ML102170222

From kanterella
Jump to navigation Jump to search

Acceptance Review of License Amendment Request for Approval of Cyber Security Plan
ML102170222
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/05/2010
From: Lyon C
Plant Licensing Branch IV
To: Larson M
Entergy Operations
Lyon C (415-2296)
References
TAC ME4379
Download: ML102170222 (2)


Text

From: Lyon, Fred Sent: Thursday, August 05, 2010 12:17 PM To: 'mlarson@entergy.com' Cc: 'cperin1@entergy.com'

Subject:

Acceptance Review (TAC No. ME4379)

By application dated July 22, 2010, Entergy Operations, Inc., requested a license amendment for Grand Gulf Nuclear Station to approve the cyber security plan and implementation schedule, and revise the license condition regarding physical protection to require the licensee to fully implement and maintain in effect all provisions of the Nuclear Regulatory Commission (NRC)-approved cyber security plan.

The purpose of this letter is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

E-mail Properties Mail Envelope Properties (A56E37EC1CBC8045910287CEF5E7AE6C23D91BD4F8)

Subject:

Acceptance Review (TAC No. ME4379)

Sent Date: 8/5/2010 12:20:14 PM Received Date: 8/5/2010 12:20:00 PM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

mlarson@entergy.com ('mlarson@entergy.com')

Tracking Status: None

cperin1@entergy.com ('cperin1@entergy.com')

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 8015 8/5/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: