IR 05000244/1990012: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/01/1990
| issue date = 10/01/1990
| title = Advises That Future self-assessment Will Be Tracked,Per Weaknesses Noted in Insp Rept 50-244/90-12
| title = Advises That Future self-assessment Will Be Tracked,Per Weaknesses Noted in Insp Rept 50-244/90-12
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = MCCABE E C
| addressee name = Mccabe E
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000244
| docket = 05000244

Latest revision as of 09:17, 13 July 2019

Advises That Future self-assessment Will Be Tracked,Per Weaknesses Noted in Insp Rept 50-244/90-12
ML17262A219
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/01/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Mccabe E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9011070263
Download: ML17262A219 (4)


Text

ROCHESTER GA ROBERT C MECREDY Vice President Ctnne Nucteer Production e'h , (/CPilizzid si'/iiiIIiiiI S AND ELECTRIC CORPORATION

.,spy~89 EAST AVENUE ROCHESTER N.Y.14649.0001 TELEPHONE~cooETse 546.2700 October 1, 1990Mr.Ebe C.McCabe Acting Chief, Projects Branch 3 Division of Reactor Projects U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406: Subject: NRC Inspection 50-244/90-12 R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.McCabe:

In the subject Inspection Report, dated September 5, 1990, you identified as a weakness, our failure to formally track deficiencies identified in our self-assessment of the Independent Verification Program.In reviewing your comment, the Ginna Planning Committee concurred with your comment and we have determined th'at deficiencies identified in future self-assessments should be tracked through an appropriate tracking system.Very truly yoursP Robert C.Mecredy~~~~~s~

ACCEI ERATED DISTRIBUTION D M REGULATORY XNFORMATION DXSTRIBUTION SYSTEM (RIDS)'SSION NBR: 9011070263 DOC.DATE: 90/10/01 NOTARIZED:

NO CIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas&Electric Corp.RECXP.NAME RECIPIENT AFFILIATION MCCABE,E.C.

Region 1 (Post 820201)SUBJECT: Advises that future self-assessment will be tracked,per weaknesses noted in Insp Rept 50-244/90-12.

DISTRIBUTION CODE: XE01D COPIES RECEIVED:LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET 05000244 D S 05000244 RECIPIEI'IT XD CODE/NAME PD1-3 PD INTERNAL: AEOD AEOD/TPAD NRR MORI SSEAU i D NRR/DLPQ/LPEB10 NRR/DRXS/DXR NRR/PMAS/ILRB12 OE DIR P E RNAL: NRC PDR COPIES LTTR ENCL 1 RECIPIENT ID CODE/NAME JOHNSON,A AEOD/DEXIB DEDRO, NRR SHANKMAN,S NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGN1 FILE 01 NSICCOPIES LTTR ENCL 1 1 1 1 1 1 1 1 A D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOih!P!-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPXES REQUIRED: LTTR 20 ENCL A D D ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C.MECREOY Yi<e Prerident Cinna Nuclear Produr(ion

\~r 1 I II Iree':,tace" S1ATC~e9 EAST AVENUE, ROCHESTER N.Y.14649-0001 TELEPHONE AREA CODE 718 546 2TOO October 1, 1990 Mr.Ebe C.McCabe Acting Chief, Projects Branch 3 Division of Reactor Projects U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406 Subject: NRC Inspection 50-244/90-12 R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.McCabe:

In the subject Inspection Report, dated September 5, 1990, you identified as a weakness, our failure to formally track deficiencies identified in our self-assessment of the Independent Verification Program.In reviewing your comment, the Ginna Planning Committee concurred with your comment and we have determined that deficiencies identified in future self-assessments should be tracked through an appropriate tracking system.Very truly yours, Robert C.Mecredy~011070~6~

9Oiooi 244 Q FGC (lo