{{#Wiki_filter:EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE r)PLANT SUPERINTENDENT EF ECT VE DATE CATEGORY"1.0 REVIEWED BY: 920bfb0382 0500024 920bps PDR*DOCK@DR I P
{{#Wiki_filter:EOP:         TITLE:
SI REV: 6 LOSS OF   ALL AC POWER RECOVERY WITHOUT ECA-0.1                          REQUIRED PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE r
                                              )
PLANT SUPERINTENDENT EF ECT VE DATE CATEGORY "1.0 REVIEWED BY:
920bfb0382 920bps 0500024 PDR   *DOCK       @DR   I P
 
(
(
EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 2 of 20 A.PURPOSE-This procedure provides actions to use normal operational systems to stabilize plant conditions following restoration of AC emergency power-B.ENTRY CONDITIONS/SYMPTOMS 1.ENTRY CONDITIONS
EOP:         TITLE:
-This Procedure is entered from: a.ECA-O.O, LOSS OF ALL AC POWER, when AC emergency power is restored and SI is not required.
SI    REV: 6 ECA-0.1     LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED                           of 20 PAGE 2 A. PURPOSE   - This procedure provides actions to use normal operational systems to stabilize plant conditions following restoration of AC emergency power-B. ENTRY CONDITIONS/SYMPTOMS
P%l q>~gt EOP: ECA-0.1 LITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV 6 PAGE 3 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o CSFSTs should be monitored for information only.FR procedures should not be implemented prior to completion of Step 11.o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+R/hr.1 Check RCP Seal Isolation Status: a.RCP seal injection needle valves CLOSED~V-300A~V-300B a.Dispatch AO with key to RWST gate to locally close valves before starting charging pump.b.RCP CCW return valves-CLOSED~MOV-759A~MOV-759B b.IF valves open or position not known, THEN check CCW pump status: 1)IF pump running, THEN go to Step 2.2)IF pump NOT running, THEN manually close valves.IF valve(s)can NOT be closed, THEN place switches for RCP thermal barrier CCW outlet valves to CLOSE.~AOV-754A~AOV-754B 2 Check CI Annunciator A-26, CONTAINMENT ISOLATION EXTINGUISHED Perform the following:
: 1. ENTRY CONDITIONS This   Procedure is entered from:
a.Depress CI reset pushbutton b.Verify annunciator A-26, CONTAINMENT ISOLATION, extinguished.  
: a. ECA-O.O, LOSS OF ALL AC POWER, when AC emergency power is restored and SI is not required.
 
P
  %l q
  > ~
gt
 
EOP:           LITLE:
REV    6 ECA-0.1         LOSS OF ALL AC POWER RECOVERY WITHOUT               SI REQUIRED PAGE 3   of 20 STEP     ACTION/EXPECTED RESPONSE                 RESPONSE   NOT OBTAINED NOTE:   o CSFSTs   should be monitored for information only. FR procedures should not be implemented prior to completion of Step 11.
o Adverse   CNMT values should be used whenever CNMT pressure     is greater than     4 psig or CNMT radiation is greater than 10+         R/hr.
1 Check RCP Seal       Isolation Status:
: a. RCP seal   injection needle valves       a. Dispatch AO with key to RWST CLOSED                                      gate to locally close valves before starting charging     pump.
          ~ V-300A
          ~ V-300B
: b. RCP CCW return valves   - CLOSED       b. IF valves open or position not known, THEN check CCW pump
          ~ MOV-759A                                    status:
          ~ MOV-759B
: 1) IF pump running, THEN go   to Step 2.
: 2) IF pump   NOT running, THEN manually close valves.
IF valve(s) can NOT be closed, THEN place switches for RCP thermal barrier   CCW outlet valves to CLOSE.
                                                            ~ AOV-754A
                                                            ~ AOV-754B 2 Check CI Annunciator A-26,                   Perform the following:
CONTAINMENT ISOLATION EXTINGUISHED                                a. Depress CI reset pushbutton
: b. Verify annunciator A-26, CONTAINMENT ISOLATION, extinguished.
 
EOP:            T I 'TLE LOSS OF ALL AC POWER RECOVERY WITHOUT              SI        REV: 6 ECA-0. 1                                  REQUIRED PAGE 4    of 20 STEP      ACTION/EXPECTED RESPONSE                  RESPONSE  NOT OBTAINED 3  Establish IA to          CNMT:
: a. Verify non-safeguards        busses        a. Perform the    following:
energized from      offsite  power
: 1) Close non-safeguards    bus  tie o  Bus 13 normal      feed  - CLOSED            breakers:
                          -OR-                                ~ Bus 13  to  Bus 14  tie
                                                              ~ Bus 15  to  Bus 16  tie o  Bus 15 normal        feed  - CLOSED
: b. Check at least two        SW  pumps        b. Manually start SW pumps as power RUNNING                                        supply permits (258 kw each).
IF less than two SW pumps running, THEN go to Step 4.
: c. Verify turbine building        SW          c. Manually align valves' isolation valves - OPEN MOV-4613 and MOV-4670
          ~ MOV-4614 and MOV-4664
: d. Start at least      two  air              d. IF  air compressors can NOT be compressors      (75 kw each)                  started,  THEN dispatch AO to locally reset compressors as necessary.
: e. Check IA supply:                            e. Perform the    following:
o  Pressure      - GREATER THAN                1) Continue attempts to restore 60 PSIG                                          IA (Refer to AP-IA.1,    LOSS OF INSTRUMENT AIR).
o  Pressure      - STABLE OR INCREASING                                  2) Continue  with Step 6. WHEN IA restored,  THEN do  Steps 3f through 5.
: f. Reset both      trains of    XY relays for IA to      CNMT  (AOV-5392)    if necessary
: g. Verify IA to      CNMT  AOV-5392 - OPEN
 
~ t J
 
EOP:              TITLE:
LOSS OF ALL AC POWER RECOVERY WITHOUT            SI        REV: 6 ECA-0.1 REQUIRED                            PAGE 5 of  20 STEP        ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED
  ************+ ****************************
CAUTION THE LOADS PLACED ON THE ENERGIZED AC EMERGENCY BUS SHOULD NOT EXCEED THE CAPACITY OF THE POWER SOURCE.
  ************+ ****************************
4  Manually Load Following Equipment On AC Emergency Busses:
: a. Start one CCW pump (124 kw)
: b. Energize    MCCs  as power supply permits
            ~ MCC  A  from  Bus 13
            ~ MCC  B  from  Bus 15
            ~ MCC  E  from  Bus 15
            ~ MCC  F from  Bus 15
: c. Verify instrument bus      D-            c. Restore power to instrument bus ENERGIZED                                    D from MCC B or MCC A I
(maintenance  supply).
: d. WHEN  bus 15 restored, THEN reset control room lighting
: e. Start at least one CNMT RECIRC fan
: f. Restore Rx head cooling as power supply permits:
: 1) Check IA to    CNMT -  AVAILABLE        1) Go  to Step 5.
: 2)  Start  one Rx compartment              2) Perform the  following:
cooling fan (23    kw each) o  Dispatch AO to reset UV relays at MCC C and MCC  D.
o  Manually start one fan as power supply permits.
(23 kw)
: 3)  Start both control rod shroud            3) Manually start  at least one fans (45 kw each)                          fan (45 kw)
: g. Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1)
 
R lt u  A by    4/
k ~
1 1
0 t~  ~ 08
 
EOP:            TI!LE:
REV! 6 ECA-0.1          LOSS OF ALI, AC POWER RECOVERY WITHOUT          SI REQUIRED                                      of 20 PAGE 6 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 5  Check  If  Charging Flow Has Been Established:
: a. Charging pumps -  ANY RUNNING        a. Perform the following:
: 1) Ensure seal    injection needle valves to both    RCPs  isolated:
                                                        ~  RCP  A, V-300A
                                                        ~  RCP  B, V-300B
: 2) Ensure HCV-142 open, demand at  Oa.
: b. Charging  pump suction aligned to    b. Manually align valves as RWST'                                    necessary.
LCV-112B -  OPEN                      IF LCV-112B can NOT be opened, THEN  perform the following:
o  LCV-112C - CLOSED
: 1) Verify charging    pump A NOT running and place in    PULL STOP.
: 2) Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging  pump  room).
: 3) WHEN  V-358 open,  THEN  direct AO  to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
: c. Start charging pumps (75 kw each) as necessary and adjust charging flow to restore PRZR level
 
4I Y'
 
EOP:            T!TLE:
REV  6 LOSS OF    ALL AC  POWER RECOVERY WITHOUT      SI ECA-0.1                              REQUIRED                              PAGE 7  of 20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 6  Verify SI      Flow Not Required:
: a. RCS  subcooling based on core          a. Go  to ECA-0.2,  LOSS OF  ALL AC exit  T/Cs - GREATER THAN O'              POWER RECOVERY    WITH  SI REQUIRED, USING FIGURE MIN SUBCOOLING                Step  l.
: b. PRZR  level    - GREATER THAN 5%      b. Control charging flow to
[30%  adverse    CNMT]                    maintain  PRZR  level.
IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF  ALL AC  POWER RECOVERY WITH  SI REQUIRED, Step    l.
7  Check PRZR Level  GREATER                Control charging flow as necessary.
THAN 134    [404'OR      ADVERSE CONTAINMENT]
 
I 4 r'
 
EOP:              TITLE:
REV    6 ECA-0.1          LOSS OF ALL AC POWER RECOVERY WITHOUT              SI REQUIRED                                        of  20 PAGE 8 STEP      ACTION/EXPECTED RESPONSF                RESPONSE NOT OBTAINED CAUTION o  IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).
o  IF S/G NR LEVEL DECREASES TO LESS THAN 5% [25% ADVERSE CNMT] AND FEED FLOW IS LESS  THAN 200 GPM, THEN THE MDAFW PUMPS SHOULD BE MANUALLY LOADED ON AC EMERGENCY BUS TO SUPPLY WATER TO THE      S/G(S).
NOTE:    o  If  MDAFW pump operation is not required, pump switches should be maintained in  PULL-STOP to prevent automatic start.
o  TDAFW pump  flow control valves  fail open    on loss of IA.
8  Check    Intact    S/G  Levels:
: a. Narrow range    level  - GREATER        a. Maintain    total  feed flow greater THAN 5%  [25% adverse  CNMT]              than 200    gpm  until narrow range level greater than 5% [25%
adverse CNMT] in at least one S/G.
IF feed flow less than 200 gpm, THEN  perform the following:
: 1) Verify MDAFW pump discharge valves open.
                                                            ~  MOV-4007
                                                            ~  MOV-4008
: 2) Manually    start MDAFW  pumps as necessary    (228 KW each).
: b. Control feed flow to maintain narrow range level between 17%
[25% adverse CNMT] and 50%
 
'I ra
 
EOP:            TITLE:
REV' ECA-0. 1 LOSS OF    ALL AC    POWER RECOVERY WITHOUT      SI REQUIRED PAGE 9  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE  NOT OBTAINED 9  Establish      S/G Pressure Control:
: a. Adjust S/G    ARV controllers to maintain existing    S/G pressure
: b. Verify S/G    ARV controllers in AUTO
: c. Dispatch AO to perform Attachment SD-2 NOTE;    If any  heat tracing or BAST temperatures are low, flowpaths from the BASTs  should be evaluated before being used.
10    Check BAST Temperature:                    Perform the following:
o  Annunciator B-31,    BAST TEMP OR      a. Verify SI  pump  suction valves LO N2 PRESS    - EXTINGUISHED              from  BASTs  closed.
o  Annunciator K-22,    HEAT TRACING          ~  MOV-826A  or  MOV-826B SYSTEM - EXTINGUISHED                      ~  MOV-826C  or  MOV-826D
: b. Open at least one SI pump suction valve from RWST.
o  MOV-825A
                                                                    -OR-o  MOV-825B
: c. Dispatch  AO  to locally check BAST and  heat tracing temperatures.
 
k 6
C'
 
EOP:              T1TLF:
LOSS OF ALL AC POWER RECOVERY WITHOUT              SI      REV: 6 ECA-0.1                                REQUIRED pAGE 10    of 20 STEP        ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED NOTE:    Safeguards bus pump is energized.
switches should be placed in    AUTO  only  if associated 11  Place Following        Pump    Switches In  AUTO:
        ~ SI pumps
        ~ RHR pumps
        ~ CNMT spray pumps NOTE:    FR  procedures  may now be    implemented as necessary.
12    Verify Adequate        SH  Flow To CCW  Hx:
: a. Verify at least    two  SW pumps          a. Manually    start  pumps as power RUNNING                                      supply permits (258 kw each).
IF less than two SW pumps can be operated, THEN go to Step 19.
: b. Verify    AUX BLDG SW  isolation          b. Establish SW to AUX BLDG (Refer valves  - OPEN                              to Attachment AUX BLDG SW).
            ~ MOV-4615 and MOV-4734                      Continue with Step 19.      WHEN SW
            ~ MOV-4616 and MOV-4735                      restored to  AUX BLDG, THEN do Steps 12c through 18.
: c. Verify    CNMT RECIRC  fan                c. Dispatch AO to locally throttle annunciator C-2,    HIGH                      flow to CCW Hx to between TEMPERATURE ALARM - EXTINGUISHED              5000 gpm and 6000 gpm    total flow.
 
4g till>  '
I 6I 4i I
 
EOP:            TITLE:
LOSS OF ALZ, AC POWER RECOVERY WITHOUT        SI      REV: 6 ECA-F 1 REQUIRED                          PAGE 11  of,20 STEP      ACTION/EXPECTED RESPONSE            RESPONSE  NOT OBTAINED 13  Check  If Normal Operation CVCS Can Be Established
: a. Verify IA restored:                  a. Continue with Step 19. WHEN IA restored, THEN do Steps 13 o  IA to  CNMT (AOV-5392) -  OPEN        through 18.
o  IA pressure  - GREATER THAN 60 PSIG
: b. Charging  pump - ANY RUNNING        b. Continue with Step 19. WHEN any charging pump running, THEN do Steps 14 through 18.
 
'l4 1
JILF4
 
EOP:              TITLE:
LOSS OF ALL AC POWER RECOVERY WITHOUT              SI      REV: 6 ECA-0.1                                  REQUIRED PAGE 12  of 20 STEP      ACTION/EXPECTED RESPONSE                RESPONSE  NOT OBTAINED Check  If  Seal Return Flow Should Be Established:
: a. Verify RCP ¹1 seal outlet                a. Go  to Step 15.
temperature    - LESS THAN 235'F
: b. Verify RCP seal      outlet valves        b. Manually open valves as OPEN                                        necessary.
            ~ AOV-270A
            ~ AOV-270B
: c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313    if  necessary
: d. Open  RCP  seal return isolation        d. Perform the following:
valve  MOV-313
: 1) Place MOV-313 switch to OPEN.
: 2) Dispatch  AO  with key to RWST gate to  locally  open MOV-313.
: e. Verify RCP ¹1 seal leakoff flow          e. IF any    RCP seal leakoff flow LESS THAN    5.5  GPM                      greater than 5.5 gpm THEN close the affected RCP seal discharge valve:
                                                        ~  RCP A, AOV-270A
                                                        ~  RCP  B, AOV<<270B IF both RCP seal discharge valves are shut, THEN go to Step 15.
: f. Verify RCP &#xb9;1      seal leakoff flow      f. Refer to AP-RCP.1,    RCP SEAL GREATER THAN    0.25  GPM                MALFUNCTION.
 
1 I
e W
  ~I ff
)JW
    ~II ll


EOP: ECA-0.1 T I'TLE LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 4 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Establish IA to CNMT: a.Verify non-safeguards busses energized from offsite power o Bus 13 normal feed-CLOSED a.Perform the following:
EOI"            TITLE:
1)Close non-safeguards bus tie breakers:-OR-o Bus 15 normal feed-CLOSED~Bus 13 to Bus 14 tie~Bus 15 to Bus 16 tie b.Check at least two SW pumps RUNNING c.Verify turbine building SW isolation valves-OPEN b.Manually start SW pumps as power supply permits (258 kw each).IF less than two SW pumps running, THEN go to Step 4.c.Manually align valves'MOV-4613 and MOV-4670~MOV-4614 and MOV-4664 d.Start at least two air compressors (75 kw each)e.Check IA supply: o Pressure-GREATER THAN 60 PSIG o Pressure-STABLE OR INCREASING f.Reset both trains of XY relays for IA to CNMT (AOV-5392) if necessary g.Verify IA to CNMT AOV-5392-OPEN d.IF air compressors can NOT be started, THEN dispatch AO to locally reset compressors as necessary.
REV: 6 ECA-0. 1       LOSS OF     ALL AC   POWER RECOVERY WITHOUT       SI REQUIRED PAGE 13  of 20 STEP       ACTION/EXPECTED RESPONSE               RESPONSE   NOT OBTAINED 15   Verify PRZR Level           GREATER       Continue with Step 19. WHEN PRZR THAN 13%     [404   adverse CNMT]           level increases to greater than 13%
e.Perform the following:
[40% adverse CNMT], THEN do Steps 16 through 18.
1)Continue attempts to restore IA (Refer to AP-IA.1, LOSS OF INSTRUMENT AIR).2)Continue with Step 6.WHEN IA restored, THEN do Steps 3f through 5.
16   Establish Normal Letdown:                  IF RCP seal return has been established, THEN establish excess
~tJ EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 5 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED************+****************************CAUTION THE LOADS PLACED ON THE ENERGIZED AC EMERGENCY BUS SHOULD NOT EXCEED THE CAPACITY OF THE POWER SOURCE.************+****************************4 Manually Load Following Equipment On AC Emergency Busses: a.Start one CCW pump (124 kw)b.Energize MCCs as power supply permits~MCC A from Bus 13~MCC B from Bus 15~MCC E from Bus 15~MCC F from Bus 15 c.Verify instrument bus D-ENERGIZED I d.WHEN bus 15 restored, THEN reset control room lighting e.Start at least one CNMT RECIRC fan f.Restore Rx head cooling as power supply permits: 1)Check IA to CNMT-AVAILABLE 2)Start one Rx compartment cooling fan (23 kw each)3)Start both control rod shroud fans (45 kw each)g.Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1)c.Restore power to instrument bus D from MCC B or MCC A (maintenance supply).1)Go to Step 5.2)Perform the following:
: a. Establish charging     line flow to     letdown as follows:
o Dispatch AO to reset UV relays at MCC C and MCC D.o Manually start one fan as power supply permits.(23 kw)3)Manually start at least one fan (45 kw)
REGEN Hx - GREATER THAN 20 GPM o  Place excess letdown    divert
R lt 1 u A by 4/k~1 0 t~~0 8 EOP: ECA-0.1 TI!LE: LOSS OF ALI, AC POWER RECOVERY WITHOUT SI REQUIRED REV!6 PAGE 6 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 5 Check If Charging Flow Has Been Established:
: b. Place the following switches to             valve, AOV-312, to    NORMAL.
a.Charging pumps-ANY RUNNING a.Perform the following:
CLOSE' o  Ensure CCW from excess    letdown Letdown   orifice valves                 open, (AOV-745).
1)Ensure seal injection needle valves to both RCPs isolated:~RCP A, V-300A~RCP B, V-300B 2)Ensure HCV-142 open, demand at Oa.b.Charging pump suction aligned to RWST'LCV-112B-OPEN o LCV-112C-CLOSED b.Manually align valves as necessary.
(AOV-200A, AOV-200B, and AOV-202)                               o  Open excess  letdown  isolation
IF LCV-112B can NOT be opened, THEN perform the following:
          ~ AOV-371, letdown isolation                 valve AOV-310.
1)Verify charging pump A NOT running and place in PULL STOP.2)Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).c.Start charging pumps (75 kw each)as necessary and adjust charging flow to restore PRZR level 3)WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
valve
4I Y' EOP: ECA-0.1 T!TLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV 6 PAGE 7 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 6 Verify SI Flow Not Required: a.RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING b.PRZR level-GREATER THAN 5%[30%adverse CNMT]a.Go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step l.b.Control charging flow to maintain PRZR level.IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step l.7 Check PRZR Level-GREATER THAN 134[404'OR ADVERSE CONTAINMENT]
          ~ AOV-427, loop     B cold leg to       o  Slowly open HCV-123 to maintain REGEN Hx                                   excess letdown temperature less than 195'F and pressure less
Control charging flow as necessary.
: c. Place letdown controllers in                 than 100 psig.
I 4 r' EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV 6 PAGE 8 of 20 STEP ACTION/EXPECTED RESPONSF RESPONSE NOT OBTAINED*****************************************CAUTION o IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).o IF S/G NR LEVEL DECREASES TO LESS THAN 5%[25%ADVERSE CNMT]AND FEED FLOW IS LESS THAN 200 GPM, THEN THE MDAFW PUMPS SHOULD BE MANUALLY LOADED ON AC EMERGENCY BUS TO SUPPLY WATER TO THE S/G(S).NOTE: o If MDAFW pump operation is not required, pump switches should be maintained in PULL-STOP to prevent automatic start.o TDAFW pump flow control valves fail open on loss of IA.8 Check Intact S/G Levels: a.Narrow range level-GREATER THAN 5%[25%adverse CNMT]a.Maintain total feed flow greater than 200 gpm until narrow range level greater than 5%[25%adverse CNMT]in at least one S/G.IF feed flow less than 200 gpm, THEN perform the following:
MANUAL at 25% open o  Adjust charging    pump speed  as
1)Verify MDAFW pump discharge valves open.~MOV-4007~MOV-4008 b.Control feed flow to maintain narrow range level between 17%[25%adverse CNMT]and 50%2)Manually start MDAFW pumps as necessary (228 KW each).
          ~ TCV-130                                   necessary.
'Ira EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV'PAGE 9 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Establish S/G Pressure Control: a.Adjust S/G ARV controllers to maintain existing S/G pressure b.Verify S/G ARV controllers in AUTO c.Dispatch AO to perform Attachment SD-2 NOTE;If any heat tracing or BAST temperatures are low, flowpaths from the BASTs should be evaluated before being used.10 Check BAST Temperature:
          ~ PCV-135 IF  RCP  seal return NOT established,
o Annunciator B-31, BAST TEMP OR LO N2 PRESS-EXTINGUISHED Perform the following:
: d. Reset both   trains of   XY relays     THEN  consult TSC to determine    if for AOV-371 and AOV-427     if         excess  letdown should be placed in necessary                               service.
a.Verify SI pump suction valves from BASTs closed.o Annunciator K-22, HEAT TRACING SYSTEM-EXTINGUISHED
: e. Open AOV-371 and AOV-427
~MOV-826A or MOV-826B~MOV-826C or MOV-826D b.Open at least one SI pump suction valve from RWST.o MOV-825A-OR-o MOV-825B c.Dispatch AO to locally check BAST and heat tracing temperatures.
: f. Open letdown   orifice valves     as necessary
k 6 C' EOP: ECA-0.1 T1TLF: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 pAGE 10 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Safeguards pump switches should be placed in AUTO only if associated bus is energized.
: g. Place TCV-130     in AUTO at 105'F
11 Place Following Pump Switches In AUTO:~SI pumps~RHR pumps~CNMT spray pumps NOTE: FR procedures may now be implemented as necessary.
: h. Place PCV-135 in       AUTO at 250 psig
12 Verify Adequate SH Flow To CCW Hx: a.Verify at least two SW pumps RUNNING b.Verify AUX BLDG SW isolation valves-OPEN~MOV-4615 and MOV-4734~MOV-4616 and MOV-4735 c.Verify CNMT RECIRC fan annunciator C-2, HIGH TEMPERATURE ALARM-EXTINGUISHED a.Manually start pumps as power supply permits (258 kw each).IF less than two SW pumps can be operated, THEN go to Step 19.b.Establish SW to AUX BLDG (Refer to Attachment AUX BLDG SW).Continue with Step 19.WHEN SW restored to AUX BLDG, THEN do Steps 12c through 18.c.Dispatch AO to locally throttle flow to CCW Hx to between 5000 gpm and 6000 gpm total flow.
: i. Adjust charging     pump speed   and HCV-142 as necessary
4g till>'6I I 4i I EOP: ECA-F 1 TITLE: LOSS OF ALZ, AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 11 of,20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check If Normal CVCS Operation Can Be Established a.Verify IA restored: o IA to CNMT (AOV-5392)
 
-OPEN o IA pressure-GREATER THAN 60 PSIG a.Continue with Step 19.WHEN IA restored, THEN do Steps 13 through 18.b.Charging pump-ANY RUNNING b.Continue with Step 19.WHEN any charging pump running, THEN do Steps 14 through 18.
L ~
'l4 1 JILF4 EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 12 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED Check If Seal Return Flow Should Be Established:
+II
a.Verify RCP&#xb9;1 seal outlet temperature
~ I Fe
-LESS THAN 235'F b.Verify RCP seal outlet valves OPEN~AOV-270A~AOV-270B a.Go to Step 15.b.Manually open valves as necessary.
 
c.Reset both trains of XY relays for RCP seal return isolation valve MOV-313 if necessary d.Open RCP seal return isolation valve MOV-313 e.Verify RCP&#xb9;1 seal leakoff flow LESS THAN 5.5 GPM d.Perform the following:
EOP:             LITLE:
1)Place MOV-313 switch to OPEN.2)Dispatch AO with key to RWST gate to locally open MOV-313.e.IF any RCP seal leakoff flow greater than 5.5 gpm THEN close the affected RCP seal discharge valve: f.Verify RCP&#xb9;1 seal leakoff flow GREATER THAN 0.25 GPM~RCP A, AOV-270A~RCP B, AOV<<270B IF both RCP seal discharge valves are shut, THEN go to Step 15.f.Refer to AP-RCP.1, RCP SEAL MALFUNCTION.
LOSS OF ALI, AC POWER RECOVERY WITHOUT             SI       REV: 6 ECA-0.1 REQUIRED                                        of 20 PAGE 14 STEP     ACTION/EXPECTED RESPONSE             RESPONSE   NOT OBTAINED 17   Check VCT Makeup System:
e W 1 I~I f f)JW~II ll EOI" ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 13 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Verify PRZR Level-GREATER THAN 13%[404 adverse CNMT]Continue with Step 19.WHEN PRZR level increases to greater than 13%[40%adverse CNMT], THEN do Steps 16 through 18.16 Establish Normal Letdown: a.Establish charging line flow to REGEN Hx-GREATER THAN 20 GPM b.Place the following switches to CLOSE'Letdown orifice valves (AOV-200A, AOV-200B, and AOV-202)~AOV-371, letdown isolation valve~AOV-427, loop B cold leg to REGEN Hx c.Place letdown controllers in MANUAL at 25%open~TCV-130~PCV-135 d.Reset both trains of XY relays for AOV-371 and AOV-427 if necessary e.Open AOV-371 and AOV-427 f.Open letdown orifice valves as necessary g.Place TCV-130 in AUTO at 105'F h.Place PCV-135 in AUTO at 250 psig i.Adjust charging pump speed and HCV-142 as necessary IF RCP seal return has been established, THEN establish excess letdown as follows: o Place excess letdown divert valve, AOV-312, to NORMAL.o Ensure CCW from excess letdown open, (AOV-745).
: a. Verify the following:                 a. IF VCT auto makeup can      NOT be established, THEN manually
o Open excess letdown isolation valve AOV-310.o Slowly open HCV-123 to maintain excess letdown temperature less than 195'F and pressure less than 100 psig.o Adjust charging pump speed as necessary.
: 1) Boric acid flow     control valve       control VCT level (Refer to SET FOR REQUIRED CSD                 ER-CVCS 1, REACTOR MAKEUP
IF RCP seal return NOT established, THEN consult TSC to determine if excess letdown should be placed in service.
                                                                ~
L~+II~I Fe EOP: ECA-0.1 LITLE: LOSS OF ALI, AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 14 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Check VCT Makeup System: a.Verify the following:
CONCENTRATION (Refer to                 CONTROL MALFUNCTION).
1)Boric acid flow control valve SET FOR REQUIRED CSD CONCENTRATION (Refer to Figure SDM)2)At least one BA and.RMW pump in AUTO a.IF VCT auto makeup can NOT be established, THEN manually control VCT level (Refer to ER-CVCS~1, REACTOR MAKEUP CONTROL MALFUNCTION).
Figure   SDM)
3)RMW mode selector switch in AUTO 4)RMW control armed-RED LIGHT LIT b.Check VCT level o Level-GREATER THAN 20%-OR-o Level-STABLE OR INCREASING b.Manually increase VCT makeup flow'as follows: 1)Ensure BA transfer pumps and RMW pumps running.IF NOT", THEN dispatch AO to reset MCC C and MCC D UV lockouts as necessary.
: 2) At   least one BA and.RMW pump in   AUTO
.,2)Place RMW flow control valve HCV-111 in MANUAL and increase RMW flow.3)Increase boric acid flow as necessary.
: 3) RMW   mode selector switch in AUTO
: 4) RMW   control   armed - RED LIGHT LIT
: b. Check VCT   level                     b. Manually increase     VCT makeup flow 'as follows:
o  Level -    GREATER THAN 20%
: 1) Ensure BA   transfer pumps and
                        -OR-                              RMW pumps running. IF NOT",
THEN dispatch AO to reset o  Level -    STABLE OR INCREASING            MCC C and MCC D UV lockouts as necessary.
                                                    .,2) Place RMW flow control valve HCV-111 in MANUAL and increase   RMW flow.
: 3) Increase   boric acid flow as necessary.
IF VCT level can NOT be restored, THEN go to Step 19.
IF VCT level can NOT be restored, THEN go to Step 19.
E>I fi EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 15 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check Charging Pump Suction Aligned To VCT: a.VCT level-GREATER THAN 20%a.IF VCT level can NOT be maintained greater than 5%, THEN perform the following:
 
1)Ensure charging pump'uction aligned, to RWST: o LCV-112B open o LCV-112C closed 2)Continue with Step 19.WHEN VCT level greater than 40%, THEN do Step 18b.b.Verify charging pumps aligned to VCT o LCV-112C-OPEN o LCV-112B-CLOSED b.Manually align valves as necessary.
E fi
19 Control'RZR Level: a.Check letdown-IN SERVICE b.Maintain PRZR level between 13%(40%adverse CNMT]and 50%a.S top and s tar t charging pumps as necessary to control PRZR level.
> I
h,~Q~s t.
 
EOP I ECA-0.1 TITLE: LOSS OF ALI, AC POWER RECOVERY WITHOUT SI REQUIRED REV 6 PAGE 16 of 2O STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.o When using a PRZR PORV select one with an operable block valve.20 Establish PRZR Pressure Control: a.Check letdown-IN SERVICE b.Use PRZR heaters and auxiliary spray valve (AOV-296)to maintain RCS pressure a.Perform the following:
EOP:             TITLE:
1)Use PRZR heaters and one PRZR PORV to maintain RCS pressure.IF IA NOT available, THEN Refer to Attachment N2 PORVS~to operate PORV.2)Go to Step 21.21 Verify Natural Circulation:
LOSS OF   ALL AC POWER RECOVERY WITHOUT       SI       REV: 6 ECA-0.1                              REQUIRED PAGE 15   of 20 STEP     ACTION/EXPECTED RESPONSE             RESPONSE   NOT OBTAINED 18   Check Charging Pump Suction Aligned     To VCT:
o RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING Increase dumping steam from intact S/Gs.o S/G pressures-STABLE OR DECREASING o RCS hot leg temperatures STABLE OR DECREASING o Core exit T/Cs-STABLE OR DECREASING o RCS cold leg temperatures
: a. VCT level   - GREATER THAN 20%       a. IF   VCT level can NOT be maintained greater than     5%, THEN perform the following:
-AT SATURATION TEMPERATURE FOR S/G PRESSURE  
: 1) Ensure charging     pump'uction aligned, to RWST:
~I EOP: ECA-0'TITLE: LOSS OF ALI, AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 17 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.
o   LCV-112B open o   LCV-112C closed
22 Check If Source Range Detectors Should Be Energized:
: 2) Continue   with Step 19. WHEN VCT level greater   than 40%,
a.Source range channels DEENERGIZED a.Go to Step 22e.b.Check intermediate range flux-EITHER CHANNEL LESS THAN 10 10 AMPS b.Perform the following:
THEN do Step 18b.
1)IF neither intermediate range channel is decreasing THEN initiate boration.c.Check the following:
: b. Verify charging pumps aligned to     b. Manually align valves as VCT                                       necessary.
o Both intermediate range channels-LESS THAN 10 AMPS 2)Continue with Step 23.WHEN flux is LESS THAN 10 1 amps on any operable channel, THEN do Steps 22c through e.c.Continue with Step 23.WHEN either condition met, THEN do Steps 22d and e.-OR-o Greater than 20 minutes since reactor trip d.Verify source range detectors ENERGIZED d.Manually energize source range detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION and go to Step 23.e.Transfer Rk-45 recorder to one source range and one intermediate range channel LID EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 18 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED*****************************************CAUTION o RCP THERMAL BARRIER COOLING SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE POTENTIAL INTRODUCTION OF STEAM INTO THE CCW SYSTEM AND THERMAL SHOCK TO RCP.o RCP SEAL INJECTION SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE RCP THERMAL, STRESSES AND POTENTIAL SEAL FAILURES.o AS PART OF SUBSEQUENT RECOVERY ACTIONS, RCP(S)SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION UNLESS REQUIRED BY AN INADEQUATE CORE COOLING SITUATION.
o   LCV-112C - OPEN o   LCV-112B - CLOSED 19   Control'RZR Level:
NOTE: SW should be aligned to CCW Hxs before restoring RCP seal cooling.23 Check RCP Cooling: a.Check CCW to RCPs: Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).o Annunciator A-7, RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED b.Check RCP seal injection:
: a. Check letdown - IN SERVICE           a. S top and s tar t charging pumps as necessary to control PRZR level.
o Labyrinth seal D/Ps-GREATER THAN 15 INCHES OF WATER-OR-o RCP seal injection flow to each RCP-GREATER THAN 6 GPM  
: b. Maintain PRZR level between      13%
~mS 4 ee 1 I" 4''<,
(40% adverse CNMT] and 50%
EOP: ECA-0.1 TITLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 19 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 24.Verify Adequate Shutdown Margin: a.Direct HP to sample RCS and PRZR liquid for boron concentration b.Verify boron concentration-GREATER THAN REQUIREMENTS OF FIGURE SDM b.Borate as necessary.
 
25 Maintain Stable Plant Conditions a.RCS pressure-STABLE b.RCS temperature
h,
-STABLE c.PRZR level-BETWEEN 13%[40%adverse CNMT]and 50%d.Intact S/G level-.BETWEEN 17%[25%adverse CNMT]and 50%a.Control PRZR heaters and auxiliary spray if available.
        ~ s t .
b.Control dumping steam as necessary.
~ Q
c.Control charging as necessary.
 
d.Control S/G feed flow as necessary.
EOP I            TITLE:
26 Verify SI Flow Not Required: a.RCS subcooling based on core exit T/Cs-GREATER THAN O'USING FIGURE MIN SUBCOOLING b.PRZR level-GREATER THAN 5%[30%adverse CNMT)a.Go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step l.b.Control charging flow to maintain PRZR level.IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step 1.
LOSS OF ALI, AC POWER RECOVERY WITHOUT               SI       REV   6 ECA-0.1                                REQUIRED PAGE 16   of 2O STEP       ACTION/EXPECTED RESPONSE                 RESPONSE     NOT OBTAINED NOTE: o   If auxiliary spray     is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.
4'*Q F IL(
o   When using   a PRZR PORV   select one with   an operable   block valve.
EOP: ECA-0.1 LITLE: LOSS OF AI,I, AC POWER RECOVERY WITHOUT SI REQUIRED REV'PAGE 20 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED h 27 Try To Restore Offsite Power To All AC Busses (Refer to ER-ELEC.1, RESTORATION OF OFFSITE POWER)Maintain plant condition stable using AC emergency power.28 Determine If Natural Circulation Cooldown Is Required: a.Consult plant staff to determine if RCS cooldown is necessary a.IF cooldown NOT required, THEN go to 0-3, HOT SHUTDOWN WITH XENON PRESENT.b.At least one RCP-OPERABLE b.Go to ES-0.2, NATURAL CIRCULATION COOLDOWN.c.Go to 0-2.2, PLANT SHUTDOWN FROM HOT SHUTDOWN TO COLD SHUTDOWN-END-1I+'1 EOP: ECA-0'T1TLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV!6 PAGE 1 of 1 ECA-0.1 APPENDIX LIS'T TITLE PAGES 1)FIGURE MIN SUBCOOLING 2)FIGURE SDM 3)ATTACHMENT SD-1 4)ATTACHMENT SD-2 5)ATTACHMENT N2 PORVS 6)ATTACHMENT SEAL COOLING 7)ATTACHMENT AUX BLDG SW 5~*C)ar.~~J~3 EOP: ECA-0.1 TITLE: LOSS OF AIL AC POWER RECOVERY WITHOUT SI REQUIRED REV: 6 PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin=Saturation Temperature From Figure Below[-]Core Exit T/C Indication RC 2500 2400 2300 2200 2100 2000 1900 1800 1700 1600 1500 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 S PRESSURE (PSIG)RCS PRESSURE INCREMENTS 20 PSIG SUBCOOLED REGION ADVERSE CNHT NORMAL CNMT INADEQUATE SUBCOOLING REGION TEMPERATURE INCREMENTS 10'f 200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE
20 Establish       PRZR Pressure Control:
('f) 4*~~t>>h L~A<<4 r J~t e+Xc'C, 4'1 al EOP: ECA-0.1 TLTLE: LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED REV 6 PAGE 1 of 1 BORON CONCENTRATION (PPH)1800 FIGURE SDM 1600 BORON INCREMENTS 20 PPH 1400 1200 1000 ADEQUATE SDM 100 PPH CONSERVATISH INCLUDEDSOO 600 400 ORA 200 BURNUP INCREMENTS 100 HWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 22 BURNUP (HWD/HTU)NOTE: To obtain core burnup, use PPCS.turn on code BURNUP.
: a. Check letdown - IN SERVICE                 a. Perform the following:
: 1) Use PRZR heaters     and one PRZR PORV to maintain RCS pressure.
IF IA NOT available,   THEN Refer to Attachment   N2 PORVS
                                                              ~ to operate PORV.
: 2)   Go to Step 21.
: b. Use PRZR heaters and auxiliary spray valve (AOV-296) to maintain RCS pressure 21  Verify Natural Circulation:                  Increase dumping steam from intact S/Gs.
o RCS  subcooling based on core exit  T/Cs -   GREATER THAN O' USING FIGURE MIN SUBCOOLING o  S/G  pressures    - STABLE  OR DECREASING o RCS hot leg temperatures STABLE OR DECREASING o Core exit   T/Cs - STABLE OR DECREASING o RCS cold leg temperatures     - AT SATURATION TEMPERATURE FOR S/G PRESSURE
 
~ I EOP:             TITLE:
SI      REV: 6 ECA-0 '         LOSS OF     ALI, AC POWER RECOVERY WITHOUT REQUIRED                             PAGE 17   of 20 STEP       ACTION/EXPECTED RESPONSE             RESPONSE   NOT OBTAINED NOTE:   Adverse   CNMT conditions or loss of forced air cooling     may result in failure of NIS   detectors.
22   Check   If Source Detectors Should Range Be Energized:
: a. Source range channels                   a. Go to Step 22e.
DEENERGIZED
: b. Check intermediate range     flux-     b. Perform the following:
EITHER CHANNEL LESS THAN 10 10 AMPS                                 1) IF neither intermediate range channel is decreasing THEN initiate boration.
: 2) Continue   with Step 23. WHEN flux is LESS THAN 10 1   amps on any operable channel,   THEN do Steps 22c through e.
: c. Check the following:                    c. Continue with Step 23. WHEN either condition met,   THEN do o  Both intermediate range                Steps 22d and e.
channels - LESS THAN 10      AMPS
                        -OR-o   Greater than   20 minutes since reactor trip
: d. Verify source   range detectors       d. Manually energize source range ENERGIZED                                  detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).
IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION and go to Step 23.
: e. Transfer Rk-45 recorder to one source range and one intermediate range channel
 
LID EOP:             TITLE:
LOSS OF ALL AC POWER RECOVERY WITHOUT             SI     REV: 6 ECA-0.1 REQUIRED                              PAGE 18 of 20 STEP     ACTION/EXPECTED RESPONSE                 RESPONSE NOT OBTAINED CAUTION o  RCP THERMAL BARRIER COOLING SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE POTENTIAL INTRODUCTION OF STEAM INTO THE CCW SYSTEM AND THERMAL SHOCK TO RCP.
o  RCP SEAL  INJECTION SHOULD BE ESTABLISHED SLOWLY TO     MINIMIZE RCP THERMAL, STRESSES  AND POTENTIAL SEAL FAILURES.
o AS PART OF SUBSEQUENT RECOVERY ACTIONS, RCP(S) SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION UNLESS REQUIRED BY AN INADEQUATE CORE COOLING SITUATION.
NOTE:   SW should be aligned to   CCW Hxs before restoring RCP seal cooling.
23   Check RCP Cooling:                             Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).
: a. Check  CCW  to  RCPs:
o Annunciator A-7,     RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15,     RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED
: b. Check RCP   seal injection:
o Labyrinth seal D/Ps - GREATER THAN 15 INCHES OF WATER
                        -OR-o RCP   seal injection flow to each   RCP   - GREATER THAN 6 GPM
 
    ~ m S    ee 1 4
I" 4''<,
 
EOP:             TITLE:
REV: 6 ECA-0.1         LOSS OF     ALL AC   POWER RECOVERY WITHOUT       SI REQUIRED PAGE 19 of 20 STEP       ACTION/EXPECTED RESPONSE               RESPONSE   NOT OBTAINED
: 24. Verify Adequate       Shutdown Margin:
: a. Direct   HP to sample RCS and PRZR liquid for   boron concentration
: b. Verify boron concentration-             b. Borate as necessary.
GREATER THAN REQUIREMENTS OF FIGURE SDM 25   Maintain Stable Plant Conditions
: a. RCS pressure   - STABLE                 a. Control    PRZR  heaters and auxiliary spray    if available.
: b. RCS temperature   - STABLE             b. Control dumping steam as necessary.
: c. PRZR level   - BETWEEN 13% [40%         c. Control charging as necessary.
adverse  CNMT] and 50%
: d. Intact   S/G level -. BETWEEN 17%     d. Control S/G feed flow as
[25% adverse   CNMT]   and 50%             necessary.
26    Verify SI      Flow Not Required:
: a. RCS  subcooling based on core            a. Go  to ECA-0.2,  LOSS OF ALL AC exit  T/Cs -  GREATER THAN O'              POWER RECOVERY    WITH  SI REQUIRED, USING FIGURE MIN SUBCOOLING                  Step  l.
: b. PRZR  level  - GREATER THAN   5%      b. Control charging flow to
[30% adverse   CNMT)                       maintain PRZR level.
IF  PRZR  level  can NOT be maintained,    THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step 1.
 
4
      '*Q F IL(
 
EOP:            LITLE:
REV' ECA-0. 1        LOSS OF AI,I, AC POWER RECOVERY WITHOUT        SI REQUIRED                           PAGE 20  of 20 STEP      ACTION/EXPECTED RESPONSE              RESPONSE NOT OBTAINED h
27  Try To Restore Offsite Power              Maintain plant condition stable To All AC Busses (Refer to                using AC emergency power.
ER-ELEC.1, RESTORATION          OF OFFSITE POWER) 28  Determine Circulation IfCooldown Natural Is Required:
: a. Consult  plant staff to determine    a. IF cooldown  NOT required, THEN if RCS  cooldown  is necessary            go to 0-3, HOT SHUTDOWN WITH XENON PRESENT.
: b. At least one  RCP  - OPERABLE        b. Go to ES-0.2, NATURAL CIRCULATION COOLDOWN.
: c. Go to 0-2.2, PLANT SHUTDOWN FROM HOT SHUTDOWN TO COLD SHUTDOWN
                                            -END-
 
1I +
'1
 
EOP:         T1TLE:
REV! 6 ECA-0 '       LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED                           of 1 PAGE 1 ECA-0.1 APPENDIX LIS'T TITLE                               PAGES
: 1) FIGURE MIN SUBCOOLING
: 2) FIGURE SDM
: 3) ATTACHMENT SD-1
: 4) ATTACHMENT SD-2
: 5) ATTACHMENT N2 PORVS
: 6) ATTACHMENT SEAL COOLING
: 7) ATTACHMENT AUX BLDG SW
 
5~
*C) ar. ~
~J
  ~3
 
EOP:           TITLE:
SI      REV: 6 ECA-0.1         LOSS OF   AIL AC   POWER RECOVERY WITHOUT REQUIRED                           PAGE 1   of 1 FIGURE MIN SUBCOOLING NOTE:   Subcooling Margin     =   Saturation Temperature     From Figure Below   [-] Core Exit T/C Indication RC S PRESSURE  (PSIG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 SUBCOOLED 1300                           REGION 1200 1100 1000 900 800 700                                                                 INADEQUATE SUBCOOLING 600                                                                   REGION ADVERSE CNHT 500 400 300 200                                         NORMAL CNMT                  TEMPERATURE 100                                                                     INCREMENTS  10'f 0
200      250     300     350     400     450     500   550     600     650     700 CORE   EXIT SATURATION TEMPERATURE ('f)
 
4
*   ~
  ~ t>>
h L
                ~ A
<<4 r
J
            ~ t e+
Xc
'C, 4'
1 al
 
EOP:           TLTLE:
REV    6 ECA-0.1         LOSS OF   ALL AC POWER RECOVERY WITHOUT         SI REQUIRED                                       of 1 PAGE 1 FIGURE SDM BORON CONCENTRATION   (PPH) 1800 BORON INCREMENTS 20 PPH 1600 1400 ADEQUATE SDM 1200                                                      100 PPH CONSERVATISH INCLUDED 1000 SOO 600 400 ORA 200                                                                         BURNUP INCREMENTS 100 HWD/HTU 0     1000     2000   3000   4000   5000   6000   7000     8000   9000   10000 11000 CYCLE 22 BURNUP (HWD/HTU)
NOTE: To     obtain core burnup, use       PPCS .turn on code     BURNUP.
 
I}}
I}}

Latest revision as of 10:43, 4 February 2020

Rev 6 to EOP ECA-0.1, Loss of All Ac Power Recovery W/O SI Required.
ML17262A883
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/06/1992
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17262A884 List:
References
ECA-.1, ECA-0.1, NUDOCS 9206160382
Download: ML17262A883 (46)


Text

EOP: TITLE:

SI REV: 6 LOSS OF ALL AC POWER RECOVERY WITHOUT ECA-0.1 REQUIRED PAGE 1 of 20 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIEW DATE r

)

PLANT SUPERINTENDENT EF ECT VE DATE CATEGORY "1.0 REVIEWED BY:

920bfb0382 920bps 0500024 PDR *DOCK @DR I P

(

EOP: TITLE:

SI REV: 6 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT REQUIRED of 20 PAGE 2 A. PURPOSE - This procedure provides actions to use normal operational systems to stabilize plant conditions following restoration of AC emergency power-B. ENTRY CONDITIONS/SYMPTOMS

1. ENTRY CONDITIONS This Procedure is entered from:
a. ECA-O.O, LOSS OF ALL AC POWER, when AC emergency power is restored and SI is not required.

P

%l q

> ~

gt

EOP: LITLE:

REV 6 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 3 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o CSFSTs should be monitored for information only. FR procedures should not be implemented prior to completion of Step 11.

o Adverse CNMT values should be used whenever CNMT pressure is greater than 4 psig or CNMT radiation is greater than 10+ R/hr.

1 Check RCP Seal Isolation Status:

a. RCP seal injection needle valves a. Dispatch AO with key to RWST CLOSED gate to locally close valves before starting charging pump.

~ V-300A

~ V-300B

b. RCP CCW return valves - CLOSED b. IF valves open or position not known, THEN check CCW pump

~ MOV-759A status:

~ MOV-759B

1) IF pump running, THEN go to Step 2.
2) IF pump NOT running, THEN manually close valves.

IF valve(s) can NOT be closed, THEN place switches for RCP thermal barrier CCW outlet valves to CLOSE.

~ AOV-754A

~ AOV-754B 2 Check CI Annunciator A-26, Perform the following:

CONTAINMENT ISOLATION EXTINGUISHED a. Depress CI reset pushbutton

b. Verify annunciator A-26, CONTAINMENT ISOLATION, extinguished.

EOP: T I 'TLE LOSS OF ALL AC POWER RECOVERY WITHOUT SI REV: 6 ECA-0. 1 REQUIRED PAGE 4 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 3 Establish IA to CNMT:

a. Verify non-safeguards busses a. Perform the following:

energized from offsite power

1) Close non-safeguards bus tie o Bus 13 normal feed - CLOSED breakers:

-OR- ~ Bus 13 to Bus 14 tie

~ Bus 15 to Bus 16 tie o Bus 15 normal feed - CLOSED

b. Check at least two SW pumps b. Manually start SW pumps as power RUNNING supply permits (258 kw each).

IF less than two SW pumps running, THEN go to Step 4.

c. Verify turbine building SW c. Manually align valves' isolation valves - OPEN MOV-4613 and MOV-4670

~ MOV-4614 and MOV-4664

d. Start at least two air d. IF air compressors can NOT be compressors (75 kw each) started, THEN dispatch AO to locally reset compressors as necessary.
e. Check IA supply: e. Perform the following:

o Pressure - GREATER THAN 1) Continue attempts to restore 60 PSIG IA (Refer to AP-IA.1, LOSS OF INSTRUMENT AIR).

o Pressure - STABLE OR INCREASING 2) Continue with Step 6. WHEN IA restored, THEN do Steps 3f through 5.

f. Reset both trains of XY relays for IA to CNMT (AOV-5392) if necessary
g. Verify IA to CNMT AOV-5392 - OPEN

~ t J

EOP: TITLE:

LOSS OF ALL AC POWER RECOVERY WITHOUT SI REV: 6 ECA-0.1 REQUIRED PAGE 5 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

                        • + ****************************

CAUTION THE LOADS PLACED ON THE ENERGIZED AC EMERGENCY BUS SHOULD NOT EXCEED THE CAPACITY OF THE POWER SOURCE.

                        • + ****************************

4 Manually Load Following Equipment On AC Emergency Busses:

a. Start one CCW pump (124 kw)
b. Energize MCCs as power supply permits

~ MCC A from Bus 13

~ MCC B from Bus 15

~ MCC E from Bus 15

~ MCC F from Bus 15

c. Verify instrument bus D- c. Restore power to instrument bus ENERGIZED D from MCC B or MCC A I

(maintenance supply).

d. WHEN bus 15 restored, THEN reset control room lighting
e. Start at least one CNMT RECIRC fan
f. Restore Rx head cooling as power supply permits:
1) Check IA to CNMT - AVAILABLE 1) Go to Step 5.
2) Start one Rx compartment 2) Perform the following:

cooling fan (23 kw each) o Dispatch AO to reset UV relays at MCC C and MCC D.

o Manually start one fan as power supply permits.

(23 kw)

3) Start both control rod shroud 3) Manually start at least one fans (45 kw each) fan (45 kw)
g. Dispatch AO to establish normal shutdown alignment (Refer to Attachment SD-1)

R lt u A by 4/

k ~

1 1

0 t~ ~ 08

EOP: TI!LE:

REV! 6 ECA-0.1 LOSS OF ALI, AC POWER RECOVERY WITHOUT SI REQUIRED of 20 PAGE 6 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 5 Check If Charging Flow Has Been Established:

a. Charging pumps - ANY RUNNING a. Perform the following:
1) Ensure seal injection needle valves to both RCPs isolated:

~ RCP A, V-300A

~ RCP B, V-300B

2) Ensure HCV-142 open, demand at Oa.
b. Charging pump suction aligned to b. Manually align valves as RWST' necessary.

LCV-112B - OPEN IF LCV-112B can NOT be opened, THEN perform the following:

o LCV-112C - CLOSED

1) Verify charging pump A NOT running and place in PULL STOP.
2) Dispatch AO to locally open manual charging pump suction from RWST (V-358 located in charging pump room).
3) WHEN V-358 open, THEN direct AO to close V-268 to isolate charging pumps B and C from VCT (V-268 located in charging pump room).
c. Start charging pumps (75 kw each) as necessary and adjust charging flow to restore PRZR level

4I Y'

EOP: T!TLE:

REV 6 LOSS OF ALL AC POWER RECOVERY WITHOUT SI ECA-0.1 REQUIRED PAGE 7 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 6 Verify SI Flow Not Required:

a. RCS subcooling based on core a. Go to ECA-0.2, LOSS OF ALL AC exit T/Cs - GREATER THAN O' POWER RECOVERY WITH SI REQUIRED, USING FIGURE MIN SUBCOOLING Step l.
b. PRZR level - GREATER THAN 5% b. Control charging flow to

[30% adverse CNMT] maintain PRZR level.

IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step l.

7 Check PRZR Level GREATER Control charging flow as necessary.

THAN 134 [404'OR ADVERSE CONTAINMENT]

I 4 r'

EOP: TITLE:

REV 6 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED of 20 PAGE 8 STEP ACTION/EXPECTED RESPONSF RESPONSE NOT OBTAINED CAUTION o IF CST LEVEL DECREASES TO LESS THAN 5 FEET, THEN ALTERNATE WATER SOURCES FOR AFW PUMPS WILL BE NECESSARY (REFER TO ER-AFW.1, ALTERNATE WATER SUPPLY TO AFW PUMPS).

o IF S/G NR LEVEL DECREASES TO LESS THAN 5% [25% ADVERSE CNMT] AND FEED FLOW IS LESS THAN 200 GPM, THEN THE MDAFW PUMPS SHOULD BE MANUALLY LOADED ON AC EMERGENCY BUS TO SUPPLY WATER TO THE S/G(S).

NOTE: o If MDAFW pump operation is not required, pump switches should be maintained in PULL-STOP to prevent automatic start.

o TDAFW pump flow control valves fail open on loss of IA.

8 Check Intact S/G Levels:

a. Narrow range level - GREATER a. Maintain total feed flow greater THAN 5% [25% adverse CNMT] than 200 gpm until narrow range level greater than 5% [25%

adverse CNMT] in at least one S/G.

IF feed flow less than 200 gpm, THEN perform the following:

1) Verify MDAFW pump discharge valves open.

~ MOV-4007

~ MOV-4008

2) Manually start MDAFW pumps as necessary (228 KW each).
b. Control feed flow to maintain narrow range level between 17%

[25% adverse CNMT] and 50%

'I ra

EOP: TITLE:

REV' ECA-0. 1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 9 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 9 Establish S/G Pressure Control:

a. Adjust S/G ARV controllers to maintain existing S/G pressure
b. Verify S/G ARV controllers in AUTO
c. Dispatch AO to perform Attachment SD-2 NOTE; If any heat tracing or BAST temperatures are low, flowpaths from the BASTs should be evaluated before being used.

10 Check BAST Temperature: Perform the following:

o Annunciator B-31, BAST TEMP OR a. Verify SI pump suction valves LO N2 PRESS - EXTINGUISHED from BASTs closed.

o Annunciator K-22, HEAT TRACING ~ MOV-826A or MOV-826B SYSTEM - EXTINGUISHED ~ MOV-826C or MOV-826D

b. Open at least one SI pump suction valve from RWST.

o MOV-825A

-OR-o MOV-825B

c. Dispatch AO to locally check BAST and heat tracing temperatures.

k 6

C'

EOP: T1TLF:

LOSS OF ALL AC POWER RECOVERY WITHOUT SI REV: 6 ECA-0.1 REQUIRED pAGE 10 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Safeguards bus pump is energized.

switches should be placed in AUTO only if associated 11 Place Following Pump Switches In AUTO:

~ SI pumps

~ RHR pumps

~ CNMT spray pumps NOTE: FR procedures may now be implemented as necessary.

12 Verify Adequate SH Flow To CCW Hx:

a. Verify at least two SW pumps a. Manually start pumps as power RUNNING supply permits (258 kw each).

IF less than two SW pumps can be operated, THEN go to Step 19.

b. Verify AUX BLDG SW isolation b. Establish SW to AUX BLDG (Refer valves - OPEN to Attachment AUX BLDG SW).

~ MOV-4615 and MOV-4734 Continue with Step 19. WHEN SW

~ MOV-4616 and MOV-4735 restored to AUX BLDG, THEN do Steps 12c through 18.

c. Verify CNMT RECIRC fan c. Dispatch AO to locally throttle annunciator C-2, HIGH flow to CCW Hx to between TEMPERATURE ALARM - EXTINGUISHED 5000 gpm and 6000 gpm total flow.

4g till> '

I 6I 4i I

EOP: TITLE:

LOSS OF ALZ, AC POWER RECOVERY WITHOUT SI REV: 6 ECA-F 1 REQUIRED PAGE 11 of,20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 13 Check If Normal Operation CVCS Can Be Established

a. Verify IA restored: a. Continue with Step 19. WHEN IA restored, THEN do Steps 13 o IA to CNMT (AOV-5392) - OPEN through 18.

o IA pressure - GREATER THAN 60 PSIG

b. Charging pump - ANY RUNNING b. Continue with Step 19. WHEN any charging pump running, THEN do Steps 14 through 18.

'l4 1

JILF4

EOP: TITLE:

LOSS OF ALL AC POWER RECOVERY WITHOUT SI REV: 6 ECA-0.1 REQUIRED PAGE 12 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED Check If Seal Return Flow Should Be Established:

a. Verify RCP ¹1 seal outlet a. Go to Step 15.

temperature - LESS THAN 235'F

b. Verify RCP seal outlet valves b. Manually open valves as OPEN necessary.

~ AOV-270A

~ AOV-270B

c. Reset both trains of XY relays for RCP seal return isolation valve MOV-313 if necessary
d. Open RCP seal return isolation d. Perform the following:

valve MOV-313

1) Place MOV-313 switch to OPEN.
2) Dispatch AO with key to RWST gate to locally open MOV-313.
e. Verify RCP ¹1 seal leakoff flow e. IF any RCP seal leakoff flow LESS THAN 5.5 GPM greater than 5.5 gpm THEN close the affected RCP seal discharge valve:

~ RCP A, AOV-270A

~ RCP B, AOV<<270B IF both RCP seal discharge valves are shut, THEN go to Step 15.

f. Verify RCP ¹1 seal leakoff flow f. Refer to AP-RCP.1, RCP SEAL GREATER THAN 0.25 GPM MALFUNCTION.

1 I

e W

~I ff

)JW

~II ll

EOI" TITLE:

REV: 6 ECA-0. 1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 13 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 15 Verify PRZR Level GREATER Continue with Step 19. WHEN PRZR THAN 13% [404 adverse CNMT] level increases to greater than 13%

[40% adverse CNMT], THEN do Steps 16 through 18.

16 Establish Normal Letdown: IF RCP seal return has been established, THEN establish excess

a. Establish charging line flow to letdown as follows:

REGEN Hx - GREATER THAN 20 GPM o Place excess letdown divert

b. Place the following switches to valve, AOV-312, to NORMAL.

CLOSE' o Ensure CCW from excess letdown Letdown orifice valves open, (AOV-745).

(AOV-200A, AOV-200B, and AOV-202) o Open excess letdown isolation

~ AOV-371, letdown isolation valve AOV-310.

valve

~ AOV-427, loop B cold leg to o Slowly open HCV-123 to maintain REGEN Hx excess letdown temperature less than 195'F and pressure less

c. Place letdown controllers in than 100 psig.

MANUAL at 25% open o Adjust charging pump speed as

~ TCV-130 necessary.

~ PCV-135 IF RCP seal return NOT established,

d. Reset both trains of XY relays THEN consult TSC to determine if for AOV-371 and AOV-427 if excess letdown should be placed in necessary service.
e. Open AOV-371 and AOV-427
f. Open letdown orifice valves as necessary
g. Place TCV-130 in AUTO at 105'F
h. Place PCV-135 in AUTO at 250 psig
i. Adjust charging pump speed and HCV-142 as necessary

L ~

+II

~ I Fe

EOP: LITLE:

LOSS OF ALI, AC POWER RECOVERY WITHOUT SI REV: 6 ECA-0.1 REQUIRED of 20 PAGE 14 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 17 Check VCT Makeup System:

a. Verify the following: a. IF VCT auto makeup can NOT be established, THEN manually
1) Boric acid flow control valve control VCT level (Refer to SET FOR REQUIRED CSD ER-CVCS 1, REACTOR MAKEUP

~

CONCENTRATION (Refer to CONTROL MALFUNCTION).

Figure SDM)

2) At least one BA and.RMW pump in AUTO
3) RMW mode selector switch in AUTO
4) RMW control armed - RED LIGHT LIT
b. Check VCT level b. Manually increase VCT makeup flow 'as follows:

o Level - GREATER THAN 20%

1) Ensure BA transfer pumps and

-OR- RMW pumps running. IF NOT",

THEN dispatch AO to reset o Level - STABLE OR INCREASING MCC C and MCC D UV lockouts as necessary.

.,2) Place RMW flow control valve HCV-111 in MANUAL and increase RMW flow.

3) Increase boric acid flow as necessary.

IF VCT level can NOT be restored, THEN go to Step 19.

E fi

> I

EOP: TITLE:

LOSS OF ALL AC POWER RECOVERY WITHOUT SI REV: 6 ECA-0.1 REQUIRED PAGE 15 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 18 Check Charging Pump Suction Aligned To VCT:

a. VCT level - GREATER THAN 20% a. IF VCT level can NOT be maintained greater than 5%, THEN perform the following:
1) Ensure charging pump'uction aligned, to RWST:

o LCV-112B open o LCV-112C closed

2) Continue with Step 19. WHEN VCT level greater than 40%,

THEN do Step 18b.

b. Verify charging pumps aligned to b. Manually align valves as VCT necessary.

o LCV-112C - OPEN o LCV-112B - CLOSED 19 Control'RZR Level:

a. Check letdown - IN SERVICE a. S top and s tar t charging pumps as necessary to control PRZR level.
b. Maintain PRZR level between 13%

(40% adverse CNMT] and 50%

h,

~ s t .

~ Q

EOP I TITLE:

LOSS OF ALI, AC POWER RECOVERY WITHOUT SI REV 6 ECA-0.1 REQUIRED PAGE 16 of 2O STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: o If auxiliary spray is in use, spray flow may be increased by closing normal charging valve AOV-294 and normal PRZR spray valves.

o When using a PRZR PORV select one with an operable block valve.

20 Establish PRZR Pressure Control:

a. Check letdown - IN SERVICE a. Perform the following:
1) Use PRZR heaters and one PRZR PORV to maintain RCS pressure.

IF IA NOT available, THEN Refer to Attachment N2 PORVS

~ to operate PORV.

2) Go to Step 21.
b. Use PRZR heaters and auxiliary spray valve (AOV-296) to maintain RCS pressure 21 Verify Natural Circulation: Increase dumping steam from intact S/Gs.

o RCS subcooling based on core exit T/Cs - GREATER THAN O' USING FIGURE MIN SUBCOOLING o S/G pressures - STABLE OR DECREASING o RCS hot leg temperatures STABLE OR DECREASING o Core exit T/Cs - STABLE OR DECREASING o RCS cold leg temperatures - AT SATURATION TEMPERATURE FOR S/G PRESSURE

~ I EOP: TITLE:

SI REV: 6 ECA-0 ' LOSS OF ALI, AC POWER RECOVERY WITHOUT REQUIRED PAGE 17 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE: Adverse CNMT conditions or loss of forced air cooling may result in failure of NIS detectors.

22 Check If Source Detectors Should Range Be Energized:

a. Source range channels a. Go to Step 22e.

DEENERGIZED

b. Check intermediate range flux- b. Perform the following:

EITHER CHANNEL LESS THAN 10 10 AMPS 1) IF neither intermediate range channel is decreasing THEN initiate boration.

2) Continue with Step 23. WHEN flux is LESS THAN 10 1 amps on any operable channel, THEN do Steps 22c through e.
c. Check the following: c. Continue with Step 23. WHEN either condition met, THEN do o Both intermediate range Steps 22d and e.

channels - LESS THAN 10 AMPS

-OR-o Greater than 20 minutes since reactor trip

d. Verify source range detectors d. Manually energize source range ENERGIZED detectors by depressing P-6 permissive defeat pushbuttons (2 of 2).

IF source ranges can NOT be restored, THEN refer to ER-NIS.1, SR MALFUNCTION and go to Step 23.

e. Transfer Rk-45 recorder to one source range and one intermediate range channel

LID EOP: TITLE:

LOSS OF ALL AC POWER RECOVERY WITHOUT SI REV: 6 ECA-0.1 REQUIRED PAGE 18 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION o RCP THERMAL BARRIER COOLING SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE POTENTIAL INTRODUCTION OF STEAM INTO THE CCW SYSTEM AND THERMAL SHOCK TO RCP.

o RCP SEAL INJECTION SHOULD BE ESTABLISHED SLOWLY TO MINIMIZE RCP THERMAL, STRESSES AND POTENTIAL SEAL FAILURES.

o AS PART OF SUBSEQUENT RECOVERY ACTIONS, RCP(S) SHOULD NOT BE STARTED PRIOR TO A STATUS EVALUATION UNLESS REQUIRED BY AN INADEQUATE CORE COOLING SITUATION.

NOTE: SW should be aligned to CCW Hxs before restoring RCP seal cooling.

23 Check RCP Cooling: Establish normal cooling to RCPs (Refer to Attachment SEAL COOLING).

a. Check CCW to RCPs:

o Annunciator A-7, RCP 1A CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED o Annunciator A-15, RCP 1B CCW RETURN HIGH TEMP OR LOW FLOW EXTINGUISHED

b. Check RCP seal injection:

o Labyrinth seal D/Ps - GREATER THAN 15 INCHES OF WATER

-OR-o RCP seal injection flow to each RCP - GREATER THAN 6 GPM

~ m S ee 1 4

I" 4<,

EOP: TITLE:

REV: 6 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 19 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED

24. Verify Adequate Shutdown Margin:
a. Direct HP to sample RCS and PRZR liquid for boron concentration
b. Verify boron concentration- b. Borate as necessary.

GREATER THAN REQUIREMENTS OF FIGURE SDM 25 Maintain Stable Plant Conditions

a. RCS pressure - STABLE a. Control PRZR heaters and auxiliary spray if available.
b. RCS temperature - STABLE b. Control dumping steam as necessary.
c. PRZR level - BETWEEN 13% [40% c. Control charging as necessary.

adverse CNMT] and 50%

d. Intact S/G level -. BETWEEN 17% d. Control S/G feed flow as

[25% adverse CNMT] and 50% necessary.

26 Verify SI Flow Not Required:

a. RCS subcooling based on core a. Go to ECA-0.2, LOSS OF ALL AC exit T/Cs - GREATER THAN O' POWER RECOVERY WITH SI REQUIRED, USING FIGURE MIN SUBCOOLING Step l.
b. PRZR level - GREATER THAN 5% b. Control charging flow to

[30% adverse CNMT) maintain PRZR level.

IF PRZR level can NOT be maintained, THEN go to ECA-0.2, LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED, Step 1.

4

'*Q F IL(

EOP: LITLE:

REV' ECA-0. 1 LOSS OF AI,I, AC POWER RECOVERY WITHOUT SI REQUIRED PAGE 20 of 20 STEP ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED h

27 Try To Restore Offsite Power Maintain plant condition stable To All AC Busses (Refer to using AC emergency power.

ER-ELEC.1, RESTORATION OF OFFSITE POWER) 28 Determine Circulation IfCooldown Natural Is Required:

a. Consult plant staff to determine a. IF cooldown NOT required, THEN if RCS cooldown is necessary go to 0-3, HOT SHUTDOWN WITH XENON PRESENT.
b. At least one RCP - OPERABLE b. Go to ES-0.2, NATURAL CIRCULATION COOLDOWN.
c. Go to 0-2.2, PLANT SHUTDOWN FROM HOT SHUTDOWN TO COLD SHUTDOWN

-END-

1I +

'1

EOP: T1TLE:

REV! 6 ECA-0 ' LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED of 1 PAGE 1 ECA-0.1 APPENDIX LIS'T TITLE PAGES

1) FIGURE MIN SUBCOOLING
2) FIGURE SDM
3) ATTACHMENT SD-1
4) ATTACHMENT SD-2
5) ATTACHMENT N2 PORVS
6) ATTACHMENT SEAL COOLING
7) ATTACHMENT AUX BLDG SW

5~

  • C) ar. ~

~J

~3

EOP: TITLE:

SI REV: 6 ECA-0.1 LOSS OF AIL AC POWER RECOVERY WITHOUT REQUIRED PAGE 1 of 1 FIGURE MIN SUBCOOLING NOTE: Subcooling Margin = Saturation Temperature From Figure Below [-] Core Exit T/C Indication RC S PRESSURE (PSIG) 2500 2400 RCS PRESSURE 2300 INCREMENTS 20 PSIG 2200 2100 2000 1900 1800 1700 1600 1500 SUBCOOLED 1300 REGION 1200 1100 1000 900 800 700 INADEQUATE SUBCOOLING 600 REGION ADVERSE CNHT 500 400 300 200 NORMAL CNMT TEMPERATURE 100 INCREMENTS 10'f 0

200 250 300 350 400 450 500 550 600 650 700 CORE EXIT SATURATION TEMPERATURE ('f)

4

  • ~

~ t>>

h L

~ A

<<4 r

J

~ t e+

Xc

'C, 4'

1 al

EOP: TLTLE:

REV 6 ECA-0.1 LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED of 1 PAGE 1 FIGURE SDM BORON CONCENTRATION (PPH) 1800 BORON INCREMENTS 20 PPH 1600 1400 ADEQUATE SDM 1200 100 PPH CONSERVATISH INCLUDED 1000 SOO 600 400 ORA 200 BURNUP INCREMENTS 100 HWD/HTU 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 CYCLE 22 BURNUP (HWD/HTU)

NOTE: To obtain core burnup, use PPCS .turn on code BURNUP.

I