ML110250629

From kanterella
Jump to navigation Jump to search

Op Retake Exam - Final Operating Exam (Sections a and B) (Folder 3)
ML110250629
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/10/2011
From: David Silk
Operations Branch I
To:
Constellation Energy Nuclear Group
Hansell S
Shared Package
ML103200039 List:
References
TAC U01839
Download: ML110250629 (109)


Text

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-1

Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-1 Task

Title:

Initiate, ensure performance of, and review Operational Test Documents.

Task Number: 204.035 KIA

Reference:

2.1.7 (4.4, 4.7)

Method of testing:

Simulated Performance: D Actual Performance: IZJ Classroom: IZJ Simulator: D Plant: D READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit-1 is at 100% reactor power.
2. STP O-SA-l, AUXILIARY FEEDWATER SYSTEM QUARTERLY SURVEILLANCE TEST, Section 6.1 has just been performed. Sections 6.2 through 6.4 have not been performed.
3. Position indication testing is not required.
4. You are performing the duties of the CRS.

Initiating Cue:

The Shift Manager directs you to perform Step 6.1.31 ofSTP O-SA-1 Section 6.1 Task Standard:

The candidate conducts a level 2 review of STP O-SA-1 section 6.1. The candidate determines 11 AFW pump to be inoperable, and TS 3.7.3.A is entered. The evaluator is expected to end the JPM.

Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals nonnally available in the plant General

References:

1. STP 0-5A-I, Auxiliary Feedwater System Quarterly Surveillance Test.
2. Technical Specifications Time Critical Task:

No Validation Time:

30 minutes Simulator Setup:

None

Appendix C Job Perfonnance Measure Fonn ES-C-l ELEMENT STANDARD Time Start:

CUE: If requested, provide the candidate with test pages 1-19 CUE: The Shift Manager directs you to perform Step 6.1.31 of STP O-SA-1 Section 6.1 Steps 6.1.31.1-13 The candidate will review 11 AFW Checks YES or N/A in accordance pump collected test data against the acceptance with the answer key in steps 6.1.31.1 criteria through 6.1.31.13

, Detennmes 11 AFW pump

  • Step 6.1.31 14 Did 11 AFW Pump develop a DIP of at differential pressure is less than the least 1210 PSID and no greater than required in step 6.1.31.14.

1295.2 PSID in Step 6.1.20?

I Checks NO Detennines 11 AFW pump Steps 6.1.31.15 Did 11 AFW Pump develop a TDH developed head is less than the greater than or equal to 2800 feet in required in step 6.1.31.15.

Step 6.1.21 Checks NO in accordance with the key in steps 6.1.31.15

  • Step 6.1.31.16 This test section is considered satisfactory Detennines 11 AFW pump testing is I if YES or NIA was answered in all steps UNSAT in step 6.1.31.16 above. Checks UNSAT II Step 6.1.3I.16.a. IF unsat THEN: Notifies the SM 11 AFW pump has
  • Notify the SM failed the testing.

I CUE: The SM directs the CRS to determine TS actions required Step 6.I.31.16.a Declare the affected equipment inoperable Detennines that TS 3.7.3.A should Take action as required by Technical be entered Specifications and administrative actions stated in EN*4-104 I Terminating Cue: This JPM is complete when it is detennined 11 AFW pumps is inoperable and TS 3.7.3.A is entered.

The evaluator is expected to end the JPM.

Time Stop:

I

Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SRO-ADMIN-l Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: _____________________

Time to Complete:

Follow up Question: ____________________________

Applicant Response: _ _ _._ ______________________

Result: SAT - - - - - - - UNSAT - - - - - - - - - -

Examiner's Signature and Date: _ -----

Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:

5. Unit-l is at 100% reactor power.
6. STP 0-5A-l, AUXILIARY FEEDWATER SYSTEM QUARTERLY SURVEILLANCE TEST, Section 6.1 has just been performed. Sections 6.2 through 6.4 have not been performed.
7. Position indication testing is not required.
8. You are performing the duties of the CRS.

Initiating Cue:

The Shift Manager directs you to perform Step 6.1.31 of STP 0-5A-l Section 6.1

APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-2

Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-2 Task

Title:

Evaluate the need for plant cooldown.

Task Number: 201.005 KIA

Reference:

2.1.25 (3.9, 4.2)

Method of testing:

Simulated Performance: 0 Actual Performance: ~

Classroom: ~ Simulator: 0 Plant: 0 READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1) Unit-l and Unit-2 were at 100% reactor power.
2) A loss of offsite power occurred at 0800. SMECO is unavailable.
3) Tbe OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to a ground fault.
4) The plant has been stabilized per EOP-7 with tbe following parameters:

a) It is now 0900.

b) Unit 1 RCS Temperature is 532F and steady. Unit 2 RCS temperature is 532F and steady.

c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet

5) You are performing the duties of the Unit 1 CRS.

Initiating Cue:

The Shift Manager directs you to perform EOP-7 step AB, EVAL UATE THE NEED FOR PLANT COOLDOWN.

Task Standard:

The candidate will assess condensate inventory using EOP attachment (9) and determine there is insufficient water to cooldown, the plant must be maintained in hot standby, and the plant can be maintained in hot standby for 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br />. The evaluator is expected to end the JPM.

Job Performance Measure Form ES-C-l Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant General

References:

1. EOP-7, Station Blackout
2. EOP Attachments Time Critical Task:

No Validation Time:

30 minutes Simulator Setup:

a. None

Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED =" CRITICAL STEP)

  • Time Start:

CUE: The Shift Manager directs you to perform EOP-7 TATE THE NEED FOR PLANT COOLDOWN Locate EOP-7, Step AB. Same as element.

1. WHEN the RCS parameters have been stabilized, THEN evaluate the need for a plant cooldown based on:

Candidate will determine

  • Plant Status Attachment (9) completion is
  • Auxiliary systems availability required
  • Condensate inventory PER ATTACHMENT (9),

MAKEUP WATER REQUIRED FOR RCS COOLDOWN Locate EOP Attachment (9) Same as element.

1. Determine the amount of makeup water required Candidate enters uses table to perform an ADV cooldown and a TBV 'INVENTORY REQUIRED TO cooldown, based on the time after shutdown: COOL DOWN TO 300F' and determines 625067 gallons are
a. ADV cooldown and time after shutdown required.

Candidate enters uses table

'INVENTORY REQUIRED TO

b. TBV cooldown and time after shutdown COOL DOWN TO 300F' and determines 94828 gallons are required.
2. Determine the amount of makeup water available The candidate determines the tank in the CSTs: levels from the initiating cue.
a. Record the level in 11 CST. 11: 27 feet
b. Record the level in 12 CST. 12: 22 feet
c. Record the level in 21 CST. 21: 26 feet
d. Determine the status of Unit 2 (check one):

Candidate checks d.2.

(1) _ Mode 1,2 or 3 and does NOT require AFWoperation. The loss of offsite power has caused (2) Mode 1, 2 or 3 and does require AFW a dual unit trip. Main feed water is NOT available to either unit on a operation.

loss of offsIte power.

(3) Mode 4, 5, 6 or defueled.

Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED =, CRITICAL STEP)

NOTE: Calculated negative values should be entered as zero.

e. Determine the amount of makeup water available to Unit 1 using one of the following formulas, based on the status checked in step 2.d above:

(1) IF step d.(1) is checked, THEN correct CST Candidate determines step is NOT levels for usable volume: applicable (2) IF step d.(2) is checked, THEN correct CST Candidate determines step IS levels for usable volume: applicable Candidate enters 27 and calculates (a) step 2.a ft - 2.75 ft = 24.25 for step 2(a)

(b) step 2.b ft - 2.5 ft= Candidate enters 22 and calculates 9.75 for step 2(b) 2 Candidate enters 24.25 and 9.75, and (c) step(a) ft + step(b) ft= calculates 34 for step 2( c)

(3) IF step d.(3) is checked, THEN correct CST Candidate determines step is NOT levels for usable volume: applicable

f. Convert the amount of CST level into gallons.

Candidate enters 34 and calculates (ft available) ft x 9636.78 gal/ft = approximately 327650 for step 2.f NOTE The nominal capacity of a Well Water pump is 300 GPM.

The nominal capacity of a Demineralized Water Transfer pump is 300 GPM.

The Fire System can fill the CST via fire hoses at greater than 500 GPM.

CAUTION The status of both units should be considered when evaluating a makeup source.

Candidate determines there is NOT

3. IF adequate inventory exists to perform adequate inventory to perform a cooldown, THEN determine if an adequate cooldoWll.

makeup source exists to maintain hot standby. Water required is 625067, inventory available is 327650

Job Performance Measure Form ES-C-l Worksheet CUE: The shift manager requests the candidate to determine how long hot standby can be maintained with the current inventory.

l

4. IF adequate inventory does NOT exist to perform cooldown, THEN evaluate the following:

The candidate uses ATTACHMENT (9) MAKEUP WATER REQUIRED

  • Maintaining hot standby conditions TO MAINTAIN HOT STANDBY.
  • Time to restore an adequate makeup source If the chart is NOT interpolated, the
  • Restoration of other plant systems (TBVs, value would be 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> of hot standby.

main feedwater system, etc.)

If chart is interpolated, the value would

  • Performing partial cooldown while restoring be approximately 44 hours1.833 days <br />0.262 weeks <br />0.0603 months <br /> 34 minutes.

plant systems Terminating Cue: This JPM is complete when it is determined how long hot standby can be maintained.

The evaluator is expected to end the JPM.

Appendix C Job Perfonnance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

Verification of Completion Job Performance Measure Number: SRO-ADMIN-2 Applicant:

NRC Examiner:

Date Perfonned:

Facility Evaluator:

Number of Attempts: _______~_ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _______________________

Result: SAT UNSAT __________

Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:

1) Unit-l and Unit-2 were at 100% reactor power.
2) A loss of offsite power occurred at 0800. SMECO is unavailable.
3) The OC DG is unavailable, the lA DG failed to start, 14 4kv bus is deenergized due to a ground fault.
4) The plant has been stabilized per EOP-7 with the following parameters:

a) It is now 0900.

b) Unit 1 RCS Temperature is 532F and steady. Unit 2 RCS temperature is 532F and steady.

c) 11 CST level is 27 feet, 12 CST level is 22 feet, 21 CST level is 26 feet

5) You are performing the duties of the Unit 1 CRS.

Initiating Cue:

The Shift Manager directs you to perform EOP-7 step AB, EV ALUATE THE NEED FOR PLANT COOLDOWN.

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-3

I Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-3 Task

Title:

Establish initial plant conditions for and approve performance of an STP.

Task Number: 210.001 KIA

Reference:

2.2.40 (3.4, 4.7)

Method of testing:

Simulated Performance: 0 Actual Performance: IZI Classroom: IZI Simulator: 0 Plant: 0 READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1) Unit-1 is at 100% reactor power.
2) STP O-SA-1 is scheduled today.
3) No maintenance was performed on the 1A DG.
4) STP M-651C-1A is not required.
5) You are performing the duties of the CRS.

Initiating Cue:

1) The Shift Manager directs you to prepare STP O-SA-1 for performance by completing SRO portions of step 4.0.A
2) List sections of the test that will be performed.

Task Standard:

The candidate correctly completes the SRO portion of the STP preliminary section using the plan of the day and Technical Specifications.

The evaluator is expected to end the JPM.

Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant General

References:

1. STP 0-8A-l, TEST OF lA DO AND 11 4KV BUS LOCI SEQUENCER
2. Technical Specifications Time Critical Task:

No Validation Time:

30 minutes Simulator Setup:

a. None

Job Performance Measure Form ES-C-I Worksheet ELEMENT STANDARD (SHADED =: CRITICAL STEP)

~,

Start:

CUE: The Shift Manager directs you to prepare STP O-SA-l for performance by completin2 SRO portions of section 4.0 A. PERFORM the following determinations:

Candidate checks Scheduled

1. IF STP M-651 C-1 A is to be performed concurrently Surveillance' based on the initial with this test THEN NOTIFY E&C to perform STP conditions.

M-651C-1A prerequisites.

CUE: The candidate is given the plan of the day NOTE

  • LOCI Sequencer testing is required monthly in Modes 1-4.
  • SIAS A-10 Logic, Channel Functional test is required quarterly in Modes 1-3 .
2. INDICATE ESFAS test requirements:

Candidate checks this checkbox 0 SIAS/UV OR LOCI SEQ test required: (check based on the preceding note required tests)

Candidate checks this checkbox PERFORM Section 6.5, MONTHLY 11 based on the preceding note 4KV BUS LOCI SEQUENCER TEST PERFORM Section 6.4, QUARTERLY Candidate checks this checkbox SIAS A-10 LOGIC AND UV A-4 LOGIC based on the preceding note TEST Candidate DOES NOT check this checkbox based on the preceding ESFAS testing NOT required:

note NOTE Taking 1A DG to LOCAL makes the DG inoperable. This minimizes unloaded run time during ESFAS testing AND is the preferred alignment.

3. IF performing ESFAS testing, THEN REVIEW equipment availability AND INDICATE 1A DG Candidate checks this checkbox alignment during test: (N/A if NOT testing ESFAS) based on the preceding note 1A DG in LOCAL during ESFAS test:

Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

Candidate DOES NOT check this checkbox based on the preceding

[] 1A DG in AUTO during ESFAS test:

note NOTE 1A DG remains operable when performing a Slow Speed start from 1C18A.

I 4. REVIEW PMT requirements, Surveillance Schedule Candidate checks this checkbox AND INDICATE 1A DG start requirements: based on the surveillance requirements (Non-fast speed start)

I

[J Slow start of 1A DG:

Candidate does not check this fJ Emergency start of 1A DG:

checkbox based on the surveillance requirements.

Candidate does not check this Start of 1A DG NOT required checkbox based on the surveillance requirements.

5. REVIEW the Surveillance Schedule OR PMT to determine YES - Performance of Sect. 6.1 is required Candidate checks these checkboxes based on the surveillance Monthly FO TRANSFER PP Automatic requirements.

Start test required.

Candidate checks this checkbox D Quarterly 1ST FO TRANSFER PP based on the surveillance Performance Capacity test required. requirements.

Candidate does not check this NO - Performance is NOT required; LEAVE checkbox based on the surveillance Sect. 6.1 blank requirements.

Candidate checks this checkbox DYES - Performance of Sect. 6.9 is required

  • based on the surveillance i requirements I

I Candidate does not check this NO - Performance is NOT required; LEAVE checkbox based on the surveillance Sect. 6.9 blank requirements.

I

Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED == CRITICAL STEP)

NOTE FSTC-OPS OR System Engineer may be contacted to make the following determination.

CUE: No maintenance was performed on the diesel

! 6. IF this is the first performance of this test after EDG-13 has been performed on 1A DG, THEN INDICATE Candidate determines the step is minimum 1A DG loaded run time for Sect. 6.8: (N/A if NOT Applicable NOT first test after~DG-13) [80273]

7. REVIEW the Surveillance Schedule OR PMT to determine if Quarterly air receiver check valve testing is required.

Candidate checks yes based on YES - Quarterly air receiver check valve surveillance requirements.

testing is required.

0 NO - Quarterly air receiver check valve testing is NOT reguired.

Terminating Cue: This JPM is complete when all SRO steps are complete in section 4.0.

The evaluator is expected to end the JPM.

Time Stop:

Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet Verification of Completion Job Perfonnance Measure Number: SRO-ADMIN-3 Applicant:

NRC Examiner:

Date Perfonned:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __

Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:

1) Unit-l is at 100% reactor power.
2) STP O-SA-l is scheduled today.
3) No maintenance was performed on the lA DG.
4) STP M-651C-IA is not required.
5) You are performing the duties of the CRS.

Initiating Cue:

1) The Shift Manager directs you to prepare STP O-SA-l for performance by completing SRO portions of step 4.0.A
2) List sections of the test that will be performed.

I APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-4

Appendix C Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1&2 Job Performance Measure No.SRO-ADMIN-4 Task

Title:

Determine radiological conditions for personnel exposure Task Number: No equivalent task at CCNPP KIA

Reference:

2.3.7 (3.5, 3.6)

Method of testing:

Simulated Performance: - - - Actual Performance: _:L Classroom: -.----- Simulator: - - - - Plant: - -

READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 2 is at 100% power.
2. 12 SFP coolers is in service. 11 SFP cooler is isolated for maintenance on 0-SFP-196,11 PP SUCT FR 11 SFP DRN. Maintenance is complete.
3. Maintenance needs you to observe for any binding while cycling the valve a number of times before its return to service.

Initiating Cue:

You have been directed to cycle 0-SFP-196, 11 PP SUCT FR 11 SFP DRN multiple times to observe for binding, and then stand by to clear tags and open the downstream isolation valve. Task time is estimated to take 10 minutes.

State the radiological requirements for entering this area. Include in your discussion:

1. Expected radiological protective clothing for valve operation
2. Highest radiation level in the work area
3. Expected dose for this assignment
4. Dose rate alarm
5. Low dose waiting area Task Standard:

Determine radiological conditions for personnel exposure NRC-17 Page 2 of6 NUREG-l 021, Revision 9

Appendix C Job Performance Measure Form ES-C-I Evaluation Criteria:

1. All critical steps completed.
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Spent Fuel Cooling Room Survey Map
2. RWP 106 task 2, "Operations Activities in High Radiation Areas (HRAs)"
3. RP-1-100, "Radiation Protection", Revision 8 General

References:

RP-1-100, "Radiation Protection", Revision 8 (Pages 14,31)

Time Critical Task:

No Validation Time:

10 minutes Simulator Setup:

None NRC-I7 Page 3 of6 NUREG-l 021, Revision 9

ELEMENT STANDARD

(* = CRITICAL STEP)

TIME START Review survey map and RWP. Same as element.

Candidate states partial anti-Cs

  • 1. State Expected radiological protective (gloves and booties) or full anti-Cs.

clothing for valve operation

  • 2. Identify highest radiation level in Determines that highest radiation the area. level in the area is 350 mRlhr 0 SFP-196.
  • 3. Calculate expected dose for this Determines that expected dose in 10 assignment. minutes is 116
  • 50mRlhr = 8.3 mR
  • 4: Identifies dose rate alarm setpoint. Determines from RWP that dose rate alarm will be set at 950 mRlhr.
  • 5. Locates low dose waiting area. Identifies from R WP room low dose waiting area is by the room door, or identifies lowest general area is by the door (.4 mRIhr), or states would wait outside of the room in the hallway.

TIME STOP Examiner Note: The task is complete when the applicant has provided requested radiological information.

NRC-I7 Page 4 of6 NUREG-I 021, Revision 9

Appendix C Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: ADMIN-4 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: _________________

Time to Complete:

Follow up Question: ______________________________________

Applicant Response: __________________________________

Result: SAT UNSAT _ _ _ _ _ __

Examiner's Signature and Date:

NRC-17 Page 5 of6 NUREG-l 021, Revision 9

Appendix C Job Perfonnance Measure Form ES-C-I Worksheet APPLICANT'S CUE SHEET Initial Conditions:

1. Unit 2 is at 100% power.
2. 12 SFP coolers is in service. 11 SFP cooler is isolated for maintenance on 0-SFP-196, 11 PP SUCT FR 11 SFP DRN.

Maintenance is complete.

3. Maintenance needs you to observe for any binding while cycling the valve a number of times before its return to service.

Initiating Cue:

You have been directed to cycle 0-SFP-196, 11 PP SUCT FR 11 SFP DRN multiple times to observe for binding. Once cycling is complete, stand by to clear tags and open the downstream isolation valve. Task time is estimated to take 10 minutes.

State the radiological requirements for entering this area. Include in your discussion:

1. Expected radiological protective clothing for valve operation
2. Highest radiation level in the work area
3. Expected dose for this assignment
4. Dose rate alarm
5. Low dose waiting area NRC-I 7 Page 6 of6 NUREG-I 021, Revision 9

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SRO-ADMIN-5 Note: This JPM should be performed in the simulator at the completion of SIM-2 JPM

Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SRO-ADMIN-5 Task

Title:

Determine appropriate emergency response actions per the ERPIP Task Number: 204.097 K.J A

Reference:

2.4.38 (2.4, 4.4)

Method of testing:

Simulated Performance: 0 Actual Performance: ~

Classroom: ~ Simulator: 0 Plant:

READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1) Plant conditions have not changed
2) You are performing the duties of the CRS.

Initiating Cue:

This task is time critical. The Shift Manager directs you to evaluate the ERPIP based on plant conditions.

Task Standard:

The candidate determined the RCS leak rate in the previous JPM, Sim-2. Sim-2 RCS leak rate is approximately 75 gpm. The candidate will correctly classify the event and complete the initial notification form within 15 minutes.

Job Perfonnance Measure Fonn ES-C-I Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals nonnally available in the plant General

References:

1. AOP-2A, Excessive RCS Leakage
2. ERPIP, Emergency Response Plan Implementation Procedure Time Critical Task:

YES Validation Time:

30 minutes Simulator Setup:

a. None Note: This JPM should be performed in the simulator at the completion of SIM-2 JPM

Job Performance Measure Form ES-C-1 ELEMENT STANDARD

~-

CUE: Evaluate the ERPIP based on plant conditions (Sim-2 RCS leak rate is ~:

I approximately 75 gpm)

The candidate locates ERPIP 3.0, IMMEDIATE I Same as element ACTIONS

-~

Refers to Immediate Actions, identifies the category from Determines ATTACHMENT 2 is .

  • the listing and goes to the appropriate Attachment. applicable CLASSIFICATION A. CLASSIFY the Event I---~----'----------------I-----'---'--"-----<
1. WHEN an event is in progress potentially requiring emergency response, THEN CONDUCT the following actions in parallel:

CUE: The Unit 2 CRS will perform step A.1.a

a. DETERMINE if existing conditions warrant implementation of one of emergency response attachments:
  • Personnel Emergency, Att 15
  • Fire, Att 16,17,18
  • Radiological Event, Att 19
  • Severe Weather, Att 20,21
  • Hazardous Material Release, Att 22
  • Containment Evacuation, Att 23
  • Security, Att 24
  • Large Area Loss, Att 25
  • Large Steam Leak, Att 26
  • Extensive Damage Mitigation Guidelines, Att 27
  • SIG Level Monitoring During Extensive Damage Mitigation, Att 28

Job Perfotmance Measure Fotm ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

Detetmines an ALERT classification is warranted under FISSION

h. EVALUATE the existing conditions against PRODUCT BARRIER Attachment 1, Emergency Action Level DEGRADATION, based on a potential loss of RCS barrier.

(EAL) Criteria, to detetmine if an EAL threshold has been met. RCS Barrier- Unisolable RCS Leakage> 50 gpm.

B. IMPLEMENT Emergency Response Actions

1. IF existing conditions warrant implementation of an emergency response attachment, in parallel, Determines step is NOT applicable THEN GO TO that attachment AND begin response actions.
2. IF an EAL condition is met, THEN OBTAIN an Attachment 3, Initial Notification Form, AND GO TO the appropriate EAL Declaration attachment: Detetmines from previous evaluation that an EAL is satisfied and obtains
  • General Emergency Actions, Att 4 an Initial Notification form.

Identities ALERT Actions as the

  • Site Area Emergency Actions, Att 9 appropriate declaration attachment and goes to Attachment 11.
  • Alert Actions, Att 11
  • Unusual Event Actions, Att 13 Candidate commences actions per Attachment 3, ALERT A.I COMPLETE Attachment 3, Initial Notification Refers to Attachment 3, Initial Fotm. Notification Fotm.

NOTE TO EVALUATOR:

Page 2 of ATTACHMENT 3 contains instructions for completing the form and mayor may not be referred to as the applicant completes page 1.

CUE: Candidate completes Attachment 3 Initial Notification Form, following instructions provided on the back of the form , Initial Notification Form; Page-l Section-A o Complete Item A 1. Checks "is" a drill

Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP) 1 t Item A2 ompee I Checks "U m't 1" I

0 Complete Item A3. Checks "ALERT" I 0 Complete Item A4. Enters "H.A.S.l 0 Complete Item AS. Checks "Yes" iO Complete Item ASa Checks "Yes" i

0 Complete Item ASb  ! Checks "Airborne" 0 Complete Item A6. Checks 6.a "None" Completes A. 7 only after items 1 I through 6 are completed, and within 0 Complete Item A 7.

i 15 minutes of determining an EAL is met.

ATTACHMENT 3, Page 1, Section B Selects blocks for:

Drill, ALERT, and Staff Normal o B. Complete Section B.

i Emergency Response Facilities.

I Prints name and signs .

. CUE: The request for an STA peer check is acknowledged Terminating Cue: Terminating Cue: This JPM is complete when an EAL e1assification is i determined based on given plant conditions and the Initial Notification Form is completed.

No further actions are required.

Appendix C Job Performance Measure Form ES-C-l Worksheet Verification of Completion Job Performance Measure Number: SRO-ADMIN-S Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: __________________________

Applicant Response: __________________________

Result: SAT UNSAT ---------

Examiner's Signature and Date:

Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:

1) Plant conditions have not changed
2) You are performing the duties of the CRS.

Initiating Cue:

This task is time critical. The Shift Manager directs you to evaluate the ERPIP based on plant conditions.

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-1

Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Perfonnance Measure No.: SIM-l (Alt Path)

Task

Title:

Verify Reactivity Control safety function is satisfied.

Task Number: 201.009 KJA

Reference:

004 A2.14 (4.4, 4.7)

Method of testinz.

Simulated Perfonnance: D Actual Perfonnance: [;8J Classroom: D Simulator: [;8J Plant:

READ TO THE APPLICANT:

[will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 1 was in Mode 1 at 100% power.
2. A significant electrical transient and Unit-l trip have occurred.
3. You are the Reactor Operator Initiating Cue:

The CRS directs you to Perform Reactivity Safety Function per EOP-O Task Standard:

The candidate will initiate Emergency Boration per EOP-O.

Form ES-C-l 1.

Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant General

References:

1. EOP-O, Post-Trip Immediate Actions Time Critical Task:

No Validation Time:

20 minutes Simulator Setup:

1. Reset to IC-24 (both units at 100%)
2. Enter malfunctions:
a. 4KV001_03, fault on 13 4kv bus on Fl
b. 4KVOOl_04, fault on 14 4kv bus on F2
3. Place simulator in run
4. Initiate Fl and F2

_ _ 5. Manually trip the reactor when 11 and 12 SGFPs trip on low suction pressure

6. Freeze the simulator.

Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

  • CUE: The CRS directs you perform Reactivity Control safety function per EOP-O I

Locates the reactivity control plaque Same as element.

1. Depress ONE set of Manual REACTOR TRIP Same as element.

buttons.

2. Check the Reactor has tripped by the following:

The candidate determines the

  • Prompt drop in NI power i reactor has tripped and alternate action step 2.1 is NOT applicable.
  • Negative SUR 3 Check that NO more than ONE CEA is NOT fully The candidate determmes that inserted. CEA positions CANNOT be determined and alternate action step 3.1 is required.

3.1 IF more than ONE CEA fails to fully insert, THEN borate the RCS to at least 2300 ppm as The candidate places the follows: handswitch for l-CVC-512-CV in close.

a. Shut the VCT M/U valve, 1-CVC-S12-CV.
b. Open the SA DIRECT M/U valve, 1-CVC-S14- The candidate may place I-eVC-MOV. I 514-MOV hand switch in open.

514-MOV is deenergized so this step is NOT critical

c. Open the BAST GRAVITY FD valves:
  • 1-CVC-S08-MOV Candidate opens i-CVC-508 MOV
  • Candidate opens l-CVC-509 MOV
d. Verify the M/U MODE SEL SW, 1-HS-210, is The candidate verifies I-HS-210 in MANUAL. in manuaL
e. Start a SA PP. The candidate starts 11 BA pump.

(12 BA pump is deenergized due to loss of power affects)

Job Performance Measure Form ES-C-I ELEMENT STANDARD (SHADED = CRITICAL STEP)

The candidate places I-CVC-50 1-  !

f. Shut the VCT OUT valve, 1-CVC-501-MOV.

MOV in close.

The candidate verifies 11 charging pump running.

g. Start ALL available CHG PPs. The loss of 14 4kv bus starts all available charging pumps so NOT critical.
4. Verify demineralized water makeup to the RCS is secured as follows: Candidate verifies 11 and 12 RCMU pumps are secured.
  • 11 and 12 RC M/U PPs are secured
  • VCT M/U valve, 1-CVC-512-CV, is shut Candidate verifies l-CVC-512 CV is shut.
  • IF RCS Makeup is in Direct Lineup, THEN The candidate determines this step the RWT CHG PP SUCT, 1-CVC-504-MOV, is shut is NOT applicable The candidate reports 'Reactivity Control is Complete' (or met)

Note: The candidate may provide additional information for valves and pumps not operating due to loss of power. This additional information is not critical.

Terminating Cue: This JPM is complete when the candidate reports the status of the Reactivity Control safety function. No further actions are required. The evaluator is expected to end the lPM.

Appendix C Job Performance Measure Form ES-C-l Worksheet Verification of Completion Job Performance Measure Number: SIM-l Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: __________________

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _~_ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT UNSAT Examiner's Signature and Date:

Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:

1. Unit 1 was in Mode 1 at 100% power.
2. A significant electrical transient and Unit-l trip have occurred.
3. You are the Reactor Operator Initiating Cue:

The CRS directs you to Perform Reactivity Safety Function per EOP-O

I APPLlCANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-2

Appendix C Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-2 (AIt Path)

Task

Title:

Respond to ReS leakage exceeding one charging pump in modes 1 and 2 Task Number: 202.015 KIA

Reference:

002 A2.01 (4.3,4.4)

Method of testing:

Simulated Performance: 0 Actual Performance: ~

Classroom: 0 Simulator: ~

Plant: 0 READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 1 is in Mode 1 at 100% power.
2. An RCS leak has developed.
3. You are the Control Room Operator Initiating Cue:

The CRS directs you to quantify the leak rate per AOP-2A Attachment (1)

Task Standard:

The candidate will attempt leak isolation. The leak will remain greater than the capacity of a charging pump requiring a Reactor Trip.

Job Perfonnance Measure Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals nonnally available in the plant General

References:

1. AOP-2A, EXCESSIVE REACTOR COOLANT LEAKAGE Time Critical Task:

No Validation Time:

10 minutes Simulator Setup:

1. Reset to IC-24 (both units at 100%)

- - 2. Enter malfunctions:

a. RCS003, RCS Leak, at 75 gpm

- - 3. Place simulator in run

4. Open I-PS-5464, plant sample isolation valve

_ _ 5. Place an off-nonnal pink ring on I-PS-5464

_ _ 6. Freeze the simulator when a second charging pump starts (about 4 minutes)

C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

I

! CUE: The CRS directs you to perform quantify the leak rate per AOP-2A Attachment (1)

I Locates AOP-2A Attachment (1) Same as element Record the following information ... Same as element.

Candidate will use 18.9 gpm for

  • Determine Factors:

step K and 86.2 for step L.

Candidate will calculate leak rate Calculate Leak Rate: to be approximately 75 gpm (+1- 5 gpm)

CUE: The CRS directs you to perform AOP-2A starting on step IV.A.S

5. IF Pressurizer level is being maintained by ONE Charging Pump, The candidate determines the leak THEN PROCEED to Section V., RCS LEAKAGE IS greater than the capac1ty 0 f a WITHIN THE CAPACITY OF ONE CHARGING charging pump and step is NIA PUMP, Page 11.
6. IF the Unit is in Mode 1 or 2, AND RCS leakage exceeds the capacity of ONE Charging Pump, The candidate determines the step THEN PROCEED to Section VI., RCS LEAKAGE is applicable and proceeds to ONE CHARGING PUMP, MODES 1 Section VI on page 27 2, Page 27.

CUE: The CRS directs you to perform AOP-2A block step VI.E, Attempt to isolate the leak I Locates AOP-2A section VLE on page 35 Same as element

1. Verify that the UO CNTMT ISOL valves are shut:
  • Candidate will place hand
  • 1-CVC-515-CV switches for l-CVC-515-CV in close.
  • 1-CVC-516-CV Candidate will place hand switches for l-CVC-516-CV in close.

Job Perfonnance Measure Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

2. Check there is NO PORV leakage by following indications:

Candidate will detennine there is

  • Quench Tank Parameters no PORV leakage due to
  • PORV discharge piping temperatures, computer points T1 07 and T1 08
  • Acoustic Monitor indication
3. Verify that ReS SAMPLE ISOL valve, 1-PS The candidate closes l-CV-5464 5464-CV, is shut.
4. Verify that the Reactor Vessel Vent valves are shut: The candidate verifies the RCS
  • 1-RC-103-SV vent valves closed
  • l-RC-104-SV
5. Verify that the PZR Vent valves are shut:

The candidate verifies the PZR

  • 1-RC-105-SV vent valves closed
  • 1-RC-106-SV NOTE A leak on the Charging header which exceeds the capacity of the charging pumps can be identified by Charging header pressure indicating less than RCS pressure.

Identification of the leak may be missed if more than one charging pump is running.

6. Determine if the leak is on the Charging header by performing the following actions:

Same as element

a. Stop all but ONE CHG PP.
b. IF Charging header pressure is less than The candidate detennines the leak RCS Pressure, THEN assume the leak is is NOT on the charging header.

on the Charging header.

c. IF the leak is NOT on the Charging The candidate starts charging header, THEN start any CHG PPs that pumps turned off in step 6.a.

were stopped.

Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

7. IF the leak is on the Charging header, THEN Candidate determines the step is perform the following actions: not applicable
8. IF the leak is determined to be occurring inside Containment by checking the following indications:
  • Rise in Containment temperature, pressure, humidity or sump level alarm frequency The candidate determines the leak is inside the containment based on
  • Rise in Containment gaseous or particulate Containment sump level alarm activity and containment humidity
  • "U-1 WR NOBLE GAS RAD MON" and "UNIT 1 MAIN VENT GASEOUS" alarms clear THEN perform the following actions:
a. Start ALL available CNTMT AIR CLRs in HIGH. Same as element
b. Open the CNTMT CLR EMER OUT valves for Same as element the operating CNTMT AIR CLRs.
9. IF the leak is NOT occurring inside of Candidate determines the step is Containment, THEN perform the following not applicable actions:
10. Determine that NO leakage into the Component The candidate determines there is Cooling System is indicated by: NO leakage into the component cooling system
  • NO rising trends on Component Cooling Radiation Monitor, 1-RI-3819
  • CC HEAD TK LVL" high alarm clear The candidate reports AOP-2A block step E is complete.

CUE: Acknowledge step E is complete CUE: Perform block AOP-2A step F, DETERMINE THE APPROPRIATE ACTIONS FOR RCS LEAKAGE, ON PAGE 42 I

Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

CUE' lfthe applicant attempts to re-calculate the leak rate' 'The leak rate has not changed'

1. Check that the leak has been isolated. I Candidate will determine the leak i has not been isolated. Candidate
  • will perform alternate step F .1.1 1.1 IF the leak has NOT been isolated AND the leak is greater than the capacity of ONE Charging Pump, THEN, with the approval of the SM/CRS, The candidate will recommend perform thefo"owingactions:

tripping the reactor and

a. Trip the Reactor. implementing EOP-O
b. IMPLEMENT EOP-O, POST TRIP IMMEDIATE ACTIONS.

I i I Tenninating Cue: This JPM -is complete when the candidate recommends a manual i reactor trip. No further actions are required. The evaluator is expected to end the lPM.

Stop:

i

Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-2 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT -------

UNSAT _ _ _ _ _ __

Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:

1. Unit 1 is in Mode 1 at 100% power.
2. An RCS leak has developed.
3. You are the Control Room Operator Initiating Cue:

The CRS directs you to quantify the leak rate per AOP-2A Attachment (1)

I APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-3

Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-3 (Alt Path)

Task

Title:

Notes failure of an operating HPSI pump and establishes safety injection using 12 HPSI pump prior to exiting EOP-O Task Number: 201.132 KIA

Reference:

006 A2.02 (3.9, 4.3)

Method of testing:

Simulated Performance: D Actual Performance: cg]

Classroom: D Simulator: cg]

Plant: D READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. 11 HPSI pump is tagged out for maintenance
2. Unit 1 was in Mode 1 at 100% power.
3. A plant transient and Unit trip occurred
4. EOP-O has been completed, EOP-S has been implemented.

S. You are the Reactor Operator Initiating Cue:

The CRS directs you to perform EOP-S block step D, 'Monitor RCS Depressurization' Task Standard:

The candidate determines that there is insufficient HPSI flow from 13 HPSI pump.

The candidate will starts 12 HPSI pump aligned to the 13 HPSI pump flow path.

Appendix C Job Performance Measure Form ES-C-l Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

I. Procedures and manuals normally available in the plant General

References:

1. EOP-5, LOSS OF COOLANT ACCIDENT Time Critical Task:

No Validation Time:

20 minutes Simulator Setup:

1. Reset to IC-24 (both units at 100%)
2. Enter malfunctions:
a. FI: RCS002, ReS leak @ 1200 gpm
3. Enter Overrides
a. I-SI-406, 13 HPSI pump discharge valve, open @ .07
4. Tag II HPSI PP HS in PTL

_ _ 5. Tag I-S1-656 in close

- - 6. Place simulator in run

7. Initiate F 1
8. Close l-CV-5J 5 and l-CV-516

_ _ 9. Stop l1Aand 12B RCPs

-- 10. Freeze simulator 5 minutes after SIAS actuates II. Acknowledge all alarms

Appendix C Job Performance Measure Form ES-C-l ELEMENT STANDARD

(* = CRITICAL STEP)

Time Start: - - -

eUE: The eRS directs you to perform EOP-5 block step D, 'Monitor ReS Depressurization' Locates EOP-5 block step D on page 8 Same as element.

Candidate will determine that

1. IF pressurizer pressure is less than or equal to SIAS has actuated by checking 1725 PSIA OR containment pressure is greater SIAS alarm, 13 HPSI pp has than or equal to 2.8 PSIG, THEN verify SIAS started, and HPS[ MOVs have actuation. opened.
2. IF pressurizer pressure is greater than 1725 PSIA AND containment pressure is less than 2.8 PSIG, Candidate will determine the step THEN perform the following actions to block is NOT applicable SIAS:
3. IF SIAS has actuated, THEN perform the following actions:
a. Verify the following pumps are running:
  • 13 HPSI PP Determines 11 HPSI is not running due to a tagout
  • ALL available CHG PPs Candidate locates EOP
b. Verify safety injection flow: attachments, refers to ATTACHMENT (10), and
  • HPSI flow PER ATTACHMENT(10), determines 13 HPSI flow is less HIGH PRESSURE SAFETY than the minimum required based INJECTION FLOW, when pressure is on addition of the 4 loop flow below 1270 PSIA indicators and/or the HPSI total flow indication.

b.1 Perform the following actions as necessary:

Candidate determines 11 HPSI

  • IF 11 HPSI PP failed, THEN start 12 HPSI pump did not fail, it is tagged out PP.

Appendix C Job Perfonnance Measure Fonn ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

  • IF 13 HPSI PP failed, THEN align 12 HPSI Candidate detennines 13 HPSI
  • PP as follows: pump has failed due to its low flow (1) Start 12 HPSI PP Candidate starts 12 HPSI pump (2) Open HPSI HDR XCONN valve, 1-SI 653-MOV. I Candidate opens I-S1-653 (3) Shut HPSI HDR XCONN valve, 1-SI-655 Candidate closes I-S1-655 MOV. I
  • Ensure electrical power is available to Same as element valves and pumps.

CUE: Another operator will verify Safety Injection lineup per attachment 2.

  • Verify safety injection system lineup PER ATIACHMENT (2), SIAS VERIFICATION CHECKLIST.

Tenninating Cue: This lPM is complete when the 12 HPSI pump is injecting into the I RCS per step b.I second bullet. No further actions are required. The evaluator is expected to end the lPM.

Job Perfonnance Measure Fonn ES-C-l Worksheet Verification of Completion Job Perfonnance Measure Number: SIM-3 Applicant:

NRC Examiner:

Date Perfonned:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT UNSAT _____________

Examiner's Signature and Date:

Appendix C Job Perfonnance Measure Fonn ES-C-l APPLICANT'S CUE SHEET Initial Conditions:

1. 11 HPSI pump is tagged out for maintenance
2. Unit 1 was in Mode 1 at 100% power.
3. A plant transient and Unit trip occurred
4. EOP-O has been completed, EOP-5 has been implemented.
5. You are the Reactor Operator Initiating Cue:

The CRS directs you to perform EOP-5 block step D, 'Monitor RCS DepressurizationI

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-4

Appendix C Job Performance Measure Form ES-C-l Form ES-C-I Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-4 (Alt Path)

Task

Title:

Takes alternate actions for turbine stop and control valve failure by shutting MSIVs, or ifSGIS actuates notes an MSIV failed to shut on SGIS and shuts the MSIVs.

Task Number: 093.002 KIA

Reference:

045 A3.04 (3.4, 3.6)

Method of testing:

Simulated Performance: D Actual Performance: ~

Classroom: D Simulator: ~ Plant:

READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 1 was in Mode 1 at 100% power.
2. A Switchyard Fault has occurred
3. The reactor has tripped
4. You are performing duties as the Control Room Operator Initiating Cue:

The CRS directs you to perform Turbine Trip per EOP-O Task Standard:

A main turbine stop valve and control valve have failed to automatically close on the plant trip. This will cause the Main Turbine to overspeed and steam generator pressures to lower rapidly. SGIS will not actuate to protect the plant. The candidate will shut the Main Steam Isolation Valves and secure the Main Generator Exciter.

Pertormance Measure Form ES-C-l Form ES-C-l Worksheet Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within al10tted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant Oeneral

References:

1. 01-28, OPERAnON OF THE 500 KV SWITCHYARD
2. EOP-O, POST-TRIP IMMEDIATE ACTIONS Time Critical Task:

No Validation Time:

5 minutes Simulator Setup:

1. Reset to IC-24 (both units at 100%)
2. Enter malfunctions:
a. SWYDOOl_02, Breaker 552-22 failure
b. T0005_0I, Main Turbine Stop Valve and Control Valve I failed as-is
c. ESFAXXXX, SOlS auto failure
3. Place simulator in run

_ _ 4. Place breaker 552-22 in open

5. Freeze simulator

Appendix C Job Performance Measure Form ES-C-l Form ES-C-I Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

Time Start:

CUE: The RO announces 'The reactor is tripped', the CRS announces 'Perform EOP-O'

1. Check the Reactor has tripped. Candidate verifies the reactor has tripped
2. Ensure the Turbine has tripped by performing the following actions: Candidate depresses both turbine trip buttons
a. Depress BOTH TURBINE TRIP buttons.
b. Check the Turbine Main Stop Valves shut:
  • MSV1 Candidate determines MSV I did
  • MSV2 not shut and alternate step b.I is required
  • MSV3
  • MSV4 Note: The candidate may report 'Taking alternate actions for (stop valve open)'. This report is not critical.

CUE: Acknowledge alternate actions b.1 IF ANY Turbine Main Stop Valve failed to Candidate will shut both Main shut, THEN shut BOTH MSIVs. Steam Isolation Valves

c. Check Turbine Speed drops. Candidate determines turbine speed is lowering CUE: If the candidate reports that breaker 552-22 did not open then provide cue

'Acknowledge and continue'

d. IF the Turbine was paralleled to the grid, The candidate determines breaker THEN verify the Turbine Generator Output 552-22 did not open and takes its breakers open: handswitch to open.
  • 11 GEN BUS BKR, O-CS-552-22
  • 11 GEN TIE BKR, O-CS-552-23 Same as element
e. Verify 11 GEN FIELD BKR, 1-CS-41, is open. Same as element

Appendix C Job Perfonnance Measure Fonn ES-C-l Form ES-C-l ELEMENT STANDARD (SHADED CRITICAL STEP)

The candidate will open the exciter field breaker.

f. Verify 11 EXCITER FIELD BKR, 1-CS-41 E, is The exciter field breaker will not open. automatically open.

Not critical since the turbine and generator have severely over sped.

3. Ensure BOTH MSR 2ND STG STM SOURCE MOVS are shut: Detennines the valves have not
  • 1-MS-4025-MOV (11 MSR) shut due to loss of povver and alternate action step 3.1 IS
  • 1-MS-4026-MOV (12 MSR) required.

Same as element.

3.1 IF EITHER MSR 2ND STG STM SOURCE MOV failed to shut, THEN perform the following actions: (Not critical since Main Steam

a. Verify the MSR 2ND STG HIGH LOAD MOV Isolation Valves vvere closed in is shut: step b.I and turbine overspeed has !
  • (11 MSR) 1-MS-4018-MOV already occurred due to stop and I
  • (12 MSR) 1-MS-4017-MOV control valve failure)
b. Dispatch an operator to verify the MSR 2ND I

STAGE BYPASS CONTROL VALVE panel Same as element loader in MANUAL with panel loader output at zero

! The CandIdate vvlli report 'Turbme Tnp IS complete' or SImIlar Tenninating Cue: This JPM is complete vvhen the candidate reports the Turbine Trip safety function. No further actions are required. The evaluator is expected to end the i lPM.

Time Stop: _ __

Appendix C Job Performance Measure Form ES-C-l Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-4 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT UNSAT _ _ _ _ _ __

Examiner's Signature and Date:

Appendix C Job Performance Measure Form ES-C-l Form ES-C-I APPLICANT'S CUE SHEET Initial Conditions:

1. Unit 1 was in Mode 1 at 100% power.
2. A Switchyard Fault has occurred
3. The reactor has tripped
4. You are performing duties as the Control Room Operator Initiating Cue:

The CRS directs you to perform Turbine Trip per EOP-O

APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-5

Appendix C Job Performance Measure Form ES-C-1 Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-5 (Alt Path)

Task

Title:

Identify, Isolate, and Confirm the Affected Steam Generator Task Number: 201.165 K/A

Reference:

035 A2.01 (4.5, 4.6)

Method of testing:

Simulated Performance: D Actual Performance: rxI Classroom: D Simulator: rxI Plant: D READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 1 was in Mode 1 at 100% power.
2. A plant transient and manual Reactor trip have occurred
3. EOP-4 has been implemented
4. The CRO has just completed isolating 11 S/G per EOP-4.
5. You are performing the duties of the an extra operator Initiating Cue:

Initiating Cue: The CRS directs you to independently verify the most affected S/G was isolated per step G.3 on page 15 Task Standard:

This JPM is complete when the operator determines the wrong S/G was isolated, restores feeding and steaming to 11 S/G, and isolates 12 S/G. The evaluator is expected to end this JPM.

Appendix C Job Performance Measure Form ES-C-l Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant General

References:

1. EOP-4, EXCESS STEAM DEMAND EVENT Time Critical Task:

No Validation Time:

25 minutes Simulator Setup:

1. Reset to IC-24 (both units at 100%)

_ _ 2. Place an off-normal pink ring next to the' 11 Steam Generator' sign (under 11 S/G level safety channels)

3. Enter malfunctions:

_ _ a. MSO10_02 10% leak, 12 Steam generator rupture in containment

b. AFW006-01, Failure of AFAS block
c. AFW006-02, Failure of AFAS block

_ _ d. AFW006-03, Failure of AFAS block

e. AFW006-04, Failure of AF AS block
4. Place simulator in run
5. When containment pressure high pre-trip alarm actuates, manually trip the unit.

_ _ 6. Stop all RCPs

- - 7. Isolate Letdown

8. Isolate 11 S/G per EOP-4 step G on page 12

Appendix C Job Perfonnance Measure Fonn ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

Time Start:

CUE: The CRS directs you to peer check the eRO by verifying the most affected S/G was isolated per Block Step G.3 on page 15 Identify and locate EOP-4 block step G.3 Same as element.

CUE: If the candidate asks which S/G was the most affected tell them that 'the most affected S/G should be independently assessed'.

3. Verify the most affectedS/Gwas isolated by The candidate detennines 12 S/G is checking the following: the most affected and the wrong S/G has been isolated based on:
  • S/G pressure lower for the affected S/G
  • Pressure is lower in 12 S/G
  • S/G level lowering for the affected S/G
  • Level is lower and lowering in 12 and stabilized for the unaffected S/G S/G. 11 S/G level is relatively
  • ReS loop T COLD lower in the affected steady loop
  • Tcold is lower in 12100p

. CUE: The candidate may report that the wrong S/G was isolated. The evaluator should acknowledge the report and give cue to 'continue with the procedure' 3;1 IF the wrong S/G was isolated, THEN Candidate detennines the steps should perform the following actions: be perfonned CAUTION Severe waterhammer may result if Main Feedwater flow is restored after it has been stopped for greater than 80 minutes.

CUE: If asked how long main feed water flow has been lost tell the candidate 'The plant was tripped 20 minutes ago'

Appendix C Job Performance Measure Form ES-C-l ELEMENT I STANDARD (SHADED CRITICAL STEP)

The candidate will at a minimum:

Restore Steaming:

1. Direct the TBO to transfer control of 11 ADV to the control room (Align 11 SIG Hand Transfer Valves to POSITION 1) or direct manual operation.

Restore feeding:

1. Place I-MS-4070-CV HS in Open or Auto
a. Restore feeding and steaming 2. Opens at least 2 S/G block valves in capability to the least affected S/G. series for 11 S/G:
  • 1-AFW-4520-CV (11 AFW PP)
  • 1-AFW-4521-CV (11 AFW PP)
  • 1-AFW-4522-CV (13 AFW PP)
  • 1-AFW-4523-CV (13 AFW PP)

J

b. WHEN RCS heat removal has been re-established to the least affected The candidate proceeds to step G.2 to S/G, THEN isolate the most affected isolate 12 S/G I S/G PER step G.2.

G.2. Isolate the affected S/G.

a. IF 11 S/G is the affected S/G, Candidate determines step 2.a is NIA THEN isolate 11 S/G by performing the following actions:

Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED == CRITICAL STEP)

b. IF 12 S/G is the affected S/G, Candidate determines step 2.b is THEN isolate 12 S/G by performing applicable.

the following actions:

(1) Shut 12 ADV using the Hand Transfer Valves on the West wall of the Unit 1 45 ft Switchgear Room as follows:

(a) IF 12 ADVwas locally operated, THEN remove the Candidate directs the TBO to manual override. 'Align 12 ADV to lC43 with a zero percent output' or similar.

(b) Verify 12 ADV controller, 1 HC-4056B, at 1C43 is set at The candidate may alternatively 0% output. direct EOP-4 step numbers.

(c) Align 12 S/G Hand Transfer Valves to 1C43 (POSITION 2):

  • 1-HV-3939A
  • 1-HV-3939B Candidate places 4517-mov HS in (2) Verify 12 SG FW ISOL valve 1 close.

FW-4517;.MOV, is shut. (Valve may be shut at this point due to ESF AS actuations)

(3) Verify 12 MSIV BYP valve, 1 Same as element MS-4052-MOV, is shut.

(4) Shut 12 S/G BID valves: Candidate places 4013 HS to close

  • 1-BD-4012-CV (Valve may be shut at this point
  • 1-BD-4013-CV due to ESF AS actuations)

(5) Shut 12 SG AFW STM SUPP & Candidate places 4071 hand switch BYPASS valves, 1-MS-4071-CV to close.

and 1-MS-4071A-CV. May be previously performed per step K when re-establishing feed.

Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

(6) Shut 12 S/G AFW BLOCK valves by placing the handswitches in SHUT:

  • 1-AFW-4530-CV Same as element
  • 1-AFW-4531-CV
  • 1-AFW-4532-CV
  • 1-AFW-4533-CV (7) Shut the MS UPSTREAM DRN Same as element.

ISOL VLVS by placing Not critical because the valve is handswitch 1-HS-6622 in already in this position from CLOSE. simulator setup.

(8) Observe locally, the S/G Safety Candidate directs an operator to Valves are NOT leaking. check for leaking S/G safety valves TIME STOP ---

TERMINATING CUE: This JPM is complete when the operator determines the wrong S/G was isolated, restores feeding and steaming to 11 S/G, and isolates 12 S/G. The evaluator is expected to end this JPM.

Appendix C Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-5 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT _ _ _ _ __ UNSAT _ _ _ _ _ __

Examiner's Signature and Date:

Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:

1. Unit 1 was in Mode 1 at 100% power.
2. A plant transient and manual Reactor trip have occurred
3. EOP-4 has been implemented
4. The CRO has just completed isolating 11 S/G per EOP-4.
5. You are performing the duties of the an extra operator Initiating Cue:

Initiating Cue: The CRS directs you to independently verify the most affected S/G was isolated per step G.3 on page 15

APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-6

Appendix C Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-6 Task

Title:

Respond to the loss of a 120 volt vital AC bus Task Number: 202.100 KIA

Reference:

006 A2.01 (3.4, 3.9)

Method of testing:

Simulated Performance: D Actual Performance: cg]

Classroom: Simulator: 0 Plant: D READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 1 is in Mode 1 at 100% power.
2. You are the Control Room Operator Initiating Cue:

The CRS directs you to respond to conditions that arise.

Task Standard:

The candidate wiU recommend AOP-7J. The candidate will use AOP-7J to diagnose a loss of 1YO I. The candidate will restore pressurizer pressure and level instruments affected by the bus loss. The candidate will protect the pressurizer by securing charging pumps before exceeding 225 inches. The candidate will protect RCPs by placing 12 CC HX in service.

Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time rna)' exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant General

References:

1. AOP-7J, Loss of 120 Volt Vital AC or 125 Volt Vital DC Power Time Critical Task:

No Validation Time~

20 minutes Simulator Setup:

1. Reset to IC-24 (both units at 100%)
2. Enter malfunctions:

- - a. Loss of 1YOl on Fl

3. Place simulator in run
4. Secure 12 CC HX per 01-16
5. Initiate the loss of 1YOl when directed by the examiner.

Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

Time Start: - - -

The CRS directs you to respond to eonditions that arise.

The candidate will announce

'Multiple Alarms' and check if RPS is calling for a trip.

Upon initiation, multiple alarms will be received Candidate will determine RPS is not calling for a trip and report this to the examiner.

CUE*. Acknowledge What actions do you recommend?.

The candidate, based on multiple alarms and status of RPS, should recommend AOP-7J.

The candidate may decide to use alarm manual guidance to take stabilizing actions for pressurizer level and pressure alarms. If the candidate takes stabilizing actions, the candidate should be asked (when actions are complete) 'Which AOP do you recommend?'

CUE: The CRS directs you to Perform AOP-7J block step IV.A, Preliminary Locates the AOP-7J Same as element.

CUE: The eRS will perform step 1

1. Perform the following immediate actions:
a. Confirm with the Fuel Handling Supervisor that any fuel assembly being handled has been placed in a safe location.
b. Suspend movement of irradiated fuel.

N/A

c. Suspend movement of heavy loads over irradiated fuel.
d. IF in Modes 5 or 6, THEN suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.
2. GO TO 1C24A. Same as element.

I

Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

3. IF 11 120 Volt Vital AC Instrument Bus (1Y01) is The candidate reviews indications deenergized, AND 11 125 Volt DC Bus is on lC24A for 1YOl and 11 DC energized, THEN PROCEED to Section V., 11 Bus then determines the a loss of 120 VOLT VITAL AC INSTRUMENT BUS only 1YOl has occurred and (1Y01). proceeds to section V on page 9.

Cue: Acknowledge recommendation, continue with the procedure

1. Verify that the PRZR PRESS CH SEL Switch is in The candidate places PRZR the Y position. PRESS CH SEL Switch in Y.
2. Verify that the RRS CH SEL Switch is in the The candidate places RRS CH RRS-Y position. SEL Switch in Y.
3. Verify that the PRZR LVL CH SEL Switch is in the Same as element.

11 OY position.

4. Verify that the PZR HTR LO LVL CUT-OFF SEL The candidate places PZR HTR Switch is in the Y position. LO LVL CUT-OFF SEL Switch in Y.

CUE: Another operator will place switch 51 in OFF, continue

5. Isolate the RCS Loop 11 instruments to RRS N/A Channel Y by placing switch S1 to OFF.
6. Shut the UD CNTMT ISOL valves: Candidate shuts l-CV-515 (not critical, will shut on its own) i
  • 1-CVC-515-CV
  • 1-CVC-516-CV Candidate shuts l-CV-516 (not critical, will shut on its own)

, Note: If pressurizer level reaches 225 prior to candidate performing step 7, the candidate should stop all charging pumps.

7. Operate the selected charging pump as Candidate will secure the running necessary to maintain PZR level within 15 inches charging pump(s). Candidate may of programmed level. NOT to exceed 225 inches. refer to OI-2A for procedure.
8. Operate Pressurizer HTRs and PRZR SPRAY Same as element. Candidate will VLVs as necessary to maintain RCS pressure place heaters in Off is pressure is between 2225 and 2275 PSIA. above 2275 (likely).

Note: The candidate may perform the following step from memory or by using 01-16 section 6.4.

Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

9. Restore 11 Saltwater header: The candidate will place 12 CC HX in service by
a. Verify 12 CC HX is in service.
  • opening 1-CC-3826-CV
  • throttle open 12 CC HX SWFLOWCONTR,1 HIC-520B Terminating Cue: This JPM is complete when the candidate places 12 CC HX in service.

No further actions are required. The evaluator is expected to end the JPM.

Time Stop:

Appendix C Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: SIM-6 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: ______~_ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _.

Applicant Response: _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT UNSAT Examiner's Signature and Date: _ _ _ _ _ _ _._ _ _ _ _ _ _ _ _ _ _ _ __

Job Performance Measure Form ES-C-l Workshei;!t'---_ _ _ _ _ _ _ _ _ _ _ __

APPLICANT'S CUE SHEET Initial Conditions:

1. Unit 1 is in Mode 1 at 100% power.
2. You are the Control Room Operator Initiating Cue:

The CRS directs you to respond to conditions that arise.

I APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM#: SIM-7

Appendix C Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-7 (Alt Path)

Task

Title:

Override shut a PORV Task Number: 064.035 KIA

Reference:

007.A2.01 (3.9,4.2)

Method of testing:

Simulated Performance: D Actual Performance: I2SJ Classroom: D Simulator: I2SJ Plant: D READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Unit 1 is stable in Mode 4 at 250F and 400 psia
2. You are performing duties as the Reactor Operator Initiating Cue:

The CRS directs you to respond to conditions that arise Task Standard:

The candidate will diagnose that the PORV is open due to equipment malfunction and shut the associated PORV block valve.

c Job Performance Measure Form ES-C-l Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant
1. ALM-I C06, RCS Control Alarm Manual Time Critical Task:

No Validation Time:

10 minutes Simulator Setup:

- - 1. Reset to IC-l

- - 2. Place simulator in run

_ _ 3. Add trigger 1: CW002-01

- - a. Tl: Override I-PI-I03-1 to 1533#

_ _ b. Tl: Override PORV 402 to Hmanopen"

___ c. F1: CW002-0 1 with 0 initial, 0 final, 0 ramp

- - d. Override PORV HS not in auto alarm OFF

4. Initiate Fl when directed by the examiner

Appendix C Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

CUE: The CRS directs you to respond to conditions that arise

  • Candidate performs panel scan Failure is initiated I and reports 'PORV ENERGIZED ALARM' I CUE: Acknowledge alarm I Locates the 1C06 alarm manual and refers to E-21 Same as element.

The candidate determines the step

1. The PORVs are energized.
  • is applicable since PORV 402 is open
1. PERF o RMthe f,oowmg:11 The candidate determines the
a. IF reactor trip occurs, THEN IMPLEMENT
  • reactor is shut down and step is EOP-O, Post-Trip Immediate Actions. I NOT apPlicabl~.

CUE: The shift manager will contact the electric shop

b. NOTIFY the electric shop to verify the trip status of the PORV thermal overloads to ensure PORV operability. [BOO34]

The candidate determines PORVs IF the PORVs are in NORMAL, THEN: , .. are in variable MPT and step is NOT applicable

d. IF the PORVs are in MPT ENABLE, THEN: The candidate determines PORVs are in variable MPT and step is applicable (1) TRIP any RCPs operating in the NON Candidate refers to RCP curve for OPERATING AREA of the RCP curve current lineup. If RCS pressure lowers to 300# candidate determines RCP are in the non-operating area of the curve.

__________ ~_ _ _ _ _ _ _ _'___~_~n_;_;d_a_t_e_secures IIA and I2B I

Appendix C Job Performance Measure Form ES-C-l ELEMENT STANDARD (SHADED = CRITICAL STEP)

(2) WHEN the cause of the high pressure Candidate determines the PORV condition has been corrected, THEN: is open due to equipment

[80064]

malfunction and not high RCS pressure.

Determines step is NIA (3) IF a PORV fails to shut or is open due to The candidate determines PORV a failed transmitter, THEN SHUT the 402 is open due to a failed applicable PORV Block, 1-RC-403-MOV transmitter and closes the PORV or 1-RC-405-MOV. 402 block valve l-RC-403-MOV CUE: The CRO will perform step 1.d.(4)

(4) DRAIN the PORV discharge piping to the

  • N/A Quench Tank as follows:
e. MONITOR computer points T106, T107, and Candidate uses plant computer to T108 for leak-off temperatures. monitor leak-off temperatures

~

Terminating Cue: This lPM is complete when the candidate isolates the open PORV flow path. No further actions are required. The evaluator is expected to end the lPM.

i

Appendix C Job Performance Measure Form ES-C-l Worksheet Verification of Completion Job Performance Measure Number: SIM-7 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Result: SAT UNSAT _ _ _ _ _ _ __

Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:

1. Unit 1 is stable in Mode 4 at 250F and 400 psia
2. You are performing duties as the Reactor Operator Initiating Cue:

The CRS directs you to respond to conditions that arise

APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PLANT-1

Job Performance Measure Form ES-C-l Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-l Task

Title:

Fill the SRW and CC head tanks during a loss of AC power Task Number: 011.025,015.008 KIA

Reference:

008 A4.07 (2.9, 2.9)

Method of testing:

Simulated Performance: C8J Actual Performance:

Classroom: D Simulator: D Plant: C8J READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
2. You are performing the duties ofthe Unit-2 ABO.

Initiating Cue:

You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH".

Task Standard:

This JPM is complete when makeup has been restored to the Service Water and Component Cooling Head Tanks.

Appendix C Job Performance Measure Form ES-C-l Worksheet Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals normally available in the plant General

References:

1. AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE.

Time Critical Task:

No Validation Time:

20 minutes Simulator Setup:

1. None

Job Performance Measure Form ES-C-I ELEMENT STANDARD I Time Start: ____

  • CUE: You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH".

Locate AOP-9A, Step CH. Same as element.

Candidate proceeds to the Unit-2 69' Same as element CUE: 2C43 notifies you that makeup has been restored to fill the Service Water and Component Cooling Head Tanks

1. WHEN notified that makeup has been restored to fill the Service Water and Component Cooling Head Tanks, THEN: Same as element
  • Open Component Cooling Head Tank Condensate Su I, 2-CD-14S.
  • ~~e~_f4~~ Head Tank Condensate SUPPIY_,-----'-____s_a_m_e_as_el::=]

CUE: The component cooling head tank level is below the sight glass

2. Operate, as necessary, to maintain level indication for the Component Cooling and Service Water Head Tanks:

Same as element

a. Component Cooling Head Tank:

(1) Open Component Cooling Head Tank Makeup Bypass, 2-CC-108 (2) Shut 2-CC-3820-CV Inlet Isol, 2-CC-107 Same as element I CUE: The component cooling bead tank level is no~al by si_gh_t_g_l_a_ss_ _ _ _ _ ----1

  • CUE: 21 SRW head tank is normal, 22 SRW head tank level is below the sight glass
b. 21 Service Water Head Tank: Candidate determines step is NOT applicable

Job Performance Measure Form ES-C-l ELEMENT STANDARD

c. 22 Service Water Head Tank:

(1) Open 22 Service Water Head Tank Makeup Bypass, 2-SRW-114 Same as element (2) Shut 22 Service Water Head Tank LCV Same as element Inlet Isol, 2-SRW-112 I

CUE: 22 SRW head tank level is level is normal by sight glass

3. Periodically monitor Component Cooling and Service Water Head Tanks levels and fill as Same as element necessary.

Terminating Cue: This JPM is complete when the Component Cooling and 22 Service Water Head Tanks are in the normal band. No further actions are required. The evaluator is expected to end the JPM.

Time Stop:

Appendix C Job Performance Measure Form ES-C-l Verification of Completion Job Performance Measure Number: PLANT-l Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Time to Complete:

Follow up Question: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~. _________

Applicant Response: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~_ _ __

Result: SAT UNSAT - - - - - - - - - -

Examiner's Signature and Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:

3. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
4. You are performing the duties of the Unit-2 ABO.

Initiating Cue:

You have just completed Step CG, ESTABLISH SALTWATER FLOW THROUGH THE COMPONENT COOLING HEAT EXCHANGERS which directs you to "Go to the 69' Aux Building to perform Step CH".

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PLANT-2

Job Performance Measure Form ES-C-l Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: PLANT-2 Task

Title:

ShutdownlReturn and AF AS sensor cabinet to/from service Task Number: 036.005 KJA

Reference:

013 A2.06 (3.7,4.0)

Method of testing:

Simulated Performance: [gJ Actual Performance: D Classroom: D Simulator: D Plant: [gJ READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. Maintenance is scheduled to be performed on AF AS channel ZE
2. Shift Manager approval has been obtained.
3. You are performing the duties of the Unit-2 CRO.

Initiating Cue:

The CRS directs you to shutdown AF AS Sensor Cabinet ZE Task Standard:

This JPM is complete when AF AS ZE sensor cabinet is shutdown.

Appendix C Job Performance Measure Form ES-C-I Worksheet Evaluation Criteria:

I. All critical steps completed (denoted by shading).

2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

I. Procedures and manuals normally available in the plant General

References:

1. OI-32B, AFAS SYSTEM OPERATION Time Critical Task:

No Validation Time:

20 minutes Simulator Setup:

1. None

Appendix C Job Performance Measure Form ES-C-l Worksheet ELEMENT STANDARD (SHADED = CRITICAL STEP)

Time Start:

CUE: The CRS directs you to shutdown AF AS Sensor Cabinet ZE Locate OI-32B Section 6.3. Same as element.

CUE: The CRS has reviewed Tech Specs 3.3.4 and 3.3.5 Candidate proceeds to the Unit-2 cable spreading Same as element room

1. UNLOCK AND OPEN the Sensor Cabinet front Candidate notifies control room, door for the Sensor Cabinet to be shutdown. then unlocks Unit 2 AF AS sensor cabinet ZE
2. CHECK that NO trips are present on any other Sensor Cabinets for SG Low Level or for SG Same as element Differential Pressure.
3. CHECK that NO trips are present on either of the Same as element Logic Cabinets. [80068]
4. PLACE the circuit breaker on the Sensor Cabinet Same as element to be shutdown to the OFF position. (FIGURE 1)
5. PLACE the 120 volt breaker for the Sensor Cabinet to be shutdown to the OFF position: Same as element Sensor Cabinet ZE. ...... Panel 2Y02-1, Breaker 22
6. CLEAR all AFAS alarms that will reset. Same as element
7. CLOSE AND LOCK the Sensor Cabinet front Same as element door.

Terminating Cue: This JPM is complete when AF AS Sensor cabinet is deenergized with door locked. No further actions are required. The evaluator is expected to end the JPM.

Time Stop:

Appendix C Job Performance Measure Form ES-C-l Worksheet Verification of Completion Job Performance Measure Number: PLANT-2 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: __________________

Time to Complete:

Follow up Question: __________________________

Applicant Response: __________________________

Result: SAT UNSAT _ _ _ _ _ __

Examiner's Signature and Date:

Appendix C Job Performance Measure Form ES-C-l APPLICANT'S CUE SHEET Initial Conditions:

1. Maintenance is scheduled to be performed on AF AS channel ZE
2. Shift Manager approval has been obtained.
3. You are performing the duties of the Unit-2 CRO.

Initiating Cue:

The CRS directs you to shutdown AF AS Sensor Cabinet ZE

i APPLICANT: _ __

CALVERT CLIFFS NUCLEAR POWER PLANT 2011 NRC INITIAL LICENSED OPERATOR EXAM JPM #: PLANT-3

Job Performance Measure Form ES-C-l Facility: Calvert CUffs 1 & 2 Job Performance Measure No.: PLANT*3 Task

Title:

Manually override Saltwater valves using hand transfer valves Task Number: 012.019 KJA

Reference:

076 A4.02 (2.6, 2.6)

Method of testing:

Simulated Performance: ~ Actual Performance: D Classroom: Simulator: D Plant: ~

READ TO THE APPLICANT:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
2. You are performing the duties of the Unit 1 TBO.

Initiating Cue:

o This JPM is complete when Salt Water valves to the Service Water Heat Exchangers are manually overridden.

Fonn ES-C-l Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps (denoted by an asterisk) completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

1. Procedures and manuals nonnally available in the plant General

References:

1. AOP-9A, CONTROL ROOM EVACUATION AND SAFE SHUTDOWN DUE TO A SEVERE CONTROL ROOM FIRE.

Time Critical Task:

No Validation Time:

20 minutes Simulator Setup:

1. None

Appendix C Job Performance Measure Form ES-C-I Worksheet ELEMENT STANDARD (SHADED = CRlTICAL STEP)

Time Start: - - -

CUE: The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers W.~EN I'lQtifi~dt Saftwalte~to the

~rviC$.Wat~f"H EN insert the K~yinto t-HS-5 . . Saltwater

..System6me~g~nCMi Same as element 1

~,,, m, c*'" """'"

2:Pf,c~:the(~f~owjng .

fftQm.lefttQrrigJ;1 ncll~**********i Same as element

. Q.U"{7~~:t:1:'HV-5g10 From CUE the step cannot be performed. The candidate will call 1C43 for direction CUE: lC43 requests that you perform actions to place l-CV-S209 in its AOP-9A position and methods that may be used to perform the action.

Place l-CV-5209 in its AOP-9A position Candidate will describe methods that could be employed to place 1 CV -5209 in its failed position.

Isolating the operating air and

. bleeding off air pressure would I pla~i~g the valve in its fail posItIOn.

Terminating Cue: This JPM is complete when Saltwater to the Service Water Heat Exchangers is overridden. No further actions are required. The evaluator is expected to

! end the lPM.

i

~

Time Stop: _ __

__________________ ~ _ _ _ _ _ _ _ _ _ _ _ ---------.J

Appendix C Job Performance Measure Form ES-C-l Worksheet Verification of Completion Job Performance Measure Number: PLANT-3 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts: __________________

Time to Complete:

Follow up Question: __________________________

Applicant Response: __________________________

Result: SAT UNSAT ---------

Examiner's Signature and Date:

Appendix C Job Performance Measure Form ES-C-l Worksheet APPLICANT'S CUE SHEET Initial Conditions:

1. A severe fire has resulted in Control Room evacuation. AOP-9A has been implemented.
2. You are performing the duties of the Unit 1 TBO.

Initiating Cue:

The CRS directs you to perform step AP, Override Saltwater to the Service Water Heat Exchangers