ML082530013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 09/10/2008
| issue date = 09/10/2008
| title = Request for Additional Information, License Amendment Request to Change the Reactor Trip System Allowed Outage Time and Surveillance Intervals (TAC Nos. MD8135 & MD8136)
| title = Request for Additional Information, License Amendment Request to Change the Reactor Trip System Allowed Outage Time and Surveillance Intervals (TAC Nos. MD8135 & MD8136)
| author name = Jervey R A
| author name = Jervey R
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Johnson J R
| addressee name = Johnson J
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| docket = 05000348, 05000364
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 10, 2008  
{{#Wiki_filter:September 10, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
 
Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319  


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)  
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)


==Dear Mr. Johnson,==
==Dear Mr. Johnson,==
The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter. Sincerely,        
 
      /RA/ R. A. Jervey, Project Manager     Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364  
The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter.
Sincerely,
                                                  /RA/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364


==Enclosure:==
==Enclosure:==
Request for Additional Information


cc w/encl: See next page September 10, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319  
Request for Additional Information cc w/encl: See next page
 
September 10, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)  
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)


==Dear Mr. Johnson,==
==Dear Mr. Johnson,==


The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter. Sincerely,
The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter.
              /RA/ R. A. Jervey, Project Manager     Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364  
Sincerely,
                                                    /RA/
R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364


==Enclosure:==
==Enclosure:==
Request for Additional Information cc w/encl:  See next page


Distribution
Request for Additional Information cc w/encl: See next page Distribution:
: PUBLIC   RidsNrrDorlLpl2-1Resource LPL2-1 R/F   RidsOgcRpResource RidsNrrLAGLappertResource RidsAcrsAcnw_MailCTRResource RidsNrrPMRJerveyResource RidsRgn2MailCenterResource RidsNrrDorlDprResource RidsNrrDeEicb Accession Number: ML082530013 OFFICE NRR/LPL2-1/PM NRR/LP2-1/LA NRR/LPL2-1/BC NAME RJervey GLappert MWong DATE 9/9/08 9/9/08 9/10/08 OFFICIAL RECORD COPY
PUBLIC                               RidsNrrDorlLpl2-1Resource LPL2-1 R/F                           RidsOgcRpResource RidsNrrLAGLappertResource           RidsAcrsAcnw_MailCTRResource RidsNrrPMRJerveyResource             RidsRgn2MailCenterResource RidsNrrDorlDprResource               RidsNrrDeEicb Accession Number: ML082530013 OFFICE NRR/LPL2-1/PM       NRR/LP2-1/LA   NRR/LPL2-1/BC NAME       RJervey         GLappert       MWong DATE       9/9/08           9/9/08         9/10/08 OFFICIAL RECORD COPY


ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION CHANGE ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVAL EXTENSIONS TAC NOS. MD8135 and MD8136 The license amendment request (LAR) proposes Technical Specification (TS) changes that would revise allowed outage times (AOT), bypass test times, and surveillance test interval (STI) extensions for TS 3.3.1, "Reactor Trip System (RTS) Instrumentation," TS 3.3.2, "Engineered Safety Features Actuation System (ESFAS) Instrumentation," TS 3.3.6, "Containment Purge and Exhaust Isolation Instrumentation," TS 3.3.7, "Control Room Emergency Filtration Pressurization System (CREFS) Actuation Instrumentation," and TS 3.38, "Penetration Room Filtration (PRF) System Actuation Instrumentation.The proposed revisions are based on WCAP-14333-P-A, Revision 1, "Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times," dated October 1998, WCAP-15376-P-A, Revision 1, "Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times," dated March 2003, TSTF-242, Revision 1, "Increase the time to perform a COT on Power Range and Intermediate Range Instruments," and TSTF-246, "RTS Instrumentation, 3.3.1 Condition F Completion Time."
REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION CHANGE ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVAL EXTENSIONS TAC NOS. MD8135 and MD8136 The license amendment request (LAR) proposes Technical Specification (TS) changes that would revise allowed outage times (AOT), bypass test times, and surveillance test interval (STI) extensions for TS 3.3.1, Reactor Trip System (RTS) Instrumentation, TS 3.3.2, Engineered Safety Features Actuation System (ESFAS) Instrumentation, TS 3.3.6, Containment Purge and Exhaust Isolation Instrumentation, TS 3.3.7, Control Room Emergency Filtration Pressurization System (CREFS) Actuation Instrumentation, and TS 3.38, Penetration Room Filtration (PRF) System Actuation Instrumentation. The proposed revisions are based on WCAP-14333-P-A, Revision 1, Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times, dated October 1998, WCAP-15376-P-A, Revision 1, Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, dated March 2003, TSTF-242, Revision 1, Increase the time to perform a COT on Power Range and Intermediate Range Instruments, and TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time.
To support the U.S. Nuclear Regulatory Commission's assessment of the acceptability of the LAR in regard to AOT, bypass test times, and STI extensions, please provide the following:  
To support the U.S. Nuclear Regulatory Commissions assessment of the acceptability of the LAR in regard to AOT, bypass test times, and STI extensions, please provide the following:
: 1. The majority of the plant specific responses to WCAP-14333 and WCAP-15376 are included in the proprietary portion of the LAR. Please provide a non-proprietary summary of the plant specific responses to each of the two conditions in the July 15, 1998 safety evaluation for WCAP-14333 and the five conditions in the December 20, 2002 safety evaluation for WCAP-15376.
: 1.       The majority of the plant specific responses to WCAP-14333 and WCAP-15376 are included in the proprietary portion of the LAR. Please provide a non-proprietary summary of the plant specific responses to each of the two conditions in the July 15, 1998 safety evaluation for WCAP-14333 and the five conditions in the December 20, 2002 safety evaluation for WCAP-15376.
Joseph M. Farley Nuclear Plant, Units 1 & 2 cc:  Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
ENCLOSURE


Mr. B. D. McKinney, Licensing Manager Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm P.O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201 Mr. J. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL  35201 State Health Officer Alabama Department of Public Health 434 Monroe St. Montgomery, AL  36130-1701 Chairman Houston County Commission P.O. Box 6406 Dothan, AL  36302 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL  36319 William D. Oldfield SAER Supervisor Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant, Units 1 & 2 cc:
P.O. Box 470 Ashford, AL 36312}}
Mr. J. Randy Johnson                        State Health Officer Vice President - Farley                    Alabama Department of Public Health Joseph M. Farley Nuclear Plant              434 Monroe St.
7388 North State Highway 95                Montgomery, AL 36130-1701 Columbia, AL 36319 Chairman Mr. B. D. McKinney, Licensing Manager       Houston County Commission Southern Nuclear Operating Company, Inc. P.O. Box 6406 P.O. Box 1295                               Dothan, AL 36302 Birmingham, AL 35201-1295 Resident Inspector Mr. M. Stanford Blanton                     U.S. Nuclear Regulatory Commission Balch and Bingham Law Firm                 7388 N. State Highway 95 P.O. Box 306                               Columbia, AL 36319 1710 Sixth Avenue North Birmingham, AL 35201                       William D. Oldfield SAER Supervisor Mr. J. Gasser                               Southern Nuclear Operating Company, Inc.
Executive Vice President                    P.O. Box 470 Southern Nuclear Operating Company, Inc. Ashford, AL 36312 P.O. Box 1295 Birmingham, AL 35201}}

Latest revision as of 14:10, 14 November 2019

Request for Additional Information, License Amendment Request to Change the Reactor Trip System Allowed Outage Time and Surveillance Intervals (TAC Nos. MD8135 & MD8136)
ML082530013
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/10/2008
From: Richard Jervey
Plant Licensing Branch II
To: Jerrica Johnson
Southern Nuclear Operating Co
Jervey, Richard 301-415-2728
References
TAC MD8135, TAC MD8136
Download: ML082530013 (4)


Text

September 10, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)

Dear Mr. Johnson,

The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter.

Sincerely,

/RA/

R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Request for Additional Information cc w/encl: See next page

September 10, 2008 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING THE LICENSE AMENDMENT REQUEST TO CHANGE THE REACTOR TRIP SYSTEM ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVALS (TAC NOS. MD8135 AND MD8136)

Dear Mr. Johnson,

The U.S. Nuclear Regulatory Commission Staff (NRC) has reviewed the License Amendment Request dated December 20, 2007, submitted by Southern Nuclear Operating Company. The NRC staff has identified additional information needed to complete its review of this amendment request. The Request for Additional Information is provided as an enclosure to this letter.

Sincerely,

/RA/

R. A. Jervey, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364

Enclosure:

Request for Additional Information cc w/encl: See next page Distribution:

PUBLIC RidsNrrDorlLpl2-1Resource LPL2-1 R/F RidsOgcRpResource RidsNrrLAGLappertResource RidsAcrsAcnw_MailCTRResource RidsNrrPMRJerveyResource RidsRgn2MailCenterResource RidsNrrDorlDprResource RidsNrrDeEicb Accession Number: ML082530013 OFFICE NRR/LPL2-1/PM NRR/LP2-1/LA NRR/LPL2-1/BC NAME RJervey GLappert MWong DATE 9/9/08 9/9/08 9/10/08 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION CHANGE ALLOWED OUTAGE TIME AND SURVEILLANCE INTERVAL EXTENSIONS TAC NOS. MD8135 and MD8136 The license amendment request (LAR) proposes Technical Specification (TS) changes that would revise allowed outage times (AOT), bypass test times, and surveillance test interval (STI) extensions for TS 3.3.1, Reactor Trip System (RTS) Instrumentation, TS 3.3.2, Engineered Safety Features Actuation System (ESFAS) Instrumentation, TS 3.3.6, Containment Purge and Exhaust Isolation Instrumentation, TS 3.3.7, Control Room Emergency Filtration Pressurization System (CREFS) Actuation Instrumentation, and TS 3.38, Penetration Room Filtration (PRF) System Actuation Instrumentation. The proposed revisions are based on WCAP-14333-P-A, Revision 1, Probabilistic Risk Analysis of the RPS and ESFAS Test Times and Completion Times, dated October 1998, WCAP-15376-P-A, Revision 1, Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, dated March 2003, TSTF-242, Revision 1, Increase the time to perform a COT on Power Range and Intermediate Range Instruments, and TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time.

To support the U.S. Nuclear Regulatory Commissions assessment of the acceptability of the LAR in regard to AOT, bypass test times, and STI extensions, please provide the following:

1. The majority of the plant specific responses to WCAP-14333 and WCAP-15376 are included in the proprietary portion of the LAR. Please provide a non-proprietary summary of the plant specific responses to each of the two conditions in the July 15, 1998 safety evaluation for WCAP-14333 and the five conditions in the December 20, 2002 safety evaluation for WCAP-15376.

ENCLOSURE

Joseph M. Farley Nuclear Plant, Units 1 & 2 cc:

Mr. J. Randy Johnson State Health Officer Vice President - Farley Alabama Department of Public Health Joseph M. Farley Nuclear Plant 434 Monroe St.

7388 North State Highway 95 Montgomery, AL 36130-1701 Columbia, AL 36319 Chairman Mr. B. D. McKinney, Licensing Manager Houston County Commission Southern Nuclear Operating Company, Inc. P.O. Box 6406 P.O. Box 1295 Dothan, AL 36302 Birmingham, AL 35201-1295 Resident Inspector Mr. M. Stanford Blanton U.S. Nuclear Regulatory Commission Balch and Bingham Law Firm 7388 N. State Highway 95 P.O. Box 306 Columbia, AL 36319 1710 Sixth Avenue North Birmingham, AL 35201 William D. Oldfield SAER Supervisor Mr. J. Gasser Southern Nuclear Operating Company, Inc.

Executive Vice President P.O. Box 470 Southern Nuclear Operating Company, Inc. Ashford, AL 36312 P.O. Box 1295 Birmingham, AL 35201