Calvert Cliffs Retake Exam: Operating Test Comments Sim 1: No comment.
Sim 2: 1) Fix initiating cue (perform or quantify).
- 2) Have the applicant quantify the RCS leak.
- 3) Provide range +/-S gpm for leak rate calculation.
- 4) Change to ask applicant for procedural recommendation at the end of AOP-2A Block Step E. (i.e., go to Block Step F). He'll decide to trip the reactor after determining that the leak is greater than the capacity of a charging pump.
- 5) Add cue to stop a second leak rate calculation.
Sim 3: Step #1 of the JPM is not critical (I.e., "verify").
Sim 4: No comment.
Sim 5: 1) Not a valid system JPM due to lack control manipulation. Replace.
- 2) No comment on replacement JPM.
8im 6: Have the applicant take the watch and then respond to the loss of the 120 VAC bus.
8im 7: Have the applicant take the watch and then respond to the PORV opening.
In-Plant 1:
No comment In-Plant 2:
No comment.
In-Plant 3:
Make into an alternate path and have operator take action to complete step to ensure that one valve properly re-positions.
Admin 1:
- 1) Modify 8TP for proper sign offs.
- 2) Add "sections 6.2-6.4 have not been performed" to initial conditions.
- 3) Add "PIT not required" to initial conditions.
Admin 2:
Add values to JPM step 2.
Admin 3:
- 1) Add "8TP M-6S1C-1A not required" in initial conditions.
- 2) Change 4.0 to 4.0A in initiating cue.
Admin 4:
- 1) Ensure RWP is signed.
- 2) Use 30 cm dose rate instead of contact dose rate.
- 3) Remove question about definition of LHRA (direct look up)
- 4) Provide minimal list of PC's required for task.
Admin 5:
- 2) Add to cue that this is a time critical JPM.