Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19095B7623 April 2019Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051)
ML19059A17828 February 2019Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet
ML16320A21318 November 2016Acceptance of Requested Licensing Amendment Action Adoption of TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability
ML13197A24616 July 2013Acceptance Review Email, Relief Request GG-ISI-017, Alternative to Reactor Vessel Internal Structure Examination, Use of BWRVIP Guidelines, Third 10-Year Inservice Inspection Interval
ML13002A4762 January 2013Acceptance Review E-mail, Amendment Request to Revise FOL to Remove 2.C.(32), Partial Feedwater Heating, to Allow Plant to Operate with Final Feedwater Temperature Reduction at End of Fuel Cycle
ML12333A07227 November 2012Acceptance Review Email, License Amendment Request to Revise TS Table 3.3.6.1-1 to Support Correction of Non-Conservative Allowable Value for Primary Containment and Drywell Isolation Instrumentation
ML12311A1345 November 2012Entergy Fleet and ISFSI-Acceptance Review Email, Direct License Transfer and Conforming Amendments for Arkansas Nuclear Units 1 & 2; Grand Gulf Unit 1, and Grand Gulf Early Site Permit; Indirect License Transfer for River Bend and Waterford
ML12299A09524 October 2012Acceptance Review E-mail, License Amendment Request, Change to the Updated Final Safety Analysis Report to Revise the Methodology for Standby Service Water Passive Failure
ML12289A15815 October 2012Acceptance Review Email, License Amendment Request to Revise Technical Specifications and Surveillance Requirements to Support Operation with a 24-Month Fuel Cycle in Accordance with Generic Letter 91-04
ML12026074326 January 2012ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci
ML11325026621 November 2011Acceptance Review Email, Proposed Emergency Action Level Scheme Change to Adopt Nuclear Energy Institute (NEI) 99-01, Revision 5, Methodology for Development of Emergency Action Levels
ML1127700623 October 2011Acceptance Review Email, License Amendment Request, Revise Criticality Safety Analysis and Technical Specification 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License Condition
ML11108036818 April 2011Acceptance Review Email, Request for Alternative GG-ISI-013 from Examination Requirements for Reactor Pressure Vessel Weld Inspection for Third 10-Year Inservice Inspection Interval
ML11101052811 April 2011Acceptance Review Email, License Amendment Request to Adopt Technical Specification Change Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.
ML1021702225 August 2010Acceptance Review of License Amendment Request for Approval of Cyber Security PlanCyber Security
ML10049177218 February 2010Acceptance Review Email Request for Exemption from the Requirements of 10 CFR Part 73Exemption Request
ML09132005912 May 2009Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207)
ML08266004722 September 2008Acceptance Review E-Mail for Application Dated 9/11/08, License Amendment Request to Revise TS Surveillance Requirements for Diesel Generator Slow Start Testing
ML08200108425 July 2008River Bend Station, and Waterford Steam Electric Station, Unit 3 - Acceptance Review, Relief Request No. CEP-ISI-011 for 10-Year Inservice Testing Interval (TAC MD8826, MD8827, MD8828, & MD8829)
ML0703102407 February 2007Acceptance Review Request for Alternative GG-ISI-002 (Pilot Request), Request to Use ASME Code Case N-716