| issue date = 10/25/2016 | | issue date = 10/25/2016 | ||
| title = NRC Initial Operator Licensing Examination Report 05000354/2016301 | | title = NRC Initial Operator Licensing Examination Report 05000354/2016301 | ||
| author name = Jackson D | | author name = Jackson D | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| addressee name = Sena | | addressee name = Sena P | ||
| addressee affiliation = PSEG Nuclear, LLC | | addressee affiliation = PSEG Nuclear, LLC | ||
| docket = 05000354 | | docket = 05000354 | ||
| license number = NPF-057 | | license number = NPF-057 | ||
| contact person = Fish T | | contact person = Fish T | ||
| document report number = 2016301 | | document report number = 2016301 | ||
| package number = ML15308A608 | | package number = ML15308A608 | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ber 25, 2016 | ||
==SUBJECT:== | |||
HOPE CREEK GENERATING STATION, UNIT 1 - NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000354/2016301 | |||
SUBJECT: HOPE CREEK GENERATING STATION, UNIT 1 - NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT | |||
==Dear Mr. Sena:== | ==Dear Mr. Sena:== | ||
On August 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Hope Creek Generating Station. The enclosed examination report documents the examination results, which were discussed on September 27, 2016, with Mr. Robert Boesch, Training Manager, and other members of your staff. | On August 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Hope Creek Generating Station. The enclosed examination report documents the examination results, which were discussed on September 27, 2016, with Mr. Robert Boesch, Training Manager, and other members of your staff. | ||
The examination included the evaluation of three applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The NRC developed the written and operating examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The license examiners determined that all ten applicants satisfied the requirements | The examination included the evaluation of three applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The NRC developed the written and operating examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. | ||
The license examiners determined that all ten applicants satisfied the requirements of Title 10 of the Code of Federal Regulation (10 CFR) Part 55, and the appropriate licenses were issued on September 27, 2016. | |||
No findings were identified during this examination. | No findings were identified during this examination. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC website http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | Sincerely, | ||
/RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-354 License No | /RA/ | ||
.: NPF-57 Enclosure: | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-354 License No.: NPF-57 Enclosure: Examination Report 05000354/2016301 w/Attachment: Supplementary Information cc w/encl: Distribution via ListServ | ||
Examination Report | |||
Mr. Peter | Mr. Peter | ||
=SUMMARY= | =SUMMARY= | ||
ER 05000354/2016301 | ER 05000354/2016301; August 22-26, 2016 and August 31, 2016; Hope Creek Generating | ||
Station, Unit 1; Initial Operator Licensing Examination Report. | |||
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The facility administered the written examination August 31, 2016. NRC | |||
Six NRC examiners evaluated the competency of three applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The NRC developed the written and operating examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The facility administered the written examination August 31, 2016. NRC examiners administered the operating tests August 22-26, 2016. The NRC examiners determined that all 10 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | |||
No findings were identified. | No findings were identified. | ||
=REPORT DETAILS= | =REPORT DETAILS= | ||
Line 58: | Line 54: | ||
==OTHER ACTIVITIES (OA)== | ==OTHER ACTIVITIES (OA)== | ||
{{a|4OA5}} | {{a|4OA5}} | ||
==4OA5 Other Activities | ==4OA5 Other Activities - Initial Operator License Examination== | ||
- Initial Operator License Examination | |||
===.1 License Applications=== | ===.1 License Applications=== | ||
====a. Scope==== | ====a. Scope==== | ||
The chief examiner reviewed all 10 license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, | The chief examiner reviewed all 10 license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The chief examiner also audited five license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes. | ||
-the-job training, including control manipulations that provided significant reactivity changes. | |||
====b. Findings==== | ====b. Findings==== | ||
Line 74: | Line 67: | ||
====a. Examination Scope==== | ====a. Examination Scope==== | ||
On August 31, 2016, the licensee proctored the administration of the written examinations to all 10 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 7, 2016 | On August 31, 2016, the licensee proctored the administration of the written examinations to all 10 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 7, 2016. | ||
The NRC examination team administered the various portions of the operating examination to all applicants August 22-26, 2016. The applicants for reactor operator licenses participated in at least two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of four administrative tasks. The applicants seeking an instant senior reactor operator license participated in at least two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of 10 system tasks, and an administrative test consisting of five administrative tasks. The applicant for an upgrade senior reactor operator license participated in two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks. | |||
====b. Findings==== | ====b. Findings==== | ||
All applicants passed all parts of the test. For the written examinations, the reactor operator applicants | All applicants passed all parts of the test. For the written examinations, the reactor operator applicants average score was 89.18 percent and ranged from 86.48 to 94.59 percent. The senior operator applicants average score was 91.33 percent and ranged from 86.86 to 95.96 percent. | ||
Chapter ES | Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this analysis and submitted the analysis to the chief examiner. The analysis recommended that one of the questions (Exam question #73)be deleted from the exam. The NRC reviewed the facilitys post-exam comment and accepted facilitys recommendation for question #73. The question was deleted from both the reactor operator and senior reactor operator exams. The text of the entire written examination and the licensees post-examination comment with the NRC resolution may be accessed in the ADAMS system under the accession numbers noted in the Attachment 1. In accordance with current NRC policy the release of the examination will be delayed for 2 years. | ||
-403 and Form ES 1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this analysis and submitted the analysis to the chief examiner. | |||
73) be deleted from the exam. The NRC reviewed the | |||
-exam comment and accepted | |||
-examination comment with the NRC resolution may be accessed in the ADAMS system under the accession numbers noted in the Attachment 1. In accordance with current NRC policy the release of | |||
===.3 Initial Licensing Examination Development=== | ===.3 Initial Licensing Examination Development=== | ||
====a. Examination Scope==== | ====a. Examination Scope==== | ||
The NRC developed the examinations in accordance with NUREG | The NRC developed the examinations in accordance with NUREG-1021, Revision 10. | ||
-1021, Revision 10. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The NRC conducted an onsite validation of the operating examinations and incorporated facility training staff comments during the week of July 18, 2016. | |||
All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The NRC conducted an onsite validation of the operating examinations and incorporated facility training staff comments during the week of July 18, 2016. | |||
====b. Findings==== | ====b. Findings==== | ||
Line 99: | Line 89: | ||
====a. Examination Scope==== | ====a. Examination Scope==== | ||
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration. | The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 107: | Line 97: | ||
====a. Examination Scope==== | ====a. Examination Scope==== | ||
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG | The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021, Revision 10 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel. | ||
-1021, Revision 10 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | |||
{{a|4OA6}} | |||
==4OA6 Meetings, Including Exit== | ==4OA6 Meetings, Including Exit== | ||
Line 120: | Line 108: | ||
The licensee did not identify any information or materials used during the examination as proprietary. | The licensee did not identify any information or materials used during the examination as proprietary. | ||
ATTACHMENTS: | |||
=SUPPLEMENTARY | =SUPPLEMENTARY INFORMATION= | ||
INFORMATION= | |||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
Line 135: | Line 122: | ||
==ITEMS OPENED, CLOSED, AND DISCUSSED== | ==ITEMS OPENED, CLOSED, AND DISCUSSED== | ||
NONE | NONE | ||
==ADAMS DOCUMENTS REFERENCED== | ==ADAMS DOCUMENTS REFERENCED== | ||
}} | }} |
Latest revision as of 19:39, 19 December 2019
ML16300A168 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 10/25/2016 |
From: | Diane Jackson Operations Branch I |
To: | Sena P Public Service Enterprise Group |
Fish T | |
Shared Package | |
ML15308A608 | List: |
References | |
2016301 | |
Download: ML16300A168 (2) | |
Text
ber 25, 2016
SUBJECT:
HOPE CREEK GENERATING STATION, UNIT 1 - NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000354/2016301
Dear Mr. Sena:
On August 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Hope Creek Generating Station. The enclosed examination report documents the examination results, which were discussed on September 27, 2016, with Mr. Robert Boesch, Training Manager, and other members of your staff.
The examination included the evaluation of three applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The NRC developed the written and operating examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10.
The license examiners determined that all ten applicants satisfied the requirements of Title 10 of the Code of Federal Regulation (10 CFR) Part 55, and the appropriate licenses were issued on September 27, 2016.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC website http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-354 License No.: NPF-57 Enclosure: Examination Report 05000354/2016301 w/Attachment: Supplementary Information cc w/encl: Distribution via ListServ
Mr. Peter
SUMMARY
ER 05000354/2016301; August 22-26, 2016 and August 31, 2016; Hope Creek Generating
Station, Unit 1; Initial Operator Licensing Examination Report.
Six NRC examiners evaluated the competency of three applicants for reactor operator licenses, six applicants for instant senior reactor operator licenses, and one applicant for an upgrade senior reactor operator license. The NRC developed the written and operating examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The facility administered the written examination August 31, 2016. NRC examiners administered the operating tests August 22-26, 2016. The NRC examiners determined that all 10 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
No findings were identified.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities - Initial Operator License Examination
.1 License Applications
a. Scope
The chief examiner reviewed all 10 license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The chief examiner also audited five license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On August 31, 2016, the licensee proctored the administration of the written examinations to all 10 applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on September 7, 2016.
The NRC examination team administered the various portions of the operating examination to all applicants August 22-26, 2016. The applicants for reactor operator licenses participated in at least two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of four administrative tasks. The applicants seeking an instant senior reactor operator license participated in at least two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of 10 system tasks, and an administrative test consisting of five administrative tasks. The applicant for an upgrade senior reactor operator license participated in two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.
b. Findings
All applicants passed all parts of the test. For the written examinations, the reactor operator applicants average score was 89.18 percent and ranged from 86.48 to 94.59 percent. The senior operator applicants average score was 91.33 percent and ranged from 86.86 to 95.96 percent.
Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this analysis and submitted the analysis to the chief examiner. The analysis recommended that one of the questions (Exam question #73)be deleted from the exam. The NRC reviewed the facilitys post-exam comment and accepted facilitys recommendation for question #73. The question was deleted from both the reactor operator and senior reactor operator exams. The text of the entire written examination and the licensees post-examination comment with the NRC resolution may be accessed in the ADAMS system under the accession numbers noted in the Attachment 1. In accordance with current NRC policy the release of the examination will be delayed for 2 years.
.3 Initial Licensing Examination Development
a. Examination Scope
The NRC developed the examinations in accordance with NUREG-1021, Revision 10.
All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The NRC conducted an onsite validation of the operating examinations and incorporated facility training staff comments during the week of July 18, 2016.
b. Findings
No findings were identified.
.4 Simulation Facility Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021, Revision 10 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. Robert Boesch, Training Manager, and other members of the licensee's management staff on September 27, 2016. The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENTS:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- R. Boesch, Training Manager
- M. Shaffer, Operations Training Supervisor
- S. Dennis, Facility Exam Team
- D. Rein, Facility Exam Team
ITEMS OPENED, CLOSED, AND DISCUSSED
NONE