| issue date = 10/30/2006
| issue date = 10/30/2006
| title = Letter Informing of Equipment Removal at GE Test Reactor
| title = Letter Informing of Equipment Removal at GE Test Reactor
| author name = Turner D W
| author name = Turner D
| author affiliation = General Electric Co
| author affiliation = General Electric Co
| addressee name = Buckley J T
| addressee name = Buckley J
| addressee affiliation = NRC/Document Control Desk, NRC/FSME
| addressee affiliation = NRC/Document Control Desk, NRC/FSME
| docket = 05000070
| docket = 05000070
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:GE Infrastructure Energy, Nuclear David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 USA T 925 862 4434 F 910 341 2577 davidw.turner@ge.com US NRC Document Control Desk Attn: John Buckley, Project Manger Mail Stop T-7-E18 Two White Flint North 11545 Rockville Pike Rockville MD 20852-2738 October 30, 2006  
{{#Wiki_filter:GE Infrastructure Energy, Nuclear David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 US NRC                                                      USA Document Control Desk                                        T 925 862 4434 Attn: John Buckley, Project Manger                          F 910 341 2577 davidw.turner@ge.com Mail Stop T-7-E18 Two White Flint North 11545 Rockville Pike Rockville MD 20852-2738 October 30, 2006


==SUBJECT:==
==SUBJECT:==
EQUIPMENT REMOVAL AT GE TEST REACTOR (GETR), LICENSE TR-1 (DOCKET 50-70)
EQUIPMENT REMOVAL AT   GE TEST REACTOR (GETR), LICENSE TR-1 (DOCKET 50-70)


==Dear Mr. Buckley:==
==Dear Mr. Buckley:==
As conveyed by our phone conversation earlier this month, GE Vallecitos is planning maintenance on a portion of the facility covered by the above mention license. This license is for 'possession only' of the GETR and associated facilities.
 
Various documents (starting with the "ENVIRONMENTAL ASSESSMENT AND NOTICE OF FINDING OF No SIGNIFICANT ENVIRONMENTAL IMPACT FOR LICENSE RENEWAL AND POSSESSION ONLY AMENDMENT" of January 29, 19861 associated with the TR-1 License allow 'decontamination testing and decommissioning training exercises' on equipment which 'could be removed, repaired, replaced or installed as part of "normal maintenance" under the operating license.'
As conveyed by our phone conversation earlier this month, GE Vallecitos is planning maintenance on a portion of the facility covered by the above mention license. This license is for 'possession only' of the GETR and associated facilities. Various documents (starting with the "ENVIRONMENTAL ASSESSMENT AND NOTICE OF FINDING OF No SIGNIFICANT ENVIRONMENTAL IMPACT FOR LICENSE RENEWAL AND POSSESSION ONLY AMENDMENT" of January 29, 19861 associated with the TR-1 License allow 'decontamination testing and decommissioning training exercises' on equipment which 'could be removed, repaired, replaced or installed as part of "normal maintenance" under the operating license.' This excludes any activity designed to restore capability for operating as a nuclear reactor. TR-1 Technical Specifications also address removal of components other than the reactor pressure vessel.
This excludes any activity designed to restore capability for operating as a nuclear reactor. TR-1 Technical Specifications also address removal of components other than the reactor pressure vessel.Recently, GE Vallecitos has been actively removing waste materials from the areas surrounding the GETR facility and our other possession only reactors.
Recently, GE Vallecitos has been actively removing waste materials from the areas surrounding the GETR facility and our other possession only reactors. We are now intending to move these activities into the facility covered by License TR-1, in keeping with the above allowance and restrictions. Specifically, we intend to undertake maintenance on the resin/filtering system outside of the reactor containment by removing the filter housings, associated piping, pumps and shielding.
We are now intending to move these activities into the facility covered by License TR-1, in keeping with the above allowance and restrictions.
General Electric Company
Specifically, we intend to undertake maintenance on the resin/filtering system outside of the reactor containment by removing the filter housings, associated piping, pumps and shielding.
 
General Electric Company Upon successful completion of this maintenance, GE may continue equipment removal in keeping with the TR-1 license. GE understands this to be fully allowed under our current license and is submitting this notification to better allow the NRC to provide oversight of our activities.
Upon successful completion of this maintenance, GE may continue equipment removal in keeping with the TR-1 license. GE understands this to be fully allowed under our current license and is submitting this notification to better allow the NRC to provide oversight of our activities.
If additional information is required, please contact me at the address above.Thank you, Digitally signed by David W. Turner Date: 2006.10.30Q 13:17:53 -08'00'David W. Turner Manager, Vallecitos Nuclear Center Page 2 of 2 DWT-2006-26 GETR maintenance}}
Ifadditional information is required, please contact me at the address above.
Thank you, Digitally signed by David W. Turner Date: 2006.10.30Q 13:17:53 -08'00' David W. Turner Manager, Vallecitos Nuclear Center Page 2 of 2                                                   DWT-2006-26 GETR maintenance}}

Latest revision as of 13:31, 23 November 2019

Letter Informing of Equipment Removal at GE Test Reactor
ML063050224
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 10/30/2006
From: Doreen Turner
General Electric Co
To: Buckley J
Document Control Desk, NRC/FSME
References
Download: ML063050224 (2)


Text

GE Infrastructure Energy, Nuclear David W. Turner Manager, Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 US NRC USA Document Control Desk T 925 862 4434 Attn: John Buckley, Project Manger F 910 341 2577 davidw.turner@ge.com Mail Stop T-7-E18 Two White Flint North 11545 Rockville Pike Rockville MD 20852-2738 October 30, 2006

SUBJECT:

EQUIPMENT REMOVAL AT GE TEST REACTOR (GETR), LICENSE TR-1 (DOCKET 50-70)

Dear Mr. Buckley:

As conveyed by our phone conversation earlier this month, GE Vallecitos is planning maintenance on a portion of the facility covered by the above mention license. This license is for 'possession only' of the GETR and associated facilities. Various documents (starting with the "ENVIRONMENTAL ASSESSMENT AND NOTICE OF FINDING OF No SIGNIFICANT ENVIRONMENTAL IMPACT FOR LICENSE RENEWAL AND POSSESSION ONLY AMENDMENT" of January 29, 19861 associated with the TR-1 License allow 'decontamination testing and decommissioning training exercises' on equipment which 'could be removed, repaired, replaced or installed as part of "normal maintenance" under the operating license.' This excludes any activity designed to restore capability for operating as a nuclear reactor. TR-1 Technical Specifications also address removal of components other than the reactor pressure vessel.

Recently, GE Vallecitos has been actively removing waste materials from the areas surrounding the GETR facility and our other possession only reactors. We are now intending to move these activities into the facility covered by License TR-1, in keeping with the above allowance and restrictions. Specifically, we intend to undertake maintenance on the resin/filtering system outside of the reactor containment by removing the filter housings, associated piping, pumps and shielding.

General Electric Company

Upon successful completion of this maintenance, GE may continue equipment removal in keeping with the TR-1 license. GE understands this to be fully allowed under our current license and is submitting this notification to better allow the NRC to provide oversight of our activities.

Ifadditional information is required, please contact me at the address above.

Thank you, Digitally signed by David W. Turner Date: 2006.10.30Q 13:17:53 -08'00' David W. Turner Manager, Vallecitos Nuclear Center Page 2 of 2 DWT-2006-26 GETR maintenance