| issue date = 04/24/2014
| issue date = 04/24/2014
| title = Summary of Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information on the Reactor Vessel Internals Program
| title = Summary of Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information on the Reactor Vessel Internals Program
| author name = Green K J
| author name = Green K
| author affiliation = NRC/NRR/DLR/RASB
| author affiliation = NRC/NRR/DLR/RASB
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-Q001 April 24, 2014 LICENSEE:       Entergy Nuclear Operations, Inc.
FACILITY:  
FACILITY:       Indian Point Nuclear Generating Unit Nos. 2 and 3


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-Q001 April 24, 2014 Entergy Nuclear Operations, Inc. Indian Point Nuclear Generating Unit Nos. 2 and 3


==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL HELD ON MARCH 26, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC. CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE REACTOR VESSEL INTERNALS PROGRAM Representatives of the US. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a conference call on March 26, 2014, to discuss a draft request for additional information (RAI) related to the Reactor Vessel Internals (RVI) program and the RVI Inspection Plan A list of the participants is enclosed By e-mail dated March 6, 2014, the staff sent draft RAisin response to Entergy's submittal on September 27, 2013. Additional information was requested on several topics, such as clarification on the primary links of the RVI inspection plan since they are relied upon to predict irradiation embrittlement and irradiation assisted stress corrosion cracking; clarification on the schedule to implement commitment  
OF CONFERENCE CALL HELD ON MARCH 26, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC. CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE REACTOR VESSEL INTERNALS PROGRAM Representatives of the US. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a conference call on March 26, 2014, to discuss a draft request for additional information (RAI) related to the Reactor Vessel Internals (RVI) program and the RVI Inspection Plan A list of the participants is enclosed By e-mail dated March 6, 2014, the staff sent draft RAisin response to Entergy's submittal on September 27, 2013. Additional information was requested on several topics, such as clarification on the primary links of the RVI inspection plan since they are relied upon to predict irradiation embrittlement and irradiation assisted stress corrosion cracking; clarification on the schedule to implement commitment #50, as stated in the Entergy submittal on September 27, 2013; and clarification on actions taken by Entergy to address the potential for degradation of the clevis insert bolts, as documented in Westinghouse lnfoGram IG-1 0-1.
#50, as stated in the Entergy submittal on September 27, 2013; and clarification on actions taken by Entergy to address the potential for degradation of the clevis insert bolts, as documented in Westinghouse lnfoGram IG-1 0-1. Entergy stated that it understood the basis for all of the staff's draft RAis, and no draft RAis were modified as a result of the conference call. The conference call was useful in clarifying the intent of the RAis. A response time of 60 days was requested and agreed upon by the staff. The applicant had an opportunity to comment on this summary. Docket Nos. 50-247 and 50-286 Enclosure*
Entergy stated that it understood the basis for all of the staff's draft RAis, and no draft RAis were modified as a result of the conference call. The conference call was useful in clarifying the intent of the RAis. A response time of 60 days was requested and agreed upon by the staff.
List of Participants cc w/encl: Listserv Kimberly Sr. Mechamcal Eng1neer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation Apnl 24, 2014 LICENSEE:
The applicant had an opportunity to comment on this summary.
Entergy Nuclear Operations, Inc. FACILITY:
K~'fl--u_.
Indian Point Nuclear Generating Unit Nos. 2 and 3
Kimberly J.(jGr~e-n, Sr. Mechamcal Eng1neer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 Enclosure*
List of Participants cc w/encl: Listserv


==SUBJECT:==
*      .. ML14105A354                    *concurrence via e*mail OFFICE       LA: DLR/RPB1*       PM: DLR/RASB BC: RPB1:DLR             PM: DLR/RASB NAME        IKing              KGreen             YDiaz             KGreen (JUribe for)
 
DATE        4/18/14              4/24/14           4/24/14           4/24/14 TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MARCH 26, 2014 PARTICIPANTS:                          AFFILIATIONS:
==SUMMARY==
Juan Uribe                             U.S. Nuclear Regulatory Commission (NRC)
OF CONFERENCE CALL HELD ON MARCH 26, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE REACTOR VESSEL INTERNALS PROGRAM Representatives of the U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a conference call on March 26, 2014, to discuss a draft request for additional information (RAI) related to the Reactor Vessel Internals (RVI) program and the RVI Inspection Plan. A list of the participants is enclosed.
Jeffrey Poehler                         NRC Allen Hiser                             NRC Roger Waters                           Entergy Nuclear Operations, Inc. (Entergy)
By e-mail dated March 6, 2014, the staff sent draft RAts in response to Entergy's submittal on September 27, 2013. Additional information was requested on several topics, such as clarification on the primary links of the RVI inspection plan since they are relied upon to predict irradiation embrittlement and irradiation assisted stress corrosion cracking; clarification on the schedule to implement commitment
Nelson Azevedo                         Entergy John Curry                             Entergy Ted Ivy                                 Entergy Bob Dolansky                           Entergy ENCLOSURE
#50, as stated in the Entergy submittal on September 27, 2013; and clarification on actions taken by Entergy to address the potential for degradation of the clevis insert bolts, as documented in Westinghouse lnfoGram IG*10-1. Entergy stated that it understood the basis for all of the staff's draft RAis, and no draft RAis were modified as a result of the conference call. The conference call was useful in clarifying the intent of the RAis. A response time of 60 days was requested and agreed upon by the staff. The applicant had an opportunity to comment on this summary. IRA! Kimberly J. Green, Sr. Mechanical Engineer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
 
==Enclosure:==
 
List of Participants cc w/encl: Listserv DISTRIBUTION:
See next page ADAMS Accession No * .. OFFICE LA: DLR/RPB1*
NAME I King DATE 4/18/14 ML14105A354
*concurrence via e*mail PM: DLR/RASB BC: RPB1:DLR PM: DLR/RASB KGreen YDiaz KGreen (JUribe for) 4/24/14 4/24/14 4/24/14 OFFICIAL RECORD COPY TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION PARTICIPANTS:
LIST OF PARTICIPANTS MARCH 26, 2014 AFFILIATIONS:
Juan Uribe U.S. Nuclear Regulatory Commission (NRC) Jeffrey Poehler NRC Allen Hiser NRC Roger Waters Entergy Nuclear Operations, Inc. (Entergy)
Nelson Azevedo Entergy John Curry Entergy Ted Ivy Entergy Bob Dolansky Entergy ENCLOSURE


==SUBJECT:==
==SUBJECT:==
Line 51: Line 40:
==SUMMARY==
==SUMMARY==
OF CONFERENCE CALL HELD ON MARCH 26, 2014, BETWEEN THE U.S. NUCLEAR REGULA TORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE REACTOR VESSEL INTERNALS PROGRAM DISTRIBUTION:
OF CONFERENCE CALL HELD ON MARCH 26, 2014, BETWEEN THE U.S. NUCLEAR REGULA TORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE REACTOR VESSEL INTERNALS PROGRAM DISTRIBUTION:
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrD1rRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRapb Resource RidsNrrDirRerb Resource RidsNrrDirRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMaiiCenter Resource YDiaz JUri be AHiser JPoehler DPickett STurk, OGC BMizuno, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMclntyre, OPA EDacus, OCA ABurritt, AI DonaldJackson, AI GMeyer, Rl MModes, AI NSheehan, Rl OPA DScrenci, AI OPA DTilft, Rl NMcNamara, AI GNewman, AI JSStewart, Rl AmiPatel, AI}}
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrD1rRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRapb Resource RidsNrrDirRerb Resource RidsNrrDirRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMaiiCenter Resource YDiaz                 ABurritt, AI JUri be                DonaldJackson, AI AHiser                GMeyer, Rl JPoehler              MModes, AI DPickett              NSheehan, Rl OPA STurk, OGC            DScrenci, AI OPA BMizuno, OGC          DTilft, Rl DRoth, OGC            NMcNamara, AI BHarris, OGC          GNewman, AI SBurnell, OPA          JSStewart, Rl DMclntyre, OPA        AmiPatel, AI EDacus, OCA}}

Latest revision as of 21:59, 5 February 2020

Summary of Conference Call Held on March 26, 2014, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information on the Reactor Vessel Internals Program
ML14105A354
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 04/24/2014
From: Kimberly Green
NRC/NRR/DLR/RASB
To:
Entergy Nuclear Operations
References
Download: ML14105A354 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-Q001 April 24, 2014 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON MARCH 26, 2014, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC. CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE REACTOR VESSEL INTERNALS PROGRAM Representatives of the US. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., (Entergy or the applicant) held a conference call on March 26, 2014, to discuss a draft request for additional information (RAI) related to the Reactor Vessel Internals (RVI) program and the RVI Inspection Plan A list of the participants is enclosed By e-mail dated March 6, 2014, the staff sent draft RAisin response to Entergy's submittal on September 27, 2013. Additional information was requested on several topics, such as clarification on the primary links of the RVI inspection plan since they are relied upon to predict irradiation embrittlement and irradiation assisted stress corrosion cracking; clarification on the schedule to implement commitment #50, as stated in the Entergy submittal on September 27, 2013; and clarification on actions taken by Entergy to address the potential for degradation of the clevis insert bolts, as documented in Westinghouse lnfoGram IG-1 0-1.

Entergy stated that it understood the basis for all of the staff's draft RAis, and no draft RAis were modified as a result of the conference call. The conference call was useful in clarifying the intent of the RAis. A response time of 60 days was requested and agreed upon by the staff.

The applicant had an opportunity to comment on this summary.

K~'fl--u_.

Kimberly J.(jGr~e-n, Sr. Mechamcal Eng1neer Aging Management of Plant Systems Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 Enclosure*

List of Participants cc w/encl: Listserv

  • .. ML14105A354 *concurrence via e*mail OFFICE LA: DLR/RPB1* PM: DLR/RASB BC: RPB1:DLR PM: DLR/RASB NAME IKing KGreen YDiaz KGreen (JUribe for)

DATE 4/18/14 4/24/14 4/24/14 4/24/14 TELEPHONE CONFERENCE CALL INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MARCH 26, 2014 PARTICIPANTS: AFFILIATIONS:

Juan Uribe U.S. Nuclear Regulatory Commission (NRC)

Jeffrey Poehler NRC Allen Hiser NRC Roger Waters Entergy Nuclear Operations, Inc. (Entergy)

Nelson Azevedo Entergy John Curry Entergy Ted Ivy Entergy Bob Dolansky Entergy ENCLOSURE

SUBJECT:

SUMMARY

OF CONFERENCE CALL HELD ON MARCH 26, 2014, BETWEEN THE U.S. NUCLEAR REGULA TORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE REACTOR VESSEL INTERNALS PROGRAM DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDir Resource RidsNrrDirRpb1 Resource RidsNrrD1rRpb2 Resource RidsNrrDirRarb Resource RidsNrrDirRasb Resource RidsNrrDirRapb Resource RidsNrrDirRerb Resource RidsNrrDirRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDraAfpb Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMaiiCenter Resource YDiaz ABurritt, AI JUri be DonaldJackson, AI AHiser GMeyer, Rl JPoehler MModes, AI DPickett NSheehan, Rl OPA STurk, OGC DScrenci, AI OPA BMizuno, OGC DTilft, Rl DRoth, OGC NMcNamara, AI BHarris, OGC GNewman, AI SBurnell, OPA JSStewart, Rl DMclntyre, OPA AmiPatel, AI EDacus, OCA