{{#Wiki_filter:CONSOLIDATED EDISON COMPANY OF NEW YORK INDIAN POINT UNIT 1 DECOMMISSIONING PLAN January 20, 1999 L i Indian Point 1 History" Received Construction Permit -1956" Construction Started -1958" Commercial Operation  
{{#Wiki_filter:CONSOLIDATED EDISON COMPANY OF NEW YORK INDIAN POINT UNIT 1 DECOMMISSIONING PLAN i
-1962* Power Operation Suspended  
January 20, 1999                 L
-October 1974" Reactor Defueled -January 1976" Plant Retired -March 1980* Decommissioning Plan Submitted  
 
--October 1980* NRC Approved Plan -January 1996 Indian Point 1 Design Description i  
Indian Point 1 History
!,V/I, I I-ii M L`:LEAR I th. tw... t t~p.~ --~..'~ --L K-'v',
" Received Construction Permit - 1956
sftow Loov Secondary Loop Pressurizer L I..i.1-------  
" Construction Started - 1958
----i enrao Genertors TurbFne I mm'aa MBFP N:I ,i I~ Circulating Llqý Pwnp 11 1 -.1 7 Z 1 .1 1 : ý I , j Reactor Prlmary~WJ~LW Condensate PunV Tertiary Loop'i Indian Point 1 Decommissioning Option Chosen"SAFSTOR"* SAFSTOR: Those activities required to place and maintain a radioactive facility in such a condition that the risk to public safety is within acceptable bounds, and that the facility can be safely stored and subsequently decontaminated to levels which permit release of the facility for unrestricted use* Unit to be dismantled after Unit 2 has retired Indian Point 1 Current Status* Reactor Defueled and Fuel In the Fuel Handling Building* Superheaters and most secondary plant (turbine, generator, condensers) have been removed* Portions of plant retained to support Unit 2 operations (chemistry labs, radioactive waste processing, administrative offices, emergency response facilities) 4 Indian Point 1 Future Activities" When Decommissioning starts, all radioactive materials will be removed from the site" The site will be restored for unrestricted use" License Termination by NRC i}}
" Commercial Operation - 1962
* Power Operation Suspended - October 1974
" Reactor Defueled - January 1976
" Plant Retired - March 1980
* Decommissioning Plan Submitted - -October 1980
* NRC Approved Plan - January 1996
 
Indian Point 1 Design Description i
 
!,V /
I, I
I
        -ii
 
ML`:LEAR I
th.tw... t t~
p.~ -         -
        ~
              .. '~ -   -
L K
                          -'v',
 
sftow   Secondary Loov   Loop Pressurizer L I .. i.1-----------   i   enrao Genertors       TurbFne I mm'aa MBFP N
:I
                                              ,i                     I~
Llqý Circulating Pwnp 7Z 11 1 -.1 1.1 j 1:ýI,
                              ~WJ~LW Condensate PunV Reactor        Prlmary Tertiary Loop
                                                                                      'i
 
Indian Point 1 Decommissioning Option Chosen "SAFSTOR"
* SAFSTOR: Those activities required to place and maintain a radioactive facility in such a condition that the risk to public safety is within acceptable bounds, and that the facility can be safely stored and subsequently decontaminated to levels which permit release of the facility for unrestricted use
* Unit to be dismantled after Unit 2 has retired
 
Indian Point 1 Current Status
* Reactor Defueled and Fuel In the Fuel Handling Building
* Superheaters and most secondary plant (turbine, generator, condensers) have been removed
* Portions of plant retained to support Unit 2 operations (chemistry labs, radioactive waste processing, administrative offices, emergency response facilities)
 
4 Indian Point 1 Future Activities
  " When Decommissioning starts, all radioactive materials will be removed from the site
  " The site will be restored for unrestricted use
  " License Termination by NRC i}}

Latest revision as of 11:21, 23 November 2019

Presentation Handout Titled, Consolidated Edison Company for New York, Indian Point Unit 1 Decommissioning Plan
ML070190688
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/20/1999
From:
Office of Nuclear Reactor Regulation
To:
References
FOIA/PA-2007-0060
Download: ML070190688 (9)


Text

CONSOLIDATED EDISON COMPANY OF NEW YORK INDIAN POINT UNIT 1 DECOMMISSIONING PLAN i

January 20, 1999 L

Indian Point 1 History

" Received Construction Permit - 1956

" Construction Started - 1958

" Commercial Operation - 1962

  • Power Operation Suspended - October 1974

" Reactor Defueled - January 1976

" Plant Retired - March 1980

  • Decommissioning Plan Submitted - -October 1980
  • NRC Approved Plan - January 1996

Indian Point 1 Design Description i

!,V /

I, I

I

-ii

ML`:LEAR I

th.tw... t t~

p.~ - -

~

.. '~ - -

L K

-'v',

sftow Secondary Loov Loop Pressurizer L I .. i.1----------- i enrao Genertors TurbFne I mm'aa MBFP N

I

,i I~

Llqý Circulating Pwnp 7Z 11 1 -.1 1.1 j 1:ýI,

~WJ~LW Condensate PunV Reactor Prlmary Tertiary Loop

'i

Indian Point 1 Decommissioning Option Chosen "SAFSTOR"

  • SAFSTOR: Those activities required to place and maintain a radioactive facility in such a condition that the risk to public safety is within acceptable bounds, and that the facility can be safely stored and subsequently decontaminated to levels which permit release of the facility for unrestricted use
  • Unit to be dismantled after Unit 2 has retired

Indian Point 1 Current Status

  • Reactor Defueled and Fuel In the Fuel Handling Building
  • Superheaters and most secondary plant (turbine, generator, condensers) have been removed
  • Portions of plant retained to support Unit 2 operations (chemistry labs, radioactive waste processing, administrative offices, emergency response facilities)

4 Indian Point 1 Future Activities

" When Decommissioning starts, all radioactive materials will be removed from the site

" The site will be restored for unrestricted use

" License Termination by NRC i