| title = | | title = Operator Licensing Retake Exam - Draft Operating Exam (Sections a and B) (Folder 2) | ||
| author name = | | author name = | ||
| author affiliation = Constellation Energy Nuclear Group, LLC | | author affiliation = Constellation Energy Nuclear Group, LLC | ||
| addressee name = Silk D | | addressee name = Silk D | ||
| addressee affiliation = NRC/RGN-I/DRS/OB | | addressee affiliation = NRC/RGN-I/DRS/OB | ||
| docket = 05000317, 05000318 | | docket = 05000317, 05000318 | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:I APPLICANT: | {{#Wiki_filter:I APPLICANT: _ __ | ||
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-1 | |||
Job Performance Measure Form ES-C-l Facility: | |||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-l (Alt Path) Task Title: Verify Reactivity Control safety function is satisfied. | Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-l (Alt Path) | ||
Task | |||
==Title:== | |||
Verify Reactivity Control safety function is satisfied. | |||
Task Number: 201.009 KIA | Task Number: 201.009 KIA | ||
==Reference:== | ==Reference:== | ||
004 A2.14 (4.4,4.7) | |||
Method of testing: | |||
Simulated Performance: D Actual Performance: C8J Classroom: D Simulator: C8J Plant: D READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit 1 was in Mode 1 at 100% power. | |||
: 2. A significant electrical transient and Unit-l trip have occurred. | |||
: 3. You are the Reactor Operator Initiating Cue: | |||
The CRS directs you to Perform Reactivity Safety Function per EOP-O Task Standard: | |||
The candidate will initiate Emergency Boratilon per EOP-O. | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet 1. | |||
Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
: 1. EOP-O, Post-Trip Immediate Actions Time Critical Task: No Validation Time: 20 minutes Simulator Setup: Reset to IC-24 (both units at 100%) Enter malfunctions: 4KVOOl_03, fault on 13 4kv bus on Fl 4KVOOl_04, fault on 14 4kv bus on F2 Place simulator in run Initiate Fl and F2 Manually trip the reactor when 11 and 12 SGFPs trip on low suction pressure Freeze the simulator. | : 1. EOP-O, Post-Trip Immediate Actions Time Critical Task: | ||
Job Performance Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) Time Start: CUE: The CRS directs you perform Reactivity Control safety function per EOP-O Locates the reactivity control Same as element. Depress ONE set of Manual REACTOR TRIP Same as element. buttons. 2. Check the Reactor has tripped by the following: | No Validation Time: | ||
The candidate determines the Prompt drop in NI power reactor has tripped and alternate action step 2.1 is NOT applicable.Negative SUR Check that NO more than ONE CEA is NOT fully The candidate determines that CEA positions CANNOT be determined and alternate action step 3.1 is required. | 20 minutes Simulator Setup: | ||
3.1 IF more than ONE CEA fails to fully insert, | : 1. Reset to IC-24 (both units at 100%) | ||
: 2. Enter malfunctions: | |||
Job Performancie Form ES-C-I STANDARD The candidate places | : a. 4KVOOl_03, fault on 13 4kv bus on Fl | ||
: f. Shut the VCT OUT valve, 1-CVC-501-MOV. | : b. 4KVOOl_04, fault on 14 4kv bus on F2 | ||
MOV in close. The candidate verifies 11 | : 3. Place simulator in run | ||
* charging pump 9 Start ALL available CHG | : 4. Initiate Fl and F2 | ||
* critical. | : 5. Manually trip the reactor when 11 and 12 SGFPs trip on low suction pressure | ||
: 4. Verify demineralized water makeup to the ReS is Candidate verifies II and 12 | : 6. Freeze the simulator. | ||
* 11 and 12 RC M/U PPs are secured VCT M/U valve, 1-CVC-512-CV, is shut Candidate verifies CV is shut. | |||
* IF RCS Makeup is in Direct Lineup, THEN | Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | ||
Terminating Cue: This IPM is complete when the candidate reports the status of the Reactivity Control safety function. | Time Start: | ||
No further actions are required. | CUE: The CRS directs you perform Reactivity Control safety function per EOP-O Locates the reactivity control plaque Same as element. | ||
The evaluator is expected to end the IPM. Time Stop: | : 1. Depress ONE set of Manual REACTOR TRIP Same as element. | ||
buttons. | |||
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-l Applicant: | : 2. Check the Reactor has tripped by the following: | ||
The candidate determines the | |||
* Prompt drop in NI power reactor has tripped and alternate action step 2.1 is NOT applicable. | |||
* Negative SUR | |||
: 3. Check that NO more than ONE CEA is NOT fully The candidate determines that inserted. CEA positions CANNOT be determined and alternate action step 3.1 is required. | |||
3.1 IF more than ONE CEA fails to fully insert, THEN borate the RCS to at least 2300 ppm as The candidate places the follows: handswitch for l-CVC-512-CV in close. | |||
: a. Shut the VCT M/U valve, 1-CVC-512-CV. | |||
: b. Open the SA DIRECT M/U valve, 1-CVC-514- The candidate may place l-CVC MOV. 514-MOV hand switch in open. | |||
514-MOV is deenergized so this step is NOT critical | |||
: c. Open the BAST GRAVITY FD valves: | |||
Candidate opens l-CVC-508 | |||
* 1-CVC-508-MOV MOV | |||
* 1-CVC-509-MOV Candidate opens l-CVC-509 MOV | |||
: d. Verify the M/U MODE SEL SW, 1-HS-210, is The candidate veritIes I-HS-21O in MANUAL. in manual. | |||
: e. Start a SA PP. The candidate starts 11 BA pump. | |||
(12 BA pump is deenergized due to loss of power affects) | |||
Job Performancie Measure Form ES-C-I ELEMENT STANDARD The candidate places I-CVC-501 | |||
: f. Shut the VCT OUT valve, 1-CVC-501-MOV. MOV in close. | |||
The candidate verifies 11 | |||
* charging pump running. | |||
9 Start ALL available CHG PPs The Ioss 0 f144kv bus startsaII available charging pumps so NOT | |||
* critical. | |||
: 4. Verify demineralized water makeup to the ReS is secured as follows: Candidate verifies II and 12 RCMU pumps are secured. | |||
* 11 and 12 RC M/U PPs are secured | |||
* VCT M/U valve, 1-CVC-512-CV, is shut Candidate verifies l-CVC-512 CV is shut. | |||
* IF RCS Makeup is in Direct Lineup, THEN the RWT CHG PP SUCT, 1-CVC-504-MOV, The candidate determines this step is shut is NOT applicable The candidate reports 'Reactivity Control is Complete' (or met) | |||
Note: The candidate may provide additional information for valves and pumps not operating due to loss of power. This additional information is not critical. | |||
Terminating Cue: This IPM is complete when the candidate reports the status of the Reactivity Control safety function. No further actions are required. The evaluator is expected to end the IPM. | |||
Time Stop: | |||
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-l Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT _ _ _ _ __ UNSAT -------- | |||
Examiner's Signature and Date: --------------------------------------- | |||
Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
Job Performance Measure Form ES-C-l APPLICANT'S CUE Initial Conditions: | : 1. Unit 1 was in Mode 1 at 100% power. | ||
: 1. Unit 1 was in Mode 1 at 100% power. 2. A significant electrical transient and Unit-l trip have occurred. | : 2. A significant electrical transient and Unit-l trip have occurred. | ||
: 3. You are the Reactor Operator Initiating The eRS directs you to Perform Reactivity Safety Function per APPLICANT: | : 3. You are the Reactor Operator Initiating Cue: | ||
The eRS directs you to Perform Reactivity Safety Function per EOP-O | |||
Appendix C Job Perfonnance Measure Fonn ES-C-1 Facility: | |||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-2 (Alt Path) Task Title: Respond to RCS leakage exceeding one charging pump in modes 1 and 2 Task Number: 202.015 K.I A | APPLICANT: _ __ | ||
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-2 | |||
Appendix C Job Perfonnance Measure Fonn ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-2 (Alt Path) | |||
Task | |||
==Title:== | |||
Respond to RCS leakage exceeding one charging pump in modes 1 and 2 Task Number: 202.015 K.I A | |||
==Reference:== | ==Reference:== | ||
002 A2.01 (4.3, 4.4) | |||
002 A2.01 (4.3, Method of Simulated Performance: | Method of testing: | ||
Actual Perfonnance: Classroom: | Simulated Performance: Actual Perfonnance: [ZJ Classroom: D Simulator: [ZJ Plant: D READ TO THE APPLICANT: | ||
D Simulator: | |||
[ZJ Plant: D READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: | Initial Conditions: | ||
: 1. Unit 1 is in Mode 1 at 100% power. 2. An RCS leak has occurred. | : 1. Unit 1 is in Mode 1 at 100% power. | ||
: 3. The | : 2. An RCS leak has occurred. | ||
: 3. The STA has calculated the RCS leak rate to be 75 gpm. | |||
: 4. You are the Control Room Operator Initiating Cue: | |||
The CRS directs you to perform AOP-2A step VI.E, 'Attempt to isolate the leak' Task Standard: | |||
The candidate will attempt to isolate letdown. The leak will remain greater than the capacity of a charging pump requiring a Reactor Trip. | The candidate will attempt to isolate letdown. The leak will remain greater than the capacity of a charging pump requiring a Reactor Trip. | ||
Job Form ES-C-I Evaluation Criteria: All critical steps completed (denoted by shading). All sequential steps completed in order. All time-critical steps (denoted by an asterisk) completed within allotted time. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: | |||
Job Perfonnanc(~ Measure Form ES-C-I Evaluation Criteria: | |||
I. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals nonnally available in the plant General | : 1. Procedures and manuals nonnally available in the plant General | ||
==References:== | ==References:== | ||
: 1. AOP-2A, EXCESSIVE REACTOR COOLANT LEAKAGE Time Critical Task: No Validation Time: 10 minutes Simulator Setup: Reset to | : 1. AOP-2A, EXCESSIVE REACTOR COOLANT LEAKAGE Time Critical Task: | ||
___ a. RCS003, RCS Leak, at 75 Place simulator in run Open I-PS-5464, plant sample isolation valve Place an off-nonnal pink ring on I-PS-5464 Freeze the simulator when a second charging pump starts (about 4 minutes) | No Validation Time: | ||
10 minutes Simulator Setup: | |||
: 1. Reset to IC-24 (both units at 100%) | |||
: 2. Enter malfunctions: | |||
___ a. RCS003, RCS Leak, at 75 gpm | |||
: 3. Place simulator in run | |||
: 4. Open I-PS-5464, plant sample isolation valve | |||
: 5. Place an off-nonnal pink ring on I-PS-5464 | |||
: 6. Freeze the simulator when a second charging pump starts (about 4 minutes) | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
Time Start: - - - - | |||
CUE: The CRS directs you to perform AOP-2A step VI.E, 'Attempt to isolate the leak' Locates AOP-2A section VLE on page 35 Same as element | |||
: 1. Verify that the UD CNTMT ISOL valves are shut: | |||
Candidate will place hand | Candidate will place hand | ||
* switches for l-CVC-516-CV in close. 2. Check there is NO PORV leakage by following indications: | * 1-CVC-515-CV switches for l-CVC-515-CV in close. | ||
Candidate will determine there is Quench Tank Parameters no PORV leakage due to PORV discharge piping computer points T1 07 and Acoustic Monitor indication | * 1-CVC-516-CV Candidate will place hand switches for l-CVC-516-CV in close. | ||
: 3. Verify that RCS SAMPLE ISOL valve, 1-PS-The candidate closes l-CV-5464 5464-CV, is shut. 4. Verify that the Reactor Vessel Vent valves are shut: The candidate verifies the RCS | : 2. Check there is NO PORV leakage by following indications: Candidate will determine there is | ||
: 5. Verify that the PZR Vent valves are shut: The candidate verifies the PZR 1-RC-105-SV vent valves closed 1-RC-106-SV Job Performance Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) NOTE A leak on the Charging header which exceeds the capacity of the charging pumps can be identified by Charging header pressure indicating less than RCS pressure. | * Quench Tank Parameters no PORV leakage due to | ||
Identification of the leak may be missed if more than one charging pump is running. 6. Determine if the leak is on the Charging header by performing the following actions: Same as element a. Stop all but ONE CHG PP. b. IF Charging header pressure is less than | * PORV discharge piping temperatures, computer points T1 07 and T108 | ||
: 8. IF the leak is determined to be occurring inside Containment by checking the following indications: Rise in Containment temperature, pressure, humidity or sump level alarm The candidate determines the leak is inside the containment based on Rise in Containment gaseous or particulate Containment sump level alarm activity and containment humidity "U-1 WR NOBLE GAS RAD MON" "UNIT 1 MAIN VENT GASEOUS" THEN perform the following actions: a. Start ALL available CNTMT AIR CLRs Job Performance Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) b. Open the CNTMT CLR EMER OUT valves for Same as element the operating CNTMT AIR CLRs. IF the leak is NOT occurring inside of Candidate determines the step is Containment. | * Acoustic Monitor indication | ||
THEN perform the following not applicable actions: 10. Determine that NO leakage into the Component The candidate determines there is Cooling System is indicated by: NO leakage into the component cooling system NO rising trends on Component Radiation Monitor. CC HEAD TK LVL" high alarm clear The candidate reports AOP-2A block step E is complete. | : 3. Verify that RCS SAMPLE ISOL valve, 1-PS-The candidate closes l-CV-5464 5464-CV, is shut. | ||
CUE: Acknowledge step E is complete CUE: Perform block AOP-2A step F, DETERMINE THE ACTIONS FOR RCS LEAKAGE, ON PAGE 1. Check that the leak has been isolated. | : 4. Verify that the Reactor Vessel Vent valves are shut: The candidate verifies the RCS | ||
Candidate will determine the leak has not been isolated. | * 1-RC-103-SV vent valves closed | ||
Candidate will perform alternate step F .1.1 1.1 IF the leak has NOT been isolated AND the is greater than the capacity of ONE Pump. THEN. with the approval of the The candidate will recommend perform the following actions: tripping the reactor and a. Trip the implementing EOP-O b. IMPLEMENT EOP-O. POST IMMEDIATE Terminating Cue: This JPM is complete when the candidate recommends a manual reactor trip. No further actions are required. | * l-RC-104-SV | ||
Th(: evaluator is expected to end the | : 5. Verify that the PZR Vent valves are shut: | ||
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-2 Applicant: | The candidate verifies the PZR | ||
* 1-RC-105-SV vent valves closed | |||
* 1-RC-106-SV | |||
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
NOTE A leak on the Charging header which exceeds the capacity of the charging pumps can be identified by Charging header pressure indicating less than RCS pressure. | |||
Identification of the leak may be missed if more than one charging pump is running. | |||
: 6. Determine if the leak is on the Charging header by performing the following actions: | |||
Same as element | |||
: a. Stop all but ONE CHG PP. | |||
: b. IF Charging header pressure is less than RCS Pressure, THEN assume the leak is The candidate determines the leak is NOT on the charging header. | |||
on the Charging header. | |||
: c. IF the leak is NOT on the Charging The candidate starts charging header, THEN start any CHG PPs that pumps turned off in step 6.a. | |||
were stopped. | |||
: 7. IF the leak is on the Charging header, THEN Candidate determines the step is perform the following actions: not applicable | |||
: 8. IF the leak is determined to be occurring inside Containment by checking the following indications: | |||
* Rise in Containment temperature, pressure, humidity or sump level alarm frequency The candidate determines the leak is inside the containment based on | |||
* Rise in Containment gaseous or particulate Containment sump level alarm activity and containment humidity | |||
* "U-1 WR NOBLE GAS RAD MON" and "UNIT 1 MAIN VENT GASEOUS" alarms clear THEN perform the following actions: | |||
: a. Start ALL available CNTMT AIR CLRs in HIGH. | |||
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
: b. Open the CNTMT CLR EMER OUT valves for Same as element the operating CNTMT AIR CLRs. | |||
: 9. IF the leak is NOT occurring inside of Candidate determines the step is Containment. THEN perform the following not applicable actions: | |||
: 10. Determine that NO leakage into the Component The candidate determines there is Cooling System is indicated by: NO leakage into the component cooling system | |||
* NO rising trends on Component Cooling Radiation Monitor. 1-RI-3819 | |||
* CC HEAD TK LVL" high alarm clear The candidate reports AOP-2A block step E is complete. | |||
CUE: Acknowledge step E is complete CUE: Perform block AOP-2A step F, DETERMINE THE APPROPRIATE ACTIONS FOR RCS LEAKAGE, ON PAGE 42 | |||
: 1. Check that the leak has been isolated. Candidate will determine the leak has not been isolated. Candidate will perform alternate step F.1.1 1.1 IF the leak has NOT been isolated AND the leak is greater than the capacity of ONE Charging Pump. THEN. with the approval of the SM/CRS. | |||
The candidate will recommend perform the following actions: | |||
tripping the reactor and | |||
: a. Trip the Reactor. implementing EOP-O | |||
: b. IMPLEMENT EOP-O. POST TRIP IMMEDIATE ACTIONS. | |||
Terminating Cue: This JPM is complete when the candidate recommends a manual reactor trip. No further actions are required. Th(: evaluator is expected to end the JPM. | |||
* Time Stop: | |||
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-2 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __ | |||
Examiner's Signature and Date: __________~_. . . . . . _ _ _ _ _ _ _ __ | |||
Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
: 1. Unit 1 is in Mode 1 at 100% power. | |||
Job Performance Measure Form ES-C-l APPLICANT'S CUE Initial Conditions: | : 2. An RCS leak has occurred. | ||
: 1. Unit 1 is in Mode 1 at 100% power. 2. An RCS leak has occurred. | : 3. The ST A has calculated the RCS leak rate to be 75 gpm. | ||
: 3. The ST A has calculated the RCS leak rate to be 75 gpm. 4. You are the Control Room Operator Initiating The CRS directs you to perform AOP-2A step VI.E, 'Attempt to isolate the I APPLICANT, | : 4. You are the Control Room Operator Initiating Cue: | ||
Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: | The CRS directs you to perform AOP-2A step VI.E, 'Attempt to isolate the leak' | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-3 (Alt Path) Task Title: Notes failure of an operating HPSI pump and establishes safety injection using 12 HPSI pump prior to exiting EOP-O Task Number: 201.132 KIA | |||
I APPLICANT, _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-3 | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-3 (Alt Path) | |||
Task | |||
==Title:== | |||
Notes failure of an operating HPSI pump and establishes safety injection using 12 HPSI pump prior to exiting EOP-O Task Number: 201.132 KIA | |||
==Reference:== | ==Reference:== | ||
006 A2.02 (3.9, 4.3) | |||
Method of testing: | |||
Simulated Performance: Actual Performance: ~ | |||
Classroom: D Simulator: ~ | |||
Plant: D READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. 11 HPSI pump is tagged out for maintenance | |||
: 2. Unit 1 was in Mode 1 at 100% power. | |||
: 3. A plant transient and Unit trip occurred | |||
: 4. EOP-O has been completed, EOP-5 has b(~en implemented. | |||
: 5. You are the Reactor Operator Initiating Cue: | |||
The CRS directs you to perform EOP-5 block step D, 'Monitor RCS Depressurization' Task Standard: | |||
The candidate determines that there is insufficient HPSI flow from 13 HPSI pump. | |||
The candidate will starts 12 HPSI pump aligned to the 13 HPSI pump flow path. | |||
...."ri-"'''x,........,''' Measure Fonn ES-C-l Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals nonnally available in the plant General | |||
==References:== | ==References:== | ||
EOP-5, LOSS OF COOLANT ACCIDENT Time Critical Task: No Validation Time: 20 minutes Simulator Setup: | : 1. EOP-5, LOSS OF COOLANT ACCIDENT Time Critical Task: | ||
No Validation Time: | |||
20 minutes Simulator Setup: | |||
_ _ 1. Reset to IC-24 (both units at 100%) | |||
: 2. Enter malfunctions: | |||
_ _ a. FI: RCS002, RCS leak @ 1200 gpm | |||
* CUE: The CRS directs you to perform EOP*-5 block step D, 'Monitor ReS Depressurization' Locates EOP-5 block step D on page 8 1. IF pressurizer pressure is less than or equal to 1725 PSIA OR containment pressure is greater than or equal to 2.8 PSIG, THEN verify SIAS actuation. | : 3. Enter Overrides | ||
: 2. IF pressurizer pressure is greater than 1725 PSIA AND containment pressure is less than 2.8 PSIG, THEN perform the following actions to block SIAS: 3. IF SIAS has actuated, THEN perform the following actions: a. Verify the following pumps are running: 11 HPSI PP 13 HPSI PP 11 LPSI PP 12 LPSI PP ALL available CHG PPs b. Verify safety injection flow: | _ _ a. I-SI-406, 13 HPSI pump discharge valve, open @ .07 | ||
Candidate detenmines 11 HPSI pump did not fail, it is tagged out Job Perfonnancle Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | _ _ 4. Tag 11 HPSI PP HS in PTL | ||
* IF 13 HPSI PP failed, THEN align 12 HPSI Candidate detennines 13 HPSI PP as follows: pump has failed due to its low flow (1) Start 12 HPSI PP Candidate starts 12 HPSI pump (2) Open HPSI HDR XCONN valve, 653-MOV. Candidate opens I-S1-653 (3) Shut HPSI HDR XCONN valve, Candidate closes I-S1-655 MOV. Ensure electrical power is available to Same as element valves and CUE: Another operator will verify Safety Injection lineup per attachment | _ _ 5. Tag I-S1-656 in close | ||
- - 6. Place simulator in run | |||
The evaluator is expected to end the JPM. | - - 7. Initiate FI | ||
Appendix C Job Performanc1e Measure Form ES-C-I Worksheet Verification of Completion Job Performance Measure Number: SIM-3 Applicant: | _ _ 8. Close I-CV-515 and I-CV-5I6 | ||
_ _ 9. Stop IIA and 12B RCPs | |||
-- 10. Freeze simulator 5 minutes after SIAS actuates | |||
_ _ 11. Acknowledge all alanns | |||
Perionmruncle Measure Fonm ES-C-l ELEMENT STANDARD | |||
(* = CRITICAL STEP) | |||
'-'tart: - - - | |||
* CUE: The CRS directs you to perform EOP*-5 block step D, 'Monitor ReS Depressurization' Locates EOP-5 block step D on page 8 Srume as element. | |||
Candidate will determine that | |||
: 1. IF pressurizer pressure is less than or equal to SIAS has actuated by checking 1725 PSIA OR containment pressure is greater SIAS alarm, 13 HPSI pp has than or equal to 2.8 PSIG, THEN verify SIAS started, rund HPSI MOVs have actuation. opened. | |||
: 2. IF pressurizer pressure is greater than 1725 PSIA AND containment pressure is less than 2.8 PSIG, Crundidate will detenmine the step THEN perform the following actions to block is NOT applicable SIAS: | |||
: 3. IF SIAS has actuated, THEN perform the following actions: | |||
: a. Verify the following pumps are running: | |||
* 11 HPSI PP | |||
* 13 HPSI PP Detenmines 11 HPSI is not running due to a tagout | |||
* 11 LPSI PP | |||
* 12 LPSI PP | |||
* ALL available CHG PPs Crundidate locates EOP | |||
: b. Verify safety injection flow: attachments, refers to ATTACHMENT (10), and | |||
* HPSI flow PER ATTACHMENT(10), detenmines 13 HPSI flow is less HIGH PRESSURE SAFETY than the minimum required based IN"IECTION FLOW, when pressure is on addition of the 4 loop flow below 1270 PSIA indicators rundJor the HPSI total flow indication. | |||
b.1 Perform the following actions as necessary: | |||
Candidate detenmines 11 HPSI | |||
* IF 11 HPSI PP failed, THEN start 12 HPSI pump did not fail, it is tagged out PP. | |||
Job Perfonnancle Measure Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
* IF 13 HPSI PP failed, THEN align 12 HPSI Candidate detennines 13 HPSI PP as follows: pump has failed due to its low flow (1) Start 12 HPSI PP Candidate starts 12 HPSI pump (2) Open HPSI HDR XCONN valve, 1-SI 653-MOV. Candidate opens I-S1-653 (3) Shut HPSI HDR XCONN valve, 1-SI-655 Candidate closes I-S1-655 MOV. | |||
* Ensure electrical power is available to Same as element valves and ~um~s. | |||
CUE: Another operator will verify Safety Injection lineup per attachment 2. | |||
* Verify safety injection system lineup PER ATTACHMENT (2), SIAS VERIFICATION CHECKLIST. | |||
Tenninating Cue: This JPM is complete when the 12 HPSI pump is injecting into the RCS per step b.I second bullet. No further actions are required. The evaluator is expected to end the JPM. | |||
Appendix C Job Performanc1e Measure Form ES-C-I Worksheet Verification of Completion Job Performance Measure Number: SIM-3 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Number of Attempts: | Facility Evaluator: | ||
Number of Attempts: __________________ | |||
Time to Complete: | |||
Follow up Question: __________________________ | |||
Applicant Response: __________________________ | |||
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __ | |||
Examiner's Signature and Date: | |||
: 1. 11 HPSI pump is tagged out for maiutenauce | |||
: 2. Unit 1 was in Mode 1 at 100% power. 3. A plant transient and Unit trip occurred 4. EOP-O has been completed, EOP-S has been implemented. | IJvU......,. C Job Perfonnancj; Measure Fonn ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | ||
S. You are the Reactor Operator Initiating Cue: The CRS directs you to perform EOP-S block step D, 'Monitor RCS Depressurization' I APPLICANT: | : 1. 11 HPSI pump is tagged out for maiutenauce | ||
: 2. Unit 1 was in Mode 1 at 100% power. | |||
Appendix C Job Performance Measure Form ES-C-l Form ES-C-l Facility: | : 3. A plant transient and Unit trip occurred | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-4 (Alt Path) Task Title: Takes alternate actions for turbine stop and control valve failure by shutting MSIVs, or if SOlS actuates notes an MSIV failed to shut on SOlS and shuts the MSIVs. Task Number: 093.002 KIA | : 4. EOP-O has been completed, EOP-S has been implemented. | ||
S. You are the Reactor Operator Initiating Cue: | |||
The CRS directs you to perform EOP-S block step D, 'Monitor RCS Depressurization' | |||
I APPLICANT: _ __ | |||
CALVERl' CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-4 | |||
Appendix C Job Performance Measure Form ES-C-l Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-4 (Alt Path) | |||
Task | |||
==Title:== | |||
Takes alternate actions for turbine stop and control valve failure by shutting MSIVs, or if SOlS actuates notes an MSIV failed to shut on SOlS and shuts the MSIVs. | |||
Task Number: 093.002 KIA | |||
==Reference:== | ==Reference:== | ||
045 A3.04 (3.4, 3.6) | |||
Method of testing: | |||
Simulated Performance: 0 Actual Performance: [gJ Classroom: Simulator: [gJ Plant: | |||
o READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit 1 was in Mode 1 at 100% power. | |||
: 2. A Switchyard Fault has occurred | |||
: 3. The reactor has tripped | |||
: 4. You are performing duties as the Control Room Operator Initiating Cue: | |||
The CRS directs you to perform Turbine Trip per EOP-O Task Standard: | |||
A main turbine stop valve and control valve have failed to automatically close on the plant trip. This will cause the Main Turbine to overspeed and steam generator pressures to lower rapidly. SGIS will not actuate to protect the plant. The candidate will shut the Main Steam Isolation Valves and secure the Main Generator Exciter. | |||
Job Performance Measure Form ES-C-l Form ES-C-l Worksheet Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
- | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
01-28, OPERATION OF THE 500 KV SWITCHYARD | : 1. 01-28, OPERATION OF THE 500 KV SWITCHYARD | ||
: 2. EOP-O, POST-TRIP IMMEDIATE ACTIONS Time Critical Task: No Validation Time: 5 minutes Simulator Setup: 1. Reset to I C-24 (both units at 100%) 2. Enter malfunctions: | : 2. EOP-O, POST-TRIP IMMEDIATE ACTIONS Time Critical Task: | ||
: a. SWYDOOI_02, Breaker 552-22 failure ___ b. TG005 _01, Main Turbine Stop Valve and Control Valve 1 failed as-is c. ESFAXXXX, SGIS auto failure 3. Place simulator in run 4. Place breaker 552-22 in open 5. Freeze simulator Job Perfonnance Fonn ES-C-I Fonn ES-C-l ELEMENT STANDARD Time CUE: The RO announces | No Validation Time: | ||
'The reactor is tripped', the CRS announces EOP-O' 1. Check the Reactor has tripped. 2. Ensure the Turbine has tripped by performing the following actions: a. Depress BOTH TURBINE TRIP buttons. b. Check the Turbine Main Stop Valves shut: | 5 minutes Simulator Setup: | ||
* MSV1 | : 1. Reset to I C-24 (both units at 100%) | ||
* MSV2 | - - 2. Enter malfunctions: | ||
: a. SWYDOOI_02, Breaker 552-22 failure | |||
___ b. TG005 _01, Main Turbine Stop Valve and Control Valve 1 failed as-is | |||
: c. ESFAXXXX, SGIS auto failure | |||
- - 3. Place simulator in run | |||
: 4. Place breaker 552-22 in open | |||
: 5. Freeze simulator | |||
Job Perfonnance Measure Fonn ES-C-I Fonn ES-C-l ELEMENT STANDARD Time Start: | |||
CUE: The RO announces 'The reactor is tripped', the CRS announces 'Perform EOP-O' | |||
: 1. Check the Reactor has tripped. Candidate verifies the reactor has tripped | |||
: 2. Ensure the Turbine has tripped by performing the following actions: Candidate depresses both turbine trip buttons | |||
: a. Depress BOTH TURBINE TRIP buttons. | |||
: b. Check the Turbine Main Stop Valves shut: | |||
* MSV1 Candidate detennines MSV I did | |||
* MSV2 not shut and alternate step b.l is required | |||
* MSV3 | * MSV3 | ||
* MSV4 | * MSV4 Note: The candidate may report 'Taking alternate actions for (stop valve open)'. This report is not critical. | ||
CUE: Acknowledge alternate actions IF ANY Turbine Main Stop Valve failed to shut, THEN shut BOTH MSIVs. c. Check Turbine Speed drops. d. IF the Turbine was paralleled to the grid, THEN verify the Turbine Generator Output breakers open: | CUE: Acknowledge alternate actions b.1 IF ANY Turbine Main Stop Valve failed to Candidate will shut both Main shut, THEN shut BOTH MSIVs. Steam Isolation Valves | ||
: c. Check Turbine Speed drops. Candidate detennines turbine speed is lowering | |||
: d. IF the Turbine was paralleled to the grid, The candidate detennines breaker THEN verify the Turbine Generator Output 552-22 did not open and takes its breakers open: handswitch to open. | |||
* 11 GEN BUS BKR, O-CS-552-22 | * 11 GEN BUS BKR, O-CS-552-22 | ||
* 11 GEN TIE BKR, O-CS-552-23 | * 11 GEN TIE BKR, O-CS-552-23 Same as element | ||
: e. Verify 11 GEN FIELD BKR, 1-CS-41, is c)pen | : e. Verify 11 GEN FIELD BKR, 1-CS-41, is c)pen. Same as element | ||
* 1-MS-4025-MOV (11 MSR) | |||
* 1-MS-4026-MOV (12 MSR) 3.1 IF EITHER MSR 2ND STG STM SOURCE MOV failed to shut, THEN perform the actions: a. Verify the MSR 2ND STG HIGH LOAD MOV is shut: * (11 MSR) 1-MS-4018-MOV | Job Perfonnance Measure Fonn ES-C-l Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | ||
* (12 MSR) 1-MS-4017-MOV Dispatch an operator to verify the MSR 2ND STAGE BYPASS CONTROL VALVE panel loader in MANUAL with panel loader output at zero | The candidate will open the | ||
: f. Verify 11 EXCITER FIELD BKR, 1-CS-41 E, is exciter field breaker open. The exciter field breaker will not automatically open | |||
No further actions are required. | : 3. Ensure BOTH MSR 2ND STG STM SOURCE MOVS are shut: Detennines the valves have not shut due to loss of power and | ||
The evaluator is expected to end the JPM. Time Stop: | * 1-MS-4025-MOV (11 MSR) alternate action step 3.1 IS | ||
* 1-MS-4026-MOV (12 MSR) required. | |||
Measure Form ES-C-l Form Verification of Completion Job Perform;mce Measure Number: SIM-4 Applicant: | 3.1 IF EITHER MSR 2ND STG STM SOURCE Same as element. | ||
MOV failed to shut, THEN perform the foliowin~1 actions: | |||
: a. Verify the MSR 2ND STG HIGH LOAD MOV (Not critical since Main Steam is shut: Isolation Valves were closed in | |||
* (11 MSR) 1-MS-4018-MOV step b.l) | |||
* (12 MSR) 1-MS-4017-MOV | |||
: b. Dispatch an operator to verify the MSR 2ND STAGE BYPASS CONTROL VALVE panel Same as element loader in MANUAL with panel loader output at zero. | |||
The Candidate will report 'Turbine Trip is complete' or similar Tenninating Cue: This JPM is complete when the candidate reports the Turbine Trip safety function. No further actions are required. The evaluator is expected to end the JPM. | |||
Time Stop: | |||
~el*tolTIl,mc:e Measure Form ES-C-l Form ES-C-l Worksheet Verification of Completion Job Perform;mce Measure Number: SIM-4 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT - - - - - - - UNSAT _ _ _ _ _ ___ | |||
Examiner's Signature ;md Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Job Performance Measure Form ES-C-l Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
;md Date: | : 1. Unit 1 was in Mode 1 at 100% power. | ||
Job Performance Measure Form ES-C-l Form ES-C-l APPLICANT'S CUE Initial Conditions: | : 2. A Switchyard Fault has occurred | ||
: 1. Unit 1 was in Mode 1 at 100% power. 2. A Switchyard Fault has occurred 3. The reactor has tripped 4. You are performing duties as the Control Room Operator Initiating The CRS directs you to perform Turbine Trip per I APPLICANT: | : 3. The reactor has tripped | ||
: 4. You are performing duties as the Control Room Operator Initiating Cue: | |||
Appendix Job Perfonnance Measure Fonn ES-C-l Worksheet Facility: | The CRS directs you to perform Turbine Trip per EOP-O | ||
Calvert Cliffs 1 & 2 Job Perfonnance Measure No.: SIM-5 (Alt Path) Task Title: Detennine whether a RCP seal has failed. Task Number: 064.013 KJA | |||
I APPLICANT: _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC ITIAL LICENSED OPERATOR EXAM JPM #: SIM-5 | |||
Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Perfonnance Measure No.: SIM-5 (Alt Path) | |||
Task | |||
==Title:== | |||
Detennine whether a RCP seal has failed. | |||
Task Number: 064.013 KJA | |||
==Reference:== | ==Reference:== | ||
003 A2.01 (3.4,3.9) | 003 A2.01 (3.4,3.9) | ||
Method of testing: Simulated Performance: Actual Perfonnance: Classroom: | Method of testing: | ||
0 Simulator: Plant: 0 READ TO THE APPLICANT: | Simulated Performance: 0 Actual Perfonnance: ~ | ||
Classroom: 0 Simulator: ~ | |||
Plant: 0 READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: Unit 1 was in Mode 1 at 100% power. The overhead annunciator alarm E55 "llB RCP SEAL TEMP HIIPRESS" has come in You are performing the duties of the Unit 1 RO. Initiating Cue: Initiating Cue: The CRS directs you to respond to alarm window E55. Task Standard: | Initial Conditions: | ||
This JPM is complete when the operator detennines that two seals have failed on lIB RCP and recommends an expeditious shutdown. | : 1. Unit 1 was in Mode 1 at 100% power. | ||
The evaluator is expected to end this JPM. | : 2. The overhead annunciator alarm E55 "llB RCP SEAL TEMP HIIPRESS" has come in | ||
: 3. You are performing the duties of the Unit 1 RO. | |||
Initiating Cue: | |||
Initiating Cue: The CRS directs you to respond to alarm window E55. | |||
This heat damage may cause seal degradation/failure during depressurization (compressive forces removed) or subsequent RCP (centrifugal CUE: Middle seal press indicated on I-PIA-I62 is approximately 2220 PSIA. Upper Seal Press indicated on I-PIA-I63 is approximately 2220 PSIA. Checks Input Devices for alanns. Detennines that high middle seal pressure alann and high upper seal pressure alann exist. | Task Standard: | ||
The operator may reference OI-1A to try to determine how many seals have failed. Checks POSSIBLE CAUSES and detennines that the abnonnal Reviews POSSIBLE CAUSES. conditions are caused by a seal failure. 1. 11 B Rep seal high Candidate detennines step is N/A lIB Rep seal high or low pressure. | This JPM is complete when the operator detennines that two seals have failed on lIB RCP and recommends an expeditious shutdown. The evaluator is expected to end this JPM. | ||
Candidate detennines this step is applicable. | |||
RCP bleed-off flow indicates approximately 2.5 gpm. Checks Bleed-off flow on Plant Computer and a. CHECK RCP seal bleed-off flow nonnal. detennines the vapor seal is not failed. | Appendix C Job Perfonnance Measure Fonn ES-C-l Evaluation Criteria: | ||
: 1. All critical steps completed (denoted by shading). | |||
Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) If RCP seal bleed-off is less than normal (or zero) with normal seal pressure, the vapor seal may failed. IF the vapor seal is determined to be failed, THEN IMPLEMENT AOP**2A, Excessive Reactor Coolant Leakage Debris from a failed seal may propagate 1to remaining seal stages, leading to complete seal CUE: CRS will contact System Engineer. IF alarm is due to the failure of ONE seal, THEN closely monitor and trend the remaining seals for an increased rate of degradation AND CONTACT the System Engineer immediately to provide Determines step is | : 2. All sequential steps completed in order. | ||
: c. IF alarm is due to the failure of TWO or more seals, Determines 11 B RCP lower THEN, and middle seals have failed (1). COMMENCE an expeditious plant shutdown PER OP-3 Normal Power Candidate recommends plant | : 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | ||
The evaluator is expected to end this JPM. | : 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | ||
Required Materials: | |||
: 1. Procedures and manuals nonnally available in the plant | |||
: 1. Alann Manual 1C06 | |||
: 2. OI-1A, Reactor Coolant System and Pump Operations No Validation Time: | |||
10 minutes Simulator Setup: | |||
_ _ 1. Reset to IC-24 (both units at 100%) | |||
- - 2. Enter malfunctions: | |||
- - a. Insert RCSOll_02, lIB Rep middle seal failure | |||
----- b. Insert RCSO 12 02. 11 BRep lower seal failure | |||
- - 3. Place simulator in run | |||
Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
Time Start: - - - - | |||
CUE: The CRS directs you to respond to the RCP alarm. | |||
Identify and locate Alarm Response Manual for I C06 window E-55. Same as element. | |||
CAUTION There is a potential for heat checking of seal faces if RCP seal limits have been exceeded. This heat damage may cause seal degradation/failure during RCS depressurization (compressive forces removed) or subsequent RCP starts (centrifugal forces). | |||
CUE: Middle seal press indicated on I-PIA-I62 is approximately 2220 PSIA. Upper Seal Press indicated on I-PIA-I63 is approximately 2220 PSIA. | |||
Checks Input Devices for alanns. | |||
Detennines that high middle seal pressure alann and high upper Checks validity of alann. seal pressure alann exist. | |||
Checks alanns against setpoints and detennines alanns are valid. | |||
Note to Evaluator: The operator may reference OI-1A to try to determine how many seals have failed. | |||
Checks POSSIBLE CAUSES and detennines that the abnonnal Reviews POSSIBLE CAUSES. | |||
conditions are caused by a seal failure. | |||
: 1. 11 B Rep seal high temperature. Candidate detennines step is N/A | |||
: 2. lIB Rep seal high or low pressure. Candidate detennines this step is applicable. | |||
RCP bleed-off flow indicates approximately 2.5 gpm. | |||
Checks Bleed-off flow on Plant Computer and | |||
: a. CHECK RCP seal bleed-off flow nonnal. detennines the vapor seal is not failed. | |||
Appendix C Job Performancl;! Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
NOTE: If RCP seal bleed-off is less than normal (or zero) with normal seal pressure, the vapor seal may bl~ failed. | |||
* IF the vapor seal is determined to be failed, THEN IMPLEMENT AOP**2A, Excessive Reactor Coolant Leakage CAUTION Debris from a failed seal may propagate 1to remaining seal stages, eventually leading to complete seal failure. | |||
CUE: CRS will contact System Engineer. | |||
: b. IF alarm is due to the failure of ONE seal, THEN closely monitor and trend the remaining seals for an increased rate of degradation AND CONTACT the System Engineer immediately to provide Determines step is NIA. | |||
an evaluation of continued operability PER CNG-OP-1.01-1002, Conduct of Operability Determinations/Functionality Assessments. | |||
: c. IF alarm is due to the failure of TWO or more seals, Determines 11 B RCP lower THEN, and middle seals have failed (1). COMMENCE an expeditious plant shutdown PER OP-3 Normal Power Candidate recommends plant Operation, and OP-4, Plant Shutdown shutdown to CRS due to two from Power Operation to Hot failed seals on 11 B RCP Standby. | |||
TIME STOP -- | |||
TERMINATING CUE: This JPM is complete when the operator has determined that 11 B RCP has two failed seals and recommends an expeditious shutdown. The evaluator is expected to end this JPM. | |||
Appendix C Job Performancl~ Measure Form ES-C-l Worksheet Verification of Completion Job Performance Measure Number: SIM-S Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _________________ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT ------- UNSAT -------- | |||
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Appendix C Job Performance Measure Form ES-C-I Worksheet APPLICANT'S CUE SHEET Initial Conditions: | |||
Appendix Job Performance Measure Form ES-C-I Worksheet APPLICANT'S CUE SHEET Initial Conditions: Unit 1 was in Mode 1 at 100% power. The overhead annunciator alarm E55 "lIB RCP SEAL TEMP HIIPRESS" has come in You are performing the duties ofthe Unit 1 RO. Initiating Initiating Cue: The CRS directs you to respond to alarm window I APPLICANT: | : 1. Unit 1 was in Mode 1 at 100% power. | ||
: 2. The overhead annunciator alarm E55 "lIB RCP SEAL TEMP HIIPRESS" has come in | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: | : 3. You are performing the duties ofthe Unit 1 RO. | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: Task Title: Respond to the loss of a 120 volt vital AC Task Number: KIA | Initiating Cue: | ||
Initiating Cue: The CRS directs you to respond to alarm window E55. | |||
I APPLICANT: _ __ | |||
CALVERl' CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-6 | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-6 Task | |||
==Title:== | |||
Respond to the loss of a 120 volt vital AC bus Task Number: 202.100 KIA | |||
==Reference:== | ==Reference:== | ||
006 A2.01 (3.4, 3.9) | |||
Method of testing: | |||
Simulated Performance: D Actual Performance: ~ | |||
Classroom: D Simulator: ~ | |||
Plant: D READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit 1 was in Mode 1 at 100% power. | |||
: 2. An electrical transient has occurred. | |||
: 3. You are the Control Room Operator Initiating Cue: | |||
The CRS directs you to Perform block step IV.A of AOP-7J. | |||
Task Standard: | |||
The candidate will use AOP-7J to diagnose llioss of 1YO 1. The candidate will restore pressurizer pressure and level instrUlments affected by the bus loss. The candidate will protect the pressurizer by securing charging pumps before exceeding 225 inches. The cllndidate will protect RCPs by placing 12 CC HX in service. | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
: 1. AOP-7J, Loss of 120 Volt Vital AC or 125 Volt Vital DC Power Time Critical Task: No Validation Time: 20 minutes Simulator Setup: | : 1. AOP-7J, Loss of 120 Volt Vital AC or 125 Volt Vital DC Power Time Critical Task: | ||
: a. Loss of | No Validation Time: | ||
20 minutes Simulator Setup: | |||
: b. Suspend movement of irradiated fuel. N/A Suspend movement of heavy loads irradiated d. IF in Modes 5 or 6, THEN suspend involving positive reactivity additions could result in loss of required SDM or | _ _ 1. Reset to IC-24 (both units at 100%) | ||
: 12. GO TO | - - 2. Enter malfunctions: | ||
PRESS CH SEL Switch in | : a. Loss of 1YOI on Fl | ||
: 3. Verify that the PRZR LVL CH SEL Switch is in the Same as element. 11 OY | : 3. Place simulator in run | ||
: 4. Verify that the PZR HTR LO LVL CUT-OFF The candidate places PZR HTR Switch is in the Y position. | : 4. Secure 12 CC HX per 01-16 | ||
LO LVL CUT-OFF SEL Switch in Y. | - - 5. Initiate the loss of 1YOI | ||
Appendix Job Performance Measure ELEMENT STANDARD (SHADED = CRITICAL STEP) CUE: Another operator will place switch 81 in OFF, continue 5. Isolate the RCS Loop 11 instruments to RRS NIA Channel Y by placing switch S1 to OFF. 6. Shut the UD CNTMT ISOL valves: Candidate shuts l-CV -515 1-CVC-515-CV 1-CVC-516-CV Candidate shuts 1-CV -516 Note: If pressurizer level reaches 225 prior to performing step 7, the candidate should stop all charging pumps. 7. Operate the selected charging pump as Candidate will secure the running necessary to maintain.PZR level within 15 inches charging pump(s). of programmed level, NOT to exceed 225 inches. 8. Operate Pressurizer HTRs and PRZR SPRAY | _ _ 6. Freeze simulator when pressuriz(~r level or pressure alarm annunciates | ||
* opening l-CC-3826-CV throttle open 12 CC HX SW FLOW CONTR, HIC-5208 Terminating Cue: This JPM is complete when the candidate places 12 CC HX in service. No further actions are required. | |||
The evaluator is expected to end the JPM. Time Stop: | Job Perfonnance Measure Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | ||
Time Start: - - - | |||
CUE: The CRS directs you to Perform block step IV.A of AOP-7J. | |||
Locates the AOP-7J Same as element. | |||
CUE: The CRS will perform step 1 1, Perform the following immediate actions: | |||
: a. Confirm with the Fuel Handling Supervisor that any fuel assembly being handled has been placed in a safe location. | |||
: b. Suspend movement of irradiated fuel. | |||
N/A | |||
: c. Suspend movement of heavy loads over irradiated fuel. | |||
: d. IF in Modes 5 or 6, THEN suspend operations involving positive reactivity additions that could result in loss of required SDM or boron i concentration. | |||
: 12. GO TO 1C24A. Same as element. | |||
. 3. IF 11 120 Volt Vital AC Instrument Bus (1YO'1) is The candidate reviews indications deenergized, AND 11 125 Volt DC Bus is on I C24A for 1YO 1 and 11 DC energized, THEN PROCEED to Section V., '11 Bus then detennines the a loss of 120 VOLT VITAL AC I NSTRUMENT BUS only IYOI has occurred and (1Y01). proceeds to section V on page 9. | |||
Cue: Acknowledge recommendation, continue with the procedure I | |||
: 1. Verify that the PRZR PRESS CH SEL Switch is in The candidate places PRZR the Y position. PRESS CH SEL Switch in Y. | |||
: 2. Verify that the RRS CH SEL Switch is in the The candidate places RRS CH RRS-Y position. SEL Switch in Y. | |||
: 3. Verify that the PRZR LVL CH SEL Switch is in the Same as element. | |||
11 OY ~osition. | |||
: 4. Verify that the PZR HTR LO LVL CUT-OFF SEL The candidate places PZR HTR Switch is in the Y position. LO LVL CUT-OFF SEL Switch in Y. | |||
Appendix C Job Performance Measure ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
CUE: Another operator will place switch 81 in OFF, continue | |||
: 5. Isolate the RCS Loop 11 instruments to RRS NIA Channel Y by placing switch S1 to OFF. | |||
: 6. Shut the UD CNTMT ISOL valves: | |||
Candidate shuts l-CV -515 | |||
* 1-CVC-515-CV | |||
* 1-CVC-516-CV Candidate shuts 1-CV -516 Note: If pressurizer level reaches 225 prior to c~mdidate performing step 7, the candidate should stop all charging pumps. | |||
: 7. Operate the selected charging pump as Candidate will secure the running necessary to maintain.PZR level within 15 inches charging pump(s). | |||
of programmed level, NOT to exceed 225 inches. | |||
: 8. Operate Pressurizer HTRs and PRZR SPRAY VLVs as necessary to maintain RCS pressure Same as element. | |||
between 2225 and 2275 PSIA. | |||
Note: The candidate may perform the following step from memory or by using 01-16 section 6.4. | |||
: 9. Restore 11 Saltwater header: The candidate will place 12 CC HX in service by | |||
: a. Verify 12 CC HX is in service. | |||
* opening l-CC-3826-CV | |||
* throttle open 12 CC HX SW FLOW CONTR, 1 HIC-5208 Terminating Cue: This JPM is complete when the candidate places 12 CC HX in service. | |||
No further actions are required. The evaluator is expected to end the JPM. | |||
Time Stop: | |||
Appendix C Job Performanc(~ Measure Form ES-C-l Worksht:et Verification of Completion Job Performance Measure Number: SIM-6 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT - - - - - - - UNSAT _ _ _ _ _ __ | |||
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
Job Performance Measure Form ES-C-l APPLICANT'S CUE Initial Conditions: | : 1. Unit 1 was in Mode 1 at 100% power. | ||
: 1. Unit 1 was in Mode 1 at 100% power. 2. An electrical transient has occurred. | : 2. An electrical transient has occurred. | ||
: 3. You are the Control Room Operator Initiating The CRS directs you to Perform block step IV.A of AOP- | : 3. You are the Control Room Operator Initiating Cue: | ||
The CRS directs you to Perform block step IV.A of AOP-7J. | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: | |||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-7 (Alt Task Title: Override shut a Task Number: KIA | I APPLICANT: _ _ __ | ||
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-7 | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-7 (Alt Path) | |||
Task | |||
==Title:== | |||
Override shut a PORV Task Number: 064.035 KIA | |||
==Reference:== | ==Reference:== | ||
007.A2.01 (3.9,4.2) | |||
007.A2.01 Method of Simulated Performance: | Method of testing: | ||
D Actual Performance: Classroom: | Simulated Performance: D Actual Performance: [g] | ||
D Simulator: | Classroom: D Simulator: [g] Plant: D READ TO THE APPLICANT: | ||
[g] Plant: D READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: | Initial Conditions: | ||
: 1. Unit 1 is stable in Mode 4 at 250F and 225 psia 2. You are performing duties as the Reador Operator 3. Alarm E-21, PORV ENERGIZED, ahlrm has been received Initiating Cue: The CRS directs you to respond to alarm window E-21 Task Standard: | : 1. Unit 1 is stable in Mode 4 at 250F and 225 psia | ||
: 2. You are performing duties as the Reador Operator | |||
: 3. Alarm E-21, PORV ENERGIZED, ahlrm has been received Initiating Cue: | |||
The CRS directs you to respond to alarm window E-21 Task Standard: | |||
The candidate will diagnose that the PORV is open due to equipment malfunction and shut the associated PORV block valve. | The candidate will diagnose that the PORV is open due to equipment malfunction and shut the associated PORV block valve. | ||
Appendix Job PerformanCE! | |||
Measure Form ES-C-l Evaluation Criteria: All critical steps completed (denoted by shading). All sequential steps completed in order. All time-critical steps (denoted by an asterisk) completed within allotted time. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: | Appendix C Job PerformanCE! Measure Form ES-C-l Evaluation Criteria: | ||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
: 1. ALM-IC06, RCS Control Alarm Manual Time Critical Task: No Validation Time: 10 minutes Simulator Setup: Resetto IC-1 Enter malfunctions: Override 1-PI-103-1 to 1533# Place simulator in run Override PORV 402 to "manopen" Freeze the simulator when pressurizer pressure lowers to 225 psia. | : 1. ALM-IC06, RCS Control Alarm Manual Time Critical Task: | ||
Appendix C Job Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | No Validation Time: | ||
* Time Start: CUE: The CRS directs you to respond to alarm window E-21 Locates the | 10 minutes Simulator Setup: | ||
is applicable since PORV 402 is open 1. PERFORM the following: | : 1. Resetto IC-1 | ||
The candidate determines the a. IF reactor trip occurs, THEN IMPLEMENT reactor is shut down and step is | : 2. Enter malfunctions: | ||
EOP-O, Post-Trip Immediate Actions. CUE: The shift manager will contact the electric shop b. NOTIFY the electric shop to verify the status of the PORV thermal overloads ensure PORV operability. The candidate determines PORVs c. IF the PORVs are in NORMAL, THEN: ... are in variable MPT and step is NOT applicable | : a. Override 1-PI-103-1 to 1533# | ||
: d. IF the PORVs are in MPT ENABLE, THEN: The candidate determines PORVs are in variable MPT and step is applicable (1) TRIP any RCPs operating in the NON-Candidate refers to RCP curve for | : 3. Place simulator in run | ||
CUE: The CRO will perform step l.d.(4) (4) DRAIN the PORV discharge piping to the Quench Tank as follows: MONITOR computer points T106, T107, and T1 08 for leak-off temperatures. | : 4. Override PORV 402 to "manopen" | ||
: 5. Freeze the simulator when pressurizer pressure lowers to 225 psia. | |||
The evaluator is expected to end the JPM. Time Stop: | Appendix C Job PerformanCE~ Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | ||
Appendix C Job Measure Form ES-C-l Verification of CI)mpletion Job Performance Measure Number: SIM-7 Applicant: | * Time Start: | ||
CUE: The CRS directs you to respond to alarm window E-21 Locates the 1C06 alarm manual and refers to E-21 Same as element. | |||
The candidate determines the step | |||
: 1. The PORVs are energized. is applicable since PORV 402 is open | |||
: 1. PERFORM the following: | |||
The candidate determines the | |||
: a. IF reactor trip occurs, THEN IMPLEMENT reactor is shut down and step is EOP-O, Post-Trip Immediate Actions. NOT applicable. | |||
CUE: The shift manager will contact the electric shop | |||
: b. NOTIFY the electric shop to verify the trip status of the PORV thermal overloads to ensure PORV operability. [80034] | |||
The candidate determines PORVs | |||
: c. IF the PORVs are in NORMAL, THEN: ... | |||
are in variable MPT and step is NOT applicable | |||
: d. IF the PORVs are in MPT ENABLE, THEN: The candidate determines PORVs are in variable MPT and step is applicable (1) TRIP any RCPs operating in the NON- Candidate refers to RCP curve for OPERATING AREA of the RCP curve current lineup and determines RCP are in the non-operating area of the curve. | |||
Candidate secures 11 A and 12B RCPs | |||
Appendix C Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
(2) WHEN the cause of the high pressure Candidate determines the PORV condition has been corrected, THEN: is open due to equipment | |||
[B0064] | |||
malfunction and not high RCS pressure. | |||
Determines step is NIA (3) IF a PORV fails to shut or is open due to The candidate determines PORV a failed transmitter, THEN SHUT the 402 is open due to a failed applicable PORV Block, 1-RC-403-MOV transmitter and closes the PORV or 1-RC-405-MOV. 402 block valve l-RC-403-MOV CUE: The CRO will perform step l.d.(4) | |||
(4) DRAIN the PORV discharge piping to the N/A Quench Tank as follows: | |||
: e. MONITOR computer points T106, T107, and Candidate uses plant computer to T1 08 for leak-off temperatures. monitor leak-off temperatures Terminating Cue: This JPM is complete when the candidate isolates the open PORV flow path. No further actions are required. The evaluator is expected to end the JPM. | |||
Time Stop: | |||
Appendix C Job Performanc~ Measure Form ES-C-l Verification of CI)mpletion Job Performance Measure Number: SIM-7 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Number of Time to Follow up Question: | Facility Evaluator: | ||
Number of Attempts: | |||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _._ _ _ _ _ _ _ _ _ _ _ __ | |||
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions: | Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __ | ||
: 1. Unit 1 is stable in Mode 4 at 250F and 225 psia 2. You are performing duties as the Reactor Operator 3. Alarm E-21, PORV ENERGIZED, alarm has been received Initiating Cue: The CRS directs you to respond to alarm window E-21 I APPLICANT: | Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
PertorJmaJl1ce Form ES-C-l Facility: | Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions: | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-l Task Title: Fill the SRW and CC head tanks during a loss of AC power Task Number: 011.025, 015.008 | : 1. Unit 1 is stable in Mode 4 at 250F and 225 psia | ||
: 2. You are performing duties as the Reactor Operator | |||
: 3. Alarm E-21, PORV ENERGIZED, alarm has been received Initiating Cue: | |||
The CRS directs you to respond to alarm window E-21 | |||
I APPLICANT: _ __ | |||
CALVER1~ CLIFFS NUCLEAR POW RPLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PLANT-1 | |||
PertorJmaJl1ce Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-l Task | |||
==Title:== | |||
Fill the SRW and CC head tanks during a loss of AC power Task Number: 011.025, 015.008 KJA | |||
==Reference:== | ==Reference:== | ||
008 A4.07 (2.9, 2.9) | |||
008 A4.07 (2.9, 2.9) Method of testing: Simulated Performance: | Method of testing: | ||
fZ] Actual Performance: | Simulated Performance: fZ] Actual Performance: | ||
Classroom: | Classroom: D Simulator: | ||
D Simulator: | Plant: fZ] | ||
Plant: fZ] READ TO THE APPLICANT: | READ TO THE APPLICANT: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: A severe fire has resulted in Control Room evacuation. | Initial Conditions: | ||
AOP-9A has been implemented. You are performing the duties of the Unit:-2 ABO. Initiating Cue: You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH". Task Standard: | : 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented. | ||
: 2. You are performing the duties of the Unit:-2 ABO. | |||
Initiating Cue: | |||
You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH". | |||
Task Standard: | |||
This JPM is complete when makeup has been restored to the Service Water and Component Cooling Head Tanks. | This JPM is complete when makeup has been restored to the Service Water and Component Cooling Head Tanks. | ||
Appendix Job Performance Measure Form ES-C-1 Worksheet Evaluation Criteria: All critical steps completed (denoted by shading). All sequential steps completed in order. All time-critical steps (denoted by an asterisk) completed within allotted time. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: Procedures and manuals normally available in the plant General | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | |||
==References:== | ==References:== | ||
AOP-9A, CONTROL ROOM EV ACUA nON AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE. Time Critical Task: No Validation Time: 20 minutes Simulator Setup: 1. None | : 1. AOP-9A, CONTROL ROOM EV ACUA nON AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE. | ||
CUE: The component cooling head tank level is below the sight glass 2. Operate, as necessary, to maintain indication for the Component Cooling Service Water Head Same as element a. Component Cooling Head Tank: (1) Open Component Cooling Head Makeup Bypass, (2) Shut 2-CC-3820-CV Inlet Isol, 2-CC-107 Same as element CUE: The component cooling head tank level is normal by sight glass CUE: 21 SRW head tank is normal, 22 SRW head tank level is below the sight glass b. 21 Service Water Head Tank: I Candidate detennines step is NOT applicable Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED= CRITICAL STEP) c. 22 Service Water Head Tank: (1) Open 22 Service Water Head Tank | Time Critical Task: | ||
Terminating Cue: This JPM is complete when the Component Cooling and 22 Service Water Head Tanks are in the normal band. No further actions are required. | No Validation Time: | ||
The evaluator is expected to end the JPM. Time Stop: | 20 minutes Simulator Setup: | ||
Job Performance Measure Form ES-C-I Verification of Completion Job Performance Measure Number: PLANT-l Applicant: | : 1. None | ||
Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
Time Start: | |||
CUE: You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH". | |||
Locate AOP-9A, Step CH. Same as element. | |||
Candidate proceeds to the Unit-2 69' Same as element I | |||
CUE: 2C43 notifies you that makeup has been restored to fill the Service Water and Component Cooling Head Tanks | |||
: 1. WHEN notified that makeup has been restored to fill the Service Water and Component Cooling Head i Tanks, THEN: Same as element | |||
* Open Component Cooling Head Tank Condensate Supply, 2-CD-145. | |||
* Open SRW Head Tank Condensate Supply, Same as element 2-CD-144. | |||
CUE: The component cooling head tank level is below the sight glass | |||
: 2. Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks: | |||
Same as element | |||
: a. Component Cooling Head Tank: | |||
(1) Open Component Cooling Head Tank Makeup Bypass, 2-CC-108 (2) Shut 2-CC-3820-CV Inlet Isol, 2-CC-107 Same as element i CUE: The component cooling head tank level is normal by sight glass CUE: 21 SRW head tank is normal, 22 SRW head tank level is below the sight glass | |||
: b. 21 Service Water Head Tank: I Candidate detennines step is NOT applicable | |||
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED= CRITICAL STEP) | |||
: c. 22 Service Water Head Tank: | |||
(1) Open 22 Service Water Head Tank Makeup Bypass, 2-SRW-114 Same as element (2) Shut 22 Service Water Head Tank LCV Same as element Inlet Isol, 2-SRW-112 CUE: 22 SRW head tank level is level is normal by sight glass | |||
: 3. Periodically monitor Component Cooling and Service Water Head Tanks levels and fill as Same as element necessary. | |||
Terminating Cue: This JPM is complete when the Component Cooling and 22 Service Water Head Tanks are in the normal band. No further actions are required. The evaluator is expected to end the JPM. | |||
Time Stop: | |||
Job Performance Measure Form ES-C-I Verification of Completion Job Performance Measure Number: PLANT-l Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _________________ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __ | |||
Examiner's Signature and Date: ______________________ | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions: | |||
Appendix Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE Initial Conditions: A severe fire has resulted in Control Room evacuation. | : 3. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented. | ||
AOP-9A has been implemented. You are performing the duties of the | : 4. You are performing the duties of the Unit-2 ABO. | ||
Initiating Cue: | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: | You have just completed Step CG, ESTABLISH SAL TWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH". | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-2 Task Title: Shutdown/Return and AF AS sensor cabinet to/from service Task Number: 036.005 KIA | |||
CALVER1' CLIFFS NUCLEAR PO'WER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PLANT-2 | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-2 Task | |||
==Title:== | |||
Shutdown/Return and AF AS sensor cabinet to/from service Task Number: 036.005 KIA | |||
==Reference:== | ==Reference:== | ||
013 A2.06 (3.7, 4.0) | |||
Method of testing: | |||
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~ | |||
READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Maintenance is scheduled to be performed on AF AS channel ZE | |||
: 2. Shift Manager approval has been obtaim~d. | |||
: 3. You are performing the duties of the Unilt-2 CRO. | |||
Initiating Cue: | |||
The CRS directs you to shutdown AF AS Sensor Cabinet ZE Task Standard: | |||
This JPM is complete when AF AS ZE sensor cabinet is shutdown. | |||
Form ES-C-l Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | |||
==References:== | ==References:== | ||
01-32B, AF AS SYSTEM OPERATION Time Critical Task: No Validation Time: 20 minutes Simulator Setup: 1. None | : 1. 01-32B, AF AS SYSTEM OPERATION Time Critical Task: | ||
No Validation Time: | |||
then unlocks Unit 2 AF AS sensor cabinet ZE CHECK that NO trips are present on any other | 20 minutes Simulator Setup: | ||
: 3. CHECK that NO trips are present on either of the Same as element Logic Cabinets. | : 1. None | ||
[B0068] PLACE the circuit breaker on the Sensor Cabinet Same as element to be shutdown to the OFF position. (FIGURE 1) PLACE the 120 volt breaker for the Sensor Cabinet to be shutdown to the OFF position: | |||
Same as element Sensor Cabinet ZE ....... Panel 2Y02-1, Breaker 6. CLEAR all AFAS alarms that will reset. Same as element 7. CLOSE AND LOCK the Sensor Cabinet front Same as element door. Terminating Cue: This JPM is complete when AF AS ZE Sensor cabinet is de energized with door locked. No further actions are required. | Appendix C Job Performanc1e Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | ||
The evaluator is expected to end the JPM. Time Stop: | Time Start: - - - - | ||
Appendix C Job Performance Measure Form ES-C-I Worksheet Verification of Completion Job Performance Measure Number: PLANT-2 Applicant: | CUE: The CRS directs you to shutdown AFAS Sensor Cabinet ZE Locate OI-32B Section 6.3. Same as element. | ||
CUE: The CRS has reviewed Tech Specs 3.3.4 and 3.3.5 Candidate proceeds to the Unit-2 cable spreading Same as element room | |||
: 1. UNLOCK AND OPEN the Sensor Cabinet front Candidate notifies control room, door for the Sensor Cabinet to be shutdown. then unlocks Unit 2 AF AS sensor cabinet ZE | |||
: 2. CHECK that NO trips are present on any other Sensor Cabinets for SG Low Level or for SG Same as element Differential Pressure. | |||
: 3. CHECK that NO trips are present on either of the Same as element Logic Cabinets. [B0068] | |||
: 4. PLACE the circuit breaker on the Sensor Cabinet Same as element to be shutdown to the OFF position. (FIGURE 1) | |||
: 5. PLACE the 120 volt breaker for the Sensor Cabinet to be shutdown to the OFF position: Same as element Sensor Cabinet ZE ....... Panel 2Y02-1, Breaker 22 | |||
: 6. CLEAR all AFAS alarms that will reset. Same as element | |||
: 7. CLOSE AND LOCK the Sensor Cabinet front Same as element door. | |||
Terminating Cue: This JPM is complete when AF AS ZE Sensor cabinet is de energized with door locked. No further actions are required. The evaluator is expected to end the JPM. | |||
Time Stop: | |||
Appendix C Job Performance Measure Form ES-C-I Worksheet Verification of Completion Job Performance Measure Number: PLANT-2 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _,_ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: | Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Result: SAT ________ UNSAT ______________ | |||
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE Initial Conditions: | Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | ||
: 1. Maintenance is scheduled to be performed on | : 1. Maintenance is scheduled to be performed on AFAS channel ZE | ||
: 3. You are performing the duties of the Unit-2 CRO. Initiating The CRS directs you to shutdown | : 2. Shift Manager approval has been obtained. | ||
: 3. You are performing the duties of the Unit-2 CRO. | |||
Fonn ES-C-l Facility: | Initiating Cue: | ||
Calvert Cliffs 1 & 2 Job Perfonnance Measure No.: PLANT-3 Task Title: Manually override Saltwater valves using hand transfer valves Task Number: 012.019 KIA | The CRS directs you to shutdown AFAS Sensor Cabinet ZE | ||
APPLICANT: _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PJLANT-3 | |||
Fonn ES-C-l Facility: Calvert Cliffs 1 & 2 Job Perfonnance Measure No.: PLANT-3 Task | |||
==Title:== | |||
Manually override Saltwater valves using hand transfer valves Task Number: 012.019 KIA | |||
==Reference:== | ==Reference:== | ||
076 A4.02 (2.6, 2.6) | |||
076 A4.02 (2.6, 2.6) Method of testing: Simulated Performance: | Method of testing: | ||
cg] Actual Perfonnance: | Simulated Performance: cg] Actual Perfonnance: D Classroom: D Simulator: D Plant: cg] | ||
D Classroom: | READ TO THE APPLICANT: | ||
D Simulator: | |||
D Plant: cg] READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task !mccessfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task !mccessfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: A severe fire has resulted in Control Room evacuation. | Initial Conditions: | ||
has been implemented. You are performing the duties of the Unit 1 TBO. Initiating Cue: The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers Task Standard: | : 1. A severe fire has resulted in Control Room evacuation. AOP~9A has been implemented. | ||
: 2. You are performing the duties of the Unit 1 TBO. | |||
Initiating Cue: | |||
The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers Task Standard: | |||
This JPM is complete when Salt Water valve:s to the Service Water Heat Exchangers are manually overridden. | This JPM is complete when Salt Water valve:s to the Service Water Heat Exchangers are manually overridden. | ||
Fonn ES-C-l Evaluation Criteria: All critical steps completed (denoted by shading). All sequential steps completed in order. All time-critical steps (denoted by an asterisk) completed within allotted time. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: Procedures and manuals nonnally available in the plant General | |||
Fonn ES-C-l Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals nonnally available in the plant General | |||
==References:== | ==References:== | ||
AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE. Time Critical Task: No Validation Time: 20 minutes Simulator Setup: 1. None Job Performance Form ES-C-I ELEMENT STANDARD (SHADED = CRITICAL STEP) Time CUE: The CRS directs you to perform step AP, Override Saltwater to the Water Heat Exchangers | : 1. AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE. | ||
: 1. WHEN notified to override Saltwater to the Service Water Heat Exchangers, THEN insert the Key into 1-HS-5149 and place the Saltwater System Emergency | Time Critical Task: | ||
* Overboard, 1-CV-5149, to OVERRIDE 2. Place the following Handvalves to OVERRIDE {from left to right}: | No Validation Time: | ||
* East HV transfer stanchion 118 SRW HX SW OUTLET, 1-HV-5210 11A SRW HX SW OUTLET, 1-HV-5209 11A & 11B SRW HXs SW BYPASS, HV-5154 d. 11B SRW HX SW STNR FLUSH, 5151A 11 B SRW HX SW STNR DIVERTER, HV-5151 11A SRW HX SW STNR FLUSH, 5148A 11A SRW HX SW STNR DIVERTER, HV-5148 12A & 128 SRW HXs SWAUX OUT, HV-5155 12A & 128 SRW HXs SW AUX BtU OUT, 1-HV-5156 | 20 minutes Simulator Setup: | ||
: j. 11A & 11B SRW HXs SW INLET, | : 1. None | ||
No further actions are re q uired. The evaluator is | |||
Job Performance Measure Form ES-C-I ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
Time Start: | |||
CUE: The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers | |||
: 1. WHEN notified to override Saltwater to the Service Water Heat Exchangers, THEN insert the Key into 1-HS-5149 and place the Saltwater System Emergency Same as element | |||
* Overboard, 1-CV-5149, to OVERRIDE TO CLOSE. | |||
: 2. Place the following Handvalves to OVERRIDE | |||
{from left to right}: | |||
Same as element | |||
* East HV transfer stanchion | |||
: a. 118 SRW HX SW OUTLET, 1-HV-5210 | |||
: b. 11A SRW HX SW OUTLET, 1-HV-5209 Same as element | |||
: c. 11A & 11B SRW HXs SW BYPASS, 1 Same as element HV-5154 | |||
: d. 11B SRW HX SW STNR FLUSH, 1-HV Same as element 5151A | |||
: e. 11 B SRW HX SW STNR DIVERTER, 1 Same as element HV-5151 | |||
: f. 11A SRW HX SW STNR FLUSH, 1-HV Same as element 5148A | |||
: g. 11A SRW HX SW STNR DIVERTER, 1 Same as element HV-5148 | |||
: h. 12A & 128 SRW HXs SWAUX OUT, 1 Same as element HV-5155 | |||
: i. 12A & 128 SRW HXs SW AUX BtU OUT, Same as element 1-HV-5156 | |||
: j. 11A & 11B SRW HXs SW INLET, 1-HV Same as element 5150 | |||
Job Performance Measure Form ES-C-l | |||
* West HV transfer stanchion | |||
: a. 12A SRW HX SW STNR DIVERTER, 1-HV- Same as element 5158 | |||
: b. 12A SRW HX SW STNR FLUSH, 1-HV-Same as element 5158A | |||
: c. 12B SRW HX SW STNR DIVERTER, 1 Same as element HV-5159 | |||
: d. 12B SRW HX SW STNR FLUSH, 1-HV-Same as element 5159A | |||
: e. 12A & 12B SRW HXs SW INLET, 1-HV-Same as element 5152 | |||
: f. 12A & 12B SRW HXs SW BtU OUT, 1 Same as element HV-5153 | |||
: g. 12A & 12B SRW HXs SW BYPASS, '1 Same as element HV-5157 | |||
: h. 12A SRW HX SW OUTLET, 1-HV-5211 Same as element | |||
: i. 12B SRW HX SW OUTLET, 1-HV-5212 Same as element | |||
: 3. Perform the next TBO assigned step. | |||
Terminating Cue: This JPM is complete when Saltwater to the Service Water Heat Exchangers is overridden. No further actions are re q uired. The evaluator is exp ected to end thelPM. | |||
Form ES-C-l Verification of Completion Job Performance Measure Number: PLANT-3 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT - - - - - - - UNSAT _ _ _ _ _ __ | |||
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Job Performanc'e Measure Form ES-C-I Workshl~et APPLICANT'S CUE SHEET Initial Conditions: | |||
: 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented. | |||
Job Performanc'e Form ES-C-I APPLICANT'S CUE Initial Conditions: A severe fire has resulted in Control Room evacuation. | : 2. You are performing the duties of the Unit 1 TBO. | ||
AOP-9A has been implemented. | Initiating Cue: | ||
: 2. You are performing the duties of the Unit 1 TBO. Initiating Cue: The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers I APPLICANT: | The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers | ||
Job Performance Measure Form ES-C-I Worksheet Facility: | I APPLICANT: _ __ | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-1 Task Title: Initiate, ensure performance of, and review Operational Test Documents. | CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-1 | ||
Task Number: 204.035 KJA | |||
Job Performance Measure Form ES-C-I Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-1 Task | |||
==Title:== | |||
Initiate, ensure performance of, and review Operational Test Documents. | |||
Task Number: 204.035 KJA | |||
==Reference:== | ==Reference:== | ||
2.1.7 (4.4, 4.7) | |||
2.1.7 (4.4, 4.7) Method of testing: Simulated Performance: | Method of testing: | ||
D ActuaIPerformance:[3J Classroom: | Simulated Performance: D ActuaIPerformance:[3J Classroom: [3J Simulator: | ||
[3J Plant: D | Plant: D READ TO THE APPLICANT: | ||
READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: | Initial Conditions: | ||
: 1) Unit-1 is at 100% reactor power. 2) STP O-SA-l, AUXILIARY FEEDWATER SYSTEM QUARTERLY SURVEILLANCE TEST, Section 6.1 has just been performed. | : 1) Unit-1 is at 100% reactor power. | ||
: 3) You are performing the duties of the CRS. Initiating Cue: The Shift Manager directs you to perform Step 6.1.31 ofSTP O-SA-l Section 6.1 Task Standard: | : 2) STP O-SA-l, AUXILIARY FEEDWATER SYSTEM QUARTERLY SURVEILLANCE TEST, Section 6.1 has just been performed. | ||
: 3) You are performing the duties of the CRS. | |||
Initiating Cue: | |||
The Shift Manager directs you to perform Step 6.1.31 ofSTP O-SA-l Section 6.1 Task Standard: | |||
The candidate conducts a level 2 review ofSTP O-SA-l section 6.1. The candidate determines 11 AFW pump to be inoperable, and TS 3.7.3.A is entered. The evaluator is expected to end the JPM. | The candidate conducts a level 2 review ofSTP O-SA-l section 6.1. The candidate determines 11 AFW pump to be inoperable, and TS 3.7.3.A is entered. The evaluator is expected to end the JPM. | ||
Appendix Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria: All critical steps completed (denoted by shading). All sequential steps completed in order. All time-critical steps (denoted by an asterisk) completed within allotted time. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
STP O-SA-l, Auxiliary Feedwater System Quarterly Surveillance Test. 2. Technical Specifications Time Critical Task: No Validation Time: 30 minutes Simulator Setup: None Appendix C Job Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) Time Start: CUE: The Shift Manager directs you to perform Step 6.1.31 of STP O-SA-l Section 6.1 Steps 6.1.31.1-13 The candidate will review 11 AFW Checks YES or NI A in accordance pump collected test data against the acceptance with the answer key in steps 6.1.31.1 criteria through 6.1.31.13 Determines 11 AFW pump Step 6.1.31.14 Did 11 AFW Pump develop a DIP of at differential pressure is less than the least 1210 PSID and no greater than required in step 6.1.31.14. | : 1. STP O-SA-l, Auxiliary Feedwater System Quarterly Surveillance Test. | ||
1295.2 PSID in Step 6.1.20? Checks NO Determines 11 AFW pump | : 2. Technical Specifications Time Critical Task: | ||
No Validation Time: | |||
IF unsat THEN: Notifies the SM 11 AFW pump has failed the testing. | 30 minutes Simulator Setup: | ||
* Notify the SM CUE: The SM directs the CRS to determine | None | ||
'IS actions required Step 6.1.31.16.a Declare the affected equipment inoperable Determines that TS 3.7.3.A should Take action as required by Te,ehnical be entered Specifications and administrative actions stated in EN-4-104 Terminating Cue: This JPM is complete when it is determined 11 AFW pumps is inoperable and TS 3.7.3.A is entered. The evaluator is expected to end the JPM. Time Stop: | |||
Appendix C Job Performancl~ Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
NRC Date Facility Number of Attempts: | Time Start: | ||
CUE: The Shift Manager directs you to perform Step 6.1.31 of STP O-SA-l Section 6.1 Steps 6.1.31.1-13 The candidate will review 11 AFW Checks YES or NI A in accordance pump collected test data against the acceptance with the answer key in steps 6.1.31.1 criteria through 6.1.31.13 Determines 11 AFW pump Step 6.1.31.14 Did 11 AFW Pump develop a DIP of at differential pressure is less than the least 1210 PSID and no greater than required in step 6.1.31.14. | |||
1295.2 PSID in Step 6.1.20? | |||
Checks NO Determines 11 AFW pump Steps 6.1.31.15 Did 11 AFW Pump develop a TDH developed head is less than the greater than or equal to 2800 feet in required in step 6.1.31.15. | |||
Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | Step 6.1.21 Checks NO in accordance with the key in steps 6.1.31.15 Step 6.1.31.16 This test section is considered satisfactory Determines 11 AFW pump testing is if YES or NIA was answered in all steps UNSAT in step 6.1.31.16 above. Checks UNSAT Step 6.1.31.16.a. IF unsat THEN: Notifies the SM 11 AFW pump has failed the testing. | ||
: 1) Unit-l is at 100% reactor power. 2) STP O-SA-l, AUXILIARY | * Notify the SM CUE: The SM directs the CRS to determine 'IS actions required Step 6.1.31.16.a Declare the affected equipment inoperable Determines that TS 3.7.3.A should Take action as required by Te,ehnical be entered Specifications and administrative actions stated in EN-4-104 Terminating Cue: This JPM is complete when it is determined 11 AFW pumps is inoperable and TS 3.7.3.A is entered. | ||
: 3) You are performing the duties of the CRS. Initiating Cue: The Shift Manager directs you to perform Step 6.1.31 ofSTP O-SA-l Section 6.1 I APPLlCANT: | The evaluator is expected to end the JPM. | ||
Time Stop: | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: | |||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-2 Task Title: Evaluate the need for plant cooldlown. | Appendix C Job Performance Measure Form ES-C-l Worksh~~et Verification of Completion Job Performance Measure Number: SRO-ADMIN-l Applicant: | ||
Task Number: 201.005 KIA | NRC Examiner: | ||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: _________________ | |||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Result: SAT ------- | |||
UNSAT -------- | |||
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
: 1) Unit-l is at 100% reactor power. | |||
: 2) STP O-SA-l, AUXILIARY FEEDWATER SYSTEM QUARTERLY SURVEILLANCE TEST, Section 6.1 has just been performed. | |||
: 3) You are performing the duties of the CRS. | |||
Initiating Cue: | |||
The Shift Manager directs you to perform Step 6.1.31 ofSTP O-SA-l Section 6.1 | |||
I APPLlCANT: _ __ | |||
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-2 | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-2 Task | |||
==Title:== | |||
Evaluate the need for plant cooldlown. | |||
Task Number: 201.005 KIA | |||
==Reference:== | ==Reference:== | ||
2.1.25 (3.9, 4.2) | |||
2.1.25 (3.9, 4.2) Method of testing: Simulated Performance: | Method of testing: | ||
D Actual Performance: | Simulated Performance: D Actual Performance: IZI Classroom: IZI Simulator: D Plant: D READ TO THE APPLICANT: | ||
IZI Classroom: | |||
IZI Simulator: | |||
D Plant: D READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial | Initial Conditions: | ||
: 1) Unit-l and Unit-2 were at 100% reactor 2) A loss of offsite power occurred at 0800. SME:CO is | : 1) Unit-l and Unit-2 were at 100% reactor pow(~r. | ||
: 3) The OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to ground fault. 4) The plant has been stabilized per EOP-7 with the following parameters: | : 2) A loss of offsite power occurred at 0800. SME:CO is unavailable. | ||
a) It is now 0900. b) Unit 1 RCS Temperature is 532F and Unit 2 RCS temperature is 532F and steady. c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet 5) You are performing the duties of the Unit 1 CRS. Initiating Cue: The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN. | : 3) The OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to a ground fault. | ||
: 4) The plant has been stabilized per EOP-7 with the following parameters: | |||
a) It is now 0900. | |||
b) Unit 1 RCS Temperature is 532F and ste~ldy. Unit 2 RCS temperature is 532F and steady. | |||
c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet | |||
: 5) You are performing the duties of the Unit 1 CRS. | |||
Initiating Cue: | |||
The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN. | |||
Task Standard: | Task Standard: | ||
The candidate will assess condensate inventOlry using EOP attachment (9) and determine there is insufficient water to cooldown, the plant must be maintained in hot standby, and the plant can be maintained in hot standby for 36 hours. The evaluator is expected to end the JPM. | The candidate will assess condensate inventOlry using EOP attachment (9) and determine there is insufficient water to cooldown, the plant must be maintained in hot standby, and the plant can be maintained in hot standby for 36 hours. The evaluator is expected to end the JPM. | ||
Job Performance Measure Form ES-C-l Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
EOP-7, Station Blackout 2. EOP Attachments Time Critical Task: No Validation Time: 30 minutes Simulator Setup: a. None Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) Time Start: CUE: The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN Locate EOP-7, Step AB. 1. WHEN the RCS parameters have been stabilized, THEN evaluate the need for a plant cooldown based on: Plant Status Auxiliary systems availability Condensate inventory PERATIACHMENT (9), MAKEUP WATER REQUIRED FOR RCS COOLDOWN Locate EOP Attachment (9) 1. Determine the amount of makeup water required to perform an ADV cooldown and a TBV cooldown, based on the time after shutdown: | : 1. EOP-7, Station Blackout | ||
: a. ADV cooldown and time after shutdown b. TBV cooldown and time after shutdown 2. Determine the amount of makeup water available in the CSTs: a. Record the level in 11 CST. b. Record the level in 12 CST. c. Record the level in 21 CST. d. Determine the status of Unit 2 (check ()ne): (1) Mode 1, 2 or 3 and does NOT require AFWoperation. | : 2. EOP Attachments Time Critical Task: | ||
(2) _ Mode 1, 2 or 3 and does require AFW | No Validation Time: | ||
30 minutes Simulator Setup: | |||
- - a. None | |||
Job Performance Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) NOTE: Calculated negative values should be entered as zero. e. Determine the amount of makeup available to Unit 1 using one of the formulas, based on the status checked in step (1) IF step d.(1) is checked, THEN correct Candidate determines step is NOT levels for usable volume: applicable (2) IF step d.(2) is checked, THEN correct CST Candidate determines step IS levels for usable volume: applicable Candidate enters 27 and calculates (a) step 2.a ft-2.75ft= | Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | ||
24.25 for step 2(a) (b) step 2.b ft -2.5 Candidate enters 22 and calculates 9.75 for step 2(b) 2 Candidate enters 24.25 and 9.75, and (c) step(a) + step(b) ft = calculates 34 for step 2( c) (3) IF step d.(3) is checked, THEN cornect Candidate determines step is NOT levels for usable volume: applicable | Time Start: | ||
: f. Convert the amount of CST level into gallons. Candidate enters 34 and calculates (ft available) x 9636.78 gal/ft = approximately 327650 for step 2.f The nominal capacity of a Well Water pump is 300 The nominal capacity of a Demineralized Water Transfer pump is 300 The Fire System can fill the CST via fire hoses at greater than 500 I The status of both units should be considered when evaluating a makeup source. Candidate determines there is NOT 3. IF adequate inventory exists to adequate inventory to perform cooldown, THEN determine if an adequate makeup source exists to maintain hot statndby. | CUE: The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN Locate EOP-7, Step AB. Same as element. | ||
Water required is 625067, inventory | : 1. WHEN the RCS parameters have been stabilized, THEN evaluate the need for a plant cooldown based on: | ||
Candidate will determine | |||
* Plant Status Attachment (9) completion is | |||
* Auxiliary systems availability required | |||
* Condensate inventory PERATIACHMENT (9), | |||
MAKEUP WATER REQUIRED FOR RCS COOLDOWN Locate EOP Attachment (9) Same as element. | |||
: 1. Determine the amount of makeup water required Candidate enters uses table to perform an ADV cooldown and a TBV 'INVENTORY REQUIRED TO cooldown, based on the time after shutdown: COOL DOWN TO 300F' and determines 625067 gallons are | |||
: a. ADV cooldown and time after shutdown required. | |||
Candidate enters uses table | |||
'INVENTORY REQUIRED TO | |||
: b. TBV cooldown and time after shutdown COOL DOWN TO 300F' and determines 94828 gallons are required. | |||
: 2. Determine the amount of makeup water available in the CSTs: | |||
: a. Record the level in 11 CST. The candidate determines the tank levels from the initiating cue | |||
: b. Record the level in 12 CST. | |||
: c. Record the level in 21 CST. | |||
: d. Determine the status of Unit 2 (check ()ne): | |||
Candidate checks d.2. | |||
(1) _ Mode 1, 2 or 3 and does NOT require AFWoperation. The loss of offsite power has caused (2) _ Mode 1, 2 or 3 and does require AFW a dual unit trip. Main feed water is NOT available to either unit on a operation. | |||
loss of offsite power. | |||
(3) Mode 4, 5, 6 or defueled. | |||
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
NOTE: Calculated negative values should be entered as zero. | |||
: e. Determine the amount of makeup watE~r available to Unit 1 using one of the following formulas, based on the status checked in step 2.d above: | |||
(1) IF step d.(1) is checked, THEN correct CST Candidate determines step is NOT levels for usable volume: applicable (2) IF step d.(2) is checked, THEN correct CST Candidate determines step IS levels for usable volume: applicable Candidate enters 27 and calculates (a) step 2.a ft-2.75ft= 24.25 for step 2(a) | |||
(b) step 2.b ft - 2.5 ft= Candidate enters 22 and calculates 9.75 for step 2(b) 2 Candidate enters 24.25 and 9.75, and (c) step(a) + step(b) ft = calculates 34 for step 2( c) | |||
(3) IF step d.(3) is checked, THEN cornect CST Candidate determines step is NOT levels for usable volume: applicable | |||
: f. Convert the amount of CST level into gallons. | |||
Candidate enters 34 and calculates (ft available) x 9636.78 gal/ft = approximately 327650 for step 2.f NOTE The nominal capacity of a Well Water pump is 300 GPM. | |||
The nominal capacity of a Demineralized Water Transfer pump is 300 GPM. | |||
The Fire System can fill the CST via fire hoses at greater than 500 GPM. | |||
CAUTION I The status of both units should be considered when evaluating a makeup source. | |||
Candidate determines there is NOT | |||
: 3. IF adequate inventory exists to perform adequate inventory to perform a cooldown, THEN determine if an adequate cooldown. | |||
makeup source exists to maintain hot statndby. Water required is 625067, inventory ! | |||
available is 327650 | |||
Job Performance Measure Form ES-C-l CUE: The shift manager requests the candidate to determine how long hot standby can be maintained with the current inventory. | |||
: 4. IF adequate inventory does NOT exist to perform cooldown, THEN evaluate the following: | : 4. IF adequate inventory does NOT exist to perform cooldown, THEN evaluate the following: | ||
The candidate uses ATTACHMENT (9) MAKEUP WATER REQUIRED Maintaining hot standby conditions TO MAINTAIN HOT STANDBY. Time to restore an adequate makeup source If the chart is NOT interpolated, the Restoration of other plant systems (TBVs, value would be 36 hours of hot standby. main feedwater system, etc.) If chart is interpolated, the value would Performing partial cooldown while restoring be approximately 44 hours 34 minutes. plant systems Terminating Cue: This JPM is complete when it is determined how long hot standby can be maintained. | The candidate uses ATTACHMENT (9) MAKEUP WATER REQUIRED | ||
The evaluator is expected to end the JPM. Time Stop: | * Maintaining hot standby conditions TO MAINTAIN HOT STANDBY. | ||
Job Performance Measure | * Time to restore an adequate makeup source If the chart is NOT interpolated, the | ||
* Restoration of other plant systems (TBVs, value would be 36 hours of hot standby. | |||
main feedwater system, etc.) | |||
If chart is interpolated, the value would | |||
* Performing partial cooldown while restoring be approximately 44 hours 34 minutes. | |||
plant systems Terminating Cue: This JPM is complete when it is determined how long hot standby can be maintained. | |||
The evaluator is expected to end the JPM. | |||
Time Stop: | |||
Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
Verification of Completion Job Performance Measure Number: SRO-ADMIN-2 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __ | |||
Examiner's Signature and Date: _ _ _ _ _,_ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
Appendix Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial | : 1) Unit-l and Unit-2 were at 100% reactor power. | ||
: 1) Unit-l and Unit-2 were at 100% reactor 2) A loss of offsite power occurred at 0800. SMECO is | : 2) A loss of offsite power occurred at 0800. SMECO is unavailable. | ||
: 3) The OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to ground fault. The plant has been stabilized per EOP-7 with the following parameters: | : 3) The OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to a ground fault. | ||
a) It is now 0900. b) Unit 1 RCS Temperature is 532F and steady. Unit 2 RCS temperature is 532F and steady. c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet 5) You are performing the duties of the Unit 1 CRS. Initiating Cue: The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN. | : 4) The plant has been stabilized per EOP-7 with the following parameters: | ||
I APPLICANT: | a) It is now 0900. | ||
b) Unit 1 RCS Temperature is 532F and steady. Unit 2 RCS temperature is 532F and steady. | |||
Appendix C Job Performance Measure Form ES-C-l Facility: | c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-3 Task Title: Establish initial plant conditions for and approve performance of an STP. Task Number: 210.001 KIA | : 5) You are performing the duties of the Unit 1 CRS. | ||
Initiating Cue: | |||
The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN. | |||
I APPLICANT: _ __ | |||
CALVERl' CLIFFS NUCLEAR PO~WER PLANT 2011 ~~RC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-3 | |||
Appendix C Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-3 Task | |||
==Title:== | |||
Establish initial plant conditions for and approve performance of an STP. | |||
Task Number: 210.001 KIA | |||
==Reference:== | ==Reference:== | ||
2.2.40 (3.4, 4.7) | |||
Method of testing: | |||
Simulated Performance: Actual Performance: ~ | |||
Classroom: [gJ Simulator: 0 Plant: 0 READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1) Unit-l is at 100% reactor power. | |||
: 2) STP O-SA-1 is scheduled today. | |||
: 3) No maintenance was performed on the lA DG | |||
: 4) You are performing the duties of the CRS. | |||
Initiating Cue: | |||
The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of step 4.0. | |||
Task Standard: | |||
The candidate correctly completes the SRO portion of the STP preliminary section using the plan of the day and Technical Specifications. | |||
The evaluator is expected to end the JPM. | |||
Appendix C Job Performancj~ Measure Form ES-C-1 Worksheet Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
STP 0-8A-I, TEST OF lA DG AND 11 4KV BUS LOCI SEQUENCER | : 1. STP 0-8A-I, TEST OF lA DG AND 11 4KV BUS LOCI SEQUENCER | ||
: 2. Technical Specifications Time Critical Task: No Validation Time: 30 minutes Simulator Setup: a. None Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) Time Start: CUE: The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of section 4.0 CUE: The candidate is given a partial copy ofthe Plan ofthe Day and STP O-SA-l CUE: STP M-6S1C-IA is not required. | : 2. Technical Specifications Time Critical Task: | ||
No Validation Time: | |||
30 minutes Simulator Setup: | |||
: a. None | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
Time Start: | |||
CUE: The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of section 4.0 CUE: The candidate is given a partial copy ofthe Plan ofthe Day and STP O-SA-l CUE: STP M-6S1C-IA is not required. | |||
A. PERFORM the following determinations: | A. PERFORM the following determinations: | ||
Candidate checks Scheduled | Candidate checks Scheduled | ||
: 1. IF STP M-651 C-1A is to be performed concurrently Surveillance' based on the initiating with this test THEN NOTIFY E&C to perform STP cue. M-651 C-1A prerequisites. | : 1. IF STP M-651 C-1A is to be performed concurrently Surveillance' based on the initiating with this test THEN NOTIFY E&C to perform STP cue. | ||
M-651 C-1A prerequisites. | |||
CUE: The candidate is given the plan of the day NOTE | CUE: The candidate is given the plan of the day NOTE | ||
* LOCI Sequencer testing is required monthly in Modes 1-4 . | * LOCI Sequencer testing is required monthly in Modes 1-4 . | ||
* SIAS A-10 Logic, Channel Functional test is required quarterly in Modes 1-3 . 2. INDICATE ESFAS test requirements: | * SIAS A-10 Logic, Channel Functional test is required quarterly in Modes 1-3 . | ||
Candidate checks this checkbox SIAS/UV OR LOCI SEQ test required: (check based on the preceding note required tests) Candidate checks this checkbox PERFORM Section 6.5, MONTHLY 11 based on the preceding note 4KV BUS LOCI SEQUENCER TEST PERFORM Section 6.4, | : 2. INDICATE ESFAS test requirements: | ||
note NOTE Taking 1A DG to LOCAL makes the DG inoperable. | Candidate checks this checkbox 0 SIAS/UV OR LOCI SEQ test required: (check based on the preceding note required tests) | ||
This minimizes unloaded run time during ESFAS testing AND is the preferred alignment. | Candidate checks this checkbox D PERFORM Section 6.5, MONTHLY 11 based on the preceding note 4KV BUS LOCI SEQUENCER TEST D PERFORM Section 6.4, QUARTERLY Candidate checks this checkbox SIAS A-1 0 LOGIC AND UV A-4 LOGIC based on the preceding note TEST Candidate DOES NOT check this checkbox based on the preceding D ESFAS testing NOT required: | ||
: 3. IF performing ESFAS testing, THEN equipment availability AND INDICATE 1A Candidate checks this checkbox alignment during test: (N/A if NOT testing ESFAS) based on the preceding note D 1A DG in LOCAL during ESFAS Job Performance Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) Candidate DOES NOT check this checkbox based on the preceding 1A DG in AUTO during ESFAS test: note NOTE 1A DG remains operable when performing a Slow Speed start from 1C18A. | note NOTE Taking 1A DG to LOCAL makes the DG inoperable. This minimizes unloaded run time during ESFAS testing AND is the preferred alignment. | ||
: 4. REVIEW PMT requirements, Surveillance Schedule I Candidate checks this checkbox AND INDICATE 1A DG start requirements: Slow start of 1A DG: Emergency start of | : 3. IF performing ESFAS testing, THEN REVIEW equipment availability AND INDICATE 1A DG Candidate checks this checkbox alignment during test: (N/A if NOT testing ESFAS) based on the preceding note D 1A DG in LOCAL during ESFAS te!~t: | ||
Quarterly 1ST FO TRANSFER PP Performance Capacity test required. | |||
NO -Performance is NOT required; LEAVE Sect. 6.1 blank DYES -Performance of Sect. 6.9 is required | Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | ||
Candidate DOES NOT check this checkbox based on the preceding D 1A DG in AUTO during ESFAS test: note NOTE 1A DG remains operable when performing a Slow Speed start from 1C18A. | |||
------------------~ | |||
: 4. REVIEW PMT requirements, Surveillance Schedule I Candidate checks this checkbox AND INDICATE 1A DG start requirements: based on the surveillance requirements (Non-fast speed start) | |||
[J Slow start of 1A DG: | |||
Candidate does not check this checkbox based on the surveillance D Emergency start of 1A DG: | |||
requirements. | |||
CUE: No maintenance was performed on the diesel 6. IF this is the first performance of this test after EDG-I ...... | Candidate does not check this Start of 1A DG NOT required checkbox based on the surveillance requirements. | ||
* Candidate determines the step is | : 5. REVIEW the Surveillance Schedule OR PMT to | ||
'.."::H~' "ine YES - Performance of Sect. 6.1 is required Candidate checks these checkboxes | |||
* based on the surveillance Monthly FO TRANSFER PP Automatic requirements. | |||
Start test reQuired. | |||
Candidate checks this checkbox Quarterly 1ST FO TRANSFER PP based on the surveillance Performance Capacity test required. requirements. | |||
Candidate does not check this NO - Performance is NOT required; LEAVE checkbox based on the surveillance Sect. 6.1 blank reqUlrements. | |||
Candidate checks this checkbox DYES - Performance of Sect. 6.9 is required based on the surveillance requirements Candidate does not check this D NO - Performance is NOT required; LEAVE checkbox based on the surveillance Sect. 6.9 blank requirements. | |||
Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
NOTE FSTC-OPS OR System Engineer may be contacted to make the determination. | |||
CUE: No maintenance was performed on the diesel | |||
: 6. IF this is the first performance of this test after EDG- I . . . . .. | |||
13 has been performed on 1A DG, THEN INDICATE | |||
* Candidate determines the step is minimum 1A DG loaded run time for Sect. 6.8: (N/A if NOT Applicable NOT first test after EDG-13) [80273] | |||
: 7. REVIEW the Surveillance Schedule OR PMT to determine if Quarterly air receiver check valve testing is required. | |||
Candidate checks yes based on D YES - Quarterly air receiver check valve surveillance requirements. | |||
testing is required. | testing is required. | ||
NO Quarterly air receiver check valve is NOT Terminating Cue: This JPM is complete when all SRO steps are complete in section 4.0. The evaluator is expected to end the JPM. | NO ~ Quarterly air receiver check valve testing is NOT required. | ||
Terminating Cue: This JPM is complete when all SRO steps are complete in section 4.0. | |||
Job Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SRO-ADMIN-3 Applicant: | The evaluator is expected to end the JPM. | ||
I | |||
Job Performancl~ Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SRO-ADMIN-3 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT _ _ _ _ __ UN SAT -------- | |||
Examiner's Signature and Date: | |||
Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | : 1) Unit-1 is at 100% reactor power. | ||
: 1) Unit-1 is at 100% reactor power. 2) STP O-SA-1 is scheduled today. 3) No maintenance was performed on the 1A DG 4) You are performing the duties of the CRS. Initiating Cue: The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of step 4.0. | : 2) STP O-SA-1 is scheduled today. | ||
I APPLICANT: | : 3) No maintenance was performed on the 1A DG | ||
Appendix Job Performance Measure Form ES-C-l Worksheet Facility: | : 4) You are performing the duties of the CRS. | ||
Calvert Cliffs 1&2 Job Performance Measure Task Title: Determine radiological conditions for personnel Task Number: No equivalent task at KIA | Initiating Cue: | ||
The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of step 4.0. | |||
I APPLICANT: - - | |||
CALVERl' CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-4 | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1&2 Job Performance Measure No.SRO-ADMIN-4 Task | |||
==Title:== | |||
Determine radiological conditions for personnel exposure Task Number: No equivalent task at CCNPP KIA | |||
==Reference:== | ==Reference:== | ||
2.3.7 (3.5, 3.6) | |||
Method oftesting: | |||
Simulated Performance: Actual Performance: _::1_ | |||
Classroom: _~ Simulator: Plant: | |||
READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1. Unit 2 is at 100% power. | |||
: 2. 12 SFP coolers is in service. 11 SF]) cooler is isolated for maintenance on 0-SFP-196,11 PP SUCT FR 11 SFP DRN. Maintenance is complete. | |||
: 3. Maintenance needs you to observe for any binding while cycling the valve a number of times before its return to service. | |||
Initiating Cue: | |||
You have been directed to cycle 0-SFP-196, 11 PP SUCT FR 11 SFP DRN multiple times to observe for binding, and then stand by to clear tags and open the downstream isolation valve. Task time is estimated to take 10 minutes. | |||
State the radiological requirements for lentering this area. Include in your discussion: | |||
: 1. Protective clothing required in the work area | |||
: 2. Highest radiation level in the work area | |||
: 3. Expected dose for this assignment | |||
: 4. Dose rate alarm | |||
: 5. Low dose waiting area What is the definition of a Locked High Radiation Area? | |||
Task Standard: | |||
Determine radiological conditions for p,ersonnel exposure NRC-17 Page 2 of6 NUREG-1 021, Revision 9 | |||
Appendix C Job Performance Measure Form ES-C-1 Worksheet Evaluation Criteria: | |||
: 1. All critical steps completed. | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps completed within allotted time. | |||
: 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
: 1. Spent Fuel Cooling Room Survey Map | |||
: 2. RWP 106 task 2, "Operations Activities in High Radiation Areas (HRAs)" | |||
: 3. RP-l-100, "Radiation Protection", Revision 8 General | |||
==References:== | ==References:== | ||
RP-I-I00, "Radiation Protection", Revision 8 (Pages 14,31) Time Critical Task: No Validation Time: 10 minutes Simulator Setup: None Page 3 of6 NUREG-1 021, Revision 9 ELEMENT (* = CRITICAL STEP) TIME START Review survey map and R WP. 1. State protective clothing | RP-I-I00, "Radiation Protection", Revision 8 (Pages 14,31) | ||
Time Critical Task: | |||
No Validation Time: | |||
Determines that highest radiation level in the area is 350 mRlhr SFP-196. Determines that expected dose in 10 minutes is 1/6 | 10 minutes Simulator Setup: | ||
* 350mRlhr = 58.3 mR Determines from R WP that dose rate alarm will be set at 950 mRlhr. Identifies from R WP room low dose waiting area is by the room door, or identifies lowest general area is by the door (.4 mRlhr), or states would wait outside of the room in the hallway. States that Locked HRA is an area where dose could exceed | None NRC-17 Page 3 of6 NUREG-1 021, Revision 9 | ||
ELEMENT STANDARD | |||
(* = CRITICAL STEP) | |||
TIME START Review survey map and R WP. Same as element. | |||
* 1. State protective clothing Determines that R WP specifies requirements. Anti-Cs and conferring with RST (Radiation Safety Technician). | |||
* 2. Identify highest radiation level in Determines that highest radiation the area. level in the area is 350 mRlhr 0 SFP-196. | |||
* 3. Calculate expected dose for this Determines that expected dose in 10 assignment. minutes is 1/6 | |||
* 350mRlhr = 58.3 mR | |||
* 4. Identifies dose rate alarm setpoint. Determines from R WP that dose rate alarm will be set at 950 mRlhr. | |||
* 5. Locates low dose waiting area. Identifies from R WP room low dose waiting area is by the room door, or identifies lowest general area is by the door (.4 mRlhr), or states would wait outside of the room in the hallway. | |||
* 6. Explains the radiation classification States that Locked HRA is an area of a Locked High Radiation Area. where dose could exceed 1RIhr at 30cm. | |||
TIME STOP Examiner Note: The task is complete when the applicant has provided requested radiological informatilon. | |||
NRC-17 Page 4 of6 NUREG-l 021, Revision 9 | |||
Appendix C Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: ADMIN-4 Applicant: | |||
NRC Examiner: | NRC Examiner: | ||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Time to Complete: | |||
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
Follow up Question: | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Result: SAT ------- UNSAT - - - - - - - - | |||
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | |||
NRC-17 Page 50f6 NUREG-l 021, Revision 9 | |||
: 1. Protective clothing required in the work area 2. Highest radiation level in the work area 3. Expected dose for this assignment | Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions: | ||
: 4. Dose rate alarm 5. Low dose waiting What is the definition of a Locked High Radiation Page 6 of6 NUREG-l 021, Revision 9 I APPLICANT: | : 1. Unit 2 is at 1000/0 power. | ||
: 2. 12 SFP coolers is in service. 11 SFP cooler is isolated for maintenance on 0-SFP-196, 11 PP SUCT FR 11 SFP DRN. | |||
Job Performance Measure Form ES-C-l Facility: | Maintenance is complete. | ||
Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADlVIIN-5 Task Title: Determine appropriate emergency response actions per the ERPIP Task Number: 204.097 | : 3. Maintenance needs you to observe for any binding while cycling the valve a number of times before its return to service. | ||
Initiating Cue: | |||
You have been directed to cycle 0-SFP-196, 11 PP SUCT FR 11 SFP DRN multiple times to observe for binding. Once cycling is complete, stand by to clear tags and open the downstream isolation valve. Task time is estimated to take 10 minutes. | |||
State the radiological requirements for entering this area. Include in your discussion: | |||
: 1. Protective clothing required in the work area | |||
: 2. Highest radiation level in the work area | |||
: 3. Expected dose for this assignment | |||
: 4. Dose rate alarm | |||
: 5. Low dose waiting area What is the definition of a Locked High Radiation Area? | |||
NRC-I? Page 6 of6 NUREG-l 021, Revision 9 | |||
I APPLICANT: _ __ | |||
CALVERT~ CLIFFS NUCLEAR POWER PLANT 2011 ~~RC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-5 | |||
Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADlVIIN-5 Task | |||
==Title:== | |||
Determine appropriate emergency response actions per the ERPIP Task Number: 204.097 KJA | |||
==Reference:== | ==Reference:== | ||
2.4.38 (2.4, 4.4) | |||
Method of testing: | |||
Simulated Performance: D Actual Performance: [?5J Classroom: [?5J Simulator: D Plant: | |||
READ TO THE APPLICANT: | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | |||
: 1) Unit-l is at 100% reactor power. | |||
: 2) An unisolable RCS leak has developed. | |||
: 3) 13 Charging pump is tagged out for maintenance. | |||
: 4) Chemistry reports no activity in Steam Generators | |||
: 5) You are performing the duties of the CRS. | |||
Initiating Cue: | |||
The Shift Manager directs you to determine the RCS leak Rate per AOP-2A Task Standard: | |||
The candidate determines the RCS leak rate. Once the leak rate is calculated, the candidate will correctly classify the event and complete the initial notification form within 15 minutes. | |||
Job Performance Measure Form ES-C-l Evaluation Criteria: | |||
: 1. All critical steps completed (denoted by shading). | |||
: 2. All sequential steps completed in order. | |||
: 3. All time-critical steps (denoted by an asterisk) completed within allotted time. | |||
: 4. JPM completed within validated tiffil~. Completion time may exceed the validated time if satisfactory progress is being made. | |||
Required Materials: | |||
Job Performance Form ES-C-l Evaluation Criteria: All critical steps completed (denoted by shading). All sequential steps completed in order. All time-critical steps (denoted by an asterisk) completed within allotted time. JPM completed within validated Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: | |||
: 1. Procedures and manuals normally available in the plant General | : 1. Procedures and manuals normally available in the plant General | ||
==References:== | ==References:== | ||
AOP-2A, Excessive RCS Leakage 2. ERPIP, Emergency Response Plan Implementation Procedure Time Critical Task: No Validation Time: 30 minutes Simulator Setup: a. None | : 1. AOP-2A, Excessive RCS Leakage | ||
: 2. ERPIP, Emergency Response Plan Implementation Procedure Time Critical Task: | |||
* Time Start: CUE: The Shift Manager directs you to determine the RCS leak Rate per The candidate locates AOP-2A Same as CUE: The STA has collected plant information on attachment 1 of Determine Factors: The candidate determines 18.9 Estimate PZR volume factor based on Pressure Step I. Estimate ReS expansion factor based on ReS The candidate determines 86.2 Temp., TAVEStep e. i Calculate Leak Rate: The candidate calculates | No Validation Time: | ||
: p. Calculate Leak Rate approximately 100 gpm aluate the ERPIP based on the calculated RCS leak rate P Call Time The candidate locates ERPIP 3.0, Same as element ACTIONS Refers to Immediate Actions, identifies the category from Determines ATTACHMENT 2 is the listing and goes to the appropriate Attachment. | 30 minutes Simulator Setup: | ||
: a. None | |||
: a. DETERMINE if existing conditions implementation of one of emergency Personnel Emergency, Att 15 Fire, Att 16,17,18 Radiological Event, Att 19 Severe Weather, Att 20,21 Hazardous Material Release, Att 22 Containment Evacuation, Att 23 Security, Att 24 Large Area Loss, Att 25 Large Steam Leak, Att 26 Extensive Damage Mitigation S/G Level Monitoring During Damage Mitigation, Att Determines an ALERT classification is warranted under FISSION | |||
Form ES-C-I ELEMENT STANDARD (SHADED = CRITICAL STEP) B. IMPLEMENT Emergency Response Actions 1. IF existing conditions warrant implementation of an emergency response attachment, in parallel, Determines step is NOT applicable THEN GO TO that attachment AND begin | Job Performanc(~ Measure Form ES-C-l ELEMENT STANDARD | ||
: 2. IF an EAL condition is met, THEN OBTAIN an Attachment 3, Initial Notification Form, AND GO TO | * Time Start: - - - - | ||
that an EAL is satisfied and obtains General Emergency Actions, Att 4 an Initial Notification form. Identifies ALERT Actions as the | CUE: The Shift Manager directs you to determine the RCS leak Rate per AOP-2A The candidate locates AOP-2A Same as element CUE: The STA has collected plant information on attachment 1 of AOP-2A Determine Factors: | ||
* Site Area Emergency Actions, Att 9 appropriate declaration attachment and goes to Attachment 11.* Alert Actions, Art 11 | The candidate determines 18.9 | ||
* Unusual Event Actions, Art 13 | : k. Estimate PZR volume factor based on ReS Pressure Step g. | ||
I. Estimate ReS expansion factor based on ReS The candidate determines 86.2 Temp., TAVEStep e. | |||
Page 2 of ATTACHMENT 3 contains instrudions for completing the form and mayor may . not be referred to as the applicant completes page 1. CUE: Candidate completes Attachment 3 Initial Notification Form, following instructions provided on the back of the form Attachment 3, Initial Notification Form; Page-l Section-A CI Complete Item A Checks "is" a drill CI Complete Item | i Calculate Leak Rate: The candidate calculates m.PZR Level approximately 264 The candidate calculates | ||
* Checks "Unit 1" CJ Complete Item Checks "ALERT" CJ Complete Item Enters "H.A.5 .1. 2" CI Complete Item Checks "Yes" Appendix C Job Performance Measure | : n. ReS Temperature approximately 86 I | ||
Prints name and signs. CUE: The request for an STA peer check is acknowledged Terminating Cue: Terminating Cue: This JPM is complete when an EAL classification is determined based on given plant conditions the Initial Notification Form is completed. | I The candidate calculates | ||
: o. ReS change approximately 17 The candidate calculates | |||
: p. Calculate Leak Rate approximately 100 gpm aluate the ERPIP based on the calculated RCS leak rate P Call Time Start: | |||
The candidate locates ERPIP 3.0, IMMEDIATE Same as element ACTIONS Refers to Immediate Actions, identifies the category from Determines ATTACHMENT 2 is the listing and goes to the appropriate Attachment. applicable | |||
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
AfTACHMENT 2, EMERGENCY CLASSIFICATION A. CLASSIFY the Event | |||
: 1. WHEN an event is in progress potentially requiring emergency response, THEN CONDUCT the following actions in parallel: | |||
CUE: The Unit 2 CRS will perform step A.1.a | |||
- .........- - - - - - - - - - - - - - - - - - - - - , - - - - - - - - - - - - - - - - - - i | |||
: a. DETERMINE if existing conditions warrant implementation of one of emergency response attachments: | |||
* Personnel Emergency, Att 15 | |||
* Fire, Att 16,17,18 | |||
* Radiological Event, Att 19 | |||
* Severe Weather, Att 20,21 | |||
* Hazardous Material Release, Att 22 | |||
* Containment Evacuation, Att 23 | |||
* Security, Att 24 | |||
* Large Area Loss, Att 25 | |||
* Large Steam Leak, Att 26 | |||
* Extensive Damage Mitigation Guidelines, Att27 | |||
* S/G Level Monitoring During Extensive Damage Mitigation, Att 28 Determines an ALERT classification is warranted under FISSION | |||
*b. EVALUATE the existing conditions against PRODUCT BARRIER Attachment I, Emergency ActionLt:~vel DEGRADATION, based on a potential loss of RCS barrier. | |||
(EAL) Criteria, to determine if an EAL threshold has been met. RCS Barrier- Unisolable ReS Leakage> 50 gpm. | |||
Form ES-C-I ELEMENT STANDARD (SHADED = CRITICAL STEP) | |||
B. IMPLEMENT Emergency Response Actions | |||
: 1. IF existing conditions warrant implementation of an emergency response attachment, in parallel, Determines step is NOT applicable THEN GO TO that attachment AND begin response actions. | |||
: 2. IF an EAL condition is met, THEN OBTAIN an Attachment 3, Initial Notification Form, AND GO TO the appropriate EAL Declaration attachment: Determines from previous evaluation that an EAL is satisfied and obtains | |||
* General Emergency Actions, Att 4 an Initial Notification form. | |||
Identifies ALERT Actions as the | |||
* Site Area Emergency Actions, Att 9 appropriate declaration attachment and goes to Attachment 11. | |||
* Alert Actions, Art 11 | |||
* Unusual Event Actions, Art 13 Candidate commences actions per Attachment 3, ALERT A.I COMPLETE Attachment 3, Initial Notification Refers to Attachment 3, Initial Form. Notification Form. | |||
NOTE TO EVALUATOR: | |||
Page 2 of ATTACHMENT 3 contains instrudions for completing the form and mayor may | |||
. not be referred to as the applicant completes page 1. | |||
CUE: Candidate completes Attachment 3 Initial Notification Form, following instructions provided on the back of the form Attachment 3, Initial Notification Form; Page-l Section-A CI Complete Item A I. Checks "is" a drill CI Complete Item A2. | |||
* Checks "Unit 1" CJ Complete Item A3. Checks "ALERT" CJ Complete Item A4. Enters "H.A. 5 .1. 2" CI Complete Item A5. Checks "Yes" | |||
Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) 0 Complete Item A5a Checks "Yes" 0 Complete Item A5b Checks "Airborne" 0 Complete Item A6. Checks 6.a "None" Completes A. 7 only after items 1 through 6 are completed, and within o Complete Item A 7. | |||
15 minutes of determining an EAL is met. | |||
ATTACHMENT 3, Page 1, Section B Selects blocks for: | |||
Drill, ALERT, and Staff Normal o B. Complete Section B. | |||
Emergency Response Facilities. | |||
Prints name and signs. | |||
CUE: The request for an STA peer check is acknowledged Terminating Cue: Terminating Cue: This JPM is complete when an EAL classification is determined based on given plant conditions ~md the Initial Notification Form is completed. | |||
No further actions are required. | No further actions are required. | ||
Time Stop: ERPIP Call Time Start -Time Stop = <<15 Minutes) | Time Stop: | ||
ERPIP Call Time Start - Time Stop = <<15 Minutes) | |||
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: | |||
NRC Date Facility Number of Attempts: | Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SRO-ADMIN-5 Applicant: | ||
NRC Examiner: | |||
Date Performed: | |||
Facility Evaluator: | |||
Job Perfonnanc(:! | Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
Measure Fonn ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | Time to Complete: | ||
: 1) Unit-l is at 100% reactor 2) An unisolable RCS leak has | Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
: 3) 13 Charging pump is tagged out for | Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ | ||
: 4) Chemistry reports no activity in Steam | Result: SAT _ _ _ _ __ UNSAT --------- | ||
: 5) You are performiug the duties of the Initiating Cue: The Shift Manager directs you to determine the RCS leak Rate per AOP-2A}} | Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - - - | ||
Job Perfonnanc(:! Measure Fonn ES-C-l APPLICANT'S CUE SHEET Initial Conditions: | |||
: 1) Unit-l is at 100% reactor power. | |||
: 2) An unisolable RCS leak has developed. | |||
: 3) 13 Charging pump is tagged out for maintenance. | |||
: 4) Chemistry reports no activity in Steam Generators | |||
: 5) You are performiug the duties of the CRS. | |||
Initiating Cue: | |||
The Shift Manager directs you to determine the RCS leak Rate per AOP-2A}} |
Latest revision as of 09:09, 11 March 2020
ML110110571 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs ![]() |
Issue date: | 12/20/2010 |
From: | Constellation Energy Nuclear Group |
To: | David Silk Operations Branch I |
Hansell S | |
Shared Package | |
ML103200039 | List: |
References | |
TAC U01839 | |
Download: ML110110571 (107) | |
Text
I APPLICANT: _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-1
Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-l (Alt Path)
Task
Title:
Verify Reactivity Control safety function is satisfied.
Task Number: 201.009 KIA
Reference:
004 A2.14 (4.4,4.7)
Method of testing:
Simulated Performance: D Actual Performance: C8J Classroom: D Simulator: C8J Plant: D READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. A significant electrical transient and Unit-l trip have occurred.
- 3. You are the Reactor Operator Initiating Cue:
The CRS directs you to Perform Reactivity Safety Function per EOP-O Task Standard:
The candidate will initiate Emergency Boratilon per EOP-O.
Appendix C Job Performance Measure Form ES-C-l Worksheet 1.
Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 1. EOP-O, Post-Trip Immediate Actions Time Critical Task:
No Validation Time:
20 minutes Simulator Setup:
- 1. Reset to IC-24 (both units at 100%)
- 2. Enter malfunctions:
- a. 4KVOOl_03, fault on 13 4kv bus on Fl
- b. 4KVOOl_04, fault on 14 4kv bus on F2
- 3. Place simulator in run
- 4. Initiate Fl and F2
- 5. Manually trip the reactor when 11 and 12 SGFPs trip on low suction pressure
- 6. Freeze the simulator.
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start:
CUE: The CRS directs you perform Reactivity Control safety function per EOP-O Locates the reactivity control plaque Same as element.
- 1. Depress ONE set of Manual REACTOR TRIP Same as element.
buttons.
- 2. Check the Reactor has tripped by the following:
The candidate determines the
- Prompt drop in NI power reactor has tripped and alternate action step 2.1 is NOT applicable.
- Negative SUR
- 3. Check that NO more than ONE CEA is NOT fully The candidate determines that inserted. CEA positions CANNOT be determined and alternate action step 3.1 is required.
3.1 IF more than ONE CEA fails to fully insert, THEN borate the RCS to at least 2300 ppm as The candidate places the follows: handswitch for l-CVC-512-CV in close.
- a. Shut the VCT M/U valve, 1-CVC-512-CV.
- b. Open the SA DIRECT M/U valve, 1-CVC-514- The candidate may place l-CVC MOV. 514-MOV hand switch in open.
514-MOV is deenergized so this step is NOT critical
- c. Open the BAST GRAVITY FD valves:
Candidate opens l-CVC-508
- 1-CVC-508-MOV MOV
- 1-CVC-509-MOV Candidate opens l-CVC-509 MOV
- d. Verify the M/U MODE SEL SW, 1-HS-210, is The candidate veritIes I-HS-21O in MANUAL. in manual.
- e. Start a SA PP. The candidate starts 11 BA pump.
(12 BA pump is deenergized due to loss of power affects)
Job Performancie Measure Form ES-C-I ELEMENT STANDARD The candidate places I-CVC-501
The candidate verifies 11
- charging pump running.
9 Start ALL available CHG PPs The Ioss 0 f144kv bus startsaII available charging pumps so NOT
- critical.
- 4. Verify demineralized water makeup to the ReS is secured as follows: Candidate verifies II and 12 RCMU pumps are secured.
- 11 and 12 RC M/U PPs are secured
- VCT M/U valve, 1-CVC-512-CV, is shut Candidate verifies l-CVC-512 CV is shut.
- IF RCS Makeup is in Direct Lineup, THEN the RWT CHG PP SUCT, 1-CVC-504-MOV, The candidate determines this step is shut is NOT applicable The candidate reports 'Reactivity Control is Complete' (or met)
Note: The candidate may provide additional information for valves and pumps not operating due to loss of power. This additional information is not critical.
Terminating Cue: This IPM is complete when the candidate reports the status of the Reactivity Control safety function. No further actions are required. The evaluator is expected to end the IPM.
Time Stop:
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-l Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT _ _ _ _ __ UNSAT --------
Examiner's Signature and Date: ---------------------------------------
Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. A significant electrical transient and Unit-l trip have occurred.
- 3. You are the Reactor Operator Initiating Cue:
The eRS directs you to Perform Reactivity Safety Function per EOP-O
APPLICANT: _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-2
Appendix C Job Perfonnance Measure Fonn ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-2 (Alt Path)
Task
Title:
Respond to RCS leakage exceeding one charging pump in modes 1 and 2 Task Number: 202.015 K.I A
Reference:
002 A2.01 (4.3, 4.4)
Method of testing:
Simulated Performance: Actual Perfonnance: [ZJ Classroom: D Simulator: [ZJ Plant: D READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 is in Mode 1 at 100% power.
- 2. An RCS leak has occurred.
- 4. You are the Control Room Operator Initiating Cue:
The CRS directs you to perform AOP-2A step VI.E, 'Attempt to isolate the leak' Task Standard:
The candidate will attempt to isolate letdown. The leak will remain greater than the capacity of a charging pump requiring a Reactor Trip.
Job Perfonnanc(~ Measure Form ES-C-I Evaluation Criteria:
I. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals nonnally available in the plant General
References:
- 1. AOP-2A, EXCESSIVE REACTOR COOLANT LEAKAGE Time Critical Task:
No Validation Time:
10 minutes Simulator Setup:
- 1. Reset to IC-24 (both units at 100%)
- 2. Enter malfunctions:
___ a. RCS003, RCS Leak, at 75 gpm
- 3. Place simulator in run
- 4. Open I-PS-5464, plant sample isolation valve
- 5. Place an off-nonnal pink ring on I-PS-5464
- 6. Freeze the simulator when a second charging pump starts (about 4 minutes)
Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start: - - - -
CUE: The CRS directs you to perform AOP-2A step VI.E, 'Attempt to isolate the leak' Locates AOP-2A section VLE on page 35 Same as element
- 1. Verify that the UD CNTMT ISOL valves are shut:
Candidate will place hand
- 1-CVC-515-CV switches for l-CVC-515-CV in close.
- 1-CVC-516-CV Candidate will place hand switches for l-CVC-516-CV in close.
- 2. Check there is NO PORV leakage by following indications: Candidate will determine there is
- Quench Tank Parameters no PORV leakage due to
- PORV discharge piping temperatures, computer points T1 07 and T108
- Acoustic Monitor indication
- 3. Verify that RCS SAMPLE ISOL valve, 1-PS-The candidate closes l-CV-5464 5464-CV, is shut.
- 4. Verify that the Reactor Vessel Vent valves are shut: The candidate verifies the RCS
- 1-RC-103-SV vent valves closed
- l-RC-104-SV
- 5. Verify that the PZR Vent valves are shut:
The candidate verifies the PZR
- 1-RC-105-SV vent valves closed
- 1-RC-106-SV
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
NOTE A leak on the Charging header which exceeds the capacity of the charging pumps can be identified by Charging header pressure indicating less than RCS pressure.
Identification of the leak may be missed if more than one charging pump is running.
- 6. Determine if the leak is on the Charging header by performing the following actions:
Same as element
- a. Stop all but ONE CHG PP.
- b. IF Charging header pressure is less than RCS Pressure, THEN assume the leak is The candidate determines the leak is NOT on the charging header.
on the Charging header.
- c. IF the leak is NOT on the Charging The candidate starts charging header, THEN start any CHG PPs that pumps turned off in step 6.a.
were stopped.
- 7. IF the leak is on the Charging header, THEN Candidate determines the step is perform the following actions: not applicable
- 8. IF the leak is determined to be occurring inside Containment by checking the following indications:
- Rise in Containment temperature, pressure, humidity or sump level alarm frequency The candidate determines the leak is inside the containment based on
- Rise in Containment gaseous or particulate Containment sump level alarm activity and containment humidity
- "U-1 WR NOBLE GAS RAD MON" and "UNIT 1 MAIN VENT GASEOUS" alarms clear THEN perform the following actions:
- a. Start ALL available CNTMT AIR CLRs in HIGH.
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
- b. Open the CNTMT CLR EMER OUT valves for Same as element the operating CNTMT AIR CLRs.
- 9. IF the leak is NOT occurring inside of Candidate determines the step is Containment. THEN perform the following not applicable actions:
- 10. Determine that NO leakage into the Component The candidate determines there is Cooling System is indicated by: NO leakage into the component cooling system
- NO rising trends on Component Cooling Radiation Monitor. 1-RI-3819
CUE: Acknowledge step E is complete CUE: Perform block AOP-2A step F, DETERMINE THE APPROPRIATE ACTIONS FOR RCS LEAKAGE, ON PAGE 42
- 1. Check that the leak has been isolated. Candidate will determine the leak has not been isolated. Candidate will perform alternate step F.1.1 1.1 IF the leak has NOT been isolated AND the leak is greater than the capacity of ONE Charging Pump. THEN. with the approval of the SM/CRS.
The candidate will recommend perform the following actions:
tripping the reactor and
- a. Trip the Reactor. implementing EOP-O
- b. IMPLEMENT EOP-O. POST TRIP IMMEDIATE ACTIONS.
Terminating Cue: This JPM is complete when the candidate recommends a manual reactor trip. No further actions are required. Th(: evaluator is expected to end the JPM.
- Time Stop:
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-2 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __
Examiner's Signature and Date: __________~_. . . . . . _ _ _ _ _ _ _ __
Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1. Unit 1 is in Mode 1 at 100% power.
- 2. An RCS leak has occurred.
- 4. You are the Control Room Operator Initiating Cue:
The CRS directs you to perform AOP-2A step VI.E, 'Attempt to isolate the leak'
I APPLICANT, _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-3
Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-3 (Alt Path)
Task
Title:
Notes failure of an operating HPSI pump and establishes safety injection using 12 HPSI pump prior to exiting EOP-O Task Number: 201.132 KIA
Reference:
006 A2.02 (3.9, 4.3)
Method of testing:
Simulated Performance: Actual Performance: ~
Classroom: D Simulator: ~
Plant: D READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. 11 HPSI pump is tagged out for maintenance
- 2. Unit 1 was in Mode 1 at 100% power.
- 3. A plant transient and Unit trip occurred
- 5. You are the Reactor Operator Initiating Cue:
The CRS directs you to perform EOP-5 block step D, 'Monitor RCS Depressurization' Task Standard:
The candidate determines that there is insufficient HPSI flow from 13 HPSI pump.
The candidate will starts 12 HPSI pump aligned to the 13 HPSI pump flow path.
...."ri-"x,........, Measure Fonn ES-C-l Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals nonnally available in the plant General
References:
- 1. EOP-5, LOSS OF COOLANT ACCIDENT Time Critical Task:
No Validation Time:
20 minutes Simulator Setup:
_ _ 1. Reset to IC-24 (both units at 100%)
- 2. Enter malfunctions:
_ _ a. FI: RCS002, RCS leak @ 1200 gpm
- 3. Enter Overrides
_ _ a. I-SI-406, 13 HPSI pump discharge valve, open @ .07
_ _ 4. Tag 11 HPSI PP HS in PTL
_ _ 5. Tag I-S1-656 in close
- - 6. Place simulator in run
- - 7. Initiate FI
_ _ 8. Close I-CV-515 and I-CV-5I6
_ _ 9. Stop IIA and 12B RCPs
-- 10. Freeze simulator 5 minutes after SIAS actuates
_ _ 11. Acknowledge all alanns
Perionmruncle Measure Fonm ES-C-l ELEMENT STANDARD
(* = CRITICAL STEP)
'-'tart: - - -
- CUE: The CRS directs you to perform EOP*-5 block step D, 'Monitor ReS Depressurization' Locates EOP-5 block step D on page 8 Srume as element.
Candidate will determine that
- 1. IF pressurizer pressure is less than or equal to SIAS has actuated by checking 1725 PSIA OR containment pressure is greater SIAS alarm, 13 HPSI pp has than or equal to 2.8 PSIG, THEN verify SIAS started, rund HPSI MOVs have actuation. opened.
- 2. IF pressurizer pressure is greater than 1725 PSIA AND containment pressure is less than 2.8 PSIG, Crundidate will detenmine the step THEN perform the following actions to block is NOT applicable SIAS:
- 3. IF SIAS has actuated, THEN perform the following actions:
- a. Verify the following pumps are running:
- 11 HPSI PP
- 11 LPSI PP
- 12 LPSI PP
- ALL available CHG PPs Crundidate locates EOP
- b. Verify safety injection flow: attachments, refers to ATTACHMENT (10), and
- HPSI flow PER ATTACHMENT(10), detenmines 13 HPSI flow is less HIGH PRESSURE SAFETY than the minimum required based IN"IECTION FLOW, when pressure is on addition of the 4 loop flow below 1270 PSIA indicators rundJor the HPSI total flow indication.
b.1 Perform the following actions as necessary:
Candidate detenmines 11 HPSI
Job Perfonnancle Measure Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
- IF 13 HPSI PP failed, THEN align 12 HPSI Candidate detennines 13 HPSI PP as follows: pump has failed due to its low flow (1) Start 12 HPSI PP Candidate starts 12 HPSI pump (2) Open HPSI HDR XCONN valve, 1-SI 653-MOV. Candidate opens I-S1-653 (3) Shut HPSI HDR XCONN valve, 1-SI-655 Candidate closes I-S1-655 MOV.
- Ensure electrical power is available to Same as element valves and ~um~s.
CUE: Another operator will verify Safety Injection lineup per attachment 2.
- Verify safety injection system lineup PER ATTACHMENT (2), SIAS VERIFICATION CHECKLIST.
Tenninating Cue: This JPM is complete when the 12 HPSI pump is injecting into the RCS per step b.I second bullet. No further actions are required. The evaluator is expected to end the JPM.
Appendix C Job Performanc1e Measure Form ES-C-I Worksheet Verification of Completion Job Performance Measure Number: SIM-3 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: __________________
Time to Complete:
Follow up Question: __________________________
Applicant Response: __________________________
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __
Examiner's Signature and Date:
IJvU......,. C Job Perfonnancj; Measure Fonn ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1. 11 HPSI pump is tagged out for maiutenauce
- 2. Unit 1 was in Mode 1 at 100% power.
- 3. A plant transient and Unit trip occurred
S. You are the Reactor Operator Initiating Cue:
The CRS directs you to perform EOP-S block step D, 'Monitor RCS Depressurization'
I APPLICANT: _ __
CALVERl' CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-4
Appendix C Job Performance Measure Form ES-C-l Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-4 (Alt Path)
Task
Title:
Takes alternate actions for turbine stop and control valve failure by shutting MSIVs, or if SOlS actuates notes an MSIV failed to shut on SOlS and shuts the MSIVs.
Task Number: 093.002 KIA
Reference:
045 A3.04 (3.4, 3.6)
Method of testing:
Simulated Performance: 0 Actual Performance: [gJ Classroom: Simulator: [gJ Plant:
o READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. A Switchyard Fault has occurred
- 3. The reactor has tripped
- 4. You are performing duties as the Control Room Operator Initiating Cue:
The CRS directs you to perform Turbine Trip per EOP-O Task Standard:
A main turbine stop valve and control valve have failed to automatically close on the plant trip. This will cause the Main Turbine to overspeed and steam generator pressures to lower rapidly. SGIS will not actuate to protect the plant. The candidate will shut the Main Steam Isolation Valves and secure the Main Generator Exciter.
Job Performance Measure Form ES-C-l Form ES-C-l Worksheet Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 1. 01-28, OPERATION OF THE 500 KV SWITCHYARD
- 2. EOP-O, POST-TRIP IMMEDIATE ACTIONS Time Critical Task:
No Validation Time:
5 minutes Simulator Setup:
- 1. Reset to I C-24 (both units at 100%)
- - 2. Enter malfunctions:
- a. SWYDOOI_02, Breaker 552-22 failure
___ b. TG005 _01, Main Turbine Stop Valve and Control Valve 1 failed as-is
- c. ESFAXXXX, SGIS auto failure
- - 3. Place simulator in run
- 4. Place breaker 552-22 in open
- 5. Freeze simulator
Job Perfonnance Measure Fonn ES-C-I Fonn ES-C-l ELEMENT STANDARD Time Start:
CUE: The RO announces 'The reactor is tripped', the CRS announces 'Perform EOP-O'
- 1. Check the Reactor has tripped. Candidate verifies the reactor has tripped
- 2. Ensure the Turbine has tripped by performing the following actions: Candidate depresses both turbine trip buttons
- a. Depress BOTH TURBINE TRIP buttons.
- b. Check the Turbine Main Stop Valves shut:
- MSV1 Candidate detennines MSV I did
- MSV2 not shut and alternate step b.l is required
- MSV3
- MSV4 Note: The candidate may report 'Taking alternate actions for (stop valve open)'. This report is not critical.
CUE: Acknowledge alternate actions b.1 IF ANY Turbine Main Stop Valve failed to Candidate will shut both Main shut, THEN shut BOTH MSIVs. Steam Isolation Valves
- c. Check Turbine Speed drops. Candidate detennines turbine speed is lowering
- d. IF the Turbine was paralleled to the grid, The candidate detennines breaker THEN verify the Turbine Generator Output 552-22 did not open and takes its breakers open: handswitch to open.
- 11 GEN BUS BKR, O-CS-552-22
- 11 GEN TIE BKR, O-CS-552-23 Same as element
- e. Verify 11 GEN FIELD BKR, 1-CS-41, is c)pen. Same as element
Job Perfonnance Measure Fonn ES-C-l Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
The candidate will open the
- f. Verify 11 EXCITER FIELD BKR, 1-CS-41 E, is exciter field breaker open. The exciter field breaker will not automatically open
- 3. Ensure BOTH MSR 2ND STG STM SOURCE MOVS are shut: Detennines the valves have not shut due to loss of power and
- 1-MS-4025-MOV (11 MSR) alternate action step 3.1 IS
- 1-MS-4026-MOV (12 MSR) required.
3.1 IF EITHER MSR 2ND STG STM SOURCE Same as element.
MOV failed to shut, THEN perform the foliowin~1 actions:
- a. Verify the MSR 2ND STG HIGH LOAD MOV (Not critical since Main Steam is shut: Isolation Valves were closed in
- (11 MSR) 1-MS-4018-MOV step b.l)
- (12 MSR) 1-MS-4017-MOV
- b. Dispatch an operator to verify the MSR 2ND STAGE BYPASS CONTROL VALVE panel Same as element loader in MANUAL with panel loader output at zero.
The Candidate will report 'Turbine Trip is complete' or similar Tenninating Cue: This JPM is complete when the candidate reports the Turbine Trip safety function. No further actions are required. The evaluator is expected to end the JPM.
Time Stop:
~el*tolTIl,mc:e Measure Form ES-C-l Form ES-C-l Worksheet Verification of Completion Job Perform;mce Measure Number: SIM-4 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT - - - - - - - UNSAT _ _ _ _ _ ___
Examiner's Signature ;md Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Job Performance Measure Form ES-C-l Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. A Switchyard Fault has occurred
- 3. The reactor has tripped
- 4. You are performing duties as the Control Room Operator Initiating Cue:
The CRS directs you to perform Turbine Trip per EOP-O
I APPLICANT: _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC ITIAL LICENSED OPERATOR EXAM JPM #: SIM-5
Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Perfonnance Measure No.: SIM-5 (Alt Path)
Task
Title:
Detennine whether a RCP seal has failed.
Task Number: 064.013 KJA
Reference:
003 A2.01 (3.4,3.9)
Method of testing:
Simulated Performance: 0 Actual Perfonnance: ~
Classroom: 0 Simulator: ~
Plant: 0 READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. The overhead annunciator alarm E55 "llB RCP SEAL TEMP HIIPRESS" has come in
- 3. You are performing the duties of the Unit 1 RO.
Initiating Cue:
Initiating Cue: The CRS directs you to respond to alarm window E55.
Task Standard:
This JPM is complete when the operator detennines that two seals have failed on lIB RCP and recommends an expeditious shutdown. The evaluator is expected to end this JPM.
Appendix C Job Perfonnance Measure Fonn ES-C-l Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals nonnally available in the plant
- 1. Alann Manual 1C06
- 2. OI-1A, Reactor Coolant System and Pump Operations No Validation Time:
10 minutes Simulator Setup:
_ _ 1. Reset to IC-24 (both units at 100%)
- - 2. Enter malfunctions:
- - a. Insert RCSOll_02, lIB Rep middle seal failure
b. Insert RCSO 12 02. 11 BRep lower seal failure
- - 3. Place simulator in run
Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start: - - - -
CUE: The CRS directs you to respond to the RCP alarm.
Identify and locate Alarm Response Manual for I C06 window E-55. Same as element.
CAUTION There is a potential for heat checking of seal faces if RCP seal limits have been exceeded. This heat damage may cause seal degradation/failure during RCS depressurization (compressive forces removed) or subsequent RCP starts (centrifugal forces).
CUE: Middle seal press indicated on I-PIA-I62 is approximately 2220 PSIA. Upper Seal Press indicated on I-PIA-I63 is approximately 2220 PSIA.
Checks Input Devices for alanns.
Detennines that high middle seal pressure alann and high upper Checks validity of alann. seal pressure alann exist.
Checks alanns against setpoints and detennines alanns are valid.
Note to Evaluator: The operator may reference OI-1A to try to determine how many seals have failed.
Checks POSSIBLE CAUSES and detennines that the abnonnal Reviews POSSIBLE CAUSES.
conditions are caused by a seal failure.
- 1. 11 B Rep seal high temperature. Candidate detennines step is N/A
- 2. lIB Rep seal high or low pressure. Candidate detennines this step is applicable.
RCP bleed-off flow indicates approximately 2.5 gpm.
Checks Bleed-off flow on Plant Computer and
- a. CHECK RCP seal bleed-off flow nonnal. detennines the vapor seal is not failed.
Appendix C Job Performancl;! Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
NOTE: If RCP seal bleed-off is less than normal (or zero) with normal seal pressure, the vapor seal may bl~ failed.
- IF the vapor seal is determined to be failed, THEN IMPLEMENT AOP**2A, Excessive Reactor Coolant Leakage CAUTION Debris from a failed seal may propagate 1to remaining seal stages, eventually leading to complete seal failure.
CUE: CRS will contact System Engineer.
- b. IF alarm is due to the failure of ONE seal, THEN closely monitor and trend the remaining seals for an increased rate of degradation AND CONTACT the System Engineer immediately to provide Determines step is NIA.
an evaluation of continued operability PER CNG-OP-1.01-1002, Conduct of Operability Determinations/Functionality Assessments.
- c. IF alarm is due to the failure of TWO or more seals, Determines 11 B RCP lower THEN, and middle seals have failed (1). COMMENCE an expeditious plant shutdown PER OP-3 Normal Power Candidate recommends plant Operation, and OP-4, Plant Shutdown shutdown to CRS due to two from Power Operation to Hot failed seals on 11 B RCP Standby.
TIME STOP --
TERMINATING CUE: This JPM is complete when the operator has determined that 11 B RCP has two failed seals and recommends an expeditious shutdown. The evaluator is expected to end this JPM.
Appendix C Job Performancl~ Measure Form ES-C-l Worksheet Verification of Completion Job Performance Measure Number: SIM-S Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _________________
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT ------- UNSAT --------
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Appendix C Job Performance Measure Form ES-C-I Worksheet APPLICANT'S CUE SHEET Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. The overhead annunciator alarm E55 "lIB RCP SEAL TEMP HIIPRESS" has come in
- 3. You are performing the duties ofthe Unit 1 RO.
Initiating Cue:
Initiating Cue: The CRS directs you to respond to alarm window E55.
I APPLICANT: _ __
CALVERl' CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-6
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-6 Task
Title:
Respond to the loss of a 120 volt vital AC bus Task Number: 202.100 KIA
Reference:
006 A2.01 (3.4, 3.9)
Method of testing:
Simulated Performance: D Actual Performance: ~
Classroom: D Simulator: ~
Plant: D READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. An electrical transient has occurred.
- 3. You are the Control Room Operator Initiating Cue:
The CRS directs you to Perform block step IV.A of AOP-7J.
Task Standard:
The candidate will use AOP-7J to diagnose llioss of 1YO 1. The candidate will restore pressurizer pressure and level instrUlments affected by the bus loss. The candidate will protect the pressurizer by securing charging pumps before exceeding 225 inches. The cllndidate will protect RCPs by placing 12 CC HX in service.
Appendix C Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
No Validation Time:
20 minutes Simulator Setup:
_ _ 1. Reset to IC-24 (both units at 100%)
- - 2. Enter malfunctions:
- a. Loss of 1YOI on Fl
- 3. Place simulator in run
- - 5. Initiate the loss of 1YOI
_ _ 6. Freeze simulator when pressuriz(~r level or pressure alarm annunciates
Job Perfonnance Measure Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start: - - -
CUE: The CRS directs you to Perform block step IV.A of AOP-7J.
Locates the AOP-7J Same as element.
CUE: The CRS will perform step 1 1, Perform the following immediate actions:
- a. Confirm with the Fuel Handling Supervisor that any fuel assembly being handled has been placed in a safe location.
- b. Suspend movement of irradiated fuel.
N/A
- c. Suspend movement of heavy loads over irradiated fuel.
- d. IF in Modes 5 or 6, THEN suspend operations involving positive reactivity additions that could result in loss of required SDM or boron i concentration.
- 12. GO TO 1C24A. Same as element.
. 3. IF 11 120 Volt Vital AC Instrument Bus (1YO'1) is The candidate reviews indications deenergized, AND 11 125 Volt DC Bus is on I C24A for 1YO 1 and 11 DC energized, THEN PROCEED to Section V., '11 Bus then detennines the a loss of 120 VOLT VITAL AC I NSTRUMENT BUS only IYOI has occurred and (1Y01). proceeds to section V on page 9.
Cue: Acknowledge recommendation, continue with the procedure I
- 1. Verify that the PRZR PRESS CH SEL Switch is in The candidate places PRZR the Y position. PRESS CH SEL Switch in Y.
- 2. Verify that the RRS CH SEL Switch is in the The candidate places RRS CH RRS-Y position. SEL Switch in Y.
- 3. Verify that the PRZR LVL CH SEL Switch is in the Same as element.
11 OY ~osition.
- 4. Verify that the PZR HTR LO LVL CUT-OFF SEL The candidate places PZR HTR Switch is in the Y position. LO LVL CUT-OFF SEL Switch in Y.
Appendix C Job Performance Measure ELEMENT STANDARD (SHADED = CRITICAL STEP)
CUE: Another operator will place switch 81 in OFF, continue
- 6. Shut the UD CNTMT ISOL valves:
Candidate shuts l-CV -515
- 1-CVC-515-CV
- 1-CVC-516-CV Candidate shuts 1-CV -516 Note: If pressurizer level reaches 225 prior to c~mdidate performing step 7, the candidate should stop all charging pumps.
- 7. Operate the selected charging pump as Candidate will secure the running necessary to maintain.PZR level within 15 inches charging pump(s).
of programmed level, NOT to exceed 225 inches.
- 8. Operate Pressurizer HTRs and PRZR SPRAY VLVs as necessary to maintain RCS pressure Same as element.
between 2225 and 2275 PSIA.
Note: The candidate may perform the following step from memory or by using 01-16 section 6.4.
- opening l-CC-3826-CV
- throttle open 12 CC HX SW FLOW CONTR, 1 HIC-5208 Terminating Cue: This JPM is complete when the candidate places 12 CC HX in service.
No further actions are required. The evaluator is expected to end the JPM.
Time Stop:
Appendix C Job Performanc(~ Measure Form ES-C-l Worksht:et Verification of Completion Job Performance Measure Number: SIM-6 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT - - - - - - - UNSAT _ _ _ _ _ __
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1. Unit 1 was in Mode 1 at 100% power.
- 2. An electrical transient has occurred.
- 3. You are the Control Room Operator Initiating Cue:
The CRS directs you to Perform block step IV.A of AOP-7J.
I APPLICANT: _ _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-7
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-7 (Alt Path)
Task
Title:
Override shut a PORV Task Number: 064.035 KIA
Reference:
007.A2.01 (3.9,4.2)
Method of testing:
Simulated Performance: D Actual Performance: [g]
Classroom: D Simulator: [g] Plant: D READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 1 is stable in Mode 4 at 250F and 225 psia
- 2. You are performing duties as the Reador Operator
- 3. Alarm E-21, PORV ENERGIZED, ahlrm has been received Initiating Cue:
The CRS directs you to respond to alarm window E-21 Task Standard:
The candidate will diagnose that the PORV is open due to equipment malfunction and shut the associated PORV block valve.
Appendix C Job PerformanCE! Measure Form ES-C-l Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 1. ALM-IC06, RCS Control Alarm Manual Time Critical Task:
No Validation Time:
10 minutes Simulator Setup:
- 1. Resetto IC-1
- 2. Enter malfunctions:
- a. Override 1-PI-103-1 to 1533#
- 3. Place simulator in run
- 4. Override PORV 402 to "manopen"
- 5. Freeze the simulator when pressurizer pressure lowers to 225 psia.
Appendix C Job PerformanCE~ Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
- Time Start:
CUE: The CRS directs you to respond to alarm window E-21 Locates the 1C06 alarm manual and refers to E-21 Same as element.
The candidate determines the step
- 1. PERFORM the following:
The candidate determines the
- a. IF reactor trip occurs, THEN IMPLEMENT reactor is shut down and step is EOP-O, Post-Trip Immediate Actions. NOT applicable.
CUE: The shift manager will contact the electric shop
- b. NOTIFY the electric shop to verify the trip status of the PORV thermal overloads to ensure PORV operability. [80034]
The candidate determines PORVs
- c. IF the PORVs are in NORMAL, THEN: ...
are in variable MPT and step is NOT applicable
- d. IF the PORVs are in MPT ENABLE, THEN: The candidate determines PORVs are in variable MPT and step is applicable (1) TRIP any RCPs operating in the NON- Candidate refers to RCP curve for OPERATING AREA of the RCP curve current lineup and determines RCP are in the non-operating area of the curve.
Candidate secures 11 A and 12B RCPs
Appendix C Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
(2) WHEN the cause of the high pressure Candidate determines the PORV condition has been corrected, THEN: is open due to equipment
[B0064]
malfunction and not high RCS pressure.
Determines step is NIA (3) IF a PORV fails to shut or is open due to The candidate determines PORV a failed transmitter, THEN SHUT the 402 is open due to a failed applicable PORV Block, 1-RC-403-MOV transmitter and closes the PORV or 1-RC-405-MOV. 402 block valve l-RC-403-MOV CUE: The CRO will perform step l.d.(4)
(4) DRAIN the PORV discharge piping to the N/A Quench Tank as follows:
- e. MONITOR computer points T106, T107, and Candidate uses plant computer to T1 08 for leak-off temperatures. monitor leak-off temperatures Terminating Cue: This JPM is complete when the candidate isolates the open PORV flow path. No further actions are required. The evaluator is expected to end the JPM.
Time Stop:
Appendix C Job Performanc~ Measure Form ES-C-l Verification of CI)mpletion Job Performance Measure Number: SIM-7 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _._ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:
- 1. Unit 1 is stable in Mode 4 at 250F and 225 psia
- 2. You are performing duties as the Reactor Operator
- 3. Alarm E-21, PORV ENERGIZED, alarm has been received Initiating Cue:
The CRS directs you to respond to alarm window E-21
I APPLICANT: _ __
CALVER1~ CLIFFS NUCLEAR POW RPLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PLANT-1
PertorJmaJl1ce Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-l Task
Title:
Fill the SRW and CC head tanks during a loss of AC power Task Number: 011.025, 015.008 KJA
Reference:
008 A4.07 (2.9, 2.9)
Method of testing:
Simulated Performance: fZ] Actual Performance:
Classroom: D Simulator:
Plant: fZ]
READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
- 2. You are performing the duties of the Unit:-2 ABO.
Initiating Cue:
You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH".
Task Standard:
This JPM is complete when makeup has been restored to the Service Water and Component Cooling Head Tanks.
Appendix C Job Performance Measure Form ES-C-1 Worksheet Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 1. AOP-9A, CONTROL ROOM EV ACUA nON AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE.
Time Critical Task:
No Validation Time:
20 minutes Simulator Setup:
- 1. None
Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start:
CUE: You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH".
Locate AOP-9A, Step CH. Same as element.
Candidate proceeds to the Unit-2 69' Same as element I
CUE: 2C43 notifies you that makeup has been restored to fill the Service Water and Component Cooling Head Tanks
- 1. WHEN notified that makeup has been restored to fill the Service Water and Component Cooling Head i Tanks, THEN: Same as element
- Open Component Cooling Head Tank Condensate Supply, 2-CD-145.
- Open SRW Head Tank Condensate Supply, Same as element 2-CD-144.
CUE: The component cooling head tank level is below the sight glass
- 2. Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks:
Same as element
- a. Component Cooling Head Tank:
(1) Open Component Cooling Head Tank Makeup Bypass, 2-CC-108 (2) Shut 2-CC-3820-CV Inlet Isol, 2-CC-107 Same as element i CUE: The component cooling head tank level is normal by sight glass CUE: 21 SRW head tank is normal, 22 SRW head tank level is below the sight glass
- b. 21 Service Water Head Tank: I Candidate detennines step is NOT applicable
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED= CRITICAL STEP)
- c. 22 Service Water Head Tank:
(1) Open 22 Service Water Head Tank Makeup Bypass, 2-SRW-114 Same as element (2) Shut 22 Service Water Head Tank LCV Same as element Inlet Isol, 2-SRW-112 CUE: 22 SRW head tank level is level is normal by sight glass
- 3. Periodically monitor Component Cooling and Service Water Head Tanks levels and fill as Same as element necessary.
Terminating Cue: This JPM is complete when the Component Cooling and 22 Service Water Head Tanks are in the normal band. No further actions are required. The evaluator is expected to end the JPM.
Time Stop:
Job Performance Measure Form ES-C-I Verification of Completion Job Performance Measure Number: PLANT-l Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _________________
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __
Examiner's Signature and Date: ______________________
Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:
- 3. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
- 4. You are performing the duties of the Unit-2 ABO.
Initiating Cue:
You have just completed Step CG, ESTABLISH SAL TWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH".
CALVER1' CLIFFS NUCLEAR PO'WER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PLANT-2
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-2 Task
Title:
Shutdown/Return and AF AS sensor cabinet to/from service Task Number: 036.005 KIA
Reference:
013 A2.06 (3.7, 4.0)
Method of testing:
Simulated Performance: ~ Actual Performance: D Classroom: D Simulator: D Plant: ~
READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 2. Shift Manager approval has been obtaim~d.
- 3. You are performing the duties of the Unilt-2 CRO.
Initiating Cue:
The CRS directs you to shutdown AF AS Sensor Cabinet ZE Task Standard:
This JPM is complete when AF AS ZE sensor cabinet is shutdown.
Form ES-C-l Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
No Validation Time:
20 minutes Simulator Setup:
- 1. None
Appendix C Job Performanc1e Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start: - - - -
CUE: The CRS directs you to shutdown AFAS Sensor Cabinet ZE Locate OI-32B Section 6.3. Same as element.
CUE: The CRS has reviewed Tech Specs 3.3.4 and 3.3.5 Candidate proceeds to the Unit-2 cable spreading Same as element room
- 1. UNLOCK AND OPEN the Sensor Cabinet front Candidate notifies control room, door for the Sensor Cabinet to be shutdown. then unlocks Unit 2 AF AS sensor cabinet ZE
- 2. CHECK that NO trips are present on any other Sensor Cabinets for SG Low Level or for SG Same as element Differential Pressure.
- 3. CHECK that NO trips are present on either of the Same as element Logic Cabinets. [B0068]
- 4. PLACE the circuit breaker on the Sensor Cabinet Same as element to be shutdown to the OFF position. (FIGURE 1)
- 5. PLACE the 120 volt breaker for the Sensor Cabinet to be shutdown to the OFF position: Same as element Sensor Cabinet ZE ....... Panel 2Y02-1, Breaker 22
- 6. CLEAR all AFAS alarms that will reset. Same as element
- 7. CLOSE AND LOCK the Sensor Cabinet front Same as element door.
Terminating Cue: This JPM is complete when AF AS ZE Sensor cabinet is de energized with door locked. No further actions are required. The evaluator is expected to end the JPM.
Time Stop:
Appendix C Job Performance Measure Form ES-C-I Worksheet Verification of Completion Job Performance Measure Number: PLANT-2 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _,_ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT ________ UNSAT ______________
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1. Maintenance is scheduled to be performed on AFAS channel ZE
- 2. Shift Manager approval has been obtained.
- 3. You are performing the duties of the Unit-2 CRO.
Initiating Cue:
The CRS directs you to shutdown AFAS Sensor Cabinet ZE
APPLICANT: _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PJLANT-3
Fonn ES-C-l Facility: Calvert Cliffs 1 & 2 Job Perfonnance Measure No.: PLANT-3 Task
Title:
Manually override Saltwater valves using hand transfer valves Task Number: 012.019 KIA
Reference:
076 A4.02 (2.6, 2.6)
Method of testing:
Simulated Performance: cg] Actual Perfonnance: D Classroom: D Simulator: D Plant: cg]
READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task !mccessfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. A severe fire has resulted in Control Room evacuation. AOP~9A has been implemented.
- 2. You are performing the duties of the Unit 1 TBO.
Initiating Cue:
The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers Task Standard:
This JPM is complete when Salt Water valve:s to the Service Water Heat Exchangers are manually overridden.
Fonn ES-C-l Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals nonnally available in the plant General
References:
- 1. AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE.
Time Critical Task:
No Validation Time:
20 minutes Simulator Setup:
- 1. None
Job Performance Measure Form ES-C-I ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start:
CUE: The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers
- 1. WHEN notified to override Saltwater to the Service Water Heat Exchangers, THEN insert the Key into 1-HS-5149 and place the Saltwater System Emergency Same as element
- Overboard, 1-CV-5149, to OVERRIDE TO CLOSE.
- 2. Place the following Handvalves to OVERRIDE
{from left to right}:
Same as element
Job Performance Measure Form ES-C-l
- 3. Perform the next TBO assigned step.
Terminating Cue: This JPM is complete when Saltwater to the Service Water Heat Exchangers is overridden. No further actions are re q uired. The evaluator is exp ected to end thelPM.
Form ES-C-l Verification of Completion Job Performance Measure Number: PLANT-3 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT - - - - - - - UNSAT _ _ _ _ _ __
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Job Performanc'e Measure Form ES-C-I Workshl~et APPLICANT'S CUE SHEET Initial Conditions:
- 1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
- 2. You are performing the duties of the Unit 1 TBO.
Initiating Cue:
The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers
I APPLICANT: _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-1
Job Performance Measure Form ES-C-I Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-1 Task
Title:
Initiate, ensure performance of, and review Operational Test Documents.
Task Number: 204.035 KJA
Reference:
2.1.7 (4.4, 4.7)
Method of testing:
Simulated Performance: D ActuaIPerformance:[3J Classroom: [3J Simulator:
Plant: D READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1) Unit-1 is at 100% reactor power.
- 2) STP O-SA-l, AUXILIARY FEEDWATER SYSTEM QUARTERLY SURVEILLANCE TEST, Section 6.1 has just been performed.
- 3) You are performing the duties of the CRS.
Initiating Cue:
The Shift Manager directs you to perform Step 6.1.31 ofSTP O-SA-l Section 6.1 Task Standard:
The candidate conducts a level 2 review ofSTP O-SA-l section 6.1. The candidate determines 11 AFW pump to be inoperable, and TS 3.7.3.A is entered. The evaluator is expected to end the JPM.
Appendix C Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 1. STP O-SA-l, Auxiliary Feedwater System Quarterly Surveillance Test.
- 2. Technical Specifications Time Critical Task:
No Validation Time:
30 minutes Simulator Setup:
None
Appendix C Job Performancl~ Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start:
CUE: The Shift Manager directs you to perform Step 6.1.31 of STP O-SA-l Section 6.1 Steps 6.1.31.1-13 The candidate will review 11 AFW Checks YES or NI A in accordance pump collected test data against the acceptance with the answer key in steps 6.1.31.1 criteria through 6.1.31.13 Determines 11 AFW pump Step 6.1.31.14 Did 11 AFW Pump develop a DIP of at differential pressure is less than the least 1210 PSID and no greater than required in step 6.1.31.14.
1295.2 PSID in Step 6.1.20?
Checks NO Determines 11 AFW pump Steps 6.1.31.15 Did 11 AFW Pump develop a TDH developed head is less than the greater than or equal to 2800 feet in required in step 6.1.31.15.
Step 6.1.21 Checks NO in accordance with the key in steps 6.1.31.15 Step 6.1.31.16 This test section is considered satisfactory Determines 11 AFW pump testing is if YES or NIA was answered in all steps UNSAT in step 6.1.31.16 above. Checks UNSAT Step 6.1.31.16.a. IF unsat THEN: Notifies the SM 11 AFW pump has failed the testing.
- Notify the SM CUE: The SM directs the CRS to determine 'IS actions required Step 6.1.31.16.a Declare the affected equipment inoperable Determines that TS 3.7.3.A should Take action as required by Te,ehnical be entered Specifications and administrative actions stated in EN-4-104 Terminating Cue: This JPM is complete when it is determined 11 AFW pumps is inoperable and TS 3.7.3.A is entered.
The evaluator is expected to end the JPM.
Time Stop:
Appendix C Job Performance Measure Form ES-C-l Worksh~~et Verification of Completion Job Performance Measure Number: SRO-ADMIN-l Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _________________
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT -------
UNSAT --------
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1) Unit-l is at 100% reactor power.
- 2) STP O-SA-l, AUXILIARY FEEDWATER SYSTEM QUARTERLY SURVEILLANCE TEST, Section 6.1 has just been performed.
- 3) You are performing the duties of the CRS.
Initiating Cue:
The Shift Manager directs you to perform Step 6.1.31 ofSTP O-SA-l Section 6.1
I APPLlCANT: _ __
CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-2
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-2 Task
Title:
Evaluate the need for plant cooldlown.
Task Number: 201.005 KIA
Reference:
2.1.25 (3.9, 4.2)
Method of testing:
Simulated Performance: D Actual Performance: IZI Classroom: IZI Simulator: D Plant: D READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1) Unit-l and Unit-2 were at 100% reactor pow(~r.
- 2) A loss of offsite power occurred at 0800. SME:CO is unavailable.
- 3) The OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to a ground fault.
- 4) The plant has been stabilized per EOP-7 with the following parameters:
a) It is now 0900.
b) Unit 1 RCS Temperature is 532F and ste~ldy. Unit 2 RCS temperature is 532F and steady.
c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet
- 5) You are performing the duties of the Unit 1 CRS.
Initiating Cue:
The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN.
Task Standard:
The candidate will assess condensate inventOlry using EOP attachment (9) and determine there is insufficient water to cooldown, the plant must be maintained in hot standby, and the plant can be maintained in hot standby for 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The evaluator is expected to end the JPM.
Job Performance Measure Form ES-C-l Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 1. EOP-7, Station Blackout
- 2. EOP Attachments Time Critical Task:
No Validation Time:
30 minutes Simulator Setup:
- - a. None
Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start:
CUE: The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN Locate EOP-7, Step AB. Same as element.
- 1. WHEN the RCS parameters have been stabilized, THEN evaluate the need for a plant cooldown based on:
Candidate will determine
- Plant Status Attachment (9) completion is
- Auxiliary systems availability required
- Condensate inventory PERATIACHMENT (9),
MAKEUP WATER REQUIRED FOR RCS COOLDOWN Locate EOP Attachment (9) Same as element.
- 1. Determine the amount of makeup water required Candidate enters uses table to perform an ADV cooldown and a TBV 'INVENTORY REQUIRED TO cooldown, based on the time after shutdown: COOL DOWN TO 300F' and determines 625067 gallons are
- a. ADV cooldown and time after shutdown required.
Candidate enters uses table
'INVENTORY REQUIRED TO
- b. TBV cooldown and time after shutdown COOL DOWN TO 300F' and determines 94828 gallons are required.
- 2. Determine the amount of makeup water available in the CSTs:
- a. Record the level in 11 CST. The candidate determines the tank levels from the initiating cue
- b. Record the level in 12 CST.
- c. Record the level in 21 CST.
- d. Determine the status of Unit 2 (check ()ne):
Candidate checks d.2.
(1) _ Mode 1, 2 or 3 and does NOT require AFWoperation. The loss of offsite power has caused (2) _ Mode 1, 2 or 3 and does require AFW a dual unit trip. Main feed water is NOT available to either unit on a operation.
loss of offsite power.
(3) Mode 4, 5, 6 or defueled.
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
NOTE: Calculated negative values should be entered as zero.
- e. Determine the amount of makeup watE~r available to Unit 1 using one of the following formulas, based on the status checked in step 2.d above:
(1) IF step d.(1) is checked, THEN correct CST Candidate determines step is NOT levels for usable volume: applicable (2) IF step d.(2) is checked, THEN correct CST Candidate determines step IS levels for usable volume: applicable Candidate enters 27 and calculates (a) step 2.a ft-2.75ft= 24.25 for step 2(a)
(b) step 2.b ft - 2.5 ft= Candidate enters 22 and calculates 9.75 for step 2(b) 2 Candidate enters 24.25 and 9.75, and (c) step(a) + step(b) ft = calculates 34 for step 2( c)
(3) IF step d.(3) is checked, THEN cornect CST Candidate determines step is NOT levels for usable volume: applicable
- f. Convert the amount of CST level into gallons.
Candidate enters 34 and calculates (ft available) x 9636.78 gal/ft = approximately 327650 for step 2.f NOTE The nominal capacity of a Well Water pump is 300 GPM.
The nominal capacity of a Demineralized Water Transfer pump is 300 GPM.
The Fire System can fill the CST via fire hoses at greater than 500 GPM.
CAUTION I The status of both units should be considered when evaluating a makeup source.
Candidate determines there is NOT
- 3. IF adequate inventory exists to perform adequate inventory to perform a cooldown, THEN determine if an adequate cooldown.
makeup source exists to maintain hot statndby. Water required is 625067, inventory !
available is 327650
Job Performance Measure Form ES-C-l CUE: The shift manager requests the candidate to determine how long hot standby can be maintained with the current inventory.
- 4. IF adequate inventory does NOT exist to perform cooldown, THEN evaluate the following:
The candidate uses ATTACHMENT (9) MAKEUP WATER REQUIRED
- Maintaining hot standby conditions TO MAINTAIN HOT STANDBY.
- Time to restore an adequate makeup source If the chart is NOT interpolated, the
- Restoration of other plant systems (TBVs, value would be 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> of hot standby.
main feedwater system, etc.)
If chart is interpolated, the value would
- Performing partial cooldown while restoring be approximately 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> 34 minutes.
plant systems Terminating Cue: This JPM is complete when it is determined how long hot standby can be maintained.
The evaluator is expected to end the JPM.
Time Stop:
Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Verification of Completion Job Performance Measure Number: SRO-ADMIN-2 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __
Examiner's Signature and Date: _ _ _ _ _,_ _ _ _ _ _ _ _ _ _ _ _ __
Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1) Unit-l and Unit-2 were at 100% reactor power.
- 2) A loss of offsite power occurred at 0800. SMECO is unavailable.
- 3) The OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to a ground fault.
- 4) The plant has been stabilized per EOP-7 with the following parameters:
a) It is now 0900.
b) Unit 1 RCS Temperature is 532F and steady. Unit 2 RCS temperature is 532F and steady.
c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet
- 5) You are performing the duties of the Unit 1 CRS.
Initiating Cue:
The Shift Manager directs you to perform EOP-7 step AB, EVALUATE THE NEED FOR PLANT COOLDOWN.
I APPLICANT: _ __
CALVERl' CLIFFS NUCLEAR PO~WER PLANT 2011 ~~RC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-3
Appendix C Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-3 Task
Title:
Establish initial plant conditions for and approve performance of an STP.
Task Number: 210.001 KIA
Reference:
2.2.40 (3.4, 4.7)
Method of testing:
Simulated Performance: Actual Performance: ~
Classroom: [gJ Simulator: 0 Plant: 0 READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1) Unit-l is at 100% reactor power.
- 2) STP O-SA-1 is scheduled today.
- 3) No maintenance was performed on the lA DG
- 4) You are performing the duties of the CRS.
Initiating Cue:
The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of step 4.0.
Task Standard:
The candidate correctly completes the SRO portion of the STP preliminary section using the plan of the day and Technical Specifications.
The evaluator is expected to end the JPM.
Appendix C Job Performancj~ Measure Form ES-C-1 Worksheet Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 2. Technical Specifications Time Critical Task:
No Validation Time:
30 minutes Simulator Setup:
- a. None
Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)
Time Start:
CUE: The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of section 4.0 CUE: The candidate is given a partial copy ofthe Plan ofthe Day and STP O-SA-l CUE: STP M-6S1C-IA is not required.
A. PERFORM the following determinations:
Candidate checks Scheduled
- 1. IF STP M-651 C-1A is to be performed concurrently Surveillance' based on the initiating with this test THEN NOTIFY E&C to perform STP cue.
M-651 C-1A prerequisites.
CUE: The candidate is given the plan of the day NOTE
- LOCI Sequencer testing is required monthly in Modes 1-4 .
- SIAS A-10 Logic, Channel Functional test is required quarterly in Modes 1-3 .
- 2. INDICATE ESFAS test requirements:
Candidate checks this checkbox 0 SIAS/UV OR LOCI SEQ test required: (check based on the preceding note required tests)
Candidate checks this checkbox D PERFORM Section 6.5, MONTHLY 11 based on the preceding note 4KV BUS LOCI SEQUENCER TEST D PERFORM Section 6.4, QUARTERLY Candidate checks this checkbox SIAS A-1 0 LOGIC AND UV A-4 LOGIC based on the preceding note TEST Candidate DOES NOT check this checkbox based on the preceding D ESFAS testing NOT required:
note NOTE Taking 1A DG to LOCAL makes the DG inoperable. This minimizes unloaded run time during ESFAS testing AND is the preferred alignment.
- 3. IF performing ESFAS testing, THEN REVIEW equipment availability AND INDICATE 1A DG Candidate checks this checkbox alignment during test: (N/A if NOT testing ESFAS) based on the preceding note D 1A DG in LOCAL during ESFAS te!~t:
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
Candidate DOES NOT check this checkbox based on the preceding D 1A DG in AUTO during ESFAS test: note NOTE 1A DG remains operable when performing a Slow Speed start from 1C18A.
~
- 4. REVIEW PMT requirements, Surveillance Schedule I Candidate checks this checkbox AND INDICATE 1A DG start requirements: based on the surveillance requirements (Non-fast speed start)
[J Slow start of 1A DG:
Candidate does not check this checkbox based on the surveillance D Emergency start of 1A DG:
requirements.
Candidate does not check this Start of 1A DG NOT required checkbox based on the surveillance requirements.
'.."::H~' "ine YES - Performance of Sect. 6.1 is required Candidate checks these checkboxes
- based on the surveillance Monthly FO TRANSFER PP Automatic requirements.
Start test reQuired.
Candidate checks this checkbox Quarterly 1ST FO TRANSFER PP based on the surveillance Performance Capacity test required. requirements.
Candidate does not check this NO - Performance is NOT required; LEAVE checkbox based on the surveillance Sect. 6.1 blank reqUlrements.
Candidate checks this checkbox DYES - Performance of Sect. 6.9 is required based on the surveillance requirements Candidate does not check this D NO - Performance is NOT required; LEAVE checkbox based on the surveillance Sect. 6.9 blank requirements.
Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
NOTE FSTC-OPS OR System Engineer may be contacted to make the determination.
CUE: No maintenance was performed on the diesel
- 6. IF this is the first performance of this test after EDG- I . . . . ..
13 has been performed on 1A DG, THEN INDICATE
- Candidate determines the step is minimum 1A DG loaded run time for Sect. 6.8: (N/A if NOT Applicable NOT first test after EDG-13) [80273]
- 7. REVIEW the Surveillance Schedule OR PMT to determine if Quarterly air receiver check valve testing is required.
Candidate checks yes based on D YES - Quarterly air receiver check valve surveillance requirements.
testing is required.
NO ~ Quarterly air receiver check valve testing is NOT required.
Terminating Cue: This JPM is complete when all SRO steps are complete in section 4.0.
The evaluator is expected to end the JPM.
I
Job Performancl~ Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SRO-ADMIN-3 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT _ _ _ _ __ UN SAT --------
Examiner's Signature and Date:
Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1) Unit-1 is at 100% reactor power.
- 2) STP O-SA-1 is scheduled today.
- 3) No maintenance was performed on the 1A DG
- 4) You are performing the duties of the CRS.
Initiating Cue:
The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of step 4.0.
I APPLICANT: - -
CALVERl' CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-4
Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1&2 Job Performance Measure No.SRO-ADMIN-4 Task
Title:
Determine radiological conditions for personnel exposure Task Number: No equivalent task at CCNPP KIA
Reference:
2.3.7 (3.5, 3.6)
Method oftesting:
Simulated Performance: Actual Performance: _::1_
Classroom: _~ Simulator: Plant:
READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. Unit 2 is at 100% power.
- 2. 12 SFP coolers is in service. 11 SF]) cooler is isolated for maintenance on 0-SFP-196,11 PP SUCT FR 11 SFP DRN. Maintenance is complete.
- 3. Maintenance needs you to observe for any binding while cycling the valve a number of times before its return to service.
Initiating Cue:
You have been directed to cycle 0-SFP-196, 11 PP SUCT FR 11 SFP DRN multiple times to observe for binding, and then stand by to clear tags and open the downstream isolation valve. Task time is estimated to take 10 minutes.
State the radiological requirements for lentering this area. Include in your discussion:
- 1. Protective clothing required in the work area
- 2. Highest radiation level in the work area
- 3. Expected dose for this assignment
- 4. Dose rate alarm
- 5. Low dose waiting area What is the definition of a Locked High Radiation Area?
Task Standard:
Determine radiological conditions for p,ersonnel exposure NRC-17 Page 2 of6 NUREG-1 021, Revision 9
Appendix C Job Performance Measure Form ES-C-1 Worksheet Evaluation Criteria:
- 1. All critical steps completed.
- 2. All sequential steps completed in order.
- 3. All time-critical steps completed within allotted time.
- 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Spent Fuel Cooling Room Survey Map
- 2. RWP 106 task 2, "Operations Activities in High Radiation Areas (HRAs)"
- 3. RP-l-100, "Radiation Protection", Revision 8 General
References:
RP-I-I00, "Radiation Protection", Revision 8 (Pages 14,31)
Time Critical Task:
No Validation Time:
10 minutes Simulator Setup:
None NRC-17 Page 3 of6 NUREG-1 021, Revision 9
ELEMENT STANDARD
(* = CRITICAL STEP)
TIME START Review survey map and R WP. Same as element.
- 1. State protective clothing Determines that R WP specifies requirements. Anti-Cs and conferring with RST (Radiation Safety Technician).
- 2. Identify highest radiation level in Determines that highest radiation the area. level in the area is 350 mRlhr 0 SFP-196.
- 3. Calculate expected dose for this Determines that expected dose in 10 assignment. minutes is 1/6
- 350mRlhr = 58.3 mR
- 4. Identifies dose rate alarm setpoint. Determines from R WP that dose rate alarm will be set at 950 mRlhr.
- 5. Locates low dose waiting area. Identifies from R WP room low dose waiting area is by the room door, or identifies lowest general area is by the door (.4 mRlhr), or states would wait outside of the room in the hallway.
- 6. Explains the radiation classification States that Locked HRA is an area of a Locked High Radiation Area. where dose could exceed 1RIhr at 30cm.
TIME STOP Examiner Note: The task is complete when the applicant has provided requested radiological informatilon.
NRC-17 Page 4 of6 NUREG-l 021, Revision 9
Appendix C Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: ADMIN-4 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT ------- UNSAT - - - - - - - -
Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
NRC-17 Page 50f6 NUREG-l 021, Revision 9
Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:
- 1. Unit 2 is at 1000/0 power.
- 2. 12 SFP coolers is in service. 11 SFP cooler is isolated for maintenance on 0-SFP-196, 11 PP SUCT FR 11 SFP DRN.
Maintenance is complete.
- 3. Maintenance needs you to observe for any binding while cycling the valve a number of times before its return to service.
Initiating Cue:
You have been directed to cycle 0-SFP-196, 11 PP SUCT FR 11 SFP DRN multiple times to observe for binding. Once cycling is complete, stand by to clear tags and open the downstream isolation valve. Task time is estimated to take 10 minutes.
State the radiological requirements for entering this area. Include in your discussion:
- 1. Protective clothing required in the work area
- 2. Highest radiation level in the work area
- 3. Expected dose for this assignment
- 4. Dose rate alarm
- 5. Low dose waiting area What is the definition of a Locked High Radiation Area?
NRC-I? Page 6 of6 NUREG-l 021, Revision 9
I APPLICANT: _ __
CALVERT~ CLIFFS NUCLEAR POWER PLANT 2011 ~~RC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-5
Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADlVIIN-5 Task
Title:
Determine appropriate emergency response actions per the ERPIP Task Number: 204.097 KJA
Reference:
2.4.38 (2.4, 4.4)
Method of testing:
Simulated Performance: D Actual Performance: [?5J Classroom: [?5J Simulator: D Plant:
READ TO THE APPLICANT:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1) Unit-l is at 100% reactor power.
- 2) An unisolable RCS leak has developed.
- 3) 13 Charging pump is tagged out for maintenance.
- 4) Chemistry reports no activity in Steam Generators
- 5) You are performing the duties of the CRS.
Initiating Cue:
The Shift Manager directs you to determine the RCS leak Rate per AOP-2A Task Standard:
The candidate determines the RCS leak rate. Once the leak rate is calculated, the candidate will correctly classify the event and complete the initial notification form within 15 minutes.
Job Performance Measure Form ES-C-l Evaluation Criteria:
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order.
- 3. All time-critical steps (denoted by an asterisk) completed within allotted time.
- 4. JPM completed within validated tiffil~. Completion time may exceed the validated time if satisfactory progress is being made.
Required Materials:
- 1. Procedures and manuals normally available in the plant General
References:
- 2. ERPIP, Emergency Response Plan Implementation Procedure Time Critical Task:
No Validation Time:
30 minutes Simulator Setup:
- a. None
Job Performanc(~ Measure Form ES-C-l ELEMENT STANDARD
- Time Start: - - - -
CUE: The Shift Manager directs you to determine the RCS leak Rate per AOP-2A The candidate locates AOP-2A Same as element CUE: The STA has collected plant information on attachment 1 of AOP-2A Determine Factors:
The candidate determines 18.9
- k. Estimate PZR volume factor based on ReS Pressure Step g.
I. Estimate ReS expansion factor based on ReS The candidate determines 86.2 Temp., TAVEStep e.
i Calculate Leak Rate: The candidate calculates m.PZR Level approximately 264 The candidate calculates
- n. ReS Temperature approximately 86 I
I The candidate calculates
- o. ReS change approximately 17 The candidate calculates
- p. Calculate Leak Rate approximately 100 gpm aluate the ERPIP based on the calculated RCS leak rate P Call Time Start:
The candidate locates ERPIP 3.0, IMMEDIATE Same as element ACTIONS Refers to Immediate Actions, identifies the category from Determines ATTACHMENT 2 is the listing and goes to the appropriate Attachment. applicable
Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)
AfTACHMENT 2, EMERGENCY CLASSIFICATION A. CLASSIFY the Event
- 1. WHEN an event is in progress potentially requiring emergency response, THEN CONDUCT the following actions in parallel:
CUE: The Unit 2 CRS will perform step A.1.a
- .........- - - - - - - - - - - - - - - - - - - - - , - - - - - - - - - - - - - - - - - - i
- a. DETERMINE if existing conditions warrant implementation of one of emergency response attachments:
- Personnel Emergency, Att 15
- Fire, Att 16,17,18
- Radiological Event, Att 19
- Severe Weather, Att 20,21
- Hazardous Material Release, Att 22
- Containment Evacuation, Att 23
- Security, Att 24
- Large Area Loss, Att 25
- Large Steam Leak, Att 26
- Extensive Damage Mitigation Guidelines, Att27
- S/G Level Monitoring During Extensive Damage Mitigation, Att 28 Determines an ALERT classification is warranted under FISSION
- b. EVALUATE the existing conditions against PRODUCT BARRIER Attachment I, Emergency ActionLt:~vel DEGRADATION, based on a potential loss of RCS barrier.
(EAL) Criteria, to determine if an EAL threshold has been met. RCS Barrier- Unisolable ReS Leakage> 50 gpm.
Form ES-C-I ELEMENT STANDARD (SHADED = CRITICAL STEP)
B. IMPLEMENT Emergency Response Actions
- 1. IF existing conditions warrant implementation of an emergency response attachment, in parallel, Determines step is NOT applicable THEN GO TO that attachment AND begin response actions.
- 2. IF an EAL condition is met, THEN OBTAIN an Attachment 3, Initial Notification Form, AND GO TO the appropriate EAL Declaration attachment: Determines from previous evaluation that an EAL is satisfied and obtains
- General Emergency Actions, Att 4 an Initial Notification form.
Identifies ALERT Actions as the
- Site Area Emergency Actions, Att 9 appropriate declaration attachment and goes to Attachment 11.
- Alert Actions, Art 11
- Unusual Event Actions, Art 13 Candidate commences actions per Attachment 3, ALERT A.I COMPLETE Attachment 3, Initial Notification Refers to Attachment 3, Initial Form. Notification Form.
NOTE TO EVALUATOR:
Page 2 of ATTACHMENT 3 contains instrudions for completing the form and mayor may
. not be referred to as the applicant completes page 1.
CUE: Candidate completes Attachment 3 Initial Notification Form, following instructions provided on the back of the form Attachment 3, Initial Notification Form; Page-l Section-A CI Complete Item A I. Checks "is" a drill CI Complete Item A2.
- Checks "Unit 1" CJ Complete Item A3. Checks "ALERT" CJ Complete Item A4. Enters "H.A. 5 .1. 2" CI Complete Item A5. Checks "Yes"
Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP) 0 Complete Item A5a Checks "Yes" 0 Complete Item A5b Checks "Airborne" 0 Complete Item A6. Checks 6.a "None" Completes A. 7 only after items 1 through 6 are completed, and within o Complete Item A 7.
15 minutes of determining an EAL is met.
ATTACHMENT 3, Page 1, Section B Selects blocks for:
Drill, ALERT, and Staff Normal o B. Complete Section B.
Emergency Response Facilities.
Prints name and signs.
CUE: The request for an STA peer check is acknowledged Terminating Cue: Terminating Cue: This JPM is complete when an EAL classification is determined based on given plant conditions ~md the Initial Notification Form is completed.
No further actions are required.
Time Stop:
ERPIP Call Time Start - Time Stop = <<15 Minutes)
Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SRO-ADMIN-5 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Time to Complete:
Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Result: SAT _ _ _ _ __ UNSAT ---------
Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - - -
Job Perfonnanc(:! Measure Fonn ES-C-l APPLICANT'S CUE SHEET Initial Conditions:
- 1) Unit-l is at 100% reactor power.
- 2) An unisolable RCS leak has developed.
- 3) 13 Charging pump is tagged out for maintenance.
- 4) Chemistry reports no activity in Steam Generators
- 5) You are performiug the duties of the CRS.
Initiating Cue: