ML15126A114: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 05/28/2015
| issue date = 05/28/2015
| title = IR 05000250/2015201 and 05000251/2015201, on 04,30,2015, Turkey Point Units 3 & 4 Security Baseline Inspection Report Cover Letter
| title = IR 05000250/2015201 and 05000251/2015201, on 04,30,2015, Turkey Point Units 3 & 4 Security Baseline Inspection Report Cover Letter
| author name = Johnson R C
| author name = Johnson R
| author affiliation = NRC/NSIR/DSO
| author affiliation = NRC/NSIR/DSO
| addressee name = Kiley M
| addressee name = Kiley M
Line 9: Line 9:
| docket = 05000250, 05000251
| docket = 05000250, 05000251
| license number = DPR-031, DPR-041
| license number = DPR-031, DPR-041
| contact person = Coughlin P L
| contact person = Coughlin P
| document report number = IR 2015201
| document report number = IR 2015201
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000250/2015201]]
See also: [[see also::IR 05000250/2015201]]


=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION
{{#Wiki_filter:SAFEGUARDS INFORMATION
  SAFEGUARDS INFORMATION
                                              May 28, 2015
 
Mr. Michael Kiley, Site Vice President
May 28, 2015  
Turkey Point Nuclear Generating Station
Florida Power & Light Company
9760 SW 344 Street
Florida City, FL 33035
Mr. Michael Kiley, Site Vice President
SUBJECT:        TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC
                SECURITY INSPECTION REPORT 05000250/2015201 AND
                05000251/2015201
Dear Mr. Kiley:
On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security
inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the
results of this inspection with Mr. Mitch Guth and other members of your staff. Inspectors
documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented one finding of very low security significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a
non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest this violation or the significance of this NCV, you should provide a response within
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with
copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and
Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear
Generating Station, Units 3 and 4.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security,
and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating
Station, Units 3 and 4.
    The enclosure transmitted herewith contains Safeguards Information. When separated from
                      the enclosure, this transmittal document is decontrolled.
                                  SAFEGUARDS INFORMATION


Turkey Point Nuclear Generating Station Florida Power & Light Company 
                                    SAFEGUARDS INFORMATION
9760 SW 344 Street
M. Kiley                                        -2-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Request for Withholding, of the NRC's "Rules of Practice," a copy of
this letter will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Safeguards Information as defined by
10 CFR 73.21 Protection of Safeguards Information; Performance Requirements, and its
disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act
of 1954, as amended. Therefore, the material in the enclosure will not be made available
electronically for public inspection in the NRC Public Document Room or from the PARS
component of NRC's ADAMS. If you choose to provide a response and Safeguards Information
is necessary to provide an acceptable response, please provide the level of protection
described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide
an acceptable response, please mark your entire response Security-Related Information -
Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
                                                  Sincerely,
                                                  /RA/
                                                  Robert C. Johnson, Chief
                                                  Security Performance Evaluation Branch
                                                  Division of Security Operations
                                                  Office of Nuclear Security and Incident Response
Docket Nos. 50-250, 50-251
License Nos. DPR-31, DPR-41
Nonpublic Enclosure: Inspection Report 05000250/2015201 and 05000251/2015201
                          w/Attachments: Supplemental Information
cc w/encl: Timothy Eck, Security Manager
                                    SAFEGUARDS INFORMATION


Florida City, FL  33035


   
  ML15126A114
SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC SECURITY INSPECTION REPORT 05000250/2015201 AND
OFFICE NSIR/DSO NSIR/DSO NSIR/DSO                           RII           NSIR/DSO/SPEB
05000251/2015201
NAME         P. Coughlin J. Clark           D. Johnson B. Desai           D. Cardenas for/C. Johnson
DATE         5/5/15         5/19/15         5/19/15       5/28/15       5/28/15
Dear Mr. Kiley:
 
On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the
results of this inspection with Mr. Mitch Guth and other members of your staff.  Inspectors
documented the results of this inspection in the enclosed inspection report.
 
NRC inspectors documented one finding of very low security significance (Green) in this report.  This finding involved a violation of NRC requirements.  The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
 
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region
II; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear
Generating Station, Units 3 and 4.
 
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security,
and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating
Station, Units 3 and 4.
 
The enclosure transmitted herewith contains Safeguards Information.  When separated from the enclosure, this transmittal document is decontrolled. 
SAFEGUARDS INFORMATION
M. Kiley -2-
  SAFEGUARDS INFORMATION
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding,"
of the NRC's "Rules of Practice," a copy of
this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management
System (ADAMS).  ADAMS
is accessible from the NRC
Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
However, the material enclosed herewith contains Safeguards Information as defined by 
10 CFR 73.21 "Protection of Safeguards Information; Performance Requirements," and its
disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act  of 1954, as amended.  Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS
component of NRC's ADAMS.  If you choose to provide a response and Safeguards Information
 
is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.  Otherwise, if Security-Related Information is necessary to provide
an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).  In accordance with 
 
10 CFR 2.390(b)(1)(ii), the NRC is waiving the
affidavit requirements for your response.
Sincerely,
/RA/  Robert C. Johnson, Chief
 
Security Performance Evaluation Branch
Division of Security Operations Office of Nuclear Security and Incident Response
Docket Nos. 50-250, 50-251
License Nos. DPR-31, DPR-41
 
Nonpublic Enclosure:  Inspection Report 05000250/2015201 and 05000251/2015201  w/Attachments:  Supplemental Information
cc w/encl:  Timothy Eck, Security Manager
 
 
 
 
  ML15126A114
OFFICE NSIR/DSO NSIR/DSO NSIR/DSO RII NSIR/DSO/SPEB NAME P. Coughlin
J. Clark D. Johnson B. Desai D. Cardenas for/C. Johnson DATE 5/5/15 5/19/15   5/19/15 5/28/15 5/28/15
}}
}}

Latest revision as of 11:55, 31 October 2019

IR 05000250/2015201 and 05000251/2015201, on 04,30,2015, Turkey Point Units 3 & 4 Security Baseline Inspection Report Cover Letter
ML15126A114
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/28/2015
From: Rachel Johnson
Division of Security Operations
To: Kiley M
Florida Power & Light Co
Coughlin P
References
IR 2015201
Download: ML15126A114 (3)


See also: IR 05000250/2015201

Text

SAFEGUARDS INFORMATION

May 28, 2015

Mr. Michael Kiley, Site Vice President

Turkey Point Nuclear Generating Station

Florida Power & Light Company

9760 SW 344 Street

Florida City, FL 33035

SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC

SECURITY INSPECTION REPORT 05000250/2015201 AND

05000251/2015201

Dear Mr. Kiley:

On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the

results of this inspection with Mr. Mitch Guth and other members of your staff. Inspectors

documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a

non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with

copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and

Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear

Generating Station, Units 3 and 4.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security,

and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating

Station, Units 3 and 4.

The enclosure transmitted herewith contains Safeguards Information. When separated from

the enclosure, this transmittal document is decontrolled.

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

M. Kiley -2-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Request for Withholding, of the NRC's "Rules of Practice," a copy of

this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by

10 CFR 73.21 Protection of Safeguards Information; Performance Requirements, and its

disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act

of 1954, as amended. Therefore, the material in the enclosure will not be made available

electronically for public inspection in the NRC Public Document Room or from the PARS

component of NRC's ADAMS. If you choose to provide a response and Safeguards Information

is necessary to provide an acceptable response, please provide the level of protection

described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide

an acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief

Security Performance Evaluation Branch

Division of Security Operations

Office of Nuclear Security and Incident Response

Docket Nos. 50-250, 50-251

License Nos. DPR-31, DPR-41

Nonpublic Enclosure: Inspection Report 05000250/2015201 and 05000251/2015201

w/Attachments: Supplemental Information

cc w/encl: Timothy Eck, Security Manager

SAFEGUARDS INFORMATION

ML15126A114

OFFICE NSIR/DSO NSIR/DSO NSIR/DSO RII NSIR/DSO/SPEB

NAME P. Coughlin J. Clark D. Johnson B. Desai D. Cardenas for/C. Johnson

DATE 5/5/15 5/19/15 5/19/15 5/28/15 5/28/15