ML072430076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/2007
| issue date = 08/31/2007
| title = 8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
| title = 8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
| author name = Caldwell J L
| author name = Caldwell J
| author affiliation = NRC/RGN-III/ORA
| author affiliation = NRC/RGN-III/ORA
| addressee name = Allen B S
| addressee name = Allen B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000440
| docket = 05000440
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:August 31, 2007 Mr. Barry S. Allen Site Vice President
{{#Wiki_filter:August 31, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097
 
FirstEnergy Nuclear Operating Company
 
Perry Nuclear Power Plant
 
P. O. Box 97, 10 Center Road, A-PY-290
 
Perry, OH 44081-0097


==SUBJECT:==
==SUBJECT:==
Line 31: Line 23:
==Dear Mr. Allen:==
==Dear Mr. Allen:==


On August 14, 2007, the NRC staff completed its performance review of Perry for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The
On August 14, 2007, the NRC staff completed its performance review of Perry for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and resultant inspection plan.
On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix. Therefore, effective the second quarter 2007, the Perry plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the Regulatory Response column, based on the White Emergency AC Power System mitigating systems performance index from January 2007. Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," during the week of August 20 to assess the root cause analysis and implementation of corrective actions for the performance index. The results will be documented in a report within 30 days of the end of the supplemental inspection.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection scheduled for April 2008. The inspections scheduled within the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.


purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
B. Allen                                        In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                              /RA/
James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58


include the security cornerstone review and resultant inspection plan.
==Enclosure:==
On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that
 
all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone
 
column of the NRC's Action Matrix. Therefore, effective the second quarter 2007, the Perry
 
plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the
 
Regulatory Response column, based on the White Emergency AC Power System mitigating
 
systems performance index from January 2007.
Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs


in a Strategic Performance Area," during the week of August 20 to assess the root cause
Perry Inspection/Activity Plan DISTRIBUTION See next page


analysis and implementation of corrective actions for the performance index. The results will be documented in a report within 30 days of the end of the supplemental inspection.
B. Allen                                                                     In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
                                                                          /RA/
 
James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection scheduled for April 2008. The
 
inspections scheduled within the last nine months of the inspection plan are tentative and may
 
be revised at the end-of-cycle review.
B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
 
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise
 
the inspection plan, we will contact you to discuss the change as soon as possible. Please
 
contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this
 
letter or the inspection plan.
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58


==Enclosure:==
==Enclosure:==


Perry Inspection/Activity Plan DISTRIBUTION See next page B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
Perry Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Perry\Perry MOC 2007 letter.wpd X Publicly Available                        G Non-Publicly Available                  G Sensitive              X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII                                RIII                            RIII                              RIII NAME                GWright:dtp                        BBurgess                        AHsia for                         JCaldwell CPederson DATE                08/21/07                            08/21/07                        08/28/07                          08/29/07 OFFICIAL RECORD COPY


Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Letter to B. Allen from J. Caldwell dated August 31, 2007
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise
 
the inspection plan, we will contact you to discuss the change as soon as possible. Please
 
contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this
 
letter or the inspection plan.
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58
 
==Enclosure:==
 
Perry Inspection/Activity Plan DISTRIBUTION See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Perry\Perry  MOC 2007 letter.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEGWright:dtpBBurgessAHsia for CPederson JCaldwellDATE08/21/0708/21/0708/28/0708/29/07 OFFICIAL RECORD COPY Letter to B. Allen from J. Caldwell dated August 31, 2007


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PERRY NUCLEAR POWER PLANT, UNIT 1cc w/encl:J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and
PERRY NUCLEAR POWER PLANT, UNIT 1 cc w/encl:     J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC R. Anderson, Vice President, Nuclear Support - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.
 
Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health President, Geauga County Board Director, Department of Emergency Services Geauga County Sheriff President, Ashtabula County Board of Commissioners Ashtabula County Sheriff Director, Ashtabula County Emergency Management Agency Mayor, Village of Genoa Genoa Village Administrator President, Lake County Board of Commissioners Lake County Sheriff Painesville City Manager Lake County Administrator Director, Lake County Emergency Management Agency President, Village of Fairport Harbor Mayor, City of Eastlake Mayor, City of Wickliffe President, Geneva City Council City Manager, Geneva Mayor, City of Kirtland Mayor, City of Mentor City Manager, Mentor Mayor, City of Mentor on the Lake Administrative Director Mayor, City of Willoughby Hills Mayor, City of Willoughby Mayor, City of Willowick Mayor, Village of Madison Village Administrator, Village of Madison Chairman, Board of Madison Township Trustees Mayor, Village of Kirtland Hills Mayor, Village of Geneva-on-the-Lake Mayor, Lakeline Village Mayor, Village of Timberlake Mayor, Village of Grand River INPO
Chief Operating Officer - FENOC
 
D. Pace, Senior Vice President, Fleet Engineering - FENOC
 
J. Rinckel, Vice President, Fleet Oversight - FENOC
 
R. Anderson, Vice President, Nuclear Support - FENOC
 
Director, Fleet Regulatory Affairs - FENOC
 
Manager, Fleet Licensing - FENOC
 
Manager, Site Regulatory Compliance - FENOC
 
D. Jenkins, Attorney, FirstEnergy Corp.
 
Public Utilities Commission of Ohio
 
Ohio State Liaison Officer
 
R. Owen, Ohio Department of Health
 
President, Geauga County Board
 
Director, Department of Emergency Services
 
Geauga County Sheriff
 
President, Ashtabula County Board of Commissioners
 
Ashtabula County Sheriff
 
Director, Ashtabula County Emergency
 
Management Agency
 
Mayor, Village of Genoa
 
Genoa Village Administrator
 
President, Lake County Board of Commissioners
 
Lake County Sheriff
 
Painesville City Manager
 
Lake County Administrator
 
Director, Lake County Emergency Management Agency
 
President, Village of Fairport Harbor
 
Mayor, City of Eastlake
 
Mayor, City of Wickliffe
 
President, Geneva City Council
 
City Manager, Geneva
 
Mayor, City of Kirtland
 
Mayor, City of Mentor
 
City Manager, Mentor
 
Mayor, City of Mentor on the Lake
 
Administrative Director
 
Mayor, City of Willoughby Hills
 
Mayor, City of Willoughby
 
Mayor, City of Willowick
 
Mayor, Village of Madison
 
Village Administrator, Village of Madison
 
Chairman, Board of Madison Township Trustees
 
Mayor, Village of Kirtland Hills
 
Mayor, Village of Geneva-on-the-Lake
 
Mayor, Lakeline Village
 
Mayor, Village of Timberlake
 
Mayor, Village of Grand River


INPO Letter to B. Allen from J. Caldwell dated August 31, 2007
Letter to B. Allen from J. Caldwell dated August 31, 2007


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PERRY NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION
PERRY NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION:
: RAG1 TJW2 TEB RidsNrrDirslpab
RAG1 TJW2 TEB RidsNrrDirslpab JLC1 MAS KGO RML2 SAM9 SRI Perry DRPIII DRSIII PLB1 TXN


JLC1 MAS KGO RML2 SAM9 SRI Perry  
Perry Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff    Planned Dates        Inspection Inspection Activity                                              Title                                          on Site        Start    End            Type BI ENG        - ENGINEERING MODIFICATIONS / 50.59 INSP.                                                                2 IP 7111102          Evaluation of Changes, Tests, or Experiments                                                          08/27/2007 09/14/2007 Baseline Inspections IP 7111117B        Permanent Plant Modifications                                                                          08/27/2007 09/14/2007 Baseline Inspections BI EP        - EP ROUTINE INSPECTION / PI VERIFICATION                                                                1 IP 7111402          Alert and Notification System Testing                                                                  10/16/2007 10/20/2007 Baseline Inspections IP 7111403          Emergency Response Organization Augmentation Testing                                                  10/16/2007 10/20/2007 Baseline Inspections IP 7111405          Correction of Emergency Preparedness Weaknesses and Deficiencies                                      10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP01      Drill/Exercise Performance                                                                            10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP02      ERO Drill Participation                                                                                10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP03      Alert & Notification System                                                                            10/16/2007 10/20/2007 Baseline Inspections 95003        - INDEPENDENT CAP FOLLOW UP                                                                              1 IP 95003            Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple              10/01/2007 11/30/2007 Supplemental Program BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                2 IP 7112101          Access Control to Radiologically Significant Areas                                                    10/22/2007 10/26/2007 Baseline Inspections IP 7112102          ALARA Planning and Controls                                                                            10/22/2007 10/26/2007 Baseline Inspections IP 71151-OR01      Occupational Exposure Control Effectiveness                                                            10/22/2007 10/26/2007 Baseline Inspections IP 71151-PR01      RETS/ODCM Radiological Effluent                                                                        10/22/2007 10/26/2007 Baseline Inspections BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                1 IP 7112201          Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                              12/10/2007 12/14/2007 Baseline Inspections RPV HEAD - RPV HEAD DROP ANALYSIS INSPECTION                                                                            1 IP 7111120          Refueling and Other Outage Activities                                                                  01/07/2008 02/15/2008 Baseline Inspections BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                1 IP 7112203          Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P                03/10/2008 03/14/2008 Baseline Inspections IP 71151-PR01      RETS/ODCM Radiological Effluent                                                                        03/10/2008 03/14/2008 Baseline Inspections BI ENG        - COMPONENT DESIGN BASES INSPECTION                                                                      5 IP 7111121          Component Design Bases Inspection                                                                      04/14/2008 05/16/2008 Baseline Inspections BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                1 IP 7112101          Access Control to Radiologically Significant Areas                                                    09/08/2008 09/12/2008 Baseline Inspections IP 71151-OR01      Occupational Exposure Control Effectiveness                                                            09/08/2008 09/12/2008 Baseline Inspections BI EP        - EP EXERCISE INSPECTION / PI VERIFICATION                                                                3 IP 7111401          Exercise Evaluation                                                                                    10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP01      Drill/Exercise Performance                                                                            10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP02      ERO Drill Participation                                                                                10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP03      Alert & Notification System                                                                            10/06/2008 10/10/2008 Baseline Inspections


DRPIII DRSIII PLB1 TXN Perry Inspection / Activity Plan 09/01/2007
Perry Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff   Planned Dates        Inspection Inspection Activity                                            Title                        on Site       Start     End            Type BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                             1 IP 7112102         ALARA Planning and Controls                                                         10/13/2008 10/17/2008 Baseline Inspections IP 71151-BI01      Reactor Coolant System Activity                                                     10/13/2008 10/17/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                             1 IP 7112202          Radioactive Material Processing and Transportation                                  11/17/2008 11/21/2008 Baseline Inspections BI OL         - BIENNIAL REQUAL. PROGRAM INSPECTION                                                 2 IP 7111111B        Licensed Operator Requalification Program                                          12/01/2008 12/05/2008 Baseline Inspections}}
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/28/2007 Report 22 2 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections 08/27/2007 09/14/2007 1     7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/27/2007 09/14/2007 1    7111117B IP Permanent Plant Modifications 1 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections 10/16/2007 10/20/2007 1    7111402 IP A lert and Notification System Testing Baseline Inspections 10/16/2007 10/20/2007 1    7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/16/2007 10/20/2007 1    7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/16/2007 10/20/2007 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/16/2007 10/20/2007 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 10/16/2007 10/20/2007 1    71151-EP03 IP A lert & Notification System 1 95003-INDEPENDENT CAP FOLLOW UP Supplemental Progra m 10/01/2007 11/30/2007 1    95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 2 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1    7112102 IP A LARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1    71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/22/2007 10/26/2007 1    71151-PR01 IP RETS/ODCM Radiological Effluent 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/10/2007 12/14/2007 1    7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 RPV HEAD-RPV HEAD DROP ANALYSIS INSPECTION Baseline Inspections 01/07/2008 02/15/2008 1    7111120 IP Refueling and Other Outage Activities 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1    7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 1    71151-PR01 IP RETS/ODCM Radiological Effluent 5 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/14/2008 05/16/2008 1    7111121 IP Component Design Bases Inspection 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/08/2008 09/12/2008 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/08/2008 09/12/2008 1    71151-OR01 IP Occupational Exposure Control Effectiveness 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 10/06/2008 10/10/2008 1    7111401 IP Exercise Evaluation Baseline Inspections 10/06/2008 10/10/2008 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 1    71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Perry Inspection / Activity Plan 09/01/2007
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/28/2007 Report 22 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/13/2008 10/17/2008 1    7112102 IP A LARA Planning and Controls Baseline Inspections 10/13/2008 10/17/2008 1    71151-BI01 IP Reactor Coolant System Activity 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/17/2008 11/21/2008 1    7112202 IP Radioactive Material Processing and Transportation 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 12/01/2008 12/05/2008 1    7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 04:05, 23 November 2019

8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
ML072430076
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/31/2007
From: Caldwell J
Region 3 Administrator
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML072430076 (7)


Text

August 31, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1

Dear Mr. Allen:

On August 14, 2007, the NRC staff completed its performance review of Perry for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and resultant inspection plan.

On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone column of the NRCs Action Matrix. Therefore, effective the second quarter 2007, the Perry plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the Regulatory Response column, based on the White Emergency AC Power System mitigating systems performance index from January 2007. Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," during the week of August 20 to assess the root cause analysis and implementation of corrective actions for the performance index. The results will be documented in a report within 30 days of the end of the supplemental inspection.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection scheduled for April 2008. The inspections scheduled within the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

B. Allen In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next page

B. Allen In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Perry\Perry MOC 2007 letter.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME GWright:dtp BBurgess AHsia for JCaldwell CPederson DATE 08/21/07 08/21/07 08/28/07 08/29/07 OFFICIAL RECORD COPY

Letter to B. Allen from J. Caldwell dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1 cc w/encl: J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC R. Anderson, Vice President, Nuclear Support - FENOC Director, Fleet Regulatory Affairs - FENOC Manager, Fleet Licensing - FENOC Manager, Site Regulatory Compliance - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health President, Geauga County Board Director, Department of Emergency Services Geauga County Sheriff President, Ashtabula County Board of Commissioners Ashtabula County Sheriff Director, Ashtabula County Emergency Management Agency Mayor, Village of Genoa Genoa Village Administrator President, Lake County Board of Commissioners Lake County Sheriff Painesville City Manager Lake County Administrator Director, Lake County Emergency Management Agency President, Village of Fairport Harbor Mayor, City of Eastlake Mayor, City of Wickliffe President, Geneva City Council City Manager, Geneva Mayor, City of Kirtland Mayor, City of Mentor City Manager, Mentor Mayor, City of Mentor on the Lake Administrative Director Mayor, City of Willoughby Hills Mayor, City of Willoughby Mayor, City of Willowick Mayor, Village of Madison Village Administrator, Village of Madison Chairman, Board of Madison Township Trustees Mayor, Village of Kirtland Hills Mayor, Village of Geneva-on-the-Lake Mayor, Lakeline Village Mayor, Village of Timberlake Mayor, Village of Grand River INPO

Letter to B. Allen from J. Caldwell dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION:

RAG1 TJW2 TEB RidsNrrDirslpab JLC1 MAS KGO RML2 SAM9 SRI Perry DRPIII DRSIII PLB1 TXN

Perry Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/27/2007 09/14/2007 Baseline Inspections IP 7111117B Permanent Plant Modifications 08/27/2007 09/14/2007 Baseline Inspections BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 IP 7111402 Alert and Notification System Testing 10/16/2007 10/20/2007 Baseline Inspections IP 7111403 Emergency Response Organization Augmentation Testing 10/16/2007 10/20/2007 Baseline Inspections IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP01 Drill/Exercise Performance 10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/16/2007 10/20/2007 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/16/2007 10/20/2007 Baseline Inspections 95003 - INDEPENDENT CAP FOLLOW UP 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 10/01/2007 11/30/2007 Supplemental Program BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 IP 7112101 Access Control to Radiologically Significant Areas 10/22/2007 10/26/2007 Baseline Inspections IP 7112102 ALARA Planning and Controls 10/22/2007 10/26/2007 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 10/22/2007 10/26/2007 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 10/22/2007 10/26/2007 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/10/2007 12/14/2007 Baseline Inspections RPV HEAD - RPV HEAD DROP ANALYSIS INSPECTION 1 IP 7111120 Refueling and Other Outage Activities 01/07/2008 02/15/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 03/10/2008 03/14/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 03/10/2008 03/14/2008 Baseline Inspections BI ENG - COMPONENT DESIGN BASES INSPECTION 5 IP 7111121 Component Design Bases Inspection 04/14/2008 05/16/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 09/08/2008 09/12/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 09/08/2008 09/12/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP01 Drill/Exercise Performance 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/06/2008 10/10/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/06/2008 10/10/2008 Baseline Inspections

Perry Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112102 ALARA Planning and Controls 10/13/2008 10/17/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 10/13/2008 10/17/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112202 Radioactive Material Processing and Transportation 11/17/2008 11/21/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 12/01/2008 12/05/2008 Baseline Inspections