NRC 2014-0070, Core Operating Limits Report Cycle 36 (U1C36)

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report Cycle 36 (U1C36)
ML14303A682
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/30/2014
From: Millen M
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2014-0070, TS 5.6.4, U1C36
Download: ML14303A682 (20)


Text

NEXTera.

EN ERGY~

~

October 30, 2014 NRC 2014-0070 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant Unit 1 Docket No. 50-266 Renewed License No. DPR-24 Core Operating Limits Report (COLR)

Unit 1 Cycle 36 (U1 C36)

In accordance with the requirements of Point Beach Nuclear Plant (PBNP)

Technical Specification 5.6.4, enclosed is revised TRM 2.1, COLR, Unit 1, Cycle 36.

The enclosure to this letter contains the revised PBNP U1 C36 COLR that was issued on October 15, 2014.

This letter contains no new regulatory commitments and no revisions to existing commitments.

Very truly yours ,

NextEra Energy Point Beach, LLC Michael Millen Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach , LLC, 6610 Nuclear Road , Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 (U1 C36) 18 pages follow

TRM 2.1 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 REVISION 16

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Point Beach Nuclear Plant has been prepared in accordance with the requirements of Technical Specification (TS) 5.6.4.

A cross-reference between the COLR sections and the PBNP Technical Specifications affected by this report is given below:

COLR PBNP Description Section TS 2.1 2.1 .1 Reactor Core Safety Limits 2.2 3.1.1 Shutdown Margin 3.1.4 Rod Group Alignment Limits 3.1 .5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.1.8 Physics Test Exceptions 2.3 3.1.3 Moderator Temperature Coefficient 2.4 3.1.5 Shutdown Bank Insertion Limit 2.5 3.1.6 Control Bank Insertion Limits 2.6 3.2.1 Nuclear Heat Flux Hot Channel Factor (F 0 (Z))

2.7 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN t.H) 2.8 3.2 .3 Axial Flux Difference (AFD) 2.9 3.3.1 Overtemperature L'l T Setpoint 2.10 3.3.1 Overpower L'l T Setpoint 2.11 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2.12 3.9.1 Refueling Boron Concentration Figure 1 2.1.1 Reactor Core Safety Limits Curve Figure 2 3.1.1 Required Shutdown Margin Figure 3 3.1.6 Control Bank Insertion Limits Figure 4 3.2.1 Hot Channel Factor Normalized Operating Envelope (K(Z))

Figure 5 3.2.1 Summary of W(Z) as a Function of Core Height Figure 5A 3.2.1 BOC Part-Power Summary of W(Z) as a Function of Core Height Figure 6 3.2 .3 Flux Difference Operating Envelope Table 1 5.6.4 NRC Approved Methodologies for COLR Parameters Page 2 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.4.

2.1 Reactor Core Safety Limits (TS 2.1.1)

The combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 1.

Applicability: MODES 1 and 2 2.2 Shutdown Margin (TS 3.1.1 and referenced in TS 3.1.4, 3.1.5, 3.1 .6, and 3.1.8) 2.2.1 SDM shall be :2:2.0% !1k/k (see Figure 2).

Applicability: MODES 1, 2, and 3 2.2.2 SDM shall be :2:1% L'1klk.

Applicability: MODES 4 and 5 2.3 Moderator Temperature Coefficient (TS 3.1.3) 2.3.1 The upper MTC limits shall be maintained within the limits.

2.3.2 The maximum upper MTC limits shall be:

$;5 pcm/°F for power levels :$;70% RTP
$;0 pcm/°F for power levels >70% RTP Applicability: MODE 1 and MODE 2 with ke11 :2:1.0.

2.4 Shutdown Bank Insertion Limit (TS 3.1.5)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

2.4.1 Each shutdown bank shall be fully withdrawn.

2.4.2 Fully withdrawn is defined as :2: 225 steps.

Applicability: MODES 1 and 2 Page 3 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.5 Control Bank Insertion Limits (TS 3.1 .6)

NOTE: This limit is not applicable while performing SR 3.1.4.2.

The control banks shall be within the insertion, sequence and overlap limits specified in Figure 3.

Applicability: MODE 1 and MODE 2 with kett ~ 1.0 2.6 Nuclear Heat Flux Hot Channel Factor (Fo(Z)) (TS 3.2.1)

The Heat Flux Hot Channel Factor shall be within the following limits:

Fa(Z) s; CFa

  • K(Z) I P for P > 0.5 Fa(Z) s; CFa
  • K(Z) I 0.5 for P s; 0.5 Where P is the fraction of Rated Power at which the core is operating.

Fa(Z) is both :

  • Steady State Fac(Z) = Fa(Z)
  • 1.08
  • W(Z) I P for P>0.5 Faw(Z) = Fa c(Z)
  • W(Z) I 0.5 for P,:: 0.5 CFa = 2.60 K(Z) is the function in Figure 4 W(Z) is the function in Figures 5 and 5A.

The following Fa penalty factors are applicable to Cycle 36.

Cycle Burnup FwQ(Z) Pena lty (MWD/MTU) Factors BOL to 1325 1.027 1326 to EOL 1.02 Applicability: MODE 1 Page 4 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.7 Nuclear Enthalpy Rise Hot Channel Factor (FN 6.!::!) (TS 3.2.2)

The Nuclear Enthalpy Rise Hot Channel Factor shall be within the following limit:

2.7.1 FNnH s 1.68 x [1 + 0.3(1-P)]

where: P is the fraction of Rated Power at which the core is operating.

Applicability: MODE 1 2.8 Axial Flux Difference (AFD) (TS 3.2 .3)

The AFD target band is +/-5% .

The AFD Acceptability Operation Limits are provided in Figure 6.

Applicability: MODE 1 with THERMAL POWER ::o:15% RTP Page 5 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.9 Overtemperature t.T Setpoint (TS 3.3.1, Table 3.3.1-1 note 1)

Overtemperature t. T setpoint parameter values (for 1800 MWt core power):

L'.To = indicated t. T at RTP, oF T = indicated RCS average temperature, oF T' s:: 576.0°F p = pressurizer pressure, psig P'  ;::.: 2235 psig K1 s:: 1.175 (NTSP) 1 2

K1 s:: 1.188 (AV)

K2  ;::.: 0.016 K3  ;::.: 0.000811 1:1 = 40 sec

'1:2 = 8 sec

'1:3 = 4 sec 1:4 = 2 sec f(t-.1) is an even function of the indicated difference between top and bottom detectors of the power-range nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests, where q 1 and qb are the percent power in the top and bottom halves of the core respectively, and q 1 + qb is total core power in percent of RTP, such that:

2.9.1 For q 1 - qb within -12, +6 percent, f(t-.1) = 0.

2. 9.2 For each percent that the magnitude of q 1 - qb exceeds +6 percent, the t. T trip setpoint shall be automatically reduced by an equivalent of 2.00 percent of Rated Power.

2.9.3 For each percent that the magnitude of q 1 - qb exceeds -12 percent, the t.T trip setpoint shall be automatically reduced by an equivalent of 2.69 percent of Rated Power.

Applicability: MODES 1 and 2 1

Nominal Setpoint Value 2

Allowable Value Page 6 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 2.10 Overpower L'iT Setpoint (TS 3.3.1, Table 3.3 .1-1 note 2)

Overpower L'1 T setpoint parameter values (for 1800 MWt core power):

L'iTo = indicated L'1 T at RTP, oF T = indicated RCS average temperature, °F T'  :::; 576.0°F K4  :::; 1.098 (NTSP) 1 K4  :::; 1.111 (AV/

Ks = 0.0 for increasing T Ks = 0.0 for decreasing T Ks  ;::: 0.00123 forT;::: T' Ks = 0.0 forT< T' "Cs = 0 sec "C3 = 4 sec "C4 = 2 sec Applicability: MODES 1 and 2 2.11 RCS Pressure. Temperature. and Flow Departure from Nucleate Boiling (DNB) Limits (TS 3.4.1) 2.11 .1 Tavg shall be :c:;57rF.

2.11.2 Pressurizer pressure shall be maintained ;:::2205 psig during operation .

NOTE: Pressurizer pressure limit does not apply during:

1) THERMAL POWER ramp >5% RTP per minute; or
2) TH ERMAL POWER step >10% RTP.

2.11.3 Reactor Coolant System raw measured Total Flow Rate shall be maintained

186,000 gpm.

Applicability: MODE 1 2.12 Refueling Boron Concentration (TS 3.9.1)

Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained ;:::2350 ppm.

Applicability: MODE 6 1

Nominal Setpoint Value 2

Allowable Value Page 7 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 1 REACTOR CORE SAFETY LIMITS CURVE 680~----~------~----~------~----~~----~----~

Unacceptable Operation 540+------+------4-----~------~------~----~----~

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 Core Power (fraction of 1800 MWt)

Page 8 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 2 REQUIRED SHUTDOWN MARGIN I +/-H+/-

I I I I I 1

!-~~+

L_ I I I II' I

I I I I 11 1-----r:_l1_ I I

\+I I . I :.

JIl L I I I I l I --__[__L I I I I 11'1 =-'Ft=R1-I , I L .

I

-1-:f +~ i ~ +/-H+/--~-:RL ~-1! .-J_!- -!- !-

~-.-

I I ! I ~-~-,-r- I I I

~:I_I...J_!_

1 I '

-r* - ~ -~ . I

-i-~-~~- ~~~-!- -!-~-~-!- ~-L-!- - ;- - -:-

$U$ -1I II I I I

  • I I . I I I I .. I '

'I . . . I I

---, ' I I

I I

  • I

' _I_ ~,' l_j_~_ - :- - 1 I I I j_ I . I I I I

_ :_ l. L I I I I lmm

- :- -*- :- _ (-

I,

+H-~ I . I -~-~- I -~ 1-

+H=:

2 II . : I -

I I ' I

.o%

  • ~-:-:I I ' I I I

.n- . *R -LF--

I '

- - _ I_ _:+ T l ! ~ liT I~-~-~- I

-~ I.

I I

I I

I I

I I I I I I I I . I I J, II ~ fi Ji w I I I .-+-- I

~-

  • I I I I 1 I . I I

--~- * -r I

~-cl ~lIj_l_~_

I

-.--~--~- I I I I I

......;_---.- _j-:- + I!_

-~

I I _ _II_ _ _

~----

~:. E !

-r: i

~-~----

M I I I I . I I ft u I I '

1 I I I . I Ii I I II~

-<n I I I I

~:_:_H ~-:-

I I I I I

~1_1_1_1_ 1-_1 I I

_ 1_ 1_ - :- - -:-

I 1 I II II ....,

-:* 1--- I

=H_ I_ I_ --,- ~-

I

~ Ib+/-+/- 3+/-f ~

  • I I I I

r-1

I I 1i-I I I I I I I

-~-.-~-

  • _L_Li

-~

I I I I I .. . I , -1 I -~-.-~- * -~- *I I I I I I I Mw I I . .

-~-I....J *:- -~-I...J_,_

I I

=8+/-!=SB M $ -r: :

I

~----

-~-

I . I I

-~~ ~ -~-~ 1-C #

~=

I I

. II .+ I I

_ l_ j__J_I_

I I

. I I I ---r-'C ore Bu

-r* --

i1liiJ(%)- . - .- I

=--t+ I I I * '

-~-~--

I I

1 I I I I Page 9 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 3 CONTROL BANK INSERTION LIMITS 240 225 121% I / 168.50% I

/ v

,.-._ 210 'J Bank B Insertion J

/

c /

3: / /

C'Cl 195 v v I L!_]-

"0

..c 180 / L

~

J176 l / /

/

(/)

165 150 v 1Bank C Insertion 1 /v 0..

Q)

+-' /

v L

(/')

c 0

135 120 /

v v

v

/

'(j) 0 a..

105 90 v VI

/

Bank D Insertion J-

.::.::. v /

v I--

aJ c

C'Cl 75 60 1/

v /

v 0

+-' 45 ~;J /

c 0 I/

u 30 15 1 28.50% I/

v A'

0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Power Level (% of Rated Power)

NOTE: The Figure is applicable for any fully withdrawn position of~ 225 steps (Limits are always considered met when withdrawn position is~ 225 steps).

Page 10 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15,2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 4 HOT CHANNEL FACTOR NORMALIZED OPERATING ENVELOPE (K(Z))

1.2 1.1 1(0.0, 1.0)1 1(6.0, 1.0)1 l(12.0, 1.0) 0.9 0.8 0.7 N'

'-' 0.6

~

0.5 0.4 0.3 0.2 0.1 0

0 2 3 4 5 6 7 8 9 10 11 12 CORE HEIGHT (FI)

Page 11 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5 Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded)

W(Z)

Height (feet) 150 3000 8000 16000 lVIWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.0 1.0000 1.0000 1.0000 1.0000 0.2 1.0000 1.0000 1.0000 1.0000 0.4 1.0000 1.0000 1.0000 1.0000 0.6 1.0000 1.0000 1.0000 1.0000 0.8 1.0000 1.0000 1.0000 1.0000 1.0 1.0000 1.0000 1.0000 1.0000 1.2 1.0000 1.0000 1.0000 1.0000 1.4 1.0000 1.0000 1.0000 1.0000 1.6 1.0986 1.0999 1.1089 1.1218 1.8 1.0986 1.0998 1.1079 1.1190 2.0 1.0982 1.0994 1.1064 1.1156 2.2 1.0975 1.0986 1.1045 1.111 7 2.4 1.0966 1.0976 1.1023 1.1072 2.6 1.0955 1.0963 1.0997 1.1023 2.8 1.0941 1.0947 1.0967 1.0971 3.0 1.0925 1.0929 1.0933 1.0917 3.2 1.0906 1.0908 1.0901 1.0876 3.4 1.0889 1.0888 1.0876 1.0850 3.6 1.0883 1.0880 1.0861 1.0829 3.8 1.0881 1.0875 1.0847 1.0830 4.0 1.0879 1.0868 1.0834 1.0835 4.2 1.0874 1.0859 1.0826 1.0837 4.4 1.0867 1.0849 1.0823 1.08 38 4.6 1.0858 1.0837 1.0817 1.0837 4.8 1.0846 1.0823 1.0810 1.0834 5.0 1.0833 1.0808 1.080 I 1.0828 5.2 1.0817 1.0792 1.0789 1.0820 5.4 1.0798 1.0773 1.0775 1.0808 5.6 1.0779 1.0751 1.0758 1.0794 5.8 1.0757 1.0727 1.0741 1.0775 6.0 1.0731 1.0700 1.0723 1.0753 Page12of18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5 (can't)

Summary of W(Z) as a Function of Core Height (Top 15% and Bottom 12% Excluded) w Z)

Height (feet) 150 3000 8000 16000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU 6.2 1.0702 1.0670 1.0708 1.0723 6.4 1.0669 1.0641 1.0699 1.0696 6.6 1.0641 1.0622 1.0686 1.0708 6.8 1.0619 1.0613 1.0659 1.0738 7.0 1.0605 1.0604 1.0672 1.0772 7.2 1.0590 1.0606 1.0723 1.0801 7.4 1.0584 1.0636 1.0764 1.0827 7.6 1.0633 1.0689 1.0803 1.0849 7.8 1.0692 1.0742 1.0840 1.0868 8.0 1.0745 1.0791 1.0872 1.0883 8.2 1.0799 1.0840 1.0902 1.0894 8.4 1.0851 1.0885 1.0928 1.0903 8.6 1.0900 1.0927 1.0950 1.0912 8.8 1.0946 1.0966 1.0968 1.0921 9.0 1.0989 1.1002 1.0983 1.0928 9.2 1.1029 1.1034 1.0994 1.0933 9.4 1.1065 1.1061 1.1001 1.0936 9.6 1.1097 1.1090 1.1010 1.0941 9.8 1.1132 1.1119 1.1015 1.0945 10.0 1.1167 1.1144 1.1018 1.0948 10.2 1.1197 1.1165 1.1033 1.0948 10.4 1.0000 1.0000 1.0000 1.0000 10.6 1.0000 1.0000 1.0000 1.0000 10.8 1.0000 1.0000 1.0000 1.0000 11.0 1.0000 1.0000 1.0000 1.0000 11.2 1.0000 1.0000 1.0000 1.0000 11.4 1.0000 1.0000 1.0000 1.0000 11.6 1.0000 1.0000 1.0000 1.0000 11.8 1.0000 1.0000 1.0000 1.0000 12.0 1.0000 1.0000 1.0000 1.0000 Page 13 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5A BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank :-::; 205 steps)

(Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Correction Factor Height (feet) (excluding lower ratio)

Hot Full Power 75% Power 0.0 1.0000 1.0000 0.2 1.0000 1.0000 0.4 1.0000 1.0000 0.6 1.0000 1.0000 0.8 1.0000 1.0000 1.0 1.0000 1.0000 1.2 1.0000 1.0000 1.4 1.0000 1.0000 1.6 1.0986 1.1882 1.8 1.0986 l.l844 2.0 1.0982 1.1793 2.2 1.0975 1.1733 2.4 1.0966 1.1672 2.6 1.0955 1.1611 2.8 1.0941 1.1547 3.0 1.0925 1.1481 3.2 1.0906 1.1412 3.4 1.0889 1. 1346 3.6 1.0883 1.1292 3.8 1.0881 1.1241 4.0 1.0879 1.1190 4.2 1.0874 1.1136 4.4 1.0867 1.1086 4.6 1.0858 1.1046 4.8 1.0846 1.1008 5.0 1.0833 1.0968 5.2 1.0817 1.0919 5.4 1.0798 1.0858 5.6 1.0779 1.0789 5.8 1.0757 1.0718 6.0 1.0731 1.0647 Page 14 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREM ENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 5A (can't)

BOC Part-Power Summary of W(Z) as a Function of Core Height (D-Bank:::; 205 steps)

(Top 15% and Bottom 12% Excluded)

Part-Power W(Z) with Corr ection Factor Height (feet) (excluding power ratio)

Hot Full Power 75% Powe r 6.2 1.0702 1.0576 6.4 1.0669 1.0500 6.6 1.0641 1.0427 6.8 1.06 19 1.0359 7.0 1.0605 1.0299 7.2 1.0590 1.0237 7.4 1.0584 1.0185 7.6 1.0633 1.01 88 7.8 1.0692 1.0200 8.0 1.0745 1.0209 8.2 1.0799 1.0219 8.4 1.0851 1.0228 8.6 1.0900 1.0234 8.8 1.0946 1.0236 9.0 1.0989 1.0240 9.2 1.1029 1.0240 9.4 1.1065 1.0240 9.6 1.1097 1.0241 9.8 1.1132 1.0251 10.0 1.1167 1.0266 10.2 1.1197 1.0282 10.4 1.0000 1.0000 10.6 1.0000 1.0000 10.8 1.0000 1.0000 11.0 1.0000 1.0000 11.2 1.0000 1.0000 11.4 1.0000 1.0000 11.6 1.0000 1.0000

11. 8 1.0000 1.0000 12.0 1.0000 1.0000 Page 15 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 FIGURE 6 FLUX DIFFERENCE OPERATING ENVELOPE 1 00 ~------------------1---rl--i--~~~==~~~====~1 Pcwe r Tech Spec Le*;c l En ve l ~~c GO 11.0 11.0 80 16.0 lc.c I 7C *21.C 21. 0 I ec 25.G 26.C

  • - .. . .. iI . ' ... 3 1. C 3 1.C

-- '-!-.....;;~___,jl.-.;;..;..;.;;.....~.o-.;;..;.,;,;;_,..~

I I

Uf\JA (:C ePTAE: LE U I\ JA C(: EPTABU::.

55 OF-'ERA TICJI\J OF'ERAT IO I\l ACC EPT.A.BLE

..... OPERAT ION Q)

I 3

0 0... 75

""0

~

ro a.:

70

\

50 - - -,- '"1- r ~ --

-40 -30 -20 -10 0 10 20 30 40 Axia l Flux D ifference NOTES:

1) This figure represents the Constant Axial Offset Control (CAOC) band used in safety analyses, it may be administratively tightened depending on in-core flux map results . Refer to Figure 2 of Reactor Operating Data (ROD) 1.2 for the administrative limit.
2) The AFD may deviate outside the target band with THERMAL POWER< 50% RTP.
3) The AFD target band is +/-5% for THERMAL POWER ~15% RTP .

Page 16 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 TABLE 1 NRC APPROVED METHODOLOGIES FOR COLR PARAMETERS COLR Parameter NRC Approved Methodology Section All Reactor Thermal Output Caldon, Inc. , Engineering Report-SOP, "TOPICAL REPORT: Improving Thermal Power Accuracy and Plant Safety While Increasing Operating Power Level Using the LEFM~'

System, " Revision 0, Mar 1997.

Caldon, Inc., Engineering Report-160P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate With the LEFM ~ ' System,"

Revision 0, May 2000.

2.1 Reactor Core Safety Limits WCAP-9272-P-A, "Westinghouse Reload I Safety Evaluation Methodology," July 1985.

2.2 Shutdown Margin WCAP-9272-P-A, "Westinghouse Reload I Safety Evaluation Methodology," July 1985.

2.3 Moderator Temperature Coefficient WCAP-9272-P-A, "Westinghouse Reload I Safety Evaluation Methodology," July 1985.

2.4 Shutdown Bank Insertion Limit WCAP-9272-P-A, "Westinghouse Reload I Safety Evaluation Methodology," July 1985.

2.5 Control Bank Insertion Limits WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985.

2.6 Nuclear Heat Flux Hot Channel WCAP-8403 (non-proprietary) , "Power Factor (F 0 (Z)) Distribution Control and Load Following Procedures," September 1974.

WCAP-14449-P-A, "Application of Best Estimate Large Break LOCA Methodology to Westinghouse PWRs with Upper Plenum Injection ," Revision 1, October 1999 (cores I containing 422V +fuel).

WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM) ," January 2005.

WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP I Code," August 1985.

WCAP-10054-P-A, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code : Safety Injection into the Broken Loop and COSI Condensation Model," Addendum 2, I Revision 1, July 1997.

Page 17 of 18

POINT BEACH NUCLEAR PLANT TRM 2.1 U1 TECHNICAL REQUIREMENTS MANUAL Revision 16 October 15, 2014 CORE OPERATING LIMITS REPORT (COLR)

UNIT 1 CYCLE 36 COLR Parameter NRC Approved Methodology Section 2.7 Nuclear Enthalpy Rise Hot Channel WCAP-9272-P-A, "Westinghouse Reload I Factor (FN llH) Safety Evaluation Methodology," July 1985.

WCAP-16259-P-A, "Westinghouse Methodology for Applications of 3-D Transient Neutronics to Non-LOCA Accident Analysis,"

August 2006.

2.8 Axial Flux Difference (AFD) WCAP-8403 (non-proprietary), "Power Distribution Control and Load Following I Procedures," September 1974.

NS-TMA-2198, Westinghouse to NRC Letter

Attachment:

"Operation and Safety Analysis Aspects of an Improved Load Follow Package,"

January 31, 1980.

NS-CE-687, Westinghouse to NRC Letter, "Power Distribution Control Analysis," July 16, 1975.

2.9 Overtemperature 11T Setpoint WCAP-8745-P-A, "Design Bases for the Thermal Overpower 11 T and Thermal Overtemperature 11T Trip Functions,"

I September 1986.

2.10 Overpower 11T Setpoint WCAP-87 45-P-A, "Design Bases for the Thermal Overpower 11T and Thermal Overtemperature 11T Trip Functions,"

I September 1986.

2.11 RCS Pressure, Temperature, and WCAP-11397-P-A, "Revised Thermal Design Flow Departure from Nucleate Procedure," April1989, for those events I Boiling (DNB) Limits analyzed using RTDP .

WCAP-14787-P, Rev. 3, "Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Point Beach Units 1 & 2 Power Uprate 1775 MWt Core Power with Feedwater Venturis, or 1800 MWt Core Power with LEFM on Feedwater Header)," February 2009.

WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 for I those events not utilizing RTDP .

2.12 Refueling Boron Concentration WCAP-9272-P-A, "Westinghouse Reload I Safety Evaluation Methodology," July 1985.

Page 18 of 18