{{#Wiki_filter:November 4, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 Core Operating Limits Report (COLR) Unit 2 Cycle 35 (U2C35) and Correction to Unit 1 Cycle 36 (U1 C36) In accordance with the requirements of Point Beach Nuclear Plant (PBNP) NRC 2015-0067 TS 5.6.4 Technical Specification 5.6.4, enclosed is TRM 2.1, COLR, Unit 2, Cycle 35 and a correction to TRM 2.1, COLR Unit 1 Cycle 36 (U1C36). Enclosure 1 to this letter contains the PBNP U2C35 COLR that was issued on October 15, 2015. Enclosure 2 to this letter contains a revised U 1 C36 COLR to correct Figure 2. It was identified that the numeric values in Figure 2 did not display properly.
{{#Wiki_filter:November 4, 2015                                                               NRC 2015-0067 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 Core Operating Limits Report (COLR) Unit 2 Cycle 35 (U2C35) and Correction to Unit 1 Cycle 36 (U1 C36)
In accordance with the requirements of Point Beach Nuclear Plant (PBNP)
Technical Specification 5.6.4, enclosed is TRM 2.1, COLR, Unit 2, Cycle 35 and a correction to TRM 2.1, COLR Unit 1 Cycle 36 (U1C36). to this letter contains the PBNP U2C35 COLR that was issued on October 15, 2015. Enclosure 2 to this letter contains a revised U 1C36 COLR to correct Figure 2. It was identified that the numeric values in Figure 2 did not display properly.
This letter contains no new regulatory commitments and no revisions to existing commitments.
This letter contains no new regulatory commitments and no revisions to existing commitments.
Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 ENCLOSURE1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 (U1C35) 18 pages follow TRM 2.1 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 REVISION 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4. A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below: COLR PBNP Description Section TS 2.1 2.1.1 Reactor Core Safety Limits 2.2 3.1.1 Shutdown Margin 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.1.8 Physics Test Exceptions 2.3 3.1.3 Moderator Temperature Coefficient 2.4 3.1.5 Shutdown Bank Insertion Limit 2.5 3.1.6 Control Bank Insertion Limits 2.6 3.2.1 Nuclear Heat Flux Hot Channel Factor (F 0 (Z)) 2.7 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN 11 H) 2.8 3.2.3 Axial Flux Difference (AFD) 2.9 3.3.1 Overtemperature L1 T Setpoint 2.10 3.3.1 Overpower L1 T Setpoint 2.11 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 3.9.1 Refueling Boron Concentration Figure 1 2.1.1 Reactor Core Safety Limits Curve Figure 2 3.1.1 Required Shutdown Margin Figure 3 3.1.6 Control Bank Insertion Limits Figure 4 3.2.1 Hot Channel Factor Normalized Operating Envelope (K(Z)) for 422V+ Fuel Figure 5 3.2.1 Summary of W(Z) as a Function of Core Height Figure 5A 3.2.1 BOG Part-Power Summary of W(Z) as a Function of Core Height Figure 6 3.2.3 Flux Difference Operating Envelope Table 1 5.6.4 NRC Approved Methodologies for COLR Parameters Page 2 of 18 POl NT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2.0 OPERATING LIMITS TRM 2.1 U2 Revision 18 October 15, 2015 The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.
Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc:     Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4. 2.1 Reactor Core Safety Limits (TS 2.1.1) The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1. Applicability:
MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4. 3.1.5. 3.1.6. and 3.1.8) 2.2.1 SDM shall be ;:::2.0% .b.klk (see Figure 2). Applicability:
MODES 1, 2, and 3 2.2.2 SDM shall be ;::::1% Aklk. Applicability:
MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits. 2.3.2 The maximum upper MTC limits shall be: pcmrF for power levels RTP pcmrF for power levels > 70% RTP Applicability:
MODE 1 and MODE 2 with keff


===2.4 Shutdown===
ENCLOSURE1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 CORE OPERATING LIMITS REPORT (COLR)
Bank Insertion Limit (TS 3.1.5) NOTE: This limit is not applicable while performing SR 3.1.4.2. 2.4.1 Each shutdown bank shall be fully withdrawn.
UNIT 2 CYCLE 35 (U1C35) 18 pages follow


====2.4.2 Fully====
TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)
withdrawn is defined as ;:::225 steps. Applicability:
UNIT 2 CYCLE 35 REVISION 18
MODES 1 and 2 Page 3 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2.5 Control Bank Insertion Limits (TS 3.1.6) TRM 2.1 U2 Revision 18 October 15, 2015 NOTE: This limit is not applicable while performing SR 3.1.4.2. The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3. Applicability:
 
MODE 1 and MODE 2 with keff <::1.0 2.6 Nuclear Heat Flux Hot Channel Factor (F 0 (Z)) (TS 3.2.1) The Heat Flux Hot Channel Factor shall be within the following limits: Fa (Z)::; CFQ
POINT BEACH NUCLEAR PLANT                                                  TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
* K(Z) I P Fa (Z) ::; CFQ
UNIT 2 CYCLE 35 1.0    CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.
* K(Z) I 0.5 for P > 0.5 for P::; 0.5 Where Pis the fraction of Rated Power at which the core is operating.
A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:
COLR          PBNP      Description Section        TS 2.1            2.1.1    Reactor Core Safety Limits 2.2          3.1.1    Shutdown Margin 3.1.4    Rod Group Alignment Limits 3.1.5    Shutdown Bank Insertion Limits 3.1.6    Control Bank Insertion Limits 3.1.8    Physics Test Exceptions 2.3          3.1.3    Moderator Temperature Coefficient 2.4          3.1.5    Shutdown Bank Insertion Limit 2.5            3.1.6    Control Bank Insertion Limits 2.6            3.2.1    Nuclear Heat Flux Hot Channel Factor (F0 (Z))
2.7          3.2.2    Nuclear Enthalpy Rise Hot Channel Factor (FN11H) 2.8          3.2.3    Axial Flux Difference (AFD) 2.9          3.3.1    Overtemperature L1T Setpoint 2.10          3.3.1    Overpower L1T Setpoint 2.11          3.4.1    RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12          3.9.1    Refueling Boron Concentration Figure 1      2.1.1    Reactor Core Safety Limits Curve Figure 2      3.1.1    Required Shutdown Margin Figure 3      3.1.6    Control Bank Insertion Limits Figure 4      3.2.1    Hot Channel Factor Normalized Operating Envelope (K(Z)) for 422V+ Fuel Figure 5      3.2.1    Summary of W(Z) as a Function of Core Height Figure 5A    3.2.1    BOG Part-Power Summary of W(Z) as a Function of Core Height Figure 6      3.2.3    Flux Difference Operating Envelope Table 1      5.6.4    NRC Approved Methodologies for COLR Parameters Page 2 of 18
 
POl NT BEACH NUCLEAR PLANT                                                  TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                              Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 2.0    OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.
2.1  Reactor Core Safety Limits (TS 2.1.1)
The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.
Applicability: MODES 1 and 2 2.2  Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4. 3.1.5. 3.1.6. and 3.1.8) 2.2.1      SDM shall be ;:::2.0% .b.klk (see Figure 2).
Applicability: MODES 1, 2, and 3 2.2.2      SDM shall be ;::::1% Aklk.
Applicability: MODES 4 and 5 2.3  Moderator Temperature Coefficient (TS 3.1.3) 2.3.1      The upper MTC limits shall be maintained within the limits.
2.3.2      The maximum upper MTC limits shall be:
                        ~5  pcmrF for power levels ~70% RTP
                        ~0  pcmrF for power levels > 70% RTP Applicability: MODE 1 and MODE 2 with keff ~1.0.
2.4  Shutdown Bank Insertion Limit (TS 3.1.5)
NOTE:      This limit is not applicable while performing SR 3.1.4.2.
2.4.1      Each shutdown bank shall be fully withdrawn.
2.4.2        Fully withdrawn is defined as ;:::225 steps.
Applicability: MODES 1 and 2 Page 3 of 18
 
POINT BEACH NUCLEAR PLANT                                                   TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                               Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 2.5   Control Bank Insertion Limits (TS 3.1.6)
NOTE:       This limit is not applicable while performing SR 3.1.4.2.
The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.
Applicability: MODE 1 and MODE 2 with       keff <::1.0 2.6   Nuclear Heat Flux Hot Channel Factor (F0 (Z)) (TS 3.2.1)
The Heat Flux Hot Channel Factor shall be within the following limits:
Fa (Z)::; CFQ
* K(Z) I P       for P > 0.5 Fa (Z) ::; CFQ
* K(Z) I 0.5     for P::; 0.5 Where Pis the fraction of Rated Power at which the core is operating.
Fa (Z) is both:
Fa (Z) is both:
* Steady State Fa c(Z) = Fa(Z)
* Steady State         Fac(Z) =Fa(Z)
* 1.08
* 1.08
* Transient Faw(Z) = Fac(Z)
* Transient           Faw(Z) = Fac(Z)
* W(Z) I P for P > 0.5 Fa w(Z) = Fa c(Z)
* W(Z) I P for P > 0.5 Faw(Z) =Fac(Z)
* W(Z) I 0.5 for P ::; 0.5 CFa = 2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and 5A The following FQ penalty factors are applicable to Cycle 35. Cycle Burnup Fvv 0 (Z) Penalty (MWD/MTU)
* W(Z) I 0.5 for P ::; 0.5 CFa = 2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and 5A The following FQ penalty factors are applicable to Cycle 35.
Factors BOL to 1179 1.026 1179 to EOL 1.02 Applicability:
Cycle Burnup             Fvv0 (Z) Penalty (MWD/MTU)                     Factors BOL to 1179                     1.026 1179 to EOL                     1.02 Applicability: MODE 1 Page 4 of 18
MODE 1 Page 4 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2. 7 Nuclear Enthalpy Rise Hot Channel Factor !lli) (TS 3.2.2) TRM 2.1 U2 Revision 18 October 15, 2015 The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit: 2.7.1 FNAH<1.68X[1  
 
+0.3(1-P)]
POINT BEACH NUCLEAR PLANT                                                     TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                   Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35
: 2. 7   Nuclear Enthalpy Rise Hot Channel Factor (~!lli) (TS 3.2.2)
The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:
2.7.1           FNAH<1.68X[1 +0.3(1-P)]
where: Pis the fraction of Rated Power at which the core is operating.
where: Pis the fraction of Rated Power at which the core is operating.
Applicability:
Applicability: MODE 1 2.8   Axial Flux Difference (AFD) (TS 3.2.3)
MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3) The AFD target band is +/-5%. The AFD Acceptability Operation Limits are provided in Figure 6. Applicability:
The AFD target band is +/-5%.
MODE 1 with THERMAL POWER >15% RTP 2.9 OvertemperatureilT Setpoint (TS 3.3.1, Table 3.3.1-1 note 1) Overtemperature L1 T setpoint parameter values (for 1800 MWt core power): L1To = indicated L1T at RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F p = pressurizer pressure, psig P' ::::: 2235 psig K1 ::::; 1.175 (NTSP)1 K1 ::::; 1.188 (AV)2 Kz ::::: 0.016 K3 ::::: 0.000811 1:1 = 40 sec 1:z = 8 sec 1:3 = 4 sec 1:4 = 2 sec f(ill) is a function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where q and qb are the percent power in the top and bottom halves of the core respectively, and q + qb is total core power in percent of RTP, such that: 1 Nominal Setpoint Value 2 Allowable Value Page 5 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2.9.1 For q 1-qb within -12, +6 percent, f(ill) = 0. TRM 2.1 U2 Revision 18 October 15, 2015 2.9.2 For each percent that the magnitude of%-qb exceeds +6 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power. 2.9.3 For each percent that the magnitude of q 1-qb exceeds -12 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power. Applicability:
The AFD Acceptability Operation Limits are provided in Figure 6.
MODES 1 and 2 2.10 Overpower L1 T Setpoint (TS 3.3.1, Table 3.3.1-1 note 2) Overpower L1 T setpoint parameter values (for 1800 MWt core power): ilTo = indicated ilT at RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F ::::; 1.098 (NTSP)1 ::::; 1.111 (AV)2 Ks 2': 0.0 for increasing T Ks = 0.0 for decreasing T K6 2': 0.00123 T' K6 = 0.0 forT< T' 'ts 2': 0 sec 't3 = 4 sec 't4 = 2 sec Applicability:
Applicability: MODE 1 with THERMAL POWER >15% RTP 2.9   OvertemperatureilT Setpoint (TS 3.3.1, Table 3.3.1-1 note 1)
MODES 1 and 2 1 Nominal Setpoint Value 2 Allowable Value Page 6 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 TRM 2.1 U2 Revision 18 October 15, 2015 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling CDNB) Limits (TS 3.4.1) 2.11.1 2.11.2 2.11.3 Tavg shall be ::;;57rF.
Overtemperature L1T setpoint parameter values (for 1800 MWt core power):
Pressurizer pressure shall be maintained
L1To     =       indicated L1T at RTP, oF T         =       indicated RCS average temperature, oF T'       ::::;   576.0&deg;F p         =       pressurizer pressure, psig P'       :::::   2235 psig K1       ::::;   1.175 (NTSP) 1 K1       ::::;   1.188 (AV) 2 Kz       :::::   0.016 K3       :::::   0.000811 1:1       =       40 sec 1:z       =       8 sec 1:3       =       4 sec 1:4       =       2 sec f(ill) is a function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where q and qb are the percent power in the top and bottom halves of the core respectively, and q + qb is total core power in percent of RTP, such that:
:2:2205 psig during operation.
1 Nominal Setpoint Value 2
NOTE: Pressurizer pressure limit does not apply during: 1) THERMAL POWER ramp >5% RTP per minute; or 2) THERMAL POWER step >10% RTP. Reactor Coolant System raw measured Total Flow Rate shall be maintained
Allowable Value Page 5 of 18
:2:186,000 gpm. Applicability:
 
MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1) Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ppm. Applicability:
POINT BEACH NUCLEAR PLANT                                                   TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
MODE 6 Page 7 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE TRM 2.1 U2 Revision 18 October 15, 2015 Unacceptable Operation 0.0 0.2 0.4 0.6 0.8 1.0 Core Power (fraction of 1800 MWt) Page 8 of 18 1.2 1.4
UNIT 2 CYCLE 35 2.9.1       For q1 - qb within -12, +6 percent, f(ill) =0.
:& <..< "' <II ::: '"' ::E ;; 0 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 2 REQUIRED SHUTDOWN MARGIN TRM 2.1 U2 Revision 18 October 15, 2015 :>.o% I I I I I I I I I I I 2.5% 2.0'16 1.5% 1.0%
2.9.2       For each percent that the magnitude of%- qb exceeds +6 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.
I I . I I , I I I I I I I 0.0% Q 10 20 30 40 50 60 70 80 90 10.0 Cm e Bum up (%) Page 9 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 ...........
2.9.3       For each percent that the magnitude of q1 - qb exceeds -12 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.
c :5: co L-"0 ..c ...... en 0.. (l) ...... CJ) '-" c 0 +=i *en 0 0.. .::&#xa3; c co co 0 L-...... c 0 0 240 225 210 195 180 165 150 135 120 105 90 75 60 45 30 15 0 FIGURE 3 CONTROL BANK INSERTION LIMITS I 121% I / 168.50% I / v *1 Bank B Insertion
Applicability: MODES 1 and 2 2.10   Overpower L1T Setpoint (TS 3.3.1, Table 3.3.1-1 note 2)
/ / v / / 18}]-/ v / / I 176l / / v 1 Bank C Insertion 1 / // / v / / v / / / / / "I Bank D Insertion -/ / / /v / v / /v / I 28.50% V / I .A' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power) NOTE: The Figure is applicable for any fully withdrawn position of:?: 225 steps (Limits are always considered met when withdrawn position is;::: 225 steps). Page 10 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 4 TRM 2.1 U2 Revision 18 October 15, 2015 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z)) 1.2 j<o.ot l.o)J I (6.0, l.O)j 11 (12.0, 1.0) 1 0.9 0.8 I 0.7 0.5 0.4 0.3 0.2 0.1 0 I 0 l 2 3 4 5 6 7 8 9 10 11 CORE HEIGHT (Fl) Page 11 of 18 12 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 5 TRM 2.1 U2 Revision 18 October 15, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
Overpower L1T setpoint parameter values (for 1800 MWt core power):
Height W(Z) {feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0972 1.0983 1.1075 1.1222 1.8 1.0973 1.0983 1.1066 1.1195 2.0 1.0970 1.0980 1.1053 1.1162 2.2 1.0965 1.0973 1.1036 1.1124 2.4 1.0958 1.0964 1.1015 1.1080 2.6 1.0949 1.0953 1.0990 1.1032 2.8 1.0937 1.0939 1.0963 1.0980 3.0 1.0923 1.0921 1.0931 1.0921 3.2 1.0906 1.0906 1.0900 1.0877 3.4 1.0892 1.0895 1.0873 1.0852 3.6 1.0886 1.0883 1.0857 1.0826 3.8 1.0884 1.0869 1.0844 1.0822 4.0 1.0882 1.0858 1.0837 1.0826 4.2 1.0879 1.0851 1.0834 1.0834 4.4 1.0874 1.0840 1.0828 1.0842 4.6 1.0867 1.0828 1.0821 1.0848 4.8 1.0857 1.0814 1.0812 1.0852 5.0 1.0844 1.0798 1.0803 1.0853 5.2 1.0829 1.0781 1.0794 1.0851 5.4 1.0811 1.0763 1.0785 1.0846 5.6 1.0790 1.0743 1.0773 1.0837 5.8 1.0766 1.0721 1.0758 1.0824 6.0 1.0739 1.0696 1.0739 1.0805 Page 12 of 18 I POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 5 (con't) TRM 2.1 U2 Revision 18 October 15, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
ilTo   =         indicated ilT at RTP, oF T     =         indicated RCS average temperature, oF T'     ::::;     576.0&deg;F
W(Z) Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0709 1.0668 1.0718 1.0784 6.4 1.0679 1.0642 1.0700 1.0755 6.6 1.0650 1.0621 1.0685 1.0717 6.8 1.0622 1.0608 1.0659 1.0736 7.0 1.0600 1.0597 1.0661 1.0777 7.2 1.0578 1.0596 1.0702 1.0808 7.4 1.0570 1.0621 1.0747 1.0837 7.6 1.0620 1.0673 1.0789 1.0861 7.8 1.0678 1.0725 1.0829 1.0882 8.0 1.0730 1.0776 1.0865 1.0900 8.2 1.0784 1.0828 1.0897 1.0914 8.4 1.0838 1.0877 1.0926 1.0925 8.6 1.0892 1.0924 1.0952 1.0937 8.8 1.0943 1.0967 1.0973 1.0949 9.0 1.0991 1.1007 1.0991 1.0959 9.2 1.1035 1.1043 1.1004 1.0965 9.4 1.1075 1.1075 1.1014 1.0969 9.6 1.1117 1.1109 1.1023 1.0968 9.8 1.1158 1.1141 1.1034 1.0965 10.0 1.1196 1.1169 1.1044 1.0958 10.2 1.1230 1.1193 1.1052 1.0946 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
                ~    ::::;     1.098 (NTSP) 1
Part-Power W(Z) with Correction Factor Height (feet) (excluding  
                ~    ::::;     1.111 (AV) 2 Ks   2':       0.0 for increasing T Ks   =         0.0 for decreasing T K6   2':       0.00123 forT~ T' K6   =         0.0 forT< T'
!)ower ratio) Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0972 1.1828 1.8 1.0973 1.1790 2.0 1.0970 1.1745 2.2 1.0965 1.1694 2.4 1.0958 1.1639 2.6 1.0949 1.1583 2.8 1.0937 1.1525 3.0 1.0923 1.1467 3.2 1.0906 1.1406 3.4 1.0892 1.1348 3.6 1.0886 1.1296 3.8 1.0884 1.1248 4.0 1.0882 1.1214 4.2 1.0879 1.1178 4.4 1.0874 1.1136 4.6 1.0867 1.1087 4.8 1.0857 1.1035 5.0 1.0844 1.0982 5.2 1.0829 1.0926 5.4 1.0811 1.0866 5.6 1.0790 1.0802 5.8 1.0766 1.0734 6.0 1.0739 1.0662 Page 14 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE SA (con't) BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
              'ts   2':       0 sec
Part-Power W(Z) with Correction Factor Height (feet) (excluding flOWer ratio) Hot Full Power 75% Power 6.2 1.0709 1.0589 6.4 1.0679 1.0515 6.6 1.0650 1.0444 6.8 1.0622 1.0373 7.0 1.0600 1.0309 7.2 1.0578 1.0245 7.4 1.0570 1.0198 7.6 1.0620 1.0204 7.8 1.0678 1.0219 8.0 1.0730 1.0227 8.2 1.0784 1.0237 8.4 1.0838 1.0246 8.6 1.0892 1.0257 8.8 1.0943 1.0266 9.0 1.0991 1.0274 9.2 1.1035 1.0282 9.4 1.1075 1.0290 9.6 1.1117 1.0303 9.8 1.1158 1.0318 10.0 1.1196 1.0335 10.2 1.1230 1.0357 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 6 TRM 2.1 U2 Revision 18 October 15, 2015 FLUX DIFFERENCE OPERATING ENVELOPE 40 NOTE: tiNA C:C;EPTAB LE OPEF!ATIDN 30 *20 i\CCEPTA6LE OPERATION 0 0 10 Axial Fhxx Difference PCVA;;f Enve!cpe lLO 11.0 11:'1-C 2L:J 21.0 .. 25J1 3LG 3LO UNACCEPfAHLE OPERATJON 30 40 1. This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit. 2. The AFD may deviate outside the target band with THERMAL POWER< 50% RTP. 3. The AFD target band is +/-5% for THERMAL 15% RTP. Page 16 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"&#x17d; System," Revision 0, Mar 1997. Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"&#x17d; System," Revision 0, May 2000. Fuel Assembly WCAP-12610-P-A, "VANTAGE+
              't3   =         4 sec
Fuel Assembly Reference Core Report," April 1995. WCAP-12610-P-A  
              't4   =         2 sec Applicability: MODES 1 and 2 1
& CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO&#x17d;," July 2006. 2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.3 Moderator Temperature WCAP-9272-P-A, "Westinghouse Reload Safety Coefficient Evaluation Methodology," July 1985. 2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.6 Nuclear Heat Flux Hot WCAP-8403 (non-proprietary), "Power Distribution Channel Factor (F 0 (Z)) Control and Load Following Procedures," Westinghouse Electric Corporation, September 1974. WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V +fuel). WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985. WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997. Page 17 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section 2.7 Nuclear Enthalpy Rise Hot WCAP-9272-P-A, "Westinghouse Reload Safety Channel Factor (FN t.H) Evaluation Methodology," July 1985. WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006. 2.8 Axial Flux Difference (AFD) WCAP-8403 (nonproprietary), "Power Distribution Control and Load Following Procedures," Westinghouse Electric Corporation, September 1974. NS-TMA-2198, Westinghouse to NRC Letter  
Nominal Setpoint Value 2
Allowable Value Page 6 of 18
 
POINT BEACH NUCLEAR PLANT                                               TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                           Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling CDNB) Limits (TS 3.4.1) 2.11.1     Tavg shall be ::;;57rF.
2.11.2      Pressurizer pressure shall be maintained :2:2205 psig during operation.
NOTE:       Pressurizer pressure limit does not apply during:
: 1)     THERMAL POWER ramp >5% RTP per minute; or
: 2)     THERMAL POWER step >10% RTP.
2.11.3      Reactor Coolant System raw measured Total Flow Rate shall be maintained
:2:186,000 gpm.
Applicability: MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1)
Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2300 ppm.
Applicability: MODE 6 Page 7 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680r-----~------~----~-------,------~-----,------,
Unacceptable Operation 540+------+------4-----~------~------+------+----~
0.0    0.2    0.4      0.6         0.8       1.0         1.2    1.4 Core Power (fraction of 1800 MWt)
Page 8 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3~?~b
:>.o% I       I         I     I       I           I         I I I I     I 2.5%
:~
<II  2.0'16
~
~
::E
;;  1.5%
0
~
~
1.0%
OSi'~  I       I     ., I     I       I           I         I I I I     I 0.0%
Q       10       20   30       40         50         60 70 80 90   10.0 Cm e Bumup (%)
Page 9 of 18
 
POINT BEACH NUCLEAR PLANT                                                                 TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 3 CONTROL BANK INSERTION LIMITS 240                                                                    I 225                      121% I                              /  168.50% I
                                      /                                        v
        ........... 210              *1 Bank B Insertion /                    /
c
:5:                 /
v                                      /
co       195      v                                                                        18}]-
        "0 L-180  /                                        /                                    /
        ..c
        ......           I 176l                                /                                    /
v
        ~          165
                                                            /    1 Bank C Insertion  1
                                                                                                //
en       150 0..
(l)
        ......                                         /
v                                    /
CJ)         135                              v c         120                          /                                      /
0
        +=i                                 /                                        /
        *en         105                                                          /
0 0..         90              /                                          "I  Bank D Insertion ~ -
        .::&#xa3;                     /                                        /
                                                                            /
c         75                                                  v co co 60 /
                            /v                                        /
0                                                    /v L-45 ~~
c 0
30                                      /
0 15                 I 28.50% V
                                                        /
0                    I       .A' 0  5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)
NOTE:       The Figure is applicable for any fully withdrawn position of:?: 225 steps (Limits are always considered met when withdrawn position is;::: 225 steps).
Page 10 of 18
 
POINT BEACH NUCLEAR PLANT                               TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                           Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))
1.2 j<o.ot l.o)J               I (6.0, l.O)j               11 (12.0, 1.0) 1 0.9 0.8                                                                   I 0.7 0.5 0.4 0.3 0.2 0.1 0                                                     I 0         l   2 3 4     5     6       7 8 9     10       11       12 CORE HEIGHT (Fl)
Page 11 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 I CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
W(Z)
Height
{feet)     150         3000         8000         16000 MWD/MTU     MWD/MTU     MWD/MTU     MWD/MTU 0.0         1.0000     1.0000       1.0000       1.0000 0.2         1.0000     1.0000       1.0000       1.0000 0.4         1.0000     1.0000       1.0000       1.0000 0.6         1.0000     1.0000       1.0000       1.0000 0.8         1.0000     1.0000       1.0000       1.0000 1.0         1.0000     1.0000       1.0000       1.0000 1.2         1.0000     1.0000       1.0000       1.0000 1.4         1.0000     1.0000       1.0000       1.0000 1.6         1.0972     1.0983       1.1075       1.1222 1.8         1.0973     1.0983       1.1066       1.1195 2.0         1.0970     1.0980       1.1053       1.1162 2.2         1.0965     1.0973       1.1036       1.1124 2.4         1.0958     1.0964       1.1015       1.1080 2.6         1.0949     1.0953       1.0990       1.1032 2.8         1.0937     1.0939       1.0963       1.0980 3.0         1.0923     1.0921       1.0931       1.0921 3.2         1.0906     1.0906       1.0900       1.0877 3.4         1.0892     1.0895       1.0873       1.0852 3.6         1.0886     1.0883       1.0857       1.0826 3.8         1.0884     1.0869       1.0844       1.0822 4.0         1.0882     1.0858       1.0837       1.0826 4.2         1.0879     1.0851       1.0834       1.0834 4.4         1.0874     1.0840       1.0828       1.0842 4.6         1.0867     1.0828       1.0821       1.0848 4.8         1.0857     1.0814       1.0812       1.0852 5.0         1.0844     1.0798       1.0803       1.0853 5.2         1.0829     1.0781       1.0794       1.0851 5.4         1.0811     1.0763       1.0785       1.0846 5.6         1.0790     1.0743       1.0773       1.0837 5.8         1.0766     1.0721       1.0758       1.0824 6.0         1.0739     1.0696       1.0739       1.0805 Page 12 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 5 (con't)
Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
W(Z)
Height (feet)     150         3000         8000       16000 MWD/MTU     MWD/MTU       MWD/MTU   MWD/MTU 6.2         1.0709       1.0668       1.0718       1.0784 6.4         1.0679       1.0642       1.0700       1.0755 6.6         1.0650       1.0621       1.0685       1.0717 6.8         1.0622       1.0608       1.0659       1.0736 7.0         1.0600       1.0597       1.0661       1.0777 7.2         1.0578       1.0596       1.0702       1.0808 7.4         1.0570       1.0621       1.0747       1.0837 7.6         1.0620       1.0673       1.0789       1.0861 7.8         1.0678       1.0725       1.0829       1.0882 8.0         1.0730       1.0776       1.0865       1.0900 8.2         1.0784       1.0828       1.0897       1.0914 8.4         1.0838       1.0877       1.0926       1.0925 8.6         1.0892       1.0924       1.0952       1.0937 8.8         1.0943       1.0967       1.0973       1.0949 9.0         1.0991       1.1007       1.0991       1.0959 9.2         1.1035       1.1043       1.1004       1.0965 9.4         1.1075       1.1075       1.1014       1.0969 9.6         1.1117       1.1109       1.1023       1.0968 9.8         1.1158       1.1141       1.1034       1.0965 10.0         1.1196       1.1169       1.1044       1.0958 10.2         1.1230       1.1193       1.1052       1.0946 10.4         1.0000       1.0000       1.0000       1.0000 10.6         1.0000       1.0000       1.0000       1.0000 10.8         1.0000       1.0000       1.0000       1.0000 11.0         1.0000       1.0000       1.0000       1.0000 11.2         1.0000       1.0000       1.0000       1.0000 11.4         1.0000       1.0000       1.0000       1.0000 11.6         1.0000       1.0000       1.0000       1.0000 11.8         1.0000       1.0000       1.0000       1.0000 12.0         1.0000       1.0000       1.0000       1.0000 Page 13 of 18
 
POINT BEACH NUCLEAR PLANT                                                 TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)               (excluding !)ower ratio)
Hot Full Power             75% Power 0.0                 1.0000                   1.0000 0.2                 1.0000                   1.0000 0.4                 1.0000                   1.0000 0.6                 1.0000                   1.0000 0.8                 1.0000                   1.0000 1.0                 1.0000                   1.0000 1.2                 1.0000                   1.0000 1.4                 1.0000                   1.0000 1.6                 1.0972                   1.1828 1.8                 1.0973                   1.1790 2.0                 1.0970                   1.1745 2.2                 1.0965                   1.1694 2.4                 1.0958                   1.1639 2.6                 1.0949                   1.1583 2.8                 1.0937                   1.1525 3.0                 1.0923                   1.1467 3.2                 1.0906                   1.1406 3.4                 1.0892                   1.1348 3.6                 1.0886                     1.1296 3.8                 1.0884                     1.1248 4.0                 1.0882                     1.1214 4.2                 1.0879                   1.1178 4.4                 1.0874                     1.1136 4.6                 1.0867                     1.1087 4.8                 1.0857                     1.1035 5.0                 1.0844                     1.0982 5.2                 1.0829                     1.0926 5.4                 1.0811                     1.0866 5.6                 1.0790                     1.0802 5.8                 1.0766                     1.0734 6.0                 1.0739                     1.0662 Page 14 of 18
 
POINT BEACH NUCLEAR PLANT                                                 TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE SA (con't)
BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)               (excluding flOWer ratio)
Hot Full Power             75% Power 6.2                 1.0709                   1.0589 6.4                 1.0679                   1.0515 6.6                 1.0650                   1.0444 6.8                 1.0622                   1.0373 7.0                 1.0600                   1.0309 7.2                 1.0578                   1.0245 7.4                 1.0570                   1.0198 7.6                 1.0620                   1.0204 7.8                 1.0678                   1.0219 8.0                 1.0730                   1.0227 8.2                 1.0784                   1.0237 8.4                 1.0838                   1.0246 8.6                 1.0892                   1.0257 8.8                 1.0943                   1.0266 9.0                 1.0991                   1.0274 9.2                 1.1035                   1.0282 9.4                 1.1075                   1.0290 9.6                 1.1117                   1.0303 9.8                 1.1158                   1.0318 10.0                 1.1196                   1.0335 10.2                 1.1230                   1.0357 10.4                 1.0000                   1.0000 10.6                 1.0000                     1.0000 10.8                 1.0000                     1.0000 11.0                 1.0000                     1.0000 11.2                 1.0000                     1.0000 11.4                 1.0000                     1.0000 11.6                 1.0000                     1.0000 11.8                 1.0000                     1.0000 12.0                 1.0000                     1.0000 Page 15 of 18
 
POINT BEACH NUCLEAR PLANT                                             TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                         Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE PCVA;;f        T~<:h Lew~!         Enve!cpe
                                                                ~\:              ~~
lLO       11.0 10~-D      11:'1-C 2L:J       21.0
                                                                        . 25J1       2'~"
C~U 3LG       3LO tiNA C:C;EPTAB LE                                  UNACCEPfAHLE OPEF!ATIDN                                          OPERATJON i\CCEPTA6LE OPERATION 40      30      *20      0      0      10                      30         40 Axial Fhxx Difference NOTE:
: 1. This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results.
Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.
: 2. The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
: 3. The AFD target band is +/-5% for THERMAL POWER~ 15% RTP.
Page 16 of 18
 
POINT BEACH NUCLEAR PLANT                                             TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                          Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter                       NRC Approved Methodology Section All   Reactor Thermal Output       Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"' System," Revision 0, Mar 1997.
Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System," Revision 0, May 2000.
WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Fuel Assembly Reference Core Report," April 1995.
WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," July 2006.
2.1   Reactor Core Safety Limits   WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.2   Shutdown Margin               WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.3   Moderator Temperature         WCAP-9272-P-A, "Westinghouse Reload Safety Coefficient                   Evaluation Methodology," July 1985.
2.4   Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.5   Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.6   Nuclear Heat Flux Hot         WCAP-8403 (non-proprietary), "Power Distribution Channel Factor (F0 (Z))       Control and Load Following Procedures,"
Westinghouse Electric Corporation, September 1974.
WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V +fuel).
WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.
WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.
WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.
Page 17 of 18
 
POINT BEACH NUCLEAR PLANT                                               TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter                         NRC Approved Methodology Section 2.7   Nuclear Enthalpy Rise Hot     WCAP-9272-P-A, "Westinghouse Reload Safety Channel Factor (FNt.H)         Evaluation Methodology," July 1985.
WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006.
2.8 Axial Flux Difference (AFD)     WCAP-8403 (nonproprietary), "Power Distribution Control and Load Following Procedures,"
Westinghouse Electric Corporation, September 1974.
NS-TMA-2198, Westinghouse to NRC Letter


==Attachment:==
==Attachment:==
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980. NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975. 2.9 Overtemperature 11 T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11 T and Thermal Overtemperature 11 T Trip Functions," September 1986 2.10 Overpower 11 T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11 T and Thermal Overtemperature 11 T Trip Functions," September 1986 2.11 RCS Pressure, Temperature, WCAP-11397 -P-A, "Revised Thermal Design and Flow Departure from Procedure," April 1989, for those events analyzed Nucleate Boiling (DNB) Limits using RTDP WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate (1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)", February 2009. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP 2.12 Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 Page 18 of 18 ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 (U1C36) (Revision
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980.
: 17) 18 pages follow TRM 2.1 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 REVISION 17 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4. A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below: COLR Section 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure SA Figure 6 Table 1 PBNP TS 2.1.1 3.1.1 3.1.4 3.1.5 3.1.6 3.1.8 3.1.3 3.1.5 3.1.6 3.2.1 3.2.2 3.2.3 3.3.1 3.3.1 3.4.1 3.9.1 2.1.1 3.1.1 3.1.6 3.2.1 3.2.1 3.2.1 3.2.3 5.6.4 Description Reactor Core Safety Limits Shutdown Margin Rod Group Alignment Limits Shutdown Bank Insertion Limits Control Bank Insertion Limits Physics Test Exceptions Moderator Temperature Coefficient Shutdown Bank Insertion Limit Control Bank Insertion Limits Nuclear Heat Flux Hot Channel Factor (F 0 (Z)) Nuclear Enthalpy Rise Hot Channel Factor (FN t-H) Axial Flux Difference (AFD) Overtemperature T Setpoint Overpower T Setpoint RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits Refueling Boron Concentration Reactor Core Safety Limits Curve Required Shutdown Margin Control Bank Insertion Limits Hot Channel Factor Normalized Operating Envelope (K(Z)) Summary of W(Z) as a Function of Core Height SOC Part-Power Summary of W(Z) as a Function of Core Height Flux Difference Operating Envelope NRC Approved Methodologies for COLR Parameters Page 2 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 2.0 OPERATING LIMITS TRM 2.1 U1 Revision 17 October 26, 2015 The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.
NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.
These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4. 2.1 Reactor Core Safety Limits (TS 2.1.1) The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1. Applicability:
2.9   Overtemperature 11T Setpoint   WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.10   Overpower 11T Setpoint         WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.11   RCS Pressure, Temperature,     WCAP-11397 -P-A, "Revised Thermal Design and Flow Departure from       Procedure," April 1989, for those events analyzed Nucleate Boiling (DNB) Limits using RTDP WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate (1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)", February 2009.
MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4, 3.1.5, 3.1.6, and 3.1.8) 2.2.1 SDM shall be 2':2.0% t1k/k (see Figure 2). Applicability:
WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP 2.12   Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 Page 18 of 18
MODES 1 , 2, and 3 2.2.2 SDM shall be 2':1% t1klk. Applicability:
 
MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits. 2.3.2 The maximum upper MTC limits shall be: pcm/&deg;F for power levels RTP pcm/&deg;F for power levels > 70% RTP Applicability:
ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 CORE OPERATING LIMITS REPORT (COLR)
MODE 1 and MODE 2 with keff 2':1.0. 2.4 Shutdown Bank Insertion Limit (TS 3.1.5) NOTE: This limit is not applicable while performing SR 3.1.4.2. 2.4.1 Each shutdown bank shall be fully withdrawn.
UNIT 1 CYCLE 36 (U1C36)
(Revision 17) 18 pages follow


====2.4.2 Fully====
TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)
withdrawn is defined as 2': 225 steps. Applicability:
UNIT 1 CYCLE 36 REVISION 17
MODES 1 and 2 Page 3 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 2.5 Control Bank Insertion Limits (TS 3.1.6) TRM 2.1 U1 Revision 17 October 26, 2015 NOTE: This limit is not applicable while performing SR 3.1.4.2. The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3. Applicability:
 
MODE 1 and MODE 2 with kett 21.0 2.6 Nuclear Heat Flux Hot Channel Factor (Fo(Z)) (TS 3.2.1) The Heat Flux Hot Channel Factor shall be within the following limits: Fa(Z) CFa
POINT BEACH NUCLEAR PLANT                                        TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                    Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
* K(Z) I P for P > 0.5 Fa(Z) CFa
UNIT 1 CYCLE 36 1.0    CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.
* K(Z) I 0.5 for P 0.5 Where Pis the fraction of Rated Power at which the core is operating.
A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:
COLR          PBNP      Description Section          TS 2.1            2.1.1    Reactor Core Safety Limits 2.2            3.1.1    Shutdown Margin 3.1.4    Rod Group Alignment Limits 3.1.5    Shutdown Bank Insertion Limits 3.1.6    Control Bank Insertion Limits 3.1.8    Physics Test Exceptions 2.3            3.1.3    Moderator Temperature Coefficient 2.4            3.1.5    Shutdown Bank Insertion Limit 2.5            3.1.6    Control Bank Insertion Limits 2.6            3.2.1    Nuclear Heat Flux Hot Channel Factor (F 0 (Z))
2.7            3.2.2    Nuclear Enthalpy Rise Hot Channel Factor (FN t-H) 2.8            3.2.3    Axial Flux Difference (AFD) 2.9            3.3.1    Overtemperature ~T Setpoint 2.10            3.3.1    Overpower ~T Setpoint 2.11            3.4.1    RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12            3.9.1    Refueling Boron Concentration Figure 1        2.1.1    Reactor Core Safety Limits Curve Figure 2        3.1.1    Required Shutdown Margin Figure 3        3.1.6    Control Bank Insertion Limits Figure 4        3.2.1    Hot Channel Factor Normalized Operating Envelope (K(Z))
Figure 5        3.2.1    Summary of W(Z) as a Function of Core Height Figure SA      3.2.1    SOC Part-Power Summary of W(Z) as a Function of Core Height Figure 6        3.2.3    Flux Difference Operating Envelope Table 1        5.6.4    NRC Approved Methodologies for COLR Parameters Page 2 of 18
 
POINT BEACH NUCLEAR PLANT                                            TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                        Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 2.0  OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.
2.1      Reactor Core Safety Limits (TS 2.1.1)
The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.
Applicability: MODES 1 and 2 2.2      Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4, 3.1.5, 3.1.6, and 3.1.8) 2.2.1      SDM shall be 2':2.0% t1k/k (see Figure 2).
Applicability: MODES 1, 2, and 3 2.2.2      SDM shall be 2':1% t1klk.
Applicability: MODES 4 and 5 2.3      Moderator Temperature Coefficient (TS 3.1.3) 2.3.1        The upper MTC limits shall be maintained within the limits.
2.3.2      The maximum upper MTC limits shall be:
                          ~5 pcm/&deg;F for power levels ~70% RTP
                          ~0 pcm/&deg;F for power levels >70% RTP Applicability: MODE 1 and MODE 2 with keff 2':1.0.
2.4    Shutdown Bank Insertion Limit (TS 3.1.5)
NOTE:      This limit is not applicable while performing SR 3.1.4.2.
2.4.1        Each shutdown bank shall be fully withdrawn.
2.4.2       Fully withdrawn is defined as 2': 225 steps.
Applicability: MODES 1 and 2 Page 3 of 18
 
POINT BEACH NUCLEAR PLANT                                           TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                       Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 2.5   Control Bank Insertion Limits (TS 3.1.6)
NOTE:       This limit is not applicable while performing SR 3.1.4.2.
The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.
Applicability: MODE 1 and MODE 2 with kett 21.0 2.6   Nuclear Heat Flux Hot Channel Factor (Fo(Z)) (TS 3.2.1)
The Heat Flux Hot Channel Factor shall be within the following limits:
Fa(Z) ~ CFa
* K(Z) I P         for P > 0.5 Fa(Z) ~ CFa
* K(Z) I 0.5       for P ~ 0.5 Where Pis the fraction of Rated Power at which the core is operating.
Fa(Z) is both:
Fa(Z) is both:
* Steady State
* Steady State         Fac(Z) = Fa(Z)
* Transient CFa = 2.60 Fa c(Z) = Fa(Z)
* 1.08
* 1.08 Faw(Z) = Fac(Z)
* Transient            Faw(Z) =Fac(Z)
* W(Z) I P for P>0.5 Fa w(Z) = Fa c(Z)
* W(Z) I P for P>0.5 Fa w(Z) = Fa c(Z)
* W(Z) I 0.5 for P_::: 0.5 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and SA. The following Fa penalty factors are applicable to Cycle 36. Cycle Burn up Fw Q{Z) Penalty (MWD/MTU)
* W(Z) I 0.5 for P_::: 0.5 CFa  =2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and SA.
Factors BOLto 1325 1.027 1326 to EOL 1.02 Applicability:
The following Fa penalty factors are applicable to Cycle 36.
MODE 1 Page 4 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 TRM 2.1 U1 Revision 17 October 26, 2015 2. 7 Nuclear Enthalpy Rise Hot Channel Factor (FN .6!::!) (TS 3.2.2) The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit: 2.7.1 FNAH:::::1.68x[1  
Cycle Burn up             FwQ{Z) Penalty (MWD/MTU)                     Factors BOLto 1325                   1.027 1326 to EOL                   1.02 Applicability: MODE 1 Page 4 of 18
+0.3(1-P)]
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                     Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36
: 2. 7 Nuclear Enthalpy Rise Hot Channel Factor (FN.6!::!) (TS 3.2.2)
The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:
2.7.1       FNAH:::::1.68x[1 +0.3(1-P)]
where: Pis the fraction of Rated Power at which the core is operating.
where: Pis the fraction of Rated Power at which the core is operating.
Applicability:
Applicability: MODE 1 2.8   Axial Flux Difference (AFD) (TS 3.2.3)
MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3) The AFD target band is +/-5%. The AFD Acceptability Operation Limits are provided in Figure 6. Applicability:
The AFD target band is +/-5%.
MODE 1 with THERMAL POWER :2:15% RTP Page 5 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 TRM 2.1 U1 Revision 17 October 26, 2015 2.9 Overtemperature T Setpoint (TS 3.3.1. Table 3.3.1-1 note 1) Overtemperature T setpoint parameter values (for 1800 MWt core power): = indicated RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F p = pressurizer pressure, psig P' 2235 psig K1 ::::; 1.175 (NTSP)1 K1 ::::; 1.188 (AVf Kz 0.016 K3 0.000811 't1 = 40 sec 'tz = 8 sec 't3 = 4 sec 't4 = 2 sec is an even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where qt and qb are the percent power in the top and bottom halves of the core respectively, and qt + qb is total core power in percent of RTP, such that: 2.9.1 For qt-qb within -12, +6 percent,  
The AFD Acceptability Operation Limits are provided in Figure 6.
= 0. 2.9.2 For each percent that the magnitude of%-qb exceeds +6 percent, T trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power. 2.9.3 For each percent that the magnitude of qt-qb exceeds -12 percent, the trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power. 1 Nominal Setpoint Value 2 Allowable Value Applicability:
Applicability: MODE 1 with THERMAL POWER :2:15% RTP Page 5 of 18
MODES 1 and 2 Page 6 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 2.10 Overpower ilT Setpoint (TS 3.3.1. Table 3.3.1-1 note 2) Overpower il T setpoint parameter values (for 1800 MWt core power): ilTo = indicated il Tat RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F ::::; 1. 098 (NTSP) 1 ::::; 1.111 (AVf Ks = 0.0 for increasing T Ks = 0.0 for decreasing T Ke 0.00123 T' Ke = 0.0 forT< T' Ts = 0 sec TJ = 4 sec 't4 = 2 sec Applicability:
 
MODES 1 and 2 2.11 RCS Pressure.
POINT BEACH NUCLEAR PLANT                                                 TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                             Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits (TS 3.4.1) 2.11.1 2.11.2 2.11.3 Tavg shall be ::::;577&deg;F.
UNIT 1 CYCLE 36 2.9   Overtemperature ~T Setpoint (TS 3.3.1. Table 3.3.1-1 note 1)
Pressurizer pressure shall be maintained psig during operation.
Overtemperature ~T setpoint parameter values (for 1800 MWt core power):
NOTE: Pressurizer pressure limit does not apply during: 1} THERMAL POWER ramp >5% RTP per minute; or 2} THERMAL POWER step >10% RTP. Reactor Coolant System raw measured Total Flow Rate shall be maintained gpm. Applicability:
              ~To      =     indicated ~Tat RTP, oF T       =     indicated RCS average temperature, oF T'       ::::; 576.0&deg;F p       = pressurizer pressure, psig P'     ~    2235 psig K1     ::::; 1.175 (NTSP) 1 K1     ::::; 1.188 (AVf Kz     ~    0.016 K3     ~    0.000811
MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1) Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ppm. Applicability:
              't1     = 40 sec
MODE 6 1 Nominal Setpoint Value 2 Allowable Value Page 7 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 1 TRM 2.1 U1 Revision 17 October 26, 2015 REACTOR CORE SAFETY LIMITS CURVE Unacceptable Operation 0.0 0.2 0.4 0.6 0.8 1.0 Core Power (fraction of 1800 MWt) Page 8 of 18 1.2 1.4 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 2 REQUIRED SHUTDOWN MARGIN TRM 2.1 U1 Revision 17 October 26, 2015 3.,5% I I I I I I I :w, I I ,___, 3.0% -+-+-'i-H--+-\-:
              'tz     = 8 sec
:-H-H-:-HH 2.5% t l ! I I "' :E 1.5% -:s :::; .!: Vl =i 1.0% -+-',--H--+-\-i 0.5% +-+-: I ._....._,__;
              't3     = 4 sec
I :-H-:-H....._,_:
              't4     = 2 sec f(~l) is an even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where qt and qb are the percent power in the top and bottom halves of the core respectively, and qt + qb is total core power in percent of RTP, such that:
0.0% 0 10 20 30 40 50 GO 70 80 90 100 Core Burn up(%) Page 9 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 ..........
2.9.1           For qt- qb within -12, +6 percent, f(~l) =0.
c :s: ro .._ "0 ..c (/) a. Q) ....... (f) ---c 0 :e (/) 0 0... c ro ro 0 .._ ....... c 0 0 240 225 210 195 180 165 150 135 120 105 90 75 60 45 30 15 0 FIGURE 3 CONTROL BANK INSERTION LIMITS I I I 121% L / 168.50% I / v 'i Bank B Insertion i / / / / 18I} / I" / I 1761 / / / 1 Bank C Insertion 1 v /"' / / / / v / / / v / ""I Bank D Insertion -/ // / / v / / / 1 28.50% I/ v I I X 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power) NOTE: The Figure is applicable for any fully withdrawn position of?_ 225 steps (Limits are always considered met when withdrawn position is?_ 225 steps). Page 10 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 4 TRM 2.1 U1 Revision 17 October 26, 2015 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z)) 1.2 1.1 1 1(0.0, 1.0)1 1(6.0, 1.0)1 11 (12.0, 1.0} 0.9 0.8 0.7 N' '-' 0.6 0.5 0.4 0.3 0.2 0.1 0 0 1 2 3 4 s 6 7 8 9 10 11 CORE HEIGHT (FI) Page 11 of 18 12 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 5 TRM 2.1 U1 Revision 17 October 26, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
2.9.2           For each percent that the magnitude of%- qb exceeds +6 percent, the~T trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.
WZ) Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0986 1.0999 1.1089 1.1218 1.8 1.0986 1.0998 1.1079 1.1190 2.0 1.0982 1.0994 1.1064 1.1156 2.2 1.0975 1.0986 1.1045 1.1117 2.4 1.0966 1.0976 1.1023 1.1072 2.6 1.0955 1.0963 1.0997 1.1023 2.8 1.0941 1.0947 1.0967 1.0971 3.0 1.0925 1.0929 1.0933 1.0917 3.2 1.0906 1.0908 1.0901 1.0876 3.4 1.0889 1.0888 1.0876 1.0850 3.6 1.0883 1.0880 1.0861 1.0829 3.8 1.0881 1.0875 1.0847 1.0830 4.0 1.0879 1.0868 1.0834 1.0835 4.2 1.0874 1.0859 1.0826 1.0837 4.4 1.0867 1.0849 1.0823 1.0838 4.6 1.0858 1.0837 1.0817 1.0837 4.8 1.0846 1.0823 1.0810 1.0834 5.0 1.0833 1.0808 1.0801 1.0828 5.2 1.0817 1.0792 1.0789 1.0820 5.4 1.0798 1.0773 1.0775 1.0808 5.6 1.0779 1.0751 1.0758 1.0794 5.8 1.0757 1.0727 1.0741 1.0775 6.0 1.0731 1.0700 1.0723 1.0753 Page 12 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 5 (con't) TRM 2.1 U1 Revision 17 October 26, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
2.9.3           For each percent that the magnitude of qt- qb exceeds -12 percent, the ~T trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.
WZ) Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0702 1.0670 1.0708 1.0723 6.4 1.0669 1.0641 1.0699 1.0696 6.6 1.0641 1.0622 1.0686 1.0708 6.8 1.0619 1.0613 1.0659 1.0738 7.0 1.0605 1.0604 1.0672 1.0772 7.2 1.0590 1.0606 1.0723 1.0801 7.4 1.0584 1.0636 1.0764 1.0827 7.6 1.0633 1.0689 1.0803 1.0849 7.8 1.0692 1.0742 1.0840 1.0868 8.0 1.0745 1.0791 1.0872 1.0883 8.2 1.0799 1.0840 1.0902 1.0894 8.4 1.0851 1.0885 1.0928 1.0903 8.6 1.0900 1.0927 1.0950 1.0912 8.8 1.0946 1.0966 1.0968 1.0921 9.0 1.0989 1.1002 1.0983 1.0928 9.2 1.1029 1.1034 1.0994 1.0933 9.4 1.1065 1.1061 1.1001 1.0936 9.6 1.1097 1.1090 1.1010 1.0941 9.8 1.1132 1.1119 1.1015 1.0945 10.0 1.1167 1.1144 1.1018 1.0948 10.2 1.1197 1.1165 1.1033 1.0948 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank:::::;
Applicability: MODES 1 and 2 1
205 steps) (Top 15% and Bottom 12% Excluded)
Nominal Setpoint Value 2
Part-Power W(Z) with Correction Factor Height (feet) (excluding iJOWer ratio) Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0986 1.1882 1.8 1.0986 1.1844 2.0 1.0982 1.1793 2.2 1.0975 1.1733 2.4 1.0966 1.1672 2.6 1.0955 1.1611 2.8 1.0941 1.1547 3.0 1.0925 1.1481 3.2 1.0906 1.1412 3.4 1.0889 1.1346 3.6 1.0883 1.1292 3.8 1.0881 1.1241 4.0 1.0879 1.1190 4.2 1.0874 1.1136 4.4 1.0867 1.1086 4.6 1.0858 1.1046 4.8 1.0846 1.1008 5.0 1.0833 1.0968 5.2 1.0817 1.0919 5.4 1.0798 1.0858 5.6 1.0779 1.0789 5.8 1.0757 1.0718 6.0 1.0731 1.0647 Page 14 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE SA (can't) BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank 205 steps) (Top 15% and Bottom 12% Excluded)
Allowable Value Page 6 of 18
Part-Power W(Z) with Correction Factor Height (feet) (excluding ower ratio) Hot Full Power 75% Power 6.2 1.0702 1.0576 6.4 1.0669 1.0500 6.6 1.0641 1.0427 6.8 1.0619 1.0359 7.0 1.0605 1.0299 7.2 1.0590 1.0237 7.4 1.0584 1.0185 7.6 1.0633 1.0188 7.8 1.0692 1.0200 8.0 1.0745 1.0209 8.2 1.0799 1.0219 8.4 1.0851 1.0228 8.6 1.0900 1.0234 8.8 1.0946 1.0236 9.0 1.0989 1.0240 9.2 1.1029 1.0240 9.4 1.1065 1.0240 9.6 1.1097 1.0241 9.8 1.1132 1.0251 10.0 1.1167 1.0266 10.2 1.1197 1.0282 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 6 TRM 2.1 U1 Revision 17 October 26, 2015 FLUX DIFFERENCE OPERATING ENVELOPE Po\ver Tech Spe-c NOTES: 90 85 70 65 60 55 50. -*40 I I I' LINACCE::PT ABLE 1. OPERATION
 
/ / / f I I I I l I f / l ! 20 ACCEPTABLE 0 10 Axial Flux Difference Level Envelc*ce %r , .*j 1.0 "11 .'!"'>.,. .i.i' *1B.G l6.& 7{} -2'1.=0 2"1 .fi 6-G -2fi.:Q. 2.8*.0 -31.D 31 '"'* .u 20 30 40 1) This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit. 2) The AFD may deviate outside the target band with THERMAL POWER< 50% RTP. 3) The AFD target band is +/-5% for THERMAL POWER ;:::15% RTP. Page 16 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 TABLE 1 TRM2.1 U1 Revision 17 October 26, 2015 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"&#x17d; System," Revision 0, Mar 1997. Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"&#x17d; System," Revision 0, May 2000. 2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.3 Moderator Temperature Coefficient WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.6 Nuclear Heat Flux Hot Channel WCAP-8403 (non-proprietary), "Power Factor (F 0 (Z)) Distribution Control and Load Following Procedures," September 1974. WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V + fuel). WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985. WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997. Page 17 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 COLR Parameter Section 2.7 Nuclear Enthalpy Rise Hot Channel Factor (FN L>H) 2.8 Axial Flux Difference (AFD) 2.9 Overtemperature L1 T Setpoint 2.10 Overpower L1 T Setpoint 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 Refueling Boron Concentration TRM 2.1 U1 Revision 17 October 26, 2015 NRC Approved Methodology WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006. WCAP-8403 (non-proprietary), "Power Distribution Control and Load Following Procedures," September 197 4. NS-TMA-2198, Westinghouse to NRC Letter  
POINT BEACH NUCLEAR PLANT                                           TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                        Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 2.10   Overpower ilT Setpoint (TS 3.3.1. Table 3.3.1-1 note 2)
Overpower il T setpoint parameter values (for 1800 MWt core power):
ilTo       =     indicated ilTat RTP, oF T       =     indicated RCS average temperature, oF T'       ::::; 576.0&deg;F
                  ~        ::::; 1. 098 (NTSP) 1
                  ~        ::::; 1.111 (AVf Ks         =     0.0 for increasing T Ks         =     0.0 for decreasing T Ke         ~      0.00123 forT~ T' Ke         =     0.0 forT< T' Ts       =     0 sec TJ       =     4 sec
                  't4       =     2 sec Applicability: MODES 1 and 2 2.11   RCS Pressure. Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits (TS 3.4.1) 2.11.1       Tavg shall be ::::;577&deg;F.
2.11.2      Pressurizer pressure shall be maintained ~2205  psig during operation.
NOTE:       Pressurizer pressure limit does not apply during:
1}       THERMAL POWER ramp >5% RTP per minute; or 2}     THERMAL POWER step >10% RTP.
2.11.3      Reactor Coolant System raw measured Total Flow Rate shall be maintained
                          ~186,000 gpm.
Applicability: MODE 1 2.12   Refueling Boron Concentration (TS 3.9.1)
Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2350 ppm.
Applicability: MODE 6 1
Nominal Setpoint Value 2
Allowable Value Page 7 of 18
 
POINT BEACH NUCLEAR PLANT                               TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                           Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680~----~------~------~------~----~------~----~
Unacceptable Operation 540+-----~-------+------4-------r------+------~----~
0.0    0.2   0.4      0.6        0.8      1.0          1.2    1.4 Core Power (fraction of 1800 MWt)
Page 8 of 18
 
POINT BEACH NUCLEAR PLANT                                                                TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                                            Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3.,5%             I               I       I         I           I       I   I :w, I         I ,___,
3.0% -+-+-'i-H--+-\-:         :-H-H-:-HH 2.5%
~
~
t l       ~%        !       I               I
-~
              =i 1=-t~:-~JJ::ES
:E
~      1.5%
-:s:::;
Vl 1.0% -+-',--H--+-\-i 0.5% +-+-:       I ._....._,__; I :-H-:-H....._,_:
0.0%
0           10             20       30       40           50       GO 70     80       90   100 Core Burn up(%)
Page 9 of 18
 
POINT BEACH NUCLEAR PLANT                                                     TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                                Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 3 CONTROL BANK INSERTION LIMITS 240                          I  I                                      I 225                        121% L                            /  168.50% I
                                      /                                      v c
210
                                  /
                                      'i Bank B Insertion i                /
:s:ro   195      I"
                              /                                        /                            18I}
                                                                    ~
        "0         180  /                                                                              /
        ..c
        ~          165  I 1761                                  /                                    /
                                                                                                      /
(/)
: a.       150 v    1 Bank C Insertion  1
                                                                                                /"'
                                                        /
Q)
        ....... 135                                /                                      /
v
        ---c (f) 120                            /                                    /
:e 0
105                      /                                      /
(/)
0 0...       90                v                                          /
                                                                              ""I  Bank D Insertion ~ -
        ~
c       75
                                  /                                      //
ro               /                                          v ro         60                                                /
                        /
0
        ....... 45  ~~l                                      /
c 0       30                                      /
0 15                   1 28.50% I/
v I    I X 0
0  5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)
NOTE:        The Figure is applicable for any fully withdrawn position of?_ 225 steps (Limits are always considered met when withdrawn position is?_ 225 steps).
Page 10 of 18
 
POINT BEACH NUCLEAR PLANT                                    TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))
1.2 1.1 1(0.0, 1.0)1                     1(6.0, 1.0)1                     11 (12.0, 1.0}
1 0.9 0.8 0.7 N'
    '-' 0.6
    ~
0.5 0.4 0.3 0.2 0.1 0
0         1     2   3     4   s       6       7   8       9     10     11       12 CORE HEIGHT (FI)
Page 11 of 18
 
POINT BEACH NUCLEAR PLANT                                 TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                             Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
WZ)
Height (feet)     150         3000         8000         16000 MWD/MTU     MWD/MTU     MWD/MTU     MWD/MTU 0.0         1.0000       1.0000       1.0000       1.0000 0.2         1.0000       1.0000       1.0000       1.0000 0.4         1.0000       1.0000       1.0000       1.0000 0.6         1.0000       1.0000       1.0000       1.0000 0.8         1.0000       1.0000       1.0000       1.0000 1.0         1.0000       1.0000       1.0000       1.0000 1.2         1.0000       1.0000       1.0000       1.0000 1.4         1.0000       1.0000       1.0000       1.0000 1.6         1.0986       1.0999       1.1089       1.1218 1.8         1.0986       1.0998       1.1079       1.1190 2.0         1.0982       1.0994       1.1064       1.1156 2.2         1.0975       1.0986       1.1045       1.1117 2.4         1.0966       1.0976       1.1023       1.1072 2.6         1.0955       1.0963       1.0997       1.1023 2.8         1.0941       1.0947       1.0967       1.0971 3.0         1.0925       1.0929       1.0933       1.0917 3.2         1.0906       1.0908       1.0901       1.0876 3.4         1.0889       1.0888       1.0876       1.0850 3.6         1.0883       1.0880       1.0861       1.0829 3.8         1.0881       1.0875       1.0847       1.0830 4.0         1.0879       1.0868       1.0834       1.0835 4.2         1.0874       1.0859       1.0826       1.0837 4.4         1.0867       1.0849       1.0823       1.0838 4.6         1.0858       1.0837       1.0817       1.0837 4.8         1.0846       1.0823       1.0810       1.0834 5.0         1.0833       1.0808       1.0801       1.0828 5.2         1.0817       1.0792       1.0789       1.0820 5.4         1.0798       1.0773       1.0775       1.0808 5.6         1.0779       1.0751       1.0758       1.0794 5.8         1.0757       1.0727       1.0741       1.0775 6.0         1.0731       1.0700       1.0723       1.0753 Page 12 of 18
 
POINT BEACH NUCLEAR PLANT                                 TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                             Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 5 (con't)
Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
WZ)
Height (feet)     150         3000         8000         16000 MWD/MTU     MWD/MTU     MWD/MTU     MWD/MTU 6.2         1.0702       1.0670       1.0708       1.0723 6.4         1.0669       1.0641       1.0699       1.0696 6.6         1.0641       1.0622       1.0686       1.0708 6.8         1.0619       1.0613       1.0659       1.0738 7.0         1.0605       1.0604       1.0672       1.0772 7.2         1.0590       1.0606       1.0723       1.0801 7.4         1.0584       1.0636       1.0764       1.0827 7.6         1.0633       1.0689       1.0803       1.0849 7.8         1.0692       1.0742       1.0840       1.0868 8.0         1.0745       1.0791       1.0872       1.0883 8.2         1.0799       1.0840       1.0902       1.0894 8.4         1.0851       1.0885       1.0928       1.0903 8.6         1.0900       1.0927       1.0950       1.0912 8.8         1.0946       1.0966       1.0968       1.0921 9.0         1.0989       1.1002       1.0983       1.0928 9.2         1.1029       1.1034       1.0994       1.0933 9.4         1.1065       1.1061       1.1001       1.0936 9.6         1.1097       1.1090       1.1010       1.0941 9.8         1.1132       1.1119       1.1015       1.0945 10.0         1.1167       1.1144       1.1018       1.0948 10.2         1.1197       1.1165       1.1033       1.0948 10.4         1.0000       1.0000       1.0000       1.0000 10.6         1.0000       1.0000       1.0000       1.0000 10.8         1.0000       1.0000       1.0000       1.0000 11.0         1.0000       1.0000       1.0000       1.0000 11.2         1.0000       1.0000       1.0000       1.0000 11.4         1.0000       1.0000       1.0000       1.0000 11.6         1.0000       1.0000       1.0000       1.0000 11.8         1.0000       1.0000       1.0000       1.0000 12.0         1.0000       1.0000       1.0000       1.0000 Page 13 of 18
 
POINT BEACH NUCLEAR PLANT                                       TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                    Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank:::::; 205 steps)
(Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)                   (excluding iJOWer ratio)
Hot Full Power               75% Power 0.0                   1.0000                     1.0000 0.2                   1.0000                     1.0000 0.4                   1.0000                     1.0000 0.6                   1.0000                     1.0000 0.8                   1.0000                     1.0000 1.0                   1.0000                     1.0000 1.2                   1.0000                     1.0000 1.4                   1.0000                     1.0000 1.6                   1.0986                     1.1882 1.8                   1.0986                     1.1844 2.0                   1.0982                     1.1793 2.2                   1.0975                     1.1733 2.4                   1.0966                     1.1672 2.6                   1.0955                     1.1611 2.8                   1.0941                     1.1547 3.0                   1.0925                     1.1481 3.2                 1.0906                       1.1412 3.4                   1.0889                     1.1346 3.6                   1.0883                     1.1292 3.8                   1.0881                     1.1241 4.0                   1.0879                     1.1190 4.2                 1.0874                       1.1136 4.4                 1.0867                       1.1086 4.6                 1.0858                       1.1046 4.8                 1.0846                       1.1008 5.0                 1.0833                       1.0968 5.2                 1.0817                       1.0919 5.4                 1.0798                       1.0858 5.6                 1.0779                       1.0789 5.8                 1.0757                       1.0718 6.0                 1.0731                       1.0647 Page 14 of 18
 
POINT BEACH NUCLEAR PLANT                                   TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE SA (can't)
BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank ~ 205 steps)
(Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)               (excluding ower ratio)
Hot Full Power           75% Power 6.2                 1.0702                 1.0576 6.4                 1.0669                 1.0500 6.6                 1.0641                 1.0427 6.8                 1.0619                 1.0359 7.0                 1.0605                 1.0299 7.2                 1.0590                 1.0237 7.4                 1.0584                 1.0185 7.6                 1.0633                 1.0188 7.8                 1.0692                 1.0200 8.0                 1.0745                 1.0209 8.2                 1.0799                 1.0219 8.4                 1.0851                 1.0228 8.6                 1.0900                 1.0234 8.8                 1.0946                 1.0236 9.0                 1.0989                 1.0240 9.2                 1.1029                 1.0240 9.4                 1.1065                 1.0240 9.6                 1.1097                 1.0241 9.8                 1.1132                 1.0251 10.0                 1.1167                 1.0266 10.2                 1.1197                 1.0282 10.4                 1.0000                   1.0000 10.6                 1.0000                   1.0000 10.8                 1.0000                   1.0000 11.0                 1.0000                 1.0000 11.2                 1.0000                   1.0000 11.4                 1.0000                   1.0000 11.6                 1.0000                   1.0000 11.8                 1.0000                   1.0000 12.0                 1.0000                   1.0000 Page 15 of 18
 
POINT BEACH NUCLEAR PLANT                                               TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                           Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE 1oo*~------~---------,---rr-~--~~~~~~~~~
Po\ver           Tech Spe-c Level            Envelc*ce
                                                                            ~*~                %r ,
                                                                                      .*j 1.0            .'!"'>.,.
                                                                                                    "11 .i.i'
                                                                                      *1B.G         l6.&
7{}       -2'1.=0       2"1 .fi 6-G       -2fi.:Q.     2.8*.0 90                                                                        -31.D         31 .u'"'*
I I
85        LINACCE::PTABLE        .I' OPERATION              1
                                          /        ACCEPTABLE
                                          /          OF'ERATI0~*4 f
                                        /
70 I
65 60                    I I
I l
55                  f I
l
                              /
50.
                -*40      -30        -20                  0        10        20            30                40 Axial Flux Difference NOTES:
: 1) This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.
: 2) The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
: 3) The AFD target band is +/-5% for THERMAL POWER ;:::15% RTP.
Page 16 of 18
 
POINT BEACH NUCLEAR PLANT                                     TRM2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR                   Parameter                     NRC Approved Methodology Section All   Reactor Thermal Output           Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"'
System," Revision 0, Mar 1997.
Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System,"
Revision 0, May 2000.
2.1   Reactor Core Safety Limits       WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.2   Shutdown Margin                   WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.3   Moderator Temperature Coefficient WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.4   Shutdown Bank Insertion Limit     WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.5   Control Bank Insertion Limits     WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.6   Nuclear Heat Flux Hot Channel     WCAP-8403 (non-proprietary), "Power Factor (F 0 (Z))                 Distribution Control and Load Following Procedures," September 1974.
WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V + fuel).
WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.
WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.
WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.
Page 17 of 18
 
POINT BEACH NUCLEAR PLANT                                     TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 COLR Parameter                     NRC Approved Methodology Section 2.7   Nuclear Enthalpy Rise Hot Channel WCAP-9272-P-A, "Westinghouse Reload Factor (FN L>H)                   Safety Evaluation Methodology," July 1985.
WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis,"
August 2006.
2.8  Axial Flux Difference (AFD)       WCAP-8403 (non-proprietary), "Power Distribution Control and Load Following Procedures," September 1974.
NS-TMA-2198, Westinghouse to NRC Letter


==Attachment:==
==Attachment:==
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980. NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975. WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1 T Trip Functions," September 1986. WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1 T Trip Functions," September 1986. WCAP-11397 -P-A, "Revised Thermal Design Procedure," April 1989, for those events analyzed using RTDP. WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate 1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)," February 2009. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. Page 18 of 18 November 4, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 Core Operating Limits Report (COLR) Unit 2 Cycle 35 (U2C35) and Correction to Unit 1 Cycle 36 (U1 C36) In accordance with the requirements of Point Beach Nuclear Plant (PBNP) NRC 2015-0067 TS 5.6.4 Technical Specification 5.6.4, enclosed is TRM 2.1, COLR, Unit 2, Cycle 35 and a correction to TRM 2.1, COLR Unit 1 Cycle 36 (U1C36). Enclosure 1 to this letter contains the PBNP U2C35 COLR that was issued on October 15, 2015. Enclosure 2 to this letter contains a revised U 1 C36 COLR to correct Figure 2. It was identified that the numeric values in Figure 2 did not display properly.
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package,"
January 31, 1980.
NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.
2.9  Overtemperature L1T Setpoint      WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1T Trip Functions,"
September 1986.
2.10  Overpower L1 T Setpoint          WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1T and Thermal Overtemperature L1T Trip Functions,"
September 1986.
2.11  RCS Pressure, Temperature, and    WCAP-11397 -P-A, "Revised Thermal Design Flow Departure from Nucleate      Procedure," April 1989, for those events Boiling (DNB) Limits              analyzed using RTDP.
WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate 1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)," February 2009.
WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP.
2.12  Refueling Boron Concentration    WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
Page 18 of 18
 
November 4, 2015                                                               NRC 2015-0067 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 Core Operating Limits Report (COLR) Unit 2 Cycle 35 (U2C35) and Correction to Unit 1 Cycle 36 (U1 C36)
In accordance with the requirements of Point Beach Nuclear Plant (PBNP)
Technical Specification 5.6.4, enclosed is TRM 2.1, COLR, Unit 2, Cycle 35 and a correction to TRM 2.1, COLR Unit 1 Cycle 36 (U1C36). to this letter contains the PBNP U2C35 COLR that was issued on October 15, 2015. Enclosure 2 to this letter contains a revised U 1C36 COLR to correct Figure 2. It was identified that the numeric values in Figure 2 did not display properly.
This letter contains no new regulatory commitments and no revisions to existing commitments.
This letter contains no new regulatory commitments and no revisions to existing commitments.
Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 ENCLOSURE1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 (U1C35) 18 pages follow TRM 2.1 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 REVISION 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4. A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below: COLR PBNP Description Section TS 2.1 2.1.1 Reactor Core Safety Limits 2.2 3.1.1 Shutdown Margin 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.1.8 Physics Test Exceptions 2.3 3.1.3 Moderator Temperature Coefficient 2.4 3.1.5 Shutdown Bank Insertion Limit 2.5 3.1.6 Control Bank Insertion Limits 2.6 3.2.1 Nuclear Heat Flux Hot Channel Factor (F 0 (Z)) 2.7 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN 11 H) 2.8 3.2.3 Axial Flux Difference (AFD) 2.9 3.3.1 Overtemperature L1 T Setpoint 2.10 3.3.1 Overpower L1 T Setpoint 2.11 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 3.9.1 Refueling Boron Concentration Figure 1 2.1.1 Reactor Core Safety Limits Curve Figure 2 3.1.1 Required Shutdown Margin Figure 3 3.1.6 Control Bank Insertion Limits Figure 4 3.2.1 Hot Channel Factor Normalized Operating Envelope (K(Z)) for 422V+ Fuel Figure 5 3.2.1 Summary of W(Z) as a Function of Core Height Figure 5A 3.2.1 BOG Part-Power Summary of W(Z) as a Function of Core Height Figure 6 3.2.3 Flux Difference Operating Envelope Table 1 5.6.4 NRC Approved Methodologies for COLR Parameters Page 2 of 18 POl NT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2.0 OPERATING LIMITS TRM 2.1 U2 Revision 18 October 15, 2015 The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.
Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc:     Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4. 2.1 Reactor Core Safety Limits (TS 2.1.1) The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1. Applicability:
MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4. 3.1.5. 3.1.6. and 3.1.8) 2.2.1 SDM shall be ;:::2.0% .b.klk (see Figure 2). Applicability:
MODES 1, 2, and 3 2.2.2 SDM shall be ;::::1% Aklk. Applicability:
MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits. 2.3.2 The maximum upper MTC limits shall be: pcmrF for power levels RTP pcmrF for power levels > 70% RTP Applicability:
MODE 1 and MODE 2 with keff


===2.4 Shutdown===
ENCLOSURE1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 CORE OPERATING LIMITS REPORT (COLR)
Bank Insertion Limit (TS 3.1.5) NOTE: This limit is not applicable while performing SR 3.1.4.2. 2.4.1 Each shutdown bank shall be fully withdrawn.
UNIT 2 CYCLE 35 (U1C35) 18 pages follow


====2.4.2 Fully====
TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)
withdrawn is defined as ;:::225 steps. Applicability:
UNIT 2 CYCLE 35 REVISION 18
MODES 1 and 2 Page 3 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2.5 Control Bank Insertion Limits (TS 3.1.6) TRM 2.1 U2 Revision 18 October 15, 2015 NOTE: This limit is not applicable while performing SR 3.1.4.2. The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3. Applicability:
 
MODE 1 and MODE 2 with keff <::1.0 2.6 Nuclear Heat Flux Hot Channel Factor (F 0 (Z)) (TS 3.2.1) The Heat Flux Hot Channel Factor shall be within the following limits: Fa (Z)::; CFQ
POINT BEACH NUCLEAR PLANT                                                  TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
* K(Z) I P Fa (Z) ::; CFQ
UNIT 2 CYCLE 35 1.0    CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.
* K(Z) I 0.5 for P > 0.5 for P::; 0.5 Where Pis the fraction of Rated Power at which the core is operating.
A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:
COLR          PBNP      Description Section        TS 2.1            2.1.1    Reactor Core Safety Limits 2.2          3.1.1    Shutdown Margin 3.1.4    Rod Group Alignment Limits 3.1.5    Shutdown Bank Insertion Limits 3.1.6    Control Bank Insertion Limits 3.1.8    Physics Test Exceptions 2.3          3.1.3    Moderator Temperature Coefficient 2.4          3.1.5    Shutdown Bank Insertion Limit 2.5            3.1.6    Control Bank Insertion Limits 2.6            3.2.1    Nuclear Heat Flux Hot Channel Factor (F0 (Z))
2.7          3.2.2    Nuclear Enthalpy Rise Hot Channel Factor (FN11H) 2.8          3.2.3    Axial Flux Difference (AFD) 2.9          3.3.1    Overtemperature L1T Setpoint 2.10          3.3.1    Overpower L1T Setpoint 2.11          3.4.1    RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12          3.9.1    Refueling Boron Concentration Figure 1      2.1.1    Reactor Core Safety Limits Curve Figure 2      3.1.1    Required Shutdown Margin Figure 3      3.1.6    Control Bank Insertion Limits Figure 4      3.2.1    Hot Channel Factor Normalized Operating Envelope (K(Z)) for 422V+ Fuel Figure 5      3.2.1    Summary of W(Z) as a Function of Core Height Figure 5A    3.2.1    BOG Part-Power Summary of W(Z) as a Function of Core Height Figure 6      3.2.3    Flux Difference Operating Envelope Table 1      5.6.4    NRC Approved Methodologies for COLR Parameters Page 2 of 18
 
POl NT BEACH NUCLEAR PLANT                                                  TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                              Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 2.0    OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.
2.1  Reactor Core Safety Limits (TS 2.1.1)
The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.
Applicability: MODES 1 and 2 2.2  Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4. 3.1.5. 3.1.6. and 3.1.8) 2.2.1      SDM shall be ;:::2.0% .b.klk (see Figure 2).
Applicability: MODES 1, 2, and 3 2.2.2      SDM shall be ;::::1% Aklk.
Applicability: MODES 4 and 5 2.3  Moderator Temperature Coefficient (TS 3.1.3) 2.3.1      The upper MTC limits shall be maintained within the limits.
2.3.2      The maximum upper MTC limits shall be:
                        ~5  pcmrF for power levels ~70% RTP
                        ~0  pcmrF for power levels > 70% RTP Applicability: MODE 1 and MODE 2 with keff ~1.0.
2.4  Shutdown Bank Insertion Limit (TS 3.1.5)
NOTE:      This limit is not applicable while performing SR 3.1.4.2.
2.4.1      Each shutdown bank shall be fully withdrawn.
2.4.2        Fully withdrawn is defined as ;:::225 steps.
Applicability: MODES 1 and 2 Page 3 of 18
 
POINT BEACH NUCLEAR PLANT                                                   TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                               Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 2.5   Control Bank Insertion Limits (TS 3.1.6)
NOTE:       This limit is not applicable while performing SR 3.1.4.2.
The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.
Applicability: MODE 1 and MODE 2 with       keff <::1.0 2.6   Nuclear Heat Flux Hot Channel Factor (F0 (Z)) (TS 3.2.1)
The Heat Flux Hot Channel Factor shall be within the following limits:
Fa (Z)::; CFQ
* K(Z) I P       for P > 0.5 Fa (Z) ::; CFQ
* K(Z) I 0.5     for P::; 0.5 Where Pis the fraction of Rated Power at which the core is operating.
Fa (Z) is both:
Fa (Z) is both:
* Steady State Fa c(Z) = Fa(Z)
* Steady State         Fac(Z) =Fa(Z)
* 1.08
* 1.08
* Transient Faw(Z) = Fac(Z)
* Transient           Faw(Z) = Fac(Z)
* W(Z) I P for P > 0.5 Fa w(Z) = Fa c(Z)
* W(Z) I P for P > 0.5 Faw(Z) =Fac(Z)
* W(Z) I 0.5 for P ::; 0.5 CFa = 2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and 5A The following FQ penalty factors are applicable to Cycle 35. Cycle Burnup Fvv 0 (Z) Penalty (MWD/MTU)
* W(Z) I 0.5 for P ::; 0.5 CFa = 2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and 5A The following FQ penalty factors are applicable to Cycle 35.
Factors BOL to 1179 1.026 1179 to EOL 1.02 Applicability:
Cycle Burnup             Fvv0 (Z) Penalty (MWD/MTU)                     Factors BOL to 1179                     1.026 1179 to EOL                     1.02 Applicability: MODE 1 Page 4 of 18
MODE 1 Page 4 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2. 7 Nuclear Enthalpy Rise Hot Channel Factor !lli) (TS 3.2.2) TRM 2.1 U2 Revision 18 October 15, 2015 The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit: 2.7.1 FNAH<1.68X[1  
 
+0.3(1-P)]
POINT BEACH NUCLEAR PLANT                                                     TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                   Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35
: 2. 7   Nuclear Enthalpy Rise Hot Channel Factor (~!lli) (TS 3.2.2)
The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:
2.7.1           FNAH<1.68X[1 +0.3(1-P)]
where: Pis the fraction of Rated Power at which the core is operating.
where: Pis the fraction of Rated Power at which the core is operating.
Applicability:
Applicability: MODE 1 2.8   Axial Flux Difference (AFD) (TS 3.2.3)
MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3) The AFD target band is +/-5%. The AFD Acceptability Operation Limits are provided in Figure 6. Applicability:
The AFD target band is +/-5%.
MODE 1 with THERMAL POWER >15% RTP 2.9 OvertemperatureilT Setpoint (TS 3.3.1, Table 3.3.1-1 note 1) Overtemperature L1 T setpoint parameter values (for 1800 MWt core power): L1To = indicated L1T at RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F p = pressurizer pressure, psig P' ::::: 2235 psig K1 ::::; 1.175 (NTSP)1 K1 ::::; 1.188 (AV)2 Kz ::::: 0.016 K3 ::::: 0.000811 1:1 = 40 sec 1:z = 8 sec 1:3 = 4 sec 1:4 = 2 sec f(ill) is a function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where q and qb are the percent power in the top and bottom halves of the core respectively, and q + qb is total core power in percent of RTP, such that: 1 Nominal Setpoint Value 2 Allowable Value Page 5 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 2.9.1 For q 1-qb within -12, +6 percent, f(ill) = 0. TRM 2.1 U2 Revision 18 October 15, 2015 2.9.2 For each percent that the magnitude of%-qb exceeds +6 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power. 2.9.3 For each percent that the magnitude of q 1-qb exceeds -12 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power. Applicability:
The AFD Acceptability Operation Limits are provided in Figure 6.
MODES 1 and 2 2.10 Overpower L1 T Setpoint (TS 3.3.1, Table 3.3.1-1 note 2) Overpower L1 T setpoint parameter values (for 1800 MWt core power): ilTo = indicated ilT at RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F ::::; 1.098 (NTSP)1 ::::; 1.111 (AV)2 Ks 2': 0.0 for increasing T Ks = 0.0 for decreasing T K6 2': 0.00123 T' K6 = 0.0 forT< T' 'ts 2': 0 sec 't3 = 4 sec 't4 = 2 sec Applicability:
Applicability: MODE 1 with THERMAL POWER >15% RTP 2.9   OvertemperatureilT Setpoint (TS 3.3.1, Table 3.3.1-1 note 1)
MODES 1 and 2 1 Nominal Setpoint Value 2 Allowable Value Page 6 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 TRM 2.1 U2 Revision 18 October 15, 2015 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling CDNB) Limits (TS 3.4.1) 2.11.1 2.11.2 2.11.3 Tavg shall be ::;;57rF.
Overtemperature L1T setpoint parameter values (for 1800 MWt core power):
Pressurizer pressure shall be maintained
L1To     =       indicated L1T at RTP, oF T         =       indicated RCS average temperature, oF T'       ::::;   576.0&deg;F p         =       pressurizer pressure, psig P'       :::::   2235 psig K1       ::::;   1.175 (NTSP) 1 K1       ::::;   1.188 (AV) 2 Kz       :::::   0.016 K3       :::::   0.000811 1:1       =       40 sec 1:z       =       8 sec 1:3       =       4 sec 1:4       =       2 sec f(ill) is a function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where q and qb are the percent power in the top and bottom halves of the core respectively, and q + qb is total core power in percent of RTP, such that:
:2:2205 psig during operation.
1 Nominal Setpoint Value 2
NOTE: Pressurizer pressure limit does not apply during: 1) THERMAL POWER ramp >5% RTP per minute; or 2) THERMAL POWER step >10% RTP. Reactor Coolant System raw measured Total Flow Rate shall be maintained
Allowable Value Page 5 of 18
:2:186,000 gpm. Applicability:
 
MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1) Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ppm. Applicability:
POINT BEACH NUCLEAR PLANT                                                   TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
MODE 6 Page 7 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE TRM 2.1 U2 Revision 18 October 15, 2015 Unacceptable Operation 0.0 0.2 0.4 0.6 0.8 1.0 Core Power (fraction of 1800 MWt) Page 8 of 18 1.2 1.4
UNIT 2 CYCLE 35 2.9.1       For q1 - qb within -12, +6 percent, f(ill) =0.
:& <..< "' <II ::: '"' ::E ;; 0 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 2 REQUIRED SHUTDOWN MARGIN TRM 2.1 U2 Revision 18 October 15, 2015 :>.o% I I I I I I I I I I I 2.5% 2.0'16 1.5% 1.0%
2.9.2       For each percent that the magnitude of%- qb exceeds +6 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.
I I . I I , I I I I I I I 0.0% Q 10 20 30 40 50 60 70 80 90 10.0 Cm e Bum up (%) Page 9 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 ...........
2.9.3       For each percent that the magnitude of q1 - qb exceeds -12 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.
c :5: co L-"0 ..c ...... en 0.. (l) ...... CJ) '-" c 0 +=i *en 0 0.. .::&#xa3; c co co 0 L-...... c 0 0 240 225 210 195 180 165 150 135 120 105 90 75 60 45 30 15 0 FIGURE 3 CONTROL BANK INSERTION LIMITS I 121% I / 168.50% I / v *1 Bank B Insertion
Applicability: MODES 1 and 2 2.10   Overpower L1T Setpoint (TS 3.3.1, Table 3.3.1-1 note 2)
/ / v / / 18}]-/ v / / I 176l / / v 1 Bank C Insertion 1 / // / v / / v / / / / / "I Bank D Insertion -/ / / /v / v / /v / I 28.50% V / I .A' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power) NOTE: The Figure is applicable for any fully withdrawn position of:?: 225 steps (Limits are always considered met when withdrawn position is;::: 225 steps). Page 10 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 4 TRM 2.1 U2 Revision 18 October 15, 2015 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z)) 1.2 j<o.ot l.o)J I (6.0, l.O)j 11 (12.0, 1.0) 1 0.9 0.8 I 0.7 0.5 0.4 0.3 0.2 0.1 0 I 0 l 2 3 4 5 6 7 8 9 10 11 CORE HEIGHT (Fl) Page 11 of 18 12 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 5 TRM 2.1 U2 Revision 18 October 15, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
Overpower L1T setpoint parameter values (for 1800 MWt core power):
Height W(Z) {feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0972 1.0983 1.1075 1.1222 1.8 1.0973 1.0983 1.1066 1.1195 2.0 1.0970 1.0980 1.1053 1.1162 2.2 1.0965 1.0973 1.1036 1.1124 2.4 1.0958 1.0964 1.1015 1.1080 2.6 1.0949 1.0953 1.0990 1.1032 2.8 1.0937 1.0939 1.0963 1.0980 3.0 1.0923 1.0921 1.0931 1.0921 3.2 1.0906 1.0906 1.0900 1.0877 3.4 1.0892 1.0895 1.0873 1.0852 3.6 1.0886 1.0883 1.0857 1.0826 3.8 1.0884 1.0869 1.0844 1.0822 4.0 1.0882 1.0858 1.0837 1.0826 4.2 1.0879 1.0851 1.0834 1.0834 4.4 1.0874 1.0840 1.0828 1.0842 4.6 1.0867 1.0828 1.0821 1.0848 4.8 1.0857 1.0814 1.0812 1.0852 5.0 1.0844 1.0798 1.0803 1.0853 5.2 1.0829 1.0781 1.0794 1.0851 5.4 1.0811 1.0763 1.0785 1.0846 5.6 1.0790 1.0743 1.0773 1.0837 5.8 1.0766 1.0721 1.0758 1.0824 6.0 1.0739 1.0696 1.0739 1.0805 Page 12 of 18 I POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 5 (con't) TRM 2.1 U2 Revision 18 October 15, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
ilTo   =         indicated ilT at RTP, oF T     =         indicated RCS average temperature, oF T'     ::::;     576.0&deg;F
W(Z) Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0709 1.0668 1.0718 1.0784 6.4 1.0679 1.0642 1.0700 1.0755 6.6 1.0650 1.0621 1.0685 1.0717 6.8 1.0622 1.0608 1.0659 1.0736 7.0 1.0600 1.0597 1.0661 1.0777 7.2 1.0578 1.0596 1.0702 1.0808 7.4 1.0570 1.0621 1.0747 1.0837 7.6 1.0620 1.0673 1.0789 1.0861 7.8 1.0678 1.0725 1.0829 1.0882 8.0 1.0730 1.0776 1.0865 1.0900 8.2 1.0784 1.0828 1.0897 1.0914 8.4 1.0838 1.0877 1.0926 1.0925 8.6 1.0892 1.0924 1.0952 1.0937 8.8 1.0943 1.0967 1.0973 1.0949 9.0 1.0991 1.1007 1.0991 1.0959 9.2 1.1035 1.1043 1.1004 1.0965 9.4 1.1075 1.1075 1.1014 1.0969 9.6 1.1117 1.1109 1.1023 1.0968 9.8 1.1158 1.1141 1.1034 1.0965 10.0 1.1196 1.1169 1.1044 1.0958 10.2 1.1230 1.1193 1.1052 1.0946 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
                ~    ::::;     1.098 (NTSP) 1
Part-Power W(Z) with Correction Factor Height (feet) (excluding  
                ~    ::::;     1.111 (AV) 2 Ks   2':       0.0 for increasing T Ks   =         0.0 for decreasing T K6   2':       0.00123 forT~ T' K6   =         0.0 forT< T'
!)ower ratio) Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0972 1.1828 1.8 1.0973 1.1790 2.0 1.0970 1.1745 2.2 1.0965 1.1694 2.4 1.0958 1.1639 2.6 1.0949 1.1583 2.8 1.0937 1.1525 3.0 1.0923 1.1467 3.2 1.0906 1.1406 3.4 1.0892 1.1348 3.6 1.0886 1.1296 3.8 1.0884 1.1248 4.0 1.0882 1.1214 4.2 1.0879 1.1178 4.4 1.0874 1.1136 4.6 1.0867 1.1087 4.8 1.0857 1.1035 5.0 1.0844 1.0982 5.2 1.0829 1.0926 5.4 1.0811 1.0866 5.6 1.0790 1.0802 5.8 1.0766 1.0734 6.0 1.0739 1.0662 Page 14 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE SA (con't) BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
              'ts   2':       0 sec
Part-Power W(Z) with Correction Factor Height (feet) (excluding flOWer ratio) Hot Full Power 75% Power 6.2 1.0709 1.0589 6.4 1.0679 1.0515 6.6 1.0650 1.0444 6.8 1.0622 1.0373 7.0 1.0600 1.0309 7.2 1.0578 1.0245 7.4 1.0570 1.0198 7.6 1.0620 1.0204 7.8 1.0678 1.0219 8.0 1.0730 1.0227 8.2 1.0784 1.0237 8.4 1.0838 1.0246 8.6 1.0892 1.0257 8.8 1.0943 1.0266 9.0 1.0991 1.0274 9.2 1.1035 1.0282 9.4 1.1075 1.0290 9.6 1.1117 1.0303 9.8 1.1158 1.0318 10.0 1.1196 1.0335 10.2 1.1230 1.0357 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 FIGURE 6 TRM 2.1 U2 Revision 18 October 15, 2015 FLUX DIFFERENCE OPERATING ENVELOPE 40 NOTE: tiNA C:C;EPTAB LE OPEF!ATIDN 30 *20 i\CCEPTA6LE OPERATION 0 0 10 Axial Fhxx Difference PCVA;;f Enve!cpe lLO 11.0 11:'1-C 2L:J 21.0 .. 25J1 3LG 3LO UNACCEPfAHLE OPERATJON 30 40 1. This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit. 2. The AFD may deviate outside the target band with THERMAL POWER< 50% RTP. 3. The AFD target band is +/-5% for THERMAL 15% RTP. Page 16 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"&#x17d; System," Revision 0, Mar 1997. Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"&#x17d; System," Revision 0, May 2000. Fuel Assembly WCAP-12610-P-A, "VANTAGE+
              't3   =         4 sec
Fuel Assembly Reference Core Report," April 1995. WCAP-12610-P-A  
              't4   =         2 sec Applicability: MODES 1 and 2 1
& CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO&#x17d;," July 2006. 2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.3 Moderator Temperature WCAP-9272-P-A, "Westinghouse Reload Safety Coefficient Evaluation Methodology," July 1985. 2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.6 Nuclear Heat Flux Hot WCAP-8403 (non-proprietary), "Power Distribution Channel Factor (F 0 (Z)) Control and Load Following Procedures," Westinghouse Electric Corporation, September 1974. WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V +fuel). WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985. WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997. Page 17 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U2 Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section 2.7 Nuclear Enthalpy Rise Hot WCAP-9272-P-A, "Westinghouse Reload Safety Channel Factor (FN t.H) Evaluation Methodology," July 1985. WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006. 2.8 Axial Flux Difference (AFD) WCAP-8403 (nonproprietary), "Power Distribution Control and Load Following Procedures," Westinghouse Electric Corporation, September 1974. NS-TMA-2198, Westinghouse to NRC Letter  
Nominal Setpoint Value 2
Allowable Value Page 6 of 18
 
POINT BEACH NUCLEAR PLANT                                               TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                           Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling CDNB) Limits (TS 3.4.1) 2.11.1     Tavg shall be ::;;57rF.
2.11.2      Pressurizer pressure shall be maintained :2:2205 psig during operation.
NOTE:       Pressurizer pressure limit does not apply during:
: 1)     THERMAL POWER ramp >5% RTP per minute; or
: 2)     THERMAL POWER step >10% RTP.
2.11.3      Reactor Coolant System raw measured Total Flow Rate shall be maintained
:2:186,000 gpm.
Applicability: MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1)
Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2300 ppm.
Applicability: MODE 6 Page 7 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680r-----~------~----~-------,------~-----,------,
Unacceptable Operation 540+------+------4-----~------~------+------+----~
0.0    0.2    0.4      0.6         0.8       1.0         1.2    1.4 Core Power (fraction of 1800 MWt)
Page 8 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3~?~b
:>.o% I       I         I     I       I           I         I I I I     I 2.5%
:~
<II  2.0'16
~
~
::E
;;  1.5%
0
~
~
1.0%
OSi'~  I       I     ., I     I       I           I         I I I I     I 0.0%
Q       10       20   30       40         50         60 70 80 90   10.0 Cm e Bumup (%)
Page 9 of 18
 
POINT BEACH NUCLEAR PLANT                                                                 TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 3 CONTROL BANK INSERTION LIMITS 240                                                                    I 225                      121% I                              /  168.50% I
                                      /                                        v
        ........... 210              *1 Bank B Insertion /                    /
c
:5:                 /
v                                      /
co       195      v                                                                        18}]-
        "0 L-180  /                                        /                                    /
        ..c
        ......           I 176l                                /                                    /
v
        ~          165
                                                            /    1 Bank C Insertion  1
                                                                                                //
en       150 0..
(l)
        ......                                         /
v                                    /
CJ)         135                              v c         120                          /                                      /
0
        +=i                                 /                                        /
        *en         105                                                          /
0 0..         90              /                                          "I  Bank D Insertion ~ -
        .::&#xa3;                     /                                        /
                                                                            /
c         75                                                  v co co 60 /
                            /v                                        /
0                                                    /v L-45 ~~
c 0
30                                      /
0 15                 I 28.50% V
                                                        /
0                    I       .A' 0  5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)
NOTE:       The Figure is applicable for any fully withdrawn position of:?: 225 steps (Limits are always considered met when withdrawn position is;::: 225 steps).
Page 10 of 18
 
POINT BEACH NUCLEAR PLANT                               TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                           Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))
1.2 j<o.ot l.o)J               I (6.0, l.O)j               11 (12.0, 1.0) 1 0.9 0.8                                                                   I 0.7 0.5 0.4 0.3 0.2 0.1 0                                                     I 0         l   2 3 4     5     6       7 8 9     10       11       12 CORE HEIGHT (Fl)
Page 11 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 I CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
W(Z)
Height
{feet)     150         3000         8000         16000 MWD/MTU     MWD/MTU     MWD/MTU     MWD/MTU 0.0         1.0000     1.0000       1.0000       1.0000 0.2         1.0000     1.0000       1.0000       1.0000 0.4         1.0000     1.0000       1.0000       1.0000 0.6         1.0000     1.0000       1.0000       1.0000 0.8         1.0000     1.0000       1.0000       1.0000 1.0         1.0000     1.0000       1.0000       1.0000 1.2         1.0000     1.0000       1.0000       1.0000 1.4         1.0000     1.0000       1.0000       1.0000 1.6         1.0972     1.0983       1.1075       1.1222 1.8         1.0973     1.0983       1.1066       1.1195 2.0         1.0970     1.0980       1.1053       1.1162 2.2         1.0965     1.0973       1.1036       1.1124 2.4         1.0958     1.0964       1.1015       1.1080 2.6         1.0949     1.0953       1.0990       1.1032 2.8         1.0937     1.0939       1.0963       1.0980 3.0         1.0923     1.0921       1.0931       1.0921 3.2         1.0906     1.0906       1.0900       1.0877 3.4         1.0892     1.0895       1.0873       1.0852 3.6         1.0886     1.0883       1.0857       1.0826 3.8         1.0884     1.0869       1.0844       1.0822 4.0         1.0882     1.0858       1.0837       1.0826 4.2         1.0879     1.0851       1.0834       1.0834 4.4         1.0874     1.0840       1.0828       1.0842 4.6         1.0867     1.0828       1.0821       1.0848 4.8         1.0857     1.0814       1.0812       1.0852 5.0         1.0844     1.0798       1.0803       1.0853 5.2         1.0829     1.0781       1.0794       1.0851 5.4         1.0811     1.0763       1.0785       1.0846 5.6         1.0790     1.0743       1.0773       1.0837 5.8         1.0766     1.0721       1.0758       1.0824 6.0         1.0739     1.0696       1.0739       1.0805 Page 12 of 18
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                     Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 5 (con't)
Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
W(Z)
Height (feet)     150         3000         8000       16000 MWD/MTU     MWD/MTU       MWD/MTU   MWD/MTU 6.2         1.0709       1.0668       1.0718       1.0784 6.4         1.0679       1.0642       1.0700       1.0755 6.6         1.0650       1.0621       1.0685       1.0717 6.8         1.0622       1.0608       1.0659       1.0736 7.0         1.0600       1.0597       1.0661       1.0777 7.2         1.0578       1.0596       1.0702       1.0808 7.4         1.0570       1.0621       1.0747       1.0837 7.6         1.0620       1.0673       1.0789       1.0861 7.8         1.0678       1.0725       1.0829       1.0882 8.0         1.0730       1.0776       1.0865       1.0900 8.2         1.0784       1.0828       1.0897       1.0914 8.4         1.0838       1.0877       1.0926       1.0925 8.6         1.0892       1.0924       1.0952       1.0937 8.8         1.0943       1.0967       1.0973       1.0949 9.0         1.0991       1.1007       1.0991       1.0959 9.2         1.1035       1.1043       1.1004       1.0965 9.4         1.1075       1.1075       1.1014       1.0969 9.6         1.1117       1.1109       1.1023       1.0968 9.8         1.1158       1.1141       1.1034       1.0965 10.0         1.1196       1.1169       1.1044       1.0958 10.2         1.1230       1.1193       1.1052       1.0946 10.4         1.0000       1.0000       1.0000       1.0000 10.6         1.0000       1.0000       1.0000       1.0000 10.8         1.0000       1.0000       1.0000       1.0000 11.0         1.0000       1.0000       1.0000       1.0000 11.2         1.0000       1.0000       1.0000       1.0000 11.4         1.0000       1.0000       1.0000       1.0000 11.6         1.0000       1.0000       1.0000       1.0000 11.8         1.0000       1.0000       1.0000       1.0000 12.0         1.0000       1.0000       1.0000       1.0000 Page 13 of 18
 
POINT BEACH NUCLEAR PLANT                                                 TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)               (excluding !)ower ratio)
Hot Full Power             75% Power 0.0                 1.0000                   1.0000 0.2                 1.0000                   1.0000 0.4                 1.0000                   1.0000 0.6                 1.0000                   1.0000 0.8                 1.0000                   1.0000 1.0                 1.0000                   1.0000 1.2                 1.0000                   1.0000 1.4                 1.0000                   1.0000 1.6                 1.0972                   1.1828 1.8                 1.0973                   1.1790 2.0                 1.0970                   1.1745 2.2                 1.0965                   1.1694 2.4                 1.0958                   1.1639 2.6                 1.0949                   1.1583 2.8                 1.0937                   1.1525 3.0                 1.0923                   1.1467 3.2                 1.0906                   1.1406 3.4                 1.0892                   1.1348 3.6                 1.0886                     1.1296 3.8                 1.0884                     1.1248 4.0                 1.0882                     1.1214 4.2                 1.0879                   1.1178 4.4                 1.0874                     1.1136 4.6                 1.0867                     1.1087 4.8                 1.0857                     1.1035 5.0                 1.0844                     1.0982 5.2                 1.0829                     1.0926 5.4                 1.0811                     1.0866 5.6                 1.0790                     1.0802 5.8                 1.0766                     1.0734 6.0                 1.0739                     1.0662 Page 14 of 18
 
POINT BEACH NUCLEAR PLANT                                                 TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE SA (con't)
BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)               (excluding flOWer ratio)
Hot Full Power             75% Power 6.2                 1.0709                   1.0589 6.4                 1.0679                   1.0515 6.6                 1.0650                   1.0444 6.8                 1.0622                   1.0373 7.0                 1.0600                   1.0309 7.2                 1.0578                   1.0245 7.4                 1.0570                   1.0198 7.6                 1.0620                   1.0204 7.8                 1.0678                   1.0219 8.0                 1.0730                   1.0227 8.2                 1.0784                   1.0237 8.4                 1.0838                   1.0246 8.6                 1.0892                   1.0257 8.8                 1.0943                   1.0266 9.0                 1.0991                   1.0274 9.2                 1.1035                   1.0282 9.4                 1.1075                   1.0290 9.6                 1.1117                   1.0303 9.8                 1.1158                   1.0318 10.0                 1.1196                   1.0335 10.2                 1.1230                   1.0357 10.4                 1.0000                   1.0000 10.6                 1.0000                     1.0000 10.8                 1.0000                     1.0000 11.0                 1.0000                     1.0000 11.2                 1.0000                     1.0000 11.4                 1.0000                     1.0000 11.6                 1.0000                     1.0000 11.8                 1.0000                     1.0000 12.0                 1.0000                     1.0000 Page 15 of 18
 
POINT BEACH NUCLEAR PLANT                                             TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                         Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE PCVA;;f        T~<:h Lew~!         Enve!cpe
                                                                ~\:              ~~
lLO       11.0 10~-D      11:'1-C 2L:J       21.0
                                                                        . 25J1       2'~"
C~U 3LG       3LO tiNA C:C;EPTAB LE                                  UNACCEPfAHLE OPEF!ATIDN                                          OPERATJON i\CCEPTA6LE OPERATION 40      30      *20      0      0      10                      30         40 Axial Fhxx Difference NOTE:
: 1. This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results.
Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.
: 2. The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
: 3. The AFD target band is +/-5% for THERMAL POWER~ 15% RTP.
Page 16 of 18
 
POINT BEACH NUCLEAR PLANT                                             TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                          Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter                       NRC Approved Methodology Section All   Reactor Thermal Output       Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"' System," Revision 0, Mar 1997.
Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System," Revision 0, May 2000.
WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Fuel Assembly Reference Core Report," April 1995.
WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," July 2006.
2.1   Reactor Core Safety Limits   WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.2   Shutdown Margin               WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.3   Moderator Temperature         WCAP-9272-P-A, "Westinghouse Reload Safety Coefficient                   Evaluation Methodology," July 1985.
2.4   Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.5   Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.6   Nuclear Heat Flux Hot         WCAP-8403 (non-proprietary), "Power Distribution Channel Factor (F0 (Z))       Control and Load Following Procedures,"
Westinghouse Electric Corporation, September 1974.
WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V +fuel).
WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.
WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.
WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.
Page 17 of 18
 
POINT BEACH NUCLEAR PLANT                                               TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL                                            Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter                         NRC Approved Methodology Section 2.7   Nuclear Enthalpy Rise Hot     WCAP-9272-P-A, "Westinghouse Reload Safety Channel Factor (FNt.H)         Evaluation Methodology," July 1985.
WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006.
2.8 Axial Flux Difference (AFD)     WCAP-8403 (nonproprietary), "Power Distribution Control and Load Following Procedures,"
Westinghouse Electric Corporation, September 1974.
NS-TMA-2198, Westinghouse to NRC Letter


==Attachment:==
==Attachment:==
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980. NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975. 2.9 Overtemperature 11 T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11 T and Thermal Overtemperature 11 T Trip Functions," September 1986 2.10 Overpower 11 T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11 T and Thermal Overtemperature 11 T Trip Functions," September 1986 2.11 RCS Pressure, Temperature, WCAP-11397 -P-A, "Revised Thermal Design and Flow Departure from Procedure," April 1989, for those events analyzed Nucleate Boiling (DNB) Limits using RTDP WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate (1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)", February 2009. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP 2.12 Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 Page 18 of 18 ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 (U1C36) (Revision
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980.
: 17) 18 pages follow TRM 2.1 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 REVISION 17 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4. A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below: COLR Section 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure SA Figure 6 Table 1 PBNP TS 2.1.1 3.1.1 3.1.4 3.1.5 3.1.6 3.1.8 3.1.3 3.1.5 3.1.6 3.2.1 3.2.2 3.2.3 3.3.1 3.3.1 3.4.1 3.9.1 2.1.1 3.1.1 3.1.6 3.2.1 3.2.1 3.2.1 3.2.3 5.6.4 Description Reactor Core Safety Limits Shutdown Margin Rod Group Alignment Limits Shutdown Bank Insertion Limits Control Bank Insertion Limits Physics Test Exceptions Moderator Temperature Coefficient Shutdown Bank Insertion Limit Control Bank Insertion Limits Nuclear Heat Flux Hot Channel Factor (F 0 (Z)) Nuclear Enthalpy Rise Hot Channel Factor (FN t-H) Axial Flux Difference (AFD) Overtemperature T Setpoint Overpower T Setpoint RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits Refueling Boron Concentration Reactor Core Safety Limits Curve Required Shutdown Margin Control Bank Insertion Limits Hot Channel Factor Normalized Operating Envelope (K(Z)) Summary of W(Z) as a Function of Core Height SOC Part-Power Summary of W(Z) as a Function of Core Height Flux Difference Operating Envelope NRC Approved Methodologies for COLR Parameters Page 2 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 2.0 OPERATING LIMITS TRM 2.1 U1 Revision 17 October 26, 2015 The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections.
NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.
These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4. 2.1 Reactor Core Safety Limits (TS 2.1.1) The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1. Applicability:
2.9   Overtemperature 11T Setpoint   WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.10   Overpower 11T Setpoint         WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.11   RCS Pressure, Temperature,     WCAP-11397 -P-A, "Revised Thermal Design and Flow Departure from       Procedure," April 1989, for those events analyzed Nucleate Boiling (DNB) Limits using RTDP WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate (1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)", February 2009.
MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4, 3.1.5, 3.1.6, and 3.1.8) 2.2.1 SDM shall be 2':2.0% t1k/k (see Figure 2). Applicability:
WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP 2.12   Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 Page 18 of 18
MODES 1 , 2, and 3 2.2.2 SDM shall be 2':1% t1klk. Applicability:
 
MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits. 2.3.2 The maximum upper MTC limits shall be: pcm/&deg;F for power levels RTP pcm/&deg;F for power levels > 70% RTP Applicability:
ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 CORE OPERATING LIMITS REPORT (COLR)
MODE 1 and MODE 2 with keff 2':1.0. 2.4 Shutdown Bank Insertion Limit (TS 3.1.5) NOTE: This limit is not applicable while performing SR 3.1.4.2. 2.4.1 Each shutdown bank shall be fully withdrawn.
UNIT 1 CYCLE 36 (U1C36)
(Revision 17) 18 pages follow
 
TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 REVISION 17


====2.4.2 Fully====
POINT BEACH NUCLEAR PLANT                                        TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                    Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
withdrawn is defined as 2': 225 steps. Applicability:
UNIT 1 CYCLE 36 1.0    CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.
MODES 1 and 2 Page 3 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 2.5 Control Bank Insertion Limits (TS 3.1.6) TRM 2.1 U1 Revision 17 October 26, 2015 NOTE: This limit is not applicable while performing SR 3.1.4.2. The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3. Applicability:
A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:
MODE 1 and MODE 2 with kett 21.0 2.6 Nuclear Heat Flux Hot Channel Factor (Fo(Z)) (TS 3.2.1) The Heat Flux Hot Channel Factor shall be within the following limits: Fa(Z) CFa
COLR          PBNP      Description Section          TS 2.1            2.1.1    Reactor Core Safety Limits 2.2            3.1.1    Shutdown Margin 3.1.4    Rod Group Alignment Limits 3.1.5    Shutdown Bank Insertion Limits 3.1.6    Control Bank Insertion Limits 3.1.8    Physics Test Exceptions 2.3            3.1.3    Moderator Temperature Coefficient 2.4             3.1.5    Shutdown Bank Insertion Limit 2.5            3.1.6    Control Bank Insertion Limits 2.6            3.2.1    Nuclear Heat Flux Hot Channel Factor (F 0 (Z))
* K(Z) I P for P > 0.5 Fa(Z) CFa
2.7            3.2.2    Nuclear Enthalpy Rise Hot Channel Factor (FN t-H) 2.8            3.2.3    Axial Flux Difference (AFD) 2.9            3.3.1    Overtemperature ~T Setpoint 2.10            3.3.1    Overpower ~T Setpoint 2.11            3.4.1    RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12            3.9.1    Refueling Boron Concentration Figure 1        2.1.1    Reactor Core Safety Limits Curve Figure 2        3.1.1    Required Shutdown Margin Figure 3        3.1.6    Control Bank Insertion Limits Figure 4        3.2.1    Hot Channel Factor Normalized Operating Envelope (K(Z))
* K(Z) I 0.5 for P 0.5 Where Pis the fraction of Rated Power at which the core is operating.
Figure 5        3.2.1    Summary of W(Z) as a Function of Core Height Figure SA      3.2.1    SOC Part-Power Summary of W(Z) as a Function of Core Height Figure 6        3.2.3    Flux Difference Operating Envelope Table 1        5.6.4    NRC Approved Methodologies for COLR Parameters Page 2 of 18
 
POINT BEACH NUCLEAR PLANT                                            TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                        Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 2.0  OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.
2.1      Reactor Core Safety Limits (TS 2.1.1)
The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.
Applicability: MODES 1 and 2 2.2      Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4, 3.1.5, 3.1.6, and 3.1.8) 2.2.1      SDM shall be 2':2.0% t1k/k (see Figure 2).
Applicability: MODES 1, 2, and 3 2.2.2      SDM shall be 2':1% t1klk.
Applicability: MODES 4 and 5 2.3      Moderator Temperature Coefficient (TS 3.1.3) 2.3.1        The upper MTC limits shall be maintained within the limits.
2.3.2      The maximum upper MTC limits shall be:
                          ~5 pcm/&deg;F for power levels ~70% RTP
                          ~0 pcm/&deg;F for power levels >70% RTP Applicability: MODE 1 and MODE 2 with keff 2':1.0.
2.4    Shutdown Bank Insertion Limit (TS 3.1.5)
NOTE:      This limit is not applicable while performing SR 3.1.4.2.
2.4.1        Each shutdown bank shall be fully withdrawn.
2.4.2        Fully withdrawn is defined as 2': 225 steps.
Applicability: MODES 1 and 2 Page 3 of 18
 
POINT BEACH NUCLEAR PLANT                                           TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                       Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 2.5   Control Bank Insertion Limits (TS 3.1.6)
NOTE:       This limit is not applicable while performing SR 3.1.4.2.
The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.
Applicability: MODE 1 and MODE 2 with kett 21.0 2.6   Nuclear Heat Flux Hot Channel Factor (Fo(Z)) (TS 3.2.1)
The Heat Flux Hot Channel Factor shall be within the following limits:
Fa(Z) ~ CFa
* K(Z) I P         for P > 0.5 Fa(Z) ~ CFa
* K(Z) I 0.5       for P ~ 0.5 Where Pis the fraction of Rated Power at which the core is operating.
Fa(Z) is both:
Fa(Z) is both:
* Steady State
* Steady State         Fac(Z) = Fa(Z)
* Transient CFa = 2.60 Fa c(Z) = Fa(Z)
* 1.08
* 1.08 Faw(Z) = Fac(Z)
* Transient            Faw(Z) =Fac(Z)
* W(Z) I P for P>0.5 Fa w(Z) = Fa c(Z)
* W(Z) I P for P>0.5 Fa w(Z) = Fa c(Z)
* W(Z) I 0.5 for P_::: 0.5 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and SA. The following Fa penalty factors are applicable to Cycle 36. Cycle Burn up Fw Q{Z) Penalty (MWD/MTU)
* W(Z) I 0.5 for P_::: 0.5 CFa  =2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and SA.
Factors BOLto 1325 1.027 1326 to EOL 1.02 Applicability:
The following Fa penalty factors are applicable to Cycle 36.
MODE 1 Page 4 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 TRM 2.1 U1 Revision 17 October 26, 2015 2. 7 Nuclear Enthalpy Rise Hot Channel Factor (FN .6!::!) (TS 3.2.2) The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit: 2.7.1 FNAH:::::1.68x[1  
Cycle Burn up             FwQ{Z) Penalty (MWD/MTU)                     Factors BOLto 1325                   1.027 1326 to EOL                   1.02 Applicability: MODE 1 Page 4 of 18
+0.3(1-P)]
 
POINT BEACH NUCLEAR PLANT                                         TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                     Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36
: 2. 7 Nuclear Enthalpy Rise Hot Channel Factor (FN.6!::!) (TS 3.2.2)
The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:
2.7.1       FNAH:::::1.68x[1 +0.3(1-P)]
where: Pis the fraction of Rated Power at which the core is operating.
where: Pis the fraction of Rated Power at which the core is operating.
Applicability:
Applicability: MODE 1 2.8   Axial Flux Difference (AFD) (TS 3.2.3)
MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3) The AFD target band is +/-5%. The AFD Acceptability Operation Limits are provided in Figure 6. Applicability:
The AFD target band is +/-5%.
MODE 1 with THERMAL POWER :2:15% RTP Page 5 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 TRM 2.1 U1 Revision 17 October 26, 2015 2.9 Overtemperature T Setpoint (TS 3.3.1. Table 3.3.1-1 note 1) Overtemperature T setpoint parameter values (for 1800 MWt core power): = indicated RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F p = pressurizer pressure, psig P' 2235 psig K1 ::::; 1.175 (NTSP)1 K1 ::::; 1.188 (AVf Kz 0.016 K3 0.000811 't1 = 40 sec 'tz = 8 sec 't3 = 4 sec 't4 = 2 sec is an even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where qt and qb are the percent power in the top and bottom halves of the core respectively, and qt + qb is total core power in percent of RTP, such that: 2.9.1 For qt-qb within -12, +6 percent,  
The AFD Acceptability Operation Limits are provided in Figure 6.
= 0. 2.9.2 For each percent that the magnitude of%-qb exceeds +6 percent, T trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power. 2.9.3 For each percent that the magnitude of qt-qb exceeds -12 percent, the trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power. 1 Nominal Setpoint Value 2 Allowable Value Applicability:
Applicability: MODE 1 with THERMAL POWER :2:15% RTP Page 5 of 18
MODES 1 and 2 Page 6 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 2.10 Overpower ilT Setpoint (TS 3.3.1. Table 3.3.1-1 note 2) Overpower il T setpoint parameter values (for 1800 MWt core power): ilTo = indicated il Tat RTP, oF T = indicated RCS average temperature, oF T' ::::; 576.0&deg;F ::::; 1. 098 (NTSP) 1 ::::; 1.111 (AVf Ks = 0.0 for increasing T Ks = 0.0 for decreasing T Ke 0.00123 T' Ke = 0.0 forT< T' Ts = 0 sec TJ = 4 sec 't4 = 2 sec Applicability:
 
MODES 1 and 2 2.11 RCS Pressure.
POINT BEACH NUCLEAR PLANT                                                 TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                             Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits (TS 3.4.1) 2.11.1 2.11.2 2.11.3 Tavg shall be ::::;577&deg;F.
UNIT 1 CYCLE 36 2.9   Overtemperature ~T Setpoint (TS 3.3.1. Table 3.3.1-1 note 1)
Pressurizer pressure shall be maintained psig during operation.
Overtemperature ~T setpoint parameter values (for 1800 MWt core power):
NOTE: Pressurizer pressure limit does not apply during: 1} THERMAL POWER ramp >5% RTP per minute; or 2} THERMAL POWER step >10% RTP. Reactor Coolant System raw measured Total Flow Rate shall be maintained gpm. Applicability:
              ~To      =     indicated ~Tat RTP, oF T       =     indicated RCS average temperature, oF T'       ::::; 576.0&deg;F p       = pressurizer pressure, psig P'     ~    2235 psig K1     ::::; 1.175 (NTSP) 1 K1     ::::; 1.188 (AVf Kz     ~    0.016 K3     ~    0.000811
MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1) Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ppm. Applicability:
              't1     = 40 sec
MODE 6 1 Nominal Setpoint Value 2 Allowable Value Page 7 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 1 TRM 2.1 U1 Revision 17 October 26, 2015 REACTOR CORE SAFETY LIMITS CURVE Unacceptable Operation 0.0 0.2 0.4 0.6 0.8 1.0 Core Power (fraction of 1800 MWt) Page 8 of 18 1.2 1.4 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 2 REQUIRED SHUTDOWN MARGIN TRM 2.1 U1 Revision 17 October 26, 2015 3.,5% I I I I I I I :w, I I ,___, 3.0% -+-+-'i-H--+-\-:
              'tz     = 8 sec
:-H-H-:-HH 2.5% t l ! I I "' :E 1.5% -:s :::; .!: Vl =i 1.0% -+-',--H--+-\-i 0.5% +-+-: I ._....._,__;
              't3     = 4 sec
I :-H-:-H....._,_:
              't4     = 2 sec f(~l) is an even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where qt and qb are the percent power in the top and bottom halves of the core respectively, and qt + qb is total core power in percent of RTP, such that:
0.0% 0 10 20 30 40 50 GO 70 80 90 100 Core Burn up(%) Page 9 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 ..........
2.9.1           For qt- qb within -12, +6 percent, f(~l) =0.
c :s: ro .._ "0 ..c (/) a. Q) ....... (f) ---c 0 :e (/) 0 0... c ro ro 0 .._ ....... c 0 0 240 225 210 195 180 165 150 135 120 105 90 75 60 45 30 15 0 FIGURE 3 CONTROL BANK INSERTION LIMITS I I I 121% L / 168.50% I / v 'i Bank B Insertion i / / / / 18I} / I" / I 1761 / / / 1 Bank C Insertion 1 v /"' / / / / v / / / v / ""I Bank D Insertion -/ // / / v / / / 1 28.50% I/ v I I X 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power) NOTE: The Figure is applicable for any fully withdrawn position of?_ 225 steps (Limits are always considered met when withdrawn position is?_ 225 steps). Page 10 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 4 TRM 2.1 U1 Revision 17 October 26, 2015 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z)) 1.2 1.1 1 1(0.0, 1.0)1 1(6.0, 1.0)1 11 (12.0, 1.0} 0.9 0.8 0.7 N' '-' 0.6 0.5 0.4 0.3 0.2 0.1 0 0 1 2 3 4 s 6 7 8 9 10 11 CORE HEIGHT (FI) Page 11 of 18 12 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 5 TRM 2.1 U1 Revision 17 October 26, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
2.9.2           For each percent that the magnitude of%- qb exceeds +6 percent, the~T trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.
WZ) Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0986 1.0999 1.1089 1.1218 1.8 1.0986 1.0998 1.1079 1.1190 2.0 1.0982 1.0994 1.1064 1.1156 2.2 1.0975 1.0986 1.1045 1.1117 2.4 1.0966 1.0976 1.1023 1.1072 2.6 1.0955 1.0963 1.0997 1.1023 2.8 1.0941 1.0947 1.0967 1.0971 3.0 1.0925 1.0929 1.0933 1.0917 3.2 1.0906 1.0908 1.0901 1.0876 3.4 1.0889 1.0888 1.0876 1.0850 3.6 1.0883 1.0880 1.0861 1.0829 3.8 1.0881 1.0875 1.0847 1.0830 4.0 1.0879 1.0868 1.0834 1.0835 4.2 1.0874 1.0859 1.0826 1.0837 4.4 1.0867 1.0849 1.0823 1.0838 4.6 1.0858 1.0837 1.0817 1.0837 4.8 1.0846 1.0823 1.0810 1.0834 5.0 1.0833 1.0808 1.0801 1.0828 5.2 1.0817 1.0792 1.0789 1.0820 5.4 1.0798 1.0773 1.0775 1.0808 5.6 1.0779 1.0751 1.0758 1.0794 5.8 1.0757 1.0727 1.0741 1.0775 6.0 1.0731 1.0700 1.0723 1.0753 Page 12 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 5 (con't) TRM 2.1 U1 Revision 17 October 26, 2015 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
2.9.3           For each percent that the magnitude of qt- qb exceeds -12 percent, the ~T trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.
WZ) Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0702 1.0670 1.0708 1.0723 6.4 1.0669 1.0641 1.0699 1.0696 6.6 1.0641 1.0622 1.0686 1.0708 6.8 1.0619 1.0613 1.0659 1.0738 7.0 1.0605 1.0604 1.0672 1.0772 7.2 1.0590 1.0606 1.0723 1.0801 7.4 1.0584 1.0636 1.0764 1.0827 7.6 1.0633 1.0689 1.0803 1.0849 7.8 1.0692 1.0742 1.0840 1.0868 8.0 1.0745 1.0791 1.0872 1.0883 8.2 1.0799 1.0840 1.0902 1.0894 8.4 1.0851 1.0885 1.0928 1.0903 8.6 1.0900 1.0927 1.0950 1.0912 8.8 1.0946 1.0966 1.0968 1.0921 9.0 1.0989 1.1002 1.0983 1.0928 9.2 1.1029 1.1034 1.0994 1.0933 9.4 1.1065 1.1061 1.1001 1.0936 9.6 1.1097 1.1090 1.1010 1.0941 9.8 1.1132 1.1119 1.1015 1.0945 10.0 1.1167 1.1144 1.1018 1.0948 10.2 1.1197 1.1165 1.1033 1.0948 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank:::::;
Applicability: MODES 1 and 2 1
205 steps) (Top 15% and Bottom 12% Excluded)
Nominal Setpoint Value 2
Part-Power W(Z) with Correction Factor Height (feet) (excluding iJOWer ratio) Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0986 1.1882 1.8 1.0986 1.1844 2.0 1.0982 1.1793 2.2 1.0975 1.1733 2.4 1.0966 1.1672 2.6 1.0955 1.1611 2.8 1.0941 1.1547 3.0 1.0925 1.1481 3.2 1.0906 1.1412 3.4 1.0889 1.1346 3.6 1.0883 1.1292 3.8 1.0881 1.1241 4.0 1.0879 1.1190 4.2 1.0874 1.1136 4.4 1.0867 1.1086 4.6 1.0858 1.1046 4.8 1.0846 1.1008 5.0 1.0833 1.0968 5.2 1.0817 1.0919 5.4 1.0798 1.0858 5.6 1.0779 1.0789 5.8 1.0757 1.0718 6.0 1.0731 1.0647 Page 14 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL TRM 2.1 U1 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE SA (can't) BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank 205 steps) (Top 15% and Bottom 12% Excluded)
Allowable Value Page 6 of 18
Part-Power W(Z) with Correction Factor Height (feet) (excluding ower ratio) Hot Full Power 75% Power 6.2 1.0702 1.0576 6.4 1.0669 1.0500 6.6 1.0641 1.0427 6.8 1.0619 1.0359 7.0 1.0605 1.0299 7.2 1.0590 1.0237 7.4 1.0584 1.0185 7.6 1.0633 1.0188 7.8 1.0692 1.0200 8.0 1.0745 1.0209 8.2 1.0799 1.0219 8.4 1.0851 1.0228 8.6 1.0900 1.0234 8.8 1.0946 1.0236 9.0 1.0989 1.0240 9.2 1.1029 1.0240 9.4 1.1065 1.0240 9.6 1.1097 1.0241 9.8 1.1132 1.0251 10.0 1.1167 1.0266 10.2 1.1197 1.0282 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 FIGURE 6 TRM 2.1 U1 Revision 17 October 26, 2015 FLUX DIFFERENCE OPERATING ENVELOPE Po\ver Tech Spe-c NOTES: 90 85 70 65 60 55 50. -*40 I I I' LINACCE::PT ABLE 1. OPERATION
 
/ / / f I I I I l I f / l ! 20 ACCEPTABLE 0 10 Axial Flux Difference Level Envelc*ce %r , .*j 1.0 "11 .'!"'>.,. .i.i' *1B.G l6.& 7{} -2'1.=0 2"1 .fi 6-G -2fi.:Q. 2.8*.0 -31.D 31 '"'* .u 20 30 40 1) This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit. 2) The AFD may deviate outside the target band with THERMAL POWER< 50% RTP. 3) The AFD target band is +/-5% for THERMAL POWER ;:::15% RTP. Page 16 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 TABLE 1 TRM2.1 U1 Revision 17 October 26, 2015 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"&#x17d; System," Revision 0, Mar 1997. Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"&#x17d; System," Revision 0, May 2000. 2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.3 Moderator Temperature Coefficient WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. 2.6 Nuclear Heat Flux Hot Channel WCAP-8403 (non-proprietary), "Power Factor (F 0 (Z)) Distribution Control and Load Following Procedures," September 1974. WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V + fuel). WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985. WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997. Page 17 of 18 POINT BEACH NUCLEAR PLANT TECHNICAL REQUIREMENTS MANUAL CORE OPERATING LIMITS REPORT (COLR) UNIT 1 CYCLE 36 COLR Parameter Section 2.7 Nuclear Enthalpy Rise Hot Channel Factor (FN L>H) 2.8 Axial Flux Difference (AFD) 2.9 Overtemperature L1 T Setpoint 2.10 Overpower L1 T Setpoint 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 Refueling Boron Concentration TRM 2.1 U1 Revision 17 October 26, 2015 NRC Approved Methodology WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006. WCAP-8403 (non-proprietary), "Power Distribution Control and Load Following Procedures," September 197 4. NS-TMA-2198, Westinghouse to NRC Letter  
POINT BEACH NUCLEAR PLANT                                           TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                        Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 2.10   Overpower ilT Setpoint (TS 3.3.1. Table 3.3.1-1 note 2)
Overpower il T setpoint parameter values (for 1800 MWt core power):
ilTo       =     indicated ilTat RTP, oF T       =     indicated RCS average temperature, oF T'       ::::; 576.0&deg;F
                  ~        ::::; 1. 098 (NTSP) 1
                  ~        ::::; 1.111 (AVf Ks         =     0.0 for increasing T Ks         =     0.0 for decreasing T Ke         ~      0.00123 forT~ T' Ke         =     0.0 forT< T' Ts       =     0 sec TJ       =     4 sec
                  't4       =     2 sec Applicability: MODES 1 and 2 2.11   RCS Pressure. Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits (TS 3.4.1) 2.11.1       Tavg shall be ::::;577&deg;F.
2.11.2      Pressurizer pressure shall be maintained ~2205  psig during operation.
NOTE:       Pressurizer pressure limit does not apply during:
1}       THERMAL POWER ramp >5% RTP per minute; or 2}     THERMAL POWER step >10% RTP.
2.11.3      Reactor Coolant System raw measured Total Flow Rate shall be maintained
                          ~186,000 gpm.
Applicability: MODE 1 2.12   Refueling Boron Concentration (TS 3.9.1)
Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2350 ppm.
Applicability: MODE 6 1
Nominal Setpoint Value 2
Allowable Value Page 7 of 18
 
POINT BEACH NUCLEAR PLANT                               TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                           Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680~----~------~------~------~----~------~----~
Unacceptable Operation 540+-----~-------+------4-------r------+------~----~
0.0    0.2   0.4      0.6        0.8      1.0          1.2    1.4 Core Power (fraction of 1800 MWt)
Page 8 of 18
 
POINT BEACH NUCLEAR PLANT                                                                TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                                            Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3.,5%             I               I       I         I           I       I   I :w, I         I ,___,
3.0% -+-+-'i-H--+-\-:         :-H-H-:-HH 2.5%
~
~
t l       ~%        !       I               I
-~
              =i 1=-t~:-~JJ::ES
:E
~      1.5%
-:s:::;
Vl 1.0% -+-',--H--+-\-i 0.5% +-+-:       I ._....._,__; I :-H-:-H....._,_:
0.0%
0           10             20       30       40           50       GO 70     80       90   100 Core Burn up(%)
Page 9 of 18
 
POINT BEACH NUCLEAR PLANT                                                     TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                                Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 3 CONTROL BANK INSERTION LIMITS 240                          I  I                                      I 225                        121% L                            /  168.50% I
                                      /                                      v c
210
                                  /
                                      'i Bank B Insertion i                /
:s:ro   195      I"
                              /                                        /                            18I}
                                                                    ~
        "0         180  /                                                                              /
        ..c
        ~          165  I 1761                                  /                                    /
                                                                                                      /
(/)
: a.       150 v    1 Bank C Insertion  1
                                                                                                /"'
                                                        /
Q)
        ....... 135                                /                                      /
v
        ---c (f) 120                            /                                    /
:e 0
105                      /                                      /
(/)
0 0...       90                v                                          /
                                                                              ""I  Bank D Insertion ~ -
        ~
c       75
                                  /                                      //
ro               /                                          v ro         60                                                /
                        /
0
        ....... 45  ~~l                                      /
c 0       30                                      /
0 15                   1 28.50% I/
v I    I X 0
0  5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)
NOTE:        The Figure is applicable for any fully withdrawn position of?_ 225 steps (Limits are always considered met when withdrawn position is?_ 225 steps).
Page 10 of 18
 
POINT BEACH NUCLEAR PLANT                                    TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))
1.2 1.1 1(0.0, 1.0)1                     1(6.0, 1.0)1                     11 (12.0, 1.0}
1 0.9 0.8 0.7 N'
    '-' 0.6
    ~
0.5 0.4 0.3 0.2 0.1 0
0         1     2   3     4   s       6       7   8       9     10     11       12 CORE HEIGHT (FI)
Page 11 of 18
 
POINT BEACH NUCLEAR PLANT                                 TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                             Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
WZ)
Height (feet)     150         3000         8000         16000 MWD/MTU     MWD/MTU     MWD/MTU     MWD/MTU 0.0         1.0000       1.0000       1.0000       1.0000 0.2         1.0000       1.0000       1.0000       1.0000 0.4         1.0000       1.0000       1.0000       1.0000 0.6         1.0000       1.0000       1.0000       1.0000 0.8         1.0000       1.0000       1.0000       1.0000 1.0         1.0000       1.0000       1.0000       1.0000 1.2         1.0000       1.0000       1.0000       1.0000 1.4         1.0000       1.0000       1.0000       1.0000 1.6         1.0986       1.0999       1.1089       1.1218 1.8         1.0986       1.0998       1.1079       1.1190 2.0         1.0982       1.0994       1.1064       1.1156 2.2         1.0975       1.0986       1.1045       1.1117 2.4         1.0966       1.0976       1.1023       1.1072 2.6         1.0955       1.0963       1.0997       1.1023 2.8         1.0941       1.0947       1.0967       1.0971 3.0         1.0925       1.0929       1.0933       1.0917 3.2         1.0906       1.0908       1.0901       1.0876 3.4         1.0889       1.0888       1.0876       1.0850 3.6         1.0883       1.0880       1.0861       1.0829 3.8         1.0881       1.0875       1.0847       1.0830 4.0         1.0879       1.0868       1.0834       1.0835 4.2         1.0874       1.0859       1.0826       1.0837 4.4         1.0867       1.0849       1.0823       1.0838 4.6         1.0858       1.0837       1.0817       1.0837 4.8         1.0846       1.0823       1.0810       1.0834 5.0         1.0833       1.0808       1.0801       1.0828 5.2         1.0817       1.0792       1.0789       1.0820 5.4         1.0798       1.0773       1.0775       1.0808 5.6         1.0779       1.0751       1.0758       1.0794 5.8         1.0757       1.0727       1.0741       1.0775 6.0         1.0731       1.0700       1.0723       1.0753 Page 12 of 18
 
POINT BEACH NUCLEAR PLANT                                 TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                             Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 5 (con't)
Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)
WZ)
Height (feet)     150         3000         8000         16000 MWD/MTU     MWD/MTU     MWD/MTU     MWD/MTU 6.2         1.0702       1.0670       1.0708       1.0723 6.4         1.0669       1.0641       1.0699       1.0696 6.6         1.0641       1.0622       1.0686       1.0708 6.8         1.0619       1.0613       1.0659       1.0738 7.0         1.0605       1.0604       1.0672       1.0772 7.2         1.0590       1.0606       1.0723       1.0801 7.4         1.0584       1.0636       1.0764       1.0827 7.6         1.0633       1.0689       1.0803       1.0849 7.8         1.0692       1.0742       1.0840       1.0868 8.0         1.0745       1.0791       1.0872       1.0883 8.2         1.0799       1.0840       1.0902       1.0894 8.4         1.0851       1.0885       1.0928       1.0903 8.6         1.0900       1.0927       1.0950       1.0912 8.8         1.0946       1.0966       1.0968       1.0921 9.0         1.0989       1.1002       1.0983       1.0928 9.2         1.1029       1.1034       1.0994       1.0933 9.4         1.1065       1.1061       1.1001       1.0936 9.6         1.1097       1.1090       1.1010       1.0941 9.8         1.1132       1.1119       1.1015       1.0945 10.0         1.1167       1.1144       1.1018       1.0948 10.2         1.1197       1.1165       1.1033       1.0948 10.4         1.0000       1.0000       1.0000       1.0000 10.6         1.0000       1.0000       1.0000       1.0000 10.8         1.0000       1.0000       1.0000       1.0000 11.0         1.0000       1.0000       1.0000       1.0000 11.2         1.0000       1.0000       1.0000       1.0000 11.4         1.0000       1.0000       1.0000       1.0000 11.6         1.0000       1.0000       1.0000       1.0000 11.8         1.0000       1.0000       1.0000       1.0000 12.0         1.0000       1.0000       1.0000       1.0000 Page 13 of 18
 
POINT BEACH NUCLEAR PLANT                                       TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                    Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank:::::; 205 steps)
(Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)                   (excluding iJOWer ratio)
Hot Full Power               75% Power 0.0                   1.0000                     1.0000 0.2                   1.0000                     1.0000 0.4                   1.0000                     1.0000 0.6                   1.0000                     1.0000 0.8                   1.0000                     1.0000 1.0                   1.0000                     1.0000 1.2                   1.0000                     1.0000 1.4                   1.0000                     1.0000 1.6                   1.0986                     1.1882 1.8                   1.0986                     1.1844 2.0                   1.0982                     1.1793 2.2                   1.0975                     1.1733 2.4                   1.0966                     1.1672 2.6                   1.0955                     1.1611 2.8                   1.0941                     1.1547 3.0                   1.0925                     1.1481 3.2                 1.0906                       1.1412 3.4                   1.0889                     1.1346 3.6                   1.0883                     1.1292 3.8                   1.0881                     1.1241 4.0                   1.0879                     1.1190 4.2                 1.0874                       1.1136 4.4                 1.0867                       1.1086 4.6                 1.0858                       1.1046 4.8                 1.0846                       1.1008 5.0                 1.0833                       1.0968 5.2                 1.0817                       1.0919 5.4                 1.0798                       1.0858 5.6                 1.0779                       1.0789 5.8                 1.0757                       1.0718 6.0                 1.0731                       1.0647 Page 14 of 18
 
POINT BEACH NUCLEAR PLANT                                   TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE SA (can't)
BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank ~ 205 steps)
(Top 15% and Bottom 12% Excluded)
Part-Power W(Z) with Correction Factor Height (feet)               (excluding ower ratio)
Hot Full Power           75% Power 6.2                 1.0702                 1.0576 6.4                 1.0669                 1.0500 6.6                 1.0641                 1.0427 6.8                 1.0619                 1.0359 7.0                 1.0605                 1.0299 7.2                 1.0590                 1.0237 7.4                 1.0584                 1.0185 7.6                 1.0633                 1.0188 7.8                 1.0692                 1.0200 8.0                 1.0745                 1.0209 8.2                 1.0799                 1.0219 8.4                 1.0851                 1.0228 8.6                 1.0900                 1.0234 8.8                 1.0946                 1.0236 9.0                 1.0989                 1.0240 9.2                 1.1029                 1.0240 9.4                 1.1065                 1.0240 9.6                 1.1097                 1.0241 9.8                 1.1132                 1.0251 10.0                 1.1167                 1.0266 10.2                 1.1197                 1.0282 10.4                 1.0000                   1.0000 10.6                 1.0000                   1.0000 10.8                 1.0000                   1.0000 11.0                 1.0000                 1.0000 11.2                 1.0000                   1.0000 11.4                 1.0000                   1.0000 11.6                 1.0000                   1.0000 11.8                 1.0000                   1.0000 12.0                 1.0000                   1.0000 Page 15 of 18
 
POINT BEACH NUCLEAR PLANT                                               TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                           Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE 1oo*~------~---------,---rr-~--~~~~~~~~~
Po\ver           Tech Spe-c Level            Envelc*ce
                                                                            ~*~                %r ,
                                                                                      .*j 1.0            .'!"'>.,.
                                                                                                    "11 .i.i'
                                                                                      *1B.G         l6.&
7{}       -2'1.=0       2"1 .fi 6-G       -2fi.:Q.     2.8*.0 90                                                                        -31.D         31 .u'"'*
I I
85        LINACCE::PTABLE        .I' OPERATION              1
                                          /        ACCEPTABLE
                                          /          OF'ERATI0~*4 f
                                        /
70 I
65 60                    I I
I l
55                  f I
l
                              /
50.
                -*40      -30        -20                  0        10        20            30                40 Axial Flux Difference NOTES:
: 1) This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.
: 2) The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
: 3) The AFD target band is +/-5% for THERMAL POWER ;:::15% RTP.
Page 16 of 18
 
POINT BEACH NUCLEAR PLANT                                     TRM2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR                   Parameter                     NRC Approved Methodology Section All   Reactor Thermal Output           Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"'
System," Revision 0, Mar 1997.
Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System,"
Revision 0, May 2000.
2.1   Reactor Core Safety Limits       WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.2   Shutdown Margin                   WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.3   Moderator Temperature Coefficient WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.4   Shutdown Bank Insertion Limit     WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.5   Control Bank Insertion Limits     WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
2.6   Nuclear Heat Flux Hot Channel     WCAP-8403 (non-proprietary), "Power Factor (F 0 (Z))                 Distribution Control and Load Following Procedures," September 1974.
WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V + fuel).
WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.
WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.
WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.
Page 17 of 18
 
POINT BEACH NUCLEAR PLANT                                     TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL                                 Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)
UNIT 1 CYCLE 36 COLR Parameter                     NRC Approved Methodology Section 2.7   Nuclear Enthalpy Rise Hot Channel WCAP-9272-P-A, "Westinghouse Reload Factor (FN L>H)                   Safety Evaluation Methodology," July 1985.
WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis,"
August 2006.
2.8  Axial Flux Difference (AFD)       WCAP-8403 (non-proprietary), "Power Distribution Control and Load Following Procedures," September 1974.
NS-TMA-2198, Westinghouse to NRC Letter


==Attachment:==
==Attachment:==
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980. NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975. WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1 T Trip Functions," September 1986. WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1 T Trip Functions," September 1986. WCAP-11397 -P-A, "Revised Thermal Design Procedure," April 1989, for those events analyzed using RTDP. WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate 1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)," February 2009. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP. WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985. Page 18 of 18}}
  "Operation and Safety Analysis Aspects of an Improved Load Follow Package,"
January 31, 1980.
NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.
2.9  Overtemperature L1T Setpoint      WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1T Trip Functions,"
September 1986.
2.10  Overpower L1 T Setpoint          WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1T and Thermal Overtemperature L1T Trip Functions,"
September 1986.
2.11  RCS Pressure, Temperature, and    WCAP-11397 -P-A, "Revised Thermal Design Flow Departure from Nucleate      Procedure," April 1989, for those events Boiling (DNB) Limits              analyzed using RTDP.
WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate 1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)," February 2009.
WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP.
2.12  Refueling Boron Concentration    WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.
Page 18 of 18}}

Latest revision as of 08:57, 5 February 2020

Core Operating Limits Report (COLR) Unit 2 Cycle 35 (U2C35) and Correction to Unit 1 Cycle 36 (U1C36)
ML15308A097
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/04/2015
From: Woyak B
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2015-0067
Download: ML15308A097 (39)


Text

November 4, 2015 NRC 2015-0067 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 Core Operating Limits Report (COLR) Unit 2 Cycle 35 (U2C35) and Correction to Unit 1 Cycle 36 (U1 C36)

In accordance with the requirements of Point Beach Nuclear Plant (PBNP)

Technical Specification 5.6.4, enclosed is TRM 2.1, COLR, Unit 2, Cycle 35 and a correction to TRM 2.1, COLR Unit 1 Cycle 36 (U1C36). to this letter contains the PBNP U2C35 COLR that was issued on October 15, 2015. Enclosure 2 to this letter contains a revised U 1C36 COLR to correct Figure 2. It was identified that the numeric values in Figure 2 did not display properly.

This letter contains no new regulatory commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 (U1C35) 18 pages follow

TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 REVISION 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.

A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:

COLR PBNP Description Section TS 2.1 2.1.1 Reactor Core Safety Limits 2.2 3.1.1 Shutdown Margin 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.1.8 Physics Test Exceptions 2.3 3.1.3 Moderator Temperature Coefficient 2.4 3.1.5 Shutdown Bank Insertion Limit 2.5 3.1.6 Control Bank Insertion Limits 2.6 3.2.1 Nuclear Heat Flux Hot Channel Factor (F0 (Z))

2.7 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN11H) 2.8 3.2.3 Axial Flux Difference (AFD) 2.9 3.3.1 Overtemperature L1T Setpoint 2.10 3.3.1 Overpower L1T Setpoint 2.11 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 3.9.1 Refueling Boron Concentration Figure 1 2.1.1 Reactor Core Safety Limits Curve Figure 2 3.1.1 Required Shutdown Margin Figure 3 3.1.6 Control Bank Insertion Limits Figure 4 3.2.1 Hot Channel Factor Normalized Operating Envelope (K(Z)) for 422V+ Fuel Figure 5 3.2.1 Summary of W(Z) as a Function of Core Height Figure 5A 3.2.1 BOG Part-Power Summary of W(Z) as a Function of Core Height Figure 6 3.2.3 Flux Difference Operating Envelope Table 1 5.6.4 NRC Approved Methodologies for COLR Parameters Page 2 of 18

POl NT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.

2.1 Reactor Core Safety Limits (TS 2.1.1)

The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.

Applicability: MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4. 3.1.5. 3.1.6. and 3.1.8) 2.2.1 SDM shall be ;:::2.0% .b.klk (see Figure 2).

Applicability: MODES 1, 2, and 3 2.2.2 SDM shall be ;::::1% Aklk.

Applicability: MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits.

2.3.2 The maximum upper MTC limits shall be:

~5 pcmrF for power levels ~70% RTP

~0 pcmrF for power levels > 70% RTP Applicability: MODE 1 and MODE 2 with keff ~1.0.

2.4 Shutdown Bank Insertion Limit (TS 3.1.5)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

2.4.1 Each shutdown bank shall be fully withdrawn.

2.4.2 Fully withdrawn is defined as ;:::225 steps.

Applicability: MODES 1 and 2 Page 3 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.5 Control Bank Insertion Limits (TS 3.1.6)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.

Applicability: MODE 1 and MODE 2 with keff <::1.0 2.6 Nuclear Heat Flux Hot Channel Factor (F0 (Z)) (TS 3.2.1)

The Heat Flux Hot Channel Factor shall be within the following limits:

Fa (Z)::; CFQ

  • K(Z) I P for P > 0.5 Fa (Z) ::; CFQ
  • K(Z) I 0.5 for P::; 0.5 Where Pis the fraction of Rated Power at which the core is operating.

Fa (Z) is both:

  • Steady State Fac(Z) =Fa(Z)
  • 1.08
  • W(Z) I P for P > 0.5 Faw(Z) =Fac(Z)
  • W(Z) I 0.5 for P ::; 0.5 CFa = 2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and 5A The following FQ penalty factors are applicable to Cycle 35.

Cycle Burnup Fvv0 (Z) Penalty (MWD/MTU) Factors BOL to 1179 1.026 1179 to EOL 1.02 Applicability: MODE 1 Page 4 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35

2. 7 Nuclear Enthalpy Rise Hot Channel Factor (~!lli) (TS 3.2.2)

The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:

2.7.1 FNAH<1.68X[1 +0.3(1-P)]

where: Pis the fraction of Rated Power at which the core is operating.

Applicability: MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3)

The AFD target band is +/-5%.

The AFD Acceptability Operation Limits are provided in Figure 6.

Applicability: MODE 1 with THERMAL POWER >15% RTP 2.9 OvertemperatureilT Setpoint (TS 3.3.1, Table 3.3.1-1 note 1)

Overtemperature L1T setpoint parameter values (for 1800 MWt core power):

L1To = indicated L1T at RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F p = pressurizer pressure, psig P'  ::::: 2235 psig K1  ::::; 1.175 (NTSP) 1 K1  ::::; 1.188 (AV) 2 Kz  ::::: 0.016 K3  ::::: 0.000811 1:1 = 40 sec 1:z = 8 sec 1:3 = 4 sec 1:4 = 2 sec f(ill) is a function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where q and qb are the percent power in the top and bottom halves of the core respectively, and q + qb is total core power in percent of RTP, such that:

1 Nominal Setpoint Value 2

Allowable Value Page 5 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.9.1 For q1 - qb within -12, +6 percent, f(ill) =0.

2.9.2 For each percent that the magnitude of%- qb exceeds +6 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.

2.9.3 For each percent that the magnitude of q1 - qb exceeds -12 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.

Applicability: MODES 1 and 2 2.10 Overpower L1T Setpoint (TS 3.3.1, Table 3.3.1-1 note 2)

Overpower L1T setpoint parameter values (for 1800 MWt core power):

ilTo = indicated ilT at RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F

~  ::::; 1.098 (NTSP) 1

~  ::::; 1.111 (AV) 2 Ks 2': 0.0 for increasing T Ks = 0.0 for decreasing T K6 2': 0.00123 forT~ T' K6 = 0.0 forT< T'

'ts 2': 0 sec

't3 = 4 sec

't4 = 2 sec Applicability: MODES 1 and 2 1

Nominal Setpoint Value 2

Allowable Value Page 6 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling CDNB) Limits (TS 3.4.1) 2.11.1 Tavg shall be ::;;57rF.

2.11.2 Pressurizer pressure shall be maintained :2:2205 psig during operation.

NOTE: Pressurizer pressure limit does not apply during:

1) THERMAL POWER ramp >5% RTP per minute; or
2) THERMAL POWER step >10% RTP.

2.11.3 Reactor Coolant System raw measured Total Flow Rate shall be maintained

2:186,000 gpm.

Applicability: MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1)

Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2300 ppm.

Applicability: MODE 6 Page 7 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680r-----~------~----~-------,------~-----,------,

Unacceptable Operation 540+------+------4-----~------~------+------+----~

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 Core Power (fraction of 1800 MWt)

Page 8 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3~?~b

>.o% I I I I I I I I I I I 2.5%
~

<II 2.0'16

~

~

E
1.5%

0

~

~

1.0%

OSi'~ I I ., I I I I I I I I I 0.0%

Q 10 20 30 40 50 60 70 80 90 10.0 Cm e Bumup (%)

Page 9 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 3 CONTROL BANK INSERTION LIMITS 240 I 225 121% I / 168.50% I

/ v

........... 210 *1 Bank B Insertion / /

c

5: /

v /

co 195 v 18}]-

"0 L-180 / / /

..c

...... I 176l / /

v

~ 165

/ 1 Bank C Insertion 1

//

en 150 0..

(l)

...... /

v /

CJ) 135 v c 120 / /

0

+=i / /

  • en 105 /

0 0.. 90 / "I Bank D Insertion ~ -

.::£ / /

/

c 75 v co co 60 /

/v /

0 /v L-45 ~~

c 0

30 /

0 15 I 28.50% V

/

0 I .A' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)

NOTE: The Figure is applicable for any fully withdrawn position of:?: 225 steps (Limits are always considered met when withdrawn position is;::: 225 steps).

Page 10 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))

1.2 j<o.ot l.o)J I (6.0, l.O)j 11 (12.0, 1.0) 1 0.9 0.8 I 0.7 0.5 0.4 0.3 0.2 0.1 0 I 0 l 2 3 4 5 6 7 8 9 10 11 12 CORE HEIGHT (Fl)

Page 11 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 I CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

W(Z)

Height

{feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0972 1.0983 1.1075 1.1222 1.8 1.0973 1.0983 1.1066 1.1195 2.0 1.0970 1.0980 1.1053 1.1162 2.2 1.0965 1.0973 1.1036 1.1124 2.4 1.0958 1.0964 1.1015 1.1080 2.6 1.0949 1.0953 1.0990 1.1032 2.8 1.0937 1.0939 1.0963 1.0980 3.0 1.0923 1.0921 1.0931 1.0921 3.2 1.0906 1.0906 1.0900 1.0877 3.4 1.0892 1.0895 1.0873 1.0852 3.6 1.0886 1.0883 1.0857 1.0826 3.8 1.0884 1.0869 1.0844 1.0822 4.0 1.0882 1.0858 1.0837 1.0826 4.2 1.0879 1.0851 1.0834 1.0834 4.4 1.0874 1.0840 1.0828 1.0842 4.6 1.0867 1.0828 1.0821 1.0848 4.8 1.0857 1.0814 1.0812 1.0852 5.0 1.0844 1.0798 1.0803 1.0853 5.2 1.0829 1.0781 1.0794 1.0851 5.4 1.0811 1.0763 1.0785 1.0846 5.6 1.0790 1.0743 1.0773 1.0837 5.8 1.0766 1.0721 1.0758 1.0824 6.0 1.0739 1.0696 1.0739 1.0805 Page 12 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 5 (con't)

Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

W(Z)

Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0709 1.0668 1.0718 1.0784 6.4 1.0679 1.0642 1.0700 1.0755 6.6 1.0650 1.0621 1.0685 1.0717 6.8 1.0622 1.0608 1.0659 1.0736 7.0 1.0600 1.0597 1.0661 1.0777 7.2 1.0578 1.0596 1.0702 1.0808 7.4 1.0570 1.0621 1.0747 1.0837 7.6 1.0620 1.0673 1.0789 1.0861 7.8 1.0678 1.0725 1.0829 1.0882 8.0 1.0730 1.0776 1.0865 1.0900 8.2 1.0784 1.0828 1.0897 1.0914 8.4 1.0838 1.0877 1.0926 1.0925 8.6 1.0892 1.0924 1.0952 1.0937 8.8 1.0943 1.0967 1.0973 1.0949 9.0 1.0991 1.1007 1.0991 1.0959 9.2 1.1035 1.1043 1.1004 1.0965 9.4 1.1075 1.1075 1.1014 1.0969 9.6 1.1117 1.1109 1.1023 1.0968 9.8 1.1158 1.1141 1.1034 1.0965 10.0 1.1196 1.1169 1.1044 1.0958 10.2 1.1230 1.1193 1.1052 1.0946 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding !)ower ratio)

Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0972 1.1828 1.8 1.0973 1.1790 2.0 1.0970 1.1745 2.2 1.0965 1.1694 2.4 1.0958 1.1639 2.6 1.0949 1.1583 2.8 1.0937 1.1525 3.0 1.0923 1.1467 3.2 1.0906 1.1406 3.4 1.0892 1.1348 3.6 1.0886 1.1296 3.8 1.0884 1.1248 4.0 1.0882 1.1214 4.2 1.0879 1.1178 4.4 1.0874 1.1136 4.6 1.0867 1.1087 4.8 1.0857 1.1035 5.0 1.0844 1.0982 5.2 1.0829 1.0926 5.4 1.0811 1.0866 5.6 1.0790 1.0802 5.8 1.0766 1.0734 6.0 1.0739 1.0662 Page 14 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE SA (con't)

BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding flOWer ratio)

Hot Full Power 75% Power 6.2 1.0709 1.0589 6.4 1.0679 1.0515 6.6 1.0650 1.0444 6.8 1.0622 1.0373 7.0 1.0600 1.0309 7.2 1.0578 1.0245 7.4 1.0570 1.0198 7.6 1.0620 1.0204 7.8 1.0678 1.0219 8.0 1.0730 1.0227 8.2 1.0784 1.0237 8.4 1.0838 1.0246 8.6 1.0892 1.0257 8.8 1.0943 1.0266 9.0 1.0991 1.0274 9.2 1.1035 1.0282 9.4 1.1075 1.0290 9.6 1.1117 1.0303 9.8 1.1158 1.0318 10.0 1.1196 1.0335 10.2 1.1230 1.0357 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE PCVA;;f T~<:h Lew~! Enve!cpe

~\: ~~

lLO 11.0 10~-D 11:'1-C 2L:J 21.0

. 25J1 2'~"

C~U 3LG 3LO tiNA C:C;EPTAB LE UNACCEPfAHLE OPEF!ATIDN OPERATJON i\CCEPTA6LE OPERATION 40 30 *20 0 0 10 30 40 Axial Fhxx Difference NOTE:

1. This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results.

Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.

2. The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
3. The AFD target band is +/-5% for THERMAL POWER~ 15% RTP.

Page 16 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"' System," Revision 0, Mar 1997.

Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System," Revision 0, May 2000.

WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Fuel Assembly Reference Core Report," April 1995.

WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," July 2006.

2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.3 Moderator Temperature WCAP-9272-P-A, "Westinghouse Reload Safety Coefficient Evaluation Methodology," July 1985.

2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.6 Nuclear Heat Flux Hot WCAP-8403 (non-proprietary), "Power Distribution Channel Factor (F0 (Z)) Control and Load Following Procedures,"

Westinghouse Electric Corporation, September 1974.

WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V +fuel).

WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.

WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.

WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.

Page 17 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section 2.7 Nuclear Enthalpy Rise Hot WCAP-9272-P-A, "Westinghouse Reload Safety Channel Factor (FNt.H) Evaluation Methodology," July 1985.

WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006.

2.8 Axial Flux Difference (AFD) WCAP-8403 (nonproprietary), "Power Distribution Control and Load Following Procedures,"

Westinghouse Electric Corporation, September 1974.

NS-TMA-2198, Westinghouse to NRC Letter

Attachment:

"Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980.

NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.

2.9 Overtemperature 11T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.10 Overpower 11T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.11 RCS Pressure, Temperature, WCAP-11397 -P-A, "Revised Thermal Design and Flow Departure from Procedure," April 1989, for those events analyzed Nucleate Boiling (DNB) Limits using RTDP WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate (1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)", February 2009.

WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP 2.12 Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 Page 18 of 18

ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 (U1C36)

(Revision 17) 18 pages follow

TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 REVISION 17

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.

A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:

COLR PBNP Description Section TS 2.1 2.1.1 Reactor Core Safety Limits 2.2 3.1.1 Shutdown Margin 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.1.8 Physics Test Exceptions 2.3 3.1.3 Moderator Temperature Coefficient 2.4 3.1.5 Shutdown Bank Insertion Limit 2.5 3.1.6 Control Bank Insertion Limits 2.6 3.2.1 Nuclear Heat Flux Hot Channel Factor (F 0 (Z))

2.7 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN t-H) 2.8 3.2.3 Axial Flux Difference (AFD) 2.9 3.3.1 Overtemperature ~T Setpoint 2.10 3.3.1 Overpower ~T Setpoint 2.11 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 3.9.1 Refueling Boron Concentration Figure 1 2.1.1 Reactor Core Safety Limits Curve Figure 2 3.1.1 Required Shutdown Margin Figure 3 3.1.6 Control Bank Insertion Limits Figure 4 3.2.1 Hot Channel Factor Normalized Operating Envelope (K(Z))

Figure 5 3.2.1 Summary of W(Z) as a Function of Core Height Figure SA 3.2.1 SOC Part-Power Summary of W(Z) as a Function of Core Height Figure 6 3.2.3 Flux Difference Operating Envelope Table 1 5.6.4 NRC Approved Methodologies for COLR Parameters Page 2 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.

2.1 Reactor Core Safety Limits (TS 2.1.1)

The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.

Applicability: MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4, 3.1.5, 3.1.6, and 3.1.8) 2.2.1 SDM shall be 2':2.0% t1k/k (see Figure 2).

Applicability: MODES 1, 2, and 3 2.2.2 SDM shall be 2':1% t1klk.

Applicability: MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits.

2.3.2 The maximum upper MTC limits shall be:

~5 pcm/°F for power levels ~70% RTP

~0 pcm/°F for power levels >70% RTP Applicability: MODE 1 and MODE 2 with keff 2':1.0.

2.4 Shutdown Bank Insertion Limit (TS 3.1.5)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

2.4.1 Each shutdown bank shall be fully withdrawn.

2.4.2 Fully withdrawn is defined as 2': 225 steps.

Applicability: MODES 1 and 2 Page 3 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.5 Control Bank Insertion Limits (TS 3.1.6)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.

Applicability: MODE 1 and MODE 2 with kett 21.0 2.6 Nuclear Heat Flux Hot Channel Factor (Fo(Z)) (TS 3.2.1)

The Heat Flux Hot Channel Factor shall be within the following limits:

Fa(Z) ~ CFa

  • K(Z) I P for P > 0.5 Fa(Z) ~ CFa
  • K(Z) I 0.5 for P ~ 0.5 Where Pis the fraction of Rated Power at which the core is operating.

Fa(Z) is both:

  • Steady State Fac(Z) = Fa(Z)
  • 1.08
  • W(Z) I P for P>0.5 Fa w(Z) = Fa c(Z)
  • W(Z) I 0.5 for P_::: 0.5 CFa =2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and SA.

The following Fa penalty factors are applicable to Cycle 36.

Cycle Burn up FwQ{Z) Penalty (MWD/MTU) Factors BOLto 1325 1.027 1326 to EOL 1.02 Applicability: MODE 1 Page 4 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36

2. 7 Nuclear Enthalpy Rise Hot Channel Factor (FN.6!::!) (TS 3.2.2)

The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:

2.7.1 FNAH:::::1.68x[1 +0.3(1-P)]

where: Pis the fraction of Rated Power at which the core is operating.

Applicability: MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3)

The AFD target band is +/-5%.

The AFD Acceptability Operation Limits are provided in Figure 6.

Applicability: MODE 1 with THERMAL POWER :2:15% RTP Page 5 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.9 Overtemperature ~T Setpoint (TS 3.3.1. Table 3.3.1-1 note 1)

Overtemperature ~T setpoint parameter values (for 1800 MWt core power):

~To = indicated ~Tat RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F p = pressurizer pressure, psig P' ~ 2235 psig K1  ::::; 1.175 (NTSP) 1 K1  ::::; 1.188 (AVf Kz ~ 0.016 K3 ~ 0.000811

't1 = 40 sec

'tz = 8 sec

't3 = 4 sec

't4 = 2 sec f(~l) is an even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where qt and qb are the percent power in the top and bottom halves of the core respectively, and qt + qb is total core power in percent of RTP, such that:

2.9.1 For qt- qb within -12, +6 percent, f(~l) =0.

2.9.2 For each percent that the magnitude of%- qb exceeds +6 percent, the~T trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.

2.9.3 For each percent that the magnitude of qt- qb exceeds -12 percent, the ~T trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.

Applicability: MODES 1 and 2 1

Nominal Setpoint Value 2

Allowable Value Page 6 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.10 Overpower ilT Setpoint (TS 3.3.1. Table 3.3.1-1 note 2)

Overpower il T setpoint parameter values (for 1800 MWt core power):

ilTo = indicated ilTat RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F

~  ::::; 1. 098 (NTSP) 1

~  ::::; 1.111 (AVf Ks = 0.0 for increasing T Ks = 0.0 for decreasing T Ke ~ 0.00123 forT~ T' Ke = 0.0 forT< T' Ts = 0 sec TJ = 4 sec

't4 = 2 sec Applicability: MODES 1 and 2 2.11 RCS Pressure. Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits (TS 3.4.1) 2.11.1 Tavg shall be ::::;577°F.

2.11.2 Pressurizer pressure shall be maintained ~2205 psig during operation.

NOTE: Pressurizer pressure limit does not apply during:

1} THERMAL POWER ramp >5% RTP per minute; or 2} THERMAL POWER step >10% RTP.

2.11.3 Reactor Coolant System raw measured Total Flow Rate shall be maintained

~186,000 gpm.

Applicability: MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1)

Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2350 ppm.

Applicability: MODE 6 1

Nominal Setpoint Value 2

Allowable Value Page 7 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680~----~------~------~------~----~------~----~

Unacceptable Operation 540+-----~-------+------4-------r------+------~----~

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 Core Power (fraction of 1800 MWt)

Page 8 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3.,5% I I I I I I I :w, I I ,___,

3.0% -+-+-'i-H--+-\-:  :-H-H-:-HH 2.5%

~

~

t l ~%  ! I I

-~

=i 1=-t~:-~JJ::ES

E

~ 1.5%

-:s:::;

Vl 1.0% -+-',--H--+-\-i 0.5% +-+-: I ._....._,__; I :-H-:-H....._,_:

0.0%

0 10 20 30 40 50 GO 70 80 90 100 Core Burn up(%)

Page 9 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 3 CONTROL BANK INSERTION LIMITS 240 I I I 225 121% L / 168.50% I

/ v c

210

/

'i Bank B Insertion i /

s:ro 195 I"

/ / 18I}

~

"0 180 / /

..c

~ 165 I 1761 / /

/

(/)

a. 150 v 1 Bank C Insertion 1

/"'

/

Q)

....... 135 / /

v

---c (f) 120 / /

e 0

105 / /

(/)

0 0... 90 v /

""I Bank D Insertion ~ -

~

c 75

/ //

ro / v ro 60 /

/

0

....... 45 ~~l /

c 0 30 /

0 15 1 28.50% I/

v I I X 0

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)

NOTE: The Figure is applicable for any fully withdrawn position of?_ 225 steps (Limits are always considered met when withdrawn position is?_ 225 steps).

Page 10 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))

1.2 1.1 1(0.0, 1.0)1 1(6.0, 1.0)1 11 (12.0, 1.0}

1 0.9 0.8 0.7 N'

'-' 0.6

~

0.5 0.4 0.3 0.2 0.1 0

0 1 2 3 4 s 6 7 8 9 10 11 12 CORE HEIGHT (FI)

Page 11 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

WZ)

Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0986 1.0999 1.1089 1.1218 1.8 1.0986 1.0998 1.1079 1.1190 2.0 1.0982 1.0994 1.1064 1.1156 2.2 1.0975 1.0986 1.1045 1.1117 2.4 1.0966 1.0976 1.1023 1.1072 2.6 1.0955 1.0963 1.0997 1.1023 2.8 1.0941 1.0947 1.0967 1.0971 3.0 1.0925 1.0929 1.0933 1.0917 3.2 1.0906 1.0908 1.0901 1.0876 3.4 1.0889 1.0888 1.0876 1.0850 3.6 1.0883 1.0880 1.0861 1.0829 3.8 1.0881 1.0875 1.0847 1.0830 4.0 1.0879 1.0868 1.0834 1.0835 4.2 1.0874 1.0859 1.0826 1.0837 4.4 1.0867 1.0849 1.0823 1.0838 4.6 1.0858 1.0837 1.0817 1.0837 4.8 1.0846 1.0823 1.0810 1.0834 5.0 1.0833 1.0808 1.0801 1.0828 5.2 1.0817 1.0792 1.0789 1.0820 5.4 1.0798 1.0773 1.0775 1.0808 5.6 1.0779 1.0751 1.0758 1.0794 5.8 1.0757 1.0727 1.0741 1.0775 6.0 1.0731 1.0700 1.0723 1.0753 Page 12 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5 (con't)

Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

WZ)

Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0702 1.0670 1.0708 1.0723 6.4 1.0669 1.0641 1.0699 1.0696 6.6 1.0641 1.0622 1.0686 1.0708 6.8 1.0619 1.0613 1.0659 1.0738 7.0 1.0605 1.0604 1.0672 1.0772 7.2 1.0590 1.0606 1.0723 1.0801 7.4 1.0584 1.0636 1.0764 1.0827 7.6 1.0633 1.0689 1.0803 1.0849 7.8 1.0692 1.0742 1.0840 1.0868 8.0 1.0745 1.0791 1.0872 1.0883 8.2 1.0799 1.0840 1.0902 1.0894 8.4 1.0851 1.0885 1.0928 1.0903 8.6 1.0900 1.0927 1.0950 1.0912 8.8 1.0946 1.0966 1.0968 1.0921 9.0 1.0989 1.1002 1.0983 1.0928 9.2 1.1029 1.1034 1.0994 1.0933 9.4 1.1065 1.1061 1.1001 1.0936 9.6 1.1097 1.1090 1.1010 1.0941 9.8 1.1132 1.1119 1.1015 1.0945 10.0 1.1167 1.1144 1.1018 1.0948 10.2 1.1197 1.1165 1.1033 1.0948 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank:::::; 205 steps)

(Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding iJOWer ratio)

Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0986 1.1882 1.8 1.0986 1.1844 2.0 1.0982 1.1793 2.2 1.0975 1.1733 2.4 1.0966 1.1672 2.6 1.0955 1.1611 2.8 1.0941 1.1547 3.0 1.0925 1.1481 3.2 1.0906 1.1412 3.4 1.0889 1.1346 3.6 1.0883 1.1292 3.8 1.0881 1.1241 4.0 1.0879 1.1190 4.2 1.0874 1.1136 4.4 1.0867 1.1086 4.6 1.0858 1.1046 4.8 1.0846 1.1008 5.0 1.0833 1.0968 5.2 1.0817 1.0919 5.4 1.0798 1.0858 5.6 1.0779 1.0789 5.8 1.0757 1.0718 6.0 1.0731 1.0647 Page 14 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE SA (can't)

BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank ~ 205 steps)

(Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding ower ratio)

Hot Full Power 75% Power 6.2 1.0702 1.0576 6.4 1.0669 1.0500 6.6 1.0641 1.0427 6.8 1.0619 1.0359 7.0 1.0605 1.0299 7.2 1.0590 1.0237 7.4 1.0584 1.0185 7.6 1.0633 1.0188 7.8 1.0692 1.0200 8.0 1.0745 1.0209 8.2 1.0799 1.0219 8.4 1.0851 1.0228 8.6 1.0900 1.0234 8.8 1.0946 1.0236 9.0 1.0989 1.0240 9.2 1.1029 1.0240 9.4 1.1065 1.0240 9.6 1.1097 1.0241 9.8 1.1132 1.0251 10.0 1.1167 1.0266 10.2 1.1197 1.0282 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE 1oo*~------~---------,---rr-~--~~~~~~~~~

Po\ver Tech Spe-c Level Envelc*ce

~*~ %r ,

.*j 1.0 .'!"'>.,.

"11 .i.i'

  • 1B.G l6.&

7{} -2'1.=0 2"1 .fi 6-G -2fi.:Q. 2.8*.0 90 -31.D 31 .u'"'*

I I

85 LINACCE::PTABLE .I' OPERATION 1

/ ACCEPTABLE

/ OF'ERATI0~*4 f

/

70 I

65 60 I I

I l

55 f I

l

/

50.

-*40 -30 -20 0 10 20 30 40 Axial Flux Difference NOTES:

1) This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.
2) The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
3) The AFD target band is +/-5% for THERMAL POWER ;:::15% RTP.

Page 16 of 18

POINT BEACH NUCLEAR PLANT TRM2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"'

System," Revision 0, Mar 1997.

Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System,"

Revision 0, May 2000.

2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.3 Moderator Temperature Coefficient WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.6 Nuclear Heat Flux Hot Channel WCAP-8403 (non-proprietary), "Power Factor (F 0 (Z)) Distribution Control and Load Following Procedures," September 1974.

WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V + fuel).

WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.

WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.

WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.

Page 17 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 COLR Parameter NRC Approved Methodology Section 2.7 Nuclear Enthalpy Rise Hot Channel WCAP-9272-P-A, "Westinghouse Reload Factor (FN L>H) Safety Evaluation Methodology," July 1985.

WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis,"

August 2006.

2.8 Axial Flux Difference (AFD) WCAP-8403 (non-proprietary), "Power Distribution Control and Load Following Procedures," September 1974.

NS-TMA-2198, Westinghouse to NRC Letter

Attachment:

"Operation and Safety Analysis Aspects of an Improved Load Follow Package,"

January 31, 1980.

NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.

2.9 Overtemperature L1T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1T Trip Functions,"

September 1986.

2.10 Overpower L1 T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1T and Thermal Overtemperature L1T Trip Functions,"

September 1986.

2.11 RCS Pressure, Temperature, and WCAP-11397 -P-A, "Revised Thermal Design Flow Departure from Nucleate Procedure," April 1989, for those events Boiling (DNB) Limits analyzed using RTDP.

WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate 1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)," February 2009.

WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP.

2.12 Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

Page 18 of 18

November 4, 2015 NRC 2015-0067 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Units 1 and 2 Docket No. 50-266 and 50-301 Renewed License No. DPR-24 and DPR-27 Core Operating Limits Report (COLR) Unit 2 Cycle 35 (U2C35) and Correction to Unit 1 Cycle 36 (U1 C36)

In accordance with the requirements of Point Beach Nuclear Plant (PBNP)

Technical Specification 5.6.4, enclosed is TRM 2.1, COLR, Unit 2, Cycle 35 and a correction to TRM 2.1, COLR Unit 1 Cycle 36 (U1C36). to this letter contains the PBNP U2C35 COLR that was issued on October 15, 2015. Enclosure 2 to this letter contains a revised U 1C36 COLR to correct Figure 2. It was identified that the numeric values in Figure 2 did not display properly.

This letter contains no new regulatory commitments and no revisions to existing commitments.

Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosures cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE1 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 (U1C35) 18 pages follow

TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 REVISION 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.

A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:

COLR PBNP Description Section TS 2.1 2.1.1 Reactor Core Safety Limits 2.2 3.1.1 Shutdown Margin 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.1.8 Physics Test Exceptions 2.3 3.1.3 Moderator Temperature Coefficient 2.4 3.1.5 Shutdown Bank Insertion Limit 2.5 3.1.6 Control Bank Insertion Limits 2.6 3.2.1 Nuclear Heat Flux Hot Channel Factor (F0 (Z))

2.7 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN11H) 2.8 3.2.3 Axial Flux Difference (AFD) 2.9 3.3.1 Overtemperature L1T Setpoint 2.10 3.3.1 Overpower L1T Setpoint 2.11 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 3.9.1 Refueling Boron Concentration Figure 1 2.1.1 Reactor Core Safety Limits Curve Figure 2 3.1.1 Required Shutdown Margin Figure 3 3.1.6 Control Bank Insertion Limits Figure 4 3.2.1 Hot Channel Factor Normalized Operating Envelope (K(Z)) for 422V+ Fuel Figure 5 3.2.1 Summary of W(Z) as a Function of Core Height Figure 5A 3.2.1 BOG Part-Power Summary of W(Z) as a Function of Core Height Figure 6 3.2.3 Flux Difference Operating Envelope Table 1 5.6.4 NRC Approved Methodologies for COLR Parameters Page 2 of 18

POl NT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.

2.1 Reactor Core Safety Limits (TS 2.1.1)

The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.

Applicability: MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4. 3.1.5. 3.1.6. and 3.1.8) 2.2.1 SDM shall be ;:::2.0% .b.klk (see Figure 2).

Applicability: MODES 1, 2, and 3 2.2.2 SDM shall be ;::::1% Aklk.

Applicability: MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits.

2.3.2 The maximum upper MTC limits shall be:

~5 pcmrF for power levels ~70% RTP

~0 pcmrF for power levels > 70% RTP Applicability: MODE 1 and MODE 2 with keff ~1.0.

2.4 Shutdown Bank Insertion Limit (TS 3.1.5)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

2.4.1 Each shutdown bank shall be fully withdrawn.

2.4.2 Fully withdrawn is defined as ;:::225 steps.

Applicability: MODES 1 and 2 Page 3 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.5 Control Bank Insertion Limits (TS 3.1.6)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.

Applicability: MODE 1 and MODE 2 with keff <::1.0 2.6 Nuclear Heat Flux Hot Channel Factor (F0 (Z)) (TS 3.2.1)

The Heat Flux Hot Channel Factor shall be within the following limits:

Fa (Z)::; CFQ

  • K(Z) I P for P > 0.5 Fa (Z) ::; CFQ
  • K(Z) I 0.5 for P::; 0.5 Where Pis the fraction of Rated Power at which the core is operating.

Fa (Z) is both:

  • Steady State Fac(Z) =Fa(Z)
  • 1.08
  • W(Z) I P for P > 0.5 Faw(Z) =Fac(Z)
  • W(Z) I 0.5 for P ::; 0.5 CFa = 2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and 5A The following FQ penalty factors are applicable to Cycle 35.

Cycle Burnup Fvv0 (Z) Penalty (MWD/MTU) Factors BOL to 1179 1.026 1179 to EOL 1.02 Applicability: MODE 1 Page 4 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35

2. 7 Nuclear Enthalpy Rise Hot Channel Factor (~!lli) (TS 3.2.2)

The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:

2.7.1 FNAH<1.68X[1 +0.3(1-P)]

where: Pis the fraction of Rated Power at which the core is operating.

Applicability: MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3)

The AFD target band is +/-5%.

The AFD Acceptability Operation Limits are provided in Figure 6.

Applicability: MODE 1 with THERMAL POWER >15% RTP 2.9 OvertemperatureilT Setpoint (TS 3.3.1, Table 3.3.1-1 note 1)

Overtemperature L1T setpoint parameter values (for 1800 MWt core power):

L1To = indicated L1T at RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F p = pressurizer pressure, psig P'  ::::: 2235 psig K1  ::::; 1.175 (NTSP) 1 K1  ::::; 1.188 (AV) 2 Kz  ::::: 0.016 K3  ::::: 0.000811 1:1 = 40 sec 1:z = 8 sec 1:3 = 4 sec 1:4 = 2 sec f(ill) is a function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where q and qb are the percent power in the top and bottom halves of the core respectively, and q + qb is total core power in percent of RTP, such that:

1 Nominal Setpoint Value 2

Allowable Value Page 5 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.9.1 For q1 - qb within -12, +6 percent, f(ill) =0.

2.9.2 For each percent that the magnitude of%- qb exceeds +6 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.

2.9.3 For each percent that the magnitude of q1 - qb exceeds -12 percent, the ilT trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.

Applicability: MODES 1 and 2 2.10 Overpower L1T Setpoint (TS 3.3.1, Table 3.3.1-1 note 2)

Overpower L1T setpoint parameter values (for 1800 MWt core power):

ilTo = indicated ilT at RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F

~  ::::; 1.098 (NTSP) 1

~  ::::; 1.111 (AV) 2 Ks 2': 0.0 for increasing T Ks = 0.0 for decreasing T K6 2': 0.00123 forT~ T' K6 = 0.0 forT< T'

'ts 2': 0 sec

't3 = 4 sec

't4 = 2 sec Applicability: MODES 1 and 2 1

Nominal Setpoint Value 2

Allowable Value Page 6 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 2.11 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling CDNB) Limits (TS 3.4.1) 2.11.1 Tavg shall be ::;;57rF.

2.11.2 Pressurizer pressure shall be maintained :2:2205 psig during operation.

NOTE: Pressurizer pressure limit does not apply during:

1) THERMAL POWER ramp >5% RTP per minute; or
2) THERMAL POWER step >10% RTP.

2.11.3 Reactor Coolant System raw measured Total Flow Rate shall be maintained

2:186,000 gpm.

Applicability: MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1)

Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2300 ppm.

Applicability: MODE 6 Page 7 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680r-----~------~----~-------,------~-----,------,

Unacceptable Operation 540+------+------4-----~------~------+------+----~

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 Core Power (fraction of 1800 MWt)

Page 8 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3~?~b

>.o% I I I I I I I I I I I 2.5%
~

<II 2.0'16

~

~

E
1.5%

0

~

~

1.0%

OSi'~ I I ., I I I I I I I I I 0.0%

Q 10 20 30 40 50 60 70 80 90 10.0 Cm e Bumup (%)

Page 9 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 3 CONTROL BANK INSERTION LIMITS 240 I 225 121% I / 168.50% I

/ v

........... 210 *1 Bank B Insertion / /

c

5: /

v /

co 195 v 18}]-

"0 L-180 / / /

..c

...... I 176l / /

v

~ 165

/ 1 Bank C Insertion 1

//

en 150 0..

(l)

...... /

v /

CJ) 135 v c 120 / /

0

+=i / /

  • en 105 /

0 0.. 90 / "I Bank D Insertion ~ -

.::£ / /

/

c 75 v co co 60 /

/v /

0 /v L-45 ~~

c 0

30 /

0 15 I 28.50% V

/

0 I .A' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)

NOTE: The Figure is applicable for any fully withdrawn position of:?: 225 steps (Limits are always considered met when withdrawn position is;::: 225 steps).

Page 10 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))

1.2 j<o.ot l.o)J I (6.0, l.O)j 11 (12.0, 1.0) 1 0.9 0.8 I 0.7 0.5 0.4 0.3 0.2 0.1 0 I 0 l 2 3 4 5 6 7 8 9 10 11 12 CORE HEIGHT (Fl)

Page 11 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 I CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

W(Z)

Height

{feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0972 1.0983 1.1075 1.1222 1.8 1.0973 1.0983 1.1066 1.1195 2.0 1.0970 1.0980 1.1053 1.1162 2.2 1.0965 1.0973 1.1036 1.1124 2.4 1.0958 1.0964 1.1015 1.1080 2.6 1.0949 1.0953 1.0990 1.1032 2.8 1.0937 1.0939 1.0963 1.0980 3.0 1.0923 1.0921 1.0931 1.0921 3.2 1.0906 1.0906 1.0900 1.0877 3.4 1.0892 1.0895 1.0873 1.0852 3.6 1.0886 1.0883 1.0857 1.0826 3.8 1.0884 1.0869 1.0844 1.0822 4.0 1.0882 1.0858 1.0837 1.0826 4.2 1.0879 1.0851 1.0834 1.0834 4.4 1.0874 1.0840 1.0828 1.0842 4.6 1.0867 1.0828 1.0821 1.0848 4.8 1.0857 1.0814 1.0812 1.0852 5.0 1.0844 1.0798 1.0803 1.0853 5.2 1.0829 1.0781 1.0794 1.0851 5.4 1.0811 1.0763 1.0785 1.0846 5.6 1.0790 1.0743 1.0773 1.0837 5.8 1.0766 1.0721 1.0758 1.0824 6.0 1.0739 1.0696 1.0739 1.0805 Page 12 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 5 (con't)

Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

W(Z)

Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0709 1.0668 1.0718 1.0784 6.4 1.0679 1.0642 1.0700 1.0755 6.6 1.0650 1.0621 1.0685 1.0717 6.8 1.0622 1.0608 1.0659 1.0736 7.0 1.0600 1.0597 1.0661 1.0777 7.2 1.0578 1.0596 1.0702 1.0808 7.4 1.0570 1.0621 1.0747 1.0837 7.6 1.0620 1.0673 1.0789 1.0861 7.8 1.0678 1.0725 1.0829 1.0882 8.0 1.0730 1.0776 1.0865 1.0900 8.2 1.0784 1.0828 1.0897 1.0914 8.4 1.0838 1.0877 1.0926 1.0925 8.6 1.0892 1.0924 1.0952 1.0937 8.8 1.0943 1.0967 1.0973 1.0949 9.0 1.0991 1.1007 1.0991 1.0959 9.2 1.1035 1.1043 1.1004 1.0965 9.4 1.1075 1.1075 1.1014 1.0969 9.6 1.1117 1.1109 1.1023 1.0968 9.8 1.1158 1.1141 1.1034 1.0965 10.0 1.1196 1.1169 1.1044 1.0958 10.2 1.1230 1.1193 1.1052 1.0946 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding !)ower ratio)

Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0972 1.1828 1.8 1.0973 1.1790 2.0 1.0970 1.1745 2.2 1.0965 1.1694 2.4 1.0958 1.1639 2.6 1.0949 1.1583 2.8 1.0937 1.1525 3.0 1.0923 1.1467 3.2 1.0906 1.1406 3.4 1.0892 1.1348 3.6 1.0886 1.1296 3.8 1.0884 1.1248 4.0 1.0882 1.1214 4.2 1.0879 1.1178 4.4 1.0874 1.1136 4.6 1.0867 1.1087 4.8 1.0857 1.1035 5.0 1.0844 1.0982 5.2 1.0829 1.0926 5.4 1.0811 1.0866 5.6 1.0790 1.0802 5.8 1.0766 1.0734 6.0 1.0739 1.0662 Page 14 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE SA (con't)

BOC Part-Power Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding flOWer ratio)

Hot Full Power 75% Power 6.2 1.0709 1.0589 6.4 1.0679 1.0515 6.6 1.0650 1.0444 6.8 1.0622 1.0373 7.0 1.0600 1.0309 7.2 1.0578 1.0245 7.4 1.0570 1.0198 7.6 1.0620 1.0204 7.8 1.0678 1.0219 8.0 1.0730 1.0227 8.2 1.0784 1.0237 8.4 1.0838 1.0246 8.6 1.0892 1.0257 8.8 1.0943 1.0266 9.0 1.0991 1.0274 9.2 1.1035 1.0282 9.4 1.1075 1.0290 9.6 1.1117 1.0303 9.8 1.1158 1.0318 10.0 1.1196 1.0335 10.2 1.1230 1.0357 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE PCVA;;f T~<:h Lew~! Enve!cpe

~\: ~~

lLO 11.0 10~-D 11:'1-C 2L:J 21.0

. 25J1 2'~"

C~U 3LG 3LO tiNA C:C;EPTAB LE UNACCEPfAHLE OPEF!ATIDN OPERATJON i\CCEPTA6LE OPERATION 40 30 *20 0 0 10 30 40 Axial Fhxx Difference NOTE:

1. This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results.

Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.

2. The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
3. The AFD target band is +/-5% for THERMAL POWER~ 15% RTP.

Page 16 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"' System," Revision 0, Mar 1997.

Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System," Revision 0, May 2000.

WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Fuel Assembly Reference Core Report," April 1995.

WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO'," July 2006.

2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.3 Moderator Temperature WCAP-9272-P-A, "Westinghouse Reload Safety Coefficient Evaluation Methodology," July 1985.

2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.6 Nuclear Heat Flux Hot WCAP-8403 (non-proprietary), "Power Distribution Channel Factor (F0 (Z)) Control and Load Following Procedures,"

Westinghouse Electric Corporation, September 1974.

WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V +fuel).

WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.

WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.

WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.

Page 17 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U2 TECHNICAL REQUIREMENTS MANUAL Revision 18 October 15, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 2 CYCLE 35 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section 2.7 Nuclear Enthalpy Rise Hot WCAP-9272-P-A, "Westinghouse Reload Safety Channel Factor (FNt.H) Evaluation Methodology," July 1985.

WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis," August 2006.

2.8 Axial Flux Difference (AFD) WCAP-8403 (nonproprietary), "Power Distribution Control and Load Following Procedures,"

Westinghouse Electric Corporation, September 1974.

NS-TMA-2198, Westinghouse to NRC Letter

Attachment:

"Operation and Safety Analysis Aspects of an Improved Load Follow Package," January 31, 1980.

NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.

2.9 Overtemperature 11T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.10 Overpower 11T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions," September 1986 2.11 RCS Pressure, Temperature, WCAP-11397 -P-A, "Revised Thermal Design and Flow Departure from Procedure," April 1989, for those events analyzed Nucleate Boiling (DNB) Limits using RTDP WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate (1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)", February 2009.

WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP 2.12 Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 Page 18 of 18

ENCLOSURE 2 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 (U1C36)

(Revision 17) 18 pages follow

TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 REVISION 17

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.

A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:

COLR PBNP Description Section TS 2.1 2.1.1 Reactor Core Safety Limits 2.2 3.1.1 Shutdown Margin 3.1.4 Rod Group Alignment Limits 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.1.8 Physics Test Exceptions 2.3 3.1.3 Moderator Temperature Coefficient 2.4 3.1.5 Shutdown Bank Insertion Limit 2.5 3.1.6 Control Bank Insertion Limits 2.6 3.2.1 Nuclear Heat Flux Hot Channel Factor (F 0 (Z))

2.7 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN t-H) 2.8 3.2.3 Axial Flux Difference (AFD) 2.9 3.3.1 Overtemperature ~T Setpoint 2.10 3.3.1 Overpower ~T Setpoint 2.11 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 3.9.1 Refueling Boron Concentration Figure 1 2.1.1 Reactor Core Safety Limits Curve Figure 2 3.1.1 Required Shutdown Margin Figure 3 3.1.6 Control Bank Insertion Limits Figure 4 3.2.1 Hot Channel Factor Normalized Operating Envelope (K(Z))

Figure 5 3.2.1 Summary of W(Z) as a Function of Core Height Figure SA 3.2.1 SOC Part-Power Summary of W(Z) as a Function of Core Height Figure 6 3.2.3 Flux Difference Operating Envelope Table 1 5.6.4 NRC Approved Methodologies for COLR Parameters Page 2 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.

2.1 Reactor Core Safety Limits (TS 2.1.1)

The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.

Applicability: MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4, 3.1.5, 3.1.6, and 3.1.8) 2.2.1 SDM shall be 2':2.0% t1k/k (see Figure 2).

Applicability: MODES 1, 2, and 3 2.2.2 SDM shall be 2':1% t1klk.

Applicability: MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits.

2.3.2 The maximum upper MTC limits shall be:

~5 pcm/°F for power levels ~70% RTP

~0 pcm/°F for power levels >70% RTP Applicability: MODE 1 and MODE 2 with keff 2':1.0.

2.4 Shutdown Bank Insertion Limit (TS 3.1.5)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

2.4.1 Each shutdown bank shall be fully withdrawn.

2.4.2 Fully withdrawn is defined as 2': 225 steps.

Applicability: MODES 1 and 2 Page 3 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.5 Control Bank Insertion Limits (TS 3.1.6)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.

Applicability: MODE 1 and MODE 2 with kett 21.0 2.6 Nuclear Heat Flux Hot Channel Factor (Fo(Z)) (TS 3.2.1)

The Heat Flux Hot Channel Factor shall be within the following limits:

Fa(Z) ~ CFa

  • K(Z) I P for P > 0.5 Fa(Z) ~ CFa
  • K(Z) I 0.5 for P ~ 0.5 Where Pis the fraction of Rated Power at which the core is operating.

Fa(Z) is both:

  • Steady State Fac(Z) = Fa(Z)
  • 1.08
  • W(Z) I P for P>0.5 Fa w(Z) = Fa c(Z)
  • W(Z) I 0.5 for P_::: 0.5 CFa =2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and SA.

The following Fa penalty factors are applicable to Cycle 36.

Cycle Burn up FwQ{Z) Penalty (MWD/MTU) Factors BOLto 1325 1.027 1326 to EOL 1.02 Applicability: MODE 1 Page 4 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36

2. 7 Nuclear Enthalpy Rise Hot Channel Factor (FN.6!::!) (TS 3.2.2)

The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:

2.7.1 FNAH:::::1.68x[1 +0.3(1-P)]

where: Pis the fraction of Rated Power at which the core is operating.

Applicability: MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2.3)

The AFD target band is +/-5%.

The AFD Acceptability Operation Limits are provided in Figure 6.

Applicability: MODE 1 with THERMAL POWER :2:15% RTP Page 5 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.9 Overtemperature ~T Setpoint (TS 3.3.1. Table 3.3.1-1 note 1)

Overtemperature ~T setpoint parameter values (for 1800 MWt core power):

~To = indicated ~Tat RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F p = pressurizer pressure, psig P' ~ 2235 psig K1  ::::; 1.175 (NTSP) 1 K1  ::::; 1.188 (AVf Kz ~ 0.016 K3 ~ 0.000811

't1 = 40 sec

'tz = 8 sec

't3 = 4 sec

't4 = 2 sec f(~l) is an even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where qt and qb are the percent power in the top and bottom halves of the core respectively, and qt + qb is total core power in percent of RTP, such that:

2.9.1 For qt- qb within -12, +6 percent, f(~l) =0.

2.9.2 For each percent that the magnitude of%- qb exceeds +6 percent, the~T trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.

2.9.3 For each percent that the magnitude of qt- qb exceeds -12 percent, the ~T trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.

Applicability: MODES 1 and 2 1

Nominal Setpoint Value 2

Allowable Value Page 6 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.10 Overpower ilT Setpoint (TS 3.3.1. Table 3.3.1-1 note 2)

Overpower il T setpoint parameter values (for 1800 MWt core power):

ilTo = indicated ilTat RTP, oF T = indicated RCS average temperature, oF T'  ::::; 576.0°F

~  ::::; 1. 098 (NTSP) 1

~  ::::; 1.111 (AVf Ks = 0.0 for increasing T Ks = 0.0 for decreasing T Ke ~ 0.00123 forT~ T' Ke = 0.0 forT< T' Ts = 0 sec TJ = 4 sec

't4 = 2 sec Applicability: MODES 1 and 2 2.11 RCS Pressure. Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits (TS 3.4.1) 2.11.1 Tavg shall be ::::;577°F.

2.11.2 Pressurizer pressure shall be maintained ~2205 psig during operation.

NOTE: Pressurizer pressure limit does not apply during:

1} THERMAL POWER ramp >5% RTP per minute; or 2} THERMAL POWER step >10% RTP.

2.11.3 Reactor Coolant System raw measured Total Flow Rate shall be maintained

~186,000 gpm.

Applicability: MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1)

Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ~2350 ppm.

Applicability: MODE 6 1

Nominal Setpoint Value 2

Allowable Value Page 7 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680~----~------~------~------~----~------~----~

Unacceptable Operation 540+-----~-------+------4-------r------+------~----~

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 Core Power (fraction of 1800 MWt)

Page 8 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 2 REQUIRED SHUTDOWN MARGIN 3.,5% I I I I I I I :w, I I ,___,

3.0% -+-+-'i-H--+-\-:  :-H-H-:-HH 2.5%

~

~

t l ~%  ! I I

-~

=i 1=-t~:-~JJ::ES

E

~ 1.5%

-:s:::;

Vl 1.0% -+-',--H--+-\-i 0.5% +-+-: I ._....._,__; I :-H-:-H....._,_:

0.0%

0 10 20 30 40 50 GO 70 80 90 100 Core Burn up(%)

Page 9 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 3 CONTROL BANK INSERTION LIMITS 240 I I I 225 121% L / 168.50% I

/ v c

210

/

'i Bank B Insertion i /

s:ro 195 I"

/ / 18I}

~

"0 180 / /

..c

~ 165 I 1761 / /

/

(/)

a. 150 v 1 Bank C Insertion 1

/"'

/

Q)

....... 135 / /

v

---c (f) 120 / /

e 0

105 / /

(/)

0 0... 90 v /

""I Bank D Insertion ~ -

~

c 75

/ //

ro / v ro 60 /

/

0

....... 45 ~~l /

c 0 30 /

0 15 1 28.50% I/

v I I X 0

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)

NOTE: The Figure is applicable for any fully withdrawn position of?_ 225 steps (Limits are always considered met when withdrawn position is?_ 225 steps).

Page 10 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))

1.2 1.1 1(0.0, 1.0)1 1(6.0, 1.0)1 11 (12.0, 1.0}

1 0.9 0.8 0.7 N'

'-' 0.6

~

0.5 0.4 0.3 0.2 0.1 0

0 1 2 3 4 s 6 7 8 9 10 11 12 CORE HEIGHT (FI)

Page 11 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

WZ)

Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0986 1.0999 1.1089 1.1218 1.8 1.0986 1.0998 1.1079 1.1190 2.0 1.0982 1.0994 1.1064 1.1156 2.2 1.0975 1.0986 1.1045 1.1117 2.4 1.0966 1.0976 1.1023 1.1072 2.6 1.0955 1.0963 1.0997 1.1023 2.8 1.0941 1.0947 1.0967 1.0971 3.0 1.0925 1.0929 1.0933 1.0917 3.2 1.0906 1.0908 1.0901 1.0876 3.4 1.0889 1.0888 1.0876 1.0850 3.6 1.0883 1.0880 1.0861 1.0829 3.8 1.0881 1.0875 1.0847 1.0830 4.0 1.0879 1.0868 1.0834 1.0835 4.2 1.0874 1.0859 1.0826 1.0837 4.4 1.0867 1.0849 1.0823 1.0838 4.6 1.0858 1.0837 1.0817 1.0837 4.8 1.0846 1.0823 1.0810 1.0834 5.0 1.0833 1.0808 1.0801 1.0828 5.2 1.0817 1.0792 1.0789 1.0820 5.4 1.0798 1.0773 1.0775 1.0808 5.6 1.0779 1.0751 1.0758 1.0794 5.8 1.0757 1.0727 1.0741 1.0775 6.0 1.0731 1.0700 1.0723 1.0753 Page 12 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5 (con't)

Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

WZ)

Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0702 1.0670 1.0708 1.0723 6.4 1.0669 1.0641 1.0699 1.0696 6.6 1.0641 1.0622 1.0686 1.0708 6.8 1.0619 1.0613 1.0659 1.0738 7.0 1.0605 1.0604 1.0672 1.0772 7.2 1.0590 1.0606 1.0723 1.0801 7.4 1.0584 1.0636 1.0764 1.0827 7.6 1.0633 1.0689 1.0803 1.0849 7.8 1.0692 1.0742 1.0840 1.0868 8.0 1.0745 1.0791 1.0872 1.0883 8.2 1.0799 1.0840 1.0902 1.0894 8.4 1.0851 1.0885 1.0928 1.0903 8.6 1.0900 1.0927 1.0950 1.0912 8.8 1.0946 1.0966 1.0968 1.0921 9.0 1.0989 1.1002 1.0983 1.0928 9.2 1.1029 1.1034 1.0994 1.0933 9.4 1.1065 1.1061 1.1001 1.0936 9.6 1.1097 1.1090 1.1010 1.0941 9.8 1.1132 1.1119 1.1015 1.0945 10.0 1.1167 1.1144 1.1018 1.0948 10.2 1.1197 1.1165 1.1033 1.0948 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE SA BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank:::::; 205 steps)

(Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding iJOWer ratio)

Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0986 1.1882 1.8 1.0986 1.1844 2.0 1.0982 1.1793 2.2 1.0975 1.1733 2.4 1.0966 1.1672 2.6 1.0955 1.1611 2.8 1.0941 1.1547 3.0 1.0925 1.1481 3.2 1.0906 1.1412 3.4 1.0889 1.1346 3.6 1.0883 1.1292 3.8 1.0881 1.1241 4.0 1.0879 1.1190 4.2 1.0874 1.1136 4.4 1.0867 1.1086 4.6 1.0858 1.1046 4.8 1.0846 1.1008 5.0 1.0833 1.0968 5.2 1.0817 1.0919 5.4 1.0798 1.0858 5.6 1.0779 1.0789 5.8 1.0757 1.0718 6.0 1.0731 1.0647 Page 14 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE SA (can't)

BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank ~ 205 steps)

(Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding ower ratio)

Hot Full Power 75% Power 6.2 1.0702 1.0576 6.4 1.0669 1.0500 6.6 1.0641 1.0427 6.8 1.0619 1.0359 7.0 1.0605 1.0299 7.2 1.0590 1.0237 7.4 1.0584 1.0185 7.6 1.0633 1.0188 7.8 1.0692 1.0200 8.0 1.0745 1.0209 8.2 1.0799 1.0219 8.4 1.0851 1.0228 8.6 1.0900 1.0234 8.8 1.0946 1.0236 9.0 1.0989 1.0240 9.2 1.1029 1.0240 9.4 1.1065 1.0240 9.6 1.1097 1.0241 9.8 1.1132 1.0251 10.0 1.1167 1.0266 10.2 1.1197 1.0282 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000 11.8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE 1oo*~------~---------,---rr-~--~~~~~~~~~

Po\ver Tech Spe-c Level Envelc*ce

~*~ %r ,

.*j 1.0 .'!"'>.,.

"11 .i.i'

  • 1B.G l6.&

7{} -2'1.=0 2"1 .fi 6-G -2fi.:Q. 2.8*.0 90 -31.D 31 .u'"'*

I I

85 LINACCE::PTABLE .I' OPERATION 1

/ ACCEPTABLE

/ OF'ERATI0~*4 f

/

70 I

65 60 I I

I l

55 f I

l

/

50.

-*40 -30 -20 0 10 20 30 40 Axial Flux Difference NOTES:

1) This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results. Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.
2) The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
3) The AFD target band is +/-5% for THERMAL POWER ;:::15% RTP.

Page 16 of 18

POINT BEACH NUCLEAR PLANT TRM2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc., Engineering Report-BOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM"'

System," Revision 0, Mar 1997.

Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM"' System,"

Revision 0, May 2000.

2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.3 Moderator Temperature Coefficient WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.6 Nuclear Heat Flux Hot Channel WCAP-8403 (non-proprietary), "Power Factor (F 0 (Z)) Distribution Control and Load Following Procedures," September 1974.

WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection," Revision 1, October 1999 (cores containing 422V + fuel).

WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005.

WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.

WCAP-1 0054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, Revision 1, July 1997.

Page 17 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 17 October 26, 2015 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 COLR Parameter NRC Approved Methodology Section 2.7 Nuclear Enthalpy Rise Hot Channel WCAP-9272-P-A, "Westinghouse Reload Factor (FN L>H) Safety Evaluation Methodology," July 1985.

WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis,"

August 2006.

2.8 Axial Flux Difference (AFD) WCAP-8403 (non-proprietary), "Power Distribution Control and Load Following Procedures," September 1974.

NS-TMA-2198, Westinghouse to NRC Letter

Attachment:

"Operation and Safety Analysis Aspects of an Improved Load Follow Package,"

January 31, 1980.

NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.

2.9 Overtemperature L1T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1 T and Thermal Overtemperature L1T Trip Functions,"

September 1986.

2.10 Overpower L1 T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower L1T and Thermal Overtemperature L1T Trip Functions,"

September 1986.

2.11 RCS Pressure, Temperature, and WCAP-11397 -P-A, "Revised Thermal Design Flow Departure from Nucleate Procedure," April 1989, for those events Boiling (DNB) Limits analyzed using RTDP.

WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate 1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)," February 2009.

WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for those events not utilizing RTDP.

2.12 Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

Page 18 of 18