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip
* trgset 2 "(et_array(1) .and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running)
trgset 2 "(et_array(1) .and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running) trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip
* trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip)
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Markup a copy of DOS 1400-05 as complete up through Step I.
: 1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8).
: 7. (Ready to start 2B Core Spray Pump per step I.
S-N-b                                                                          Page 3 of 10
8).
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-b  Page 4 of 10  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The Unit 2 Core Spray 'B' Pump operability surveillance is required due to maintenance.
: 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
: 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
: 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
: 4. The system is filled and vented.
: 4. The system is filled and vented.
Line 1,015: Line 997:
: 8. The LPCI/Core Spray Room Coolers are running.
: 8. The LPCI/Core Spray Room Coolers are running.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor directs you to perform DOS 1400
: 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
-05 step I.8 for the 2B Core Spray pump. 2. All applicable Prerequisites have been met.
: 2. All applicable Prerequisites have been met.
: 3. Inform the Unit Supervisor upon completion of step I.8.
: 3. Inform the Unit Supervisor upon completion of step I.8.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
S-N-b                                                                Page 4 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-b  Page 5 of 10  Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-b                                                                        Page 5 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-b  Page 6 of 10  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide Examinee a copy of DOS 1400-05. NOTE: 1. Verify the following valve line up: MO 2-1402-4B Closed MO 2-1402-38B Open 2-1402-6B Ope n  MO 2-1402-25B Closed MO 2-1402-3B Open 2-1402-40B-SV Closed Verifies the following:
Provide Examinee a copy of DOS 1400-05.
Green light illuminated
: 1. Verify the following valve line   Verifies the following:
. Green light illuminated
up:
. Directs NLO to Verify 2-1402-6 B-SV Closed. Green light illuminated
* MO 2-1402-4B Closed
. Green light illuminated
* Green light illuminated.
. Directs NLO to Verify 2-14 02-40B-SV Closed       _____         _____         _____
* MO 2-1402-38B Open
* Green light illuminated.
* 2-1402-6B Open
* Directs NLO to Verify 2-1402-6B-SV Closed.
* MO 2-1402-25B Closed
* Green light illuminated.
* MO 2-1402-3B Open
* Green light illuminated.
* 2-1402-40B-SV Closed
* Directs NLO to Verify 2-1402-40B-SV Closed       _____     _____       _____
CUE:
2-1402-40B-SV, INST SV is closed.
2-1402-40B-SV, INST SV is closed.
CUE: The next three (3) actions may be requested to be performed at the same time.
NOTE:
NOTE: 2. Verify 2B CORE SPRAY MOTOR has adequate lubrication
The next three (3) actions may be requested to be performed at the same time.
. Contacts NLO to verify 2B CORE SPRAY MOTOR has adequate lubrication per step I.8.b.(1).
: 2. Verify 2B CORE SPRAY             Contacts NLO to verify 2B MOTOR has adequate                CORE SPRAY MOTOR lubrication.                      has adequate lubrication       _____      _____        _____
_____        _____        _____
per step I.8.b.(1).
2B Core Spray motor oil level is normal (within +0 to  
CUE:
-1/8 inch band).
2B Core Spray motor oil level is normal (within +0 to -1/8 inch band).
CUE: 3. Verify 2B LPCI/CS Room Cooler is operating properly.
: 3. Verify 2B LPCI/CS Room           Contacts NLO to verify Cooler is operating properly. proper room cooler operation per step I.8.c.     _____     _____       _____
Contacts NLO to verify proper room cooler operation per step I.8.c
CUE:
. _____         _____         _____
2B LPCI/CS room cooler is operating normally.
2B LPCI/CS room cooler is operating normally.
S-N-b                                                                      Page 6 of 10
Job Performance Measure (JPM)
UNSAT    Comment PERFORMANCE CHECKLIST                              STANDARDS                SAT
: 4.      Direct NLO to open 2-1402-        Directs 2-1402-40B-SV 40B-SV and report pressure.        Open.
CUE:
CUE:
Job Performance Measure (JPM)
When asked, report: 2-1402-40B-SV Inst SV is Open.
S-N-b  Page 7 of 10  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  4. Direct NLO to open 2
: 5.     Record suction pressure           Pressure of 7 psig provided by NLO.                   recorded on Data Sheet 1.
-1402-40B-SV and report pressure.
CUE:
Directs 2-1402-40B-SV Open. _____        _____        ____
When asked, report: suction pressure is 7 psig.
_ When asked, report: "2
: 6.     Calculate 2-1402-8B initial       DP Calculated:
-1402-40B-SV Inst SV is Open
closed DP.
". CUE: 5. Record suction pressure provided by NLO.
2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5     _____       _____       _____
Pressure of 7 psig recorded on Data Sheet 1.
psig)
_____        _____        _____
CUE:
When asked, report: "suction pressure is 7 psig".
If examinee requests the above calculation to be verified, sign the verified by line.
CUE: 6. Calculate 2
If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report.
-1402-8B initial closed DP.
NOTE:
DP Calculated:
Candidate will N/A step I.8.g.
2-1450-1B   ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5 psig)    _____         _____         _____
: 7.     Start 2B CORE SPRAY               Red light illuminated and Pump.                              annunciators H-13 and A-5 alarm.                       _____       _____       _____
If examinee requests the above calculation to be verified, CUE: sign the "verified by" lineIf the student informs the SRO that the Core Spray System should be declared inoperable,       acknowledge the report.
. Candidate will N/A step I.8.g.
NOTE: 7. Start 2B CORE SPRAY Pump. Red light illuminated and annunciators H
-13 and A-5 alarm. _____         _____         _____
2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after                          the 2-1402-4B valve has dual indication.
NOTE:
NOTE:
2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication.
S-N-b                                                                          Page 7 of 10
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-b  Page 8 of 10  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
* 8. Open FLOW TEST VLV MO 2-1402-4B. Rotates and holds MO 2
* 8. Open FLOW TEST VLV MO          Rotates and holds MO 2-2-1402-4B.                     1402-4B Control switch CW to Open.                   _____     _____       _____
-1402-4B Control switch CW to Open.
_____         _____         _____
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 9. Acknowledge and report alarm for 2B CS pump trip.
: 9. Acknowledge and report         Acknowledges annunciator alarm for 2B CS pump trip.     H-5 and makes report.
Acknowledges annunciator H-5 and makes report.
CUE:
_____        _____        _____
Acknowledge report.
Acknowledge report.
* 10. Immediately Close              Green light illuminated.
2-1402-4B.
Red light illuminated.        _____      _____      _____
CUE:
CUE:
* 10. Immediately Close
If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
CUE:
If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue:
Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
: 11. Informs Unit Supervisor task    Examinee notifies the Unit is complete.                    Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-b                                                                      Page 8 of 10


2-1402-4B. Green light illuminated.
Red light illuminated.
_____        _____        _____
If examinee enters DOA 6500
-10, respond that the assist NSO will execute that procedure.
CUE: If examinee terminates, or requests permission to terminate the surveillance CUE: OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue: Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
: 11. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
_____        _____        _____
Acknowledge report of task completion.
CUE:  END  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-b  Page 9 of 10  Operator's Name:
Operators Name:
Job Title:     RO SRO       JPM Title: CORE SPRAY
Job
- PERFORM PUMP TEST WITH PUMP TRIP Revision Number: 0 5
 
JPM Number:  S-N-b  Task Number and Title: 209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400
==Title:==
-05 K/A Number and Importance: 209001.A4.01    3.8 / 3.6
RO           SRO JPM


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP Revision Number: 05 JPM Number: S-N-b Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01          3.8 / 3.6 Suggested Testing Environment:         Simulator Actual Testing Environment:               Simulator       Control Room           In-Plant Testing Method:         Simulate           Alternate Path:     Yes           No Perform                 SRO Only:       Yes           No Time Critical:           Yes           No Estimated Time to Complete: 22 minutes             Actual Time Used:           minutes
Yes No Estimated Time to Complete:
22 minutes Actual Time Used:
minutes


==References:==
==References:==
DOS 1400-05, rev 41 EVALUATION


DOS 1400-05, rev 41  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?            Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                      Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                  Date:
S-N-b                                                                        Page 9 of 10


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-b  Page 10 of 10  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The Unit 2 Core Spray 'B' Pump operability surveillance is required due to maintenance.
: 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
: 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
: 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
: 4. The system is filled and vented. 5. The required valve operability surveillance has been completed.
: 4. The system is filled and vented.
: 5. The required valve operability surveillance has been completed.
: 6. Vibration data is NOT required.
: 6. Vibration data is NOT required.
: 7. The Unit 2 NLO is standing by in the corner room.
: 7. The Unit 2 NLO is standing by in the corner room.
: 8. The LPCI/Core Spray Room Coolers are running.
: 8. The LPCI/Core Spray Room Coolers are running.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor directs you to perform DOS 1400
: 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
-05 step I.8 for the 2B Core Spray pump.
: 2. All applicable Prerequisites have been met.
: 2. All applicable Prerequisites have been met.
: 3. Notify the Unit Supervisor upon completion of step I.8.
: 3. Notify the Unit Supervisor upon completion of step I.8.
S-N-b                                                              Page 10 of 10
Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


Exelon Nuclear Job Performance Measure
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam S-N-c                                                    Page 2 of 8


DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES  JPM Number:
Job Performance Measure (JPM)
S-N-c  Revision Number: 0 1  Date: 09/10 Developed By:
SIMULATOR SETUP INSTRUCTIONS
Instructor Date    Approved By:
: 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
Facility Representative Date Job Performance Measure (JPM)
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
S-N-c  Page 2 of 8  Revision Record (Summary)
Revision 00 New JPM. Revision 01 Revised for 2010 NRC exam Job Performance Measure (JPM)
S-N-c  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure that Both DEHC monitors are displaying the STATUS screen .
: 2. Ensure that Both DEHC monitors are displaying the STATUS screen .
: 3. Insert following Malfunctions and/or Remotes:
: 3. Insert following Malfunctions and/or Remotes:
None. 4. Setup the following Triggers:
* None.
None. 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902
: 4. Setup the following Triggers:
-7 panel only).
* None.
DOCUMENT PREPARATION Markup a copy of DGP 02
: 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only).
-03.
DOCUMENT PREPARATION Markup a copy of DGP 02-03.
S-N-c                                                                          Page 3 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-c  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required. 3. Another NSO will acknowledge annunciators not associated with this task
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
. INITIATING CUE
: 3. Another NSO will acknowledge annunciators not associated with this task.
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02
INITIATING CUE
-03 step s E.29. 2. Inform the Unit Supervisor when the task is complete.
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-c                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-c  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DGP 02-03. NOTE: All the below actions can be performed on eitherof the Digital EHC control stations.
Provide the Examinee with the provided copy of DGP 02-03.
: 1. Select <CONTROL>.
All the below actions can be performed on either of the Digital EHC control stations.
Utilizing the trackball controller, clicks on <CONTROL>.
* 1. Select <CONTROL>.               Utilizing the trackball controller, clicks on
_____         _____         _____
                                          <CONTROL>.                     _____     _____       _____
* 2. Select <RX COOLDOWN>.
* 2. Select <RX COOLDOWN>.           Utilizing the trackball controller, clicks on
Utilizing the trackball controller, clicks on         <RX COOLDOWN>. _____         _____         _____
                                          <RX COOLDOWN>.                 _____     _____       _____
: 3. Verify REACTOR COOLDOWN is OFF.
: 3. Verify REACTOR                  Observes the REACTOR COOLDOWN is OFF.                 COOLDOWN OFF select button is orange.             _____     _____       _____
Observes the REACTOR COOLDOWN OFF select button is orange.
* 4. Select STPT/RAMP.               Utilizing the trackball controller, clicks on the
_____         _____         _____
                                          <STPT/RAMP>.                   _____     _____       _____
* 4. Select STPT/RAMP.
* 5. Enter desired target             Clicks in the Set Point box.
Utilizing the trackball controller, clicks on the <STPT/RAMP>.
temperature setpoint.            Utilizing the keyboard, enters 400.0.                 _____     _____       _____
_____         _____         _____
* 6. Enter desired cooldown rate     Clicks in the Ramp Rate in the Ramp box.                box. Utilizing the keyboard, enters 75.0.                   _____     _____       _____
* 5. Enter desired target temperature setpoint.
* 7. Select <OK>.                     Utilizing the trackball controller, clicks on <OK>.
Clicks in the Set Point box.
Clicks <OK> on the Confirm Setpoint pop up       _____     _____       _____
Utilizing the keyboard, enters 400.0.
window.
_____         _____         _____
* 8. Initiate Reactor cooldown by     Utilizing the trackball selecting ON for REACTOR         controller, clicks on <ON>.
* 6. Enter desired cooldown rate in the Ramp box.
COOLDOWN.
Clicks in the Ramp Rate
Clicks <OK> on the Begin Reactor Cooldown pop up       _____     _____       _____
 
window.
box. Utilizing the keyboard, enters 75.0.
S-N-c                                                                        Page 5 of 8
_____         _____         _____
* 7. Select <OK>.
Utilizing the trackball controller, clicks on <OK>.
Clicks <OK> on the Confirm Setpoint pop up window. _____         _____         _____
* 8. Initiate Reactor cooldown by selecting ON for REACTOR COOLDOWN. Utilizing the trackball controller, clicks on <ON>.
Clicks <OK> on the "Begin Reactor Cooldown" pop up window. _____         _____         _____


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-c  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  9. On <CONTROL> <PRESSURE CONTROL> screen, adjust pressure setpoint as necessary to maintain at least 50 psig above Reactor pressure.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
Utilizing the trackball controller, clicks on <PRESSURE CONTROL>. _____         _____         _____
: 9. On <CONTROL>                   Utilizing the trackball
        <PRESSURE CONTROL>             controller, clicks on screen, adjust pressure       <PRESSURE setpoint as necessary to       CONTROL>.
maintain at least 50 psig above Reactor pressure.                                       _____   _____     _____
NOTE:
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
NOTE: 10. Select STPT/RAMP and input value of 50.0.
: 10. Select STPT/RAMP and input     Utilizing the trackball value of 50.0.                 controller, clicks on
Utilizing the trackball controller, clicks on <STPT/RAMP
                                        <STPT/RAMP > and input 50.0.
> and input 50.0. _____        _____        _____
NOTE:
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
NOTE: 11. On <CONTROL> <
: 11. On <CONTROL> <BPV             If uses other DEHC JACK> screen, verify BPV       screen, utilizing the Jack position setpoint is     trackball controller, clicks
BPV JACK> screen, verify BPV Jack position setpoint is  
        -5.0%.                         on <CONTROL>.
-5.0%. If uses other DEHC screen, utilizing the trackball controller, clicks on <CONTROL>.
Utilizing the trackball controller, clicks on < BPV JACK >.                       _____    _____      _____
Utilizing the trackball controller, clicks on < BPV JACK >. Observes BPV Jack position setpoint is  
Observes BPV Jack position setpoint is -5.0%.
-5.0%.
: 12. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                  Supervisor.
_____        _____        _____
CUE:
: 12. Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
_____        _____        _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-c                                                                    Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-c  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    RO SRO      JPM Title: DEHC
Job
- ESTABLISH RPV COOLDOWN WITH BYPASS VALVES Revision Number: 01


JPM Number:  S
==Title:==
-N-c  Task Number and Title: 29501LP040, Respond to a Reactor Scram IAW DGP 02
RO            SRO JPM
-03.
K/A Number and Importance: 241000.A4.06    3.9 / 3.9


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES Revision Number: 01 JPM Number: S-N-c Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
Yes No Estimated Time to Complete:
K/A Number and Importance: 241000.A4.06        3.9 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
12 minutes Actual Time Used:
minutes


==References:==
==References:==
DGP 02-03, rev 89 EVALUATION


DGP 02-03, rev 8 9  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-c                                                                        Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-c  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
: 3. Another NSO will acknowledge annunciators not associated with this task
: 3. Another NSO will acknowledge annunciators not associated with this task.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F.
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.
: 2. Inform the Unit Supervisor when the task is complete.
: 29. 2. Inform the Unit Supervisor when the task is complete.
S-N-c                                                                Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


LPCI - MITIGATE HIGH SUCTION PRESSURE                                                      WHILE LINING UP TO CST SUCTION FOR INJECTION  JPM Number:
S-N-d  Revision Number: 0 7  Date: 09/10 Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-d  Page 2 of 9  Revision Record (Summary)
Revision 0 6 Bank JPM. Revision 0 7 Revised for 2010 NRC exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-d Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for 2010 NRC exam.
S-N-d                                                   Page 2 of 9
 
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify NO LPCI pumps operating
: 2. Verify NO LPCI pumps operating .
. 3. Insert following Malfunctions and/or Remotes:
: 3. Insert following Malfunctions and/or Remotes:
None. 4. Setup the following Triggers:
* None.
None. DOCUMENT PREPARATION Markup a copy of DEOP 0500
: 4. Setup the following Triggers:
-03.
* None.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-d                                                                          Page 3 of 9
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-d  Page 4 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection
: 2. A transient has occurred requiring Alternate Water Injection.
. 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping.
-65 inches and slowly dropping.
: 4. RPV pressure is 375 psig and slowly dropping.
: 4. RPV pressure is 375 psig and slowly dropping.
: 5. An EO has been briefed and is in the field.
: 5. An EO has been briefed and is in the field.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
-03, step G.12.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-d                                                                          Page 4 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-d  Page 5 of 9  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                   STANDARDS                   SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the Examinee with the provided copy of DEOP 0500
Provide the Examinee with the provided copy of DEOP 0500-03.
-03. NOTE:
* 1. Place 2A LPCI PP control     ALL lights extinguished.
* 1. Place 2A LPCI PP control switch in Pull
switch in Pull-to-Lock.
-to-Lock. ALL lights extinguished.
* 2. Place PP SUCT VLV MO 2-      RED light illuminated.
_____        _____        _____
1501-5A control switch in Manual Bypass and verify                                   _____       _____     _____
* 2. Place PP SUCT VLV MO 2
closed.
-1 501-5A control switch in Manual Bypass and verify closed. RED light illuminated
: 3. Verify MIN FLOW VLV 2-        RED light illuminated.
. _____         _____         _____
1501-13A closed if not needed.                                                     _____       _____     _____
: 3. Verify MIN FLOW VLV 2
CUE:
-1501-13A closed if not needed. RED light illuminated.
_____         _____         _____
2-1501-13A is not required for 2B LPCI pump.
2-1501-13A is not required for 2B LPCI pump.
CUE: The following valves may be verified in any order NOTE: 4. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
NOTE:
GREEN lights illuminated.
The following valves may be verified in any order
_____         _____         _____
: 4. Verify TORUS CLG/TEST         GREEN lights illuminated.
: 5. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. GREEN lights illuminated.
valves 2-1501-20A and 2-1501-38A closed.                                         _____       _____     _____
_____         _____         _____
: 5. Verify TORUS SPRAY VLVs       GREEN lights illuminated.
: 6. Verify DW SPRAY VLVs 2
2-1501-19A and 2-1501-18A closed.                                                     _____       _____     _____
-1501-28A and 2-1501-27A closed. GREEN lights illuminated.
: 6. Verify DW SPRAY VLVs 2-      GREEN lights illuminated.
_____         _____         _____
1501-28A and 2-1501-27A closed.                                                     _____       _____     _____
: 7. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
: 7. Verify TORUS CLG/TEST         GREEN lights illuminated.
GREEN lights illuminated.
valves 2-1501-20B and 2-1501-38B closed.                                         _____       _____     _____
_____         _____         _____
: 8. Verify TORUS SPRAY VLVs       GREEN lights illuminated.
: 8. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed. GREEN lights illuminated.
2-1501-19B and 2-1501-18B closed.                                                     _____       _____     _____
_____         _____         _____
S-N-d                                                                      Page 5 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-d  Page 6 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  9. Verify DW SPRAY VLVs 2
UNSAT    Comment PERFORMANCE CHECKLIST                     STANDARDS                 SAT
-1501-28B and 2-1501-27B closed. GREEN lights illuminated.
: 9. Verify DW SPRAY VLVs 2-        GREEN lights illuminated.
_____         _____         _____
1501-28B and 2-1501-27B closed.                                                     _____       _____       _____
For bleeding off the pressure in the suction piping,                                                                                   the examinee may communicate each of the following steps individually OR                                           instruct the NLO to complete actions of DEOP 0500
NOTE:
-03 step G.12.c.(5 thru 8).
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
NOTE: When directed, as the NLO in the field, communicate that the steps                                                       (either individually of as a whole) have been completed.
CUE:
CUE: 10. Unlock AND open 2
When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed.
-1501-74A, U2 LPCI A PMP VENT VLV. Instructs NLO to complete step G.12.c.(5).(a).
: 10. Unlock AND open 2-1501-         Instructs NLO to complete 74A, U2 LPCI A PMP             step G.12.c.(5).(a).
_____        _____        _____
VENT VLV.
: 11. Crack open 2
: 11. Crack open 2-1501-15A, U2       Instructs NLO to complete LPCI A PMP VENT VLV until     step G.12.c.(5).(b).
-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe.
flow is observed from pipe.                                  _____       _____       _____
Instructs NLO to complete step G.12.c.(5).(b).
: 12. Close 2(3)-1501-15A, U2         Instructs NLO to complete LPCI A PMP VENT VLV.           step G.12.c.(5).(c).
_____         _____         _____
: 13. Close AND lock 2-1501-74A,     Instructs NLO to complete U2(3) LPCI A PMP               step G.12.c.(5).(d).
: 12. Close 2(3)
VENT VLV.
-1501-15A, U2 LPCI A PMP VENT VLV.
* 14. Open 2-1501-47A-R, U2           Instructs NLO to obtain PI LPCI A PUMP SUCT PI           2-1501-47A reading per 2-1501-47A ROOT VLV (at       step G.12.c.(6).              _____      _____      _____
Instructs NLO to complete step G.12.c.(5).(c).
pump) and verify PI 2-1501-47A indicates less than 15 psig.
_____        _____        _____
CUE:
: 13. Close AND lock 2
-1501-74A, U2(3) LPCI A PMP VENT VLV. Instructs NLO to complete step G.12.c.(5).(d).
_____        _____        _____
* 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI      
 
2-1501-47A ROOT VLV (at pump) and verify PI 2
-1501-47A indicates less than 15 psig. Instructs NLO to obtain PI 2-1501-47A reading per step G.12.c.(6).
_____        _____        _____
PI 2-1501-47A indicates 15.5 psig.
PI 2-1501-47A indicates 15.5 psig.
CUE:
* 15. Recognizes reading is NOT       Determines reading is less than 15 psig.             greater than 15 psig.
* 15. Recognizes reading is NOT less than 15 psig.
S-N-d                                                                    Page 6 of 9
Determines reading is greater than 15 psig.
_____        _____        _____


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-d  Page 7 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
Instructs NLO to close 2
: 16. Close 2-1501-47A-R, U2           Instructs NLO to close 2-LPCI A PUMP SUCT PI            1501-47A per step G.12.c.(8).                   _____   _____     _____
-1501-47A per step G.12.c.(8).
2-1501-47A ROOT VLV.
_____         _____         _____
CUE:
2-1501-47A-R is Closed.
2-1501-47A-R is Closed.
CUE: BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 17. Open PP SUCT VLV MO 2-1501-5A. GREEN light illuminated.
* 17. Open PP SUCT VLV MO 2-           GREEN light illuminated.
_____        _____        _____
1501-5A.
* 18. Place 2A LPCI PP control switch in AUTO.
* 18. Place 2A LPCI PP control         Depresses and places 2A switch in AUTO.                 LPCI PP c/s to center (AUTO) position.             _____   _____     _____
Depresses and places 2A LPCI PP c/s to center (AUTO) position.
: 19. Notify Unit Supervisor that 2A   Examinee notifies Unit LPCI pump cannot be used       Supervisor of 2A LPCI with suction from the CST.     pump suction pressure         _____    _____      _____
_____         _____         _____
problem when aligned to CST. May recommend using another LPCI pump.
: 19. Notify Unit Supervisor that 2A  
CUE:
 
Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected Acknowledge report of task completion.
LPCI pump cannot be used with suction from the CST.
END JPM Stop Time:_________
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
S-N-d                                                                    Page 7 of 9
_____        _____        _____
Before examinee proceeds,                                                                                                                     inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected CUE: Acknowledge report of task completion.
END   JPM Stop Time
: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-d  Page 8 of 9  Operator's Name:
Operators Name:
Job Title:    RO SRO      JPM Title: LPCI
Job
- MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 07


JPM Number:  S-N-d  Task Number and Title: 29502LK061, Lineup LPCI to the CST
==Title:==
RO            SRO JPM


K/A Number and Importance: 203000.A4.02    4.1 / 4.1
==Title:==
LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 07 JPM Number: S-N-d Task Number and


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02        4.1 / 4.1 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room          In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
Simulator Control Roo m  In-Plant Testing Method:
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
12 minutes Actual Time Used:
minutes


==References:==
==References:==
DEOP 0500-03, rev 20 EVALUATION


DEOP 0500-03, rev 20  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-d                                                                        Page 8 of 9


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):
Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-d  Page 9 of 9  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection
: 2. A transient has occurred requiring Alternate Water Injection.
. 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping.
-65 inches and slowly dropping.
: 4. RPV pressure is 375 psig and slowly dropping.
: 4. RPV pressure is 375 psig and slowly dropping.
: 5. An EO has been briefed and is in the field.
: 5. An EO has been briefed and is in the field.
INITIATING CUE 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500
INITIATING CUE
-03, step G.12.
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
S-N-d                                                              Page 9 of 9


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


CONTAINMENT
Job Performance Measure (JPM)
- VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number:
Revision Record (Summary)
S-N-e  Revision Number: 0 5  Date: 0 9/10 Developed By:
Revision 04 Bank JPM.
Instructor Date    Approved By:
Revision 05 Revised for 2010 NRC exam.
Facility Representative Date Job Performance Measure (JPM)
S-N-e                                                    Page 2 of 8
S-N-e  Page 2 of 8  Revision Record (Summary)
Revision 0 4 Bank JPM. Revision 0 5 Revised for 2010 NRC exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-e  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work
: 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
. 2. Ensure Torus water level is 20 feet. 3. Insert following Malfunctions and/or Remotes.
: 2. Ensure Torus water level is 20 feet.
IMF CIGP2I (Spurious Group II Isolation)
: 3. Insert following Malfunctions and/or Remotes.
IOR PCDOOP61 OFF (prevents the 1601
* IMF CIGP2I (Spurious Group II Isolation)
-61 valve from opening)
* IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
Adjusts Torus Level indications to ~20 feet. ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
* Adjusts Torus Level indications to ~20 feet.
Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
* ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled
* Adjusts Drywell & Torus pressures to 50.0 psig.
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
: 4. Verify the SBGT system operating and verify flow ~4000 scfm.
: 4. Verify the SBGT system operating and verify flow ~4000 scfm.
: 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
: 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
: 6. Place CRM ISOL switch to ISOLATE  
: 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
- wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 500-04.
DOCUMENT PREPARATION Markup a copy of DEOP 500
S-N-e                                                                      Page 3 of 8
-04.
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-e  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Aux NSO.
: 1. You are the Aux NSO.
: 2. A break inside the Primary Containment has occurred.
: 2. A break inside the Primary Containment has occurred.
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 200
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
-01. 4. Torus water level is 20' 5. Control Room ventilation has been isolated.
: 4. Torus water level is 20'
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
: 8. The Instrument Air System is available.
: 8. The Instrument Air System is available.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
* Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-e                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-e  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide examinee the marked up copy of DEOP 0500
Provide examinee the marked up copy of DEOP 0500-04.
-04. NOTE: Annunciator 902
Annunciator 902-3 A-15 may be received during this JPM.
-3 A-15 may be received during this JPM.
: 1. Verify SBGT is operating and     Verifies 2/3A SBGT train flow is ~ 4000 scfm.             FI 7540-13 is reading
: 1. Verify SBGT is operating and flow is ~ 4000 scfm.
                                          ~4000 scfm.                     _____     _____       _____
Verifies 2/3A SBGT train              FI 7540-13 is reading ~4000 scfm.
: 2. Verify Reactor Mode switch       Verifies Reactor Mode NOT in RUN.                     switch NOT in RUN.
_____         _____         _____
: 3. Place VENT ISOL SIGNAL           Momentarily places BYPASS switch on 902-5           Bypass switch to Torus panel to TORUS.                 Position.                       _____     _____       _____
: 2. Verify Reactor Mode switch NOTVerifies Reactor Mode switch  in RUN. NOT in RUN. _____        _____        _____
NOTE:
: 3. Place VENT ISOL SIGNAL BYPASS switch on 902
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.
-5 panel to TORUS.
: 4. Open AO 2-1601-61, TORUS         Places AO 2-1601-61 2-INCH VENT VLV.                control switch to OPEN position and determines         _____      _____        _____
Momentarily places Bypass switch to Torus Position.
that the valve will not open.
_____         _____         _____
NOTE:
The AO 2-1601-61, TORUS 2
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
-INCH VENT VLV, will NOTE: NOT open. 4. Open AO 2-1601-61, TORUS 2-INCH VENT VLV.
BEGIN ALTERNATE PATH
Places AO 2
* 5. Place VENT ISOL SIGNAL           Momentarily places Vent BYPASS switch on 902-5           Isol Signal Bypass switch panel to DRYWELL.               to Drywell position.           _____     _____       _____
-1601-61 control switch to OPEN position and determines that the valve will not open.
_____        _____        _____
IF candidate states that the 2
-1601-61 valve will not open, direct him/her to complete the task
. NOTE: BEGIN ALTERNATE PATH
* 5. Place VENT ISOL SIGNAL BYPASS switch on 902
-5 panel to DRYWELL.
Momentarily places Vent Isol Signal Bypass switch to Drywell position.
_____         _____         _____
If examinee reads TORUS BOTTOM PRESS PI 2
-1640-103,                                                          inform him/her that the meter displays 58 psig and is trending UP slowly.
CUE:
CUE:
* 6. Open AO 2-1601-62, DW 2-INCH Vent.
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
Red Open light illuminated.
* 6. Open AO 2-1601-62, DW           Red Open light illuminated.
_____        _____        _____
2-INCH Vent.
S-N-e                                                                        Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-e  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT      Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT
* 7. Open AO 2-1601-63, VENT TO SBGT. Red Open light illuminated.
* 7.     Open AO 2-1601-63, VENT         Red Open light illuminated.
_____        _____        _____
TO SBGT.
: 8. Start as many Turbine Building and Radwaste Exhaust fans as possible.
: 8.     Start as many Turbine           Initiates action to start All Building and Radwaste           available Turbine Building Exhaust fans as possible.       and Radwaste Exhaust fans.                           _____     _____         _____
Initiates action to start All available Turbine Building and Radwaste Exhaust fans. _____         _____         _____
: 9.     Determine if SBGT flow is       Containment pressure adequate to control and         stable or decreasing.
: 9. Determine if SBGT flow is adequate to control and maintain DW pressure below the Primary Containment Pressure Limit.
maintain DW pressure below the Primary Containment                                         _____      _____          _____
Containment pressure stable or decreasing.
Pressure Limit.
_____        _____        _____
CUE:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
CUE: If examinee asks reading on TORUS BOTTOM PRESS PI 2
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
-1640-103,                                                     inform him/her that the meter has decreased to 53 psig (5 psig less than original report). 10. Informs Unit Supervisor task is complete.
: 10. Informs Unit Supervisor task     Examinee notifies the Unit is complete.                    Supervisor.
Examinee notifies the Unit Supervisor. _____        _____        _____
CUE:
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-e                                                                          Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-e  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    RO SRO      JPM Title: CONTAINMENT
Job
- VENT THE TORUS WITH LEVEL LESS THAN 30 FEET Revision Number: 05


JPM Number:  S
==Title:==
-N-e  Task Number and Title: 295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit
RO            SRO JPM
.
K/A Number and Importance:
295024.A1.14    3.4 / 3.5


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET Revision Number: 05 JPM Number: S-N-e Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
Yes No Estimated Time to Complete:
K/A Number and Importance: 295024.A1.14        3.4 / 3.5 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 17 minutes           Actual Time Used:           minutes
17 minutes Actual Time Used:
minutes


==References:==
==References:==
DEOP 0500-04, rev 12 EVALUATION


D EOP 0500-04, rev 1 2  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-e                                                                        Page 7 of 8


==SUMMARY==
: Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactor y  Unsatisfactory Comments:                Evaluator's Name (Print):
Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-e  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Aux NSO.
: 1. You are the Aux NSO.
: 2. A break inside the Primary Containment has occurred.
: 2. A break inside the Primary Containment has occurred.
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 200
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
-01. 4. Torus water level is 20' 5. Control Room ventilation has been isolated.
: 4. Torus water level is 20'
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
: 8. The Instrument Air System is available.
: 8. The Instrument Air System is available.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
-04, attachment 1 to control Primary Containment pressure. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
S-N-e                                                              Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date


AUX POWER
Job Performance Measure (JPM)
- TRANSFER POWER TO TR
Revision Record (Summary)
-22 FROM TR-2 1 WITH BREAKER FAILURE  JPM Number:
Revision 00 New JPM.
S-N-f  Revision Number: 0 1  Date: 09/10 Developed By:
Revision 01 Revised for 2010 NRC exam.
Instructor Date    Approved By:
S-N-f                                                   Page 2 of 9
Facility Representative Date Job Performance Measure (JPM) S-N-f  Page 2 of 9  Revision Record (Summary)
 
Revision 0 0 New JPM. Revision 0 1 Revised for 2010 NRC exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)  S-N-f Page 3 of 9 SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Insert following Malfunctions and/or Remotes:
: 2. Insert following Malfunctions and/or Remotes:
M63 (to prevent TR
* M63 (to prevent TR-22 to Bus 23 breaker from closing).
-22 to Bus 23 breaker from closing).
: 3. Setup the following Triggers:
: 3. Setup the following Triggers:
None. 4. Ensure ONLY 2 RFPs operating.
* None.
: 4. Ensure ONLY 2 RFPs operating.
: 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
: 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Marked up copy of DOP 6500-01.
: 1. Marked up copy of DOP 6500-01.
Job Performance Measure (JPM)  S-N-f Page 4 of 9 INITIAL CONDITIONS
S-N-f                                                                           Page 3 of 9
 
Job Performance Measure (JPM)
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit 2 was operating at rated power when the TR
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
-21 trouble alarm is received.
: 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
: 3. The NLO, dispatched to TR
: 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
-21, report ed that the TR
: 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
-21 cooling fans are not all operating and the transformer temperature is rising
. 4. The Unit Supervisor has decided to unload TR
-21 by transferring auxiliary power to       TR-22. 5. Another operator will verify TR
-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-2 2 from TR-2 1 in accordance with DOP 6500
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
-01. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-f                                                                          Page 4 of 9


Job Performance Measure (JPM) S-N-f  Page 5 of 9  JPM Start Time
Job Performance Measure (JPM)
: PERFORMANCE CHECKLIST
JPM Start Time: _________
_________ STANDARDS SAT UNSAT Comment Provide the examinee with the provided copy of DOP 6500-01. NOTE: This task has two parts, which can be performed in any order.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT NOTE:
IF the incoming and running voltages are NOT approximately equal,                                             inform examinee that they ARE approximately equal.
Provide the examinee with the provided copy of DOP 6500-01.
CUE: TRANSFER BUS 21 TO TR
This task has two parts, which can be performed in any order.
-22
CUE:
* 1. Position TR-22 to Bus 21 SYNCHROSCOPE selector switch to ON.
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
Switch in ON position. _____        _____         _____
TRANSFER BUS 21 TO TR-22
: 2. Verify: INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
* 1. Position TR-22 to Bus 21         Switch in ON position.
SYNCHRONIZING meter at 12 o'clock position and NOTSYNCHRONIZING meter lights  rotating. NOT glowing. Voltages approximately equal. Meter NOTWhite lights extinguished
SYNCHROSCOPE selector switch to ON.                                                 _____        _____     _____
. rotating.     _____        _____         _____
: 2. Verify:
* 3. Position TR-22 to Bus 21 breaker control switch to CLOSE. RED light illuminated.
INCOMING VOLTS and               Voltages approximately RUNNING VOLTS meters             equal.
_____        _____         _____
approximately equal.
: 4. Verify: SYNCHRONIZING meter at 12 o'clock position. TR-22 to Bus 21 breaker indicates CLOSED.
Meter NOT rotating.
Annunciator 902
SYNCHRONIZING meter at 12 oclock position and NOT     White lights extinguished.
-8 D-1 in alarm. Meter NOT  rotating. RED light illuminated.
rotating.
Annunciator 902
SYNCHRONIZING meter                                          _____        _____     _____
-8 D-1 illuminated.
lights NOT glowing.
* 3. Position TR-22 to Bus 21         RED light illuminated.
breaker control switch to CLOSE.                                                       _____        _____     _____
: 4. Verify:
SYNCHRONIZING meter at           Meter NOT rotating.
12 oclock position.
TR-22 to Bus 21 breaker RED light illuminated.
indicates CLOSED.
Annunciator 902-8 D-1 in         Annunciator 902-8 D-1 alarm.                          illuminated.
S-N-f                                                                      Page 5 of 9


_____        _____        _____
Job Performance Measure (JPM)
 
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS               SAT
Job Performance Measure (JPM) S-N-f  Page 6 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 5. Position TR-21 to Bus 21       GREEN light illuminated.
* 5. Position TR-21 to Bus 21 breaker control switch to TRIP. GREEN light illuminated.
breaker control switch to TRIP.                                                       _____   _____         _____
_____         _____         _____
: 6. Verify:
: 6. Verify: TR-21 to Bus 21 breaker indicates OPEN.
TR-21 to Bus 21 breaker         GREEN light illuminated.
Annunciator 902
indicates OPEN.
-8 D-1 clears. GREEN light illuminated.
Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears.
Annunciator 902
extinguished.
-8 D-1 extinguished.
: 7. Position TR-22 to Bus 21       Switch in OFF position.
 
synchroscope selector switch to OFF.                                                     _____   _____         _____
_____        _____        _____
: 8. Verify Bus 21 AMMETER and       Verifies Bus 21 amps and VOLTMETER indications are      volts are normal.
: 7. Position TR-22 to Bus 21 synchroscope selector switch to O FF. Switch in OFF position
normal.                                                      _____   _____         _____
. _____         _____         _____
NOTE:
: 8. Verify Bus 21 AMMETER and VOLTMETER indications are normal. Verifies Bus 21 amps and volts are normal. _____         _____         _____
Amps may vary depending on conditions, and volts are normally ~ 4160.
Amps may vary depending on conditions, and volts are normally ~ 4160
TRANSFER BUS 23 TO TR-22
. NOTE: TRANSFER BUS 23 TO TR
* 9. Position TR-22 to Bus 23       Switch in ON position.
-22
SYNCHROSCOPE selector switch to ON.                                               _____   _____         _____
* 9. Position TR-22 to Bus 23 SYNCHROSCOPE selector switch to ON.
: 10. Verify:
Switch in ON position. _____         _____         _____
INCOMING VOLTS and             Voltages approximately RUNNING VOLTS meters           equal.
: 10. Verify: INCOMING VOLTS and RUNNING VOLTS meters approximately equal.
approximately equal.
SYNCHRONIZING meter at 12 o'clock position and NOTSYNCHRONIZING meter lights  rotating. NOT glowing. Voltages approximately equal. Meter NOTWhite lights extinguished.
Meter NOT rotating.
rotating.     _____         _____         _____
SYNCHRONIZING meter at 12 oclock position and NOT     White lights extinguished.
rotating.
SYNCHRONIZING meter                                          _____   _____         _____
lights NOT glowing.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 11. Position TR-22 to Bus 23 breaker control switch to CLOSE. Breaker does NOT close
* 11. Position TR-22 to Bus 23       Breaker does NOT close.
. _____         _____         _____
breaker control switch to CLOSE.                                                       _____   _____         _____
S-N-f                                                                    Page 6 of 9


Job Performance Measure (JPM) S-N-f  Page 7 of 9  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Job Performance Measure (JPM)
* 12. IMMEDIATELY position s TR-22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                 SAT
GREEN light illuminated. _____         _____         _____
* 12. IMMEDIATELY positions TR-       GREEN light illuminated.
IF an Operator is dispatched to check the tripped breaker, report:                                                         "the breaker is open, with NO flags up"
22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor.                                     _____           _____     _____
. CUE: Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de
CUE:
-energize Bus 23
IF an Operator is dispatched to check the tripped breaker, report:
. NOTE: 13. Informs Unit Supervisor task is complete.
the breaker is open, with NO flags up.
Examinee notifies the Unit Supervisor.
NOTE:
_____        _____        _____
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.
: 13. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                    Supervisor.
CUE:
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
: _________  
S-N-f                                                                        Page 7 of 9


Job Performance Measure (JPM) S-N-f  Page 8 of 9  Operator's Name:
Job Performance Measure (JPM)
Job Title:    RO SRO      JPM Title: AUX POWER
Operators Name:
- TRANSFER POWER TO TR
Job
-22 FROM TR
-21 WITH BREAKER FAILURE Revision Number: 0 1
JPM Number:  S
-N-f  Task Number and Title: 262L024, Transfer a 4160 volt bus between power supplies.


K/A Number and Importance: 262001.A4.04    3.6 / 3.7
==Title:==
RO            SRO JPM


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE Revision Number: 01 JPM Number: S-N-f Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
262L024, Transfer a 4160 volt bus between power supplies.
Yes No Estimated Time to Complete:
K/A Number and Importance: 262001.A4.04        3.6 / 3.7 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 14 minutes           Actual Time Used:           minutes
14 minutes Actual Time Used:
minutes


==References:==
==References:==
DOP 6500-01, rev 10 EVALUATION


DO P 6500-01, rev 10  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-f                                                                        Page 8 of 9


==SUMMARY==
Job Performance Measure (JPM)
:
INITIAL CONDITIONS
Were all the Critical Elements performed satisfactorily?
: 1. You are the Unit 2 Aux NSO.
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
: 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
Date:
: 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
Job Performance Measure (JPM) S-N-f  Page 9 of 9  INITIAL CONDITIONS 1. You are the Unit 2 Aux NSO.
: 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
: 2. Unit 2 was operating at rated power when the TR
INITIATING CUE
-21 trouble alarm is received. 3. The NLO, dispatched to TR
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
-21, report ed that the TR
: 2. Inform the Unit Supervisor when the task is complete.
-21 cooling fans are not all operating and the transformer temperature is rising
S-N-f                                                              Page 9 of 9
. 4. The Unit Supervisor has decided to unload TR
-21 by transferring auxiliary power to TR
-22. 5. Another operator will verify TR
-86 Load Tap Changer positions and loading remains below the restrictions of the procedure
. INITIATING CUE
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-2 2 from TR-2 1 in accordance with DOP 6500
-01. 2. Inform the Unit Supervisor when the task is complete.


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


RWM - ENTER SUBSTITUTE ROD POSITION JPM Number:
Job Performance Measure (JPM)
S-N-g  Revision Number: 0 5  Date: 09/10 Developed By:
Revision Record (Summary)
Instructor Date    Approved By:
Revision 04 Bank JPM.
Facility Representative Date Job Performance Measure (JPM)
Revision 05 Revised for 2010 NRC exam.
S-N-g  Page 2 of 7 Revision Record (Summary) Revision 0 4 Bank JPM. Revision 05 Revised for 2010 NRC exam.
S-N-g                                                Page 2 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-g  Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Desired substitute position for control rod N
: 2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below).
-07 is 48. (Check prior to inserting the malfunction below)
: 3. Enter the following Expert Command prior to starting this JPM.
. 3. Enter the following Expert Command prior to starting this JPM.
* IMF RDFAILN7 (RPIS failure for control rod N-07)
IMF RDFAILN7 (RPIS failure for control rod N
: 4. Acknowledge alarms and reset alarms.
-07) 4. Acknowledge alarms and reset alarms.
: 5. Verify RWM operational and on Main Screen.
: 5. Verify RWM operational and on Main Screen.
DOCUMENT PREPARATION Markup a copy of DOP 0400-02.
DOCUMENT PREPARATION Markup a copy of DOP 0400-02.
S-N-g                                                                          Page 3 of 7
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-g  Page 4 of 7 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 NSO
: 1. You are the Unit 2 NSO.
. 2. Control Rod N-07 rod position has failed.
: 2. Control Rod N-07 rod position has failed.
: 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
: 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
: 4. The Control Rod has been currently verified to be at position 48.
: 4. The Control Rod has been currently verified to be at position 48.
: 5. The Rod Worth Minimizer is operational.
: 5. The Rod Worth Minimizer is operational.
: 6. No other rods have had a substitute position assigned.
: 6. No other rods have had a substitute position assigned.
INITIATING CUE 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400
INITIATING CUE
-02, step G.3.c.
: 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
: 2. Notify Unit Supervisor when the substitute position has been entered.
: 2. Notify Unit Supervisor when the substitute position has been entered.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g                                                                          Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-g  Page 5 of 7 JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment #
_________ STANDARDS SAT UNSAT Comment # Provide examinee a copy of DOP 0400
PERFORMANCE CHECKLIST                       STANDARDS                   SAT NOTE:
-02. NOTE: 1. Proceed to Step G.3.c.(1) of DOP 0400
Provide examinee a copy of DOP 0400-02.
-02. Proceeds to Step G.3.c.(1) of DOP 0400-02. _____        _____        _____
: 1. Proceed to Step            Proceeds to Step G.3.c.(1) of G.3.c.(1) of DOP 0400-     DOP 0400-02.
* 2. Selects Secondary Functions, then Substitute Position screen Substitute Position screen SELECTED. _____        _____        _____
02.
* 3. Selects control rod N
* 2. Selects Secondary             Substitute Position screen Functions, then               SELECTED.
-07 on the touch screen.
Substitute Position screen
Control Rod N
* 3. Selects control rod N-07     Control Rod N-07 outlined with on the touch screen.          blue box and shown on screen as SELECTED.
-07 outlined with blue box and shown on screen as SELECTED.
* 4. Sets the desired Control     POSITION SHOWN on top of Rod position on the bar       position bar graph, reads 48.
_____        _____        _____
graph on the left side of the screen.
* 4. Sets the desired Control Rod position on the bar graph on the left side of the screen. POSITION SHOWN on top of position bar graph, reads 48.
* 5. Touches the ENTER             RWM accepts the request, rod REQUEST box.                  N-07 position indication changes from ?? to substituted 48 position.
_____        _____        _____
: 6. Touches the EXIT          RWM returns to the Main FUNCTION box to            Display return to the Main Display CUE:
* 5. Touches the ENTER REQUEST box.
Respond as US when examinee informs you they have completed the task END JPM Stop Time:_________
RWM accepts the request, rod
S-N-g                                                                      Page 5 of 7


N-07 position indication changes from ?? to substituted 48 position.
_____        _____        _____  6. Touches the EXIT FUNCTION box to return to the Main Display RWM returns to the Main Display  _____        _____        _____
Respond as US when examinee informs you they have completed the task CUE:  END  JPM Stop Time
: _________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-g  Page 6 of 7 Operator's Name:
Operators Name:
Job Title:    RO SRO      JPM Title: RWM - ENTER SUBSTITUTE ROD POSITION Revision Number: 05
Job


JPM Number: S
==Title:==
-N-g  Task Number and Title: 201L027, Enter Substitute Rod Position.
RO            SRO JPM


K/A Number and Importance: 201006.A4.06     3.2 / 3.2 Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
RWM - ENTER SUBSTITUTE ROD POSITION Revision Number: 05 JPM Number: S-N-g Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Pa th: Yes No   Perform SRO Only: Yes No Time Critical:
==Title:==
Yes No Estimated Time to Complete:
201L027, Enter Substitute Rod Position.
12 minutes Actual Time Used:
K/A Number and Importance: 201006.A4.06         3.2 / 3.2 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
minutes


==References:==
==References:==
DOP 0400-02, rev 23 EVALUATION


DOP 0400-02, rev 2 3  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:              Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-g                                                                        Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):
Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-g  Page 7 of 7 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. Control Rod N-07 rod position has failed. 3. Control Rod N
: 2. Control Rod N-07 rod position has failed.
-07 was verified to be at position 48 prior to failure, and has NOT been moved.
: 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
: 4. The Control Rod has been currently verified to be at position 48.
: 4. The Control Rod has been currently verified to be at position 48.
: 5. The Rod Worth Minimizer is operational.
: 5. The Rod Worth Minimizer is operational.
: 6. No other rods have had a substitute position assigned
: 6. No other rods have had a substitute position assigned.
. INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N
: 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
-07 in accordance with DOP 0400
-02, step G.3.c.
: 2. Notify Unit Supervisor when the substitute position has been entered.
: 2. Notify Unit Supervisor when the substitute position has been entered.
S-N-g                                                                    Page 7 of 7
Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


Exelon Nuclear Job Performance Measure
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 00 New JPM developed for 2010 NRC exam.
S-N-h                                              Page 2 of 7


OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE  JPM Number:
S-N-h  Revision Number: 0 0  Date: 09/10 Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-h  Page 2 of 7  Revision Record (Summary)
Revision 0 0 New JPM developed for 2010 NRC exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-h  Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 12.
: 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:     It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation
: 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation.
. 3. Setup the following Triggers
: 3. Setup the following Triggers:
None. DOCUMENT PREPARATION Markup a copy of DOP 5400-05.
* None.
DOCUMENT PREPARATION Markup a copy of DOP 5400-05.
S-N-h                                                                          Page 3 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-h  Page 4 of 7 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
. INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
-05, step G.4
: 2. Inform the Unit Supervisor when the task is complete.
. 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-h                                                                          Page 4 of 7


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-h  Page 5 of 7 JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment #
_________ STANDARDS SAT UNSAT Comment # Provide the Examinee with the provided copy of DOP 5400-05. NOTE: 1. Proceeds to step G.4 of DOP 5400-05. Locates step G.4 of the procedure (which then directs next step).
PERFORMANCE CHECKLIST                         STANDARDS                   SAT NOTE:
_____         _____         _____
Provide the Examinee with the provided copy of DOP 5400-05.
: 2. Determines the correct step to utilize is step G.2 1 of DOP 5400
: 1. Proceeds to step G.4 of     Locates step G.4 of the DOP 5400-05.                procedure (which then directs next step).                       _____   _____     _____
-05. Proceeds to step G.2 1 of the procedure.
: 2. Determines the correct     Proceeds to step G.21 of the step to utilize is step     procedure.
_____         _____         _____
G.21 of DOP 5400-05.                                           _____   _____     _____
* 3. Close AO 2-5417, ADSORBER TRN 2 BYPASS VLV
* 3. Close AO 2-5417,               GREEN light illuminated.
. GREEN light illuminate
ADSORBER TRN 2 BYPASS VLV.
: d. _____        _____        _____
* 4. Close AO 2-5423,               GREEN light illuminated.
* 4. Close AO 2-5423, ADSORBER TRN 3 BYPASS VLV
ADSORBER TRN 3 BYPASS VLV.
. GREEN light illuminated
* 5. Open AO 2-5415,               GREEN light illuminated.
. _____        _____        _____
ADSORBER TRN 1 DISCH VLV.
* 5. Open AO 2-5415, ADSORBER TRN 1 DISCH VLV. GREEN light illuminated
* 6. Open AO 2-5421,               GREEN light illuminated.
. _____        _____        _____
ADSORBER TRN 2 DISCH VLV.
* 6. Open AO 2-5421, ADSORBER TRN 2 DISCH VLV. GREEN light illuminated
* 7. Close AO 2-5416,               GREEN light illuminated.
. _____        _____        _____
ADSORBER TRN 1 BYPASS VLV.
* 7. Close AO 2-5416, ADSORBER TRN 1 BYPASS VLV
* 8. Close AO 2-5422,               GREEN light illuminated.
. GREEN light illuminated. _____        _____        _____
ADSORBER TRN 2 BYPASS VLV.
* 8. Close AO 2-5422, ADSORBER TRN 2 BYPASS VLV
: 9. Notify Unit Supervisor of   Unit Supervisor notified of task task completion.            completion.
. GREEN light illuminated
CUE:
. _____        _____        _____
: 9. Notify Unit Supervisor of task completion.
Unit Supervisor notified of task completion.
_____        _____        _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-h                                                                      Page 5 of 7
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-h  Page 6 of 7 Operator's Name:
Operators Name:
Job Title:    RO SRO      JPM Title: OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIE S MODE Revision Number: 0 0
Job
JPM Number:  S
-N-h  Task Number and Title: 271L005, Startup the Offgas Charcoal Adsorber system


K/A Number and Importance: 271000.A4.09    3.3 / 3.2
==Title:==
RO            SRO JPM


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE Revision Number: 00 JPM Number: S-N-h Task Number and
Simulator Control Room In-Plant Testing Method:
 
Simulate Alternate Path
==Title:==
: Yes No   Perform SRO Only: Yes No Time Critical:
271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09        3.3 / 3.2 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes           Actual Time Used:           minutes
Yes No Estimated Time to Complete:
1 2 minutes Actual Time Used:
minutes


==References:==
==References:==
DOP 5400-05, rev 32 EVALUATION


DOP 5400-05, rev 3 2  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:              Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-h                                                                        Page 6 of 7


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):
Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-h  Page 7 of 7 INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
-05, step G.4
: 2. Inform the Unit Supervisor when the task is complete.
. 2. Inform the Unit Supervisor when the task is complete.
S-N-h                                                                Page 7 of 7
 
Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By:
Instructor                    Date Approved By:
Facility Representative        Date


Exelon Nuclear Job Performance Measure
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 09 Bank JPM.
Revision 10 Revised for 2010 NRC Exam.
S-N-i                                                    Page 2 of 8


LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number:
S-N-i  Revision Number:
1 0  Date: 0 9/10        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-i  Page 2 of 8  Revision Record (Summary)
Revision 0 9 Bank JPM. Revision 1 0 Revised for 2010 NRC Exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. None, this JPM is performed in the plant.
: 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03. .
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-i                                                      Page 3 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO. 2. Unit 2 has just scrammed.
: 1. You are an extra NSO.
: 2. Unit 2 has just scrammed.
: 3. A LOCA is causing RPV level to lower.
: 3. A LOCA is causing RPV level to lower.
: 4. The Clean Demin Water system is operating normally.
: 4. The Clean Demin Water system is operating normally.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
-03, step G.4.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to  
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
 
document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-i                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT      Comment PERFORMANCE CHECKLIST                         STANDARDS                 SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DEOP 0500-03. NOTE: The examinee is NOT required to obtain a key to open or close locked valves.
Provide the Examinee with the supplied copy of DEOP 0500-03.
The examinee is required only to identify which type of key is required to open the valve
The examinee is NOT required to obtain a key to open or close locked valves.
. 1. Proceeds to the Unit 2 Standby Liquid Control (SBLC) area.
The examinee is required only to identify which type of key is required to open the valve.
Proceeds to the U2 SBLC area. _____         _____         _____
: 1. Proceeds to the Unit 2           Proceeds to the U2 SBLC Standby Liquid Control           area.
* 2. Unlock and close 2-1101-4, SBLC STORAGE TK OUTLET SV. Unlock lock and removes chain, then rotates valve hand wheel full clockwise.
(SBLC) area.                                                   _____       _____         _____
_____         _____         _____
* 2. Unlock and close 2-1101-4,       Unlock lock and removes SBLC STORAGE TK                  chain, then rotates valve OUTLET SV.                      hand wheel full clockwise. _____       _____         _____
The component is in the condition you have described
CUE:
. CUE:
The component is in the condition you have described.
* 3. Unlock and close 2-1199-37 SBLC STORAGE TK OUTLET SV. Unlock lock and removes chain, then rotates valve handle 1/4 turn clockwise.
* 3. Unlock and close 2-1199-37       Unlock lock and removes SBLC STORAGE TK                  chain, then rotates valve OUTLET SV.                      handle 1/4 turn clockwise. _____       _____         _____
_____         _____         _____
CUE:
The component is in the condition you have described
The component is in the condition you have described.
. CUE:
* 4. Open 2-4315-500, CLEAN           Rotates valve hand wheel DEMIN WTR SUPPLY TO             full counter-clockwise.
* 4. Open 2-4315-500, CLEAN DEMIN WTR SUPPLY TO SBLC SV. Rotates valve hand wheel full counter
SBLC SV.                                                        _____       _____         _____
-clockwise.
CUE:
_____         _____         _____
The component is in the condition you have described.
The component is in the condition you have described
* 5. Open 2-1101-7, CLEAN             Rotates valve hand wheel DEMIN WTR TO SBLC TEST           full counter-clockwise.
. CUE:
TK SV.                                                          _____       _____         _____
* 5. Open 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV. Rotates valve hand wheel full counter
CUE:
-clockwise.
The component is in the condition you have described.
_____         _____         _____
S-N-i                                                                          Page 5 of 8
The component is in the condition you have described
 
. CUE:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT    Comment PERFORMANCE CHECKLIST                       STANDARDS                   SAT
* 6. Unlock and open 2-1101-8, SBLC TEST TK OUTLET SV
* 6. Unlock and open 2-1101-8,       Unlock lock and removes SBLC TEST TK OUTLET SV.         chain, then rotates valve hand wheel full counter-       _____       _____        _____
. Unlock lock and removes chain, then rotates valve hand wheel full counter
clockwise.
-clockwise.
CUE:
_____         _____        _____
The component is in the condition you have described.
The component is in the condition you have described
NOTE:
. CUE:  NOTE:
* 7. Start both SBLC pumps from     Contacts the Unit 2 Control the main Control Room.         Room Operator to start the SBLC pumps.                   _____       _____        _____
* 7. Start both SBLC pumps from the main Control Room.
CUE:
Contacts the Unit 2 Control Room Operator to start the SBLC pumps.
_____         _____        _____
I have started both Unit 2 Standby Liquid Control pumps.
I have started both Unit 2 Standby Liquid Control pumps.
CUE: 8. Throttle 2-1 101-7, CLEAN DEMIN WTR TO SBLC TEST TK SV, to stabilize level in tank. Opens / closes valve to maintain test tank level
: 8. Throttle 2-1101-7, CLEAN       Opens / closes valve to DEMIN WTR TO SBLC TEST         maintain test tank level.
. _____         _____        _____
TK SV, to stabilize level in                                   _____       _____        _____
tank.
CUE:
The test tank level is now stabilized (as much going in as is going out).
The test tank level is now stabilized (as much going in as is going out).
CUE: 9. Informs Unit Supervisor task is complete.
: 9. Informs Unit Supervisor task   Examinee notifies the Unit is complete.                    Supervisor.
Examinee notifies the Unit Supervisor.
CUE:
_____        _____        _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-i                                                                        Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:     RO SRO       JPM Title: LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number:
Job
1 0 JPM Number: S-N-i Task Number and Title: 295L088, Line Up SBLC Test Tank for Alternate Water Injection
 
.
==Title:==
K/A Number and Importance:
RO           SRO JPM
295031.A1.08     3.8 / 3.9 Suggested Testing Environment
 
:   Simulator Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Testing Method:
LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 10 JPM Number: S-N-i Task Number and
Simulate Alternate Path
 
: Yes No   Perform SRO Only: Yes No Time Critical:
==Title:==
Yes No Estimated Time to Complete:
295L088, Line Up SBLC Test Tank for Alternate Water Injection.
1 7 minutes Actual Time Used:
K/A Number and Importance: 295031.A1.08         3.8 / 3.9 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 17 minutes           Actual Time Used:           minutes
minutes


==References:==
==References:==
DEOP 0500-03, rev 19 EVALUATION


DEOP 0500-03, rev 19  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-i                                                                        Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-i  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO.
: 1. You are an extra NSO.
: 2. Unit 2 has just scrammed.
: 2. Unit 2 has just scrammed.
Line 2,016: Line 1,974:
: 4. The Clean Demin Water system is operating normally.
: 4. The Clean Demin Water system is operating normally.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
-03,           step G.4. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
S-N-i                                                                Page 8 of 8


Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By:
Instructor                      Date Approved By:
Facility Representative          Date


EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number:
Job Performance Measure (JPM)
S-N-j  Revision Number: 0 2  Date: 09/10 Developed By:
Revision Record (Summary)
Instructor Date    Approved By:
Revision 01 Bank JPM.
Facility Representative Date Job Performance Measure (JPM)
Revision 02 Revised for 2010 NRC exam.
S-N-j  Page 2 of 8  Revision Record (Summary) Revision 0 1 Bank JPM. Revision 02 Revised for 2010 NRC exam.
S-N-j                                                    Page 2 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. None, this JPM is performed in the plant.
: 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOA 6600-01.
DOCUMENT PREPARATION Markup a copy of DOA 6600-01.
S-N-j                                                      Page 3 of 8
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO. 2. Annunciator 9 02-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated
: 1. You are an extra NSO.
. INITIATING CUE
: 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600
INITIATING CUE
-01, attachment A
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
. 2. Inform the Unit Supervisor when the task is complete
: 2. Inform the Unit Supervisor when the task is complete.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-j                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 5 of 8  JPM Start Time: PERFORMANCE CHECKLIST
JPM Start Time: _________
_________ STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOA 6600-01. NOTE: 1. Proceed s to the 2/3 Diesel Generator Room.
UNSAT    Comment PERFORMANCE CHECKLIST                           STANDARDS                 SAT NOTE:
Proceed s to the 2/3 Diesel Generator Room
Provide the Examinee with the supplied copy of DOA 6600-01.
. _____        _____        ____
: 1. Proceeds to the 2/3 Diesel         Proceeds to the 2/3 Diesel Generator Room.                   Generator Room.
_
* 2. Examinee checks the level in       Observes day tank the D/G Fuel Oil Day Tank.         sightglass and determines day tank needs filling.
* 2. Examinee checks the level in the D/G Fuel Oil Day Tank.
CUE:
Observes day tank sightglass and determines day tank needs filling.
Point to the lower third area on the local sightglass measuring stick and state: the level is here.
_____        _____        _____
NOTE:
Point to the lower third area on the local sightglass measuring stick and state: " the level is here".
Normal level is 30 - 38".
CUE: Normal level is 30 - 38". NOTE: 3. Verify that power is available to the DIESEL FUEL OIL TRANSFER PUMP 2/3. Verifies power available, by local indicating lights illuminated.
: 3. Verify that power is available     Verifies power available, to the DIESEL FUEL OIL             by local indicating lights TRANSFER PUMP 2/3.                 illuminated.
_____        _____        _____
CUE:
The GREEN LIGHT is illuminated.
The GREEN LIGHT is illuminated.
* 4. Start the Fuel Oil Transfer        Holds 2/3-5203 U2 Diesel Pump by holding local Test        Oil Transfer Pp c/s in ON Switch in the ON position.        position.
CUE:
CUE:
* 4. Start the Fuel Oil Transfer Pump by holding local Test Switch in the ON position.
Holds 2/3-5203 U2 Diesel Oil Transfer Pp c/s in ON position. _____        _____        _____
The pump is running.
The pump is running.
CUE: You have held the switch for approximately 5 minutes.
You have held the switch for approximately 5 minutes.
S-N-j                                                                            Page 5 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT      Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT
* 5. Checks the level in the fuel oil day tank. OBSERVES sight glass and/or REQUESTS annunciator 902
* 5. Checks the level in the fuel oil   OBSERVES sight glass day tank.                         and/or REQUESTS annunciator 902-8 G-4 status.                       _____       _____       _____
-8 G-4 status. _____         _____         _____
CUE:
Point to the 35 inch mark on the local sightglass measuring stick and state: " the level is here". AND/OR the NSO says Control Room alarm 902
Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here.
-8 G-4 has reset.
AND/OR the NSO says Control Room alarm 902-8 G-4 has reset.
CUE: 6. Informs Unit Supervisor task is complete.
: 6. Informs Unit Supervisor task       Examinee notifies the Unit is complete.                      Supervisor.
Examinee notifies the Unit Supervisor.
CUE:
_____        _____        _____
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time:_________
END JPM Stop Time:_________
S-N-j                                                                          Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:    RO SRO      JPM Title: : EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 0 2
Job
JPM Number:  S
-N-j  Task Number and Title: 264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.


K/A Number and Importance:
==Title:==
264000.G.1.30     4.4 / 4.0 Suggested Testing Environment:
RO            SRO JPM
In-Plant Actual Testing Environment:
 
Simulator Control Room In-Plant Testing Method:
==Title:==
Simulate Alternate Path
: EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 02 JPM Number: S-N-j Task Number and
: Yes No   Perform SRO Only: Yes No Time Critical:
 
Yes No Estimated Time to Complete:
==Title:==
12 minutes Actual Time Used:
264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.
minutes
K/A Number and Importance: 264000.G.1.30         4.4 / 4.0 Suggested Testing Environment:       In-Plant Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 12 minutes             Actual Time Used:           minutes


==References:==
==References:==
DOA 6600-01, rev 15 EVALUATION


DO A 6600-01, rev 1 5  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-j                                                                        Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-j  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO. 2. Annunciator 902
: 1. You are an extra NSO.
-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
: 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
-01, attachment A.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete
S-N-j                                                                Page 8 of 8
.
 
Exelon Nuclear Job Performance Measure
Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By:
Instructor                  Date Approved By:
Facility Representative      Date
 
Job Performance Measure (JPM)
Revision Record (Summary)
Revision 10 Bank JPM.
Revision 11 Revised for 2010 NRC Exam.
S-N-k                                                    Page 2 of 8


HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number:
S-N-k  Revision Number:
1 1  Date: 0 9/10 Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
S-N-k  Page 2 of 8  Revision Record (Summary)
Revision 10 Bank JPM. Revision 1 1 Revised for 2010 NRC Exam.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 3 of 8  SIMULATOR SETUP INSTRUCTIONS
SIMULATOR SETUP INSTRUCTIONS
: 1. None, this JPM is performed in the plant.
: 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOP 4650-01. .
DOCUMENT PREPARATION Markup a copy of DOP 4650-01.
S-N-k                                                      Page 3 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 4 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO
: 1. You are an extra NSO.
. 2. Control Room personnel have noticed a pungent odor in the Control Room.
: 2. Control Room personnel have noticed a pungent odor in the Control Room.
: 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
: 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
: 4. The Unit 3 Supervisor has evacuated ALL non
: 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
-essential personnel from the Control Room and has directed all NSOs to don SCBAs
: 5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01.
. 5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650
INITIATING CUE
-01. INITIATING CUE
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650
-01, step G.3.
: 2. Inform the Unit 3 Supervisor when the task is complete.
: 2. Inform the Unit 3 Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-k                                                                          Page 4 of 8


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 5 of 8  JPM Start Time
JPM Start Time: _________
: PERFORMANCE CHECKLIST
UNSAT    Comment PERFORMANCE CHECKLIST                         STANDARDS                   SAT NOTE:
_________ STANDARDS SAT UNSAT Comment Provide the Examinee with the supplied copy of DOP 4650
Provide the Examinee with the supplied copy of DOP 4650-01.
-01. NOTE: 1. Proceed s to Emergency Breathing Air manifold in Unit 2 Battery Room
: 1. Proceeds to Emergency            Proceeds to Emergency Breathing Air manifold in Unit   Breathing Air manifold in 2 Battery Room.                   Unit 2 Battery Room.           _____     _____       _____
. Proceeds to Emergency Breathing Air manifold in Unit 2 Battery Room.
: 2. Verify the following:            Verifies valve handle perpendicular to valve body for:
_____         _____         _____
* LP-1 CLOSED
: 2. Verify the following:
* LP-1
LP-1 CLOSED LP-2 CLOSED LP-3 CLOSED  LP-4 CLOSED Verifies valve handle perpendicular to valve body for:  LP-LP-2  LP-3  LP-4   _____        _____        _____
* LP-2 CLOSED
* 3. OPEN all Main Bank Cylinder shutoff valves (Cylinders 7 through 13)
* LP-2                      _____    _____      _____
. Turns hand wheels on cylinders 7
* LP-3 CLOSED
-13 full counter clockwise.
* LP-3
_____         _____         _____
* LP-4 CLOSED
* LP-4
* 3. OPEN all Main Bank Cylinder       Turns hand wheels on shutoff valves (Cylinders 7       cylinders 7-13 full counter through 13).                      clockwise.                     _____     _____       _____
CUE:
The component is in the condition you have described.
The component is in the condition you have described.
CUE: Count cylinders from left to right to find cylinders 7
NOTE:
-13. NOTE:
Count cylinders from left to right to find cylinders 7-13.
* 4. Check Main Bank pressure
* 4. Check Main Bank pressure.         Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side         _____    _____      _____
. Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side gauge). _____        _____        _____
gauge).
NOTE:
Have examinee read actual pressure.
Have examinee read actual pressure.
NOTE: If pressure is <
2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.
CUE:
CUE:
If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.
S-N-k                                                                          Page 5 of 8
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 6 of 8  PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
UNSAT      Comment PERFORMANCE CHECKLIST                           STANDARDS                   SAT
* 5. Pressurize the supply manifold from the Main Bank by opening LP
* 5.     Pressurize the supply           OPENS valve LP-3 by manifold from the Main Bank     turning valve handle by opening LP-3, CR EMERG       counter clockwise 1/4 turn     _____        _____      _____
-3, CR EMERG AIR BREATHING CYL SV.
AIR BREATHING CYL SV.            so handle is in-line with valve body CUE:
OPENS valve LP
-3 by turning valve handle counter clockwise 1/4 turn so handle is in
-line with valve body
_____        _____        _____
The component is in the condition you have described.
The component is in the condition you have described.
CUE: 6. Verify pressure regulator PRV-3 is maintaining manifold pressure >65 psig and <80 psig.
: 6.     Verify pressure regulator       VERIFIES manifold PRV-3 is maintaining             pressure between 65 and manifold pressure >65 psig      80 psig as read on CR         _____        _____      _____
VERIFIES manifold pressure between 65 and 80 psig as read on CR EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).
and <80 psig.                    EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).
_____        _____        _____
CUE:
If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here. CUE: Have examinee read actual pressure.
If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here.
NOTE: 7. Informs Unit Supervisor task is complete.
NOTE:
Examinee notifies the Unit Supervisor.
Have examinee read actual pressure.
_____        _____        _____
: 7.     Informs Unit Supervisor task     Examinee notifies the Unit is complete.                    Supervisor.
CUE:
Acknowledge report of task completion.
Acknowledge report of task completion.
CUE:  END   JPM Stop Time
END JPM Stop Time:_________
:_________
S-N-k                                                                            Page 6 of 8
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 7 of 8  Operator's Name:
Operators Name:
Job Title:     RO SRO       JPM Title: VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR Revision Number:
Job
1 1 JPM Number: S-N-k Task Number and Title: 279M001, Valve in Control Room Breathing Air Supply
 
.
==Title:==
K/A Number and Importance:
RO           SRO JPM
600000.A2.10    2.9 / 3.1
 
==Title:==
VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR Revision Number: 11 JPM Number: S-N-k Task Number and


Suggested Testing Environment
==Title:==
:   Simulator Actual Testing Environment:
279M001, Valve in Control Room Breathing Air Supply.
Simulator Control Room In-Plant Testing Method:
K/A Number and Importance: 600000.A2.10        2.9 / 3.1 Suggested Testing Environment:       Simulator Actual Testing Environment:             Simulator       Control Room           In-Plant Testing Method:         Simulate         Alternate Path:     Yes           No Perform               SRO Only:       Yes           No Time Critical:           Yes         No Estimated Time to Complete: 15 minutes           Actual Time Used:           minutes
Simulate Alternate Path
: Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete:
1 5 minutes Actual Time Used:
minutes


==References:==
==References:==
DOP 4650-01, rev 09 EVALUATION


DOP 4650-01, rev 0 9  EVALUATION
==SUMMARY==
Were all the Critical Elements performed satisfactorily?          Yes            No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                    Satisfactory              Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:                                                Date:
S-N-k                                                                        Page 7 of 8


==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Yes  No  The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:  Satisfactory Unsatisfactory Comments:                Evaluator's Name (Print):      Evaluator's Signature:
Date:
Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-k  Page 8 of 8  INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. You are an extra NSO
: 1. You are an extra NSO.
. 2. Control Room personnel have noticed a pungent odor in the Control Room.
: 2. Control Room personnel have noticed a pungent odor in the Control Room.
: 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
: 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
: 4. The Unit 3 Supervisor has evacuated ALL non
: 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
-essential personnel from the Control Room and has directed all NSOs to don SCBAs
: 5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01.
. 5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01. INITIATING CUE
INITIATING CUE
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
: 2. Inform the Unit 3 Supervisor when the task is complete.}}
: 2. Inform the Unit 3 Supervisor when the task is complete.
S-N-k                                                                Page 8 of 8}}

Latest revision as of 19:29, 20 March 2020

2011 Dresden Nuclear Power Station Initial License Examination Administered Job Performance Measures
ML12021A023
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/29/2011
From: Bielby M
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML11104A072 List:
References
Download: ML12021A023 (156)


Text

Exelon Nuclear Job Performance Measure PERFORM CALCULATED DRYWELL LEAKRATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date A-N-1-R

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified for 2010 NRC exam.

A-N-1-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION Markup a copy of Appendix A.

A-N-1-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 NSO.
2. Unit 3 is operating at rated conditions.
3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed.

INITIATING CUES

1. Perform the required calculations and ensure the acceptance criteria have been met.
2. When complete, give the completed paperwork to the Unit Supervisor for approval.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee the copy of Appendix X, with the times and gallons pumped completed.

  • 1. Complete Appendix A, Completes Appendix A, page(s) page(s), with the results matching those on the provided KEY. _____ _____ _____
  • 2. Informs the Unit Notifies Unit Supervisor.

Supervisor that Acceptance Criteria has been exceeded for _____ _____ _____

Floor Drain Leakage on FRI 1600 HOURS (5.10 gpm).

CUE:

Acknowledge report.

END JPM Stop Time:_________

A-N-1-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

Perform Calculated Drywell Leak Rate JPM Number: A-N-1-R Revision Number: 01 Task Number and

Title:

29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.

K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment:Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 16 minutes Actual Time Used: minutes

References:

Appendix A, Rev 124 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

A-N-1-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 NSO.
2. Unit 3 is operating at rated conditions.
3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed.

INITIATING CUES

1. Perform the required calculations and ensure the acceptance criteria have been met.
2. When complete, give the completed paperwork to the Unit Supervisor for approval.

A-N-1-R Page 7 of 7

Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

A-N-2-R Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.
2. Insert the following override:
  • IOR acd231ab OFF DOCUMENT PREPARATION
1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.

A-N-2-R Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 and Unit 3 are operating at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.

INITIATING CUE

1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
2. The Unit 3 assist NSO has already collected the data for Unit 3.
3. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-R Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of Appendix X.

1. Record & initial Bus 24-1 & Examinee records OPEN Bus 34-1 Tie ACB (902-8) position.

position. _____ _____ _____

2. Record & initial Bus 24 & Bus Examinee records 24-1 Tie GCB (902-8) CLOSED position.

position. _____ _____ _____

3. Record & initial TR 22 to Bus Examinee records 24 GCB (902-8) position. CLOSED position.
4. Record & initial Bus 24 & Bus Examinee records 24-1 Tie GCB (902-8) CLOSED position.

position. _____ _____ _____

5. Record & initial Bus 24-1 & Examinee records OPEN Bus 34-1 Tie ACB (902-8) position.

position. _____ _____ _____

  • 6. Record & initial Bus 23-1 & Examinee records actual Bus 24-1 Volts, by selecting voltage (~4160 Volts).

Bus 23-1. _____ _____ _____

NOTE:

The candidate may select the A/B phase in any of the three flowing steps.

When the A/B phase is selected, it will read 0 (malfunction in setup).

  • 7. Record & initial Bus 23-1 & Examinee discovers that Bus 24-1 Volts, by selecting the A/B phase reads 0 Bus 24-1. and reports to the Unit Supervisor that a local _____ _____ _____

reading will be required.

CUE:

The local voltage reading for Bus 23-1 & Bus 24-1 Volts, phase A/B, is 4155 volts.

A-N-2-R Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

8. Directs EO or Field Directs EO or Field Supervisor to take local Supervisor to take local reading for Bus 23-1 & Bus reading. _____ _____ _____

24-1 Volts, phase A/B.

  • 9. Record & initial Bus 23 & Bus Examinee records actual 24 Volts, by selecting Bus 23. voltage (~4160 Volts).
  • 10. Record & initial Bus 23 & Bus Examinee records actual 24 Volts, by selecting Bus 24. voltage (~4160 Volts).
  • 11. Indicate acceptance criteria Examinee circles YES for met. acceptance criteria.
12. Enter signature, date, and Examinee enters time, for Performed By. signature, current date, and current time, for _____ _____ _____

Performed By.

13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-2-R Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

PERFORM OFF-SITE SOURCES AVAILABLE Revision Number: 05 JPM Number: A-N-2-R Task Number and

Title:

299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.

K/A Number and Importance: Generic.2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

Appendix X, rev 30 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-R Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 and Unit 3 are operating at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.

INITIATING CUE

1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
2. The Unit 3 assist NSO has already collected the data for Unit 3.
3. Inform the Unit Supervisor when the task is complete.

A-N-2-R Page 8 of 8

Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

A-N-3-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-02.

A-N-3-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The NLO reported all surveillance requirements were within specifications.

INITIATING CUE

1. Perform calculation verification and ensure paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOS 6600-02.

  • 1. Candidate should identify Identifies differential step I.5 has a mathematical pressure should read 4.

error. _____ _____ _____

  • 2. Candidate should identify Identifies incorrect step I.15 OR step I.16 is verification of dP <6.

signed off as verified dP of <6 _____ _____ _____

(actual is 7).

  • 3. Candidate should identify that Identifies step NOT steps I.21.a & b have been independently verified.

initialed by the same person _____ _____ _____

performing the surveillance and were NOT independently verified.

4. Notify Unit Supervisor of Notifies Unit Supervisor, discrepancies. may dispatch Operators to verify/correct issues, also _____ _____ _____

may initiate IR.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 02 JPM Number: A-N-3-R Task Number and

Title:

299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

DOS 6600-02, rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The NLO reported all surveillance requirements were within specifications.

INITIATING CUE

1. Perform calculation verification and ensure paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

A-N-3-R Page 7 of 7

Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

A-N-4-R Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.
3. Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

A-N-4-R Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-R Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOS 1500-08.

The following steps can be performed in any order.

  • 1. Examinee fills out running See attached key.

pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). _____ _____ _____

  • 2. Examinee calculates Dilution See attached key.

flow (1,017,000 gpm).

3. Examinee enters dilution flow See attached key.

(from above) to calculate CCSW Activity Limit. _____ _____ _____

  • 4. Examinee calculates CCSW See attached key.

-5 Activity Limit (2.91 x 10 ).

5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor.

sample limit exceeds the allowable discharge. _____ _____ _____

6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-4-R Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO JPM

Title:

PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-R Task Number and

Title:

277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOS 1500-08, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-R Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

A-N-4-R Page 7 of 7

Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for2010 NRC exam.

A-N-1-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. None.

A-N-1-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The following timeline occurred:
  • 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
  • 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
  • 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the reportability requirements.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-1-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Candidate locates a copy of Reportability Manual LS-AA-1110.

  • 1. Determines the event is Determines the event is reportable per SAF 1.9. reportable per SAF 1.9, News Release or Notification of Other _____ _____ _____

Government Agency.

  • 2. Determines the time limit to Determines the time limit Notify the NRC Operations to Notify the NRC Center via the ENS within Operations Center via the four hours of the occurrence. ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has _____ _____ _____

been or will be made.

END JPM Stop Time:_________

A-N-1-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and

Title:

299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

Reportability Manual LS-AA-1110, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-1-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. The following timeline occurred:
  • 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
  • 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
  • 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the reportability requirements.

A-N-1-S Page 7 of 7

Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 03 Bank JPM.

Revision 04 Revised for 2010 NRC exam.

A-N-2-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup.

DOCUMENT PREPARATION

1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.

A-N-2-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Supervisor.
2. Unit 2 and Unit 3 are at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
1. Review the data and complete the paperwork.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-2-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of Appendix X with a completed Attachment 3.

  • 1. Verifies data all entered. Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT

> 3851 Volts. _____ _____ _____

  • 2. Verifies data all entered. Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT >

3851 Volts. _____ _____ _____

  • 3. Verify data is accurate, by Verifies Voltmeter Bus 23-reading Voltmeter. 1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus _____ _____ _____

23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct value, CUE:

If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections.

END JPM Stop Time:_________

A-N-2-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 04 JPM Number: A-N-2-S Task Number and

Title:

299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.

K/A Number and Importance: Generic.2.1.31 4.2 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

Appendix X, rev 30 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-2-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Supervisor.
2. Unit 2 and Unit 3 are at near rated power.
3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
1. Review the data and complete the paperwork.

A-N-2-S Page 7 of 7

Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified for 2010 NRC exam.

A-N-3-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of Appendix A.

A-N-3-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. Unit 2 is operating at rated conditions.
3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.

INITIATING CUE

1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
2. Correct any discrepancies noted (if any).

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-3-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of Appendix A.

If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.

  • 1. Determine Calculated Floor Determines Floor Drain Drain Leakage is correct. leakage for THU 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 4.50 gpm. _____ _____ _____
  • 2. Determine Calculated Floor Determines TOTAL leakage Drain Leakage is correct. for FRI 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> should be 12.13 gpm.

NOTE:

If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.

  • 3. Determine Calculated Floor Determines Floor Drain Drain Leakage is correct. leakage for FRI 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 5.15 gpm (TS). _____ _____ _____
  • >5 gpm unidentified leakage for FRI 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.

Recognizes in Cond A.

5. Reports discrepancies. Examinee reports discrepancies noted.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-3-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 01 JPM Number: A-N-3-S Task Number and

Title:

29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.

K/A Number and Importance: Generic.2.2.40 3.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

Appendix A, rev 124 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-3-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. Unit 2 is operating at rated conditions.
3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 ,

AND 3 REACTOR COOLANT LEAKAGE LOG.

INITIATING CUE

1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
2. Correct any discrepancies noted (if any).

A-N-3-S Page 7 of 7

Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

A-N-4-S Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.
3. Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

A-N-4-S Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-4-S Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOS 1500-08.

The following steps can be performed in any order.

  • 1. Examinee fills out running See attached key.

pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). _____ _____ _____

  • 2. Examinee calculates Dilution See attached key.

flow (1,017,000 gpm).

3. Examinee enters dilution flow See attached key.

(from above) to calculate CCSW Activity Limit. _____ _____ _____

  • 4. Examinee calculates CCSW See attached key.

-5 Activity Limit (2.91 x 10 ).

5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor.

sample limit exceeds the allowable discharge. _____ _____ _____

6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

A-N-4-S Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-S Task Number and

Title:

277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOS 1500-08, rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-4-S Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an on-shift Operator.
2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.

INITIATING CUE

1. Complete DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

A-N-4-S Page 7 of 7

Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Bank JPM.

Revision 01 Revised for 2010 NRC exam.

A-N-5-S Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. This is a tabletop JPM utilizing simulator procedures.
2. No Simulator setup needed.

DOCUMENT PREPARATION

1. Two (2) marked up copies of EP-AA-113-F-02.
2. Blank copy of EP-AA-113.
3. Blank copy of EP-AA-113-F-03.

A-N-5-S Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

A-N-5-S Page 4 of 9

Job Performance Measure (JPM)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

A-N-5-S Page 5 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee the provided copies of:

EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03

1. Applicant determines need for Emergency action is emergency action. needed per initiating cue.

CUE:

If asked, Clay and Jax do NOT have any adverse reactions to KI.

2. Applicant recognizes per the Recognizes that initiating cue that authorization to take KI authorization to take KI must must also be completed.

also be completed prior to the _____ _____ _____

emergency workers entering the space.

  • 3. Determines there is or has Determines KI must be been a Loss of Fuel Clad issued.

Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.

  • 4. Documents the decision to BOTH individuals being issue KI using THYROID authorized for KI and BLOCKING AGENT entering the space must be AUTHORIZATION Form listed with their correct (EP-AA-113-F-03). names and employee ID numbers:
  • Clay Morrow _____ _____ _____

123456

  • Jax Teller 891011 A-N-5-S Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.

5. Notifies Occupational Health Examinee states that (Medical) Services he/she would notify OHS.

Department promptly that KI _____ _____ _____

is to be issued to Exelon Nuclear personnel or contractors.

NOTE:

JPM is complete when applicant notifies OHS of KI use.

END JPM Stop Time:_________

A-N-5-S Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

SRO JPM

Title:

AUTHORIZE USE OF KI Revision Number: 01 JPM Number: A-N-5-S Task Number and

Title:

29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.

K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

EP-AA-113, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

A-N-5-S Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Station Emergency Director.
2. A General Emergency has been declared.
3. There is an offsite release in progress.
4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
5. Containment is currently being challenged.
6. The TSC has NOT been activated, but the appropriate EAL has been declared.
7. An Emergency life saving operation MUST be performed.
8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
9. The operation requires two people to enter the field.
10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
11. Clay and Jax have NEVER received an emergency exposure before.
12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.

INITIATING CUES

1. Execute section 4.4 of EP-AA-113.

A-N-5-S Page 9 of 9

Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 Modified for 2010 NRC exam.

S-N-a Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
  • IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
3. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION DOP 1100-02 hardcard.

S-N-a Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-a Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Examinee should locate the hard card, then provide the included copy.

  • 1. Place the SBLC INJECTION Turns the SBLC CONTROL keylock switch to INJECTION CONTROL the SYS 1 OR SYS 2 keylock switch to either the position. intermediate right OR _____ _____ _____

intermediate left position.

2. Verifies applicable SQUIB SQUIB A or B light off.

pilot light NOT lit.

3. Verifies applicable PUMP PUMP 1 or PUMP 2 light pilot light lit. on.
4. Verifies FLOW pilot light lit. WHITE light illuminated.
5. SBLC SQUIB VLV CKT Annunciator 902-5 H-6 FAILURE annunciator alarms illuminated.

(902-5 H-6). _____ _____ _____

BEGIN ALTERNATE PATH

  • 6. Verifies RWCU valve Examinee recognizes that 2-1201-1 closed. valve 2-1201-1 valve did NOT close. _____ _____ _____
  • 7. Verifies RWCU valve Takes manual action for a 2-1201-1 closed. failed automatic action and closes 2-1201-1 valve, by _____ _____ _____

placing c/s in the CLOSED position.

8. Verifies RWCU valve GREEN light illuminated.

2-1201-1A closed.

  • 9. Verifies RWCU valve Examinee recognizes that 2-1201-2 closed. valve 2-1201-2 valve did NOT close. _____ _____ _____

S-N-a Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 10. Closes RWCU valve Takes manual action for a 2-1201-2 closed. failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED _____ _____ _____

position.

11. Verifies RWCU valve GREEN light illuminated.

2-1201-3 closed.

12. Verifies RWCU valve RED light illuminated.

2-1201-7 closed.

13. Informs Unit Supervisor task Reports SBLC is injecting is complete. and valves 2-1201-2 and 2-1201-3 failed to close automatically. _____ _____ _____

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-a Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

SBLC - INJECTION WITH RWCU ISOLATION FAILURE Revision Number: 00 JPM Number: S-N-a Task Number and

Title:

211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 9 minutes Actual Time Used: minutes

References:

DOP 1100-02, rev 18 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-a Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

S-N-a Page 8 of 8

Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

S-N-b Page 2 of 10

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Start the LPCI/CS room cooler fans.
3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:

NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.

  • trgset 1 "cssbkppb .and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON)
  • ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip)
  • ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip)
  • trgset 2 "(et_array(1) .and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running)
  • trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip)

DOCUMENT PREPARATION

1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8).

S-N-b Page 3 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
3. The operability surveillance for the 2A Core Spray pump is NOT needed.
4. The system is filled and vented.
5. The required valve operability surveillance has been completed.
6. Vibration data is NOT required.
7. The Unit 2 NLO is standing by in the corner room.
8. The LPCI/Core Spray Room Coolers are running.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
2. All applicable Prerequisites have been met.
3. Inform the Unit Supervisor upon completion of step I.8.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

S-N-b Page 4 of 10

Job Performance Measure (JPM)

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-b Page 5 of 10

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide Examinee a copy of DOS 1400-05.

1. Verify the following valve line Verifies the following:

up:

  • MO 2-1402-4B Closed
  • Green light illuminated.
  • MO 2-1402-38B Open
  • Green light illuminated.
  • 2-1402-6B Open
  • Directs NLO to Verify 2-1402-6B-SV Closed.
  • MO 2-1402-25B Closed
  • Green light illuminated.
  • MO 2-1402-3B Open
  • Green light illuminated.
  • 2-1402-40B-SV Closed
  • Directs NLO to Verify 2-1402-40B-SV Closed _____ _____ _____

CUE:

2-1402-40B-SV, INST SV is closed.

NOTE:

The next three (3) actions may be requested to be performed at the same time.

2. Verify 2B CORE SPRAY Contacts NLO to verify 2B MOTOR has adequate CORE SPRAY MOTOR lubrication. has adequate lubrication _____ _____ _____

per step I.8.b.(1).

CUE:

2B Core Spray motor oil level is normal (within +0 to -1/8 inch band).

3. Verify 2B LPCI/CS Room Contacts NLO to verify Cooler is operating properly. proper room cooler operation per step I.8.c. _____ _____ _____

CUE:

2B LPCI/CS room cooler is operating normally.

S-N-b Page 6 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

4. Direct NLO to open 2-1402- Directs 2-1402-40B-SV 40B-SV and report pressure. Open.

CUE:

When asked, report: 2-1402-40B-SV Inst SV is Open.

5. Record suction pressure Pressure of 7 psig provided by NLO. recorded on Data Sheet 1.

CUE:

When asked, report: suction pressure is 7 psig.

6. Calculate 2-1402-8B initial DP Calculated:

closed DP.

2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5 _____ _____ _____

psig)

CUE:

If examinee requests the above calculation to be verified, sign the verified by line.

If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report.

NOTE:

Candidate will N/A step I.8.g.

7. Start 2B CORE SPRAY Red light illuminated and Pump. annunciators H-13 and A-5 alarm. _____ _____ _____

NOTE:

2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication.

S-N-b Page 7 of 10

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 8. Open FLOW TEST VLV MO Rotates and holds MO 2-2-1402-4B. 1402-4B Control switch CW to Open. _____ _____ _____

BEGIN ALTERNATE PATH

9. Acknowledge and report Acknowledges annunciator alarm for 2B CS pump trip. H-5 and makes report.

CUE:

Acknowledge report.

  • 10. Immediately Close Green light illuminated.

2-1402-4B.

Red light illuminated. _____ _____ _____

CUE:

If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.

CUE:

If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue:

Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.

11. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-b Page 8 of 10

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP Revision Number: 05 JPM Number: S-N-b Task Number and

Title:

209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01 3.8 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 22 minutes Actual Time Used: minutes

References:

DOS 1400-05, rev 41 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-b Page 9 of 10

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
3. The operability surveillance for the 2A Core Spray pump is NOT needed.
4. The system is filled and vented.
5. The required valve operability surveillance has been completed.
6. Vibration data is NOT required.
7. The Unit 2 NLO is standing by in the corner room.
8. The LPCI/Core Spray Room Coolers are running.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
2. All applicable Prerequisites have been met.
3. Notify the Unit Supervisor upon completion of step I.8.

S-N-b Page 10 of 10

Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam S-N-c Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure that Both DEHC monitors are displaying the STATUS screen .
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.
5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only).

DOCUMENT PREPARATION Markup a copy of DGP 02-03.

S-N-c Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-c Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DGP 02-03.

All the below actions can be performed on either of the Digital EHC control stations.

  • 1. Select <CONTROL>. Utilizing the trackball controller, clicks on

<CONTROL>. _____ _____ _____

  • 2. Select <RX COOLDOWN>. Utilizing the trackball controller, clicks on

<RX COOLDOWN>. _____ _____ _____

3. Verify REACTOR Observes the REACTOR COOLDOWN is OFF. COOLDOWN OFF select button is orange. _____ _____ _____
  • 4. Select STPT/RAMP. Utilizing the trackball controller, clicks on the

<STPT/RAMP>. _____ _____ _____

  • 5. Enter desired target Clicks in the Set Point box.

temperature setpoint. Utilizing the keyboard, enters 400.0. _____ _____ _____

  • 6. Enter desired cooldown rate Clicks in the Ramp Rate in the Ramp box. box. Utilizing the keyboard, enters 75.0. _____ _____ _____
  • 7. Select <OK>. Utilizing the trackball controller, clicks on <OK>.

Clicks <OK> on the Confirm Setpoint pop up _____ _____ _____

window.

  • 8. Initiate Reactor cooldown by Utilizing the trackball selecting ON for REACTOR controller, clicks on <ON>.

COOLDOWN.

Clicks <OK> on the Begin Reactor Cooldown pop up _____ _____ _____

window.

S-N-c Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

9. On <CONTROL> Utilizing the trackball

<PRESSURE CONTROL> controller, clicks on screen, adjust pressure <PRESSURE setpoint as necessary to CONTROL>.

maintain at least 50 psig above Reactor pressure. _____ _____ _____

NOTE:

The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.

10. Select STPT/RAMP and input Utilizing the trackball value of 50.0. controller, clicks on

<STPT/RAMP > and input 50.0.

NOTE:

The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.

11. On <CONTROL> <BPV If uses other DEHC JACK> screen, verify BPV screen, utilizing the Jack position setpoint is trackball controller, clicks

-5.0%. on <CONTROL>.

Utilizing the trackball controller, clicks on < BPV JACK >. _____ _____ _____

Observes BPV Jack position setpoint is -5.0%.

12. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-c Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES Revision Number: 01 JPM Number: S-N-c Task Number and

Title:

29501LP040, Respond to a Reactor Scram IAW DGP 02-03.

K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DGP 02-03, rev 89 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-c Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
3. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
2. Inform the Unit Supervisor when the task is complete.

S-N-c Page 8 of 8

Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for 2010 NRC exam.

S-N-d Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify NO LPCI pumps operating .
3. Insert following Malfunctions and/or Remotes:
  • None.
4. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

S-N-d Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.
5. An EO has been briefed and is in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-d Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03.

  • 1. Place 2A LPCI PP control ALL lights extinguished.

switch in Pull-to-Lock.

  • 2. Place PP SUCT VLV MO 2- RED light illuminated.

1501-5A control switch in Manual Bypass and verify _____ _____ _____

closed.

3. Verify MIN FLOW VLV 2- RED light illuminated.

1501-13A closed if not needed. _____ _____ _____

CUE:

2-1501-13A is not required for 2B LPCI pump.

NOTE:

The following valves may be verified in any order

4. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20A and 2-1501-38A closed. _____ _____ _____

5. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19A and 2-1501-18A closed. _____ _____ _____

6. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28A and 2-1501-27A closed. _____ _____ _____

7. Verify TORUS CLG/TEST GREEN lights illuminated.

valves 2-1501-20B and 2-1501-38B closed. _____ _____ _____

8. Verify TORUS SPRAY VLVs GREEN lights illuminated.

2-1501-19B and 2-1501-18B closed. _____ _____ _____

S-N-d Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

9. Verify DW SPRAY VLVs 2- GREEN lights illuminated.

1501-28B and 2-1501-27B closed. _____ _____ _____

NOTE:

For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).

CUE:

When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed.

10. Unlock AND open 2-1501- Instructs NLO to complete 74A, U2 LPCI A PMP step G.12.c.(5).(a).

VENT VLV.

11. Crack open 2-1501-15A, U2 Instructs NLO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b).

flow is observed from pipe. _____ _____ _____

12. Close 2(3)-1501-15A, U2 Instructs NLO to complete LPCI A PMP VENT VLV. step G.12.c.(5).(c).
13. Close AND lock 2-1501-74A, Instructs NLO to complete U2(3) LPCI A PMP step G.12.c.(5).(d).

VENT VLV.

  • 14. Open 2-1501-47A-R, U2 Instructs NLO to obtain PI LPCI A PUMP SUCT PI 2-1501-47A reading per 2-1501-47A ROOT VLV (at step G.12.c.(6). _____ _____ _____

pump) and verify PI 2-1501-47A indicates less than 15 psig.

CUE:

PI 2-1501-47A indicates 15.5 psig.

  • 15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig.

S-N-d Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

16. Close 2-1501-47A-R, U2 Instructs NLO to close 2-LPCI A PUMP SUCT PI 1501-47A per step G.12.c.(8). _____ _____ _____

2-1501-47A ROOT VLV.

CUE:

2-1501-47A-R is Closed.

BEGIN ALTERNATE PATH

  • 17. Open PP SUCT VLV MO 2- GREEN light illuminated.

1501-5A.

  • 18. Place 2A LPCI PP control Depresses and places 2A switch in AUTO. LPCI PP c/s to center (AUTO) position. _____ _____ _____
19. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI with suction from the CST. pump suction pressure _____ _____ _____

problem when aligned to CST. May recommend using another LPCI pump.

CUE:

Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-d Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 07 JPM Number: S-N-d Task Number and

Title:

29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02 4.1 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 20 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-d Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 375 psig and slowly dropping.
5. An EO has been briefed and is in the field.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
2. Inform the Unit Supervisor when the task is complete.

S-N-d Page 9 of 9

Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

S-N-e Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
2. Ensure Torus water level is 20 feet.
3. Insert following Malfunctions and/or Remotes.
  • IMF CIGP2I (Spurious Group II Isolation)
  • IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
  • Adjusts Torus Level indications to ~20 feet.

ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20

  • ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
  • Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.

irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled

  • Adjusts Drywell & Torus pressures to 50.0 psig.

ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0

4. Verify the SBGT system operating and verify flow ~4000 scfm.
5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.

DOCUMENT PREPARATION Markup a copy of DEOP 500-04.

S-N-e Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Aux NSO.
2. A break inside the Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
4. Torus water level is 20'
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-e Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide examinee the marked up copy of DEOP 0500-04.

Annunciator 902-3 A-15 may be received during this JPM.

1. Verify SBGT is operating and Verifies 2/3A SBGT train flow is ~ 4000 scfm. FI 7540-13 is reading

~4000 scfm. _____ _____ _____

2. Verify Reactor Mode switch Verifies Reactor Mode NOT in RUN. switch NOT in RUN.
3. Place VENT ISOL SIGNAL Momentarily places BYPASS switch on 902-5 Bypass switch to Torus panel to TORUS. Position. _____ _____ _____

NOTE:

The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.

4. Open AO 2-1601-61, TORUS Places AO 2-1601-61 2-INCH VENT VLV. control switch to OPEN position and determines _____ _____ _____

that the valve will not open.

NOTE:

IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.

BEGIN ALTERNATE PATH

  • 5. Place VENT ISOL SIGNAL Momentarily places Vent BYPASS switch on 902-5 Isol Signal Bypass switch panel to DRYWELL. to Drywell position. _____ _____ _____

CUE:

If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.

  • 6. Open AO 2-1601-62, DW Red Open light illuminated.

2-INCH Vent.

S-N-e Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 7. Open AO 2-1601-63, VENT Red Open light illuminated.

TO SBGT.

8. Start as many Turbine Initiates action to start All Building and Radwaste available Turbine Building Exhaust fans as possible. and Radwaste Exhaust fans. _____ _____ _____
9. Determine if SBGT flow is Containment pressure adequate to control and stable or decreasing.

maintain DW pressure below the Primary Containment _____ _____ _____

Pressure Limit.

CUE:

DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.

If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).

10. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-e Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET Revision Number: 05 JPM Number: S-N-e Task Number and

Title:

295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.

K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes

References:

DEOP 0500-04, rev 12 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-e Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Aux NSO.
2. A break inside the Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
4. Torus water level is 20'
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

S-N-e Page 8 of 8

Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

S-N-f Page 2 of 9

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert following Malfunctions and/or Remotes:
  • M63 (to prevent TR-22 to Bus 23 breaker from closing).
3. Setup the following Triggers:
  • None.
4. Ensure ONLY 2 RFPs operating.
5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.

DOCUMENT PREPARATION

1. Marked up copy of DOP 6500-01.

S-N-f Page 3 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-f Page 4 of 9

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the examinee with the provided copy of DOP 6500-01.

This task has two parts, which can be performed in any order.

CUE:

IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.

TRANSFER BUS 21 TO TR-22

  • 1. Position TR-22 to Bus 21 Switch in ON position.

SYNCHROSCOPE selector switch to ON. _____ _____ _____

2. Verify:

INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.

approximately equal.

Meter NOT rotating.

SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.

rotating.

SYNCHRONIZING meter _____ _____ _____

lights NOT glowing.

  • 3. Position TR-22 to Bus 21 RED light illuminated.

breaker control switch to CLOSE. _____ _____ _____

4. Verify:

SYNCHRONIZING meter at Meter NOT rotating.

12 oclock position.

TR-22 to Bus 21 breaker RED light illuminated.

indicates CLOSED.

Annunciator 902-8 D-1 in Annunciator 902-8 D-1 alarm. illuminated.

S-N-f Page 5 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Position TR-21 to Bus 21 GREEN light illuminated.

breaker control switch to TRIP. _____ _____ _____

6. Verify:

TR-21 to Bus 21 breaker GREEN light illuminated.

indicates OPEN.

Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears.

extinguished.

7. Position TR-22 to Bus 21 Switch in OFF position.

synchroscope selector switch to OFF. _____ _____ _____

8. Verify Bus 21 AMMETER and Verifies Bus 21 amps and VOLTMETER indications are volts are normal.

normal. _____ _____ _____

NOTE:

Amps may vary depending on conditions, and volts are normally ~ 4160.

TRANSFER BUS 23 TO TR-22

  • 9. Position TR-22 to Bus 23 Switch in ON position.

SYNCHROSCOPE selector switch to ON. _____ _____ _____

10. Verify:

INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.

approximately equal.

Meter NOT rotating.

SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.

rotating.

SYNCHRONIZING meter _____ _____ _____

lights NOT glowing.

BEGIN ALTERNATE PATH

  • 11. Position TR-22 to Bus 23 Breaker does NOT close.

breaker control switch to CLOSE. _____ _____ _____

S-N-f Page 6 of 9

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 12. IMMEDIATELY positions TR- GREEN light illuminated.

22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor. _____ _____ _____

CUE:

IF an Operator is dispatched to check the tripped breaker, report:

the breaker is open, with NO flags up.

NOTE:

Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.

13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-f Page 7 of 9

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE Revision Number: 01 JPM Number: S-N-f Task Number and

Title:

262L024, Transfer a 4160 volt bus between power supplies.

K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

DOP 6500-01, rev 10 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-f Page 8 of 9

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.

INITIATING CUE

1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
2. Inform the Unit Supervisor when the task is complete.

S-N-f Page 9 of 9

Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 04 Bank JPM.

Revision 05 Revised for 2010 NRC exam.

S-N-g Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below).
3. Enter the following Expert Command prior to starting this JPM.
4. Acknowledge alarms and reset alarms.
5. Verify RWM operational and on Main Screen.

DOCUMENT PREPARATION Markup a copy of DOP 0400-02.

S-N-g Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Control Rod N-07 rod position has failed.
3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
4. The Control Rod has been currently verified to be at position 48.
5. The Rod Worth Minimizer is operational.
6. No other rods have had a substitute position assigned.

INITIATING CUE

1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
2. Notify Unit Supervisor when the substitute position has been entered.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-g Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide examinee a copy of DOP 0400-02.

1. Proceed to Step Proceeds to Step G.3.c.(1) of G.3.c.(1) of DOP 0400- DOP 0400-02.

02.

  • 2. Selects Secondary Substitute Position screen Functions, then SELECTED.

Substitute Position screen

  • 3. Selects control rod N-07 Control Rod N-07 outlined with on the touch screen. blue box and shown on screen as SELECTED.
  • 4. Sets the desired Control POSITION SHOWN on top of Rod position on the bar position bar graph, reads 48.

graph on the left side of the screen.

  • 5. Touches the ENTER RWM accepts the request, rod REQUEST box. N-07 position indication changes from ?? to substituted 48 position.
6. Touches the EXIT RWM returns to the Main FUNCTION box to Display return to the Main Display CUE:

Respond as US when examinee informs you they have completed the task END JPM Stop Time:_________

S-N-g Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

RWM - ENTER SUBSTITUTE ROD POSITION Revision Number: 05 JPM Number: S-N-g Task Number and

Title:

201L027, Enter Substitute Rod Position.

K/A Number and Importance: 201006.A4.06 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DOP 0400-02, rev 23 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-g Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. Control Rod N-07 rod position has failed.
3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
4. The Control Rod has been currently verified to be at position 48.
5. The Rod Worth Minimizer is operational.
6. No other rods have had a substitute position assigned.

INITIATING CUE

1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
2. Notify Unit Supervisor when the substitute position has been entered.

S-N-g Page 7 of 7

Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 00 New JPM developed for 2010 NRC exam.

S-N-h Page 2 of 7

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 12.

NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation.
3. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION Markup a copy of DOP 5400-05.

S-N-h Page 3 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.

INITIATING CUE

1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-h Page 4 of 7

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment #

PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the provided copy of DOP 5400-05.

1. Proceeds to step G.4 of Locates step G.4 of the DOP 5400-05. procedure (which then directs next step). _____ _____ _____
2. Determines the correct Proceeds to step G.21 of the step to utilize is step procedure.

G.21 of DOP 5400-05. _____ _____ _____

  • 3. Close AO 2-5417, GREEN light illuminated.

ADSORBER TRN 2 BYPASS VLV.

  • 4. Close AO 2-5423, GREEN light illuminated.

ADSORBER TRN 3 BYPASS VLV.

  • 5. Open AO 2-5415, GREEN light illuminated.

ADSORBER TRN 1 DISCH VLV.

  • 6. Open AO 2-5421, GREEN light illuminated.

ADSORBER TRN 2 DISCH VLV.

  • 7. Close AO 2-5416, GREEN light illuminated.

ADSORBER TRN 1 BYPASS VLV.

  • 8. Close AO 2-5422, GREEN light illuminated.

ADSORBER TRN 2 BYPASS VLV.

9. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-h Page 5 of 7

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE Revision Number: 00 JPM Number: S-N-h Task Number and

Title:

271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09 3.3 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DOP 5400-05, rev 32 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-h Page 6 of 7

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.

INITIATING CUE

1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
2. Inform the Unit Supervisor when the task is complete.

S-N-h Page 7 of 7

Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 09 Bank JPM.

Revision 10 Revised for 2010 NRC Exam.

S-N-i Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.

S-N-i Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-i Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DEOP 0500-03.

The examinee is NOT required to obtain a key to open or close locked valves.

The examinee is required only to identify which type of key is required to open the valve.

1. Proceeds to the Unit 2 Proceeds to the U2 SBLC Standby Liquid Control area.

(SBLC) area. _____ _____ _____

  • 2. Unlock and close 2-1101-4, Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. hand wheel full clockwise. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 3. Unlock and close 2-1199-37 Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. handle 1/4 turn clockwise. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 4. Open 2-4315-500, CLEAN Rotates valve hand wheel DEMIN WTR SUPPLY TO full counter-clockwise.

SBLC SV. _____ _____ _____

CUE:

The component is in the condition you have described.

  • 5. Open 2-1101-7, CLEAN Rotates valve hand wheel DEMIN WTR TO SBLC TEST full counter-clockwise.

TK SV. _____ _____ _____

CUE:

The component is in the condition you have described.

S-N-i Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 6. Unlock and open 2-1101-8, Unlock lock and removes SBLC TEST TK OUTLET SV. chain, then rotates valve hand wheel full counter- _____ _____ _____

clockwise.

CUE:

The component is in the condition you have described.

NOTE:

  • 7. Start both SBLC pumps from Contacts the Unit 2 Control the main Control Room. Room Operator to start the SBLC pumps. _____ _____ _____

CUE:

I have started both Unit 2 Standby Liquid Control pumps.

8. Throttle 2-1101-7, CLEAN Opens / closes valve to DEMIN WTR TO SBLC TEST maintain test tank level.

TK SV, to stabilize level in _____ _____ _____

tank.

CUE:

The test tank level is now stabilized (as much going in as is going out).

9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-i Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 10 JPM Number: S-N-i Task Number and

Title:

295L088, Line Up SBLC Test Tank for Alternate Water Injection.

K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes

References:

DEOP 0500-03, rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-i Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Unit 2 has just scrammed.
3. A LOCA is causing RPV level to lower.
4. The Clean Demin Water system is operating normally.

INITIATING CUE

1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
2. Inform the Unit Supervisor when the task is complete.

S-N-i Page 8 of 8

Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

S-N-j Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DOA 6600-01.

S-N-j Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-j Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOA 6600-01.

1. Proceeds to the 2/3 Diesel Proceeds to the 2/3 Diesel Generator Room. Generator Room.
  • 2. Examinee checks the level in Observes day tank the D/G Fuel Oil Day Tank. sightglass and determines day tank needs filling.

CUE:

Point to the lower third area on the local sightglass measuring stick and state: the level is here.

NOTE:

Normal level is 30 - 38".

3. Verify that power is available Verifies power available, to the DIESEL FUEL OIL by local indicating lights TRANSFER PUMP 2/3. illuminated.

CUE:

The GREEN LIGHT is illuminated.

  • 4. Start the Fuel Oil Transfer Holds 2/3-5203 U2 Diesel Pump by holding local Test Oil Transfer Pp c/s in ON Switch in the ON position. position.

CUE:

The pump is running.

You have held the switch for approximately 5 minutes.

S-N-j Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Checks the level in the fuel oil OBSERVES sight glass day tank. and/or REQUESTS annunciator 902-8 G-4 status. _____ _____ _____

CUE:

Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here.

AND/OR the NSO says Control Room alarm 902-8 G-4 has reset.

6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-j Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 02 JPM Number: S-N-j Task Number and

Title:

264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.

K/A Number and Importance: 264000.G.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes

References:

DOA 6600-01, rev 15 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-j Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.

INITIATING CUE

1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
2. Inform the Unit Supervisor when the task is complete.

S-N-j Page 8 of 8

Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Revision Record (Summary)

Revision 10 Bank JPM.

Revision 11 Revised for 2010 NRC Exam.

S-N-k Page 2 of 8

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS

1. None, this JPM is performed in the plant.

DOCUMENT PREPARATION Markup a copy of DOP 4650-01.

S-N-k Page 3 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Control Room personnel have noticed a pungent odor in the Control Room.
3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
2. Inform the Unit 3 Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

S-N-k Page 4 of 8

Job Performance Measure (JPM)

JPM Start Time: _________

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:

Provide the Examinee with the supplied copy of DOP 4650-01.

1. Proceeds to Emergency Proceeds to Emergency Breathing Air manifold in Unit Breathing Air manifold in 2 Battery Room. Unit 2 Battery Room. _____ _____ _____
2. Verify the following: Verifies valve handle perpendicular to valve body for:
  • LP-2 _____ _____ _____
  • 3. OPEN all Main Bank Cylinder Turns hand wheels on shutoff valves (Cylinders 7 cylinders 7-13 full counter through 13). clockwise. _____ _____ _____

CUE:

The component is in the condition you have described.

NOTE:

Count cylinders from left to right to find cylinders 7-13.

  • 4. Check Main Bank pressure. Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side _____ _____ _____

gauge).

NOTE:

Have examinee read actual pressure.

CUE:

If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.

S-N-k Page 5 of 8

Job Performance Measure (JPM)

UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT

  • 5. Pressurize the supply OPENS valve LP-3 by manifold from the Main Bank turning valve handle by opening LP-3, CR EMERG counter clockwise 1/4 turn _____ _____ _____

AIR BREATHING CYL SV. so handle is in-line with valve body CUE:

The component is in the condition you have described.

6. Verify pressure regulator VERIFIES manifold PRV-3 is maintaining pressure between 65 and manifold pressure >65 psig 80 psig as read on CR _____ _____ _____

and <80 psig. EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).

CUE:

If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here.

NOTE:

Have examinee read actual pressure.

7. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

S-N-k Page 6 of 8

Job Performance Measure (JPM)

Operators Name:

Job

Title:

RO SRO JPM

Title:

VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR Revision Number: 11 JPM Number: S-N-k Task Number and

Title:

279M001, Valve in Control Room Breathing Air Supply.

K/A Number and Importance: 600000.A2.10 2.9 / 3.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

DOP 4650-01, rev 09 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

S-N-k Page 7 of 8

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. You are an extra NSO.
2. Control Room personnel have noticed a pungent odor in the Control Room.
3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01.

INITIATING CUE

1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
2. Inform the Unit 3 Supervisor when the task is complete.

S-N-k Page 8 of 8