{{#Wiki_filter:From:Wang, Alan To:Perino, Christina; SEITER, JEFFERY ALAN; JACKSON, RITA R Cc:Burkhardt, Janet; Chen, Qiao-Lynn | {{#Wiki_filter:From: Wang, Alan To: Perino, Christina; SEITER, JEFFERY ALAN; JACKSON, RITA R Cc: Burkhardt, Janet; Chen, Qiao-Lynn | ||
==Subject:== | ==Subject:== | ||
Acceptance Review of Grand Gulf Nuclear Station License Amendment Request Regarding 24 month Fuel Cycle(TAC No. ME9764) | Acceptance Review of Grand Gulf Nuclear Station License Amendment Request Regarding 24 month Fuel Cycle (TAC No. ME9764) | ||
Date:Monday, October 15, 2012 10:32:44 | Date: Monday, October 15, 2012 10:32:44 AM Christina, Jeff and Rita, By letter dated October 2, 2012 (GNR0-2012100096), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the Grand Gulf Nuclear Station, Unit 1 (GGNS). The license amendment request (LAR) proposes to revise the Technical Specifications (TS) to support operation with 24-month fuel cycles. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | |||
By letter dated October 2, 2012 (GNR0-2012100096), Entergy Operations, Inc. (Entergy,the licensee) requested an amendment to the Facility Operating License for the Grand Gulf Nuclear Station, Unit 1 (GGNS). | The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
The license amendment request (LAR) proposes | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original | |||
applications. | |||
Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and | |||
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. | |||
The | |||
The | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. | |||
If additional information is needed for the staff to complete | |||
If you have any questions, please contact me at (301) 415-1445. | If you have any questions, please contact me at (301) 415-1445. | ||
Alan Wang Project Manager (Grand Gulf Nuclear Station) | |||
Alan Wang Project Manager (Grand Gulf Nuclear Station)Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222}} | Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222}} |
Latest revision as of 21:18, 11 November 2019
ML12289A158 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 10/15/2012 |
From: | Wang A Plant Licensing Branch IV |
To: | Rolonda Jackson, Perino C, Seiter J Entergy Operations |
Wang A | |
References | |
TAC ME9764 | |
Download: ML12289A158 (1) | |
Text
From: Wang, Alan To: Perino, Christina; SEITER, JEFFERY ALAN; JACKSON, RITA R Cc: Burkhardt, Janet; Chen, Qiao-Lynn
Subject:
Acceptance Review of Grand Gulf Nuclear Station License Amendment Request Regarding 24 month Fuel Cycle (TAC No. ME9764)
Date: Monday, October 15, 2012 10:32:44 AM Christina, Jeff and Rita, By letter dated October 2, 2012 (GNR0-2012100096), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the Grand Gulf Nuclear Station, Unit 1 (GGNS). The license amendment request (LAR) proposes to revise the Technical Specifications (TS) to support operation with 24-month fuel cycles.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445.
Alan Wang Project Manager (Grand Gulf Nuclear Station)