ML17263A466: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCEI.ERAT@9 DOCUMENT DIST UTION SYSTEM REGULAT~INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:9311170036 DOC.DATE: 93/11/10 ,NOTARIZED:
{{#Wiki_filter:ACCEI.ERAT@9 DOCUMENT DIST                                       UTION SYSTEM REGULAT~ INFORMATION DISTRIBUTION                   STEM (RIDS)
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION ST MARTIN,J.T.
ACCESSION NBR:9311170036             DOC.DATE: 93/11/10 ,NOTARIZED: NO                   DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                     G 05000244 AUTH. NAME           AUTHOR AFFILIATION ST MARTIN,J.T.       Rochester Gas a Electric Corp.
Rochester Gas a Electric Corp.MECREDY,R.C.
MECREDY,R.C.         Rochester Gas & Electric Corp.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 JOHNSON,A.R.
RECIP.NAME           RECIPIENT AFFILIATION JOHNSON,A.R.             Project Directorate I-3
Project Directorate I-3  


==SUBJECT:==
==SUBJECT:==
LER 93-005-00:on 931011,due to misinterpretation of TS 4.6.l.e.3.(a) requirements, verification of load shedding'apability of safeguards loads not adequately performed.
LER 93-005-00:on 931011,due to misinterpretation of TS                                   D 4.6.l.e.3.(a) requirements, verification of load shedding
Testing completed to verify capability.W/931110 ltr.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR Q ENCL Q SIZE: I~TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
              'apability of safeguards               loads not adequately performed.
05000244 D RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A 1 INTERNAL: AEOD/DOA AEOD/ROAB/DSP NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB EXTERNAL: EGSG BRYCEPJ.H NRC PDR NSIC POOREPW.COPIES LTTR ENCL 1 1 1 1 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 2 2 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DE/EELB NRR/DORS/OEAB NRR/DRCH/HICB NRR/DRZL/RPEB BASSA SPLB REG ILE 02 RG FILE 01 L ST LOBBY WARD NSIC MURPHY,G.A NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1~1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
Testing completed to verify capability.W/931110 ltr.
PLEASE HELP US TO REDUCE WASTEl CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO, ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDf D r rvr r FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 28  
TITLE: 50.73/50.9 Licensee Event Report (LER),QIncidentQRpt, etc.
'l jeylvm IgeZZaxri"jr I]'jlj j'J'ii'OCHESTER GAS AND ELECTRIC CORPORATION ROBERT C MECREDY Vice Preridenl Cinna Nuclear Production e rrew~~~II C/'g coen srArc~89 EAST AVENUE, ROCHESTER N.Y.14649-0001 TEi.EpHolr E AREA CODE 7 l6 546 2700 November 10, 1993 U.S.Nuclear Regulatory Commission Attn: Allen R.Johnson Project Directorate I-3 Document Control Desk Nashington, DC 20555  
DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR                      ENCL      SIZE:    I ~
NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).                   05000244 D
RECIPIENT              COPIES                RECIPIENT         COPIES ID CODE/NAME           LTTR ENCL            ID CODE/NAME      LTTR ENCL            D PDl-3 LA                     1        1      PD1-3 PD              1    1 JOHNSON,A                   1       1 1
INTERNAL: AEOD/DOA                       1        1      AEOD/DSP/TPAB          1    1 AEOD/ROAB/DSP               2        2      NRR/DE/EELB            1    1 NRR/DE/EMEB                 1        1      NRR/DORS/OEAB          1    1 NRR/DRCH/HHFB               1        1      NRR/DRCH/HICB          1    1 NRR/DRCH/HOLB               1        1      NRR/DRZL/RPEB          1    1 NRR/DRSS/PRPB               2        2        BASSA    SPLB        1    1 NRR/DSSA/SRXB               1        1      REG  ILE      02    1  ~ 1 RES/DSIR/EIB                 1        1      RG      FILE    01    1    1 EXTERNAL: EGSG BRYCEPJ.H                 2       2       L ST LOBBY WARD        1     1 NRC PDR                      1       1       NSIC MURPHY,G.A       1     1 NSIC POOREPW.                1       1       NUDOCS FULL TXT        1     1 D
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO, ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDf r rvr r
FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR                   28   ENCL   28
 
'l jeylvm IgeZZaxri e                      ~ ~ ~ II C rrew "jr                                                                     /        'g  coen I]'jlj srArc j'J'ii'OCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT C MECREDY                                                                                TEi.EpHolr E Vice Preridenl                                                                            AREA CODE 7 l6 546 2700 Cinna Nuclear Production November 10, 1993 U.S. Nuclear Regulatory Commission Attn: Allen R. Johnson Project Directorate I-3 Document                       Control Desk Nashington,                         DC 20555


==Subject:==
==Subject:==
LER 93-005, Failure to Perform Surveillance, Due to Misinterpretation of Requirements, Causes a Condition Prohibited by Plant Technical Specifications R.E.Ginna Nuclear Power Plant Docket No.50-244 In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"any operation or condition prohibited by the plant's Technical Specifications", the attached Licensee Event Report LER 93-005 is hereby submitted.
LER 93-005, Failure to Perform Surveillance,                   Due to Misinterpretation of Requirements, Causes a Condition Prohibited by Plant Technical Specifications R.E. Ginna Nuclear Power Plant Docket No. 50-244 In accordance with 10 CFR 50.73, Licensee Event Report System, item (a) (2) (i) (B), which requires a report of, "any operation or condition prohibited by the plant's Technical Specifications", the attached Licensee Event Report LER 93-005 is hereby submitted.
This event has in no way affected the public's health and safety.Very truly yours, Robert C.Me redy xc: U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Senior Resident Inspector 931117003b
This event has in no way affected the public's health and safety.
'7i31110 PDR ADOCK 05000244 S PDR  
Very truly yours, Robert C. Me redy xc:                 U.S. Nuclear Regulatory Commission Region I 475         Allendale   Road King of Prussia,           PA 19406 Ginna         USNRC Senior Resident Inspector 931117003b '7i31110 PDR           ADOCK 05000244 S                                       PDR


NRC FORH 366 (5-92)U.S NUCLEAR REGULATORY COHHISSI ON APPROVED BY QLB NO.3150-0104 EXPIRES 5/31/95 LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)ESTIHATED BURDEN PER RESPONSE TO COHPLY WITH THIS INFORHATION COLLECTION REOUEST: 50.0 HRS.FORWARD COHMENTS REGARDING BURDEN ESTIHATE TO THE IHFORHATION AND RECORDS MANAGEHENT BRANCH (HNBB 7714), U.S.NUCLEAR REGULATORY COHHISSION, WASHIHGTON, DC 20555-0001 AND TO THE PAPERWORK REDUCTION PROJECT (3150 0104), OFFICE OF HANAGEMENT AND BUDGET WASHINGTON DC 20503.FAcILITY NAME (1)R.E~Ginna Nuclear Power Plant DOCKET NQSER (2)05000244 PAGE (3)1 OF 9 TITLE (4)Failure to Perform Surveillance, Due to Misinterpretation of Requirements, Causes a Condition Prohibited by Plant Technical Specifications EVENT DATE 5 LER NINBER 6 REPORT DATE 7 OTHER FACILITIES INVOLVED 8 HONTH 10 DAY YEAR YEAR 11 93 93 SEQUENTIAL NUMBER-005-REVISION NUMBER 00 HONTH DAY YEAR 10 93 FACILITY NAME FACILITY NAME DOCKET NUMBER 05000 DOCKET NUMBER 05000 OPERATING M<X)E (9)POWER LEVEL (10)N 097 20.402<b)20.405(a)(1)(i)20.405(a)(1)<ii) 20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v) 20.405(c)50.36<c)(1)50.36(c)(2)
NRC FORH   366                                   U.S   NUCLEAR REGULATORY COHHISSI ON                 APPROVED BY QLB NO. 3150-0104 (5-92)                                                                                                          EXPIRES 5/31/95 ESTIHATED   BURDEN   PER RESPONSE   TO   COHPLY   WITH THIS INFORHATION COLLECTION REOUEST:         50.0 HRS.
)(50.73(a)(2)(i) 50.73(a)(2)(ii) 50.73(a)(2)(iii)
LICENSEE EVENT REPORT                      (LER)                          FORWARD COHMENTS   REGARDING BURDEN ESTIHATE TO THE IHFORHATION AND RECORDS MANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, (See reverse    for required  number  of digits/characters for        each  block)    WASHIHGTON, DC 20555-0001     AND TO THE PAPERWORK REDUCTION     PROJECT   (3150 0104),       OFFICE   OF HANAGEMENT AND BUDGET     WASHINGTON   DC   20503.
LICENSEE CONTACT FOR THIS LER 12 50'3(a)(2)(iv) 50.73(a)(2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50'3(a)(2)(viii)(B) 50.73(a)(2)(x) 73.71(b)73.71(c)OTHER (Specify in Abstract below and in Text, NRC Form 366A THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR: Check one or more 11 NAHE John T.St.Hartin-Director, Operating Experience TELEPHONE NUHBER (Include Area Code)(315)524-4446 C<NPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT 13 CAUSE SYSTEH COMPONENT HANUFACTURER REPORTABLE TO NPRDS';;ip:4:+I PQ+IPqx".'AUSE SYSTEH COMPONENT HANUFACTURER REPORTABLE TO NPRDS SUPPLEMENTAL REPORT EXPECTED 14 YES (I f yes, complete EXPECTED SUBMISSION DATE).X NO EXPECTED SUBMISSION DATE (15)HONTH DAY YEAR ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)(16)On October 11, 1993, at 1330 EDST, with the reactor at approximately 97'.full power, evaluation of surveillance testing procedures determined that Technical Specification 4.6.1.e.3.(a) requirements were misinterpreted.
FAcILITY NAME (1)     R. E   ~   Ginna Nuclear Power Plant                                   DOCKET NQSER   (2)                     PAGE   (3) 05000244                          1 OF 9 TITLE (4) Failure to Perform Surveillance,       Due to Misinterpretation of Requirements,         Causes a Condition Prohibited by Plant Technical Specifications EVENT DATE     5                 LER NINBER   6                 REPORT DATE       7             OTHER   FACILITIES INVOLVED 8 SEQUENTIAL      REVISION                              FACILITY NAME                    DOCKET NUMBER HONTH     DAY     YEAR     YEAR NUMBER          NUMBER HONTH      DAY    YEAR 05000 10        11       93       93     005               00                   10     93 FACILITY NAME                     DOCKET NUMBER 05000 OPERATING                 THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10            CFR:      Check one  or more    11 M<X)E (9)       N         20.402<b)                           20.405(c)                        50 '3(a)(2)(iv)               73.71(b)
Therefore, it was concluded that verification of load shedding capability of safeguards loads had not been adequately performed.
POWER                    20.405(a   )(1)(i)                   50.36< c) (1)                     50.73(a)(2)(v)               73.71(c) 097 LEVEL  (10)                20.405(a)(1)<ii)                    50.36(c)(2)                       50.73(a)(2)(vii)             OTHER 20.405(a)(1)(iii)                )( 50.73(a)(2)(i)                     50.73(a)(2)(viii)(A) (Specify in 20.405(a)(1)(iv)                     50.73(a)(2)(ii)                   50 '3(a)(2)(viii)(B)
Immediate corrective action was initiated to complete testing that would verify this load shedding capability.
Abstract below and in Text, 20.405(a)(1)(v)                     50.73(a)(2)(iii)                 50.73(a)(2)(x)            NRC Form 366A LICENSEE CONTACT FOR THIS LER        12 NAHE     John T. St. Hartin - Director, Operating Experience                                       TELEPHONE NUHBER   (Include Area     Code)
This testing was completed within 24 hours of discovery, achieving compliance with Technical Specification 4.6.1.e.3.(a) requirements.
(315) 524-4446 C<NPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT               13 REPORTABLE                                                                        REPORTABLE CAUSE     SYSTEH      COMPONENT    HANUFACTURER                                          SYSTEH     COMPONENT     HANUFACTURER TO NPRDS                                                                         TO NPRDS
The underlying cause of the failure to perform this surveillance was a misinterpretation of Technical Specification surveillance requirements.(This event is NUREG-1220 (E)cause code.)Corrective action was to perform the testing.Corrective action to preclude repetition is outlined in Section V (B).NRC FORM 366 (5-92)'
                                                                        ';;ip:4:+I PQ+IPqx".'AUSE SUPPLEMENTAL REPORT EXPECTED       14                                     EXPECTED            HONTH      DAY        YEAR YES                                                                                             SUBMISSION (I f yes,   complete   EXPECTED SUBMISSION DATE).                   X     NO DATE (15)
ABSTRACT     (Limit to   1400 spaces,   i.e., approximately     15 single-spaced typewritten lines)         (16)
On     October 11, 1993, at 1330 EDST, with the reactor at approximately 97'.
full power, evaluation of surveillance testing procedures determined that Technical Specification 4.6.1.e.3.(a) requirements were misinterpreted.
Therefore,             it   was concluded that verification of load shedding capability of safeguards loads had not been adequately performed.
Immediate           corrective action was initiated to complete testing that would verify this load shedding capability. This testing was completed within 24 hours of discovery, achieving compliance with Technical Specification 4.6.1.e.3.(a) requirements.
The underlying cause of the failure to perform this surveillance was a misinterpretation of Technical Specification surveillance requirements.
(This event             is   NUREG-1220           (E) cause             code.)
Corrective action was to perform the testing. Corrective action to preclude repetition is outlined in Section V (B).
NRC FORM   366   (5-92)


NRC FORM 366A (5-92)U.S.NUCLEAR REGULATORY COHIISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY OMB NO 3150-0104 EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO COHPLY WITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS HANAGEHEHT BRANCH (MNBB 7714), U.S.NUCLEAR REGULATORY COHMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150.0104), OFFICE OF MAHAGEHENT AND BUDGET WASHINGTOH DC 20503.FACILITY NAME 1 R.E.Ginna Nuclear Power Plant DOCKET NUMBER 2 05000244 YEAR 93--005--00 LER HIMBER 6 SEQUENTIAL REVISION PAGE 3 2 OF 9 t TEXT (If more space is required, use additional copies of HRC Form 366A)(17)PRE-EVENT PLANT CONDITIONS The plant was at approximately 979.steady state reactor power.An evaluation of surveillance test procedures was in progress, to address potential non-compliance with Technical Specification 4.6.1.e.3.(a) surveillance requirements to verify load shedding from the emergency buses.II.DESCRIPTION OF EVENT A.DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:
NRC FORM 366A                             U.S. NUCLEAR REGULATORY COHIISSION             APPROVED BY OMB NO     3150-0104 (5-92)                                                                                            EXPIRES   5/31/95 ESTIHATED BURDEN PER RESPONSE TO COHPLY WITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.
1.October 11, 1993, 1330 EDST: Event date and approximate time.2.October 11, 1993, 1330 EDST: Discovery date and approximate time.3.October 11, 1993, 2037 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 14.4.October 12, 1993, 0441 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 18.5.October 12, 1993, 0447 EDST: Completed testing of load shedding for safeguards loads from emergency bus 14.6.October 12, 1993, 0539 EDST: Completed testing of load shedding for safeguards loads from emergency bus 18.Load shedding was satisfactorily verified for the"A" train of safeguards equipment.
FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER)                                      THE INFORMATION AND RECORDS HANAGEHEHT BRANCH TEXT CONTINUATION                                      (MNBB 7714), U.S. NUCLEAR REGULATORY COHMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION   PROJECT     (3150.0104),     OFFICE     OF MAHAGEHENT AND BUDGET WASHINGTOH DC 20503.
7.October 12, 1993, 0540 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 17.8.October 12, 1993, 0625 EDST: Completed testing to verify load shedding for safeguards loads from emergency bus 17.9.October 12, 1993, 0626 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 16.NRC FORH 366A (5-92)  
FACILITY NAME   1                     DOCKET NUMBER  2              LER HIMBER    6                  PAGE  3 YEAR SEQUENTIAL      REVISION R.E. Ginna Nuclear Power Plant                             05000244             93   -- 005--             00         2 OF 9 t
TEXT (If more space is required, use additional copies of HRC Form 366A)   (17)
PRE-EVENT PLANT CONDITIONS The   plant was at approximately 979. steady state reactor power. An evaluation of surveillance test procedures was in progress, to address potential non-compliance with Technical Specification 4.6.1.e.3.(a) surveillance requirements to verify load shedding from the emergency buses.
II. DESCRIPTION OF EVENT A. DATES       AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:
: 1.     October 11, 1993, 1330               EDST:       Event date and approximate time.
: 2.     October 11, 1993, 1330               EDST:       Discovery date and approximate time.
: 3.     October 11, 1993, 2037 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 14.
: 4.     October 12, 1993, 0441 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 18.
: 5.     October 12, 1993, 0447               EDST:       Completed testing of load shedding for safeguards                 loads from emergency bus 14.
: 6.     October 12, 1993, 0539 EDST: Completed testing of load shedding for safeguards loads from emergency bus 18. Load shedding was satisfactorily verified for the "A" train of safeguards equipment.
: 7.     October 12, 1993, 0540 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 17.
: 8.     October 12, 1993, 0625 EDST: Completed testing to verify load shedding for safeguards loads from emergency bus 17.
: 9.     October 12, 1993, 0626 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 16.
NRC FORH 366A (5-92)


NRC FORM 366A (5-92)U.S.NUCLEAR REGULATORY CQIIISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY MB NO.3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY lllTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.FORNARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORHATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714), U.S.NUCLEAR REGULATORY COMHISSION, NASHINGTOH, DC 20555-0001 AND TO THE PAPERNORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET IJASHINGTON DC 20503.FACILITY NAME 1 R.E.Ginna Nuclear Power Plant DOCKET NINBER 2 YEAR 05000244 93 LER NNBER 6 SEQUENTIAL M--005--REVISION 00 PAGE 3 3 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A)(17)10.October 12, 1993, 0716 EDST: "B" component cooling water (CCW)pump operability was indeterminate.
NRC FORM 366A                             U.S. NUCLEAR REGULATORY CQIIISSION             APPROVED BY   MB NO. 3150-0104 (5-92)                                                                                            EXPIRES   5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY lllTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.
The pump was declared inoperable and removed from service.11.October 12, 1993, 0950 EDST: Completed testing of load shedding for safeguards loads from emergency bus 16.Load shedding was satisfactorily verified for the"B" train of safeguards equipment, except for the"B" CCW pump.12.October 12, 1993, 1003 EDST: With the completion of testing for the"A" and"B" trains of safeguards equipment, compliance with Technical Specification 4.6.1.e.3.(a) was achieved.13.October 12, 1993, 1939 EDST: "B" CCW pump declared operable.B.EVENT: On October 11, 1993, at approximately 1330 EDST, station and engineering staff confirmed that surveillance test procedures had not fully complied with the requirements of Technical Specification (TS)4.6.1.e.3.(a), in that verification of load shedding of safeguards loads powered from the emergency buses (buses 14, 16, 17, and 18), while simulating a loss of offsite power in conjunction with a safety injection (SI)test signal, had not been performed as required.The guidance of NRC Generic Letter (GL)87-09, entitled"Sections 3.0 and 4.0 of the Standard Technical Specifications (STS)on the Applicability of Limiting Conditions for Operation and Surveillance Requirements", was followed.Both the"A" and"B"" diesel generators (D/Gs)were available to perform all intended functions.
FORNARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER)                                    THE INFORHATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION                                      (MNBB 7714), U.S. NUCLEAR REGULATORY COMHISSION, NASHINGTOH, DC 20555-0001       AND TO THE PAPERNORK REDUCTION     PROJECT     (3140-0104),   OFFICE   OF MANAGEMENT AND BUDGET IJASHINGTON DC 20503.
Failure to perform the surveillance within the specified time interval constituted a non-compliance with the Operability Requirements of the Limiting Conditions for Operation (LCO).NRC FORH 366A (5-92)  
FACILITY NAME   1                     DOCKET NINBER  2              LER NNBER    6                PAGE  3 YEAR SEQUENTIAL      REVISION R.E. Ginna Nuclear Power Plant                             05000244 M
93   -- 005--             00       3 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A)   (17)
: 10. October 12, 1993, 0716 EDST:                           "B" component cooling water (CCW) pump       operability         was   indeterminate.               The pump was declared inoperable and removed from service.
: 11. October 12, 1993, 0950 EDST: Completed testing of load shedding for safeguards loads from emergency bus 16. Load shedding was satisfactorily verified for the "B" train of safeguards equipment, except for the "B" CCW pump.
: 12. October 12, 1993, 1003 EDST: With the completion of testing for the "A" and "B" trains of safeguards equipment, compliance with Technical Specification 4.6.1.e.3.(a)         was   achieved.
: 13. October 12, 1993, 1939 EDST:                           "B"     CCW   pump     declared operable.
B. EVENT:
On   October 11, 1993, at approximately 1330 EDST, station and engineering staff confirmed that surveillance test procedures had not fully complied with the requirements of Technical Specification (TS) 4.6.1.e.3.(a), in that verification of load shedding of safeguards loads powered from the emergency buses (buses 14, 16, 17, and 18), while simulating a loss of offsite power in conjunction with a safety injection (SI) test signal, had not been performed as required.                           The guidance of NRC Generic Letter (GL) 87-09, entitled "Sections 3.0 and 4.0 of the Standard Technical Specifications (STS) on the Applicability of Limiting Conditions for Operation and Surveillance Requirements", was followed. Both the "A" and "B""
diesel generators (D/Gs) were available to perform all intended functions. Failure to perform the surveillance within the specified time interval constituted a non-compliance with the Operability Requirements of the Limiting Conditions for Operation (LCO).
NRC FORH 366A (5-92)


NRC FORM 366A (5-92)U.S.NUCLEAR REGULATORY CQIIISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY OMB NO.3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COHPLY NITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE IHFORMATIOH AND RECORDS MANAGEMENT BRANCH (MHBB 7714), U.S.NUCLEAR REGULATORY COMMISSION, MASHINGTON, DC 20555-0001 AND TO THE PAPERNORK REDUCTION PROJECT (3110-0104), OFFICE OF MANAGEMENT AND BUDGET NASHINGTON DC 20503.FACILITY NAME R.E.Ginna Nuclear Power Plant DOCKET NUMBER 2 05000244 LER NINIBER 6 YEAR SEQUENTIAL M 93-005--REVISION M 00 PAGE 3 4 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A)(17)Surveillance testing to verify compliance with TS 4.6.1.e.3.(a) was initiated on October 11, 1993, at approximately 2037 EDST, with each emergency bus being tested sequentially.
NRC FORM 366A                               U.S. NUCLEAR REGULATORY CQIIISSION             APPROVED BY OMB NO. 3150-0104 (5-92)                                                                                              EXPIRES   5/31/95 ESTIMATED BURDEN PER RESPONSE TO COHPLY NITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS.
Testing for the"A" train of safeguards equipment (emergency buses 14 and 18)was completed at approximately 0539 EDST (on October 12, 1993), and testing for the"B" train (emergency buses 16 and 17)was completed at approximately 0950 EDST.Technical Specification compliance was achieved at approximately 1003 EDST.During testing of the"B" train, resistance reading of a relay contact associated with the"B" CCW pump breaker Undervoltage Trip circuitry did not meet the specified acceptance criteria.Despite having confidence that the higher resistance did not impede the"B" CCW pump load shedding feature, the station staff elected to declare the"B" CCW pump inoperable.
FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER)                                      THE IHFORMATIOH AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION                                      (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, MASHINGTON, DC 20555-0001       AND TO THE PAPERNORK REDUCTION   PROJECT     (3110-0104),         OFFICE   OF MANAGEMENT AND BUDGET NASHINGTON DC 20503.
The"B" CCW pump was removed from service, and the appropriate TS LCO was entered, until functional testing and/or corrective maintenance could verify acceptable circuit operation.
FACILITY NAME                         DOCKET NUMBER  2              LER NINIBER  6                      PAGE  3 SEQUENTIAL      REVISION YEAR R.E. Ginna Nuclear Power Plant 005--
Subsequently, the"B" CCW pump breaker was racked into the test position, closed from the Main Control Board, and successfully trip tested by actuating the undervoltage circuitry.
M              M 05000244            93                          00             4 OF 9 TEXT (If more space   is required, use additional copies of NRC Form 366A)   (17)
This test demonstrated acceptable load shedding capability.
Surveillance testing to verify compliance with TS 4.6.1.e.3.(a) was     initiated on October 11, 1993, at approximately 2037 EDST, with each emergency bus being tested sequentially. Testing for the "A" train of safeguards equipment (emergency buses 14 and
Following this verification of circuit operability, corrective maintenance was performed to improve circuit performance.
: 18) was completed at approximately 0539 EDST (on October 12, 1993), and testing for the "B" train (emergency buses 16 and
The corrective maintenance consisted of burnishing of an auxiliary relay contact in the pump trip circuitry.
: 17) was completed at approximately 0950 EDST. Technical Specification compliance was achieved at approximately 1003 EDST.
The corrective maintenance proved successful, with subsequent resistance readings meeting the acceptance criteria.The"B" CCW pump was restored to service and declared operable.Note'hat the functional trip test,'which was successfully performed prior to the corrective maintenance, demonstrated acceptable load shedding capability for the"B" CCW pump.HRC FORM 366A (5-92) lf NRC FORM 366A (5-92)U.S.NUCLEAR REGULATORY CNHIISSIOH LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY W HO.3150-0104 EXP I RES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.FORMARD COMMENTS REGARD IHG BURDEH ESTIMATE TO THE INFORMATION AHD RECORDS MANAGEMENT BRANCH (MHBB 7714), U.S.NUCLEAR REGULATORY COMMISSION, IIASHINGTON, DC 20555-0001 AHD TO THE PAPERISRK REDUCI'ION PROJECT (3140-0104), OFFICE OF MAHAGEMENT AHD BUDGET UASHIHGTON DC 20503.FACILITY NAME 1 R.E.Ginna Nuclear Power Plant DOCKET NINSER 2 05000244 YEAR LER NIMBER 6 SEQUENTIAL 93-005--REVISION 00 PAGE 3 5 OF 9 TEXT (If more space is required, use additional copies of HRC Form 366A)(17)C~INOPERABLE STRUCTURES i COMPONENTS i OR SYSTEMS THAT CONTRI BUTED TO THE EVENT: None.D.OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED: None.E.METHOD OF DISCOVERY:
During testing of the "B" train, resistance reading of a relay contact associated with the "B" CCW pump breaker Undervoltage Trip circuitry did not meet the specified acceptance criteria.
This event was apparent after completion of an evaluation of TS 4.6.1.e.3.(a) and surveillance test procedures (procedures RSSP 2'i RSSP 2'Ai RSSP 2'i RSSP 19'SSP 20i PT 9''4i PT-9.1.16, PT-9.1.17, and PT-9.1.18).
Despite having confidence that the higher resistance did not impede the "B" CCW pump load shedding feature, the station staff elected to declare the "B" CCW pump inoperable. The "B" CCW pump was removed from service, and the appropriate TS LCO was entered, until functional testing and/or corrective maintenance could verify acceptable circuit operation.
This evaluation determined that verification of load shedding capability of safeguards loads from the emergency buses had not been adequately performed.
Subsequently, the "B" CCW pump breaker was racked into the test position, closed from the Main Control Board, and successfully trip tested by actuating the undervoltage circuitry. This test demonstrated acceptable load shedding capability. Following this verification of circuit operability, corrective maintenance was performed                   to improve circuit performance.
F.OPERATOR ACTION: The Control Room operators were notified of the failure to fully comply with the requirements of TS, and that the guidance of NRC GL 87-09 provided a 24 hour period to complete the required surveillance testing.G.SAFETY SYSTEM RESPONSE: None.HRC FORM 366A (5-92)  
The corrective maintenance consisted of burnishing of an auxiliary relay contact in the pump trip circuitry. The corrective maintenance proved successful, with subsequent resistance readings meeting the acceptance criteria. The "B" CCW pump was restored to service and declared operable.
the functional trip test, 'which was successfully performed Note'hat prior to the corrective maintenance,                             demonstrated acceptable load shedding capability for the "B" CCW pump.
HRC FORM 366A (5-92)


NRC FORM 366A (5-92)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY m NO.3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECT ION REQUEST: 50.0 HRS.FORWARD COMMENTS REGARD IHG BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MHBB 7714), U.ST NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001 AHD TO THE PAPERWORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET WASHINGTON DC 20503.FACILITY NAME 1 R.E.Ginna Nuclear Power Plant DOCKET HLNBER 2 YEAR 05000244 93--005--00 LER NUMBER 6 SEQUENTIAL REVI SION PAGE 3 6 OF 9 TEXT (lf more space is required, use additional copies of, NRC Form 366A)(17)III.CAUSE OF EVENT A.IMMEDIATE CAUSE: The immediate cause for failure to fully comply with requirements of TS was procedural deficiency, in that surveillance test procedures did not completely reflect the requirements of TS 4.6.1.e.3.(a).
lf NRC FORM   366A                               U.S. NUCLEAR REGULATORY CNHIISSIOH              APPROVED BY    W HO. 3150-0104 (5-92)                                                                                               EXP I RES  5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.
B.ROOT CAUSE: The underlying cause of the procedural deficiencies was a misinterpretation of TS surveillance requirements.
FORMARD COMMENTS REGARD IHG BURDEH ESTIMATE TO LICENSEE EVENT REPORT (LER)                                      THE INFORMATION AHD RECORDS MANAGEMENT BRANCH TEXT CONTINUATION                                        (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, IIASHINGTON, DC 20555-0001      AHD TO THE PAPERISRK REDUCI'ION    PROJECT      (3140-0104),    OFFICE  OF MAHAGEMENT AHD BUDGET UASHIHGTON DC 20503.
TS 4.6.1.e.3.(a) had been previously interpreted that the load shedding capabilities required to be verified were for the non-essential loads powered from the emergency buses.This capability (for non-essential loads)has been tested by simulating a SI signal during performance of procedures RSSP-2.1 and RSSP-2.1A, which are performed each refueling outage.The need to verify load shedding capabilities for safeguards loads, with both undervoltage and SI present, had not been considered in this interpretation.(This event is NUREG-1220 (E)cause code, Management/Quality Assurance Deficiency).
FACILITY NAME  1                      DOCKET NINSER  2              LER NIMBER    6                  PAGE  3 YEAR SEQUENTIAL        REVISION R.E. Ginna Nuclear Power Plant                              05000244            93    005--                00        5 OF 9 TEXT  (If more  space  is required,  use additional copies of HRC Form 366A)  (17)
IV.ANALYSIS OF EVENT: I This event is reportable in accordance with 10 CFR 50'3i Licensee Event Report System, item (a)(2)(i)(B), which requires a report of,"Any operation or condition prohibited by the plant's Technical Specifications".
C~    INOPERABLE STRUCTURES i COMPONENTS i OR SYSTEMS THAT CONTRI BUTED TO THE EVENT:
Failure to perform the surveillance to verify load shedding from the emergency buses for greater than 18 months is a condition prohibited by Ginna Technical Specifications.
None.
D. OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED:
None.
E. METHOD OF DISCOVERY:
This event was apparent                  after completion of an evaluation of                                  TS RSSP 2    'i 4.6.1.e.3.(a)            and RSSP 2 'Ai RSSP 2          'i surveillance test procedures (procedures PT-9.1.16, PT-9.1.17, and PT-9.1.18). This evaluation RSSP 19'SSP 20i PT 9 ' '4i determined that verification of load shedding capability of safeguards loads from the emergency buses had not been adequately performed.
F. OPERATOR ACTION:
The    Control      Room    operators were notified of the failure to fully comply with              the requirements of TS, and that the guidance of          NRC  GL 87-09 provided a 24 hour period to complete the required surveillance testing.
G. SAFETY SYSTEM RESPONSE:
None.
HRC FORM  366A  (5-92)
 
NRC FORM  366A                              U.S. NUCLEAR REGULATORY COMMISSION              APPROVED BY   m5/31/95 NO. 3150-0104 (5-92)                                                                                              EXPIRES ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECT ION REQUEST: 50.0 HRS.
FORWARD COMMENTS REGARD IHG BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER)                                      THE INFORMATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION                                        (MHBB 7714), U.ST NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001       AHD TO THE PAPERWORK REDUCTION   PROJECT     (3140-0104),   OFFICE   OF MANAGEMENT AND BUDGET     WASHINGTON   DC 20503.
FACILITY NAME 1                       DOCKET HLNBER  2              LER NUMBER    6                PAGE  3 YEAR SEQUENTIAL      REVI SION R.E. Ginna Nuclear Power Plant                             05000244             93   -- 005--             00         6 OF 9 TEXT (lf more space is required, use additional copies of, NRC Form 366A)   (17)
III.     CAUSE OF EVENT A. IMMEDIATE CAUSE:
The immediate cause               for failure to fully comply with requirements of             TS was     procedural deficiency, in that surveillance test procedures did not completely reflect the requirements of TS 4.6.1.e.3.(a).
B. ROOT CAUSE:
The underlying cause of the procedural deficiencies was a misinterpretation of TS surveillance requirements. TS 4.6.1.e.3.(a) had been previously interpreted that the load shedding capabilities required to be verified were for the non-essential loads powered from the emergency buses. This capability (for non-essential loads) has been tested by simulating a SI signal during performance of procedures RSSP-2.1 and RSSP-2.1A, which are performed each refueling outage.
The need to verify load shedding capabilities for safeguards loads, with both undervoltage and SI present, had not been considered in this interpretation.                             (This event is NUREG-1220 (E) cause code, Management/Quality Assurance Deficiency).
IV.       ANALYSIS OF EVENT:
I This event is reportable in accordance with 10 CFR 50 Licensee Event Report System, item (a) (2) (i) (B), which
                                                                                                          '3i requires a report of, "Any operation or condition prohibited by the plant's Technical Specifications". Failure to perform the surveillance to verify load shedding from the emergency buses for greater than 18 months is a condition prohibited by Ginna Technical Specifications.
NRC FORM  366A (5-92)
 
NRC FORM 366A                                U S. NUCLEAR REGULATORY CQNIISSION            APPROVED BY    W NO. 3150-0104 (5-92)                                                                                              EXP IRES  5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.
FORWARD COMMENTS REGARDING BURDEN ESTIHATE TO LICENSEE EVENT REPORT (LER)                                      THE INFORHATION AND RECORDS MANAGEHENT BRANCH TEXT CONTINUATION                                        (MNBB 7714), U.S. NUCLEAR REGULATORY COMHISSION, WASHINGTON, DC 20555-0001      AND TO THE PAPERWORK REDUCTION    PROJECT      (3140-0104),    OFFICE  OF MANAGEMENT AND BUDGET      WASHIHGTON  DC  20503.
FACILITY NAME    1                      DOCKET NUHBER  2              LER NIMBER    6                PAGE    3 SEQUENTIAL      REVISION YEAR R.E. Ginna Nuclear Power Plant                              05000244            93    005--                00        7 OF 9 TEXT (If more space  is required,  use additional copies of NRC Form 366A)  (17)
As    stated in          NRC GL 87-09, "Failure to perform a Surveillance Requirement          within      the allowed surveillance interval, defined by Specification 4.0.2, shall constitute non-compliance with the OPERABILITY requirements for a Limiting Condition for Operation.
The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed.                The ACTION requirements may be delayed for up to 24 hours to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours."
An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:
The requirement of TS 4.6.1.e.3.(a) is to simulate a loss of offsite power in conjunction with a safety injection test signal and verify de-energization of the emergency buses and load shedding from the emergency buses.
Performance of this surveillance is accomplished through a number of shutdown procedures:                          RSSP-2.1, RSSP-2.1A, RSSP-2.2, RSSP-19, RSSP-20, PT-9.1.14, PT-9.1.16, PT-9.1.17, and PT-9.1.18. An evaluation of these procedures indicated that the undervoltage load shedding of the following safeguards equipment was not being performed:                      safety injection (SI) pumps, residual heat removal (RHR) pumps, service water (SW) pumps, containment recirculation fans, and auxiliary feedwater (AFW) pumps. In addition, the undervoltage (in conjunction with SI signal) load shedding of the CCW pumps was not being performed. The procedures did verify the operability of the undervoltage relays, undervoltage system logic, and partially verified the operability of the undervoltage auxiliary relays. The procedures also verified the load shedding of all other emergency bus loads.
NRC FORM 366A  (5-92)
 
NRC FORM 366A                              U.S. NUCLEAR REGULATORY CQOIISSION              APPROVED BY QQI NO. 3150-0104 (5-92)                                                                                            EXPIRES  5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY 'WITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS.
FORWARD COMMENTS REGARDIHG BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER)                                      THE INFORMATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION                                      (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION@
WASHINGTON, DC 20555 0001      AHD TO THE PAPERWORK REDUCTION    PROJECT    (3140 0104),    OFFICE  OF MANAGEMENT AND BUDGET      WASHINGTON  DC  20503.
FACILITY NAME  1                      DOCKET HIMBER  2              LER HIHIBER  6                PAGE    3 YEAR SEQUENTIAL      REVISION R.E. Ginna Nuclear Power Plant                            05000244              93    -- 005              00        8 OF 9 TEXT (If more space  is required, use additional copies of NRC Form 366A)  (17)
The    testing performed on October 11 and 12, 1993 demonstrated end-to-end operability of the undervoltage protection system.
This testing verified undervoltage signals to all safeguards equipment, and undervoltage in conjunction with SI signals to the CCW pumps. This testing also verified full operability of the undervoltage auxiliary relays.
The    testing, in combination with the surveillance tests conducted during the 1993 outage,.met the requirements of TS 4.6.1.e.3.(a). Based on the above, public's health and safety was assured at all times.
it    can be concluded that the V.      CORRECTIVE ACTION A. ACTION TAKEN            TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS:
O      Testing      was performed        within 24 hours of discovery,                            and compliance        with    the  requirements          of TS 4.6.1.e.3.(a)                  was achieved.
B. ACTION TAKEN            OR PLANNED TO PREVENT RECURRENCE:
o      Procedures that verify load shedding                            capability will be upgraded to include safeguards loads,                            for conditions of undervoltage and            SI, prior to the next scheduled refueling outage.
O      The requirements of TS 4.6.1 have been reviewed and compared with surveillance procedures.                              No non-compliances were    identified.
O      A  review of Section 4 of the Ginna Technical Specifications will be performed, to ensure that there are implementing procedures for every surveillance required by TS.
NRC FORM 366A (5-92)
NRC FORM 366A (5-92)
* NRC FORM 366A (5-92)U S.NUCLEAR REGULATORY CQNIISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY W NO.3150-0104 EXP IRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.FORWARD COMMENTS REGARDING BURDEN ESTIHATE TO THE INFORHATION AND RECORDS MANAGEHENT BRANCH (MNBB 7714), U.S.NUCLEAR REGULATORY COMHISSION, WASHINGTON, DC 20555-0001 AND TO THE PAPERWORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET WASHIHGTON DC 20503.FACILITY NAME 1 R.E.Ginna Nuclear Power Plant DOCKET NUHBER 2 YEAR 05000244 93-005--00 LER NIMBER 6 SEQUENTIAL REVISION PAGE 3 7 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A)(17)As stated in NRC GL 87-09,"Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute non-compliance with the OPERABILITY requirements for a Limiting Condition for Operation.
The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed.
The ACTION requirements may be delayed for up to 24 hours to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours." An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:
The requirement of TS 4.6.1.e.3.(a) is to simulate a loss of offsite power in conjunction with a safety injection test signal and verify de-energization of the emergency buses and load shedding from the emergency buses.Performance of this surveillance is accomplished through a number of shutdown procedures:
RSSP-2.1, RSSP-2.1A, RSSP-2.2, RSSP-19, RSSP-20, PT-9.1.14, PT-9.1.16, PT-9.1.17, and PT-9.1.18.
An evaluation of these procedures indicated that the undervoltage load shedding of the following safeguards equipment was not being performed:
safety injection (SI)pumps, residual heat removal (RHR)pumps, service water (SW)pumps, containment recirculation fans, and auxiliary feedwater (AFW)pumps.In addition, the undervoltage (in conjunction with SI signal)load shedding of the CCW pumps was not being performed.
The procedures did verify the operability of the undervoltage relays, undervoltage system logic, and partially verified the operability of the undervoltage auxiliary relays.The procedures also verified the load shedding of all other emergency bus loads.NRC FORM 366A (5-92)
NRC FORM 366A (5-92)U.S.NUCLEAR REGULATORY CQOIISSION LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY QQI NO.3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY'WITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS.FORWARD COMMENTS REGARDIHG BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MHBB 7714), U.S.NUCLEAR REGULATORY COMMISSION@
WASHINGTON, DC 20555 0001 AHD TO THE PAPERWORK REDUCTION PROJECT (3140 0104), OFFICE OF MANAGEMENT AND BUDGET WASHINGTON DC 20503.FACILITY NAME 1 R.E.Ginna Nuclear Power Plant DOCKET HIMBER 2 05000244 YEAR 93--005-00 LER HIHIBER 6 SEQUENTIAL REVISION PAGE 3 8 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A)(17)The testing performed on October 11 and 12, 1993 demonstrated end-to-end operability of the undervoltage protection system.This testing verified undervoltage signals to all safeguards equipment, and undervoltage in conjunction with SI signals to the CCW pumps.This testing also verified full operability of the undervoltage auxiliary relays.The testing, in combination with the surveillance tests conducted during the 1993 outage,.met the requirements of TS 4.6.1.e.3.(a).
Based on the above, it can be concluded that the public's health and safety was assured at all times.V.CORRECTIVE ACTION A.ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS: O Testing was performed within 24 hours of discovery, and compliance with the requirements of TS 4.6.1.e.3.(a) was achieved.B.ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:
o Procedures that verify load shedding capability will be upgraded to include safeguards loads, for conditions of undervoltage and SI, prior to the next scheduled refueling outage.O The requirements of TS 4.6.1 have been reviewed and compared with surveillance procedures.
No non-compliances were identified.
O A review of Section 4 of the Ginna Technical Specifications will be performed, to ensure that there are implementing procedures for every surveillance required by TS.NRC FORM 366A (5-92)


NRC FORM 366A (5-92)U.S.NUCLEAR REGULATORY C(NHISSIOH LICENSEE EVENT REPORT (LER)TEXT CONTINUATION APPROVED BY OMB NO.3150-0104 EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY'NITN THIS IHFORMATIOH COLLECTIOH REOUEST: 50.0 NRS.FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND RECORDS MANAGEMENT BRANCH (MHBB 7714), U.S.NUCLEAR REGULATORY COMHISSIOH
NRC FORM 366A                               U.S. NUCLEAR REGULATORY C(NHISSIOH               APPROVED BY OMB NO. 3150-0104 (5-92)                                                                                              EXPIRES   5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY 'NITN THIS IHFORMATIOH COLLECTIOH REOUEST: 50.0 NRS.
~IJASHINGTON, DC 20555-0001 AHD TO THE PAPERMORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET NASHIHGTON DC 20503.FACI LIT'Y NAME 1 R.E.Ginna Nuclear Power Plant DOCKET NUMBER 2 05000244 LER NUMBER 6 YEAR SEQUENTIAL 93-005--REVISION 00 PAGE 3 9 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A)(17)VI.ADDITIONAL INFORMATION A.FAILED COMPONENTS:
FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER)                                      THE INFORMATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION                                      (MHBB 7714), U.S. NUCLEAR REGULATORY COMHISSIOH ~
None.B.PREVIOUS LERs ON SIMILAR EVENTS.A similar LER event historical search was conducted with the following results: No documentation of similar LER events with the same root cause at Ginna Nuclear Power Plant could be identified.
IJASHINGTON, DC 20555-0001     AHD TO THE PAPERMORK REDUCTION     PROJECT     (3140-0104),   OFFICE   OF MANAGEMENT AND BUDGET NASHIHGTON DC 20503.
C.SPECIAL COMMENTS: NRC GL 87-09 allows 24 hours to perform a missed surveillance test, if the allowable outage time (AOT)of the LCO Action Requirements are less than this 24 hour time limit, or when shutdown Action Requirements apply.This time limit is based'n balancing the risks between completing the required testing and potentially challenging safety systems while performing shutdown actions.TS 4.6.1.e.3.(a) is normally required to be performed during shutdown conditions, since performing this surveillance removes the normal source of offsite power, which may cause electrical system disturbances.
FACI LIT'Y NAME 1                     DOCKET NUMBER  2              LER NUMBER    6                PAGE  3 YEAR SEQUENTIAL      REVISION R.E. Ginna Nuclear Power Plant                             05000244             93     005--               00       9 OF 9 TEXT (If more space   is required, use additional copies of NRC Form 366A)   (17)
Rochester Gas&Electric (RG&E)elected to perform the necessary testing at power, after evaluating the potential risks.A review of existing testing procedures indicated that only specific portions of the load shedding capabilities were not being tested.RG&E determined that performance of the necessary voltage and continuity tests to verify these untested capabilities could be safely conducted at power.This is due to the fact that no safeguards loads on the buses would have to be declared inoperable, and no offsite power source would have to be removed from service to perform the tests.Therefore, performance of the necessary tests (at power)within 24 hours of discovery was deemed appropriate.
VI. ADDITIONAL INFORMATION A. FAILED           COMPONENTS:
HRC FORM 366A (5.92)}}
None.
B. PREVIOUS LERs             ON   SIMILAR EVENTS.
A   similar LER event historical search was conducted with the following results: No documentation of similar LER events with the same root cause at Ginna Nuclear Power Plant could be identified.
C. SPECIAL COMMENTS:
NRC GL       87-09 allows 24 hours to perform a missed surveillance test,       if   the allowable outage time (AOT) of the LCO Action Requirements are less than this 24 hour time limit, or when shutdown Action Requirements apply. This time limit is based balancing the risks between completing the required testing
                                                                                                                                'n and potentially challenging safety systems while performing shutdown actions. TS 4.6.1.e.3.(a) is normally required to be performed during shutdown conditions, since performing this surveillance removes the normal source of offsite power, which may cause electrical system disturbances.                                   Rochester Gas &
Electric (RG&E) elected to perform the necessary testing at power,       after evaluating the potential risks.
A review of existing testing procedures indicated that only specific portions of the load shedding capabilities were not being tested. RG&E determined that performance of the necessary voltage and continuity tests to verify these untested capabilities could be safely conducted at power. This is due to the fact that no safeguards loads on the buses would have to be declared inoperable, and no offsite power source would have to be removed from service to perform the tests. Therefore, performance of the necessary tests (at power) within 24 hours of discovery             was deemed       appropriate.
HRC FORM 366A (5.92)}}

Latest revision as of 09:35, 4 February 2020

LER 93-005-00:on 931011,due to Misinterpretation of TS 4.6.1.e.3.(a) Requirements,Verification of Load Shedding Capability of Safeguards Loads Not Adequately Performed. Testing Completed to Verify capability.W/931110 Ltr
ML17263A466
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/10/1993
From: Mecredy R, St Martin J
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
LER-93-005, LER-93-5, NUDOCS 9311170036
Download: ML17263A466 (22)


Text

ACCEI.ERAT@9 DOCUMENT DIST UTION SYSTEM REGULAT~ INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9311170036 DOC.DATE: 93/11/10 ,NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION ST MARTIN,J.T. Rochester Gas a Electric Corp.

MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R. Project Directorate I-3

SUBJECT:

LER 93-005-00:on 931011,due to misinterpretation of TS D 4.6.l.e.3.(a) requirements, verification of load shedding

'apability of safeguards loads not adequately performed.

Testing completed to verify capability.W/931110 ltr.

TITLE: 50.73/50.9 Licensee Event Report (LER),QIncidentQRpt, etc.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: I ~

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PDl-3 LA 1 1 PD1-3 PD 1 1 JOHNSON,A 1 1 1

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DORS/OEAB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRZL/RPEB 1 1 NRR/DRSS/PRPB 2 2 BASSA SPLB 1 1 NRR/DSSA/SRXB 1 1 REG ILE 02 1 ~ 1 RES/DSIR/EIB 1 1 RG FILE 01 1 1 EXTERNAL: EGSG BRYCEPJ.H 2 2 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1 NSIC POOREPW. 1 1 NUDOCS FULL TXT 1 1 D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO, ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDf r rvr r

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 28

'l jeylvm IgeZZaxri e ~ ~ ~ II C rrew "jr / 'g coen I]'jlj srArc j'J'ii'OCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT C MECREDY TEi.EpHolr E Vice Preridenl AREA CODE 7 l6 546 2700 Cinna Nuclear Production November 10, 1993 U.S. Nuclear Regulatory Commission Attn: Allen R. Johnson Project Directorate I-3 Document Control Desk Nashington, DC 20555

Subject:

LER 93-005, Failure to Perform Surveillance, Due to Misinterpretation of Requirements, Causes a Condition Prohibited by Plant Technical Specifications R.E. Ginna Nuclear Power Plant Docket No. 50-244 In accordance with 10 CFR 50.73, Licensee Event Report System, item (a) (2) (i) (B), which requires a report of, "any operation or condition prohibited by the plant's Technical Specifications", the attached Licensee Event Report LER 93-005 is hereby submitted.

This event has in no way affected the public's health and safety.

Very truly yours, Robert C. Me redy xc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Senior Resident Inspector 931117003b '7i31110 PDR ADOCK 05000244 S PDR

NRC FORH 366 U.S NUCLEAR REGULATORY COHHISSI ON APPROVED BY QLB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO COHPLY WITH THIS INFORHATION COLLECTION REOUEST: 50.0 HRS.

LICENSEE EVENT REPORT (LER) FORWARD COHMENTS REGARDING BURDEN ESTIHATE TO THE IHFORHATION AND RECORDS MANAGEHENT BRANCH (HNBB 7714), U.S. NUCLEAR REGULATORY COHHISSION, (See reverse for required number of digits/characters for each block) WASHIHGTON, DC 20555-0001 AND TO THE PAPERWORK REDUCTION PROJECT (3150 0104), OFFICE OF HANAGEMENT AND BUDGET WASHINGTON DC 20503.

FAcILITY NAME (1) R. E ~ Ginna Nuclear Power Plant DOCKET NQSER (2) PAGE (3) 05000244 1 OF 9 TITLE (4) Failure to Perform Surveillance, Due to Misinterpretation of Requirements, Causes a Condition Prohibited by Plant Technical Specifications EVENT DATE 5 LER NINBER 6 REPORT DATE 7 OTHER FACILITIES INVOLVED 8 SEQUENTIAL REVISION FACILITY NAME DOCKET NUMBER HONTH DAY YEAR YEAR NUMBER NUMBER HONTH DAY YEAR 05000 10 11 93 93 005 00 10 93 FACILITY NAME DOCKET NUMBER 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR: Check one or more 11 M<X)E (9) N 20.402<b) 20.405(c) 50 '3(a)(2)(iv) 73.71(b)

POWER 20.405(a )(1)(i) 50.36< c) (1) 50.73(a)(2)(v) 73.71(c) 097 LEVEL (10) 20.405(a)(1)<ii) 50.36(c)(2) 50.73(a)(2)(vii) OTHER 20.405(a)(1)(iii) )( 50.73(a)(2)(i) 50.73(a)(2)(viii)(A) (Specify in 20.405(a)(1)(iv) 50.73(a)(2)(ii) 50 '3(a)(2)(viii)(B)

Abstract below and in Text, 20.405(a)(1)(v) 50.73(a)(2)(iii) 50.73(a)(2)(x) NRC Form 366A LICENSEE CONTACT FOR THIS LER 12 NAHE John T. St. Hartin - Director, Operating Experience TELEPHONE NUHBER (Include Area Code)

(315) 524-4446 C<NPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT 13 REPORTABLE REPORTABLE CAUSE SYSTEH COMPONENT HANUFACTURER SYSTEH COMPONENT HANUFACTURER TO NPRDS TO NPRDS

';;ip:4:+I PQ+IPqx".'AUSE SUPPLEMENTAL REPORT EXPECTED 14 EXPECTED HONTH DAY YEAR YES SUBMISSION (I f yes, complete EXPECTED SUBMISSION DATE). X NO DATE (15)

ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16)

On October 11, 1993, at 1330 EDST, with the reactor at approximately 97'.

full power, evaluation of surveillance testing procedures determined that Technical Specification 4.6.1.e.3.(a) requirements were misinterpreted.

Therefore, it was concluded that verification of load shedding capability of safeguards loads had not been adequately performed.

Immediate corrective action was initiated to complete testing that would verify this load shedding capability. This testing was completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery, achieving compliance with Technical Specification 4.6.1.e.3.(a) requirements.

The underlying cause of the failure to perform this surveillance was a misinterpretation of Technical Specification surveillance requirements.

(This event is NUREG-1220 (E) cause code.)

Corrective action was to perform the testing. Corrective action to preclude repetition is outlined in Section V (B).

NRC FORM 366 (5-92)

NRC FORM 366A U.S. NUCLEAR REGULATORY COHIISSION APPROVED BY OMB NO 3150-0104 (5-92) EXPIRES 5/31/95 ESTIHATED BURDEN PER RESPONSE TO COHPLY WITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.

FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER) THE INFORMATION AND RECORDS HANAGEHEHT BRANCH TEXT CONTINUATION (MNBB 7714), U.S. NUCLEAR REGULATORY COHMISSION, WASHINGTON, DC 20555-0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150.0104), OFFICE OF MAHAGEHENT AND BUDGET WASHINGTOH DC 20503.

FACILITY NAME 1 DOCKET NUMBER 2 LER HIMBER 6 PAGE 3 YEAR SEQUENTIAL REVISION R.E. Ginna Nuclear Power Plant 05000244 93 -- 005-- 00 2 OF 9 t

TEXT (If more space is required, use additional copies of HRC Form 366A) (17)

PRE-EVENT PLANT CONDITIONS The plant was at approximately 979. steady state reactor power. An evaluation of surveillance test procedures was in progress, to address potential non-compliance with Technical Specification 4.6.1.e.3.(a) surveillance requirements to verify load shedding from the emergency buses.

II. DESCRIPTION OF EVENT A. DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:

1. October 11, 1993, 1330 EDST: Event date and approximate time.
2. October 11, 1993, 1330 EDST: Discovery date and approximate time.
3. October 11, 1993, 2037 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 14.
4. October 12, 1993, 0441 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 18.
5. October 12, 1993, 0447 EDST: Completed testing of load shedding for safeguards loads from emergency bus 14.
6. October 12, 1993, 0539 EDST: Completed testing of load shedding for safeguards loads from emergency bus 18. Load shedding was satisfactorily verified for the "A" train of safeguards equipment.
7. October 12, 1993, 0540 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 17.
8. October 12, 1993, 0625 EDST: Completed testing to verify load shedding for safeguards loads from emergency bus 17.
9. October 12, 1993, 0626 EDST: Initiated testing to verify load shedding capability for loads on emergency bus 16.

NRC FORH 366A (5-92)

NRC FORM 366A U.S. NUCLEAR REGULATORY CQIIISSION APPROVED BY MB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY lllTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.

FORNARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER) THE INFORHATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION (MNBB 7714), U.S. NUCLEAR REGULATORY COMHISSION, NASHINGTOH, DC 20555-0001 AND TO THE PAPERNORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET IJASHINGTON DC 20503.

FACILITY NAME 1 DOCKET NINBER 2 LER NNBER 6 PAGE 3 YEAR SEQUENTIAL REVISION R.E. Ginna Nuclear Power Plant 05000244 M

93 -- 005-- 00 3 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)

10. October 12, 1993, 0716 EDST: "B" component cooling water (CCW) pump operability was indeterminate. The pump was declared inoperable and removed from service.
11. October 12, 1993, 0950 EDST: Completed testing of load shedding for safeguards loads from emergency bus 16. Load shedding was satisfactorily verified for the "B" train of safeguards equipment, except for the "B" CCW pump.
12. October 12, 1993, 1003 EDST: With the completion of testing for the "A" and "B" trains of safeguards equipment, compliance with Technical Specification 4.6.1.e.3.(a) was achieved.
13. October 12, 1993, 1939 EDST: "B" CCW pump declared operable.

B. EVENT:

On October 11, 1993, at approximately 1330 EDST, station and engineering staff confirmed that surveillance test procedures had not fully complied with the requirements of Technical Specification (TS) 4.6.1.e.3.(a), in that verification of load shedding of safeguards loads powered from the emergency buses (buses 14, 16, 17, and 18), while simulating a loss of offsite power in conjunction with a safety injection (SI) test signal, had not been performed as required. The guidance of NRC Generic Letter (GL) 87-09, entitled "Sections 3.0 and 4.0 of the Standard Technical Specifications (STS) on the Applicability of Limiting Conditions for Operation and Surveillance Requirements", was followed. Both the "A" and "B""

diesel generators (D/Gs) were available to perform all intended functions. Failure to perform the surveillance within the specified time interval constituted a non-compliance with the Operability Requirements of the Limiting Conditions for Operation (LCO).

NRC FORH 366A (5-92)

NRC FORM 366A U.S. NUCLEAR REGULATORY CQIIISSION APPROVED BY OMB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COHPLY NITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS.

FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER) THE IHFORMATIOH AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, MASHINGTON, DC 20555-0001 AND TO THE PAPERNORK REDUCTION PROJECT (3110-0104), OFFICE OF MANAGEMENT AND BUDGET NASHINGTON DC 20503.

FACILITY NAME DOCKET NUMBER 2 LER NINIBER 6 PAGE 3 SEQUENTIAL REVISION YEAR R.E. Ginna Nuclear Power Plant 005--

M M 05000244 93 00 4 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)

Surveillance testing to verify compliance with TS 4.6.1.e.3.(a) was initiated on October 11, 1993, at approximately 2037 EDST, with each emergency bus being tested sequentially. Testing for the "A" train of safeguards equipment (emergency buses 14 and

18) was completed at approximately 0539 EDST (on October 12, 1993), and testing for the "B" train (emergency buses 16 and
17) was completed at approximately 0950 EDST. Technical Specification compliance was achieved at approximately 1003 EDST.

During testing of the "B" train, resistance reading of a relay contact associated with the "B" CCW pump breaker Undervoltage Trip circuitry did not meet the specified acceptance criteria.

Despite having confidence that the higher resistance did not impede the "B" CCW pump load shedding feature, the station staff elected to declare the "B" CCW pump inoperable. The "B" CCW pump was removed from service, and the appropriate TS LCO was entered, until functional testing and/or corrective maintenance could verify acceptable circuit operation.

Subsequently, the "B" CCW pump breaker was racked into the test position, closed from the Main Control Board, and successfully trip tested by actuating the undervoltage circuitry. This test demonstrated acceptable load shedding capability. Following this verification of circuit operability, corrective maintenance was performed to improve circuit performance.

The corrective maintenance consisted of burnishing of an auxiliary relay contact in the pump trip circuitry. The corrective maintenance proved successful, with subsequent resistance readings meeting the acceptance criteria. The "B" CCW pump was restored to service and declared operable.

the functional trip test, 'which was successfully performed Note'hat prior to the corrective maintenance, demonstrated acceptable load shedding capability for the "B" CCW pump.

HRC FORM 366A (5-92)

lf NRC FORM 366A U.S. NUCLEAR REGULATORY CNHIISSIOH APPROVED BY W HO. 3150-0104 (5-92) EXP I RES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS.

FORMARD COMMENTS REGARD IHG BURDEH ESTIMATE TO LICENSEE EVENT REPORT (LER) THE INFORMATION AHD RECORDS MANAGEMENT BRANCH TEXT CONTINUATION (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION, IIASHINGTON, DC 20555-0001 AHD TO THE PAPERISRK REDUCI'ION PROJECT (3140-0104), OFFICE OF MAHAGEMENT AHD BUDGET UASHIHGTON DC 20503.

FACILITY NAME 1 DOCKET NINSER 2 LER NIMBER 6 PAGE 3 YEAR SEQUENTIAL REVISION R.E. Ginna Nuclear Power Plant 05000244 93 005-- 00 5 OF 9 TEXT (If more space is required, use additional copies of HRC Form 366A) (17)

C~ INOPERABLE STRUCTURES i COMPONENTS i OR SYSTEMS THAT CONTRI BUTED TO THE EVENT:

None.

D. OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED:

None.

E. METHOD OF DISCOVERY:

This event was apparent after completion of an evaluation of TS RSSP 2 'i 4.6.1.e.3.(a) and RSSP 2 'Ai RSSP 2 'i surveillance test procedures (procedures PT-9.1.16, PT-9.1.17, and PT-9.1.18). This evaluation RSSP 19'SSP 20i PT 9 ' '4i determined that verification of load shedding capability of safeguards loads from the emergency buses had not been adequately performed.

F. OPERATOR ACTION:

The Control Room operators were notified of the failure to fully comply with the requirements of TS, and that the guidance of NRC GL 87-09 provided a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period to complete the required surveillance testing.

G. SAFETY SYSTEM RESPONSE:

None.

HRC FORM 366A (5-92)

NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY m5/31/95 NO. 3150-0104 (5-92) EXPIRES ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECT ION REQUEST: 50.0 HRS.

FORWARD COMMENTS REGARD IHG BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER) THE INFORMATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION (MHBB 7714), U.ST NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555-0001 AHD TO THE PAPERWORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET WASHINGTON DC 20503.

FACILITY NAME 1 DOCKET HLNBER 2 LER NUMBER 6 PAGE 3 YEAR SEQUENTIAL REVI SION R.E. Ginna Nuclear Power Plant 05000244 93 -- 005-- 00 6 OF 9 TEXT (lf more space is required, use additional copies of, NRC Form 366A) (17)

III. CAUSE OF EVENT A. IMMEDIATE CAUSE:

The immediate cause for failure to fully comply with requirements of TS was procedural deficiency, in that surveillance test procedures did not completely reflect the requirements of TS 4.6.1.e.3.(a).

B. ROOT CAUSE:

The underlying cause of the procedural deficiencies was a misinterpretation of TS surveillance requirements. TS 4.6.1.e.3.(a) had been previously interpreted that the load shedding capabilities required to be verified were for the non-essential loads powered from the emergency buses. This capability (for non-essential loads) has been tested by simulating a SI signal during performance of procedures RSSP-2.1 and RSSP-2.1A, which are performed each refueling outage.

The need to verify load shedding capabilities for safeguards loads, with both undervoltage and SI present, had not been considered in this interpretation. (This event is NUREG-1220 (E) cause code, Management/Quality Assurance Deficiency).

IV. ANALYSIS OF EVENT:

I This event is reportable in accordance with 10 CFR 50 Licensee Event Report System, item (a) (2) (i) (B), which

'3i requires a report of, "Any operation or condition prohibited by the plant's Technical Specifications". Failure to perform the surveillance to verify load shedding from the emergency buses for greater than 18 months is a condition prohibited by Ginna Technical Specifications.

NRC FORM 366A (5-92)

NRC FORM 366A U S. NUCLEAR REGULATORY CQNIISSION APPROVED BY W NO. 3150-0104 (5-92) EXP IRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORHATION COLLECTION REQUEST: 50.0 HRS.

FORWARD COMMENTS REGARDING BURDEN ESTIHATE TO LICENSEE EVENT REPORT (LER) THE INFORHATION AND RECORDS MANAGEHENT BRANCH TEXT CONTINUATION (MNBB 7714), U.S. NUCLEAR REGULATORY COMHISSION, WASHINGTON, DC 20555-0001 AND TO THE PAPERWORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET WASHIHGTON DC 20503.

FACILITY NAME 1 DOCKET NUHBER 2 LER NIMBER 6 PAGE 3 SEQUENTIAL REVISION YEAR R.E. Ginna Nuclear Power Plant 05000244 93 005-- 00 7 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)

As stated in NRC GL 87-09, "Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute non-compliance with the OPERABILITY requirements for a Limiting Condition for Operation.

The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed. The ACTION requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage time limits of the ACTION requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."

An assessment was performed considering both the safety consequences and implications of this event with the following results and conclusions:

The requirement of TS 4.6.1.e.3.(a) is to simulate a loss of offsite power in conjunction with a safety injection test signal and verify de-energization of the emergency buses and load shedding from the emergency buses.

Performance of this surveillance is accomplished through a number of shutdown procedures: RSSP-2.1, RSSP-2.1A, RSSP-2.2, RSSP-19, RSSP-20, PT-9.1.14, PT-9.1.16, PT-9.1.17, and PT-9.1.18. An evaluation of these procedures indicated that the undervoltage load shedding of the following safeguards equipment was not being performed: safety injection (SI) pumps, residual heat removal (RHR) pumps, service water (SW) pumps, containment recirculation fans, and auxiliary feedwater (AFW) pumps. In addition, the undervoltage (in conjunction with SI signal) load shedding of the CCW pumps was not being performed. The procedures did verify the operability of the undervoltage relays, undervoltage system logic, and partially verified the operability of the undervoltage auxiliary relays. The procedures also verified the load shedding of all other emergency bus loads.

NRC FORM 366A (5-92)

NRC FORM 366A U.S. NUCLEAR REGULATORY CQOIISSION APPROVED BY QQI NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY 'WITH THIS INFORMATION COLLECTIOH REQUEST: 50.0 HRS.

FORWARD COMMENTS REGARDIHG BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER) THE INFORMATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION (MHBB 7714), U.S. NUCLEAR REGULATORY COMMISSION@

WASHINGTON, DC 20555 0001 AHD TO THE PAPERWORK REDUCTION PROJECT (3140 0104), OFFICE OF MANAGEMENT AND BUDGET WASHINGTON DC 20503.

FACILITY NAME 1 DOCKET HIMBER 2 LER HIHIBER 6 PAGE 3 YEAR SEQUENTIAL REVISION R.E. Ginna Nuclear Power Plant 05000244 93 -- 005 00 8 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)

The testing performed on October 11 and 12, 1993 demonstrated end-to-end operability of the undervoltage protection system.

This testing verified undervoltage signals to all safeguards equipment, and undervoltage in conjunction with SI signals to the CCW pumps. This testing also verified full operability of the undervoltage auxiliary relays.

The testing, in combination with the surveillance tests conducted during the 1993 outage,.met the requirements of TS 4.6.1.e.3.(a). Based on the above, public's health and safety was assured at all times.

it can be concluded that the V. CORRECTIVE ACTION A. ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS:

O Testing was performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery, and compliance with the requirements of TS 4.6.1.e.3.(a) was achieved.

B. ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:

o Procedures that verify load shedding capability will be upgraded to include safeguards loads, for conditions of undervoltage and SI, prior to the next scheduled refueling outage.

O The requirements of TS 4.6.1 have been reviewed and compared with surveillance procedures. No non-compliances were identified.

O A review of Section 4 of the Ginna Technical Specifications will be performed, to ensure that there are implementing procedures for every surveillance required by TS.

NRC FORM 366A (5-92)

NRC FORM 366A U.S. NUCLEAR REGULATORY C(NHISSIOH APPROVED BY OMB NO. 3150-0104 (5-92) EXPIRES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMPLY 'NITN THIS IHFORMATIOH COLLECTIOH REOUEST: 50.0 NRS.

FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO LICENSEE EVENT REPORT (LER) THE INFORMATION AND RECORDS MANAGEMENT BRANCH TEXT CONTINUATION (MHBB 7714), U.S. NUCLEAR REGULATORY COMHISSIOH ~

IJASHINGTON, DC 20555-0001 AHD TO THE PAPERMORK REDUCTION PROJECT (3140-0104), OFFICE OF MANAGEMENT AND BUDGET NASHIHGTON DC 20503.

FACI LIT'Y NAME 1 DOCKET NUMBER 2 LER NUMBER 6 PAGE 3 YEAR SEQUENTIAL REVISION R.E. Ginna Nuclear Power Plant 05000244 93 005-- 00 9 OF 9 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)

VI. ADDITIONAL INFORMATION A. FAILED COMPONENTS:

None.

B. PREVIOUS LERs ON SIMILAR EVENTS.

A similar LER event historical search was conducted with the following results: No documentation of similar LER events with the same root cause at Ginna Nuclear Power Plant could be identified.

C. SPECIAL COMMENTS:

NRC GL 87-09 allows 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to perform a missed surveillance test, if the allowable outage time (AOT) of the LCO Action Requirements are less than this 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> time limit, or when shutdown Action Requirements apply. This time limit is based balancing the risks between completing the required testing

'n and potentially challenging safety systems while performing shutdown actions. TS 4.6.1.e.3.(a) is normally required to be performed during shutdown conditions, since performing this surveillance removes the normal source of offsite power, which may cause electrical system disturbances. Rochester Gas &

Electric (RG&E) elected to perform the necessary testing at power, after evaluating the potential risks.

A review of existing testing procedures indicated that only specific portions of the load shedding capabilities were not being tested. RG&E determined that performance of the necessary voltage and continuity tests to verify these untested capabilities could be safely conducted at power. This is due to the fact that no safeguards loads on the buses would have to be declared inoperable, and no offsite power source would have to be removed from service to perform the tests. Therefore, performance of the necessary tests (at power) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery was deemed appropriate.