ML103080005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML103080005
| number = ML103080005
| issue date = 11/04/2010
| issue date = 11/04/2010
| title = Waterford-2010-10-Draft Operating Test Comments
| title = 2010-10-Draft Operating Test Comments
| author name = Apger G W
| author name = Apger G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Attachment 10 Page 1 of 3 OBDI 202 - IOLE Process WT-2010-10 DRAFT OPERATING TEST COMMENTS ADMIN JPMS JPM# 6. Explanation (See below for instructions) SRO (A5) See markups on draft submittal.
{{#Wiki_filter:WT-2010-10                                                                 DRAFT OPERATING TEST COMMENTS                                                               ADMIN JPMS 6.
SRO (A6) See markups on draft submittal.
JPM#                                                                                         Explanation (See below for instructions)
SRO (A7) See markups on draft submittal.
SRO (A5) See markups on draft submittal.
SRO (A8) See markups on draft submittal.
SRO (A6) See markups on draft submittal.                     *** ALL COMMENTS WERE RESOLVED DURING and SRO (A7) See markups on draft submittal.                     FOLLOWING OPTEST VALIDATION ****
MARKUPS ATTACHED AT END SRO (A8) See markups on draft submittal.
SRO (A9) See markups on draft submittal.
SRO (A9) See markups on draft submittal.
Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Exam ination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.  
Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconf iguration or realignment. 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level fo r the license being tested. 3. Check the appropriate box when an attribute weakness is identified:  The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin. The JPM does not contain sufficient c ues that are objective (not leading). All critical steps (elements) have not been properly identified. Scope of the task is either too narrow (N) or too broad (B). Excessive overlap with other part of operating test or wr itten examination. 4. Check the appropriate box when a job content error is identified:  Topics not linked to job content (e.g., di sguised task, not required in real job). Task is trivial and without safety significance. 5. Based on the reviewer
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
=s judgment, is the JPM as written (U)na cceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory? 6. Provide a brief description of any U or E rating in the explanation column. 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
: 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
Attachment 10 Page 2 of 3 OBDI 202 - IOLE Process WT-2010-10 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN-PLANT SYSTEMS JPMS JPM# 6. Explanation (See below for instructions) S1 One minor edit of JPM cue sheet. Also move this sheet to the end of the JPM. S2 See markups on draft submittal. S3 See markups on draft submittal. S4 See markups on draft submittal. S5 See markups on draft submittal. S6 See markups on draft submittal. S7 See markups on draft submittal. GENERIC COMMENT:  Need examiner cues for in-plants. P1 See markups on draft submittal. P2 See markups on draft submittal. Have another JPM for FPC system as indicated on the JPM markup. P3 See markups on draft submittal. Examiner cues can be inferred from standards. No separate cues needed.
: 3. Check the appropriate box when an attribute weakness is identified:
Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Exam ination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.  
* The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconf iguration or realignment. 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level fo r the license being tested. 3. Check the appropriate box when an attribute weakness is identified:  
* The JPM does not contain sufficient cues that are objective (not leading).
$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.  
* All critical steps (elements) have not been properly identified.
$ The JPM does not contain sufficient c ues that are objective (not leading).  
* Scope of the task is either too narrow (N) or too broad (B).
$ All critical steps (elements) have not been properly identified.  
* Excessive overlap with other part of operating test or written examination.
$ Scope of the task is either too narrow (N) or too broad (B).  
: 4. Check the appropriate box when a job content error is identified:
$ Excessive overlap with other part of operating test or wr itten examination. 4. Check the appropriate box when a job content error is identified: Topics not linked to job content (e.g., di sguised task, not required in real job). Task is trivial and without safety significance. 5. Based on the reviewer
* Topics not linked to job content (e.g., disguised task, not required in real job).
=s judgment, is the JPM as written (U)na cceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory? 6. Provide a brief description of any U or E rating in the explanation column. 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
* Task is trivial and without safety significance.
Attachment 10 Page 3 of 3 OBDI 202 - IOLE Process WT-2010-10 DRAFT OPERATING TEST COMMENTS SCENARIOS Scenario Set 10. Explanation (See below for instructions) 1 See markups on draft submittal. Minor edits. 2 Minimal scenario that may be the ba ckup. See markups on draft submittal. Minor edits on page 10 of 16 on D2. 3 No Comments Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Ex amination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the iss ue in the space provided. 1. ES: ES-301 checklists 4, 5, & 6 satisfied.
: 5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
: 2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed. 3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2. 4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scen ario events and actions. 5. Pred: Scenario sequence and other factors avoid predictability issues. 6. TL: Time line constructed, including ev ent and process triggered conditions, such t hat scenario can run without routine exam iner cuing. 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably sim ilar exposure and events are needed for evaluation purposes. 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interact ions. 9. Based on the reviewer
: 6. Provide a brief description of any U or E rating in the explanation column.
=s judgment, rate the scenario set as (U)nacceptable (requiring r epair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory. 10. Provide a brief description of problem in the explanation column. 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0                                                                            Page 1 of 3                                                   OBDI 202 - IOLE Process


Waterford 3 2010 NRC SRO Exam
WT-2010-10                                                                DRAFT OPERATING TEST COMMENTS                            CONTROL ROOM/IN-PLANT SYSTEMS JPMS 6.
JPM#                                                                                        Explanation (See below for instructions)
S1      One minor edit of JPM cue sheet. Also move this sheet to the end of the JPM.
S2      See markups on draft submittal.
S3      See markups on draft submittal.
S4      See markups on draft submittal.
S5      See markups on draft submittal.
S6      See markups on draft submittal.
S7      See markups on draft submittal.
GENERIC COMMENT: Need examiner cues for in-plants.
P1      See markups on draft submittal.
P2      See markups on draft submittal. Have another JPM for FPC system as indicated on the JPM markup.
P3      See markups on draft submittal. Examiner cues can be inferred from standards. No separate cues needed.
Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
: 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
: 3. Check the appropriate box when an attribute weakness is identified:
        $ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
        $ The JPM does not contain sufficient cues that are objective (not leading).
        $ All critical steps (elements) have not been properly identified.
        $ Scope of the task is either too narrow (N) or too broad (B).
        $ Excessive overlap with other part of operating test or written examination.
: 4. Check the appropriate box when a job content error is identified:
* Topics not linked to job content (e.g., disguised task, not required in real job).
* Task is trivial and without safety significance.
: 5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
: 6. Provide a brief description of any U or E rating in the explanation column.
: 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0                                                                          Page 2 of 3                                                  OBDI 202 - IOLE Process


JOB PERFORMANCE MEASURE
WT-2010-10                                                            DRAFT OPERATING TEST COMMENTS                                                                SCENARIOS Scenario
: 10. Explanation (See below for instructions)
Set 1      See markups on draft submittal. Minor edits.
2      Minimal scenario that may be the backup. See markups on draft submittal. Minor edits on page 10 of 16 on D2.
3      No Comments Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
: 1. ES: ES-301 checklists 4, 5, & 6 satisfied.
: 2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
: 3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2.
: 4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions.
: 5. Pred: Scenario sequence and other factors avoid predictability issues.
: 6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
: 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
: 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions.
: 9. Based on the reviewer=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
: 10. Provide a brief description of problem in the explanation column.
: 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0                                                                      Page 3 of 3                                                  OBDI 202 - IOLE Process


A1 Review Completed Surveillance for Approval EXAMINER REVIEW COMMENTS IN RED
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A1 Review Completed Surveillance for Approval EXAMINER REVIEW COMMENTS IN RED Applicant:
Examiner:


Applicant: 
JPM A1 JOB PERFORMANCE MEASURE DATA PAGE Task:               Review and approve surveillance OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check.
 
Task Standard:     Applicants review discovered three errors as identified in the key.,
Examiner: 
and Applicant also the applicant correctly evaluated Tech Specs in accordance with as identified in the key.
 
JPM A1 Revision 0 Page 2 of 6 2010 NRC SRO Exam  JOB PERFORMANCE MEASURE DATA PAGE Task: Review and approve surveill ance OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check.
Task Standard:
Applicant's review discovered three error s as identified in the key
., and Applicant also the applicant correctly evaluated Tech Specs in accordance with as identified in the key.


==References:==
==References:==
OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check Time Critical: No Validation Time:15 mins.  
OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check Time Critical:       No       Validation Time:     15 mins.
 
K/A     2.1.23, Ability to perform specific system and     Importance Rating       4.4 integrated plant procedures during all modes of plant operation.
K/A 2.1.23, Ability to perform specific system and Importance Rating 4.4 integrated plant procedures during all modes of plant operation.
Applicant:
 
Time Start:                                   Time Finish:
Applicant:
Performance Time:                              minutes Performance Rating:              SAT                  UNSAT Comments:
 
Examiner:                                                        Date:
Time Start:   Time Finish:
Signature Revision 0                                  Page 2 of 6                    2010 NRC SRO Exam


Performance Time:  minutes
JPM A1 Revision 0 Page 3 of 6 2010 NRC SRO Exam


Performance Rating: SAT UNSAT Comments: 
JPM A1 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check
Examiner:  Date:  Signature JPM A1 Revision 0 Page 3 of 6 2010 NRC SRO Exam
 
JPM A1  Revision 0 Page 4 of 6 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check


==
==
Description:==
Description:==


This JPM is performed in the simulator, but use of the simulator is not required. The applicant will be given a completed OP-903-117, Attachment 1 for EDG Fuel Oil Transfer Pump A. The key identifies indicates the error s that the applicant must identify. One of the error s will make EDG Fuel Oil Transfer Pump A inoperable. The applicant will be required to identify the correct Tech Spec.  
This JPM is performed in the simulator, but use of the simulator is not required. The applicant will be given a completed OP-903-117, Attachment 1 for EDG Fuel Oil Transfer Pump A. The key identifies indicates the errors that the applicant must identify. One of the errors will make EDG Fuel Oil Transfer Pump A inoperable. The applicant will be required to identify the correct Tech Spec.
READ TO APPLICANT DIRECTION TO APPLICANT:
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.
Provide all answers on the sheets provided.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                Page 4 of 6                  2010 NRC SRO Exam


READ TO APPLICANT
JPM A1 TASK ELEMENT 1                                     STANDARD The following errors must be identified:
 
DIRECTION TO APPLICANT:
 
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any
 
other JPM. If you have any questions, raise your hand and I will come to your desk.
 
Provide all answers on the sheets provided.
 
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
 
JPM A1 Revision 0 Page 5 of 6 2010 NRC SRO Exam TASK ELEMENT 1 STANDARD Review Attachment 10.1 for accuracy.
The following errors must be identified:
* The vibration meter and probe are past their calibration dates.
* The vibration meter and probe are past their calibration dates.
* Pump differential pressure was calculated incorrectly.
* Pump differential pressure was calculated incorrectly.
The corrected pressure is below the low limit of 70.7  
Review Attachment 10.1 for accuracy.      The corrected pressure is below the low limit of 70.7 PSID.
 
* The flow calculation for EGF-109 A, Fuel Oil Transfer Pump A Discharge Check, was performed incorrectly.
PSID.
* The flow calculation for EGF-109 A, Fuel Oil Transfer Pump A Discharge Check, was performed incorrectly.
 
The corrected flow is greater than the required 30 gpm.
The corrected flow is greater than the required 30 gpm.
Comment:   Critical SAT / UNSAT TASK ELEMENT 2 STANDARD Determine applicable Tech Spec
Comment:                                                         Critical SAT / UNSAT TASK ELEMENT 2                                     STANDARD Tech Spec 3.8.1.1 b and d must be entered.
 
associated with EDG Fuel Oil Transfer
 
Pump A being inoperable.
Tech Spec 3.8.1.1 b and d must be entered.
Actions include:
Actions include:
* Restore EDG A within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD  
* Restore EDG A within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
 
* Restoration within 72 hours may be extended to 10 days if a temporary emergency diesel generator is verified Determine applicable Tech Spec            available.
SHUTDOWN within the following 30 hours.
associated with EDG Fuel Oil Transfer
* Restoration within 72 hours may be extended to 10 days if a temporary emergency diesel generator is verified  
* Complete OP-903-066, Electrical Breaker Alignment Pump A being inoperable.                  Check, within 1 hour, and at least every 8 hours thereafter.
 
available.
* Complete OP-903-066, Electrical Breaker Alignment Check, within 1 hour, and at least every 8 hours  
 
thereafter.
The following must be satisfied within 2 hours:
The following must be satisfied within 2 hours:
* All required systems, subsystems, trains, components, and devices that depend on the remaining OPERABLE  
* All required systems, subsystems, trains, components, and devices that depend on the remaining OPERABLE diesel generator as a source of emergency power must be OPERABLE
 
diesel generator as a source of emergency power must  
 
be OPERABLE
* Emergency Feedwater Pump AB must be OPERABLE.
* Emergency Feedwater Pump AB must be OPERABLE.
Comment:   Critical SAT / UNSAT END OF TASK  
Comment:                                                         Critical SAT / UNSAT END OF TASK Revision 0                                Page 5 of 6                            2010 NRC SRO Exam


JPM A1 Revision 0 Page 6 of 6 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
JPM A1 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* Emergency Diesel Generator A Fuel Oil Transfer Pump IST has been completed in accordance with OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check.
* The completed attachment for the surveillance has been reviewed and is ready for SM/CRS review.
INITIATING CUES:
* Review the provided surveillancethe attachment. Mark and provide any comments on this sheet.
Revision 0                              Page 6 of 6                  2010 NRC SRO Exam


INITIAL CONDITIONS:
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A2 Review COLSS Constant Calculation in accordance with OP-004-005, Core Operating Limits Supervisory System Operation Applicant:
 
Examiner:
Emergency Diesel Generator A Fuel O il Transfer Pump IST has been completed in accordance with OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check. The completed attachment for the surveillance has been reviewed and is ready for SM/CRS review.
EXAMINER REVIEW COMMENTS IN RED
 
INITIATING CUES:  
 
Review the provided surveillance the attachment. Mark and provide any comments on this sheet
.
Waterford 3 2010 NRC SRO Exam


JOB PERFORMANCE MEASURE
JPM A2 JOB PERFORMANCE MEASURE DATA PAGE Task:               Review COLSS constant calculation in accordance with OP-004-005, Core Operating Limits Supervisory System Operation Task Standard:     Applicant identified errors as identified in the key for Attachment 11.6, Calculation of Charging and Letdown Parameters.
 
A2 Review COLSS Constant Calculation in accordance with OP-004-005, Core Operating Limits Supervisory System Operation
 
Applicant: 
 
Examiner:
EXAMINER REVIEW COMMENTS IN RED JPM A2 Revision 0 Page 2 of 7 2010 NRC SRO Exam  JOB PERFORMANCE MEASURE DATA PAGE Task: Review COLSS constant calcul ation in accordance with OP-004-005, Core Operating Limits Supervisory System Operation Task Standard: Applicant identified errors as identified in the key for Attachment 11.6, Calculation of Charging and Letdown Parameters.  


==References:==
==References:==
OP-004-005, Core Operating Limits Supervisory System Operation Time Critical: No Validation Time:15 mins.
OP-004-005, Core Operating Limits Supervisory System Operation Time Critical:       No       Validation Time:     15   mins.
K/A 2.1.20, Ability to interpret and execute. Importance Rating 3.0 4.6 procedure steps Change 301-1       Applicant:
K/A     2.1.20, Ability to interpret and execute.           Importance Rating       3.04.6 Change procedure steps 301-1 Applicant:
Time Start:                                  Time Finish:
Performance Time:                              minutes Performance Rating:                SAT                UNSAT Comments:
Examiner:                                                            Date:
Signature Revision 0                                  Page 2 of 7                      2010 NRC SRO Exam


Time Start:  Time Finish: 
JPM A2 Revision 0 Page 3 of 7 2010 NRC SRO Exam


Performance Time:  minutes
JPM A2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
Simulator / Plant Monitoring Computer OP-004-005, Core Operating Limits Supervisory System Operation
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature JPM A2  Revision 0 Page 3 of 7 2010 NRC SRO Exam
 
JPM A2 Revision 0 Page 4 of 7 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
Simulator / Plant Monitoring Computer OP-004-005, Core Operating Limits Supervisory System Operation  


==
==
Description:==
Description:==


This JPM is performed in the simulator and use of the Plant Monitoring Computer is required. The applicant will be given a co mpleted OP-004-005, Attachment 11.6 for COLSS Charging and Letdown Constants. The ke y identifies errors that the applicant must identify. There will be a combinati on of data collection and procedure execution errors.  
This JPM is performed in the simulator and use of the Plant Monitoring Computer is required. The applicant will be given a completed OP-004-005, Attachment 11.6 for COLSS Charging and Letdown Constants. The key identifies errors that the applicant must identify. There will be a combination of data collection and procedure execution errors.
READ TO APPLICANT DIRECTION TO APPLICANT:
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.
Provide all answers on the sheets provided.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                              Page 4 of 7                    2010 NRC SRO Exam


READ TO APPLICANT
JPM A2 Evaluator Note Provide the completed Attachment 11.6 on colored paper to the applicant.
 
TASK ELEMENT 1                                         STANDARD The following errors must be identified:
DIRECTION TO APPLICANT:
 
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any
 
other JPM. If you have any questions, raise your hand and I will come to your desk.
 
Provide all answers on the sheets provided.
 
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
 
JPM A2 Revision 0 Page 5 of 7 2010 NRC SRO Exam Evaluator Note Provide the completed Attachment 11.6 on colored paper to the applicant.
TASK ELEMENT 1 STANDARD Review Attachment 11.6 for accuracy.
The following errors must be identified:
* The data collected for PMC point A39103 was incorrect.
* The data collected for PMC point A39103 was incorrect.
307.0 °F from point A39104 was recorded vice 354.38  
307.0 °F from point A39104 was recorded vice 354.38
 
                                            °F. This affects the value of step 11.6.2.1. The correct value for step 11.6.2.1 is 329.0484.
°F. This affects the value of step 11.6.2.1. The correct  
Review Attachment 11.6 for accuracy.
 
* Step 11.6.2.2 was calculated incorrectly. The parentheses were not used properly when the calculation was performed. The correct value for step 11.6.2.2 is 43705.72.
value for step 11.6.2.1 is 329.0484.
* Step 11.6.2.4 was calculated incorrectly. The value 0.000031 was entered with too few characters. The correct value for step 11.6.2.4 is 0.021127.
* Step 11.6.2.2 was calculated incorrectly. The parentheses were not used properly when the  
Comment:                                                             Critical SAT / UNSAT END OF TASK Revision 0                                   Page 5 of 7                             2010 NRC SRO Exam
 
calculation was performed. The correct value for step  
 
11.6.2.2 is 43705.72.
* Step 11.6.2.4 was calculated incorrectly. The value 0.000031 was entered with too few characters. The  
 
correct value for step 11.6.2.4 is 0.021127.
Comment:   Critical SAT / UNSAT  
 
END OF TASK  
 
JPM A2  Revision 0 Page 6 of 7 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
Plant conditions are as you see on the Simula tor. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable.
You are not allowed to use any network computers. 
 
Plant configuration was changed from 1 Char ging Pump running to 2 Charging Pumps running.
 
You are the CRS and have been given a comple ted Attachment 11.6, Calculation of Charging and Letdown Parameters, from OP-004-005, Core Operating Limits Supervisory System Operation, to review.
 
Perform this review and mark any comments on this sheet.
 
JPM A2  Revision 0 Page 7 of 7 2010 NRC SRO Exam Place this page before the JPM CUE sheet so that the page count does not confuse the applicant.
SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-190
 
After all simulator generated alarms are clear, place the simulator in FREEZE.


Verify the parameters on the PMC match the values on the key.  
JPM A2 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Plant conditions are as you see on the Simulator. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable. You are not allowed to use any network computers.
Plant configuration was changed from 1 Charging Pump running to 2 Charging Pumps running.
You are the CRS and have been given a completed Attachment 11.6, Calculation of Charging and Letdown Parameters, from OP-004-005, Core Operating Limits Supervisory System Operation, to review.
Perform this review and mark any comments on this sheet.
Revision 0                            Page 6 of 7                    2010 NRC SRO Exam


Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE
JPM A2 Place this page before the JPM CUE sheet so that the page count does not confuse the applicant.
 
SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-190 After all simulator generated alarms are clear, place the simulator in FREEZE.
A3 Evaluate Low Pressure Safety Injection Train B Operability
Verify the parameters on the PMC match the values on the key.
 
Revision 0                              Page 7 of 7                      2010 NRC SRO Exam
Applicant: 


Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A3 Evaluate Low Pressure Safety Injection Train B Operability Applicant:
Examiner:
Examiner:
EXAMINER REVIEW COMMENTS IN RED
EXAMINER REVIEW COMMENTS IN RED


JPM A3 Revision 0 Page 2 of 5 2010 NRC Walk Through Exam  JOB PERFORMANCE MEASURE DATA PAGE Task: Evaluate the operability of Low Pr essure Safety Injection Train B during the performance of OP-903-026, Emergency Core Cooling System Valve Lineup Verification.
JPM A3 JOB PERFORMANCE MEASURE DATA PAGE Task:               Evaluate the operability of Low Pressure Safety Injection Train B during the performance of OP-903-026, Emergency Core Cooling System Valve Lineup Verification.
Task Standard: Applicant determined the total gas volume for each of the 2 penetrations and determined that L PSI Train B became inoperable after the void was discovered at SI-134 B.  
Task Standard:       Applicant determined the total gas volume for each of the 2 penetrations and determined that LPSI Train B became inoperable after the void was discovered at SI-134 B.


==References:==
==References:==
OP-903-026, Emergency Co re Cooling System Valve Lineup Verification Time Critical: No Validation Time:20 mins.  
OP-903-026, Emergency Core Cooling System Valve Lineup Verification Time Critical:       No       Validation Time:     20 mins.
 
K/A     2.2.40, Ability to apply Technical                 Importance Rating         4.7 Specifications for a system Applicant:
K/A 2.2.40, Ability to apply Technical   Importance Rating 4.7 Specifications for a system Applicant:
Time Start:                                 Time Finish:
 
Performance Time:                             minutes Performance Rating:               SAT                 UNSAT Comments:
Time Start:   Time Finish:
Examiner:                                                       Date:
 
Signature Revision 0                                 Page 2 of 5             2010 NRC Walk Through Exam
Performance Time: minutes  
 
Performance Rating: SAT UNSAT Comments:
 
Examiner:   Date:   Signature  
 
JPM A3  Revision 0 Page 3 of 5 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:


OP-903-026, Emergency Core Cooling System Valve Lineup Verification  
JPM A3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
OP-903-026, Emergency Core Cooling System Valve Lineup Verification


==
==
Description:==
Description:==


This JPM is performed in the simulator, but use of the simulator is not required. The applicant will be provided information describing the results of surveillance OP-903-026, Emergency Core Cooling System Valve Lineup Verification. He , and will be required to evaluate void size and location to determine what the total gas volume was in the 2 locations of importance
This JPM is performed in the simulator, but use of the simulator is not required. The applicant will be provided information describing the results of surveillance OP-903-026, Emergency Core Cooling System Valve Lineup Verification. He, and will be required to evaluate void size and location to determine what the total gas volume was in the 2 locations of importance. The applicant will also be required to determine when in the testing sequence Low Pressure Safety Injection Train B became inoperable.
. The applicant will also be required to determine when in the testing sequence Low Pressure Safety Injection Train B became inoperable.  
READ TO APPLICANT DIRECTION TO APPLICANT:
 
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.
READ TO APPLICANT  
Provide all answers on the sheets provided.
 
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
DIRECTION TO APPLICANT:  
Revision 0                             Page 3 of 5                       2010 NRC SRO Exam
 
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any  
 
other JPM. If you have any questions, raise your hand and I will come to your desk.  
 
Provide all answers on the sheets provided.  
 
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.  
 
JPM A3  Revision 0 Page 4 of 5 2010 NRC SRO Exam Evaluator Note The simulator is not required for this JPM. Provide the applicant with the colored cue sheet.
TASK ELEMENT 1 STANDARD A. What was the total gas volume applicable to each of the 2 penetrations?
Penetration 36, for SI-1412 B and SI-133 B = 1.71 ft 3 Penetration 37, for SI-1402 B and SI-134 B = 1.459 ft 3  Comment:  Critical SAT  /  UNSAT TASK ELEMENT 2 STANDARD B. At what point in the sequence did Low Pressure Safety Injection Train B become


JPM A3 Evaluator Note The simulator is not required for this JPM. Provide the applicant with the colored cue sheet.
TASK ELEMENT 1                                            STANDARD Penetration 36, for SI-1412 B and SI-133 B = 1.71 ft3 A.      What was the total gas volume applicable to each of the 2 penetrations?                                Penetration 37, for SI-1402 B and SI-134 B = 1.459 ft3 Comment:                                                                          Critical SAT / UNSAT TASK ELEMENT 2                                            STANDARD B.      At what point in the sequence did Low After the void was discovered Pressure Safety Injection Train B become at SI-134 B.
inoperable, if any?
inoperable, if any?
After the void was discovered at SI-134 B.
Comment:                                                                           Critical Low Pressure Safety Injection Train B remained                                 SAT / UNSAT operable after SI-1412 B, SI-1402 B and SI-133 B voids were discovered. Low Pressure Safety Injection Train B was required to be declared inoperable after the void was discovered at SI-134 B.
Comment: Low Pressure Safety Injection Train B remained operable after SI-1412 B, SI-1402 B and SI-133 B voids were discovered. Low Pressure Safety  
After step 3 of the listed sequence, the total gas volume for SI-1412 B and SI-133 B was 1.71 ft3, less than the limit of 1.802 ft3 for that penetration.
 
After step 4 of the above sequence, the total gas volume for SI-1402 B and SI-134 B was 1.459 ft3, above the limit of 1.229 ft3 for that penetration.
Injection Train B was required to be declared  
END OF TASK Revision 0                                     Page 4 of 5                             2010 NRC SRO Exam
 
inoperable after the void was discovered at SI-134 B.
After step 3 of the listed sequence, the total gas volume for SI-1412 B and SI-133 B was 1.71 ft 3 , less than the limit of 1.802 ft 3 for that penetration.
After step 4 of the above sequence, the total gas volume for SI-1402 B and SI-134 B was 1.459 ft 3 , above the limit of 1.229 ft 3 for that penetration.
Critical SAT  /  UNSAT END OF TASK  
 
JPM A3  Revision 0 Page 5 of 5 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
OP-903-026, Emergency Core Cooling System Va lve Lineup Verification, is in progress.
The RCA Watch has discovered voids duri ng the performance of the surveillance.
After each void was discovered, actions were taken to fill that line before moving to the next location. The RCA Watch called in t he following results in the order listed:
: 1. SI-1412 B, RC Loop 1A FCV Downstream Vent    9 inch arc 2. SI-1402 B, LPSI Header to RC Loop 1B FCV Downstream Vent  8 inch arc 3. SI-133 B, LPSI Pump B Discharge to RC Loop 2B Vent  10 inch arc 4. SI-134 B, RC Loop 1 SHDN Cooling Warm-up Line Vent  7 inch arc
 
A. What was the total gas volume applicable to each of the 2 penetrations?
 
B. At what point in the sequence did Low Pr essure Safety Injection Train B become inoperable, if any?


JPM A3 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
OP-903-026, Emergency Core Cooling System Valve Lineup Verification, is in progress.
The RCA Watch has discovered voids during the performance of the surveillance.
After each void was discovered, actions were taken to fill that line before moving to the next location. The RCA Watch called in the following results in the order listed:
: 1. SI-1412 B, RC Loop 1A FCV Downstream Vent                                9 inch arc
: 2. SI-1402 B, LPSI Header to RC Loop 1B FCV Downstream Vent                8 inch arc
: 3. SI-133 B, LPSI Pump B Discharge to RC Loop 2B Vent                      10 inch arc
: 4. SI-134 B, RC Loop 1 SHDN Cooling Warm-up Line Vent                      7 inch arc A.      What was the total gas volume applicable to each of the 2 penetrations?
B.      At what point in the sequence did Low Pressure Safety Injection Train B become inoperable, if any?
Record answers on this sheet.
Record answers on this sheet.
A.
A.
 
B.
B.
Revision 0                              Page 5 of 5                      2010 NRC SRO Exam
 
Waterford 3 2010 NRC SRO Exam  
 
JOB PERFORMANCE MEASURE
 
A4 Review a Liquid Release Permit
 
Applicant: 


Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A4 Review a Liquid Release Permit Applicant:
Examiner:
Examiner:
EXAMINER REVIEW COMMENTS IN RED
EXAMINER REVIEW COMMENTS IN RED


JPM A4 Revision 0 Page 2 of 6 2010 NRC SRO Exam  JOB PERFORMANCE MEASURE DATA PAGE Task: Review and approve a liquid release permit in accordance with OP-007-001, Boron Management.
JPM A4 JOB PERFORMANCE MEASURE DATA PAGE Task:                 Review and approve a liquid release permit in accordance with OP-007-001, Boron Management.
Task Standard:
Task Standard:       Applicant identified errors in the permit according to the key.
Applicant identified error s in the permit according to the key.  


==References:==
==References:==
OP-007-001, Boron Management CE-003-514, Liquid Radioactive Release Permit  
OP-007-001, Boron Management CE-003-514, Liquid Radioactive Release Permit EC-M84-001 Time Critical:      No        Validation Time:      20  mins.
K/A      2.3.6, Ability to approve release permits            Importance Rating        3.8 Applicant:
Time Start:                                  Time Finish:
Performance Time:                                minutes Performance Rating:              SAT                  UNSAT Comments:
Examiner:                                                            Date:
Signature Revision 0                                  Page 2 of 6                      2010 NRC SRO Exam


EC-M84-001 Time Critical: No Validation Time:20 mins.
JPM A4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-007-001, Boron Management EC-M84-001
K/A 2.3.6, Ability to approve release permits  Importance Rating 3.8            Applicant: 
 
Time Start:  Time Finish: 
 
Performance Time:  minutes
 
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature   
 
JPM A4 Revision 0 Page 3 of 6 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-007-001, Boron Management EC-M84-001  


==
==
Description:==
Description:==


This JPM is performed in the simulator and use of the Plant Monitoring Computer and the RM-11 Radiation Monitoring Computer is required. The applicant will be given a release permit for Boric Acid Condensate Tank B to authorize. The key identifies errors that the applicant must identif
This JPM is performed in the simulator and use of the Plant Monitoring Computer and the RM-11 Radiation Monitoring Computer is required. The applicant will be given a release permit for Boric Acid Condensate Tank B to authorize. The key identifies errors that the applicant must identify. There will be a combination of data collection errors from both the PMC and RM-11. There are also plant conditions that are not properly reflected in the permit. The applicant will be able to gather this information from the control panel alignment.
: y. There will be a combination of data collection errors from both the PMC and RM-11.
READ TO APPLICANT DIRECTION TO APPLICANT:
There are also plant conditi ons that are not properly reflected in the permit. The applicant will be able to gather this information from the  
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.
 
Provide all answers on the sheets provided.
control panel alignment.  
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
 
Revision 0                             Page 3 of 6                       2010 NRC SRO Exam
READ TO APPLICANT  
 
DIRECTION TO APPLICANT:  
 
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any  
 
other JPM. If you have any questions, raise your hand and I will come to your desk.  
 
Provide all answers on the sheets provided.  
 
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.  
 
JPM A4  Revision 0 Page 4 of 6 2010 NRC SRO Exam Evaluator Note Provide the Boric Acid Condensate Tank B Release Permit, printed on colored paper, to the applicant.
TASK ELEMENT 1 STANDARD Review the Boric Acid Condensate Tank
 
B Release Permit for accuracy.
The 3 All of the [space] following errors must be identified:
* The data collected for Boric Acid Condensate Tank B was incorrect. The level for Waste Condensate Tank B
 
was recorded instead. The tank percent and tank
 
volume in gallons reflect the level in Waste Condensate
 
Tank B.
* The permit list that 4 Circulating Water Pumps are running, but only 3 are running.
* The setpoint for the Boric Acid Condensate Radiation Monitor is reading 8.0 e-02 uCi/ml vice 6.50 e-01. This
 
reading must be verified from the RM-11 computer.
* The Boric Acid Condensate Radiation Monitor is listed as PRM-IRE-0647 on various locations of the permit. 


JPM A4 Evaluator Note Provide the Boric Acid Condensate Tank B Release Permit, printed on colored paper, to the applicant.
TASK ELEMENT 1                                        STANDARD The 3All of the [space] following errors must be identified:
* The data collected for Boric Acid Condensate Tank B was incorrect. The level for Waste Condensate Tank B was recorded instead. The tank percent and tank volume in gallons reflect the level in Waste Condensate Tank B.
Review the Boric Acid Condensate Tank
* The permit list that 4 Circulating Water Pumps are B Release Permit for accuracy.              running, but only 3 are running.
* The setpoint for the Boric Acid Condensate Radiation Monitor is reading 8.0 e-02 uCi/ml vice 6.50 e-01. This reading must be verified from the RM-11 computer.
* The Boric Acid Condensate Radiation Monitor is listed as PRM-IRE-0647 on various locations of the permit.
The correct UNID number is PRM-IRE-0627.
The correct UNID number is PRM-IRE-0627.
Comment:   Critical SAT / UNSAT END OF TASK  
Comment:                                                           Critical SAT / UNSAT END OF TASK Revision 0                                  Page 4 of 6                            2010 NRC SRO Exam


JPM A4 Revision 0 Page 5 of 6 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
JPM A4 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
Plant conditions are as you see on the Simulator. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable. You are not allowed to use any network computers.
Plant conditions are as you see on the Simula tor. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable.
Boric Acid Condensate Tank B is ready to be released and the Release Permit is in the Control Room for your review.
You are not allowed to use any network computers.
Perform this reviewReview the Release Permit and mark provide any comments on this sheet.
 
Revision 0                             Page 5 of 6                     2010 NRC SRO Exam
Boric Acid Condensate Tank B is ready to be released and the Release Permit is in the  
 
Control Room for your review.  
 
Perform this reviewReview the Release Permit and mark provide any comments on this sheet.  
 
JPM A4  Revision 0 Page 6 of 6 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS
 
Reset to IC-190
 
After all simulator generated alarms are clear, place the simulator in FREEZE.
 
Verify the parameters on the PMC and R M-11 match the values on the key.


JPM A4 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-190 After all simulator generated alarms are clear, place the simulator in FREEZE.
Verify the parameters on the PMC and RM-11 match the values on the key.
PLACE THIS SHEET BEFORE THE APPLICANT CUE SHEET TO PREVENT PAGE SEQUENCE CONFUSION.
PLACE THIS SHEET BEFORE THE APPLICANT CUE SHEET TO PREVENT PAGE SEQUENCE CONFUSION.
Revision 0                              Page 6 of 6                      2010 NRC SRO Exam


Waterford 3 2010 NRC SRO Exam  
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A5 Classify Emergency Plan Entry Level Applicant:
 
JOB PERFORMANCE MEASURE  
 
A5 Classify Emergency Plan Entry Level
 
Applicant:
 
Examiner:
Examiner:
EXAMINER REVIEW COMMENTS IN RED.
EXAMINER REVIEW COMMENTS IN RED.


JPM A5 Revision 0 Page 2 of 6 2010 NRC SRO Exam  JOB PERFORMANCE MEASURE DATA PAGE Task: Classify Emergency Plan Entry Level  
JPM A5 JOB PERFORMANCE MEASURE DATA PAGE Task:               Classify Emergency Plan Entry Level Task Standard:       Applicant determined correct Emergency Plan class and initiating condition.
 
Task Standard: Applicant determined corre ct Emergency Plan class and initiating condition.  


==References:==
==References:==
EP-001-001 Recognition and Classification of Emergency Conditions Time Critical: No Validation Time:15 mins.  
EP-001-001 Recognition and Classification of Emergency Conditions Time Critical:     No       Validation Time:     15 mins.
 
K/A     2.4.41, Knowledge of the emergency action         Importance Rating     4.6 level thresholds and classifications.
K/A 2.4.41, Knowledge of the emergency action   Importance Rating 4.6 level thresholds and classifications.
Applicant:
Applicant:
Time Start:                                 Time Finish:
 
Performance Time:                             minutes Performance Rating:             SAT                 UNSAT Comments:
Time Start:   Time Finish:
Examiner:                                                       Date:
 
Signature Revision 0                                Page 2 of 6                  2010 NRC SRO Exam
Performance Time: minutes  
 
Performance Rating: SAT UNSAT Comments:
 
Examiner:   Date:   Signature  


JPM A5 Revision 0 Page 3 of 6 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
JPM A5 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
EP-001-001 Recognition and Classification of Emergency Conditions
EP-001-001 Recognition and Classification of Emergency Conditions  


==
==
Description:==
Description:==


This JPM is performed in the simulator and use of the Plant Monitoring Computer and the RM-11 Radiation Monitoring Computer is required. The applicant will be given plant conditions and directed to make the appropriate Emergency Plan class and initiating  
This JPM is performed in the simulator and use of the Plant Monitoring Computer and the RM-11 Radiation Monitoring Computer is required. The applicant will be given plant conditions and directed to make the appropriate Emergency Plan class and initiating condition. The applicant will have to get data off of the RM-11 or Plant Monitoring computers to properly classify the event.
 
READ TO APPLICANT DIRECTION TO APPLICANT:
condition. The applicant will have to get data off of the RM-11 or Plant Monitoring computers to properly classify the event.  
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.
 
Provide all answers on the sheets provided.
READ TO APPLICANT  
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
 
Revision 0                             Page 3 of 6                     2010 NRC SRO Exam
DIRECTION TO APPLICANT:  
 
Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any  
 
other JPM. If you have any questions, raise your hand and I will come to your desk.  
 
Provide all answers on the sheets provided.  
 
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.  
 
JPM A5  Revision 0 Page 4 of 6 2010 NRC SRO Exam TASK ELEMENT 1 STANDARD Determine the correct Emergency Plan class and initiating condition.
Applicant declares an Alert based on initiating condition AA1, any UNPLANNED release of
 
gaseous or liquid radioactivity to the
 
environment that exceeds 200 times the
 
radiological effluent ODCM limits for > 15
 
minutes. Comment: PLANT STACK Wide Range Gas Monitor PRM-IRE-0110, RE0110-4 will read > 1.51E+07 uCi/sec, the
 
Alert classification limit. It will be less than the Site
 
Area Emergency limit of 2.55E+08 uCi/sec.
Plant Stack PIG Gas Channels, PRM-IRE-0100.1S or 2S, RE0100.1-1 or RE0100.2-1 will be > 3.45E-03
 
uCi/cc, the Unusual Event criteria. There is no criteria
 
to upgrade from an Unusual Event to an Alert based
 
on either Plant Stack PIG Gas Channel.
Critical SAT  /  UNSAT


END OF TASK  
JPM A5 TASK ELEMENT 1                                              STANDARD Applicant declares an Alert based on initiating condition AA1, any UNPLANNED release of gaseous or liquid radioactivity to the Determine the correct Emergency Plan class and                environment that exceeds 200 times the initiating condition.                                          radiological effluent ODCM limits for > 15 minutes.
Comment:                                                                            Critical PLANT STACK Wide Range Gas Monitor PRM-IRE-0110, RE0110-4 will read > 1.51E+07 uCi/sec, the                                SAT / UNSAT Alert classification limit. It will be less than the Site Area Emergency limit of 2.55E+08 uCi/sec.
Plant Stack PIG Gas Channels, PRM-IRE-0100.1S or 2S, RE0100.1-1 or RE0100.2-1 will be > 3.45E-03 uCi/cc, the Unusual Event criteria. There is no criteria to upgrade from an Unusual Event to an Alert based on either Plant Stack PIG Gas Channel.
END OF TASK Revision 0                                          Page 4 of 6                            2010 NRC SRO Exam


JPM A5 Revision 0 Page 5 of 6 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
JPM A5 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
Plant conditions are as you see on the Simulator. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable. You are not allowed to use any network computers.
Plant conditions are as you see on the Simula tor. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable.
A failure of the Gaseous Waste System has occurred. Conditions are as displayed on the simulator. These conditions have existed for 30 minutes.
You are not allowed to use any network computers.
You are the Shift Manager / Emergency Coordinator. Determine the appropriate Emergency Plan class and initiating condition.
 
Mark all of your conclusions on this sheet.
A failure of the Gaseous Waste System has occurred. Conditions are as displayed on  
Revision 0                             Page 5 of 6                   2010 NRC SRO Exam
 
the simulator. These conditions have existed for 30 minutes.  
 
You are the Shift Manager / Emergency C oordinator. Determine the appropriate Emergency Plan class and initiating condition.  
 
Mark all of your conclusions on this sheet.  
 
JPM A5  Revision 0 Page 6 of 6 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS
 
Reset to IC-190
 
After all simulator generated alarms are clear, place the simulator in FREEZE.
 
Verify the parameters on the PMC match the values on the key.


JPM A5 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-190 After all simulator generated alarms are clear, place the simulator in FREEZE.
Verify the parameters on the PMC match the values on the key.
PLACE BEFORE APPLICANT CUE SHEET TO ELIMINATE PAGE SEQUENCE CONFUSION.
PLACE BEFORE APPLICANT CUE SHEET TO ELIMINATE PAGE SEQUENCE CONFUSION.
Revision 0                              Page 6 of 6                      2010 NRC SRO Exam


Waterford 3 2010 NRC SRO Exam  
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S1 ATC Immediate Operator Actions on 2 Dropped CEAs Applicant:
 
Examiner:
JOB PERFORMANCE MEASURE  
 
S1 ATC Immediate Operator Actions on 2 Dropped CEAs
 
Applicant:
 
Examiner:


JPM S1 Revision 0 Page 2 of 8 2010 NRC SRO Exam  JOB PERFORMANCE MEASURE DATA PAGE Task: ATC Immediate Operator Actions on 2 Dropped CEAs Task Standard: Applicant tripped the r eactor using 32 A and 32 B breakers in accordance with OP-902-000 and comp leted the ATC operator's Standard Post Trip Actions.  
JPM S1 JOB PERFORMANCE MEASURE DATA PAGE Task:             ATC Immediate Operator Actions on 2 Dropped CEAs Task Standard:     Applicant tripped the reactor using 32 A and 32 B breakers in accordance with OP-902-000 and completed the ATC operators Standard Post Trip Actions.


==References:==
==References:==
OP-901-102, CEA or CEDMCS Malfunction OP-902-000, Standard Post Trip Actions Alternate Path: Yes Time Critical:No Validation Time: 5 mins.
OP-901-102, CEA or CEDMCS Malfunction OP-902-000, Standard Post Trip Actions Alternate Path:     Yes     Time Critical:   No       Validation Time:     5     mins.
K/A 001 A2.13, ATWS Importance Rating 4.4 / 4.6   RO / SRO   Applicant:
K/A     001 A2.13, ATWS                                   Importance Rating     4.4 / 4.6 RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                               Time Finish:
Performance Time:                            minutes Performance Rating:            SAT                UNSAT Comments:
Examiner:                                                        Date:
Signature Revision 0                              Page 2 of 8                      2010 NRC SRO Exam


Performance Time:  minutes
JPM S1 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
None
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature   
 
JPM S1 Revision 0 Page 3 of 8 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
None  


==
==
Description:==
Description:==


Applicant will position himself as the AT C operator at CP-2. CEAs 3 and 14 will drop into the core. The applicant should notice the condition, announce the condition, and trip the reactor without direction.
Applicant will position himself as the ATC operator at CP-2. CEAs 3 and 14 will drop into the core. The applicant should notice the condition, announce the condition, and trip the reactor without direction. The normal reactor trip pushbuttons will not function. The applicant should move to the first contingency and use the Diverse Reactor Trip pushbuttons. One of these buttons is faulted. The DRTS alarms will come in, but the CEA MG set load contactors will not open. The applicant should then move to the second contingency, and open both 32 Bus Feeder breakers, and reclose them 5 seconds later. The task should be stopped after the applicant completes the immediate operator actions for the ATC position.
The normal reactor trip pushbuttons will not function. The applicant should move to the first contingency and use the Diverse  
 
Reactor Trip pushbuttons. One of these butt ons is faulted. The DRTS alarms will come in, but the CEA MG set load contactors will not open. The applicant should then move to the second contingency, and open both 32 Bu s Feeder breakers, and reclose them 5 seconds later. The task should be stopped after the applicant completes the immediate  
 
operator actions for the ATC position.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 8                    2010 NRC SRO Exam


I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
JPM S1 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* The plant is at 100% power.
INITIATING CUES:
* Respond to conditions observed.
* Perform actions as required by the ATC operator.
Revision 0                              Page 4 of 8      2010 NRC SRO Exam


provide initiating cues and reports on other ac tions when directed by you. Indicate to me when you understand your assigned task.  
JPM S1 Evaluator Note
: 1. All of the listed steps are from OP-901-102, CEA or CEDMCS Malfunction, and OP-902-000, Standard Post Trip Actions, but the applicant is required to perform the listed steps from memory.
: 2. Direct simulator operator to initiate trigger 1 when ready to begin.
TASK ELEMENT 1                                            STANDARD Pushes both reactor trip D.1. Determines 2 CEAs have dropped, attempts to trip the reactor from pushbuttons on CP-2 or CP-2 or CP-8 CP-8.
Comment:                                                                                Critical Trip pushbuttons are faulted and Reactor Trip Circuit Breakers will not open.                                                                                SAT / UNSAT TASK ELEMENT 2                                            STANDARD Pushes both DRTS 1.a.1.2 Attempts to trip reactor using DRTS pushbuttons on CP-2.
pushbuttons on CP-2.
Comment:                                                                                Critical 1 DRTS pushbutton is faulted and CEA MG set load contactors will not open.                                                                                SAT / UNSAT TASK ELEMENT 3                                            STANDARD Opens SST A32 FEEDER 1.a.1.3 Open BOTH the following breakers for 5 seconds and close:            and SST B32 FEEDER
* SST A32 FEEDER                                                              breakers for 5 seconds and
* SST B32 FEEDER                                                              then re-closes both breakers.
Comment:                                                                                Critical Evaluator: If applicant stops after re-closing the A and B 32 Feeder breakers, prompt him as the CRS to perform his Standard Post Trip                    SAT / UNSAT Actions.
Revision 0                                        Page 5 of 8                            2010 NRC SRO Exam


Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
JPM S1 TASK ELEMENT 4                              STANDARD
 
: 1. Determine Reactivity Control acceptance criteria are met:
JPM S1 Revision 0 Page 4 of 8 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
* Check reactor power is dropping.
 
* Check startup rate is negative.                           Verifies listed parameters.
INITIAL CONDITIONS:
* Check less than TWO CEAs are NOT fully inserted.
 
Comment:                                                                     Critical SAT / UNSAT TASK ELEMENT 5                               STANDARD
The plant is at 100% power.
: 3. Determine RCS Inventory Control acceptance criteria are met:
 
Check that the following conditions exist:
INITIATING CUES:
* Pressurizer level is 7% to 60%
 
Respond to conditions observed. Perform actions as required by the ATC operator.
 
JPM S1  Revision 0 Page 5 of 8 2010 NRC SRO Exam Evaluator Note 1. All of the listed steps are from OP-901-102, CEA or CEDMCS Malfunction, and OP-902-000, Standard Post Trip Actions, but the applicant is required to perform the listed steps from memory. 2. Direct simulator operator to initiate trigger 1 when ready to begin.
TASK ELEMENT 1 STANDARD D.1. Determines 2 CEAs have dropped, attempts to trip the reactor from CP-2 or CP-8 Pushes both reactor trip pushbuttons on CP-2 or
 
CP-8. Comment: Trip pushbuttons are faulted and Reactor Trip Circuit Breakers will not open.
Critical SAT  /  UNSAT TASK ELEMENT 2 STANDARD 1.a.1.2  Attempts to trip reactor using DRTS pushbuttons on CP-2.
Pushes both DRTS pushbuttons on CP-2.
Comment: 1 DRTS pushbutton is faulted and CEA MG set load contactors will not open.
Critical SAT  /  UNSAT TASK ELEMENT 3 STANDARD 1.a.1.3  Open BOTH the following breakers for 5 seconds and close:
* SST A32 FEEDER
* SST B32 FEEDER Opens SST A32 FEEDER and SST B32 FEEDER
 
breakers for 5 seconds and
 
then re-closes both
 
breakers.
Comment: Evaluator: If applicant stops after re-closing the A and B 32 Feeder breakers, prompt him as the CRS to perform his Standard Post Trip
 
Actions.
Critical SAT  /  UNSAT
 
JPM S1  Revision 0 Page 6 of 8 2010 NRC SRO Exam TASK ELEMENT 4 STANDARD 1. Determine Reactivity Control acceptance criteria are met: Check reactor power is dropping. Check startup rate is negative. Check less than TWO CEAs are NOT fully inserted.
Verifies listed parameters.
Comment:
 
Critical SAT / UNSAT TASK ELEMENT 5 STANDARD 3. Determine RCS Inventory Control acceptance criteria are met:
Check that the following conditions exist: Pressurizer level is 7% to 60% Pressurizer level is trending to 33% to 60%  Check RCS subcooling is greater than or equal to 28 ºF.
Verifies listed parameters.
Verifies listed parameters.
Comment:
* Pressurizer level is trending to 33% to 60%
* Check RCS subcooling is greater than or equal to 28 ºF.
Comment:                                                                     Critical SAT / UNSAT TASK ELEMENT 6                              STANDARD
: 4. Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist:
* Pressurizer pressure is 1750 psia to 2300 psia                Verifies listed parameters.
* Pressurizer pressure is trending to 2125 psia to 2275 psia Comment:                                                                    Critical SAT / UNSAT Revision 0                                    Page 6 of 8                  2010 NRC SRO Exam


Critical SAT / UNSAT TASK ELEMENT 6 STANDARD 4. Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist: Pressurizer pressure is 1750 psia to 2300 psia  Pressurizer pressure is trending to 2125 psia to 2275 psia Verifies listed parameters.
JPM S1 TASK ELEMENT 7                                    STANDARD
Comment:
: 5. Determine Core Heat Removal acceptance criteria are met:
* Check at least one RCP is operating.
* Check operating loop T is less than 13 ºF.                        Verifies listed parameters.
* Check RCS subcooling is greater than or equal to 28 ºF.
Comment:                                                                          Critical SAT / UNSAT TASK ELEMENT 8                                    STANDARD 6.b. Determine RCS Heat Removal acceptance criteria are met:
* Check RCS TCOLD is 530 ºF to 550 ºF                                Verifies listed parameters.
Comment:                                                                          Critical SAT / UNSAT TASK ELEMENT 9                                    STANDARD
: 7. Determine Containment Isolation acceptance criteria are met:
* Check containment pressure is less than 16.4 psia.
* Check NO containment area radiation monitor alarms OR unexplained rise in activity.                                      Verifies listed parameters.
* Check NO steam plant activity monitor alarms OR unexplained rise in activity.
Comment:                                                                           Critical SAT / UNSAT END OF TASK Revision 0                                    Page 7 of 8                        2010 NRC SRO Exam


Critical SAT  /  UNSAT
JPM S1 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-195 Verify the following Malfunctions:
* No Trigger o rp01a, RPS manual pushbutton a o rp01b, RPS manual pushbutton b o rp01c, RPS manual pushbutton c o rp01d, RPS manual pushbutton d
* Trigger 1:
o rd02a03, drop CEA 3 o rd02a14, drop CEA 14 Verify the following Overrides:
* No Trigger o di-02a06s02-1, DRT pushbutton 1 of 2 Coordinate with examiner to initiate Trigger 1 on his cue.
Revision 0                              Page 8 of 8      2010 NRC SRO Exam


JPM S1  Revision 0 Page 7 of 8 2010 NRC SRO Exam TASK ELEMENT 7 STANDARD 5. Determine Core Heat Removal acceptance criteria are met: Check at least one RCP is operating. Check operating loop T is less than 13 ºF. Check RCS subcooling is greater than or equal to 28 ºF.
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S2 Failed Pressurizer Level Control due to Failed RCS Cold Leg Temperature Instrument and Pressurizer Level Control Applicant:
Verifies listed parameters.
Examiner:
Comment:


Critical SAT  /  UNSAT TASK ELEMENT 8 STANDARD 6.b. Determine RCS Heat Removal acceptance criteria are met:  Check RCS T COLD is 530 ºF to 550 ºF Verifies listed parameters.
JPM S2 JOB PERFORMANCE MEASURE DATA PAGE Task:             Perform actions associated with a faulted Pressurizer level setpoint in accordance with OP-901-110, Pressurizer Level Control Malfunction.
Comment: 
Task Standard:     Faulted Reactor Coolant Cold Leg temperature instrument was removed from service in accordance with OP-901-110.
 
Critical SAT  /  UNSAT TASK ELEMENT 9 STANDARD 7. Determine Containment Isolation acceptance criteria are met:  Check containment pressure is less than 16.4 psia. Check NO containment area radiation monitor alarms OR unexplained rise in activity. Check NO steam plant activity monitor alarms OR unexplained rise in activity.
Verifies listed parameters.
Comment: 
 
Critical SAT  /  UNSAT
 
END OF TASK
 
JPM S1  Revision 0 Page 8 of 8 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-195
 
Verify the following Malfunctions:  No Trigger o rp01a, RPS manual pushbutton a o rp01b, RPS manual pushbutton b o rp01c, RPS manual pushbutton c o rp01d, RPS manual pushbutton d Trigger 1:
o rd02a03, drop CEA 3 o rd02a14, drop CEA 14
 
Verify the following Overrides:  No Trigger o di-02a06s02-1, DRT pushbutton 1 of 2
 
Coordinate with examiner to in itiate Trigger 1 on his cue.
 
Waterford 3 2010 NRC SRO Exam
 
JOB PERFORMANCE MEASURE
 
S2 Failed Pressurizer Level Control due to Failed RCS Cold Leg Temperature Instrument and Pressurizer Level Control
 
Applicant: 
 
Examiner: 
 
JPM S2  Revision 0 Page 2 of 9 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Perform actions associated with a faulted Pressurizer level setpoint in accordance with OP-901-110, Pressurizer Level Control  
 
Malfunction.
Task Standard: Faulted Reactor Coolant Cold Leg temperature instrument was removed from service in accordance with OP-901-110.  


==References:==
==References:==
OP-901-110, Pressurizer Level Control Malfunction Alternate Path: Yes Time Critical:No Validation Time: 15 mins.
OP-901-110, Pressurizer Level Control Malfunction Alternate Path:     Yes     Time Critical:   No       Validation Time:     15     mins.
K/A 004 A2.22, Mismatch of Charging and Letdown  Importance Rating 3.2 / 3.1 flows RO / SRO   Applicant:
004 A2.22, Mismatch of Charging and K/A                                                      Importance Rating     3.2 / 3.1 Letdown flows                                                 RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                               Time Finish:
 
Performance Time:                           minutes Performance Rating:           SAT                 UNSAT Comments:
Performance Time: minutes  
Examiner:                                                       Date:
 
Signature Revision 0                              Page 2 of 9                      2010 NRC SRO Exam
Performance Rating: SAT UNSAT Comments:
 
Examiner:   Date:   Signature  


JPM S2 Revision 0 Page 3 of 9 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
JPM S2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-901-110, Pressurizer Level Control Malfunction
OP-901-110, Pressurizer Level Control Malfunction  


==
==
Description:==
Description:==


The applicant will be positioned as the ATC oper ator to start this task. The JPM will start with RCS Cold Leg temperature in strument RC-ITI-0111-Y failed high. The cue sheet will direct the applicant to match Charging and Letdown flow. This will be  
The applicant will be positioned as the ATC operator to start this task. The JPM will start with RCS Cold Leg temperature instrument RC-ITI-0111-Y failed high. The cue sheet will direct the applicant to match Charging and Letdown flow. This will be accomplished at CP-2. After the applicant reports that Charging and Letdown flows are matched and verifications made, the applicant will be directed to assume the role of the BOP operator and select the non-selected Cold Leg instrument. This is located behind CP-2. This selection will not function, requiring the applicant to remove the failed instrument from service at both Reactor Regulating drawers.
 
accomplished at CP-2. After the applicant r eports that Charging and Letdown flows are matched and verifications made, the applicant will be directed to assume the role of the BOP operator and select the non-selected Cold Leg instrument. This is located behind CP-2. This selection will not function, r equiring the applicant to remove the failed instrument from service at bot h Reactor Regulating drawers.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 9                    2010 NRC SRO Exam


I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
JPM S2 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
provide initiating cues and reports on other ac tions when directed by you. Indicate to me when you understand your assigned task.
* Mode 1, 15% power
 
* Main Turbine testing in planned for next shift INITIATING CUES:
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
* You are the ATC operator
 
* Annunciator B-1, Pressurizer Level Hi/Lo, on Panel H has come into alarm.
JPM S2 Revision 0 Page 4 of 9 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
* The CRS has entered OP-901-110, Pressurizer Level Control Malfunction, section E2, Pressurizer Level Setpoint Malfunction
 
* The CRS has directed you to raise Letdown flow to 120 - 126 gpm to match Charging and Letdown flow in accordance with step 1.
INITIAL CONDITIONS:  
Revision 0                               Page 4 of 9                 2010 NRC SRO Exam
 
Mode 1, 15% power Main Turbine testing in planned for next shift  
 
INITIATING CUES:  
 
You are the ATC operator Annunciator B-1, Pressurizer Level Hi/
Lo, on Panel H has come into alarm. The CRS has entered OP-901-110, Pressu rizer Level Control Malfunction, section E2, Pressurizer Level Setpoint Malfunction The CRS has directed you to raise Letdown flow to 120 - 126 gpm to match Charging and Letdown flow in accordance with step 1.  
 
JPM S2  Revision 0 Page 5 of 9 2010 NRC SRO Exam Evaluator Note Direct the simulator operator to place the simulator in RUN when ready to start.
TASK ELEMENT 1 STANDARD 1. Place Pressurizer Level Controller (RC-ILIC-0110) in MAN AND adjust
 
OUTPUT to slowly adjust letdown flow to restore Pressurizer level.
Letdown flow is raised to 120 - 126 gpm..
Comment:  Critical SAT  /  UNSAT Evaluator Note After the applicant reports that Charging and Letdown flows are approximately matched, direct him to perform steps 2 and 3.
 
TASK ELEMENT 2 STANDARD 2. Verify normal indications on ALL Safety Measurement Channel Hot
 
Leg AND Cold Leg temperature indicators.
Hot and Cold Leg safety temperature indicators are


JPM S2 Evaluator Note Direct the simulator operator to place the simulator in RUN when ready to start.
TASK ELEMENT 1                                          STANDARD
: 1. Place Pressurizer Level Controller (RC-ILIC-0110) in MAN AND adjust      Letdown flow is raised to OUTPUT to slowly adjust letdown flow to restore Pressurizer level.          120 - 126 gpm..
Comment:                                                                                Critical SAT / UNSAT Evaluator Note After the applicant reports that Charging and Letdown flows are approximately matched, direct him to perform steps 2 and 3.
TASK ELEMENT 2                                          STANDARD Hot and Cold Leg safety
: 2. Verify normal indications on ALL Safety Measurement Channel Hot temperature indicators are Leg AND Cold Leg temperature indicators.
verified on CP-7.
verified on CP-7.
Comment:   SAT / UNSAT TASK ELEMENT 3 STANDARD 3. Determine affected channel(s) by c hecking Reactor Regulating System (RRS) T AVG recorders (RC-ITR-0111 AND RC-ITR-0121).
Comment:
Both channels are identified as affected by the failure.
SAT / UNSAT TASK ELEMENT 3                                         STANDARD
Comment:   SAT / UNSAT Evaluator Note Inform the applicant that the CRS has completed steps 4 through 8. The CRS has directed him to  
: 3. Determine affected channel(s) by checking Reactor Regulating System     Both channels are identified (RRS) TAVG recorders (RC-ITR-0111 AND RC-ITR-0121).                         as affected by the failure.
 
Comment:
evaluate steps 9 and 10.
SAT / UNSAT Evaluator Note Inform the applicant that the CRS has completed steps 4 through 8. The CRS has directed him to evaluate steps 9 and 10.
The applicant may have already identified and reported t he failed instrument prior to reaching this step.  
The applicant may have already identified and reported the failed instrument prior to reaching this step.
 
Revision 0                                       Page 5 of 9                           2010 NRC SRO Exam
JPM S2  Revision 0 Page 6 of 9 2010 NRC SRO Exam TASK ELEMENT 4 STANDARD Procedure Note: Selecting the non-faulted channel may cause automatic actions to occur if actual level is not at program level.
Note reviewed.
Comment:    SAT  /  UNSAT TASK ELEMENT 5 STANDARD 9. Check Reactor Regulating System (RRS) Hot Leg indicators (RC-ITI-
 
0111-X AND RC-ITI-0121-X) for abnormal readings.
Hot Leg temperature indicators are verified to be


JPM S2 TASK ELEMENT 4                                            STANDARD Procedure Note: Selecting the non-faulted channel may cause automatic Note reviewed.
actions to occur if actual level is not at program level.
Comment:
SAT / UNSAT TASK ELEMENT 5                                            STANDARD Hot Leg temperature
: 9. Check Reactor Regulating System (RRS) Hot Leg indicators (RC-ITI-indicators are verified to be 0111-X AND RC-ITI-0121-X) for abnormal readings.
reading normally.
reading normally.
Comment:   SAT / UNSAT TASK ELEMENT 6 STANDARD 10. Check Reactor Regulating System (RRS) Cold Leg indicators (RC-
Comment:
SAT / UNSAT TASK ELEMENT 6                                           STANDARD
: 10. Check Reactor Regulating System (RRS) Cold Leg indicators (RC-             RC-ITI-0111-Y is identified ITI-0111-Y AND RC-ITI-0121-Y) for abnormal readings.                          as failed high.
Comment:                                                                                  Critical This is critical to identify failed instrument so that the correct procedure is performed.                                                              SAT / UNSAT Evaluator Cue Cue the applicant that he is now filling the role of the BOP operator and that another operator is filling the role of the ATC operator.
Revision 0                                        Page 6 of 9                            2010 NRC SRO Exam


ITI-0111-Y AND RC-ITI-0121-Y) for abnormal readings.
JPM S2 Evaluator Cue Direct the applicant as following based on his report:
RC-ITI-0111-Y is identified as failed high.
If he correctly identifies that Loop 1 Cold Leg (RC-ITI-0111-Y) is failed, then cue:
Comment: This is critical to identify failed instrument so that the correct procedure is performed.
Perform step 10.1 on for TCOLD LOOP 1 selector switch located behind CP-2 and verify setpoint restoration.
Critical SAT / UNSAT Evaluator Cue Cue the applicant that he is now filling the role of the BOP operator and that another operator is filling
o    If he incorrectly identifies that Loop 1 Hot Leg (RC-ITI-0111-X) is failed, then cue:
Perform step 9.1 and select LOOP 2 for TAVE LOOP SELECTOR on BOTH RRS local cabinets (CP-12A AND CP-12B) and verify setpoint restoration.
o    If he incorrectly identifies that Loop 2 Hot Leg (RC-ITI-0121-X) is failed, then cue:
Perform step 9.2 and select LOOP 1 for TAVE LOOP SELECTOR on BOTH RRS local cabinets (CP-12A AND CP-12B) and verify setpoint restoration.
o    If he incorrectly identifies that Loop 2 Cold Leg (RC-ITI-0121-Y) is failed, then cue:
Perform step 10.2 on for TCOLD LOOP 2 selector switch located behind CP-2 and verify setpoint restoration.
Evaluator Note Positioning the selector switch in the next step will not affect clear the malfunction. The applicant should detect and report this additional failure/problem. The indications that are applicable include:
* Recorder RC-ILR-0110 Setpoint does not return to normal, ~ 33%
* All 3 Charging Pumps continue operating
* TAVE Recorders RC-ITR-0111 and 0121 do not return to normal, ~ 550 °F
* Pressurizer Level Hi/Lo Annunciator H B-1 does not clear TASK ELEMENT 7                                            STANDARD 10.1 Select presently non-selected position (ALT OR NORM) on TCOLD Loop 1 selector switch is LOOP 1 selector switch located behind CP-2, Reactor Control placed in ALT.
Comment:                                                                                  Critical THIS STEP IS NOT CRITICAL SAT / UNSAT Revision 0                                        Page 7 of 9                            2010 NRC SRO Exam


the role of the ATC operator.
JPM S2 Evaluator Note The applicant should recommend removing the failed instrument at both Reactor Regulating panels.
 
JPM S2  Revision 0 Page 7 of 9 2010 NRC SRO Exam Evaluator Cue Direct the applicant as following based on his report:  If he correctly identifies that Loop 1 Cold Leg (RC-ITI-0111-Y) is failed, then cue:
"Perform step 10.1 on for TCOLD LOOP 1 selector switch located behind CP-2 and verify setpoint restoration
". o If he incorrectly identifies that Loop 1 Hot Leg (RC-ITI-0111-X) is failed, then cue:
"Perform step 9.1 and select LOOP 2 for TAVE LOOP SELECTOR on BOTH RRS local cabinets (CP-12A AND CP-12B) and verify setpoint restoration
". o If he incorrectly identifies that Loop 2 Hot Leg (RC-ITI-0121-X) is failed, then cue:
"Perform step 9.2 and select LOOP 1 for TAVE LOOP SELECTOR on BOTH RRS local cabinets (CP-12A AND CP-12B) and verify setpoint restoration
". o If he incorrectly identifies that Loop 2 Cold Leg (RC-ITI-0121-Y) is failed, then cue:
"Perform step 10.2 on for TCOLD LOOP 2 selector switch located behind CP-2 and verify setpoint restoration
". Evaluator Note Positioning the selector switch in the next step will not affect clear the malfunction. The applicant should detect and report this additional failure/problem. The indications that are applicable include:  Recorder RC-ILR-0110 Setpoint does not return to normal, ~ 33%  All 3 Charging Pumps continue operating  T AVE Recorders RC-ITR-0111 and 0121 do not return to normal, ~ 550 °F  Pressurizer Level Hi/Lo Annunciator H B-1 does not clear TASK ELEMENT 7 STANDARD 10.1 Select presently non-selected position (ALT OR NORM) on TCOLD
 
LOOP 1 selector switch located behind CP-2, Reactor Control
 
Loop 1 selector switch is placed in ALT.
Comment: THIS STEP IS NOT CRITICAL Critical SAT  /  UNSAT
 
JPM S2 Revision 0 Page 8 of 9 2010 NRC SRO Exam Evaluator Note The applicant should recommend removing the failed in strument at both Reactor Regulating panels.
Request this recommendation if it has not already been made.
Request this recommendation if it has not already been made.
Once recommended, direct th e applicant to carry out this action.
Once recommended, direct the applicant to carry out this action.After the applicant recommends removing the failed instruments from the RRS, direct the applicant to remove the failed instrument at both RRS panels.
After the applicant recommends removing the failed instruments from the RRS, direct the applicant to remove the failed instrument at both RRS panels.
TASK ELEMENT 8                                           STANDARD 10.1 Select LOOP 2 on BOTH RRS local cabinets (CP-12A AND CP-                 LOOP 2 is selected on both 12B)                                                                          Reactor Regulating cabinets.
TASK ELEMENT 8 STANDARD 10.1 Select LOOP 2 on BOTH RRS local cabinets (CP-12A AND CP-
Comment:                                                                               Critical SAT / UNSAT Evaluator Note End task after the applicant verifies setpoint has been restored to normal, ~33%.
 
END OF TASK Revision 0                                       Page 8 of 9                           2010 NRC SRO Exam
12B)
LOOP 2 is selected on both Reactor Regulating  
 
cabinets.
Comment:   Critical SAT / UNSAT Evaluator Note End task after the applicant verifies setpoint has been restored to normal, ~33%.
END OF TASK  
 
JPM S2  Revision 0 Page 9 of 9 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-196
 
Verify the following Malfunctions:
 
RC18C set at 100% failure on Trigger 1.
 
Verify the following Overrides:
 
DI-02B1S-0 overridden to Normal
 
Place the simulator in RUN
 
Initiate Trigger 1
 
Acknowledge panel annunciators
 
Place the simulator in FREEZE.


JPM S2 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-196 Verify the following Malfunctions:
* RC18C set at 100% failure on Trigger 1.
Verify the following Overrides:
* DI-02B1S-0 overridden to Normal Place the simulator in RUN Initiate Trigger 1 Acknowledge panel annunciators Place the simulator in FREEZE.
Place the simulator to RUN on direction from the evaluator.
Place the simulator to RUN on direction from the evaluator.
Waterford 3 2010 NRC SRO Exam  
Revision 0                              Page 9 of 9        2010 NRC SRO Exam


JOB PERFORMANCE MEASURE  
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S3 Reduce RCS Pressure and Establish Pressurizer Level on a Failure of All Charging Applicant:
Examiner:


S3 Reduce RCS Pressure and Establish Pressurizer Level on a Failure of All Charging
JPM S3 JOB PERFORMANCE MEASURE DATA PAGE Task:             Reduce RCS pressure with Main Spray and restore Pressurizer Level with High Pressure Safety Injection Task Standard:     Applicant reduced RCS pressure to below HPSI Pump shutoff head and established Safety Injection System flow in accordance with OP-901-112, Charging or Letdown Malfunction.
 
Applicant: 
 
Examiner: 
 
JPM S3 Revision 0 Page 2 of 7 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Reduce RCS pressure with Main Spray and restore Pressurizer Level with High Pressure Safety Injection Task Standard: Applicant reduced RCS pressu re to below HPSI Pump shutoff head and established Safety Injection System flow in accordance with OP-
 
901-112, Charging or Letdown Malfunction.  


==References:==
==References:==
OP-901-112, Charging or Letdown Malfunction Alternate Path: No Time Critical:No Validation Time: 20 mins.
OP-901-112, Charging or Letdown Malfunction Alternate Path:     No       Time Critical:   No     Validation Time:     20     mins.
K/A 006 A1.18, Pressurizer level and pressure Importance Rating 4.0 / 4.3   RO / SRO   Applicant:
K/A     006 A1.18, Pressurizer level and pressure       Importance Rating     4.0 / 4.3 RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                               Time Finish:
 
Performance Time:                           minutes Performance Rating:           SAT                 UNSAT Comments:
Performance Time: minutes  
Examiner:                                                       Date:
 
Signature Revision 0                              Page 2 of 7                    2010 NRC SRO Exam
Performance Rating: SAT UNSAT Comments:
 
Examiner:   Date:   Signature  


JPM S3 Revision 0 Page 3 of 7 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
JPM S3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-901-112, Charging or Letdown Malfunction
OP-901-112, Charging or Letdown Malfunction  


==
==
Description:==
Description:==


The applicant will perform the roles of t he ATC and BOP operators for this JPM.
The applicant will perform the roles of the ATC and BOP operators for this JPM.
The initial conditions describe that the pl ant has experienced a loss of all Charging capacity. The applicable off normal procedur e directs tripping the reactor and lowering RCS pressure to < 1400 psia. The JPM begins with the reactor tripped and Standard  
The initial conditions describe that the plant has experienced a loss of all Charging capacity. The applicable off normal procedure directs tripping the reactor and lowering RCS pressure to < 1400 psia. The JPM begins with the reactor tripped and Standard Post Trip Actions complete. The RCS will be at normal post trip pressure, 2250 psia.
 
Main Spray will be used to accomplish the pressure reduction. After RCS pressure is below 1400 psia, a High Pressure Safety Injection Pump is started and flow established to restore Pressurizer level.
Post Trip Actions complete. The RCS will be at normal post trip pressure, 2250 psia.
 
Main Spray will be used to accomplish the pressure reduction. After RCS pressure is  
 
below 1400 psia, a High Pressure Safety Inje ction Pump is started and flow established to restore Pressurizer level.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 7                    2010 NRC SRO Exam


I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
JPM S3 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
provide initiating cues and reports on other ac tions when directed by you. Indicate to me when you understand your assigned task.  
* The crew has entered OP-901-112, Charging or Letdown Malfunction, due to a piping weld failure downstream of CVC-209, Charging Pumps Header Isolation.
 
* The CRS has directed a reactor trip due to the lowering Pressurizer Level.
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.  
* OP-902-000, Standard Post Trip Actions, have been completed.
 
INITIATING CUES:
JPM S3  Revision 0 Page 4 of 7 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
* The CRS directs you to perform all of the remaining portions of step 2 in sub-section E1, Charging Malfunction, and establish a RCS pressure of 1250 - 1350 psia and restoring Pressurizer level to 30% using HPSI Pump A.
 
Revision 0                               Page 4 of 7                     2010 NRC SRO Exam
INITIAL CONDITIONS:


The crew has entered OP-901-112, Char ging or Letdown Malfunction, due to a piping weld failure downstream of CVC-209, Charging Pumps Header
JPM S3 Evaluator Note Direct the simulator operator to place the simulator in RUN when ready to start.
 
Isolation. The CRS has directed a reactor trip due to the lowering Pressurizer Level. OP-902-000, Standard Post Trip Actions, have been completed.
 
INITIATING CUES:
 
The CRS directs you to perform all of the remaining portions of step 2 in sub-section E 1 , Charging Malfunction, and establish a RCS pressure of 1250 - 1350 psia and restoring Pressurizer level to 30% using HPSI
 
Pump A. 
 
JPM S3 Revision 0 Page 5 of 7 2010 NRC SRO Exam Evaluator Note Direct the simulator operator to place the simulator in RUN when ready to start.
Evaluator Note The Pressurizer Pressure Low Trip setpoint will need to be reset on 2 different occasions during the reduction of RCS pressure to < 1400 PSIA. There is only 1 occasion listed.
Evaluator Note The Pressurizer Pressure Low Trip setpoint will need to be reset on 2 different occasions during the reduction of RCS pressure to < 1400 PSIA. There is only 1 occasion listed.
This step becomes applicable when either annunciator K B-16 or K C-16 alarm.
This step becomes applicable when either annunciator K B-16 or K C-16 alarm.
TASK ELEMENT 1 STANDARD 2.3 WHEN PZR PRESSURE LO PRETRIP annunciator alarms, THEN  
TASK ELEMENT 1                                             STANDARD Pressurizer Pressure low 2.3 WHEN PZR PRESSURE LO PRETRIP annunciator alarms, THEN                   pressure setpoints are reset reset Pressurizer Pressure Low Trip setpoint on ALL FOUR channels.           prior to receiving a Safety Injection Actuation Comment:                                                                               Critical SAT / UNSAT Evaluator Note Since there is no Charging Flow, Pressurizer pressure must be reduced using Main Spray. Controller RC-IHIC-0100 at CP-2 should be taken to MANUAL and output raised to create Main Spray flow.
 
TASK ELEMENT 2                                             STANDARD Pressurizer pressure is 2.4 Reduce Pressurizer pressure to < 1400 PSIA.                             reduced to 1250 - 1350 PSIA using Main Spray.
reset Pressurizer Pressure Low Trip setpoint on ALL FOUR channels.
Comment:                                                                               Critical SAT / UNSAT Revision 0                                       Page 5 of 7                           2010 NRC SRO Exam
Pressurizer Pressure low pressure setpoints are reset
 
prior to receiving a Safety  
 
Injection Actuation Comment:   Critical SAT / UNSAT Evaluator Note Since there is no Charging Flow, Pressurizer pressu re must be reduced using Main Spray. Controller RC-IHIC-0100 at CP-2 should be taken to MANUAL and output raised to create Main Spray flow.
TASK ELEMENT 2 STANDARD 2.4 Reduce Pressurizer pressure to < 1400 PSIA.
Pressurizer pressure is reduced to 1250 - 1350 PSIA using Main Spray.
Comment:   Critical SAT / UNSAT  
 
JPM S3  Revision 0 Page 6 of 7 2010 NRC SRO Exam Evaluator Note After Pressurizer pressure is < 1400 PSIA, the Main Spray valves should be throttled closed to prevent Pressurizer pressure from dropping below the mi nimum pressure for RCP operation, approximately 1250 PSIA.
 
TASK ELEMENT 2 STANDARD 2.5 Start ONE available HPSI Pump AND open associated valves as


JPM S3 Evaluator Note After Pressurizer pressure is < 1400 PSIA, the Main Spray valves should be throttled closed to prevent Pressurizer pressure from dropping below the minimum pressure for RCP operation, approximately 1250 PSIA.
TASK ELEMENT 2                                          STANDARD 2.5 Start ONE available HPSI Pump AND open associated valves as HPSI Pump A is running.
required to restore Pressurizer level:
required to restore Pressurizer level:
HPSI Pump A is running.
Comment:                                                                             Critical SAT / UNSAT TASK ELEMENT 3                                         STANDARD 2.5 Start ONE available HPSI Pump AND open associated valves as required to restore Pressurizer level:
Comment:   Critical SAT / UNSAT TASK ELEMENT 3 STANDARD 2.5 Start ONE available HPSI Pump AND open associated valves as  
At least 1 HPSI flow control
 
* HPSI Train A                                                           valve is throttled open and
required to restore Pressurizer level:
* HPSI COLD LEG INJECTION 1A (SI 225A)                                   Pressurizer level is restored
* HPSI Train A
* HPSI COLD LEG INJECTION 1B (SI 226A)                                   to > 25%.
* HPSI COLD LEG INJECTION 1A (SI 225A)
* HPSI COLD LEG INJECTION 1B (SI 226A)
* HPSI COLD LEG INJECTION 2A (SI 227A)
* HPSI COLD LEG INJECTION 2A (SI 227A)
* HPSI COLD LEG INJECTION 2B (SI 228A)
* HPSI COLD LEG INJECTION 2B (SI 228A)
At least 1 HPSI flow control valve is throttled open and
Comment:                                                                              Critical SAT / UNSAT END OF TASK Revision 0                                    Page 6 of 7                            2010 NRC SRO Exam


Pressurizer level is restored
JPM S3 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-199 There are no Malfunctions or Overrides for this JPM.
Revision 0                            Page 7 of 7    2010 NRC SRO Exam


to > 25%.
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S4 Place Shutdown Cooling Train A in Service Applicant:
Comment:  Critical SAT  /  UNSAT END OF TASK
Examiner:
 
JPM S3  Revision 0 Page 7 of 7 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-199
 
There are no Malfunctions or Overrides for this JPM.
 
Waterford 3 2010 NRC SRO Exam  
 
JOB PERFORMANCE MEASURE  
 
S4 Place Shutdown Cooling Train A in Service


Applicant: 
JPM S4 JOB PERFORMANCE MEASURE DATA PAGE Task:             Place Shutdown Cooling Train A in Service Task Standard:     Applicant placed Shutdown Cooling Train A in service in accordance with OP-009-005 and secured Low Pressure Safety Injection Pump A after SI-405 A failed closed.
 
Examiner: 
 
JPM S4 Revision 0 Page 2 of 11 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Place Shutdown Cooling Train A in Service Task Standard: Applicant placed Shutdown Coo ling Train A in service in accordance with OP-009-005 and secured Low Pressure Safety Injection Pump  
 
A after SI-405 A failed closed.  


==References:==
==References:==
OP-009-005, Shutdown Cooling OP-901-131, Shutdown Cooling Malfunction Alternate Path: Yes Time Critical:No Validation Time: 30 mins.
OP-009-005, Shutdown Cooling OP-901-131, Shutdown Cooling Malfunction Alternate Path:     Yes       Time Critical:   No     Validation Time:     30     mins.
K/A 005 A4.01, Controls and indication for RHR   Importance Rating 3.6 / 3.4 pumps RO / SRO   Applicant:
K/A     005 A4.01, Controls and indication for RHR       Importance Rating     3.6 / 3.4 pumps                                                   RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                               Time Finish:
Performance Time:                            minutes Performance Rating:            SAT                UNSAT Comments:
Examiner:                                                        Date:
Signature Revision 0                              Page 2 of 11                    2010 NRC SRO Exam


Performance Time:  minutes
JPM S4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-009-005, Shutdown Cooling
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature   
 
JPM S4 Revision 0 Page 3 of 11 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-009-005, Shutdown Cooling  


==
==
Description:==
Description:==


This task is performed at CP-8. The applicant must place Shutdown Cooling Train A in service. The fault in this task is that SI-405 A, RC Loop 2 SDC Suction Inside Containment Isol, will fail closed, requiring the applicant to secure Low Pressure Safety Injection Pump A. The task can be stopped after LPSI Pump A is secured.  
This task is performed at CP-8. The applicant must place Shutdown Cooling Train A in service. The fault in this task is that SI-405 A, RC Loop 2 SDC Suction Inside Containment Isol, will fail closed, requiring the applicant to secure Low Pressure Safety Injection Pump A. The task can be stopped after LPSI Pump A is secured.
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 11                    2010 NRC SRO Exam


I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
JPM S4 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
provide initiating cues and reports on other ac tions when directed by you. Indicate to me when you understand your assigned task.
* The plant is in Mode 4
 
* Protected Train is A
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
* RCS temperature is 280 &deg;F
 
* RCS pressure is 340 PSIA
JPM S4 Revision 0 Page 4 of 11 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
* Shutdown Cooling Train A has been placed in Standby in accordance with OP-009-005, Shutdown Cooling, section 5.3.
 
INITIATING CUES:
INITIAL CONDITIONS:  
* The CRS has directed you to place Shutdown Cooling Train A in service in accordance with OP-009-005, section 6.1.
 
Revision 0                             Page 4 of 11                   2010 NRC SRO Exam
The plant is in Mode 4 Protected Train is A RCS temperature is 280 &deg;F RCS pressure is 340 PSIA Shutdown Cooling Train A has been placed in Standby in accordance with OP-009-005, Shutdown Coo ling, section 5.3.  
 
INITIATING CUES:  
 
The CRS has directed you to place Shutdown Cooling Train A in service in accordance with OP-009-005, section 6.1.  
 
JPM S4  Revision 0 Page 5 of 11 2010 NRC SRO Exam TASK ELEMENT 1 STANDARD Procedure Note: The Shutdown Cooling Train placed in service should be on the Protected Train.
Note reviewed.
Comment: 
 
SAT  /  UNSAT TASK ELEMENT 2 STANDARD Procedure Caution: Following a design basis tornado event, delaying the initiation of Shutdown Cooling (SDC) for up to 7 days will be
 
required to ensure the Component Cooling Water System is capable
 
of removing Reactor Coolant System decay heat. The actual delay
 
time will depend on UHS damage and ambient temperature and will
 
be determined by engineering. Emergency Feedwater supports decay
 
heat removal until SDC can be initiated.
Caution reviewed.
Comment: 
 
SAT  /  UNSAT TASK ELEMENT 3 STANDARD 6.1.1: Verify Shutdown Cooling Train A has been aligned to Standby
 
condition in accordance with Section 5.3, Alignment of Shutdown


JPM S4 TASK ELEMENT 1                                      STANDARD Procedure Note: The Shutdown Cooling Train placed in service Note reviewed.
should be on the Protected Train.
Comment:
SAT / UNSAT TASK ELEMENT 2                                      STANDARD Procedure Caution: Following a design basis tornado event, delaying the initiation of Shutdown Cooling (SDC) for up to 7 days will be required to ensure the Component Cooling Water System is capable of removing Reactor Coolant System decay heat. The actual delay      Caution reviewed.
time will depend on UHS damage and ambient temperature and will be determined by engineering. Emergency Feedwater supports decay heat removal until SDC can be initiated.
Comment:
SAT / UNSAT TASK ELEMENT 3                                      STANDARD 6.1.1: Verify Shutdown Cooling Train A has been aligned to Standby Cue sheet lists this as condition in accordance with Section 5.3, Alignment of Shutdown complete.
Cooling Train A to Standby Condition.
Cooling Train A to Standby Condition.
Cue sheet lists this as complete.
Comment: 
SAT  /  UNSAT Evaluator Note Any Dry Fan started in SLOW must be declared inoperable and Tech Spec 3.7.4 addressed.
TASK ELEMENT 4 STANDARD 6.1.2: Verify sufficient number of Dry Cooling Tower Fans running to
accept increased heat load on CCW System.
Any fans started must be started in FAST.
Comment:  Applicant may ask the CRS how man fans he wants
running. If asked, respond to keep the fans in automatic and verify
they cycle on as required. Any number of fans started is acceptable.
SAT  /  UNSAT
JPM S4  Revision 0 Page 6 of 11 2010 NRC SRO Exam TASK ELEMENT 5 STANDARD Procedure Caution: CC-963A is required to be maintained open while in Mode 4 to preserve the design temperature basis of piping and
associated components at the CCW outlet of shutdown cooling heat
exchanger A. With CC-963A open, flow through Shutdown Cooling
Heat Exchanger A will be maintained above 2305 gpm.
Caution reviewed.
Comment: 
SAT  /  UNSAT TASK ELEMENT 6 STANDARD 6.1.3: Place Shutdown HX A CCW Flow Control, CC-963A, control switch to Open.
CC-963 A is opened.
Comment:
Comment:
Critical SAT / UNSAT TASK ELEMENT 7 STANDARD (1) The following Reactor Coolant System limits shall be met for Shutdown Cooling Entry:  
SAT / UNSAT Evaluator Note Any Dry Fan started in SLOW must be declared inoperable and Tech Spec 3.7.4 addressed.
TASK ELEMENT 4                                      STANDARD 6.1.2: Verify sufficient number of Dry Cooling Tower Fans running to Any fans started must be accept increased heat load on CCW System.                            started in FAST.
Comment: Applicant may ask the CRS how man fans he wants running. If asked, respond to keep the fans in automatic and verify they cycle on as required. Any number of fans started is acceptable.          SAT / UNSAT Revision 0                                      Page 5 of 11                      2010 NRC SRO Exam


RCS temperature limit: < 350 &deg;F
JPM S4 TASK ELEMENT 5                                    STANDARD Procedure Caution: CC-963A is required to be maintained open while in Mode 4 to preserve the design temperature basis of piping and associated components at the CCW outlet of shutdown cooling heat    Caution reviewed.
 
exchanger A. With CC-963A open, flow through Shutdown Cooling Heat Exchanger A will be maintained above 2305 gpm.
RCS pressure limit: < 392 psia
 
(2) If Containment Spray Header A Isolation, CS-125 A, is open while  
 
Shutdown Cooling Train A is operating, then Containment Spray A riser may fill and possibly spray water into Containment, due to
 
leakage past Containment Spray Pump A discharge stop check, CS-
 
117A. Caution reviewed.
Comment: 
 
SAT  /  UNSAT
 
JPM S4  Revision 0 Page 7 of 11 2010 NRC SRO Exam TASK ELEMENT 8 STANDARD 6.1.4: Unlock and Open RC Loop 2 SDC Suction Outside Containment Isol, SI-407A.
SI-407 A is opened.
Comment: Key 133 required.
Critical SAT  /  UNSAT TASK ELEMENT 9 STANDARD 6.1.5: Notify Radiation Protecti on Department that Shutdown Cooling Train A is being placed in service.
Call is made.
Comment:
Comment:
SAT / UNSAT TASK ELEMENT 10 STANDARD 6.1.6: Start LPSI Pump A. LPSI Pump A is started.
SAT / UNSAT TASK ELEMENT 6                                    STANDARD 6.1.3: Place Shutdown HX A CCW Flow Control, CC-963 A is opened.
CC-963A, control switch to Open.
Comment:                                                                        Critical SAT / UNSAT TASK ELEMENT 7                                    STANDARD (1) The following Reactor Coolant System limits shall be met for Shutdown Cooling Entry:
RCS temperature limit: < 350 &deg;F RCS pressure limit: < 392 psia (2) If Containment Spray Header A Isolation, CS-125 A, is open while Caution reviewed.
Shutdown Cooling Train A is operating, then Containment Spray A riser may fill and possibly spray water into Containment, due to leakage past Containment Spray Pump A discharge stop check, CS-117A.
Comment:
Comment:
Annunciator LPSI Pump A Flow Lost (Cabinet M, F-3) is expected. It
SAT / UNSAT Revision 0                                      Page 6 of 11                      2010 NRC SRO Exam


will clear when the applicant raises flow > 2900 gpm.
JPM S4 TASK ELEMENT 8                                      STANDARD 6.1.4: Unlock and Open RC Loop 2 SDC Suction Outside SI-407 A is opened.
Critical SAT / UNSAT TASK ELEMENT 11 STANDARD 6.1.7: Raise Shutdown Cooling flow by Manually adjusting LPSI Header Flow controller 2A/2B, SI-IFIC-0307, output until Shutdown  
Containment Isol, SI-407A.
Comment:                                                                        Critical Key 133 required.
SAT / UNSAT TASK ELEMENT 9                                      STANDARD 6.1.5: Notify Radiation Protection Department that Shutdown Cooling Call is made.
Train A is being placed in service.
Comment:
SAT / UNSAT TASK ELEMENT 10                                    STANDARD 6.1.6: Start LPSI Pump A.                                          LPSI Pump A is started.
Comment:                                                                        Critical Annunciator LPSI Pump A Flow Lost (Cabinet M, F-3) is expected. It will clear when the applicant raises flow > 2900 gpm.                       SAT / UNSAT TASK ELEMENT 11                                     STANDARD 6.1.7: Raise Shutdown Cooling flow by Manually adjusting LPSI Header Flow controller 2A/2B, SI-IFIC-0307, output until Shutdown Flow is raised to 4100 gpm.
Cooling Header A Flow indicates 4100 GPM, as indicated by RC Loop 2 Shdn Line Flow Indicator, SI-IFI-1307-A1.
Comment:                                                                        Critical SAT / UNSAT TASK ELEMENT 12                                    STANDARD Setpoint potentiometer is set 6.1.8: Adjust LPSI Header Flow Controller 2A/2B, SI-IFIC-0307, to 73%, and controller is setpoint potentiometer to 73%, and place controller to AUTO.
placed in AUTO Comment:                                                                        Critical SAT / UNSAT Revision 0                                      Page 7 of 11                      2010 NRC SRO Exam


Cooling Header A Flow indicates 4100 GPM, as indicated by RC Loop  
JPM S4 TASK ELEMENT 13                                      STANDARD 6.1.9: Verify LPSI Header Flow Controller 2A/2B, SI-IFIC-0307, is maintaining 4100 GPM Shutdown Cooling Header A flow, as indicated   Flow is verified.
 
by RC Loop 2 Shdn Line Flow Indicator, SI-IFI-1307-A1.
2 Shdn Line Flow Indicator, SI-IFI-1307-A1.
Flow is raised to 4100 gpm.
Comment:
Comment:
Critical SAT / UNSAT TASK ELEMENT 12 STANDARD 6.1.8: Adjust LPSI Header Flow Controller 2A/2B, SI-IFIC-0307, setpoint potentiometer to 73%, and place controller to AUTO.
SAT / UNSAT TASK ELEMENT 14                                      STANDARD Procedure note: If a sample was drawn prior to shutdown and no interim shutdown has occurred where SDC was placed in service and Note reviewed.
Setpoint potentiometer is set to 73%, and controller is
boron concentration could have been reduced, then sampling is not required.
 
placed in AUTO Comment: 
 
Critical SAT  /  UNSAT
 
JPM S4  Revision 0 Page 8 of 11 2010 NRC SRO Exam TASK ELEMENT 13 STANDARD 6.1.9: Verify LPSI Header Flow Controller 2A/2B, SI-IFIC-0307, is maintaining 4100 GPM Shutdown Cooli ng Header A flow, as indicated by RC Loop 2 Shdn Line Flow Indicator, SI-IFI-1307-A1.
Flow is verified.
Comment:
Comment:
SAT / UNSAT TASK ELEMENT 14 STANDARD Procedure note: If a sample was drawn prior to shutdown and no interim shutdown has occurred where SDC was placed in service and
SAT / UNSAT TASK ELEMENT 15                                      STANDARD 6.1.10: At SM/CRS discretion, direct Chemistry Department to sample None Shutdown Cooling Train A for boron concentration.
 
boron concentration could have been reduced, then sampling is not
 
required.
Note reviewed.
Comment:
Comment:
SAT  /  UNSAT TASK ELEMENT 15 STANDARD 6.1.10: At SM/CRS discretion, direct Chemistry Department to sample Shutdown Cooling Train A for boron concentration.
Evaluator: When requested provide information to applicant that all required Chemistry requirements are met.                                     SAT / UNSAT TASK ELEMENT 16                                       STANDARD Procedure Note: Shutdown Cooling Train A requires one operable Low Pressure Safety Injection Flow Control Valve for the train to be Note reviewed.
None Comment:
Evaluator: When requested provide information to applicant that all  
 
required Chemistry requirements are met.  
 
SAT / UNSAT TASK ELEMENT 16 STANDARD Procedure Note: Shutdown Cooling Train A requires one operable Low Pressure Safety Injection Flow Control Valve for the train to be  
 
operable.
operable.
Note reviewed.
Comment:
Comment:
SAT / UNSAT  
SAT / UNSAT Revision 0                                    Page 8 of 11                          2010 NRC SRO Exam


JPM S4 Revision 0 Page 9 of 11 2010 NRC SRO Exam TASK ELEMENT 17 STANDARD Procedure Caution: The Reactor Coolant System shall not exceed the 100 &deg;F per hour cooldown rate of Technical Specification 3.4.8.1.
JPM S4 TASK ELEMENT 17                                     STANDARD Procedure Caution: The Reactor Coolant System shall not exceed the Caution reviewed.
Caution reviewed.
100 &deg;F per hour cooldown rate of Technical Specification 3.4.8.1.
Comment:
Comment:
SAT / UNSAT TASK ELEMENT 18 STANDARD 6.1.11.1: Open the following valves: SI-139A LPSI Header to RC Loop 2A Flow Control SI-138A LPSI Header to RC Loop 2B Flow Control SI-139 A and SI-138 A are open. Comment:  
SAT / UNSAT TASK ELEMENT 18                                     STANDARD 6.1.11.1: Open the following valves:
 
SI-139 A and SI-138 A are
Critical SAT / UNSAT TASK ELEMENT 19 STANDARD 6.1.11.2: Throttle Closed RC Loop 2 Shdn Cooling Warmup, SI-135A, until one of the following is within 100&deg;F of Shutdown Cooling Train A  
* SI-139A LPSI Header to RC Loop 2A Flow Control open.
 
* SI-138A LPSI Header to RC Loop 2B Flow Control Comment:                                                                         Critical SAT / UNSAT TASK ELEMENT 19                                     STANDARD 6.1.11.2: Throttle Closed RC Loop 2 Shdn Cooling Warmup, SI-135A, until one of the following is within 100&deg;F of Shutdown Cooling Train A temperature, as indicated by LPSI Pump A Discharge Header Temperature is within 100 &deg;F Temperature Indicator, SI-ITI-0351X:
temperature, as indicated by LPSI Pump A Discharge Header  
Hot Leg 2 temperature, as indicated by RC Loop 2 Hot Leg Temperature Indicator, RC-ITI-0122-HA Comment:
 
Temperature Indicator, SI-ITI-0351X:
Hot Leg 2 temperature, as indicated by RC Loop 2 Hot Leg  
 
Temperature Indicator, RC-ITI-0122-HA Temperature is within 100 &deg;F Comment:
SI-135 A is a large gate valve with a very long stroke.
SI-135 A is a large gate valve with a very long stroke.
SAT / UNSAT  
SAT / UNSAT Revision 0                                      Page 9 of 11                      2010 NRC SRO Exam


JPM S4 Revision 0 Page 10 of 11 2010 NRC SRO Exam TASK ELEMENT 20 STANDARD 6.1.11.3: Close RC Loop 2 Shdn Cooling Warmup, SI-135 A. SI-135 A is closed Comment:
JPM S4 TASK ELEMENT 20                                             STANDARD 6.1.11.3: Close RC Loop 2 Shdn Cooling Warmup, SI-135 A.                   SI-135 A is closed Comment:                                                                               Critical SAT / UNSAT Evaluator Note Coordinate with the simulator operator to initiate trigger 1 to close SI-405 A.
Critical SAT / UNSAT Evaluator Note Coordinate with the simulator operator to initiate trigger 1 to close SI-405 A.  
TASK ELEMENT 21                                              STANDARD Secure LPSI Pump A                                                          LPSI Pump A is off.
Comment:                                                                                Critical This is an immediate operator action IAW OP-901-131 D.1                            SAT / UNSAT END OF TASK Revision 0                                      Page 10 of 11                            2010 NRC SRO Exam


TASK ELEMENT 21 STANDARD Secure LPSI Pump A LPSI Pump A is off.
JPM S4 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-197 Verify the following Malfunctions:
Comment:
* Si23a for SI-405 A Coordinate with the examiner so that when SI-135 A is fully closed at step 6.1.11.3, Trigger 1 is initiated to close SI-405 A.
This is an immediate operator action IAW OP-901-131 D.1 Critical SAT  /  UNSAT
Revision 0                              Page 11 of 11            2010 NRC SRO Exam


END OF TASK
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S5 Synchronize the Main Generator to the Grid Applicant:
Examiner:


JPM S4  Revision 0 Page 11 of 11 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-197
JPM S5 JOB PERFORMANCE MEASURE DATA PAGE Task:               Synchronize the Main Generator to the grid in accordance with OP-010-004, Power Operations.
 
Task Standard:     The Main Generator was synchronized to the grid with both Output Breakers closed in accordance with OP-010-004, Power Operations.
Verify the following Malfunctions:  Si23a for SI-405 A
 
Coordinate with the examiner so that when SI-135 A is fully closed at step 6.1.11.3, Trigger 1 is init iated to close SI-405 A.
 
Waterford 3 2010 NRC SRO Exam
 
JOB PERFORMANCE MEASURE
 
S5 Synchronize the Main Generator to the Grid
 
Applicant: 
 
Examiner: 
 
JPM S5 Revision 0 Page 2 of 14 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Synchronize the Main Generator to the grid in accordance with OP-010-004, Power Operations.
Task Standard: The Main Generator was synch ronized to the grid with both Output Breakers closed in accordance with OP-010-004, Power Operations.  


==References:==
==References:==
OP-010-004, Power Operations Alternate Path: Yes Time Critical:No Validation Time: 30 mins.
OP-010-004, Power Operations Alternate Path:     Yes       Time Critical:   No     Validation Time:     30     mins.
K/A 062 A4.07, Synchronizing and paralleling of   Importance Rating 3.1 / 3.1 different AC supplies RO / SRO   Applicant:
K/A     062 A4.07, Synchronizing and paralleling of       Importance Rating     3.1 / 3.1 different AC supplies                                   RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                                 Time Finish:
Performance Time:                            minutes Performance Rating:              SAT                UNSAT Comments:
Examiner:                                                        Date:
Signature Revision 0                                Page 2 of 14                    2010 NRC SRO Exam


Performance Time:  minutes
JPM S5 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-010-004, Power Operations
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature   
 
JPM S5 Revision 0 Page 3 of 14 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-010-004, Power Operations  


==
==
Description:==
Description:==


This JPM takes place at CP-1. The applicant will start the task with all Main  
This JPM takes place at CP-1. The applicant will start the task with all Main Turbine testing complete and the unit running at 1800 rpm. The cue will direct the applicant to perform an auto synchronization of the Main Generator. The auto synchronization will fail to close either Main Generator Output Breaker. The applicant will then perform a manual synchronization.
 
Turbine testing complete and the unit running at 1800 rpm. The cue will direct the  
 
applicant to perform an auto synchronization of the Main Generator. The auto synchronization will fail to close either Main Generator Output Breaker. The applicant will then perform a manual synchronization.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 14                    2010 NRC SRO Exam


I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
JPM S5 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
provide initiating cues and reports on other ac tions when directed by you. Indicate to me when you understand your assigned task.
* Plant is in Mode 1 at 15% power following a refueling outage
 
* All Main Turbine testing has been completed.
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
* Watch standers are standing by at the Main Transformers and the Generator Auxiliaries area.
 
* The Load Dispatcher and Southern Control have been notified that we are coming on line.
JPM S5 Revision 0 Page 4 of 14 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
INITIATING CUES:
 
* You are directed to synchronize the Main Generator to the grid using the auto synchronization circuit in accordance with OP-010-004, Power Operations.
INITIAL CONDITIONS:  
Revision 0                               Page 4 of 14                   2010 NRC SRO Exam
 
Plant is in Mode 1 at 15% power following a refueling outage All Main Turbine testing has been completed. Watch standers are standing by at the Main Transformers and the Generator Auxiliaries area. The Load Dispatcher and Southern Cont rol have been notified that we are coming on line.  
 
INITIATING CUES:  
 
You are directed to synchronize the Main Generator to the grid using the auto synchronization circuit in accordanc e with OP-010-004, Power Operations.  
 
JPM S5  Revision 0 Page 5 of 14 2010 NRC SRO Exam TASK ELEMENT 1 STANDARD Procedure Note: Monitor Main Transformer A(B) during the initial energization and loading phases of the transformer for indications of static discharging as evidenced by unusual bumping, thudding, crackling, popping, or similar noises. Notify Sy stem Engineering immediately if any unusual noises are emanating from the transformer tank.
Note reviewed.
Comment:    SAT  /  UNSAT TASK ELEMENT 2 STANDARD 9.1.22  Close Generator Exciter Field Breaker on CP-1 to excite


JPM S5 TASK ELEMENT 1                                      STANDARD Procedure Note: Monitor Main Transformer A(B) during the initial energization and loading phases of the transformer for indications of static discharging as evidenced by unusual bumping, thudding, crackling, Note reviewed.
popping, or similar noises. Notify System Engineering immediately if any unusual noises are emanating from the transformer tank.
Comment:
SAT / UNSAT TASK ELEMENT 2                                      STANDARD 9.1.22 Close Generator Exciter Field Breaker on CP-1 to excite Breaker closed.
Generator field.
Generator field.
Breaker closed.
Comment:                                                                           Critical SAT / UNSAT Evaluator Note Local watchstander reports no unusual noises at the Main Transformers.
Comment:   Critical SAT / UNSAT Evaluator Note Local watchstander reports no unusual noises at the Main Transformers.  
TASK ELEMENT 3                                       STANDARD 9.1.23 Locally verify Main Transformer Cooling System operating with no Verification complete.
 
TASK ELEMENT 3 STANDARD 9.1.23 Locally verify Main Transformer Cooling System operating with no  
 
unusual noises.
unusual noises.
Verification complete.
Comment:
Comment:   SAT / UNSAT Evaluator Note Local watchstander reports Isophase Bus Duct Cooling Fan is operating normally.  
SAT / UNSAT Evaluator Note Local watchstander reports Isophase Bus Duct Cooling Fan is operating normally.
 
Revision 0                                     Page 5 of 14                         2010 NRC SRO Exam
JPM S5  Revision 0 Page 6 of 14 2010 NRC SRO Exam TASK ELEMENT 4 STANDARD 9.1.24  Locally verify Generator Isophase Bus Duct Cooling Fan selected to Auto has started.
Verification complete.
Comment:    SAT  /  UNSAT TASK ELEMENT 5 STANDARD Procedure Caution: Do not leave synchronizer energized for longer than 5 minutes to prevent relay damage. Ensure that only one synchronizer circuit is energized at any time to prevent synchronizer malfunction.
Caution reviewed.
Comment:    SAT  /  UNSAT TASK ELEMENT 6 STANDARD 9.1.25  Place Synchronizer Switch for first Generator Output Breaker to
 
Manual, and verify Generator Running, GEN-EM-2210A, and Incoming, GEN-EM-2210B, voltmeters indicate voltage.
First Generator Output Breaker is placed in
 
MANUAL. Comment:  Critical SAT  /  UNSAT TASK ELEMENT 7 STANDARD Procedure Note: Voltage Regulator operation should be in accordance
 
with Attachment 9.8, Entergy Guidelines Regarding Generator Voltage


JPM S5 TASK ELEMENT 4                                    STANDARD 9.1.24 Locally verify Generator Isophase Bus Duct Cooling Fan selected Verification complete.
to Auto has started.
Comment:
SAT / UNSAT TASK ELEMENT 5                                    STANDARD Procedure Caution: Do not leave synchronizer energized for longer than 5 minutes to prevent relay damage. Ensure that only one synchronizer  Caution reviewed.
circuit is energized at any time to prevent synchronizer malfunction.
Comment:
SAT / UNSAT TASK ELEMENT 6                                    STANDARD 9.1.25 Place Synchronizer Switch for first Generator Output Breaker to First Generator Output Manual, and verify Generator Running, GEN-EM-2210A, and Incoming,      Breaker is placed in GEN-EM-2210B, voltmeters indicate voltage.                            MANUAL.
Comment:                                                                          Critical SAT / UNSAT TASK ELEMENT 7                                    STANDARD Procedure Note: Voltage Regulator operation should be in accordance with Attachment 9.8, Entergy Guidelines Regarding Generator Voltage    Note reviewed.
Regulator and Abnormal Frequency Operation.
Regulator and Abnormal Frequency Operation.
Note reviewed.
Comment:
Comment:   SAT / UNSAT  
SAT / UNSAT Revision 0                                      Page 6 of 14                      2010 NRC SRO Exam


JPM S5 Revision 0 Page 7 of 14 2010 NRC SRO Exam TASK ELEMENT 8 STANDARD Procedure Caution: Exciter field am ps shall not exceed 45 amps when matching incoming and running voltages with the base voltage adjuster.
JPM S5 TASK ELEMENT 8                                     STANDARD Procedure Caution: Exciter field amps shall not exceed 45 amps when Caution reviewed.
Caution reviewed.
matching incoming and running voltages with the base voltage adjuster.
Comment:   SAT / UNSAT TASK ELEMENT 9 STANDARD 9.1.26 Using Base Voltage Adjust Switch, raise Incoming (Generator)  
Comment:
SAT / UNSAT TASK ELEMENT 9                                     STANDARD 9.1.26 Using Base Voltage Adjust Switch, raise Incoming (Generator) voltage, GEN-EM-2210B, to match Running (Grid) voltage, GEN-EM-        Voltage adjusted.
2210A.
Comment:                                                                        Critical SAT / UNSAT TASK ELEMENT 10                                    STANDARD 9.1.27 Place Synchronizer Switch for first Generator Output Breaker in First Generator Output Off.                                                                  Breaker is placed in OFF.
Comment:                                                                        Critical It does not matter which breaker is closed first.
SAT / UNSAT TASK ELEMENT 11                                    STANDARD Voltage Regulator switch is 9.1.28 Place Auto Voltage Regulator switch in Test.
in TEST.
Comment:                                                                        Critical SAT / UNSAT WHY IS THIS CRITICAL??? IF deviation already at zero then not performing this will not affect the JPM outcome.
Revision 0                                        Page 7 of 14                  2010 NRC SRO Exam


voltage, GEN-EM-2210B, to match Running (Grid) voltage, GEN-EM-
JPM S5 TASK ELEMENT 12                                     STANDARD 9.1.29 Verify Voltage Regulator Balance needle deviates from zero in both directions, by rotating Voltage Regulator Adjust switch clockwise   Balance needle adjusted.
 
and counterclockwise.
2210A. Voltage adjusted.
Comment:
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 10 STANDARD 9.1.27  Place Synchronizer Switch for first Generator Output Breaker in
SAT / UNSAT TASK ELEMENT 13                                     STANDARD 9.1.30 Adjust Volt Reg Balance to zero, and place Auto Voltage          Auto Voltage Regulator Regulator switch to On.                                                 switch is in ON.
 
Comment:                                                                           Critical SAT / UNSAT TASK ELEMENT 14                                     STANDARD 9.1.31 Adjust Turbine speed to 1801-1802 RPM, at SM/CRS discretion, Speed verified.
Off. First Generator Output Breaker is placed in OFF.
in accordance with OP-005-007, Main Turbine Generator.
Comment: It does not matter which breaker is closed first.
Comment:
Critical SAT  /  UNSAT TASK ELEMENT 11 STANDARD 9.1.28  Place Auto Voltage Regulator switch in Test.
IF asked provide a specific value SAT / UNSAT TASK ELEMENT 15                                     STANDARD 9.1.32 Notify Load Dispatcher and Southern Control unit is ready to go Notification given in cue.
Voltage Regulator switch is in TEST. Comment:  WHY IS THIS CRITICAL???  IF deviation already at zero then not performing this will not affect the JPM outcome.
on line.
Critical SAT  /  UNSAT
Comment:
 
SAT / UNSAT TASK ELEMENT 16                                     STANDARD 9.1.33.1 Verify Auto Synchronization is disabled by placing Gen Bkr Auto Verification complete.
JPM S5 Revision 0 Page 8 of 14 2010 NRC SRO Exam TASK ELEMENT 12 STANDARD 9.1.29 Verify Voltage Regulator Balance needle deviates from zero in both directions, by rotating Voltage Regulator Adjust switch clockwise and counterclockwise.
Synch Switch in Disable.
Balance needle adjusted.
Comment:
Comment:   SAT / UNSAT TASK ELEMENT 13 STANDARD 9.1.30 Adjust Volt Reg Balance to zero, and place Auto Voltage Regulator switch to On.
SAT / UNSAT Revision 0                                     Page 8 of 14                       2010 NRC SRO Exam
Auto Voltage Regulator switch is in ON.
Comment:   Critical SAT / UNSAT TASK ELEMENT 14 STANDARD 9.1.31 Adjust Turbine speed to 1801-1802 RPM, at SM/CRS discretion, in accordance with OP-005-007, Main Turbine Generator.
Speed verified.
Comment: IF asked- provide a specific value SAT / UNSAT TASK ELEMENT 15 STANDARD 9.1.32 Notify Load Dispatcher and Southern Control unit is ready to go  
 
on line. Notification given in cue.
Comment:   SAT / UNSAT TASK ELEMENT 16 STANDARD 9.1.33.1 Verify Auto Synchronization is disabled by placing Gen Bkr Auto Synch Switch in Disable.
Verification complete.
Comment:   SAT / UNSAT  
 
JPM S5  Revision 0 Page 9 of 14 2010 NRC SRO Exam TASK ELEMENT 17 STANDARD Procedure Note: Auto Synchronizer controls Generator voltage when an Auto Synchronizer circuit is placed in service. It may take several


JPM S5 TASK ELEMENT 17                                  STANDARD Procedure Note: Auto Synchronizer controls Generator voltage when an Auto Synchronizer circuit is placed in service. It may take several Note reviewed.
revolutions (~ three) of the synchroscope before the Synch lights illuminate to allow circuit to adjust voltage and frequency.
revolutions (~ three) of the synchroscope before the Synch lights illuminate to allow circuit to adjust voltage and frequency.
Note reviewed.
Comment:
Comment:   SAT / UNSAT TASK ELEMENT 18 STANDARD 9.1.33.2 Place Synchronizer for first Generator Output Breaker to be  
SAT / UNSAT TASK ELEMENT 18                                   STANDARD 9.1.33.2 Place Synchronizer for first Generator Output Breaker to be Switch is in AUTO.
 
closed in Auto.
closed in Auto.
Switch is in AUTO.
Comment:                                                                           Critical SAT / UNSAT TASK ELEMENT 19                                   STANDARD Procedure Note: Main Generator Voltage is matched with Switchyard Voltage when Incoming and Running Voltage needles are opposite one     Note reviewed.
Comment:   Critical SAT / UNSAT TASK ELEMENT 19 STANDARD Procedure Note: Main Generator Voltage is matched with Switchyard  
another.
 
Comment:
Voltage when Incoming and Running Voltage needles are opposite one another. Note reviewed.
SAT / UNSAT TASK ELEMENT 20                                   STANDARD 9.1.33.3 Verify proper operation of Main Generator Auto Synchronization circuit by all of the following:
Comment:   SAT / UNSAT TASK ELEMENT 20 STANDARD 9.1.33.3 Verify proper operation of Main Generator Auto Synchronization  
* Synchroscope rotating slowly in the fast direction. (< 1 rev per 10 sec)                                                               Verification complete.
 
* Synch check lights are illuminated between 5 till and 12 oclock.
circuit by all of the following: Synchroscope rotating slowly in the fast direction. (< 1 rev per 10 sec) Synch check lights are illuminated between 5 till and 12 o'clock. Incoming voltage, GEN-EM-2210B, approximately equal to running voltage, GEN-EM-2210A.
* Incoming voltage, GEN-EM-2210B, approximately equal to running voltage, GEN-EM-2210A.
Verification complete.
Comment:
Comment:   SAT / UNSAT  
SAT / UNSAT Revision 0                                         Page 9 of 14                   2010 NRC SRO Exam
 
JPM S5  Revision 0 Page 10 of 14 2010 NRC SRO Exam TASK ELEMENT 21 STANDARD Procedure Note: Placing Gen Bkr Auto Synch switch in Enable allows Generator Output Breaker to close automatically. The Gen Bkr Auto


JPM S5 TASK ELEMENT 21                                        STANDARD Procedure Note: Placing Gen Bkr Auto Synch switch in Enable allows Generator Output Breaker to close automatically. The Gen Bkr Auto          Note reviewed.
Synch must be held in Enable until GOB closes.
Synch must be held in Enable until GOB closes.
Note reviewed.
Comment:
Comment:   SAT / UNSAT TASK ELEMENT 22 STANDARD 9.1.33.4 When Synchroscope passes "15 after 12 o'clock" position and Synch Check lights are extinguished, then place and hold Gen Bkr Auto Synch switch in Enable.
SAT / UNSAT TASK ELEMENT 22                                         STANDARD 9.1.33.4 When Synchroscope passes 15 after 12 oclock position and Synch Check lights are extinguished, then place and hold Gen Bkr Auto       Switch is in ENABLE.
Switch is in ENABLE.
Synch switch in Enable.
Comment:   Critical SAT / UNSAT Evaluator Note The fault will prevent the Generator Output Breaker from closing. The applicant should eventually  
Comment:                                                                               Critical SAT / UNSAT Evaluator Note The fault will prevent the Generator Output Breaker from closing. The applicant should eventually release the Auto Sync Switch and report the failure to the CRS.
 
Direct the applicant as the CRS to sync the Main Generator in MANUAL in accordance with step 9.1.34.
release the Auto Sync Switch and report the failure to the CRS.
TASK ELEMENT 23                                         STANDARD 9.1.33.7 Turn Synchronizer to OFF.                                         Switch is in OFF.
Direct the applicant as the CRS to sync the Main Generator in MANUAL in accordance with step 9.1.34. TASK ELEMENT 23 STANDARD 9.1.33.7 Turn Synchronizer to OFF. Switch is in OFF.
Comment:                                                                               Critical SAT / UNSAT TASK ELEMENT 24                                         STANDARD 9.1.34.1 Place Synchronizer in Manual.                                     Switch is in MANUAL.
Comment:   Critical SAT / UNSAT TASK ELEMENT 24 STANDARD 9.1.34.1 Place Synchronizer in Manual. Switch is in MANUAL.
Comment:                                                                               Critical SAT / UNSAT Revision 0                                   Page 10 of 14                           2010 NRC SRO Exam
Comment:   Critical SAT / UNSAT  
 
JPM S5  Revision 0 Page 11 of 14 2010 NRC SRO Exam TASK ELEMENT 25 STANDARD Procedure Note: Main Generator Voltage is matched with Switchyard Voltage when Incoming and Running voltage needles are opposite one
 
another. Note reviewed.
Comment:    SAT  /  UNSAT TASK ELEMENT 26 STANDARD 9.1.34.2  Verify Incoming voltage, GE N-EM-2210B, is slightly higher than Running Voltage, GEN-EM-2210A.
Verification complete.
Comment:    SAT  /  UNSAT TASK ELEMENT 27 STANDARD 9.1.34.3  Verify Synchroscope is rotating slowly in the fast direction. Verification complete.
Comment:    SAT  /  UNSAT TASK ELEMENT 28 STANDARD 9.1.34.4  Verify one complete revolution of the synchroscope every 15 seconds or greater, before attempting to close the Generator Output Breaker. Verification complete.
Comment:    SAT  /  UNSAT TASK ELEMENT 29 STANDARD Procedure Caution: Attempt to close a generator output breaker only at
 
12 o'clock. Failure to do this could result in paralleling the generator out


JPM S5 TASK ELEMENT 25                                          STANDARD Procedure Note: Main Generator Voltage is matched with Switchyard Voltage when Incoming and Running voltage needles are opposite one          Note reviewed.
another.
Comment:
SAT / UNSAT TASK ELEMENT 26                                          STANDARD 9.1.34.2 Verify Incoming voltage, GEN-EM-2210B, is slightly higher than Verification complete.
Running Voltage, GEN-EM-2210A.
Comment:
SAT / UNSAT TASK ELEMENT 27                                          STANDARD 9.1.34.3 Verify Synchroscope is rotating slowly in the fast direction.      Verification complete.
Comment:
SAT / UNSAT TASK ELEMENT 28                                          STANDARD 9.1.34.4 Verify one complete revolution of the synchroscope every 15 seconds or greater, before attempting to close the Generator Output          Verification complete.
Breaker.
Comment:
SAT / UNSAT TASK ELEMENT 29                                          STANDARD Procedure Caution: Attempt to close a generator output breaker only at 12 oclock. Failure to do this could result in paralleling the generator out Caution reviewed.
of phase.
of phase.
Caution reviewed.
Comment:
Comment:   SAT / UNSAT  
SAT / UNSAT Revision 0                                       Page 11 of 14                         2010 NRC SRO Exam
 
JPM S5  Revision 0 Page 12 of 14 2010 NRC SRO Exam TASK ELEMENT 30 STANDARD 9.1.34.5  When Synchroscope reaches slightly before 12 o' clock position and Synch Check lights are On, then Close the first Generator Output Breaker. Generator Output Breaker is CLOSED.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 31 STANDARD 9.1.34.6  Turn Synchronizer Switch to OFF. Switch is in OFF.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 32 STANDARD 9.1.35  Verify Generator has picked up approximately 5% load ( 62 Mwe). Verification complete.
Comment:    SAT  /  UNSAT TASK ELEMENT 33 STANDARD Procedure Note: Prior to closing the second Generator Output Breaker, wait at least 20 seconds after placing synchronizer in Manual to allow


JPM S5 TASK ELEMENT 30                                      STANDARD 9.1.34.5 When Synchroscope reaches slightly before 12 o clock position Generator Output Breaker and Synch Check lights are On, then Close the first Generator Output is CLOSED.
Breaker.
Comment:                                                                          Critical SAT / UNSAT TASK ELEMENT 31                                      STANDARD 9.1.34.6 Turn Synchronizer Switch to OFF.                              Switch is in OFF.
Comment:                                                                          Critical SAT / UNSAT TASK ELEMENT 32                                      STANDARD 9.1.35 Verify Generator has picked up approximately 5% load ( 62 Verification complete.
Mwe).
Comment:
SAT / UNSAT TASK ELEMENT 33                                      STANDARD Procedure Note: Prior to closing the second Generator Output Breaker, wait at least 20 seconds after placing synchronizer in Manual to allow  Note reviewed.
Synch Check Relay to realign.
Synch Check Relay to realign.
Note reviewed.
Comment:
Comment:   SAT / UNSAT TASK ELEMENT 34 STANDARD 9.1.36.1 Place Synchronizer in Manual for remaining Generator Output  
SAT / UNSAT TASK ELEMENT 34                                     STANDARD 9.1.36.1 Place Synchronizer in Manual for remaining Generator Output Switch is in MANUAL.
 
Breaker.
Breaker. Switch is in MANUAL.
Comment:                                                                           Critical SAT / UNSAT Revision 0                                   Page 12 of 14                       2010 NRC SRO Exam
Comment:  Critical SAT  /  UNSAT
 
JPM S5  Revision 0 Page 13 of 14 2010 NRC SRO Exam TASK ELEMENT 35 STANDARD 9.1.36.2  Close the Generator Output Breaker.
Generator Output Breaker is CLOSED.
Comment:   Critical SAT / UNSAT TASK ELEMENT 36 STANDARD 9.1.36.3  Turn the Synchronizer switch to Off Switch is in OFF.
Comment: Is this critical (i.e. damage to equipment)??
Critical SAT  /  UNSAT END OF TASK
 
JPM S5  Revision 0 Page 14 of 14 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-196


There are no Malfunctions for this JPM.  
JPM S5 TASK ELEMENT 35                        STANDARD Generator Output Breaker 9.1.36.2 Close the Generator Output Breaker.
is CLOSED.
Comment:                                                              Critical SAT / UNSAT TASK ELEMENT 36                        STANDARD 9.1.36.3 Turn the Synchronizer switch to Off              Switch is in OFF.
Comment:                                                              Critical Is this critical (i.e. damage to equipment)??
SAT / UNSAT END OF TASK Revision 0                                  Page 13 of 14            2010 NRC SRO Exam


JPM S5 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-196 There are no Malfunctions for this JPM.
Verify the following Overrides:
Verify the following Overrides:
o DI-01A06S08-1 overridden to OFF  
o DI-01A06S08-1 overridden to OFF Revision 0                            Page 14 of 14  2010 NRC SRO Exam


Waterford 3 2010 NRC SRO Exam  
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S6 Reset Containment Spray Actuation Applicant:
Examiner:


JOB PERFORMANCE MEASURE
JPM S6 JOB PERFORMANCE MEASURE DATA PAGE Task:             Reset Containment Spray Actuation Task Standard:     CSAS initiation and actuation were reset in accordance with OP-902-009, Standard Appendices, Appendix 5 - E.
 
S6 Reset Containment Spray Actuation
 
Applicant: 
 
Examiner: 
 
JPM S6 Revision 0 Page 2 of 8 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Reset Containment Spray Actuation  
 
Task Standard: CSAS initiation and actuation were reset in accordance with OP-902-009, Standard Appendices, Appendix 5 - E.  


==References:==
==References:==
OP-902-009, Standar d Appendices, Appendix 5 - E OP-902-004, Excess Steam Demand Recovery Alternate Path: No Time Critical:No Validation Time: 10 mins.
OP-902-009, Standard Appendices, Appendix 5 - E OP-902-004, Excess Steam Demand Recovery Alternate Path:     No         Time Critical:   No     Validation Time:     10     mins.
K/A 012 A4.04, Bistable, trips, reset and test switches  Importance Rating 3.3 / 3.3   RO / SRO   Applicant:
012 A4.04, Bistable, trips, reset and test K/A                                                        Importance Rating     3.3 / 3.3 switches RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                                 Time Finish:
 
Performance Time:                             minutes Performance Rating:             SAT                 UNSAT Comments:
Performance Time: minutes  
Examiner:                                                         Date:
 
Signature Revision 0                                 Page 2 of 8                     2010 NRC SRO Exam
Performance Rating: SAT UNSAT Comments:
 
Examiner:   Date:   Signature  
 
JPM S6  Revision 0 Page 3 of 8 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:


OP-902-009, Standard Appendices, Appendix 5 - E OP-902-004, Excess Steam Demand Recovery  
JPM S6 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
OP-902-009, Standard Appendices, Appendix 5 - E OP-902-004, Excess Steam Demand Recovery


==
==
Description:==
Description:==


The JPM begins in an Excess Steam Demand event, after the applicable Steam  
The JPM begins in an Excess Steam Demand event, after the applicable Steam Generator has blown dry. Containment Spray termination criteria are met. The applicant will be directed to reset CSAS. Actions for this task take place at CP-8, CP-10 A through D, and CP-33.
 
Generator has blown dry. Containment Spray termination criteria are met. The applicant will be directed to reset CSAS. Actions for this task take place at CP-8, CP-10 A through D, and CP-33.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 8                    2010 NRC SRO Exam


I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
JPM S6 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* An Excess Steam Demand event has occurred.
* The crew is implementing OP-902-004, Excess Steam Demand Recovery
* The conditions of step 44 of OP-902-004 have been verified to be met. Do not give this. If the applicant wants, he can verify it in the control room using plant conditions (Step 27, not 44).
* Containment Spray is NOT needed for iodine removal.
INITIATING CUES:
* The CRS directs you, the BOP operator, to perform OP-902-009, Standard Appendices, Appendix 5 - E and reset CSAS.
Revision 0                              Page 4 of 8                    2010 NRC SRO Exam


provide initiating cues and reports on other ac tions when directed by you. Indicate to me when you understand your assigned task.  
JPM S6 Evaluator Note When Applicant is ready, cue the simulator operator to place the simulator in RUN.
TASK ELEMENT 1                                            STANDARD 1.1 Place control switches for the following valves to CLOSE:
* CC-641, CCW RCP INLET OUTSIDE ISOL                                    All 3 valve control switches
* CC-710, CCW RCP OUTLET INSIDE ISOL                                    are in CLOSED.
* CC-713, CCW RCP OUTLET OUTSIDE ISOL Comment:                                                                                Critical SAT / UNSAT Evaluator Note To Reset CSAS Initiation relays, the following 4 steps must be performed on Channels A, B, C, and D.
TASK ELEMENT 2                                            STANDARD The applicable Reset 1.2.a Place the Reset Permissive switch to "UNLK" position. (CP-10)
Permissive switch is in UNLK.
Comment:                                                                                Critical Applicant will need key 218 for this manipulation.                                  SAT / UNSAT TASK ELEMENT 3                                            STANDARD CSAS Reset pushbutton is 1.2.b Press CSAS Reset pushbutton.
pressed.
Comment:                                                                                Critical SAT / UNSAT Revision 0                                      Page 5 of 8                            2010 NRC SRO Exam


Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
JPM S6 TASK ELEMENT 4                                   STANDARD 1.2.c Verify the initiation relay indicator lit on the ENGINEERED Verification complete.
 
SAFETY FEATURES SYSTEM mimic.
JPM S6 Revision 0 Page 4 of 8 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Comment:
 
SAT / UNSAT TASK ELEMENT 5                                   STANDARD The applicable Reset 1.2.d Place the Reset permissive switch to LK position                 Permissive switch is in the LK position.
INITIAL CONDITIONS:
Comment:                                                                         Critical This sequence must be repeated for Channels A - D.
 
SAT / UNSAT TASK ELEMENT 6                                   STANDARD 1.3.a Reset CSAS actuation logic on BOTH trains as follows:           CSAS Reset pushbuttons A
An Excess Steam Demand event has occurred
* Press the CSAS Reset pushbuttons. (CP-33)                       & B have been de-pressed.
. The crew is implementing OP-902-004, Excess Steam Demand Recovery  The conditions of step 44 of OP
Comment:                                                                         Critical There are 2 buttons on CP-33 that must be pressed, 1 for Train A and 1 for Train B.                                                                 SAT / UNSAT TASK ELEMENT 7                                   STANDARD 1.3.b Verify the actuation relay indicator lit on the ENGINEERED       CP-10 verification is SAFETY FEATURES SYSTEM mimic. (CP-10)                                 complete.
-902-004 have been verified to be met
Comment:                                                                     SAT / UNSAT Revision 0                                           Page 6 of 8                 2010 NRC SRO Exam
. Do not give this. If the applicant wants, he can verify it in the control room using plant conditions (Step 27, not 44).
Containment Spray is NOT needed for iodine removal
.
INITIATING CUES:
 
The CRS directs you , the BOP operator,  to perform OP-902-009, Standard Appendices, Appendix 5 - E and reset CSAS.
 
JPM S6  Revision 0 Page 5 of 8 2010 NRC SRO Exam Evaluator Note When Applicant is ready, cue the simulator operator to place the simulator in RUN.
TASK ELEMENT 1 STANDARD 1.1  Place control switches for the following valves to CLOSE:  CC-641, CCW RCP INLET OUTSIDE ISOL  CC-710, CCW RCP OUTLET INSIDE ISOL  CC-713, CCW RCP OUTLET OUTSIDE ISOL All 3 valve control switches are in CLOSED.
Comment:  Critical SAT  /  UNSAT Evaluator Note To Reset CSAS Initiation relays, the following 4 steps must be performed on Channels A, B, C, and D.
TASK ELEMENT 2 STANDARD 1.2.a  Place the Reset Permissive switch to "UNLK" position. (CP-10)
The applicable Reset Permissive switch is in
 
UNLK. Comment:  Applicant will need key 218 for this manipulation.
Critical SAT  /  UNSAT TASK ELEMENT 3 STANDARD 1.2.b  Press CSAS Reset pushbutton.
CSAS Reset pushbutton is pressed. Comment:  Critical SAT  /  UNSAT
 
JPM S6  Revision 0 Page 6 of 8 2010 NRC SRO Exam TASK ELEMENT 4 STANDARD 1.2.c Verify the initiation relay indicator lit on the ENGINEERED SAFETY FEATURES SYSTEM mimic.
Verification complete.
Comment:   SAT / UNSAT TASK ELEMENT 5 STANDARD 1.2.d Place the Reset permissive switch to LK position The applicable Reset Permissive switch is in the  
 
LK position.
Comment: This sequence must be repeated for Channels A - D.
Critical SAT / UNSAT TASK ELEMENT 6 STANDARD 1.3.a Reset CSAS actuation logic on BOTH trains as follows: Press the CSAS Reset pushbuttons. (CP-33)
CSAS Reset pushbuttons A
& B have been de-pressed.
Comment: There are 2 buttons on CP-33 that must be pressed, 1 for Train A and 1 for Train B.
Critical SAT / UNSAT TASK ELEMENT 7 STANDARD 1.3.b Verify the actuation relay indicator lit on the ENGINEERED SAFETY FEATURES SYSTEM mimic. (CP-10)
CP-10 verification is complete.
Comment:   SAT / UNSAT  
 
JPM S6  Revision 0 Page 7 of 8 2010 NRC SRO Exam TASK ELEMENT 8 STANDARD 1.4  Stop ONE CS pump at a time.
One Containment Spray Pump is secured.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 9 STANDARD 1.5  IF a CS pump is operating, THEN stop the remaining CS pump.
Second Containment Spray Pump is secured.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 10 STANDARD 1.6  Close the following Containment Spray valves:  CS-125 A, CNTMT SPRAY HEADER A ISOL  CS-125 B, CNTMT SPRAY HEADER B ISOL CS-125 A and CS-125 B are closed.
Comment: Control switch must be taken to OPEN and then to CLOSE.
Critical SAT  /  UNSAT TASK ELEMENT 11 STANDARD 1.7  Place BOTH Containment Spray pump control switches to normal position.
Both Containment Spray pump control switches are


JPM S6 TASK ELEMENT 8                                STANDARD One Containment Spray 1.4 Stop ONE CS pump at a time.
Pump is secured.
Comment:                                                                  Critical SAT / UNSAT TASK ELEMENT 9                                STANDARD Second Containment Spray 1.5 IF a CS pump is operating, THEN stop the remaining CS pump.
Pump is secured.
Comment:                                                                  Critical SAT / UNSAT TASK ELEMENT 10                                STANDARD 1.6 Close the following Containment Spray valves:
* CS-125 A, CNTMT SPRAY HEADER A ISOL                        CS-125 A and CS-125 B
* CS-125 B, CNTMT SPRAY HEADER B ISOL                        are closed.
Comment:                                                                  Critical Control switch must be taken to OPEN and then to CLOSE.
SAT / UNSAT TASK ELEMENT 11                                STANDARD Both Containment Spray 1.7 Place BOTH Containment Spray pump control switches to normal pump control switches are position.
in the normal position.
in the normal position.
Comment:   Critical SAT / UNSAT  
Comment:                                                                   Critical SAT / UNSAT END OF TASK Revision 0                                    Page 7 of 8                  2010 NRC SRO Exam


END OF TASK
JPM S6 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-198 Verify the following Malfunctions:
o Ms11b          25%
o Ch09          50%
Place the Simulator in Run on the lead examiners cue.
Revision 0                            Page 8 of 8    2010 NRC SRO Exam


JPM S6  Revision 0 Page 8 of 8 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-198
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S7 Waste Condensate Tank Discharge Applicant:
 
Examiner:
Verify the following Malfunctions:
o Ms11b 25%
o Ch09  50%
 
Place the Simulator in Run on the lead examiner's cue.
 
Waterford 3 2010 NRC SRO Exam  
 
JOB PERFORMANCE MEASURE  
 
S7 Waste Condensate Tank Discharge


Applicant: 
JPM S7 JOB PERFORMANCE MEASURE DATA PAGE Task:             Waste Condensate Tank Discharge Task Standard:     Applicant initiated Waste Condensate Tank release in accordance with OP-007-004, Liquid Waste Management System, and secured the release after the flow controller failed to maximum output.
 
Examiner: 
 
JPM S7 Revision 0 Page 2 of 7 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Waste Condensate Tank Discharge  
 
Task Standard: Applicant initiated Waste Condensate Tank release in accordance with OP-007-004, Liquid Waste M anagement System, and secured the release after the flow controller failed to maximum output.  


==References:==
==References:==
OP-007-004, Liqui d Waste Management System CE-003-514, Liquid Radioactive Waste Release Permit (Computer)
OP-007-004, Liquid Waste Management System CE-003-514, Liquid Radioactive Waste Release Permit (Computer)
Alternate Path: Yes Time Critical:No Validation Time: 15 mins.
Alternate Path:     Yes       Time Critical:   No       Validation Time:     15     mins.
K/A 068 A4.03, Stoppage of releases if limits   Importance Rating 3.9 / 3.8 exceeded RO / SRO   Applicant:
K/A     068 A4.03, Stoppage of releases if limits           Importance Rating   3.9 / 3.8 exceeded                                                 RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                                 Time Finish:
Performance Time:                            minutes Performance Rating:            SAT                  UNSAT Comments:
Examiner:                                                          Date:
Signature Revision 0                                Page 2 of 7                      2010 NRC SRO Exam


Performance Time:  minutes
JPM S7 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-007-004, Liquid Waste Management System Discharge Permit for Waste Condensate Tank A
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature   
 
JPM S7 Revision 0 Page 3 of 7 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-007-004, Liquid Wa ste Management System Discharge Permit for Waste Condensate Tank A  


==
==
Description:==
Description:==


The applicant will be tasked with initia ting a discharge of Waste Condensate Tank A. The cue will provide indicate that the operator in the field has completed all required lineups and is standing by. When the app licant initiates flow, the flow controller output will fail high, causing discharge flow to exceed the 50 gpm permit flow limit. The flow controller will not be capable of securing flow. The applicant will stop discharge  
The applicant will be tasked with initiating a discharge of Waste Condensate Tank A. The cue will provide indicate that the operator in the field has completed all required lineups and is standing by. When the applicant initiates flow, the flow controller output will fail high, causing discharge flow to exceed the 50 gpm permit flow limit. The flow controller will not be capable of securing flow. The applicant will stop discharge flow by closing the discharge isolation valves.
 
flow by closing the discharge isolation valves.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 7                    2010 NRC SRO Exam


I will explain the initial conditions, and state t he task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will
JPM S7 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
provide initiating cues and reports on other ac tions when directed by you. Indicate to me when you understand your assigned task.
* Waste Condensate Tank A has been prepared for discharge.
 
* The RCA Watch reports that he has completed step 6.10.6 of OP-007-004, Liquid Waste Management System, and that Attachment 11.4, Waste Condensate Tank Discharge Checklist, is complete.
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
INITIATING CUES:
 
* The RCA Watch reports that he has completed step 6.10.6 in OP-007-004, Liquid Waste Management System, and that Attachment 11.4, Waste Condensate Tank Discharge Checklist, is complete.
JPM S7 Revision 0 Page 4 of 7 2010 NRC SRO Exam APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
* The Control Room Supervisor directs you to commence discharging Waste Condensate Tank A, starting at step 6.10.7 of OP-007-004 LWMS.
 
Revision 0                               Page 4 of 7                 2010 NRC SRO Exam
INITIAL CONDITIONS:  
 
Waste Condensate Tank A has been prepared for discharge. The RCA Watch reports that he has completed step 6.10.6 of OP-007-004, Liquid Waste Management System, and that Attachment 11.4, Waste Condensate Tank Discharge Checklist, is complete.  
 
INITIATING CUES:  
 
The RCA Watch reports that he has completed step 6.10.6 in OP
-007-004, Liquid Waste Management System, and that Attachment 11.4, Waste Condensate Tank Discharge Checklist , is complete.
The Control Room Supervisor directs you to commence discharging Waste Condensate Tank A , starting at step 6.10.7 of OP-007-004 LWMS.  
 
JPM S7  Revision 0 Page 5 of 7 2010 NRC SRO Exam TASK ELEMENT 1 STANDARD 6.10.7  On CP-4, Reset Liquid Waste Discharge Flow Integrator to zero. Integrator is reset to zero.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 2 STANDARD 6.10.8  Record WCT level and Liquid Waste Discharge Integrator reading
 
on Liquid Release Permit.
Reading is recorded on the Release Permit.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 3 STANDARD 6.10.9  Verify Liquid Waste Discharge Flow Controller, LWM-IFIC-0647, in Manual with 0% output.
Verification complete.
Comment:    SAT  /  UNSAT TASK ELEMENT 4 STANDARD Procedure Caution:  If Circulating Water flow is reduced to less than that
 
required by the discharge permit, then discharge shall be secured


JPM S7 TASK ELEMENT 1                                        STANDARD 6.10.7 On CP-4, Reset Liquid Waste Discharge Flow Integrator to zero. Integrator is reset to zero.
Comment:                                                                            Critical SAT / UNSAT TASK ELEMENT 2                                        STANDARD 6.10.8 Record WCT level and Liquid Waste Discharge Integrator reading    Reading is recorded on the on Liquid Release Permit.                                                Release Permit.
Comment:                                                                            Critical SAT / UNSAT TASK ELEMENT 3                                        STANDARD 6.10.9 Verify Liquid Waste Discharge Flow Controller, LWM-IFIC-0647, Verification complete.
in Manual with 0% output.
Comment:
SAT / UNSAT TASK ELEMENT 4                                        STANDARD Procedure Caution: If Circulating Water flow is reduced to less than that required by the discharge permit, then discharge shall be secured        Caution reviewed.
immediately.
immediately.
Caution reviewed.
Comment:
Comment:   SAT / UNSAT  
SAT / UNSAT Revision 0                                     Page 5 of 7                         2010 NRC SRO Exam
 
JPM S7  Revision 0 Page 6 of 7 2010 NRC SRO Exam Evaluator Note The combined control switch on CP-4 will open LWM-441 and give an open permissive to LWM-442.
LWM-442 is operated using controller LWM-IFIC-0647, also on CP-4.
What about LWM-315 A(B) in the procedure step 6.10.10.1??
Evaluator Note When flow rises above the trigger setpoint, the output of the controller will fail in the raise position. Flow will rise above the Permit limit of 50 gpm. The applicant will not be able to secure flow with the
 
controller. The applicant will be required to secure flow by closing LWM-441 and LWM-442 using the control switch.


TASK ELEMENT 5 STANDARD 6.10.10 To start discharging WCT, momentarily position Liquid Waste  
JPM S7 Evaluator Note The combined control switch on CP-4 will open LWM-441 and give an open permissive to LWM-442.
 
LWM-442 is operated using controller LWM-IFIC-0647, also on CP-4. What about LWM-315 A(B) in the procedure step 6.10.10.1??
Condensate Flow Control handswitch, LWM-441 and LWM-442, to Open  
Evaluator Note When flow rises above the trigger setpoint, the output of the controller will fail in the raise position. Flow will rise above the Permit limit of 50 gpm. The applicant will not be able to secure flow with the controller. The applicant will be required to secure flow by closing LWM-441 and LWM-442 using the control switch.
 
TASK ELEMENT 5                                               STANDARD LWM-441 is opened using control switch.
and adjust flow using Liquid Waste Condensate Flow Controller, LWM-IFIC-0647, not to exceed value specified on Liquid Release Permit.
6.10.10 To start discharging WCT, momentarily position Liquid Waste             LWM-442 is throttled open Condensate Flow Control handswitch, LWM-441 and LWM-442, to Open               using controller.??
LWM-441 is opened using control switch.
and adjust flow using Liquid Waste Condensate Flow Controller, LWM-             Procedure states: use IFIC-0647, not to exceed value specified on Liquid Release Permit.             LWM-315 A(B) as necessary to achieve desired flow.
LWM-442 is throttled open using controller.
Comment:                                                                                     Critical The following step is the alternate path.
??  Procedure states: use LWM-315 A(B) as necessary to achieve desired flow.
SAT / UNSAT Additional step: Attempt to stop flow using IFIC-0647 TASK ELEMENT 6                                               STANDARD Position Liquid Waste Condensate Flow Control Switch for LWM-441 and           LWM-441 and LWM-442 LWM-442 to Closed and verify LWM-441 and LWM-442 are closed.                   are closed.
Comment: The following step is the alternate path.
Comment:                                                                                     Critical SAT / UNSAT END OF TASK Revision 0                                       Page 6 of 7                                 2010 NRC SRO Exam
Critical SAT / UNSAT Additional step: Attempt to stop flow using IFIC-0647 TASK ELEMENT 6 STANDARD Position Liquid Waste Condensate Flow Control Switch for LWM-441 and LWM-442 to Closed and verify LWM-441 and LWM-442 are closed.
LWM-441 and LWM-442 are closed.
Comment:   Critical SAT / UNSAT END OF TASK  
 
JPM S7  Revision 0 Page 7 of 7 2010 NRC SRO Exam SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-197
 
There are no Malfunctions for this JPM.


JPM S7 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-197 There are no Malfunctions for this JPM.
Verify the following Overrides:
Verify the following Overrides:
o DI-04A3A12C-3 is overridden to PUSH  
o DI-04A3A12C-3 is overridden to PUSH Verify the following Event Trigger settings:
Trigger 7 is set as zaowdlwmifif0647(1)>0.2 Revision 0                              Page 7 of 7      2010 NRC SRO Exam


Verify the following Event Trigger settings:
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE P1 Reset Emergency Feedwater Pump AB Applicant:
Trigger 7 is set as zaowdlwmifif0647(1)>0.2
Examiner:


Waterford 3 2010 NRC SRO Exam
JPM P1 JOB PERFORMANCE MEASURE DATA PAGE Task:             Reset overspeed device on Emergency Feedwater Pump AB during a Station Blackout.
 
Task Standard:     The overspeed device on Emergency Feedwater Pump AB was reset in accordance with OP-902-005, Station Blackout Recovery.
JOB PERFORMANCE MEASURE
 
P1 Reset Emergency Feedwater Pump AB
 
Applicant: 
 
Examiner: 
 
JPM P1 Revision 0 Page 2 of 7 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Reset overspeed device on Emergency Feedwater Pump AB during a Station Blackout.
Task Standard: The overspeed device on Emergency Feedwater Pump AB was reset in accordance with OP-902-005, Station Blackout Recovery.  


==References:==
==References:==
OP-902-005, Station Blackout Recovery Alternate Path: No Time Critical:No Validation Time: 10 mins.
OP-902-005, Station Blackout Recovery Alternate Path:     No       Time Critical:   No       Validation Time:     10     mins.
K/A 061 A2.04, Pump failure or improper operation  Importance Rating 3.4 / 3.8   RO / SRO   Applicant:
061 A2.04, Pump failure or improper K/A                                                      Importance Rating     3.4 / 3.8 operation RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                               Time Finish:
 
Performance Time:                           minutes Performance Rating:             SAT                 UNSAT Comments:
Performance Time: minutes  
Examiner:                                                        Date:
 
Signature Revision 0                              Page 2 of 7                      2010 NRC SRO Exam
Performance Rating: SAT UNSAT Comments:


Examiner:  Date:  Signature   
JPM P1 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-902-005, Station Blackout Recovery
JPM P1 Revision 0 Page 3 of 7 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-902-005, Station Blackout Recovery  


==
==
Description:==
Description:==


This task takes place in the RCA. The task takes place during a simulated  
This task takes place in the RCA. The task takes place during a simulated Station Blackout. This requires the applicant to simulate manual operation of MS-416, Emergency Feedwater Pump AB Trip Valve. All components are located on the -35 elevation. This JPM takes place in a location with numerous pipes and supports that are bump hazards, but no special PPE will be required for this task. There are no special radiological requirements to perform this task.
 
Station Blackout. This requires the applicant to simulate manual operation of MS-416, Emergency Feedwater Pump AB Trip Valve.
All components are located on the -35 elevation. This JPM takes place in a lo cation with numerous pipes and supports that are bump hazards, but no special PPE will be r equired for this task. There are no special radiological requirements to perform this task.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated, do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 7                    2010 NRC SRO Exam


I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated , do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when
JPM P1 APPLICANT CUE SHEET Do Not Manipulate Any Plant Components (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* A Station Blackout event is in progress
* Emergency Feedwater Pump AB has tripped on an overspeed condition
* The Control Room has closed MS-401 A and MS-401 B.
* The Control Room has cycled MS-407 Open and Closed to depressurize the steam header. Remove this bullet if this step is done locally per 10.1.b.
INITIATING CUES:
* The CRS directs you to reset Emergency Feedwater Pump AB in accordance with OP-902-005, Step 10 RNO.
Revision 0                                Page 4 of 7          2010 NRC Walk Through Exam


directed by you. Indicate to me when you understand your assigned task.  
JPM P1 TASK ELEMENT 1                                            STANDARD 10.1.a. Close BOTH PUMP AB TURB STM SUPPLY valves: MS-401 A Provided in the cue.
 
and MS-401 B.
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.  
Comment:
 
SAT / UNSAT TASK ELEMENT 2                                            STANDARD 10.1.b. Locally verify the steam supply header depressurized using MS-Provided in cue.
JPM P1  Revision 0 Page 4 of 7 2010 NRC Walk Through Exam APPLICANT CUE SHEET
407, EFW Pump AB Drip Pot Normal Drain Bypass.
 
Comment:
Do Not Manipulate Any Plant Components
10.1.b states locally. Should this be done locally by the applicant??
 
Provide examiner cue                                                                 SAT / UNSAT Evaluator Note MS-416 trips closed on an overpseed. In a Station Blackout, MS-416 MOV must be manually operated in the closed direction to position the valve for reset. The physical indication as this operation is performed would be the trip bar moving from a low, tripped position up to the trip latch.
(TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Evaluator Note MS-416 in the tripped position before and after MOV is manually operated:
 
Revision 0                                         Page 5 of 7                   2010 NRC Walk Through Exam
INITIAL CONDITIONS:


A Station Blackout event is in progress  Emergency Feedwater Pump AB has tripped on an overspeed condition  The Control Room has closed MS-401 A and MS-401 B. The Control Room has cycled MS-407 Open and Closed to depressurize the steam header.
JPM P1 TASK ELEMENT 3                                    STANDARD MS-416 is operated in the 10.1.c. Locally close MS 416, EFW Pump AB Turbine Stop Valve.
Remove this bullet if this step is done locally per 10.1.b.
closed direction.
EXAMINER CUE: Valve latching mechanism is full up.
Comment:                                                                      Critical SAT / UNSAT Evaluator Note The overspeed device is reset by moving the trip bar towards MS-416.
TASK ELEMENT 4                                    STANDARD 10.1.d. Verify mechanical Overspeed reset.                          Overspeed device is reset.
EXAMINER CUE: A cue to give to applicant for this task. OR A PICTURE.
Comment:                                                                      Critical SAT / UNSAT Revision 0                                    Page 6 of 7            2010 NRC Walk Through Exam


INITIATING CUES:
JPM P1 TASK ELEMENT 5                            STANDARD MS-416 is manually 10.1.e. Locally open MS 416, EFW Pump AB Turbine Stop Valve.
 
opened.
The CRS directs you to reset Emergency Feedwater Pump AB in accordance with OP-902-005, Step 10 RNO.
EXAMINER CUE: Valve is fully CCW and valve stem is up.
 
Comment:                                                               Critical SAT / UNSAT TASK ELEMENT 6                             STANDARD 10.1.f. Open BOTH PUMP AB TURB STM SUPPLY valves.
JPM P1 Revision 0 Page 5 of 7 2010 NRC Walk Through Exam TASK ELEMENT 1 STANDARD 10.1.a. Close BOTH PUMP AB TURB STM SUPPLY valves: MS-401 A and MS-401 B.
Communication made to
Provided in the cue.
* MS 401A the Control Room.
Comment:    SAT  /  UNSAT TASK ELEMENT 2 STANDARD 10.1.b. Locally verify the steam supply header depressurized using MS-407, EFW Pump AB Drip Pot Normal Drain Bypass.
* MS 401B Comment:
Provided in cue.
SAT / UNSAT END OF TASK Revision 0                                Page 7 of 7          2010 NRC Walk Through Exam
Comment: 10.1.b states locally. Should this be done locally by the applicant??  Provide examiner cue-SAT  /  UNSAT Evaluator Note MS-416 trips closed on an overpseed. In a Station Blackout, MS-416 MOV must be manually operated
 
in the closed direction to position the valve for reset.
The physical indication as this operation is performed would be the trip bar moving from a low, tripped position up to the trip latch. 
 
Evaluator Note MS-416 in the tripped position before and after MOV is manually operated:
 
JPM P1  Revision 0 Page 6 of 7 2010 NRC Walk Through Exam TASK ELEMENT 3 STANDARD 10.1.c. Locally close MS 416, EFW Pump AB Turbine Stop Valve.
MS-416 is operated in the closed direction. EXAMINER CUE:  Valve latching mechanism is full up.
Comment:  Critical SAT  /  UNSAT Evaluator Note The overspeed device is reset by moving the trip bar towards MS-416.
 
TASK ELEMENT 4 STANDARD 10.1.d. Verify mechanical Overspeed reset. Overspeed device is reset. EXAMINER CUE:  A cue to give to applicant for this task. OR A PICTURE. Comment:  Critical SAT  /  UNSAT
 
JPM P1  Revision 0 Page 7 of 7 2010 NRC Walk Through Exam TASK ELEMENT 5 STANDARD 10.1.e. Locally open MS 416, EFW Pump AB Turbine Stop Valve.
MS-416 is manually opened. EXAMINER CUE: Valve is fully CCW and valve stem is up.
Comment:   Critical SAT / UNSAT TASK ELEMENT 6 STANDARD 10.1.f. Open BOTH PUMP AB TURB STM SUPPLY valves. MS 401A  MS 401B Communication made to the Control Room.
Comment:   SAT / UNSAT END OF TASK  
 
Waterford 3 2010 NRC SRO Exam  
 
JOB PERFORMANCE MEASURE
 
P2 Aligning Spent Fuel Pool Purification
 
Applicant: 


Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE P2 Aligning Spent Fuel Pool Purification Applicant:
Examiner:
Examiner:
THIS JPM DOES NOT SEEM DISCRIMINATING AND HAS A LOW IR.
THIS JPM DOES NOT SEEM DISCRIMINATING AND HAS A LOW IR.
PLEASE HAVE ANOTHER JPM AVAILABLE TO REPLACE THIS (SECURE FROM RWSP PURIFICATION OR PLACE FPC IN RWSP PURIFICATION). WE WILL RUN THIS AND THE REPLACEMENT DURING VALIDATION.
PLEASE HAVE ANOTHER JPM AVAILABLE TO REPLACE THIS (SECURE FROM RWSP PURIFICATION OR PLACE FPC IN RWSP PURIFICATION). WE WILL RUN THIS AND THE REPLACEMENT DURING VALIDATION.
JPM P2 Revision 0 Page 2 of 8 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Place the Spent Fuel Pool on purification in accordance with OP-002-006, Fuel Pool Cooling and Purification Task Standard: The Spent Fuel Pool was a ligned for purification in accordance with OP-002-006, Fuel Pool Cooling and Purification.  
 
JPM P2 JOB PERFORMANCE MEASURE DATA PAGE Task:               Place the Spent Fuel Pool on purification in accordance with OP-002-006, Fuel Pool Cooling and Purification Task Standard:     The Spent Fuel Pool was aligned for purification in accordance with OP-002-006, Fuel Pool Cooling and Purification.


==References:==
==References:==
OP-002-006, Fuel Pool Cooling and Purification Alternate Path: No Time Critical:No Validation Time: 15 mins.
OP-002-006, Fuel Pool Cooling and Purification Alternate Path:     No       Time Critical:   No       Validation Time:     15     mins.
K/A 033 K4.02, Maintenance of Spent Fuel Pool   Importance Rating 2.5 / 2.7 cleanliness RO / SRO   Applicant:
K/A     033 K4.02, Maintenance of Spent Fuel Pool         Importance Rating   2.5 / 2.7 cleanliness                                             RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                               Time Finish:
Performance Time:                            minutes Performance Rating:            SAT                UNSAT Comments:
Examiner:                                                        Date:
Signature Revision 0                              Page 2 of 8                      2010 NRC SRO Exam


Performance Time:  minutes
JPM P2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-002-006, Fuel Pool Cooling and Purification
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature   
 
JPM P2 Revision 0 Page 3 of 8 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-002-006, Fuel Pool Cooling and Purification  


==
==
Description:==
Description:==


This task takes place in the RCA, specific to the Fuel Handling Building. All  
This task takes place in the RCA, specific to the Fuel Handling Building. All components are located on the +1 elevation of the Fuel Handling Building. No special PPE will be required for this task. There are no special radiological requirements to perform this task.
 
components are located on the +1 elevation of the Fuel Handling Building. No special PPE will be required for this task. There are no special radiological requirements to perform this task.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated, do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 8                    2010 NRC SRO Exam


I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated , do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when
JPM P2 APPLICANT CUE SHEET Do Not Manipulate Any Plant Components (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* Refueling Water Storage Pool Purification has been in service for 2 days.
* Refueling Water Storage Pool Purification was secured 1 hour ago.
INITIATING CUES:
* The CRS directs you to place the Spent Fuel Pool on purification.
* No system venting is required.
Revision 0                              Page 4 of 8                      2010 NRC SRO Exam


directed by you. Indicate to me when you understand your assigned task.  
JPM P2 TASK ELEMENT 1                                        STANDARD 6.4.1 Verify Refueling Water Storage Pool Purification is secured in Provided in cue.
accordance with Section 6.7, Securing RWSP Purification.
Comment:
SAT / UNSAT TASK ELEMENT 2                                        STANDARD 6.4.2 Throttle Fuel Pool Purif Pump Discharge Isolation, FS-318, to 2        FS-318 is throttled 2 turns turns Open.                                                                  open.
EXAMINER CUE: Valve fully clockwise and then CCW 2 turns.
Comment:                                                                                Critical SAT / UNSAT TASK ELEMENT 3                                        STANDARD 6.4.3 Close Fuel Pool Purification Pump breaker, FS-EBKR-314A-5D.            Breaker is closed.
EXAMINER CUE: Breaker ON (or up etc.)
Comment:                                                                                Critical The 314 A Bus is located on the +1 elevation of the Fuel Handling Building.                                                                          SAT / UNSAT TASK ELEMENT 4                                        STANDARD Procedure Note.
(1) Fuel Pool Purification Pump will not start if Fuel Pool level is <41' 6".
(2) Fuel Pool Purification components should be bypassed as necessary to maintain differential pressures less than or equal to the Maximum DP limit listed below. Chemistry Department should be notified when any of these components are bypassed (refer to Limitation 3.2.6 for applicable      Note reviewed.
bypass valves):
* Fuel Pool Purification Filter DP: 25 PSID
* Fuel Pool Ion Exchanger Outlet Header Strainer DP: 10 PSID
* Combined DP of Fuel Pool Ion Exchanger and Fuel Pool Ion Exchanger Outlet Header Strainer (aligned to sense differential pressure across both): 25 PSID Revision 0                                        Page 5 of 8                          2010 NRC SRO Exam


Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
JPM P2 Comment:
SAT / UNSAT Revision 0 Page 6 of 8    2010 NRC SRO Exam


JPM P2 Revision 0 Page 4 of 8 2010 NRC SRO Exam APPLICANT CUE SHEET
JPM P2 TASK ELEMENT 5                                    STANDARD Procedure caution.
If the Spent Fuel Pool temperature (PMC PIDs A47004 and A47005) rises to > 135 &deg;F at any time during purification, then the Fuel Pool    Caution reviewed.
Purification Pump must be stopped or Fuel Pool ion exchanger resin damage may occur.
Comment:
SAT / UNSAT TASK ELEMENT 6                                    STANDARD 6.4.4 Start the Fuel Pool Purification Pump.                            Pump started.
EXAMINER CUE: Red light ON, pump amps, flow, noise etc.
Comment:                                                                          Critical The control switch for the Fuel Pool Purification Pump is located in the Fuel Pool Purification cubicle.                                                SAT / UNSAT TASK ELEMENT 7                                    STANDARD 6.4.5 If venting is required, then vent from the following valves:
* FS-319          Fuel Pool Purif Pump Discharge Header Vent Provided in the cue.
* FS-324          Fuel Pool Purif Filter Vent
* FS-344          Fuel Pool Ion Exchanger Outlet Header Vent Comment:
SAT / UNSAT TASK ELEMENT 8                                    STANDARD 6.4.6 Open Fuel Pool Purif Pump Discharge Isolation, FS-318.            FS-318 is full open.
EXAMINER CUE: Fully clockwise Comment:                                                                          Critical SAT / UNSAT Revision 0                                       Page 7 of 8                     2010 NRC SRO Exam


Do Not Manipulate Any Plant Components
JPM P2 END OF TASK Revision 0    Page 8 of 8 2010 NRC SRO Exam


(TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE P3 SUPS 014 AB Operation Applicant:
 
Examiner:
INITIAL CONDITIONS:
 
Refueling Water Storage Pool Purification has been in service for 2 days. Refueling Water Storage Pool Purification was secured 1 hour ago.
 
INITIATING CUES:
 
The CRS directs you to place the Spent Fuel Pool on purification. No system venting is required.
 
JPM P2  Revision 0 Page 5 of 8 2010 NRC SRO Exam TASK ELEMENT 1 STANDARD 6.4.1  Verify Refueling Water Storage Pool Purification is secured in accordance with Section 6.7, Securing RWSP Purification.
Provided in cue.
Comment:    SAT  /  UNSAT TASK ELEMENT 2 STANDARD 6.4.2  Throttle Fuel Pool Purif Pump Discharge Isolation, FS-318, to 2 turns Open.
FS-318 is throttled 2 turns open. EXAMINER CUE: Valve fully clockwise and then CCW 2 turns.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 3 STANDARD 6.4.3  Close Fuel Pool Purification Pump breaker, FS-EBKR-314A-5D. Breaker is closed.
EXAMINER CUE:  Breaker ON (or up etc.)
Comment: The 314 A Bus is located on the +1 elevation of the Fuel Handling Building.
Critical SAT  /  UNSAT TASK ELEMENT 4 STANDARD Procedure Note.
 
(1)  Fuel Pool Purification Pump will not start if Fuel Pool level is <41' 6".
 
(2)  Fuel Pool Purification com ponents should be bypassed as necessary to maintain differential pressures less than or equal to the Maximum DP
 
limit listed below. Chemistry Department should be notified when any of
 
these components are bypassed (refer to Limitation 3.2.6 for applicable
 
bypass valves):  Fuel Pool Purification Filter DP:  25 PSID  Fuel Pool Ion Exchanger Outlet Header Strainer DP:  10 PSID  Combined DP of Fuel Pool Ion Exchanger and Fuel Pool Ion Exchanger Outlet Header Strainer (aligned to sense differential
 
pressure across both):  25 PSID Note reviewed.
JPM P2  Revision 0 Page 6 of 8 2010 NRC SRO Exam Comment:    SAT  /  UNSAT
 
JPM P2  Revision 0 Page 7 of 8 2010 NRC SRO Exam TASK ELEMENT 5 STANDARD Procedure caution.
If the Spent Fuel Pool temper ature (PMC PIDs A47004 and A47005) rises to >
135  F at any time during purification, then the Fuel Pool Purification Pump must be stopped or Fuel Pool ion exchanger resin
 
damage may occur.
Caution reviewed.
Comment:    SAT  /  UNSAT TASK ELEMENT 6 STANDARD 6.4.4  Start the Fuel Pool Purification Pump. Pump started. EXAMINER CUE:  Red light ON, pump amps, flow, noise etc.
Comment: The control switch for the Fuel Pool Purification Pump is located in the Fuel Pool Purification cubicle.
Critical SAT  /  UNSAT TASK ELEMENT 7 STANDARD 6.4.5  If venting is required, then vent from the following valves:  FS-319 Fuel Pool Purif Pump Discharge Header Vent  FS-324 Fuel Pool Purif Filter Vent  FS-344 Fuel Pool Ion E xchanger Outlet Header Vent Provided in the cue.
Comment:    SAT  /  UNSAT TASK ELEMENT 8 STANDARD 6.4.6  Open Fuel Pool Purif Pump Discharge Isolation, FS-318. FS-318 is full open. EXAMINER CUE:  Fully clockwise Comment:  Critical SAT  /  UNSAT
 
JPM P2  Revision 0 Page 8 of 8 2010 NRC SRO Exam END OF TASK Waterford 3 2010 NRC SRO Exam  
 
JOB PERFORMANCE MEASURE  


P3 SUPS 014 AB Operation
JPM P3 JOB PERFORMANCE MEASURE DATA PAGE Task:             Transfer SUPS 014 AB from Alternate to Normal AC power Task Standard:     SUPS 014 AB was transferred from Alternate to Normal AC alignment in accordance with OP-006-005, Inverters and Distribution.
 
Applicant: 
 
Examiner: 
 
JPM P3 Revision 0 Page 2 of 9 2010 NRC SRO Exam JOB PERFORMANCE MEASURE DATA PAGE Task: Transfer SUPS 014 AB from Alternate to Normal AC power  
 
Task Standard: SUPS 014 AB was transferr ed from Alternate to Normal AC alignment in accordance with OP-006-005, Inverters and Distribution.


==References:==
==References:==
OP-006-005, Inverters and Distribution Alternate Path: Yes Time Critical:No Validation Time: 20 mins.
OP-006-005, Inverters and Distribution Alternate Path:     Yes     Time Critical:     No     Validation Time:     20     mins.
K/A 062 A3.04, Operation of inverter Importance Rating 2.7 / 2.9   RO / SRO   Applicant:
K/A     062 A3.04, Operation of inverter                 Importance Rating     2.7 / 2.9 RO / SRO Applicant:
Time Start:   Time Finish:
Time Start:                               Time Finish:
Performance Time:                            minutes Performance Rating:            SAT                  UNSAT Comments:
Examiner:                                                        Date:
Signature Revision 0                                Page 2 of 9                    2010 NRC SRO Exam


Performance Time:  minutes
JPM P3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
OP-006-005, Inverters and Distribution
Performance Rating: SAT UNSAT Comments: 
 
Examiner:  Date:  Signature   
 
JPM P3 Revision 0 Page 3 of 9 2010 NRC SRO Exam EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:  
 
OP-006-005, Inverters and Distribution  


==
==
Description:==
Description:==


SUPS 014 AB will be simulated in the Alternate AC power alignment. Applicant  
SUPS 014 AB will be simulated in the Alternate AC power alignment. Applicant will transfer SUPS 014 AB to the Normal AC alignment. All steps will be simulated in Switchgear Room A. No special PPE will be required for this task.
 
will transfer SUPS 014 AB to the Normal AC alignment. All steps will be simulated in  
 
Switchgear Room A. No specia l PPE will be required for this task.  
 
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated, do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.
Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
Revision 0                                  Page 3 of 9                    2010 NRC SRO Exam


I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated , do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when
JPM P3 APPLICANT CUE SHEET Do Not Manipulate Any Plant Components (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* SUPS 014 AB is in the Alternate AC alignment
* The inverter was isolated in accordance with OP-006-005, Inverters and Distribution, steps Step 6.5.2.7.
INITIATING CUES:
* The CRS directs you to place SUPS 014 AB in the Normal AC alignment in accordance with OP-006-005, Inverters and Distribution, section 6.5.3.
PLACE THIS SHEET AT END OF JPM Revision 0                                Page 4 of 9                    2010 NRC SRO Exam


directed by you. Indicate to me when you understand your assigned task.
JPM P3 TASK ELEMENT 1                             STANDARD 6.5.3.1.1 Place Normal Feeder breaker to ON.               Breaker is ON.
 
Comment:                                                             Critical SAT / UNSAT TASK ELEMENT 2                             STANDARD 6.5.3.1.2 Verify Inverter Input Voltage > 121 VDC, then Breaker is ON.
Read the Initial Condition and Cues from t he colored Applicant Cue Sheet, and then give the cue sheet to the applicant.
place Emergency Feeder breaker to ON.
 
Comment:                                                             Critical SAT / UNSAT TASK ELEMENT 3                             STANDARD Pushbutton is pressed 6.5.3.1.3 Depress and release Inverter Operate pushbutton.
JPM P3 Revision 0 Page 4 of 9 2010 NRC SRO Exam APPLICANT CUE SHEET
and released.
 
Comment:                                                             Critical SAT / UNSAT TASK ELEMENT 4                             STANDARD 6.5.3.2 Verify SUPS 014AB Static Switch Retransfer toggle Verification complete.
Do Not Manipulate Any Plant Components
switch in INHIBIT.
 
Comment:
(TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
SAT / UNSAT Revision 0                             Page 5 of 9                 2010 NRC SRO Exam
 
INITIAL CONDITIONS:
 
SUPS 014 AB is in the Alternate AC alignment  The inverter was isolated in accordance with OP-006-005, Inverters and Distribution, steps Step 6.5.2.7. 
 
INITIATING CUES:
 
The CRS directs you to place SUPS 014 AB in the Normal AC alignment in accordance with OP-006-005, Inverters and Distribution, section 6.5.3.
 
PLACE THIS SHEET AT END OF JPM JPM P3  Revision 0 Page 5 of 9 2010 NRC SRO Exam TASK ELEMENT 1 STANDARD 6.5.3.1.1 Place Normal Feeder breaker to ON. Breaker is ON.
Comment:   Critical SAT / UNSAT TASK ELEMENT 2 STANDARD 6.5.3.1.2 Verify Inverter Input Voltage > 121 VDC, then place Emergency Feeder breaker to ON.
Breaker is ON.
Comment:   Critical SAT / UNSAT TASK ELEMENT 3 STANDARD 6.5.3.1.3 Depress and release Inverter Operate pushbutton.
Pushbutton is pressed and released.
Comment:   Critical SAT / UNSAT TASK ELEMENT 4 STANDARD 6.5.3.2 Verify SUPS 014AB Stat ic Switch Retransfer toggle switch in INHIBIT.
Verification complete.
Comment:   SAT / UNSAT  
 
JPM P3  Revision 0 Page 6 of 9 2010 NRC SRO Exam TASK ELEMENT 5 STANDARD 6.5.3.3  Place SUPS 014AB Al ternate Feeder breaker to ON. Breaker is ON.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 6 STANDARD 6.5.3.4  Depress and releas e SUPS 014AB Static Switch Transfer Test pushbutton.
Test pushbutton depressed and


JPM P3 TASK ELEMENT 5                              STANDARD 6.5.3.3 Place SUPS 014AB Alternate Feeder breaker to Breaker is ON.
ON.
Comment:                                                              Critical SAT / UNSAT TASK ELEMENT 6                              STANDARD Test pushbutton 6.5.3.4 Depress and release SUPS 014AB Static Switch depressed and Transfer Test pushbutton.
released.
released.
Comment:   Critical SAT / UNSAT TASK ELEMENT 7 STANDARD 6.5.3.4.1 Verify Static Switch On Reserve light Illuminates. Verification complete.
Comment:                                                               Critical SAT / UNSAT TASK ELEMENT 7                               STANDARD 6.5.3.4.1 Verify Static Switch On Reserve light Illuminates. Verification complete.
Comment:   SAT / UNSAT TASK ELEMENT 8 STANDARD 6.5.3.5 Depress and release SUPS 014AB Lamp Test/Reset pushbutton.
Comment:
Pushbutton depressed and released.
SAT / UNSAT TASK ELEMENT 8                               STANDARD 6.5.3.5 Depress and release SUPS 014AB Lamp Test/Reset       Pushbutton depressed pushbutton.                                                 and released.
Comment:   Critical SAT / UNSAT  
Comment:                                                               Critical SAT / UNSAT Revision 0                           Page 6 of 9                     2010 NRC SRO Exam
 
JPM P3  Revision 0 Page 7 of 9 2010 NRC SRO Exam TASK ELEMENT 9 STANDARD 6.5.3.5.1  Verify Static Switch On Reserve light remains Illuminated.
Verification complete.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 10 STANDARD 6.5.3.6  Place SUPS 014AB Ou tput To PDP014AB breaker to ON. Breaker is ON.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 11 STANDARD 6.5.3.7 Place SUPS 014AB Bypass breaker to OFF. Breaker is OFF.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 12 STANDARD 6.5.3.8  Place SUPS 014AB AC Voltage Select Switch to INVERTER.
Select Switch is in INVERTER.
Comment:  Critical SAT  /  UNSAT
 
JPM P3  Revision 0 Page 8 of 9 2010 NRC SRO Exam Evaluator Note When applicant observes the SUPS Output Voltage meter, provide indication of zero volts.
If the applicant presses the Operate pushbutton, prov ide the indications provided in Task Element 13.
If the applicant does not press the Operate pushbu tton, then provide the indication that the Static Swit ch On Reserve light is still illuminated at Task Element 16.
TASK ELEMENT 13 STANDARD 6.5.3.9  If no voltage is indi cated, then depress and release SUPS 014AB Inverter Operate pushbutton, and verify the following:  Inverter Phase Locked light Illuminated  Inverter Output voltage CN ~120 VAC (118.8 to 121.2 VAC)  Inverter Output voltage AN ~120 VAC (118.8 to 121.2 VAC)  Inverter Output voltage BN ~120 VAC (118.8 to 121.2 VAC)  Inverter Output frequency ~60 Hz (59.97 to 60.03 Hz)
Observes no voltage and presses and
 
releases the Operate
 
pushbutton.
Comment:  Critical SAT  /  UNSAT TASK ELEMENT 14 STANDARD 6.5.3.10  Place SUPS 014AB Stat ic Switch Retransfer toggle switch to AUTO.
Toggle Switch is in Auto. Comment:  Critical SAT  /  UNSAT


JPM P3 Revision 0 Page 9 of 9 2010 NRC SRO Exam TASK ELEMENT 15 STANDARD 6.5.3.11  After approximately 30 seconds, depress and release SUPS 014AB Lamp Test/Reset pushbutton.
JPM P3 TASK ELEMENT 9                         STANDARD 6.5.3.5.1 Verify Static Switch On Reserve light remains Verification complete.
Pushbutton pressed and released.
Illuminated.
Comment:   Critical SAT / UNSAT TASK ELEMENT 16 STANDARD 6.5.3.11.1 Verify Static Switch On Reserve light Extinguished.
Comment:                                                          Critical SAT / UNSAT TASK ELEMENT 10                        STANDARD 6.5.3.6 Place SUPS 014AB Output To PDP014AB breaker Breaker is ON.
Verification complete.
to ON.
Comment:   Critical SAT / UNSAT END OF TASK
Comment:                                                         Critical SAT / UNSAT TASK ELEMENT 11                        STANDARD 6.5.3.7 Place SUPS 014AB Bypass breaker to OFF.        Breaker is OFF.
Comment:                                                          Critical SAT / UNSAT TASK ELEMENT 12                        STANDARD 6.5.3.8 Place SUPS 014AB AC Voltage Select Switch to    Select Switch is in INVERTER.                                               INVERTER.
Comment:                                                         Critical SAT / UNSAT Revision 0                            Page 7 of 9                2010 NRC SRO Exam


Appendix D Scenario Outline Form ES-D-1 Scenario 1 Rev 1 Facility: WATERFORD 3 Scenario No.: 1 Op Test No.:
JPM P3 Evaluator Note When applicant observes the SUPS Output Voltage meter, provide indication of zero volts.
NRC Examiners:  Operators:            Initial Conditions:  100%, 125 EFPD, AB buses aligned to Train B Protected Train is B Emergency Diesel Generator A is out of service.
If the applicant presses the Operate pushbutton, provide the indications provided in Task Element 13.
Turnover:  Maintain 100 % power Event No. Malf. No. Event Type* Event Description 1 H_105 I - ATC I - SRO Remove Reactor Power Cutback from service in accordance with OP-004-015. 2 RC22F2 TS - SRO I - SRO Pressurizer pressure instrument RC-IPI-0102 B fails low.
If the applicant does not press the Operate pushbutton, then provide the indication that the Static Switch On Reserve light is still illuminated at Task Element 16.
3 SG01B CV02C TS - SRO C - SRO C - ATC Steam Generator 2 tube leakage Charging Pump AB fails to auto start 4 N/A R- ATC N-BOP N-SRO Rapid Plant Power Reduction due to Steam Generator tube leakage.
TASK ELEMENT 13                                          STANDARD 6.5.3.9 If no voltage is indicated, then depress and release SUPS 014AB Inverter Operate pushbutton, and verify the following:
5 RC08A RC09A RC10A C - ATC C - SRO Reactor Coolant Pump 1A seal failure, manual reactor trip 6 SG01B M-All Steam G enerator Tube Rupture 7 RP08C C - ATC C - SRO Containment Isolation CVC-401 fails to auto close on CIAS 8 MS11B M - All Main Steam li ne break on Steam Generator 2 inside Containment. * (N)ormal,    (R)eactivi ty,    (I)nstrument,    (C)omponent,    (M)ajor
* Inverter Phase Locked light Illuminated Observes no voltage
* Inverter Output voltage CN ~120 VAC (118.8 to 121.2 and presses and VAC) releases the Operate
* Inverter Output voltage AN ~120 VAC (118.8 to 121.2 pushbutton.
VAC)
* Inverter Output voltage BN ~120 VAC (118.8 to 121.2 VAC)
* Inverter Output frequency ~60 Hz (59.97 to 60.03 Hz)
Comment:                                                                              Critical SAT / UNSAT TASK ELEMENT 14                                          STANDARD 6.5.3.10 Place SUPS 014AB Static Switch Retransfer toggle Toggle Switch is in switch to AUTO.                                                              Auto.
Comment:                                                                              Critical SAT / UNSAT Revision 0                                      Page 8 of 9                          2010 NRC SRO Exam


Scenario Event Description NRC Scenario 1 Scenario 1 Rev 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.  
JPM P3 TASK ELEMENT 15                      STANDARD 6.5.3.11 After approximately 30 seconds, depress and Pushbutton pressed release SUPS 014AB Lamp Test/Reset pushbutton.      and released.
Comment:                                                      Critical SAT / UNSAT TASK ELEMENT 16                      STANDARD 6.5.3.11.1 Verify Static Switch On Reserve light Verification complete.
Extinguished.
Comment:                                                      Critical SAT / UNSAT END OF TASK Revision 0                            Page 9 of 9            2010 NRC SRO Exam


After assuming the shift, annunciator H1005, Reactor Power Cutback Single Channel Trouble, alarms and Reactor Power Cutba ck auto actuation fails. The crew will be contacted by I&C maintenance after re viewing the annunciator response procedure describing a failure of Reactor Power Cut back, requiring Reactor Power Cutback be removed from service in accordance with OP-004-015, Reactor Power Cutback. This manipulation is performed by the ATC operator at CP-2 and CP-7.  
Appendix D                              Scenario Outline                      Form ES-D-1 Facility:      WATERFORD 3            Scenario No.: 1      Op Test No.:    NRC Examiners:                                        Operators:
Initial Conditions:
* 100%, 125 EFPD, AB buses aligned to Train B
* Protected Train is B
* Emergency Diesel Generator A is out of service.
Turnover:
* Maintain 100 % power Event      Malf. No. Event                            Event No.                   Type*                          Description 1      H_105        I - ATC      Remove Reactor Power Cutback from service in I - SRO      accordance with OP-004-015.
2      RC22F2        TS - SRO    Pressurizer pressure instrument RC-IPI-0102 B I - SRO      fails low.
3      SG01B        TS - SRO    Steam Generator 2 tube leakage CV02C        C - SRO      Charging Pump AB fails to auto start C - ATC 4      N/A          R- ATC      Rapid Plant Power Reduction due to Steam N-BOP        Generator tube leakage.
N-SRO 5      RC08A        C - ATC     Reactor Coolant Pump 1A seal failure, manual RC09A        C - SRO      reactor trip RC10A 6      SG01B        M-All        Steam Generator Tube Rupture 7     RP08C        C - ATC      Containment Isolation CVC-401 fails to auto close C - SRO      on CIAS 8      MS11B        M - All      Main Steam line break on Steam Generator 2 inside Containment.
    *  (N)ormal,  (R)eactivity, (I)nstrument,    (C)omponent,    (M)ajor Scenario 1 Rev 1


After Reactor Power Cutback is removed from service, Pressurizer pressure instrument RC-IPI-0102 B fails low. The AT C operator will receive the annunc iators for this failure. The CRS should evaluate Tech Specs and enter Tech Spec 3.3.1 and 3.3.2 and determine that Plant Protection System bistable 6 for low Pressurizer pressure must be bypassed within 1 hour on C hannel B. Tech Spec 3.
Scenario Event Description NRC Scenario 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.
3.3.5 and 3.3.3.6 should be referenced but not entered. Plant Monito ring Computer group SPD S indication of Pressurizer pressure is affected by this failure.  
After assuming the shift, annunciator H1005, Reactor Power Cutback Single Channel Trouble, alarms and Reactor Power Cutback auto actuation fails. The crew will be contacted by I&C maintenance after reviewing the annunciator response procedure describing a failure of Reactor Power Cutback, requiring Reactor Power Cutback be removed from service in accordance with OP-004-015, Reactor Power Cutback. This manipulation is performed by the ATC operator at CP-2 and CP-7.
 
After Reactor Power Cutback is removed from service, Pressurizer pressure instrument RC-IPI-0102 B fails low. The ATC operator will receive the annunciators for this failure.
After the CRS evaluates Tech Specs but before bistable 6 is bypassed, a Steam Generator tube leak develops in Steam Generator 2. Charging Pump AB will be aligned as the first backup Charging Pump and it will fail to auto start on the lowering Pressurizer level. The ATC operator should make this diagnosis and start Charging Pump AB. The CRS should enter OP-901-202, Steam Generator Tube Leakage or High Activity. The size of the leak will require entering OP-901-212, Rapid Plant Power Reduction. For the power reduction, the ATC will perform Direct Boration to the RCS as well as Pressurizer boron equalization and ASI control with CEAs. The BOP will manipulate the controls to reduce Main Turbine load. The CRS should enter Tech Spec 3.4.5.2 for Steam G enerator 2 leakage. The CRS ma y consider declaring Charging Pump AB inoperable due to it's failure to auto start, but no Tech Spec entry is required.  
The CRS should evaluate Tech Specs and enter Tech Spec 3.3.1 and 3.3.2 and determine that Plant Protection System bistable 6 for low Pressurizer pressure must be bypassed within 1 hour on Channel B. Tech Spec 3.3.3.5 and 3.3.3.6 should be referenced but not entered. Plant Monitoring Computer group SPDS indication of Pressurizer pressure is affected by this failure.
 
After the CRS evaluates Tech Specs but before bistable 6 is bypassed, a Steam Generator tube leak develops in Steam Generator 2. Charging Pump AB will be aligned as the first backup Charging Pump and it will fail to auto start on the lowering Pressurizer level. The ATC operator should make this diagnosis and start Charging Pump AB. The CRS should enter OP-901-202, Steam Generator Tube Leakage or High Activity. The size of the leak will require entering OP-901-212, Rapid Plant Power Reduction. For the power reduction, the ATC will perform Direct Boration to the RCS as well as Pressurizer boron equalization and ASI control with CEAs. The BOP will manipulate the controls to reduce Main Turbine load. The CRS should enter Tech Spec 3.4.5.2 for Steam Generator 2 leakage. The CRS may consider declaring Charging Pump AB inoperable due to its failure to auto start, but no Tech Spec entry is required.
Once the crew has commenced the power reduc tion and lowered power to ~ 90%, or at the lead examiner's cue, RCP 1a will develop multiple seal failures. The second and third seal failures will be timed to occur 3 minutes after the initial seal failure. The crew should have time to get out off normal pr ocedure OP-901-130, Reactor Coolant Pump Malfunction, before the subsequent seals fail. With the second and third seals failing, the crew will be required to trip the reactor.  
Once the crew has commenced the power reduction and lowered power to ~ 90%, or at the lead examiners cue, RCP 1a will develop multiple seal failures. The second and third seal failures will be timed to occur 3 minutes after the initial seal failure. The crew should have time to get out off normal procedure OP-901-130, Reactor Coolant Pump Malfunction, before the subsequent seals fail. With the second and third seals failing, the crew will be required to trip the reactor.
 
When the reactor is tripped, the Steam Generator tube leak will degrade to a rupture.
When the reactor is tripped, the Steam Genera tor tube leak will degr ade to a rupture. The CRS should direct the ATC to initiate Sa fety Injection and Containment Isolation.
The CRS should direct the ATC to initiate Safety Injection and Containment Isolation.
Containment Isolation valve CVC-401 at CP-4 will fail to close on the CIAS, requiring the ATC operator to close the valve.
Containment Isolation valve CVC-401 at CP-4 will fail to close on the CIAS, requiring the ATC operator to close the valve.
Scenario Event Description NRC Scenario 1 Scenario 1 Rev 1 After the crew completes OP-902-000, Standard Post Trip Actions and the CRS diagnoses into OP-902-007, Steam Generator Tube Rupture Recovery, the CRS should direct a rapid RCS cooldown to less than 520 &deg;F T HOT. After this direction is given, a Main Steam Line break will develop on Stea m Generator 2 inside Containment. The CRS should exit OP-902-007 and enter OP-902-008, Functional Recovery Procedure.
Scenario 1 Rev 1
Prioritization in OP-902-008 should result in Containment Isolation being priority 1. The crew should address Containment Isolation by using the steps in the Heat Removal section to isolate Steam Generator 2.
 
The scenario can be terminated after Steam G enerator 2 is isolat ed, or at the lead examiners discretion.
Scenario Event Description NRC Scenario 1 Scenario 1 Rev 1 Critical Tasks
: 1. Trip any RCP not satisfying RCP operating limits.
 
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. The required task becomes applicable after Containment Spray has been actuated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling.
: 2. Prevent Opening the Main Steam Safety Valves.
 
This task is satisfied by the crew taking action to maintain Steam Generator #2 pressure below the safety valve setpoint by taking action to reduce RCS pressure to < 945 psia.
 
Scenario Quantitative Attributes 1. Total malfunctions (5-8) 8 2. Malfunctions after EOP entry (1-2) 2 3. Abnormal events (2-4) 3 4. Major transients (1-2) 2 5. EOPs entered/requiring substantive actions (1-2) 2 6. EOP contingencies requiring substantive actions (0-2) 1 7. Critical tasks (2-3) 2 NRC Scenario 1 Scenario 1 Rev 1 Scenario Notes:
A. Reset Simulator to IC-191. B. Verify the following Scenario Malfunctions are loaded: 1. rc22f2 for Pressurizer le vel instrument RC-ILI-0102 B 2. sg01B for Steam Generator #2 tube leak
: 3. cv02c for Charging Pump AB
: 4. rc08a, 09a, and 10a for RCP 1A
: 5. rp08c for CVC-401
: 6. ms11b for Steam Generat or #2 steam line break 7. eg10a for EDG A overspeed device C. Verify the following remotes 1. egr27 for EDG B local alarm acknowledgement D. Verify the following overrides 1. di-08a05s14-1 for closing FP-601 A set to trigger 9 2. di-08a05s19-1 for closi ng IA-909 set to trigger 9 3. di-04a04s10-1 for closing CVC-109 set to trigger 9 4. di-02a05a2s34-0 for Reactor Power Cutback out of service set to trigger 1. 5. di-02a05a2s30-0 for Reactor Power Cutback lamp test. E. Verify the following under Event Triggers: 1. zdirpciastrp(4).eq.1 is set on trigger 9 F. Verify the following C ontrol Board Conditions: 1. Danger tag placed on EDG A control switch
: 2. Danger tag placed on EDG A Output Breaker G. Verify EDG A output breaker is rack ed out and place danger tags on EDG A and its output breaker. H. Ensure Protected Train B sign is placed in SM office window.
I. Verify EOOS is 8.5 Yellow J. Complete the simulator setup checklist.
 
NRC Scenario 1 Scenario 1 Rev 1 Simulator Booth Instructions Event 1 Reactor Power Cutback Failure
: 1. On Lead Examiner's cue, initiate Event Trigger 1.
: 2. After the annunciator response procedure is referenced, call the CRS as the on shift I&C technician. R eport that during planned data collection, the Reactor Power Cutback Channel A has locked up and will not respond to any commands
 
or signals. 3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 2 Pressurizer Pressure Inst rument RC-IPI-0102 B Fails Low
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 2. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room. 3. If sent to LCP-43, report RCS pressu re indications are reading normal on all channels except for Channel B.


Event 3 / 4 Steam Generator #2 Tube Leak / Chargi ng Pump AB Fails to Start / Rapid Plant Power Reduction
Scenario Event Description NRC Scenario 1 After the crew completes OP-902-000, Standard Post Trip Actions and the CRS diagnoses into OP-902-007, Steam Generator Tube Rupture Recovery, the CRS should direct a rapid RCS cooldown to less than 520 &deg;F THOT. After this direction is given, a Main Steam Line break will develop on Steam Generator 2 inside Containment. The CRS should exit OP-902-007 and enter OP-902-008, Functional Recovery Procedure.
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
Prioritization in OP-902-008 should result in Containment Isolation being priority 1. The crew should address Containment Isolation by using the steps in the Heat Removal section to isolate Steam Generator 2.
: 2. If Chemistry or HP is called, acknowledge S/G tube leak and need to carry out the actions of UNT-005-032, Steam Gener ator Primary to Secondary Leakage. 3. If called as TGB watch to monitor Condensate System Polisher pressure, acknowledge and remove Polisher Vessel from service if necessary. 4. If called as the RCA Watch to check C harging Pump AB, report that it looks normal locally.  
The scenario can be terminated after Steam Generator 2 is isolated, or at the lead examiners discretion.
Scenario 1 Rev 1


Event 5 Reactor Coolant Pump 1A seal failure
Scenario Event Description NRC Scenario 1 Critical Tasks
: 1. On Lead Examiner's cue, initiate Event Trigger 5.  
: 1. Trip any RCP not satisfying RCP operating limits.
: 2. If Engineering is called, acknowledge communication and report that engineering will investigate the RCP 1A failure. 3. If called as the RAB Watch to check RCP vibration in Switchgear room B, acknowledge communication, no report is necessary.  
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. The required task becomes applicable after Containment Spray has been actuated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling.
: 2. Prevent Opening the Main Steam Safety Valves.
This task is satisfied by the crew taking action to maintain Steam Generator #2 pressure below the safety valve setpoint by taking action to reduce RCS pressure to < 945 psia.
Scenario Quantitative Attributes
: 1. Total malfunctions (5-8)                                              8
: 2. Malfunctions after EOP entry (1-2)                                    2
: 3. Abnormal events (2-4)                                                3
: 4. Major transients (1-2)                                                2
: 5. EOPs entered/requiring substantive actions (1-2)                      2
: 6. EOP contingencies requiring substantive actions (0-2)                1
: 7. Critical tasks (2-3)                                                  2 Scenario 1 Rev 1


NRC Scenario 1 Scenario 1 Rev 1 Event 4 Steam Generator #2 Tube Rupture
NRC Scenario 1 Scenario Notes:
: 1. On Lead Examiner's cue, initiate change the severity of malfunction SG01B to 7% and ramp it in over a 1 minute period. 2. If called as RAB watch to check Emergen cy Diesel Generator B, initiate Trigger 16, after EDG B Trouble alarm clear, report it is running satisfactorily.  
A. Reset Simulator to IC-191.
B. Verify the following Scenario Malfunctions are loaded:
: 1. rc22f2 for Pressurizer level instrument RC-ILI-0102 B
: 2. sg01B for Steam Generator #2 tube leak
: 3. cv02c for Charging Pump AB
: 4. rc08a, 09a, and 10a for RCP 1A
: 5. rp08c for CVC-401
: 6. ms11b for Steam Generator #2 steam line break
: 7. eg10a for EDG A overspeed device C. Verify the following remotes
: 1. egr27 for EDG B local alarm acknowledgement D. Verify the following overrides
: 1. di-08a05s14-1 for closing FP-601 A set to trigger 9
: 2. di-08a05s19-1 for closing IA-909 set to trigger 9
: 3. di-04a04s10-1 for closing CVC-109 set to trigger 9
: 4. di-02a05a2s34-0 for Reactor Power Cutback out of service set to trigger 1.
: 5. di-02a05a2s30-0 for Reactor Power Cutback lamp test.
E. Verify the following under Event Triggers:
: 1. zdirpciastrp(4).eq.1 is set on trigger 9 F. Verify the following Control Board Conditions:
: 1. Danger tag placed on EDG A control switch
: 2. Danger tag placed on EDG A Output Breaker G. Verify EDG A output breaker is racked out and place danger tags on EDG A and its output breaker.
H. Ensure Protected Train B sign is placed in SM office window.
I. Verify EOOS is 8.5 Yellow J. Complete the simulator setup checklist.
Scenario 1 Rev 1


Event 5 Steam Generator #2 Steam Line Break
NRC Scenario 1 Simulator Booth Instructions Event 1      Reactor Power Cutback Failure
: 1. After the crew has entered OP-902-007 and commenced the rapid cooldown and on the Lead Examiner's cue, in itiate Event Trigger 7.  
: 1. On Lead Examiner's cue, initiate Event Trigger 1.
: 2. After the annunciator response procedure is referenced, call the CRS as the on shift I&C technician. Report that during planned data collection, the Reactor Power Cutback Channel A has locked up and will not respond to any commands or signals.
: 3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 2      Pressurizer Pressure Instrument RC-IPI-0102 B Fails Low
: 1. On Lead Examiner's cue, initiate Event Trigger 2.
: 2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
: 3. If sent to LCP-43, report RCS pressure indications are reading normal on all channels except for Channel B.
Event 3 / 4  Steam Generator #2 Tube Leak / Charging Pump AB Fails to Start / Rapid Plant Power Reduction
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 2. If Chemistry or HP is called, acknowledge S/G tube leak and need to carry out the actions of UNT-005-032, Steam Generator Primary to Secondary Leakage.
: 3. If called as TGB watch to monitor Condensate System Polisher pressure, acknowledge and remove Polisher Vessel from service if necessary.
: 4. If called as the RCA Watch to check Charging Pump AB, report that it looks normal locally.
Event 5      Reactor Coolant Pump 1A seal failure
: 1. On Lead Examiner's cue, initiate Event Trigger 5.
: 2. If Engineering is called, acknowledge communication and report that engineering will investigate the RCP 1A failure.
: 3. If called as the RAB Watch to check RCP vibration in Switchgear room B, acknowledge communication, no report is necessary.
Scenario 1 Rev 1


Event 6 High Pressure Safety Injection Pump A fails to start
NRC Scenario 1 Event 4      Steam Generator #2 Tube Rupture
: 1. If called to check the HPSI Pump A breaker, report all indications are normal. 2. If called to check the HPSI Pump A locally, report all indications are normal.  
: 1. On Lead Examiner's cue, initiate change the severity of malfunction SG01B to 7% and ramp it in over a 1 minute period.
: 2. If called as RAB watch to check Emergency Diesel Generator B, initiate Trigger 16, after EDG B Trouble alarm clear, report it is running satisfactorily.
Event 5      Steam Generator #2 Steam Line Break
: 1. After the crew has entered OP-902-007 and commenced the rapid cooldown and on the Lead Examiner's cue, initiate Event Trigger 7.
Event 6       High Pressure Safety Injection Pump A fails to start
: 1. If called to check the HPSI Pump A breaker, report all indications are normal.
: 2. If called to check the HPSI Pump A locally, report all indications are normal.
Scenario 1 Rev 1


NRC Scenario 1 Scenario 1 Rev 1 Scenario Timeline: Event Malfunction Severity Ramp HH:MM:SS Delay Trigger 1 H_L05 N/A N/A N/A 1 Remove Reactor Power Cutback from service 1 DI-02A05A2S34-0 N/A N/A N/A 1 Reactor Power Cutback Auto Actuate 1 DI-02A05A2S30-0 N/A N/A N/A 1 Remove Reactor Power Cutback Lamp Test 2 RC22F2 N/A N/A N/A 2 Pressurizer pressure instru ment RC-IPI-0102 B fails low 3 SG01 B 0.6 % 00:3:00 NA 3 Steam Generator #2 Tube Leak 4 CV02C N/A N/A N/A N/A Charging Pump AB fails to auto start 5 RC08 RC09 RC10 A 100 % 00:30 00:30 00:30 N/A 03:00 03:15 Reactor Coolant Pump 1A seal failures 6 SG01 B 7.0 % 00:01:00 N/A N/A Steam Generator #2 Tube Rupture 7 RP08C N/A N/A N/A N/A CVC-401 fails to close on CIAS 8 MS11B 12 % 03:00 N/A 8 Main Steam Line Break S/G 2  
NRC Scenario 1 Scenario Timeline:
Ramp Event   Malfunction           Severity                     Delay Trigger HH:MM:SS 1         H_L05                 N/A           N/A         N/A     1 Remove Reactor Power Cutback from service 1     DI-02A05A2S34-0         N/A           N/A         N/A     1 Reactor Power Cutback Auto Actuate 1     DI-02A05A2S30-0         N/A           N/A         N/A     1 Remove Reactor Power Cutback Lamp Test 2       RC22F2                 N/A           N/A         N/A     2 Pressurizer pressure instrument RC-IPI-0102 B fails low 3         SG01         B       0.6 %       00:3:00         NA     3 Steam Generator #2 Tube Leak 4       CV02C                 N/A           N/A         N/A   N/A Charging Pump AB fails to auto start 5         RC08         A     100 %         00:30         N/A    5 RC09                              00:30       03:00 RC10                              00:30       03:15 Reactor Coolant Pump 1A seal failures 6         SG01         B       7.0 %       00:01:00       N/A   N/A Steam Generator #2 Tube Rupture 7       RP08C                 N/A           N/A         N/A   N/A CVC-401 fails to close on CIAS 8       MS11B                 12 %         03:00         N/A     8 Main Steam Line Break S/G 2 Scenario 1 Rev 1


NRC Scenario 1 Scenario 1 Rev 1  
NRC Scenario 1


==REFERENCES:==
==REFERENCES:==


Event Procedures 1 OP-004-015, Reactor Power Cutback System 2 OP-009-007, Plant Protection System Tech Spec 3.3.1 and 3.3.2 3 OP-901-202, Steam Generator Tube Leakage or High Activity Tech Spec 3.4.5.2 4 OP-901-212, Rapid Plant Power Reduction Tech Spec 3.1.3.6 Regulating an d Group P CEA Insertion Limits 5 OP-901-130, Reactor C oolant Pump Malfunction 6 OP-902-000, Standard Post Trip Actions OP-902-007, Steam Generator Tube Rupture Recovery OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart 8 OP-902-008, Safety Function Recovery Procedure OP-902-009, Standard Appendic es, Appendix 13, Stabilize RCS Temperature  
Event                                   Procedures 1   OP-004-015, Reactor Power Cutback System 2   OP-009-007, Plant Protection System Tech Spec 3.3.1 and 3.3.2 3   OP-901-202, Steam Generator Tube Leakage or High Activity Tech Spec 3.4.5.2 4   OP-901-212, Rapid Plant Power Reduction Tech Spec 3.1.3.6 Regulating and Group P CEA Insertion Limits 5   OP-901-130, Reactor Coolant Pump Malfunction 6   OP-902-000, Standard Post Trip Actions OP-902-007, Steam Generator Tube Rupture Recovery OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart 8   OP-902-008, Safety Function Recovery Procedure OP-902-009, Standard Appendices, Appendix 13, Stabilize RCS Temperature Scenario 1 Rev 1


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 1 Page 1 of 23           Event
Appendix D                       Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC   Scenario #       1     Event #           1         Page     1     of     23 Event


== Description:==
== Description:==
Remove Reactor Power Cutback from Service Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 ATC Recognize and report indications of failed Cutback Channel. Alarms:
Remove Reactor Power Cutback from Service Time       Position                           Applicants Actions or Behavior ATC       Recognize and report indications of failed Cutback Channel.
Reactor Pwr Cutback Single Chnl Trouble (Cabinet H, L-5)     Indications:
Alarms:
Reactor Power Cutback AUTO ACTUATE OUT OF SERVICE pushbutton illuminated on CP-2     CRS After receiving phone call from I&C Maintenance, directs ATC to remove Reactor Power Cutback from service. BOP Step 8.1.2.1 Verify 65% bistable lamps on all four Nuclear Instrumentation Test Drawers Illuminated.
* Reactor Pwr Cutback Single Chnl Trouble (Cabinet H, L-5)
Lamps are located behind the main panels on CP-10 A - D. ATC Step 8.1.2.2 On CP-7, verify all four LOSS OF TURB BYPASS keyswitches in BYPASS and all four red BYPASS lamps Illuminated. ATC Step 8.1.2.3 On CP-2, place LOSS OF TURBINE TRIP keyswitch to ENABLE. ATC Step 8.1.2.4 On CP-7, place all four LOSS OF TURB BYPASS keyswitches to OFF and verify all four green OFF lamps Illuminate. BOP Step 8.1.2.5 On Steam Bypass Control System Cabinet (IC-ECP-05), verify Reactor Power Cutback lamps Extinguished.
Indications:
Lamps are located behind the main panels on CP-05, which is not modeled. Coach surrogate on this report. ATC Step 8.1.2.6 On CP-2, place LOSS OF LOAD keyswitch to TURBINE TRIP. CRS Step 8.1.2.7 Notify the Duty Plant Manager that Loss of Turbine Trip has been placed in service. Examiner Note This event is complete after the ATC operator addresses the AUTO ACTUATE OUT OF SERVICE pushbutton at step 7.1.2 Or As directed by the Lead Evaluator  
* Reactor Power Cutback AUTO ACTUATE OUT OF SERVICE pushbutton illuminated on CP-2 CRS       After receiving phone call from I&C Maintenance, directs ATC to remove Reactor Power Cutback from service.
BOP       Step 8.1.2.1 Verify 65% bistable lamps on all four Nuclear Instrumentation Test Drawers Illuminated.
* Lamps are located behind the main panels on CP-10 A - D.
ATC       Step 8.1.2.2 On CP-7, verify all four LOSS OF TURB BYPASS keyswitches in BYPASS and all four red BYPASS lamps Illuminated.
ATC       Step 8.1.2.3 On CP-2, place LOSS OF TURBINE TRIP keyswitch to ENABLE.
ATC       Step 8.1.2.4 On CP-7, place all four LOSS OF TURB BYPASS keyswitches to OFF and verify all four green OFF lamps Illuminate.
BOP       Step 8.1.2.5 On Steam Bypass Control System Cabinet (IC-ECP-05), verify Reactor Power Cutback lamps Extinguished.
* Lamps are located behind the main panels on CP-05, which is not modeled. Coach surrogate on this report.
ATC       Step 8.1.2.6 On CP-2, place LOSS OF LOAD keyswitch to TURBINE TRIP.
CRS       Step 8.1.2.7 Notify the Duty Plant Manager that Loss of Turbine Trip has been placed in service.
Examiner Note This event is complete after the ATC operator addresses the AUTO ACTUATE OUT OF SERVICE pushbutton at step 7.1.2 Or As directed by the Lead Evaluator Scenario 1, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 2 Page 2 of 23           Event
Appendix D                         Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC   Scenario #       1     Event #           2         Page       2     of   23 Event


== Description:==
== Description:==
Pressurizer Pressure Instrument Failure Match title with D-1 Time Position Applicant's Actions or Behavior Scenario 1, Revision 0  ATC Recognize and report indications of failed channel. Alarms:
Pressurizer Pressure Instrument Failure Match title with D-1 Time       Position                             Applicants Actions or Behavior ATC       Recognize and report indications of failed channel.
RPS CHANNEL TRIP PZR PRESSURE LOW (Cabinet K, A-16)
Alarms:
PZR PRESSURE LO PRETRIP B/D (Cabinet K, C-16)
* RPS CHANNEL TRIP PZR PRESSURE LOW (Cabinet K, A-16)
RPS CHANNEL B TROUBLE (Cabinet K, F-18)     Indications Pressurizer pressure instrument RC-IPI-0102 B on CP-7 indicates pegged low.
* PZR PRESSURE LO PRETRIP B/D (Cabinet K, C-16)
Pressurizer pressure indication on the Plant Monitoring Computer mimic SPDS averages the failed indicator with valid pressure indication.
* RPS CHANNEL B TROUBLE (Cabinet K, F-18)
Pressurizer Pressure Lo trip and pre-trip lamps lit on CP-7 Channel B. CRS Review Tech Specs based on the failed instrument.
Indications
Refer to Tech Spec 3.3.3.5 and 3.3.3.6.
* Pressurizer pressure instrument RC-IPI-0102 B on CP-7 indicates pegged low.
Enter Tech Spec 3.3.1 (item 5) and 3.3.2 (items 1 and 3)
* Pressurizer pressure indication on the Plant Monitoring Computer mimic SPDS averages the failed indicator with valid pressure indication.
Direct bypassing Channel B bistable 6 for Lo Pressurizer Pressure. This is a 1 hour action. Note OP-903-013, Monthly Channel Checks, does list this instrument for Tech Spec 3.3.3.5 and 3.3.3.6 applicability. Entry is not required, however, because the minimum channel requirements will still be met after the failure. Examiner Note This event is complete after the CRS evaluates Tech Specs Or As directed by the Lead Evaluator  
* Pressurizer Pressure Lo trip and pre-trip lamps lit on CP-7 Channel B.
CRS         Review Tech Specs based on the failed instrument.
* Refer to Tech Spec 3.3.3.5 and 3.3.3.6.
* Enter Tech Spec 3.3.1 (item 5) and 3.3.2 (items 1 and 3)
* Direct bypassing Channel B bistable 6 for Lo Pressurizer Pressure.
This is a 1 hour action.
Note       OP-903-013, Monthly Channel Checks, does list this instrument for Tech Spec 3.3.3.5 and 3.3.3.6 applicability. Entry is not required, however, because the minimum channel requirements will still be met after the failure.
Examiner Note This event is complete after the CRS evaluates Tech Specs Or As directed by the Lead Evaluator Scenario 1, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 3 of 23           Event
Appendix D                       Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC   Scenario #       1     Event #           3/4         Page       3     of   23 Event


== Description:==
== Description:==
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0  ATC Recognize and report indications of Steam Generator Tube Leakage. Alarms:
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time       Position                           Applicants Actions or Behavior ATC       Recognize and report indications of Steam Generator Tube Leakage.
RAD MONITORING SYS ACTIVITY HI-HI (Cabinet L, A-9)
Alarms:
VACUUM PUMPS EXHAUST ACTIVITY HI (Cabinet E, C-3)     Indications RM-11 Rad Monitor indication will display rising activity on Main Steam Rad Monitor #2, Steam Generator #2 N-16 Rad Monitor, Main Condenser Vacuum Pumps WRGM, and the Blowdown radiation monitor. Steam Generator tube leakage indication rising as indicated on PMC Group PSLR (PMC PID C48304). CRS Enter and direct the implementation of OP-901-202, Steam Generator Tube Leakage or High Activity. Examiner Note The following steps are from OP-901-202, Steam Generator Tube Leakage or High Activity. CRS 1. IF Pressurizer level CANNOT be maintained with available Charging Pumps, THEN perform the following: 1.1 Manually trip Reactor. 1.2 Manually initiate Safety Injection Actuation (SIAS) AND Containment Isolation Actuation (CIAS).
* RAD MONITORING SYS ACTIVITY HI-HI (Cabinet L, A-9)
1.3 GO TO OP-902-000, STANDARD POST TRIP ACTIONS. CRS Procedure NOTE (1) The calculated Primary to Secondary Leak Rate values must be considered valid, unless the reading can be quickly diagnosed as incorrect due to an obvious malfunction of the PMC or AE Discharge Rad Monitor. (2) The AE Discharge Rad Monitor is considered the primary Rad Monitor which has the sensitivity to measure small Primary to Secondary Leakage. The AE Discharge Rad Monitor reading inputs into the Primary to Secondary Leak Calculation on PMC Group PLSR. The MS Line N16 Rad Monitors may be used as verification of AE Discharge Rad Monitor or as primary indication if the AE Discharge Rad Monitor is OOS.
* VACUUM PUMPS EXHAUST ACTIVITY HI (Cabinet E, C-3)
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 4 of 23          Event
Indications
* RM-11 Rad Monitor indication will display rising activity on Main Steam Rad Monitor #2, Steam Generator #2 N-16 Rad Monitor, Main Condenser Vacuum Pumps WRGM, and the Blowdown radiation monitor.
* Steam Generator tube leakage indication rising as indicated on PMC Group PSLR (PMC PID C48304).
CRS       Enter and direct the implementation of OP-901-202, Steam Generator Tube Leakage or High Activity.
Examiner Note The following steps are from OP-901-202, Steam Generator Tube Leakage or High Activity.
CRS       1.       IF Pressurizer level CANNOT be maintained with available Charging Pumps, THEN perform the following:
1.1     Manually trip Reactor.
1.2     Manually initiate Safety Injection Actuation (SIAS) AND Containment Isolation Actuation (CIAS).
1.3     GO TO OP-902-000, STANDARD POST TRIP ACTIONS.
CRS       Procedure NOTE (1)     The calculated Primary to Secondary Leak Rate values must be considered valid, unless the reading can be quickly diagnosed as incorrect due to an obvious malfunction of the PMC or AE Discharge Rad Monitor.
(2)     The AE Discharge Rad Monitor is considered the primary Rad Monitor which has the sensitivity to measure small Primary to Secondary Leakage. The AE Discharge Rad Monitor reading inputs into the Primary to Secondary Leak Calculation on PMC Group PLSR. The MS Line N16 Rad Monitors may be used as verification of AE Discharge Rad Monitor or as primary indication if the AE Discharge Rad Monitor is OOS.
Scenario 1, Revision 0


== Description:==
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:   NRC   Scenario #       1     Event #         3/4         Page     4      of   23 Event
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 CRS 2. Determine RCS leak rate using ANY of the following:  Calculated Steam Generator leakage displayed on PMC Group PSLR (PMC PID C48304)  Calculated Steam Generator leakage displayed on PMC PID C48251 (RE5501 CH1 LEAK RATE) and C48252 (RE5501 CH2 LEAK RATE)  Approximate RCS leak rate by subtracting total of Letdown flow AND RCP CBO flow from Charging Flow  Calculated Charging / Letdown Mismatch displayed on PMC Group Leakrate (PMC PID S13001)  RCS Leak Rate calculation in accordance with  OP-903-024, REACTOR COOLANT SYSTEM WATER INVENTORY BALANCE  Calculated steam generator leakage based upon chemistry sample, per CE-003-705, Determination Of Primary-To-Secondary Leak Rate    CRS Procedure NOTE Any rise >30 GPD/HR followed by a subsequent lowering of the rate of change would indicate a spike and a rapid power reduction is not required. CRS 3. IF Primary to Secondary Leakage in any Steam Generator is  75 GPD (~0.05 GPM) AND the rate of change is rising by 30 GPD/HR (~0.02 GPM/HR), THEN perform the following: 3.1 Commence a rapid plant shutdown in accordance with OP-901-212, RAPID PLANT POWER REDUCTION, AND concurrently with this Procedure, reduce Plant Power to 50% within 1 hour. 3.2 WHEN Plant Power is 50%, THEN in accordance with OP-901-212, RAPID PLANT POWER REDUCTION, AND concurrently with this Procedure, be in Mode 3 within 2 hours AND Mode 5 in the following 30 hours. These conditions will be met. The CRS should enter OP-901-212 and perform it concurrently with OP-901-202. Steps 1 through 15 of Steam Generator Tube Leakage or High Activity are listed here. The CRS should begin the steps of Rapid Plant Power Reduction before working these steps. The steps of OP-901-212, Rapid Plant Power Reduction follow step 15 of OP-901-202.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 5 of 23           Event


== Description:==
== Description:==
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 CRS 7. Notify Chemistry Depar tment to perform the following: 7.1 Provide current Plant status including the following:  Primary to Secondary Leakrate  Primary to Secondary Leakage Rate of Change  Plant action(s) Operations is OR will be implementing (example: plant shutdown, rapid plant shutdown, monitoring) 7.2 Carry out actions in accordance with UNT-005-032, STEAM GENERATOR PRIMARY-TO-SECONDARY LEAKAGE. 7.3 Begin sampling Steam Generators for activity. 7.4 Quantify Steam Generator Tube leakage. CRS 8. Notify Radiation Protection to carry out the actions of UNT-005-032, STEAM GENERATOR PRIMARY-TO-SECONDARY LEAKAGE. CRS / BOP 9. Verify BD-303, DISCHARGE TO WASTE, Locked Closed. CRS / BOP 10. Verify BD-1162, BD FLASH TANK VENT, Closed. CRS / BOP 11. Verify CD-145, CD DUMP TO WASTE POND, Closed. 11.1 Notify Chemistry prior to dumping Condensate from the Condenser Hotwell to the CST. Crew 12. Establish AND monitor a PMC Trend of the following PMC points:  C48304 PRI TO SEC LEAKAGE  C48305 PRI TO SEC LEAK RATE CHANGE (GPD/HR)  C48251 RE5501 CH1 LEAK RATE  C48252 RE5501 CH2 LEAK RATE    CRS Procedure NOTE Until arrangements are made for disposal of radioactively contaminated resin, Condensate Polisher Vessels should NOT be placed in service with resin loaded in the vessel.
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time       Position                         Applicants Actions or Behavior CRS     2.     Determine RCS leak rate using ANY of the following:
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 6 of 23          Event
* Calculated Steam Generator leakage displayed on PMC Group PSLR (PMC PID C48304)
* Calculated Steam Generator leakage displayed on PMC PID C48251 (RE5501 CH1 LEAK RATE) and C48252 (RE5501 CH2 LEAK RATE)
* Approximate RCS leak rate by subtracting total of Letdown flow AND RCP CBO flow from Charging Flow
* Calculated Charging / Letdown Mismatch displayed on PMC Group Leakrate (PMC PID S13001)
* RCS Leak Rate calculation in accordance with OP-903-024, REACTOR COOLANT SYSTEM WATER INVENTORY BALANCE
* Calculated steam generator leakage based upon chemistry sample, per CE-003-705, Determination Of Primary-To-Secondary Leak Rate CRS      Procedure NOTE Any rise >30 GPD/HR followed by a subsequent lowering of the rate of change would indicate a spike and a rapid power reduction is not required.
CRS      3.     IF Primary to Secondary Leakage in any Steam Generator is 75 GPD (~0.05 GPM) AND the rate of change is rising by 30 GPD/HR (~0.02 GPM/HR), THEN perform the following:
3.1    Commence a rapid plant shutdown in accordance with OP-901-212, RAPID PLANT POWER REDUCTION, AND concurrently with this Procedure, reduce Plant Power to 50% within 1 hour.
3.2    WHEN Plant Power is 50%, THEN in accordance with OP-901-212, RAPID PLANT POWER REDUCTION, AND concurrently with this Procedure, be in Mode 3 within 2 hours AND Mode 5 in the following 30 hours.
* These conditions will be met. The CRS should enter OP-901-212 and perform it concurrently with OP-901-202.
* Steps 1 through 15 of Steam Generator Tube Leakage or High Activity are listed here. The CRS should begin the steps of Rapid Plant Power Reduction before working these steps. The steps of OP-901-212, Rapid Plant Power Reduction follow step 15 of OP-901-202.
Scenario 1, Revision 0


== Description:==
Appendix D                     Required Operator Actions                                 Form ES-D-2 Op Test No.:   NRC   Scenario #       1   Event #           3/4         Page       5    of   23 Event
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 CRS 15. Remove from service ANY Condensate Polisher Vessels which are loaded with resin in accordance with OP-003-031, CONDENSATE POLISHER/BACKWASH TREATMENT. 15.1 Do not place in service any condensate polisher vessel loaded with resin without the coordination of Chemistry. Examiner Note For the failure of Charging Pump AB failing to auto start on lowering level, this malfunction may occur before or after the Rapid Power Reduction is started, depending on the pace of the crew. Charging Pump AB would have auto started at ~ 53%, depending on power level. ATC Recognize and report indications of Charging Pump AB Auto Start Failure. Alarm (This alarm only comes in if Pressurizer Level drops to 3.9% below the Pressurizer Level Setpoint. If the ATC starts Charging Pump AB before this level, this alarm will not come in):
PRESSURIZER LEVEL HI/LO (Cabinet H, B-1)      Indications Pressurizer level drops more than 2.5% below Pressurizer Level Setpoint and Charging Pump AB does not start. ATC Start Charging Pump AB by taki ng the control switch on CP-2 to ON. Examiner Note The following steps are from OP-901-212, Rapid Plant Power Reduction. CRS NOTE (1) A rapid power reduction is defined as approximately 30 MW/minute load reduction on the main turbine. (2) Power Reduction may be stopped at any point.
(3) Some Steps of this procedure may not be applicable due to plant conditions. In these cases SM/CRS may NA the step. (4) Steps within this procedure may be performed concurrently or out of sequence with SM/CRS concurrence.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 7 of 23           Event


== Description:==
== Description:==
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 ATC Begin RCS Boration by either of the following methods as directed by the CRS: Direct Boration  Emergency Boration using one Charging Pump    CRS Step 1: Begin RCS Boration by one of the following methods:
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time       Position                           Applicants Actions or Behavior CRS      7.      Notify Chemistry Department to perform the following:
up to 340 EFPD: Direct Boration or  Emergency Boration using one Charging Pump ATC Steps for Direct Boration:
7.1     Provide current Plant status including the following:
CAUTION (1) This section affects reactivity. This evolution should be crosschecked and completed prior to leaving CP-4. (2) At least one reactor coolant pump in each loop should be operating prior to performing direct boration operations to ensure proper chemical mixing.  
* Primary to Secondary Leakrate
* Primary to Secondary Leakage Rate of Change
* Plant action(s) Operations is OR will be implementing (example:
plant shutdown, rapid plant shutdown, monitoring) 7.2      Carry out actions in accordance with UNT-005-032, STEAM GENERATOR PRIMARY-TO-SECONDARY LEAKAGE.
7.3      Begin sampling Steam Generators for activity.
7.4      Quantify Steam Generator Tube leakage.
CRS      8.      Notify Radiation Protection to carry out the actions of UNT-005-032, STEAM GENERATOR PRIMARY-TO-SECONDARY LEAKAGE.
CRS / BOP  9.      Verify BD-303, DISCHARGE TO WASTE, Locked Closed.
CRS / BOP  10.      Verify BD-1162, BD FLASH TANK VENT, Closed.
CRS / BOP  11.      Verify CD-145, CD DUMP TO WASTE POND, Closed.
11.1     Notify Chemistry prior to dumping Condensate from the Condenser Hotwell to the CST.
Crew    12.     Establish AND monitor a PMC Trend of the following PMC points:
* C48304 PRI TO SEC LEAKAGE
* C48305 PRI TO SEC LEAK RATE CHANGE (GPD/HR)
* C48251 RE5501 CH1 LEAK RATE
* C48252 RE5501 CH2 LEAK RATE CRS      Procedure NOTE Until arrangements are made for disposal of radioactively contaminated resin, Condensate Polisher Vessels should NOT be placed in service with resin loaded in the vessel.
Scenario 1, Revision 0


====6.7.1 Inform====
Appendix D                         Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC   Scenario #         1     Event #           3/4       Page       6    of   23 Event
SM/CRS that this Section is being performed.
NOTE When performing a Plant down power where final RCS Boron Concentration needs to be determined, the following Plant Data Book figure(s) will assist the Operator in determining the required RCS Boron PPM change. 1.2.1.1 Power Defect Vs Power Level  1.4.3.1 Inverse Boron Worth Vs. Tmod at BOC (<30 EFPD)  1.4.4.1 Inverse Boron Worth Vs. Tmod at Peak Boron (30 EFPD up to 170 EFPD)  1.4.5.1 Inverse Boron Worth Vs. Tmod at MOC (170 EFPD up to 340 EFPD)  1.4.6.1 Inverse Boron Worth Vs. Tmod at EOC ( 340 EFPD) 6.7.2 At SM/CRS discretion, calculate volume of Boric Acid to be added on Attachment 11.6, Calculation of Boric Acid Volume for Direct Boration or VCT Borate Makeup Mode. Should use Reactor Engineering Reactivity Worksheet 6.7.3 Set Boric Acid Makeup Batch Counter to volume of Boric Acid desired. 6.7.4 Verify Boric Acid Makeup Pumps selector switch aligned to desired Boric Acid Makeup Pump A(B).
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 8 of 23           Event


== Description:==
== Description:==
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0  
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time         Position                             Applicants Actions or Behavior CRS      15.      Remove from service ANY Condensate Polisher Vessels which are loaded with resin in accordance with OP-003-031, CONDENSATE POLISHER/BACKWASH TREATMENT.
15.1    Do not place in service any condensate polisher vessel loaded with resin without the coordination of Chemistry.
Examiner Note For the failure of Charging Pump AB failing to auto start on lowering level, this malfunction may occur before or after the Rapid Power Reduction is started, depending on the pace of the crew. Charging Pump AB would have auto started at ~ 53%, depending on power level.
ATC      Recognize and report indications of Charging Pump AB Auto Start Failure.
Alarm (This alarm only comes in if Pressurizer Level drops to 3.9% below the Pressurizer Level Setpoint. If the ATC starts Charging Pump AB before this level, this alarm will not come in):
* PRESSURIZER LEVEL HI/LO (Cabinet H, B-1)
Indications
* Pressurizer level drops more than 2.5% below Pressurizer Level Setpoint and Charging Pump AB does not start.
ATC      Start Charging Pump AB by taking the control switch on CP-2 to ON.
Examiner Note The following steps are from OP-901-212, Rapid Plant Power Reduction.
CRS      NOTE (1) A rapid power reduction is defined as approximately 30 MW/minute load reduction on the main turbine.
(2) Power Reduction may be stopped at any point.
(3) Some Steps of this procedure may not be applicable due to plant conditions. In these cases SM/CRS may NA the step.
(4) Steps within this procedure may be performed concurrently or out of sequence with SM/CRS concurrence.
Scenario 1, Revision 0


====6.7.5 Place====
Appendix D                      Required Operator Actions                                  Form ES-D-2 Op Test No.:    NRC  Scenario #      1    Event #            3/4        Page      7     of    23 Event
Direct Boration Valve, BAM-143, control switch to AUTO.


====6.7.6 Place====
== Description:==
Makeup Mode selector switch to BORATE.  
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time      Position                          Applicants Actions or Behavior ATC    Begin RCS Boration by either of the following methods as directed by the CRS:
* Direct Boration
* Emergency Boration using one Charging Pump CRS      Step 1: Begin RCS Boration by one of the following methods:
up to 340 EFPD:
Direct Boration or Emergency Boration using one Charging Pump ATC    Steps for Direct Boration:
CAUTION (1) This section affects reactivity. This evolution should be crosschecked and completed prior to leaving CP-4.
(2) At least one reactor coolant pump in each loop should be operating prior to performing direct boration operations to ensure proper chemical mixing.
* 6.7.1 Inform SM/CRS that this Section is being performed.
NOTE When performing a Plant down power where final RCS Boron Concentration needs to be determined, the following Plant Data Book figure(s) will assist the Operator in determining the required RCS Boron PPM change.
* 1.2.1.1 Power Defect Vs Power Level
* 1.4.3.1 Inverse Boron Worth Vs. Tmod at BOC (<30 EFPD)
* 1.4.4.1 Inverse Boron Worth Vs. Tmod at Peak Boron (30 EFPD up to 170 EFPD)
* 1.4.5.1 Inverse Boron Worth Vs. Tmod at MOC (170 EFPD up to 340 EFPD)
* 1.4.6.1 Inverse Boron Worth Vs. Tmod at EOC ( 340 EFPD)
* 6.7.2 At SM/CRS discretion, calculate volume of Boric Acid to be added on Attachment 11.6, Calculation of Boric Acid Volume for Direct Boration or VCT Borate Makeup Mode.
* Should use Reactor Engineering Reactivity Worksheet
* 6.7.3 Set Boric Acid Makeup Batch Counter to volume of Boric Acid desired.
* 6.7.4 Verify Boric Acid Makeup Pumps selector switch aligned to desired Boric Acid Makeup Pump A(B).
Scenario 1, Revision 0


====6.7.7 Verify====
Appendix D                      Required Operator Actions                                Form ES-D-2 Op Test No.:    NRC  Scenario #        1    Event #          3/4          Page      8    of    23 Event
selected Boric Acid Makeup Pump A(B) Starts.  


====6.7.8 Verify====
== Description:==
Direct Boration Valve, BAM-143, Opens.
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time      Position                          Applicants Actions or Behavior
NOTE The Boric Acid Flow Totalizer will not register below 3 GPM. The Boric Acid Flow Totalizer is most accurate in the range of 10 - 25 GPM.
* 6.7.5 Place Direct Boration Valve, BAM-143, control switch to AUTO.
6.7.9 If manual control of Boric Acid flow is desired, then perform the following:
* 6.7.6 Place Makeup Mode selector switch to BORATE.
6.7.9.1 Verify Boric Acid Flow controller, BAM-IFIC-0210Y, in Manual.
* 6.7.7 Verify selected Boric Acid Makeup Pump A(B) Starts.
6.7.9.2 Adjust Boric Acid Flow controller, BAM-IFIC-0210Y, output to >3 GPM flow rate.
* 6.7.8 Verify Direct Boration Valve, BAM-143, Opens.
6.7.11 Verify Boric Acid Makeup Control Valve, BAM-141, Intermediate or Open. 6.7.12 Observe Boric Acid flow rate for proper indication. Note This manipulation is performed at CP-4. The ATC should use the Reactivity Worksheet to recommend a boron quantity to the CRS. ATC Perform Boron Equalization as follows:
* NOTE
Place available Pressurizer Pressure Backup Heater Control Switches to ON. Reduce Pressurizer Spray Valve Controller (RC-IHIC-0100) setpoint potentiometer to establish spray flow and maintain RCS pressure 2250 PSIA (2175 - 2265). This manipulation is performed at CP-2. ATC Operate CEAs to maintain ASI using CEA Reg. Group 6 or Group P Control Element Assemblies. Operate CEAs in Manual Group mode as follows:  
* The Boric Acid Flow Totalizer will not register below 3 GPM. The Boric Acid Flow Totalizer is most accurate in the range of 10 - 25 GPM.
* 6.7.9 If manual control of Boric Acid flow is desired, then perform the following:
* 6.7.9.1 Verify Boric Acid Flow controller, BAM-IFIC-0210Y, in Manual.
* 6.7.9.2 Adjust Boric Acid Flow controller, BAM-IFIC-0210Y, output to >3 GPM flow rate.
* 6.7.11 Verify Boric Acid Makeup Control Valve, BAM-141, Intermediate or Open.
* 6.7.12 Observe Boric Acid flow rate for proper indication.
Note     This manipulation is performed at CP-4. The ATC should use the Reactivity Worksheet to recommend a boron quantity to the CRS.
ATC     Perform Boron Equalization as follows:
* Place available Pressurizer Pressure Backup Heater Control Switches to ON.
* Reduce Pressurizer Spray Valve Controller (RC-IHIC-0100) setpoint potentiometer to establish spray flow and maintain RCS pressure 2250 PSIA (2175 - 2265).
This manipulation is performed at CP-2.
ATC     Operate CEAs to maintain ASI using CEA Reg. Group 6 or Group P Control Element Assemblies.
Operate CEAs in Manual Group mode as follows:
* 6.7.1 Verify Plant Monitoring Computer operable in accordance with OP-004-012, Plant Monitoring Computer.
Scenario 1, Revision 0


====6.7.1 Verify====
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:   NRC   Scenario #       1     Event #           3/4           Page   9     of   23 Event
Plant Monitoring Computer operable in accordance with OP-004-012, Plant Monitoring Computer.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 9 of 23           Event


== Description:==
== Description:==
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0  
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time       Position                             Applicants Actions or Behavior
* 6.7.2 Position Group Select switch to desired group.
* 6.7.3 Place Mode Select switch to MG and verify the following:
* White lights Illuminated on Group Selection Matrix for selected group
* MG light Illuminates
* 6.7.4 Operate CEA Manual Shim switch to INSERT group to desired height while monitoring the following:
* CEA Position Indicator selected CEA group is moving in desired direction
* If Reactor is critical, then monitor the following:
* Reactor Power
* Reactor Coolant System (RCS) temperature
* Axial Shape Index (ASI)
NOTE The Operator should remain in the area in front of the CEA Drive Mechanism Control Panel when the Mode Select switch is not in OFF.
6.7.5 When desired set of moves have been completed, then place Mode Select switch to OFF.
Note    CEA Group P should be used first to a low limit of 120 inches, followed by CEA Group 6 to a low limit of 120 inches to comply with Tech Spec 3.1.3.6.
* This manipulation is performed at CP-2.
CRS      Notify the Load Dispatcher (Woodlands) that a rapid power reduction is in progress.
CRS      Announce to Station Personnel over the Plant Paging System that a rapid plant power reduction is in progress.
Crew    Maintain RCS Cold Leg Temperature 536&deg;F to 549&deg;F.
Scenario 1, Revision 0


====6.7.2 Position====
Appendix D                        Required Operator Actions                              Form ES-D-2 Op Test No.:    NRC    Scenario #        1    Event #          3/4        Page    10      of    23 Event
Group Select switch to desired group.  


====6.7.3 Place====
== Description:==
Mode Select switch to MG and verify the following:  White lights Illuminated on Group Selection Matrix for selected group  MG light Illuminates
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time      Position                            Applicants Actions or Behavior BOP        Commence Turbine load reduction by performing the following:
* Depress LOAD RATE MW/MIN pushbutton.
* Set selected rate in Display Demand Window.
* Depress ENTER pushbutton.
* Depress REFERENCE pushbutton.
* Set desired load in Reference Demand Window.
* Depress ENTER pushbutton.
* Depress GO pushbutton.
This manipulation is performed at CP-1. The BOP will set up the Main Turbine controls. The ATC will direct the BOP when to commence unloading the Main Turbine based on the drop in RCS Cold Leg temperature.
CRS        When Reactor Power consistently indicates less than 98% power, as indicated on PMC PID C24631 [MAIN STEAM RAW POWER (MSBSRAW)],
or an alternate point provided by Reactor Engineering, then verify the value of C24648 [BSCAL SMOOTHING VAL. APPLD (DUMOUT17)] automatically changes to 1.
Examiner Note This event is complete after power has been reduced to the satisfaction of the Lead Evaluator.
Scenario 1, Revision 0


====6.7.4 Operate====
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:   NRC   Scenario #       1   Event #           5        Page     11    of   23 Event
CEA Manual Shim switch to INSERT group to desired height while monitoring the following:  CEA Position Indicator selected CEA group is moving in desired direction  If Reactor is critical, then monitor the following:  Reactor Power  Reactor Coolant System (RCS) temperature  Axial Shape Index (ASI)
NOTE The Operator should remain in the area in front of the CEA Drive Mechanism Control Panel when the Mode Select switch is not in OFF.
6.7.5 When desired set of moves have been completed, then place Mode Select switch to OFF. Note CEA Group P should be used first to a low limit of 120 inches, followed by CEA Group 6 to a low limit of 120 inches to comply with Tech Spec 3.1.3.6.
This manipulation is performed at CP-2. CRS Notify the Load Dispatcher (Woodlands) that a rapid power reduction is in progress. CRS Announce to Station Personnel over the Plant Paging System that a rapid plant power reduction is in progress. Crew Maintain RCS Cold Leg Temperature 536&deg;F to 549&deg;F.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3 / 4 Page 10 of 23           Event


== Description:==
== Description:==
Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 BOP Commence Turbine load reduction by performing the following:
Reactor Coolant Pump 1A Seal Failure Time       Position                           Applicants Actions or Behavior ATC / BOP   Recognize and report indications of RCP 1A seal failure.
Depress LOAD RATE MW/MIN pushbutton.
Indications
Set selected rate in Display Demand Window.
* RCP 1A seal bleed off flow and temperature rising on the Plant Monitoring Computer and CP-2.
Depress ENTER pushbutton.
* RCP 1A seal pressures rising on the Plant Monitoring Computer and CP-2.
Depress REFERENCE pushbutton.
CRS      Enter and direct the implementation of OP-901-130, Reactor Coolant Pump Malfunction.
Set desired load in Reference Demand Window.
CRS      IF Reactor Coolant Pump Seal has failed, THEN GO TO section E1, Seal Failure.
Depress ENTER pushbutton.
Crew    Procedure Note
Depress GO pushbutton. This manipulation is performed at CP-1. The BOP will set up the Main Turbine controls. The ATC will direct the BOP when to commence unloading the Main Turbine based on the drop in RCS Cold Leg temperature. CRS When Reactor Power consistently indicates less than 98% power, as indicated on PMC PID C24631 [MAIN STEAM RAW POWER (MSBSRAW)],
: 1. RCP Seal pressure and Control Bleedoff temperature and flow are normally as follows (assuming normal operating RCS temperature and pressure):
or an alternate point provided by Reactor Engineering, then verify the value of C24648 [BSCAL SMOOTHING VAL. APPLD (DUMOUT17)] automatically changes to 1. Examiner Note This event is complete after power has been reduced to the satisfaction of the Lead Evaluator.  
* Vapor Seal pressure: 25 to 45 PSIG
* Upper Seal pressure: 585 to 915 PSIG
* Middle Seal pressure: 1237 to 1815 PSIG
* CBO temperature: 135&deg; to 190&deg;F
* CBO flow: 1.2 to 1.8 GPM
: 2. (If only one Reactor Coolant Pump Seal has failed on a Reactor Coolant Pump, THEN pump operation may continue provided the seal package is monitored for further degradation.
Crew    1. Inform System Engineer of Reactor Coolant Pump Seal failure.
Crew    Procedure Caution (1) CCW TEMPERATURES OF <75 F COULD LEAD TO ESSENTIAL CHILLER TRIPS ON EVAPORATOR LOW REFRIGERANT PRESSURE.
(2) CCW TEMPERATURE SHOULD BE CHANGED AT A RATE OF  10 &deg;F IN ONE HOUR TO PREVENT DEGREDATION OF THE REACTOR COOLANT PUMP SEALS.
Scenario 1, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 5 Page 11 of 23           Event
Appendix D                       Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC   Scenario #         1     Event #           5         Page       12    of   23 Event


== Description:==
== Description:==
Reactor Coolant Pump 1A Seal Failure Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 ATC / BOP Recognize and report indications of RCP 1A seal failure. Indications RCP 1A seal bleed off flow and temperature rising on the Plant Monitoring Computer and CP-2.
Reactor Coolant Pump 1A Seal Failure Time       Position                             Applicants Actions or Behavior CRS / BOP     2. IF Controlled Bleedoff temperature is rising, THEN lower Component Cooling Water temperature by ANY of the following:
RCP 1A seal pressures rising on the Plant Monitoring Computer and CP-2. CRS Enter and direct the implementation of OP-901-130, Reactor Coolant Pump Malfunction. CRS IF Reactor Coolant Pump Seal has failed, THEN GO TO section E1, Seal Failure. Crew Procedure Note 1. RCP Seal pressure and Control Bleedoff temperature and flow are normally as follows (assuming normal operating RCS temperature and pressure): Vapor Seal pressure: 25 to 45 PSIG  Upper Seal pressure: 585 to 915 PSIG  Middle Seal pressure: 1237 to 1815 PSIG  CBO temperature: 135&deg; to 190&deg;F  CBO flow: 1.2 to 1.8 GPM 2. (If only one Reactor Coolant Pump Seal has failed on a Reactor Coolant Pump, THEN pump operation may continue provided the seal package is monitored for further degradation. Crew 1. Inform System Engineer of Reactor Coolant Pump Seal failure. Crew Procedure Caution (1) CCW TEMPERATURES OF <75~ F COULD LEAD TO ESSENTIAL CHILLER TRIPS ON EVAPORATOR LOW REFRIGERANT PRESSURE. (2) CCW TEMPERATURE SHOULD BE CHANGED AT A RATE OF  10 &deg;F IN ONE HOUR TO PREVENT DEGREDATION OF THE REACTOR COOLANT PUMP SEALS.
* Start Dry Cooling Tower Fans.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 5 Page 12 of 23           Event
* Start Auxiliary Component Cooling Water Pump(s) AND associated Wet Cooling Tower Fans.
* Start Auxiliary Component Cooling Water Pump(s) AND lower ACC-126A(B) setpoint.
Examiner Note Seals are timed such that the second seal will fail 3 minutes after the first.
: 3. IF TWO OR MORE seals fail in rapid succession, (within 12 hours) THEN perform the following:
ATC      3.1 Trip the Reactor.
ATC      3.2 Secure affected Reactor Coolant Pump.
* Control switch is on CP-2.
Crew      3.3 GO TO OP-902-000, STANDARD POST TRIP ACTIONS.
Examiner Note This event is complete after the ATC operator trips the reactor. The severity of the SGTL should be updated upon reactor trip.
Scenario 1, Revision 0
 
Appendix D                       Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC Scenario #       1     Event #           6/7        Page     13    of   23 Event


== Description:==
== Description:==
Reactor Coolant Pump 1A Seal Failure Time Position Applicant's Actions or Behavior Scenario 1, Revision 0  CRS / BOP 2. IF Controlled Bleedoff temperature is rising, THEN lower Component Cooling Water temperature by ANY of the following:  Start Dry Cooling Tower Fans. Start Auxiliary Component Cooling Water Pump(s) AND associated Wet Cooling Tower Fans. Start Auxiliary Component Cooling Water Pump(s) AND lower ACC-126A(B) setpoint. Examiner Note Seals are timed such that the second seal will fail 3 minutes after the first.     3. IF TWO OR MORE seals fail in rapid succession, (within 12 hours) THEN perform the following:  ATC 3.1 Trip the Reactor. ATC 3.2 Secure affected Reactor Coolant Pump.
Steam Generator Tube Rupture / CVC-401 Fails to Close Time       Position                             Applicants Actions or Behavior ATC / BOP   Recognize and report indications of Steam Generator Tube Rupture.
Control switch is on CP-2. Crew 3.3 GO TO OP-902-000, STANDARD POST TRIP ACTIONS. Examiner Note This event is complete after the ATC operator trips the reactor. The severity of the SGTL should be updated upon reactor trip.  
Alarms
* PRESSURIZER LEVEL HI/LO (Cabinet H, B-1)
Indications
* Pressurizer level lowering > Charging Pump capacity.
* Lowering Pressurizer pressure.
* Charging Pump A auto-starts if not already started.
ATC    If directed by CRS, trip Reactor using 2 Reactor Trip pushbuttons at CP-2.
ATC    If directed by CRS, initiate Safety Injection Actuation (SIAS) and Containment Isolation Actuation (CIAS) at CP-7.
ATC     Close CVC-401 after Containment isolation
* This component is on CP-4 and receives a CIAS closure signal. This step becomes applicable after the CIAS is actuated.
BOP      Start High Pressure Safety Injection Pump A This component is on CP-8 and receives a SIAS start signal. This step becomes applicable after the SIAS is actuated.
CRS      Direct ATC and BOP to carry out Standard Post trip Actions.
ATC    Determine Reactivity Control acceptance criteria are met:
* Check reactor power is dropping.
* Check startup rate is negative.
* Check less than TWO CEAs are NOT fully inserted.
Scenario 1, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6 / 7 Page 13 of 23           Event
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC Scenario #       1     Event #         6/7         Page     14    of     23 Event


== Description:==
== Description:==
Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 ATC / BOP Recognize and report indications of Steam Generator Tube Rupture.
Steam Generator Tube Rupture / CVC-401 Fails to Close Time       Position                           Applicants Actions or Behavior BOP     Determine Maintenance of Vital Auxiliaries acceptance criteria are met:
Alarms    PRESSURIZER LEVEL HI/LO (Cabinet H, B-1)     Indications Pressurizer level lowering > Charging Pump capacity.
Check the Main Turbine is tripped:
Lowering Pressurizer pressure.
* Governor valves closed
Charging Pump A auto-starts if not already started.
* Throttle valves closed BOP      Check the Main Generator is tripped:
ATC If directed by CRS, trip Reactor using 2 Reactor Trip pushbuttons at CP-2.
* GENERATOR BREAKER A tripped
ATC If directed by CRS, initiate Safety Injection Actuation (SIAS) and Containment Isolation Actuation (CIAS) at CP-7.
* GENERATOR BREAKER B tripped
ATC Close CVC-401 after Containment isolation This component is on CP-4 and receives a CIAS closure signal. This step becomes applicable after the CIAS is actuated.
* EXCITER FIELD BREAKER tripped BOP     Check station loads are energized from offsite electrical power as follows:
BOP Start High Pressure Safety Injection Pump A This component is on CP-8 and receives a SIAS start signal. This step becomes applicable after the SIAS is actuated.
Train A
CRS Direct ATC and BOP to carry out Standard Post trip Actions. ATC Determine Reactivity Control acceptance criteria are met: Check reactor power is dropping. Check startup rate is negative. Check less than TWO CEAs are NOT fully inserted.
* A1, 6.9 KV non safety bus
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6 / 7 Page 14 of 23          Event
* A2, 4.16 KV non safety bus
* A3, 4.16 KV safety bus
* A-DC electrical bus
* A or C vital AC Instrument Channel Train B
* B1, 6.9 KV non safety bus
* B2, 4.16 KV non safety bus
* B3, 4.16 KV safety bus
* B-DC electrical bus B or D vital AC Instrument Channel ATC     Determine RCS Inventory Control acceptance criteria are met:
Check that the following conditions exist:
* Pressurizer level is 7% to 60%
* Pressurizer level is trending to 33% to 60%
* Check RCS subcooling is greater than or equal to 28&#xba;F.
Scenario 1, Revision 0


== Description:==
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC Scenario #       1   Event #         6/7       Page     15     of     23 Event
Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 BOP Determine Maintenance of Vital Auxiliaries acceptance criteria are met: Check the Main Turbine is tripped:  Governor valves closed  Throttle valves closed    BOP Check the Main Generator is tripped:  GENERATOR BREAKER A tripped  GENERATOR BREAKER B tripped  EXCITER FIELD BREAKER tripped    BOP Check station loads are energized from offsite electrical power as follows:
Train A  A1, 6.9 KV non safety bus  A2, 4.16 KV non safety bus  A3, 4.16 KV safety bus  A-DC electrical bus  A or C vital AC Instrument Channel Train B  B1, 6.9 KV non safety bus  B2, 4.16 KV non safety bus  B3, 4.16 KV safety bus  B-DC electrical bus B or D vital AC Instrument Channel    ATC Determine RCS Inventory Control acceptance criteria are met: Check that the following conditions exist:  Pressurizer level is 7% to 60%  Pressurizer level is trending to 33% to 60%  Check RCS subcooling is greater than or equal to 28&#xba;F.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6 / 7 Page 15 of 23           Event


== Description:==
== Description:==
Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 ATC Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist: Pressurizer pressure is 1750 psia to 2300 psia Pressurizer pressure is trending to 2125 psia to 2275 psia IF pressurizer pressure is less than 1684 psia, THEN verify the following have initiated.
Steam Generator Tube Rupture / CVC-401 Fails to Close Time       Position                         Applicants Actions or Behavior ATC     Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist:
* Pressurizer pressure is 1750 psia to 2300 psia
* Pressurizer pressure is trending to 2125 psia to 2275 psia IF pressurizer pressure is less than 1684 psia, THEN verify the following have initiated.
* SIAS
* SIAS
* CIAS    ATC Determine Core Heat Removal acceptance criteria are met: Check at least one RCP is operating. Check operating loop T is less than 13&#xba;F. Check RCS subcooling is greater than or equal to 28&#xba;F. BOP Determine RCS Heat Removal acceptance criteria are met: Check that at least one steam generator has BOTH of the following: Steam generator level is 5% to 80% NR Main Feedwater is available to restore level within 50%-70% NR.
* CIAS ATC     Determine Core Heat Removal acceptance criteria are met:
ATC Check RCS T C is 530 &#xba;F to 550 &#xba;F     BOP Check steam generator pressure is 885 psia to 1040 psia. BOP Check Feedwater Control in Reactor Trip Override: MAIN FW REG valves are closed STARTUP FW REG valves are 13% to 21% open Operating main Feedwater pumps are 3800 rpm to 4000 rpm     BOP Reset moisture separator reheaters, and check the temperature control valves closed.
* Check at least one RCP is operating.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6 / 7 Page 16 of 23           Event
* Check operating loop T is less than 13&#xba;F.
* Check RCS subcooling is greater than or equal to 28&#xba;F.
BOP     Determine RCS Heat Removal acceptance criteria are met:
Check that at least one steam generator has BOTH of the following:
* Steam generator level is 5% to 80% NR
* Main Feedwater is available to restore level within 50%-70% NR.
ATC     Check RCS TC is 530 &#xba;F to 550 &#xba;F BOP     Check steam generator pressure is 885 psia to 1040 psia.
BOP     Check Feedwater Control in Reactor Trip Override:
* MAIN FW REG valves are closed
* STARTUP FW REG valves are 13% to 21% open
* Operating main Feedwater pumps are 3800 rpm to 4000 rpm BOP     Reset moisture separator reheaters, and check the temperature control valves closed.
Scenario 1, Revision 0
 
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC Scenario #         1   Event #           6/7       Page     16   of   23 Event


== Description:==
== Description:==
Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 ATC Determine Containment Isolation acceptance criteria are met: Check containment pressure is less than 16.4 psia. Check NO containment area radiation monitor alarms OR unexplained rise in activity. Check NO steam plant activity monitor alarms OR unexplained rise in activity. BOP Determine Containment Temperature and Pressure Control acceptance criteria are met: Check containment temperature is less than or equal to 120&#xba;F. Check containment pressure is less than 16.4 psia.
Steam Generator Tube Rupture / CVC-401 Fails to Close Time       Position                           Applicants Actions or Behavior ATC     Determine Containment Isolation acceptance criteria are met:
BOP Secure AH-12 A or B on CRS direction after initiation of SIAS at CP-18.
* Check containment pressure is less than 16.4 psia.
CRS After review of Standard Post Trip Actions, use Appendix 1, Diagnostic Flow Chart of OP-902-009 to select appropriate optimal recovery procedure. Proper use of chart will result in use of OP-902-007, Steam Generator Tube Rupture Recovery CRS Enter and direct the implementation of OP-902-007, Steam Generator Tube Rupture Recovery.
* Check NO containment area radiation monitor alarms OR unexplained rise in activity.
CRS 1. Confirm diagnosis of a SGTR: a. Check Safety Function Status Check acceptance criteria are satisfied.  
* Check NO steam plant activity monitor alarms OR unexplained rise in activity.
BOP     Determine Containment Temperature and Pressure Control acceptance criteria are met:
* Check containment temperature is less than or equal to 120&#xba;F.
* Check containment pressure is less than 16.4 psia.
BOP     Secure AH-12 A or B on CRS direction after initiation of SIAS at CP-18.
CRS     After review of Standard Post Trip Actions, use Appendix 1, Diagnostic Flow Chart of OP-902-009 to select appropriate optimal recovery procedure.
* Proper use of chart will result in use of OP-902-007, Steam Generator Tube Rupture Recovery CRS     Enter and direct the implementation of OP-902-007, Steam Generator Tube Rupture Recovery.
CRS     1. Confirm diagnosis of a SGTR:
: a. Check Safety Function Status Check acceptance criteria are satisfied.
: b. IF steam generator sample path is available, THEN direct Chemistry to sample BOTH steam generators for activity.
: b. IF steam generator sample path is available, THEN direct Chemistry to sample BOTH steam generators for activity.
Crew 2. Announce a Steam Generator Tube Rupture is in progress using the plant page. CRS 3. Advise the Shift Manager to REFER TO EP-001-001, "Recognition & Classification of Emergency Condition", and implement the Emergency Plan.
Crew     2. Announce a Steam Generator Tube Rupture is in progress using the plant page.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6 / 7 Page 17 of 23           Event
CRS     3. Advise the Shift Manager to REFER TO EP-001-001, "Recognition &
Classification of Emergency Condition", and implement the Emergency Plan.
Scenario 1, Revision 0
 
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:   NRC   Scenario #       1     Event #         6/7         Page   17     of     23 Event


== Description:==
== Description:==
Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 CRS 4. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps".
Steam Generator Tube Rupture / CVC-401 Fails to Close Time       Position                           Applicants Actions or Behavior CRS     4. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps".
Step is not applicable.
* Step is not applicable.
CRS 5. REFER TO Section 6.0, "Placekeeper", and record the time of the reactor trip. CRS 6. IF Pressurizer pressure is less than 1684 psia, THEN verify SIAS has initiated.
CRS     5. REFER TO Section 6.0, "Placekeeper", and record the time of the reactor trip.
CRS 7. IF SIAS has initiated, THEN: a. Verify safety injection pumps have started. b. Check safety injection flow is within the following:
CRS     6. IF Pressurizer pressure is less than 1684 psia, THEN verify SIAS has initiated.
CRS     7. IF SIAS has initiated, THEN:
: a. Verify safety injection pumps have started.
: b. Check safety injection flow is within the following:
* Appendix 2-E, "HPSI Flow Curve"
* Appendix 2-E, "HPSI Flow Curve"
* Appendix 2-F, "LPSI Flow Curve" c. Verify ALL available charging pumps are operating.
* Appendix 2-F, "LPSI Flow Curve"
CRS / ATC 8.
: c. Verify ALL available charging pumps are operating.
IF Pressurizer pressure is less than 1621 psia, AND SIAS is actuated, THEN: a. Verify no more than two RCPs are operating.  
CRS / ATC   8. IF Pressurizer pressure is less than 1621 psia, AND SIAS is actuated, THEN:
: b. IF Pressurizer pressure is less than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits", THEN stop ALL RCPs. Step is not applicable.
: a. Verify no more than two RCPs are operating.
CRS / BOP 9.
: b. IF Pressurizer pressure is less than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits", THEN stop ALL RCPs.
IF RCPs are operating, THEN: a. Verify CCW available to RCPs.  
* Step is not applicable.
: b. IF a CSAS is initiated, THEN stop ALL RCPs. c. IF RCS TC is less than 382&#xba;F, THEN verify no more than two RCPs are operating.
CRS / BOP   9. IF RCPs are operating, THEN:
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6 / 7 Page 18 of 23           Event
: a. Verify CCW available to RCPs.
: b. IF a CSAS is initiated, THEN stop ALL RCPs.
: c. IF RCS TC is less than 382&#xba;F, THEN verify no more than two RCPs are operating.
Scenario 1, Revision 0
 
Appendix D                       Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC   Scenario #       1     Event #           6/7         Page     18       of     23 Event


== Description:==
== Description:==
Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 BOP 10. Check a CCW pump is operating for each energized 4.16 KV safety bus.
Steam Generator Tube Rupture / CVC-401 Fails to Close Time       Position                               Applicants Actions or Behavior BOP         10. Check a CCW pump is operating for each energized 4.16 KV safety bus.
CRS / BOP 11. Commence a rapid RCS cooldown to less than 520 &deg;F T Hot using the steam bypass valves.
CRS / BOP     11. Commence a rapid RCS cooldown to less than 520 &deg;F THot using the steam bypass valves.
Since the Main Condenser is available at this point in the scenario, the CRS should direct the BO P to open Steam Bypass Valve #1 50% open to commence this rapid cooldown. If the crew initiated a Main Steam Isolation Signal prior to this point, the rapid cooldown would be initiated by opening both Atmospheric Dump Valves 100% open.
* Since the Main Condenser is available at this point in the scenario, the CRS should direct the BOP to open Steam Bypass Valve #1 50% open to commence this rapid cooldown.
ATC 13. IF MSIS is NOT present, THEN lower the automatic initiation setpoints as the cooldown and depressurization proceed for MSIS (low SG Pressure).
* If the crew initiated a Main Steam Isolation Signal prior to this point, the rapid cooldown would be initiated by opening both Atmospheric Dump Valves 100% open.
The CRS should direct the ATC to perform this action during the rapid cooldown to < 520 THOT. Reset MSIS setpoints on all 4 channels at CP-7.
ATC       13. IF MSIS is NOT present, THEN lower the automatic initiation setpoints as the cooldown and depressurization proceed for MSIS (low SG Pressure).
Examiner Note This event is complete after commencing the rapid cooldown.  
* The CRS should direct the ATC to perform this action during the rapid cooldown to < 520 THOT.
* Reset MSIS setpoints on all 4 channels at CP-7.
Examiner Note This event is complete after commencing the rapid cooldown.
Scenario 1, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 19 of 23           Event
Appendix D                     Required Operator Actions                             Form ES-D-2 Op Test No.:     NRC Scenario #       1     Event #           8       Page   19     of     23 Event


== Description:==
== Description:==
Main Steam Line Break / Function Recovery Procedure Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 ATC / BOP Recognize and report indications of Main Steam Line Break.
Main Steam Line Break / Function Recovery Procedure Time       Position                           Applicants Actions or Behavior ATC / BOP   Recognize and report indications of Main Steam Line Break.
Alarms   Containment Water Leakage Hi (Cabinet N, L-20)
Alarms
Containment Water Leakage Hi-Hi (Cabinet N, K-20)
* Containment Water Leakage Hi (Cabinet N, L-20)
Containment Pressure Hi / Lo (Cabinet M, H-4)
* Containment Water Leakage Hi-Hi (Cabinet N, K-20)
Containment Pressure Hi / Lo (Cabinet N, H-14)     Indications Lowering Pressurizer level.
* Containment Pressure Hi / Lo (Cabinet M, H-4)
Lowering Pressurizer pressure.
* Containment Pressure Hi / Lo (Cabinet N, H-14)
Rising Containment pressure.
Indications
Lowering Steam Generator #2 pressure. CRS Recognize the second event in progress. Exit OP-902-007 and enter OP-902-008, Functional Recovery procedure. Crew 1. Announce that the Functional Recovery Procedure is in progress using the plant page. CRS 2. Advise the Shift Manager to REFER TO EP-001-001, "Recognition & Classification of Emergency Condition" and implement the Emergency Plan. CRS 3. REFER TO the "Placekeeper" and record the time of the reactor trip. ATC 4. IF pressurizer pressure is less than 1621 psia, AND SIAS is actuated, THEN: a. Verify no more than two RCPs are operating.  
* Lowering Pressurizer level.
: b. IF pressurizer pressure is less than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits", THEN stop ALL RCPs. ATC 5. IF RCPs are operating, THEN: a. IF a CSAS is initiated, THEN stop ALL RCPs. b. Verify CCW available to RCPs. c. IF RCS TC is less than 382&#xba;F [384&#xba;F], THEN verify no more than two RCPs are operating.
* Lowering Pressurizer pressure.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 20 of 23           Event
* Rising Containment pressure.
* Lowering Steam Generator #2 pressure.
CRS     Recognize the second event in progress. Exit OP-902-007 and enter OP-902-008, Functional Recovery procedure.
Crew     1. Announce that the Functional Recovery Procedure is in progress using the plant page.
CRS     2. Advise the Shift Manager to REFER TO EP-001-001, "Recognition &
Classification of Emergency Condition" and implement the Emergency Plan.
CRS     3. REFER TO the "Placekeeper" and record the time of the reactor trip.
ATC     4. IF pressurizer pressure is less than 1621 psia, AND SIAS is actuated, THEN:
: a. Verify no more than two RCPs are operating.
: b. IF pressurizer pressure is less than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits", THEN stop ALL RCPs.
ATC     5. IF RCPs are operating, THEN:
: a. IF a CSAS is initiated, THEN stop ALL RCPs.
: b. Verify CCW available to RCPs.
: c. IF RCS TC is less than 382&#xba;F [384&#xba;F], THEN verify no more than two RCPs are operating.
Scenario 1, Revision 0
 
Appendix D                         Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC     Scenario #         1     Event #           8         Page     20   of     23 Event


== Description:==
== Description:==
Main Steam Line Break / Function Recovery Procedure Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 Critical Task Trip any RCP not satisfying RCP operating limits.
Main Steam Line Break / Function Recovery Procedure Time       Position                               Applicants Actions or Behavior Critical Task Trip any RCP not satisfying RCP operating limits.
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow / CSAS.
This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow / CSAS.
ATC Following initiation of CSAS (auto or manual) secure all running Reactor Coolant Pumps as follows: Place each RCP control switch to stop at CP-2     CRS 6. Direct Chemistry to sample BOTH steam generators for activity and boron. CRS 7. IF power is lost to both 3A and 3B safety buses and NOT expected to be restored within 30 minutes, THEN perform the following:
ATC         Following initiation of CSAS (auto or manual) secure all running Reactor Coolant Pumps as follows:
This step is not applicable due to no power loss. CRS 8. IF power is lost to both 3A and 3B safety buses and NOT expected to be restored within 30 minutes, THEN perform the following to reduce unnecessary station loads:
* Place each RCP control switch to stop at CP-2 CRS         6. Direct Chemistry to sample BOTH steam generators for activity and boron.
This step is not applicable due to no power loss. CRS 9. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps".
CRS         7. IF power is lost to both 3A and 3B safety buses and NOT expected to be restored within 30 minutes, THEN perform the following:
This step is not applicable due to no power loss. BOP 10. Place Hydrogen Analyzers in service as follows:
* This step is not applicable due to no power loss.
Train A   o Place Train A H2 ANALYZER CNTMT ISOL VALVE keyswitch to OPEN. o Place H2 ANALYZER A POWER to ON.
CRS         8. IF power is lost to both 3A and 3B safety buses and NOT expected to be restored within 30 minutes, THEN perform the following to reduce unnecessary station loads:
o Check H2 ANALYZER A Pumps indicate ON.
* This step is not applicable due to no power loss.
Train B   o Place Train B H2 ANALYZER CNTMT ISOL VALVE keyswitch to OPEN. o Place H2 ANALYZER B POWER to ON.
CRS         9. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps".
o Check H2 ANALYZER B Pumps indicate ON.
* This step is not applicable due to no power loss.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 21 of 23           Event
BOP         10. Place Hydrogen Analyzers in service as follows:
* Train A o   Place Train A H2 ANALYZER CNTMT ISOL VALVE keyswitch to OPEN.
o   Place H2 ANALYZER A POWER to ON.
o   Check H2 ANALYZER A Pumps indicate ON.
* Train B o   Place Train B H2 ANALYZER CNTMT ISOL VALVE keyswitch to OPEN.
o   Place H2 ANALYZER B POWER to ON.
o   Check H2 ANALYZER B Pumps indicate ON.
Scenario 1, Revision 0
 
Appendix D                     Required Operator Actions                                 Form ES-D-2 Op Test No.:   NRC   Scenario #       1     Event #             8         Page       21     of     23 Event


== Description:==
== Description:==
Main Steam Line Break / Function Recovery Procedure Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 CRS 11. Identify success paths to be used to satisfy each safety function using BOTH of the following: Resource Assessment Trees Safety Function Tracking Sheet Note The CRS will perform the prioritization using the Reso urce Assessment Trees. The STA would use the Safety Function Tracking Sheets.     Proper prioritization will result in Containment Isolation being priority 1 and RCS Inventory Control being priority 2. The CRS may request plant data from the ATC and BOP operators during his prioritization. The CRS may ask for the BOP to verify Safety Injection Pumps are meeting the flow curves of OP-902-009, Appendix 2. Both High and Low Pressure Safety Injection Pumps are meeting  
Main Steam Line Break / Function Recovery Procedure Time       Position                           Applicants Actions or Behavior CRS     11. Identify success paths to be used to satisfy each safety function using BOTH of the following:
 
* Resource Assessment Trees
their flow curves. The Containment Isolatio n section of OP-902-008 will direct the CRS to carry out the actions in the Heat Removal section, HR-2, steps 16-28. These steps will direct reducing RCS pressure and Isolating S/G #2.
* Safety Function Tracking Sheet Note
BOP 16.1 Commence a rapid RCS cooldown to less than 520 &deg;F T HOT using Steam Bypass valves.
* The CRS will perform the prioritization using the Resource Assessment Trees. The STA would use the Safety Function Tracking Sheets.
The CRS should have already ordered this step in OP-902-007. Since the Main Steam Line Break is inside Containment, the Main Steam Isolation valves will now be closed. The CRS should now order the BOP to open both Atmospheric Dump Valves 100% to re-commence the rapid cooldown. RCS temperature may already be < 520 &deg;F due to the Excess Steam Demand. In that case, this step is not applicable.  
Proper prioritization will result in Containment Isolation being priority 1 and RCS Inventory Control being priority 2.
* The CRS may request plant data from the ATC and BOP operators during his prioritization. The CRS may ask for the BOP to verify Safety Injection Pumps are meeting the flow curves of OP-902-009, Appendix
: 2. Both High and Low Pressure Safety Injection Pumps are meeting their flow curves.
* The Containment Isolation section of OP-902-008 will direct the CRS to carry out the actions in the Heat Removal section, HR-2, steps 16-28.
These steps will direct reducing RCS pressure and Isolating S/G #2.
BOP     16.1 Commence a rapid RCS cooldown to less than 520 &deg;F THOT using Steam Bypass valves.
* The CRS should have already ordered this step in OP-902-007. Since the Main Steam Line Break is inside Containment, the Main Steam Isolation valves will now be closed. The CRS should now order the BOP to open both Atmospheric Dump Valves 100% to re-commence the rapid cooldown.
* RCS temperature may already be < 520 &deg;F due to the Excess Steam Demand. In that case, this step is not applicable.
Scenario 1, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 22 of 23           Event
Appendix D                         Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC     Scenario #         1     Event #           8           Page   22   of     23 Event


== Description:==
== Description:==
Main Steam Line Break / Function Recovery Procedure Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 Critical Task Prevent opening the Main Steam Safety Valves This task is satisfied by taking action to lower RCS pressure in accordance with step 17.
Main Steam Line Break / Function Recovery Procedure Time       Position                               Applicants Actions or Behavior Critical Task Prevent opening the Main Steam Safety Valves This task is satisfied by taking action to lower RCS pressure in accordance with step 17.
ATC 17. Depressurize the RCS by performing ALL of the following:  
ATC         17. Depressurize the RCS by performing ALL of the following:
: a. Maintain pressurizer pressure within ALL of the following criteria: Less than 945 psia [915 psia] Within 50 psi of the most affected steam generator pressure Within Appendix 2A-D, "RCS Pressure and Temperature Limits" IF RCPs are operating, greater than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits" b. Operate main or auxiliary pressurizer spray.  
: a. Maintain pressurizer pressure within ALL of the following criteria:
* Less than 945 psia [915 psia]
* Within 50 psi of the most affected steam generator pressure
* Within Appendix 2A-D, "RCS Pressure and Temperature Limits"
* IF RCPs are operating, greater than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits"
: b. Operate main or auxiliary pressurizer spray.
: c. IF HPSI throttle criteria are met, THEN perform ANY of the following:
: c. IF HPSI throttle criteria are met, THEN perform ANY of the following:
* Control charging and letdown flow
* Control charging and letdown flow
* Throttle HPSI flow Note The ATC operator should receive direction from the CRS to perform this step. He should evaluate plant conditions and decide on a minimum RCS pressure. The critical task is satisfied when the applicant takes action to start reducing RCS pressure (< 945 PSIA does not need to be reached in the scenario). Auxiliary Spray will be required since all RCPs will be secured. HPSI throttle criteria will not be met at this point.
* Throttle HPSI flow Note
BOP IF RCS T HOT  is less than 520 &deg;F, THEN isolate the most affected SG:     BOP a. Place the ADV setpoint to 980 psig and verify controller in AUTO.
* The ATC operator should receive direction from the CRS to perform this step. He should evaluate plant conditions and decide on a minimum RCS pressure. The critical task is satisfied when the applicant takes action to start reducing RCS pressure (< 945 PSIA does not need to be reached in the scenario).
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 23 of 23           Event
* Auxiliary Spray will be required since all RCPs will be secured.
* HPSI throttle criteria will not be met at this point.
BOP         IF RCS THOT is less than 520 &deg;F, THEN isolate the most affected SG:
BOP         a. Place the ADV setpoint to 980 psig and verify controller in AUTO.
Scenario 1, Revision 0
 
Appendix D                         Required Operator Actions                           Form ES-D-2 Op Test No.:   NRC     Scenario #       1   Event #           8         Page   23     of 23 Event


== Description:==
== Description:==
Main Steam Line Break / Function Recovery Procedure Time Position Applicant's Actions or Behavior Scenario 1, Revision 0 BOP b. Verify the MSIV is closed.
Main Steam Line Break / Function Recovery Procedure Time       Position                             Applicants Actions or Behavior BOP         b. Verify the MSIV is closed.
BOP c. Verify the MFIV is closed.
BOP         c. Verify the MFIV is closed.
BOP d. IF EFAS-2 is NOT initiated, THEN close EFW Isolation Valves: EFW 228B (SG 2 PRIMARY) EFW 229B (SG 2 BACKUP)
BOP         d. IF EFAS-2 is NOT initiated, THEN close EFW Isolation Valves:
BOP e. Place EFW Flow Control Valves in MAN and close: EFW 224B, SG 2 PRIMARY EFW 223B, SG 2 BACKUP BOP f. Close MS 401B, PUMP AB TURB STM SUPPLY SG 2.
* EFW 228B (SG 2 PRIMARY)
BOP g. Close Main Steam Line 2 Drains: MS 120B NORMAL MS 119B BYPASS BOP h. Close Steam Generator Blowdown isolation valves: BD 103B STM GEN 2 (OUT) BD 102B STM GEN 2 (IN)     BOP i. Check main steam safety valves are closed. Examiner Note This event is complete after the CRS has directed Steam Generator #2 to be isolated AND The ATC operator has commenced reducing RCS pressure Or As directed by the Lead Evaluator.  
* EFW 229B (SG 2 BACKUP)
BOP         e. Place EFW Flow Control Valves in MAN and close:
* EFW 224B, SG 2 PRIMARY
* EFW 223B, SG 2 BACKUP BOP         f. Close MS 401B, PUMP AB TURB STM SUPPLY SG 2.
BOP         g. Close Main Steam Line 2 Drains:
* MS 120B NORMAL
* MS 119B BYPASS BOP         h. Close Steam Generator Blowdown isolation valves:
* BD 103B STM GEN 2 (OUT)
* BD 102B STM GEN 2 (IN)
BOP         i. Check main steam safety valves are closed.
Examiner Note This event is complete after the CRS has directed Steam Generator #2 to be isolated AND The ATC operator has commenced reducing RCS pressure Or As directed by the Lead Evaluator.
Scenario 1, Revision 0


Appendix D Scenario Outline Form ES-D-1 Scenario 2 Rev 1 Facility: WATERFORD 3 Scenario No.: 2 Op Test No.:
Appendix D                               Scenario Outline                       Form ES-D-1 Facility:       WATERFORD 3               Scenario No.: 2       Op Test No.:   NRC Examiners:                                         Operators:
NRC Examiners:   Operators:             Initial Conditions: 100%, 125 EFPD, AB buses aligned to Train B.
Initial Conditions:
Protected Train is B Emergency Diesel Generator A is tagged out for planned maintenance.
* 100%, 125 EFPD, AB buses aligned to Train B.
Turnover: Maintain 100 % power Severe Thunderstorm Warning and Tornado Watch and in effect Event No. Malf. No. Event Type* Event Description 1 CV01B TS - SRO C - ATC C - SRO Charging Pump B trips 2 N/A TS - SRO Dry Cooling Tower Fan 8A reported with no oil in sight glass.
* Protected Train is B
3 FW27M FW28M R - ATC N - BOP N - SRO Heater 5 and 6 A isolate on high level.
* Emergency Diesel Generator A is tagged out for planned maintenance.
Normal plant power reduction to < 72%. 4 RC04C RD24 A,B,E,F M - All I - ATC I - SRO RCP 2A Shaft Shear with aut omatic trip initiated but correct alignment of trip breakers do not open.
Turnover:
Manual reactor trip.
* Maintain 100 % power
5 RD11A-44 RD11A-74 RD11A-68 C-ATC C - SRO 3 CEAs stick out on trip requiring Emergency Boration 6 ED01 A, B, C, D M-All Loss of Off Site Power 7 EG08B C- BOP C - SRO EDG B fails to auto-start  
* Severe Thunderstorm Warning and Tornado Watch and in effect Event       Malf. No. Event Type*                         Event No.                                                    Description 1         CV01B     TS - SRO       Charging Pump B trips C - ATC C - SRO 2           N/A     TS - SRO       Dry Cooling Tower Fan 8A reported with no oil in sight glass.
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor
3       FW27M       R - ATC         Heater 5 and 6 A isolate on high level.
FW28M      N - BOP        Normal plant power reduction to < 72%.
N - SRO 4         RC04C     M - All         RCP 2A Shaft Shear with automatic trip initiated RD24                      but correct alignment of trip breakers do not open.
I - ATC A,B,E,F                    Manual reactor trip.
I - SRO 5       RD11A-44     C-ATC           3 CEAs stick out on trip requiring Emergency RD11A-74                    Boration C - SRO RD11A-68 6         ED01     M-All           Loss of Off Site Power A, B, C, D 7         EG08B     C- BOP         EDG B fails to auto-start C - SRO
    *   (N)ormal, (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor Scenario 2 Rev 1


Scenario Event Description NRC Scenario 2 Scenario 2 Rev 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.
Scenario Event Description NRC Scenario 2 The crew assumes the shift at 100% power with instructions to maintain 100% power.
Emergency Diesel Generator A is out of service due to a cracked lube oil strainer valve. Tech Spec 3.8.1.1 b and d hav e been entered. The turnover will include that the site is under a Severe Thunderstorm Warning and a Tornado Watch. All of the necessary actions of OP-901-521, Severe Weather and Flooding, have been accomplished.  
Emergency Diesel Generator A is out of service due to a cracked lube oil strainer valve.
Tech Spec 3.8.1.1 b and d have been entered. The turnover will include that the site is under a Severe Thunderstorm Warning and a Tornado Watch. All of the necessary actions of OP-901-521, Severe Weather and Flooding, have been accomplished.
After taking the shift, Charging Pump B will trip on motor overload. The crew should start Charging Pump AB or A and enter OP-901-112, Charging or Letdown Malfunction.
The CRS should enter Tech Spec 3.1.2.4 and TRM 3.1.2.4. Additionally, the crew will no longer be in compliance with Tech Spec 3.8.1.1 d, requiring action within 2 hours.
The CRS should direct the ATC to align Charging Pump AB to replace Charging Pump B and exit Tech Spec 3.1.2.4, comply with Tech Spec 3.8.1.1.b, and remain in TRM 3.1.2.4.
After the ATC aligns Charging Pump AB or at the lead examiners direction, the Outside Watch will call and report that during his rounds in the Dry Cooling Tower Area, he has discovered Dry Cooling Tower Fan 8A has a cracked oil housing and no oil is visible in the sight glass. The CRS should declare Dry Cooling Tower Fan 8A inoperable and enter Tech Spec 3.7.4 action c, which, due to the tornado watch, requires a shutdown if not restored in 1 hour.
After the CRS identifies the correct Tech Spec, Heater 5A Normal Level Control Valve will fail closed. The rising level will cause Heaters 5A and 6A to isolate. Based on guidance from OP-003-034, Feed Heater Vents and Drains, the crew should determine the need to commence a normal plant shutdown in accordance with OP-010-005, Plant Shutdown, to lower Main Generator load to less than 893 MWe, 72% power. The ATC will perform Pressurizer boron equalization, direct Boration to the RCS, as well as ASI control with CEAs. The BOP will manipulate the Main Turbine controls to reduce load.
Once the crew has commenced the power reduction and lowered power to ~ 90%, or at the lead examiners discretion, Reactor Coolant Pump 2A will have a sheared shaft failure. The Plant Protection System will actuate, but 4 Reactor Trip Breakers will fail to open automatically. The crew should manually trip the reactor using the Diverse Reactor Trip System. After the reactor trip, 3 CEAs will fail to insert. The ATC should commence Emergency Boration in accordance with OP-901-103, Emergency Boration.
The crew will carry out the immediate operator actions of OP-902-000, Standard Post Trip Actions.
During the review of Standard Post Trip Actions, a Loss of Off Site Power will occur.
EDG B will fail to automatically start and have to be started manually by the BOP operator. The CRS should enter OP-902-003, Loss of Off Site Power/Loss of Forced Circulation Recovery. Once in OP-902-003, the CRS should direct the performance of OP-902-009, Standard Appendices, Appendix 20, Operation of DCT Sump Pumps. The scenario can be terminated after the CRS orders the performance of OP-902-009 Appendix 20 or at the lead examiners discretion.
Scenario 2 Rev 1


After taking the shift, Charging Pump B will trip on motor overload. The crew should start Charging Pump AB or A and enter OP-901-112, Charging or Letdown Malfunction. The CRS should enter Tech Spec 3.1.2.4 and TRM 3.1.2.4. Additi onally, the crew will no longer be in compliance with Tech Spec 3.
Scenario Event Description NRC Scenario 2 Critical Tasks
8.1.1 d, requiring ac tion within 2 hours. The CRS should direct the ATC to align Ch arging Pump AB to replace Charging Pump B and exit Tech Spec 3.1.2.4, comply with Tech Spec 3.8.1.1.b, and remain in TRM 3.1.2.4.
: 1. Manually trip the Reactor.
This task is satisfied by manually tripping the reactor within 1 minute of the failure of the automatic trip. The required task becomes applicable after the annunciators are received associated with the RCP 2A sheared shaft.
: 2. Establish reactivity control.
This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification. The required task becomes applicable after the Reactor is tripped and 2 CEAs remain stuck out following event 5.
: 3. Energize at least one vital electrical AC bus.
This task is satisfied by starting Emergency Diesel Generator B. This task becomes applicable following the loss of off site power triggered in event 7.
Scenario Quantitative Attributes
: 1. Total malfunctions (5-8)                                              6
: 2. Malfunctions after EOP entry (1-2)                                    2
: 3. Abnormal events (2-4)                                                  2
: 4. Major transients (1-2)                                                2
: 5. EOPs entered/requiring substantive actions (1-2)                      1
: 6. EOP contingencies requiring substantive actions (0-2)                  1
: 7. Critical tasks (2-3)                                                  3 Scenario 2 Rev 1


After the ATC aligns Charging Pump AB or at the lead examiners direction, the Outside Watch will call and report that during his rounds in the Dry Cooling Tower Area, he has discovered Dry Cooling Tower Fan 8A has a cracked oil housing and no oil is visible in the sight glass. The CRS should declare Dry Cooling Tower Fan 8A inoperable and enter Tech Spec 3.7.4 action c, which, due to the tornado watch, requires a shutdown if not restored in 1 hour.
NRC Scenario 2 Scenario Notes:
 
A. Reset Simulator to IC-192.
After the CRS identifies the co rrect Tech Spec, Heater 5A Normal Level Control Valve will fail closed. The rising level will caus e Heaters 5A and 6A to isolate. Based on guidance from OP-003-034, Feed Heater Vents and Drains, the crew should determine the need to commence a normal plant shutdown in accordance with OP-010-005, Plant Shutdown, to lower Main Generator load to less than 893 MWe, 72% power. The ATC will perform Pressurizer boron equalization, di rect Boration to the RCS, as well as ASI control with CEAs. The BOP will manipulate the Main Turbine controls to reduce load.
B. Verify the following Scenario Malfunctions:
 
: 1. cv01b for Charging Pump B trip
Once the crew has commenced the power reduc tion and lowered power to ~ 90%, or at the lead examiner's discretion, Reactor Coolant Pump 2A will have a sheared shaft failure. The Plant Protection System will actuat e, but 4 Reactor Trip Breakers will fail to open automatically. The crew should manua lly trip the reactor using the Diverse Reactor Trip System. After t he reactor trip, 3 CEAs will fail to insert. The ATC should commence Emergency Boration in accordance with OP-901-103, Emergency Boration.
: 2. rc04c for RCP 2A sheared shaft
The crew will carry out the i mmediate operator actions of OP-902-000, Standard Post Trip Actions.
: 3. rd24a for Reactor Trip Circuit Breaker 1 fail to open
 
: 4. rd24b for Reactor Trip Circuit Breaker 2 fail to open
During the review of Standard Post Trip Acti ons, a Loss of Off Site Power will occur.
: 5. rd24efor Reactor Trip Circuit Breaker 5 fail to open
EDG B will fail to automatically start and have to be started manually by the BOP operator. The CRS should enter OP-902-003, Loss of Off Site Power/Loss of Forced Circulation Recovery. Once in OP-902-003, the CRS should direct the performance of OP-902-009, Standard Appendices, Appendix 20, Operation of DCT Sump Pumps. The scenario can be terminated after the CRS orders the performance of OP-902-009 Appendix 20 or at the l ead examiners discretion.
: 6. rd24f for Reactor Trip Circuit Breaker 6 fail to open
Scenario Event Description NRC Scenario 2 Scenario 2 Rev 1 Critical Tasks
: 7. rd11a44 for CEA 44 stuck
: 1. Manually trip the Reactor.
: 8. rd11a68 for CEA 68 stuck
 
: 9. ed01a for Off Site Feeder Breaker 7172 trip
This task is satisfied by manually tripping the reactor within 1 minute of the failure of the automatic trip. The required task becomes applicable after the annunciators are received associated with the RCP 2A sheared shaft.
: 10. ed01b for Off Site Feeder Breaker 7176 trip
: 2. Establish reactivity control.
: 11. ed01c for Off Site Feeder Breaker 7182 trip
 
: 12. ed01d for Off Site Feeder Breaker 7186 trip
This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification. The required task becomes applicable after the Reactor is tripped and 2 CEAs remain stuck out following event 5.
: 13. eg10a for EDG A overspeed device
: 3. Energize at least one vital electrical AC bus.
: 14. eg08b for EDG B fail to auto start
 
: 15. fw27m for Heater 5A NLCV
This task is satisfied by starting Emergency Diesel Generator B. This task becomes applicable following the loss of off site power triggered in event 7.
: 16. fw28m for Heater 5A ALCV C. Verify the following Annunciators
Scenario Quantitative Attributes 1. Total malfunctions (5-8) 6 2. Malfunctions after EOP entry (1-2) 2 3. Abnormal events (2-4) 2 4. Major transients (1-2) 2 5. EOPs entered/requiring substantive actions (1-2) 1 6. EOP contingencies requiring substantive actions (0-2) 1 7. Critical tasks (2-3) 3 NRC Scenario 2 Scenario 2 Rev 1 Scenario Notes:
: 1. b_e07 for Dry Cooling Tower 1 level high
A. Reset Simulator to IC-192. B. Verify the following Scenario Malfunctions: 1. cv01b for Charging Pump B trip  
: 2. b_e08 for Dry Cooling Tower 2 level high D. Verify the following Overrides
: 2. rc04c for RCP 2A sheared shaft  
: 1. egr27 for EDG B local alarm acknowledgement E. Verify the following Control Board Conditions:
: 3. rd24a for Reactor Trip Cir cuit Breaker 1 fail to open 4. rd24b for Reactor Trip Cir cuit Breaker 2 fail to open 5. rd24efor Reactor Trip Cir cuit Breaker 5 fail to open 6. rd24f for Reactor Trip Cir cuit Breaker 6 fail to open 7. rd11a44 for CEA 44 stuck  
: 1. Danger tag placed on EDG A control switch
: 8. rd11a68 for CEA 68 stuck  
: 2. Danger tag placed on EDG A Output Breaker F. Verify EDG A output breaker is racked out and place danger tags on EDG A and its output breaker.
: 9. ed01a for Off Site Feeder Breaker 7172 trip  
G. Ensure Protected Train B sign is placed in SM office window.
: 10. ed01b for Off Site Feeder Breaker 7176 trip  
: 11. ed01c for Off Site Feeder Breaker 7182 trip  
: 12. ed01d for Off Site Feeder Breaker 7186 trip  
: 13. eg10a for EDG A overspeed device  
: 14. eg08b for EDG B fail to auto start  
: 15. fw27m for Heater 5A NLCV  
: 16. fw28m for Heater 5A ALCV C. Verify the following Annunciators 1. b_e07 for Dry Cooling Tower 1 level high  
: 2. b_e08 for Dry Cooling Tower 2 level high D. Verify the following Overrides 1. egr27 for EDG B local alarm acknowledgement E. Verify the following C ontrol Board Conditions: 1. Danger tag placed on EDG A control switch 2. Danger tag placed on EDG A Output Breaker F. Verify EDG A output breaker is racked out and place danger tags on EDG A and its output breaker. G. Ensure Protected Train B sign is placed in SM office window.
H. Complete the simulator setup checklist.
H. Complete the simulator setup checklist.
NRC Scenario 2 Scenario 2 Rev 1 Simulator Booth Instructions
Scenario 2 Rev 1


Event 1 Charging Pump A Trips
NRC Scenario 2 Simulator Booth Instructions Event 1       Charging Pump A Trips
: 1. On Lead Examiner's cue, initiate Event Trigger 1.  
: 1. On Lead Examiner's cue, initiate Event Trigger 1.
: 2. If called, the RCA should report a sc ent of burnt electrical components at Charging Pump B. 3. If Work Week Manager is called, info rm the caller that a work package will be assembled and a team will be sent to the Control Room.  
: 2. If called, the RCA should report a scent of burnt electrical components at Charging Pump B.
: 3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 2      Dry Cooling Tower Fan 8A Failure
: 1. On Lead Examiner's cue, call 4100 and report indication of a cracked oil housing on DCT Fan 8A reduction gear and that there is no oil visible in the sight glass.
: 2. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 3      Heater 5A NLCV Failure / Normal Plant Power Reduction
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
: 2. When called, have the TGB Watch report that Heater 5A NLCV is closed and that you do not know why. You will investigate and report back.
: 3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
Event 4      Reactor Coolant Pump 2A Sheared Shaft / Trip Failure
: 1. On Lead Examiner's cue, initiate Event Trigger 4.
: 2. If the Work Week Manager or Duty Plant Manager is called, inform the caller that they will make the necessary calls.
Event 5      CEA 74 and 68 Fail to Insert / Emergency Boration
: 1. No calls for this malfunction should occur.
Scenario 2 Rev 1


Event 2 Dry Cooling Tower Fan 8A Failure
NRC Scenario 2 Event 6      Loss of Off Site Power
: 1. On Lead Examiner's cue, call 4100 and report indication of a cracked oil housing on DCT Fan 8A reduction gear an d that there is no oil visi ble in the sight glass. 2. If Work Week Manager is called, info rm the caller that a work package will be assembled and a team will be sent to the Control Room.  
: 1. After the crew has completed Standard Post Tip Actions and on the Lead Examiner's cue, initiate Event Trigger 6.
: 2. If called as OSW watch report that a steady rain has been falling all shift.
: 3. If called to come to the Control Room to get a copy of OP-902-009, Appendix 20 for aligning the DCT Sump Pumps, report that you have a copy at the 314 Bus.
Event 8      Emergency Diesel Generator B fails to start
: 1. If called as RAB watch to check EDG B, initiate Trigger 9, and when the EDG B Trouble alarm is clear, report that it is running satisfactorily.
Scenario 2 Rev 1


Event 3 Heater 5A NLCV Failure / Normal Plant Power Reduction
NRC Scenario 2 Scenario Timeline:
: 1. On Lead Examiner's cue, initiate Event Trigger 3.
Ramp Event   Malfunction            Severity                Delay  Trigger HH:MM:SS EPR09          A        1.5          N/A      N/A      N/A Precipitation at 1.5 inches per hour EGR29          A      N/A            NA      NA      N/A EDG A output breaker racked out EG10          A      N/A            NA        NA      N/A EDG A overspeed device pulled 1        CV01          B      N/A            N/A      N/A      1 Charging Pump B trip 2          N/A                  N/A            N/A      N/A      N/A Dry Cooling Tower Fan 8A failure 3       FW27          M        0%            N/A      N/A      3 FW28          M      35%
: 2. When called, have the TGB Watch report that Heater 5A NLCV is closed and that you do not know why. You wil l investigate and report back. 3. If Work Week Manager or I&C is called, inform the ca ller that a work package will be assembled and a team will be sent to the Control Room.
Isophase Bus Fan failure 4        RC04          C      N/A            N/A      N/A      4 RCP 2A Sheared Shaft 4        RD24        A, B,    N/A            N/A      N/A      N/A E, F Reactor Trip Breakers 1, 2, 5, & 6 fail to open 5        RD11A          44      N/A            N/A      N/A      N/A CEA 44 stuck out after reactor trip 5        RD11A          68      N/A            N/A      N/A      N/A CEA 68 stuck out after trip 6        ED01        A, B,    N/A            N/A      N/A      6 C, D Loss of Off Site Power 7        EG08          B      N/A            N/A      N/A      N/A EDG B Fail to Auto-start B_E07                  N/A            N/A    00:02:30    6 B_E08                                        00:04:00 Dry Cooling Tower 1 & 2 high level alarm Scenario 2 Rev 1


Event 4 Reactor Coolant Pump 2A S heared Shaft / Trip Failure
NRC Scenario 2
: 1. On Lead Examiner's cue, initiate Event Trigger 4.
: 2. If the Work Week Manager or Duty Plant Manager is called, inform the caller that they will make the necessary calls.
Event 5 CEA 74 and 68 Fail to Insert / Emergency Boration
: 1. No calls for this malfunction should occur.
 
NRC Scenario 2 Scenario 2 Rev 1 Event 6 Loss of Off Site Power
: 1. After the crew has completed Standard Post Tip Actions and on the Lead Examiner's cue, initiate Event Trigger 6. 2. If called as OSW watch report that a steady rain has been falling all shift. 3. If called to come to th e Control Room to get a copy of OP-902-009, Appendix 20 for aligning the DCT Sump Pumps, repor t that you have a copy at the 314 Bus.
Event 8 Emergency Diesel Generator B fails to start
: 1. If called as RAB watch to check EDG B, initiate Trigger 9, and when the EDG B Trouble alarm is clear, report that it is running satisfactorily.
 
NRC Scenario 2 Scenario 2 Rev 1 Scenario Timeline: Event Malfunction  Severity Ramp HH:MM:SS Delay Trigger EPR09 A 1.5 N/A N/A N/A  Precipitation at 1.
5 inches per hour  EGR29 A N/A NA NA N/A  EDG A output breaker racked out EG10 A N/A NA NA N/A  EDG A overspeed device pulled 1 CV01 B N/A N/A N/A 1  Charging Pump B trip 2 N/A  N/A N/A N/A N/A  Dry Cooling Tower Fan 8A failure 3 FW27 FW28 M M 0% 35% N/A N/A 3  Isophase Bus Fan failure 4 RC04 C N/A N/A N/A  4  RCP 2A Sheared Shaft 4 RD24 A, B, E, F N/A N/A N/A N/A  Reactor Trip Breakers 1, 2, 5, & 6 fail to open 5 RD11A 44 N/A N/A N/A N/A  CEA 44 stuck out after reactor trip 5 RD11A 68 N/A N/A N/A N/A  CEA 68 stuck out after trip 6 ED01 A, B, C, D N/A N/A N/A 6  Loss of Off Site Power 7 EG08 B N/A N/A N/A N/A  EDG B Fail to Auto-start B_E07 B_E08  N/A N/A 00:02:30 00:04:00 6  Dry Cooling Tower 1 & 2 high level alarm NRC Scenario 2 Scenario 2 Rev 1


==REFERENCES:==
==REFERENCES:==


Event Procedures 1 OP-901-112, Charging or Letdown Malfunction Tech Spec 3.1.2.4, 3.8.1.1  
Event Procedures 1   OP-901-112, Charging or Letdown Malfunction Tech Spec 3.1.2.4, 3.8.1.1 TRM 3.1.2.4 2  Tech Spec 3.7.4 3  OP-003-034, Feed Heater Vents and Drains OP-500-001, Annunciator Response for Control Room Cabinet A OP-010-005, Plant Shutdown 4  OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart 5  OP-901-103, Emergency Boration 6  OP-902-003, Loss of Off Site Power/Loss of Forced Flow OP-902-009, Standard Appendices, Appendix 20, Operation of Dry Cooling Tower Sump Pumps Scenario 2 Rev 1


TRM 3.1.2.4 2 Tech Spec 3.7.4 3 OP-003-034, Feed Heater Vents and Drains OP-500-001, Annunciator Response for Control Room Cabinet A
Appendix D                            Required Operator Actions                                Form ES-D-2 Op Test No.:        NRC    Scenario #        2     Event #            1        Page      1    of    16 Event


OP-010-005, Plant Shutdown 4 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart 5 OP-901-103, Emergency Boration 6 OP-902-003, Loss of Off Site Power/Loss of Forced Flow OP-902-009, Standard Appendic es, Appendix 20, Operat ion of Dry Cooling Tower Sump Pumps  
== Description:==
Charging Pump B Trip Time          Position                            Applicants Actions or Behavior Note      All controls for the Charging manipulations are on CP-4 ATC        Recognize and report indications of Charging Pump B trip.
Alarms:
* Charging Pump B Trip/Trouble (Cabinet G, B-6)
* Charging Pumps Header Flow Lo (Cabinet G, H-5)
* Charging Pump B Not Available (Cabinet G, A-6)
Indications:
* Charging flow and Charging Header pressure drop
* Charging Pump B control switch indicates stop Examiner Note There are steps in off normal OP-901-112, Charging or Letdown Malfunction, to manually start a standby Charging Pump after verifying a suction path. It is acceptable for the CRS to direct this action prior to entering OP-901-112 to avoid isolating the Charging and Letdown system on high temperature.
If this is directed, the CRS should still enter OP-901-112 even after a Charging Pump is running.
CRS        Enter and direct the implementation of OP-901-112, Charging or Letdown Malfunction.
CRS        1. Stop turbine load changes.
CRS        3. IF a Charging Malfunction is indicated, THEN go to Subsection E1, Charging Malfunction.
CRS should evaluate E0 and go to sub-section E1.
CRS        Procedure Note If all Charging Pumps are secured, then LETDOWN STOP VALVE (CVC 101) will close on high REGEN HX TUBE OUTLET temperature if RCS is 470&deg;F.
This condition is applicable to the plant conditions. Regen Heat Exchanger temperature will rise to the 470 &deg;F setpoint. Time is available for the crew to take action prior to isolation.
Scenario 2, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 1 Page 1 of 16           Event
Appendix D                       Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC Scenario #       2     Event #           1         Page       2      of   16 Event


== Description:==
== Description:==
Charging Pump B Trip Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 Note All controls for the Charging manipulations are on CP-4    ATC Recognize and report indications of Charging Pump B trip. Alarms:
Charging Pump B Trip Time       Position                           Applicants Actions or Behavior CRS      Procedure Caution THE REACTOR COOLANT SYSTEM WILL BE BORATED IF A CHARGING PUMP IS STARTED WITH THE RWSP AS THE MAKEUP WATER SOURCE.
Charging Pump B Trip/Trouble (Cabinet G, B-6)
ATC    1. IF Charging Pumps have tripped, THEN perform the following:
Charging Pumps Header Flow Lo (Cabinet G, H-5)
1.1 Verify open EITHER VCT DISCH VALVE (CVC 183) OR RWSP TO CHARGING PUMP (CVC 507).
Charging Pump B Not Available (Cabinet G, A-6)     Indications:
1.2 IF Letdown has NOT isolated, THEN attempt to restart Charging Pump(s).
Charging flow and Charging Header pressure drop Charging Pump B control switch indicates stop    Examiner Note There are steps in off normal OP-901-112, Charging or Letdown Malfunction, to manually start a standby Charging Pump after verifying a suction path. It is acceptable for the CRS to direct this action prior to entering OP-901-112 to avoid isolating the Charging and Letdown system on high temperature. If this is directed, the CRS should still enter OP-901-112 even after a Charging Pump is running. CRS Enter and direct the implementation of OP-901-112, Charging or Letdown Malfunction. CRS 1. Stop turbine load changes. CRS 3. IF a Charging Malfunction is indicated, THEN go to Subsection E 1 , Charging Malfunction. CRS should evaluate E 0 and go to sub-section E
1.3 IF the Charging Pump can NOT be restarted, THEN verify closed LETDOWN STOP VALVE (CVC 101).
: 1. CRS Procedure Note If all Charging Pumps are secured, then LETDOWN STOP VALVE (CVC 101) will close on high REGEN HX TUBE OUTLET temperature if RCS is 470&deg;F. This condition is applicable to the plant conditions. Regen Heat Exchanger temperature will rise to the 470 &deg;F setpoint. Time is available for the crew to take action prior to isolation.
1.4 IF the reason for the Charging pump trip is corrected AND Pressurizer level is in normal operating band, THEN place Charging and Letdown in service in accordance with OP-002-005, CHEMICAL AND VOLUME CONTROL.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 1 Page 2 of 16          Event
* The ATC operator should verify a Charging Pump suction path via CVC-183 prior to starting another Charging Pump. Either Charging Pump A or AB can be started. This action is typically directed by the CRS.
* If the crew does not start another Charging Pump prior to Letdown isolating at 470 &deg;F, then the crew should reestablish Charging and Letdown in accordance with OP-002-005.
CRS     2. IF normal Charging flow can NOT be established AND Pressurizer level falls below minimum Pressurizer level for operation in accordance with Attachment 1, Pressurizer Level Versus Tave Curve, THEN perform the following:
This step should not be applicable due to the duration of the malfunction.
Crew    3. IF the PMC is available, THEN display PMC Group CVCS and monitor Charging System parameters to determine cause of Charging malfunction.
This data can be retrieved by any member of the crew. PMC point D39704, CVCS CHG PMP MTR B OVLD TRIP and D39702, CVCS CHG PMP MTR B TRP/TRBL will provide indication of the electrical failure of Charging Pump B.
Scenario 2, Revision 0


== Description:==
Appendix D                       Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC   Scenario #       2     Event #           1         Page     3     of   16 Event
Charging Pump B Trip Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 CRS Procedure Caution THE REACTOR COOLANT SYSTEM WILL BE BORATED IF A CHARGING PUMP IS STARTED WITH THE RWSP AS THE MAKEUP WATER SOURCE. ATC 1. IF Charging Pumps have tripped, THEN perform the following:  1.1 Verify open EITHER VCT DISCH VALVE (CVC 183) OR RWSP TO CHARGING PUMP (CVC 507). 1.2 IF Letdown has NOT isolated, THEN attempt to restart Charging Pump(s). 1.3 IF the Charging Pump can NOT be restarted, THEN verify closed LETDOWN STOP VALVE (CVC 101). 1.4 IF the reason for the Charging pump trip is corrected AND Pressurizer level is in normal operating band, THEN place Charging and Letdown in service in accordance with OP-002-005, CHEMICAL AND VOLUME CONTROL. The ATC operator should verify a Charging Pump suction path via CVC-183 prior to starting another Charging Pump. Either Charging Pump A or AB can be started. This action is typically directed by the CRS.
If the crew does not start another Charging Pump prior to Letdown isolating at 470 &deg;F, then the crew should reestablish Charging and Letdown in accordance with OP-002-005. CRS 2. IF normal Charging flow can NOT be established AND Pressurizer level falls below minimum Pressurizer level for operation in accordance with  , Pressurizer Level Versus Tave Curve, THEN perform the following:    This step should not be applicable due to the duration of the malfunction. Crew 3. IF the PMC is available, THEN display PMC Group CVCS and monitor Charging System parameters to determine cause of Charging malfunction. This data can be retrieved by any member of the crew. PMC point D39704, CVCS CHG PMP MTR B OVLD TRIP and D39702, CVCS CHG PMP MTR B TRP/TRBL will provide indication of the electrical failure of Charging Pump B.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 1 Page 3 of 16           Event


== Description:==
== Description:==
Charging Pump B Trip Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 CRS Evaluates Tech Spec and TRM 3.1.2.4 and enters both. Additionally, with Emergency Diesel A out of service, the crew will no longer be in compliance with Tech Spec 3.8.1.1.d. Tech Spec 3.1.2.4 can be exited and 3.8.1.1.d complied with by aligning Charging Pump AB to replace B for SIAS. The CRS should remain in TRM 3.1.2.4 after this operation. ATC Align Charging Pump AB to replace B on SIAS by aligning the Pump AB Assignment switch to the B position on CP-4. CRS Exit Tech Spec 3.1.2.4 and determine compliance with Tech Spec 3.8.1.1.d. Crew must remain in TRM 3.1.2.4. Examiner Note This event is complete after Charging Pump AB is aligned to replace Charging Pump B Or As directed by the Lead Evaluator  
Charging Pump B Trip Time       Position                           Applicants Actions or Behavior CRS       Evaluates Tech Spec and TRM 3.1.2.4 and enters both. Additionally, with Emergency Diesel A out of service, the crew will no longer be in compliance with Tech Spec 3.8.1.1.d.
Tech Spec 3.1.2.4 can be exited and 3.8.1.1.d complied with by aligning Charging Pump AB to replace B for SIAS.
The CRS should remain in TRM 3.1.2.4 after this operation.
ATC       Align Charging Pump AB to replace B on SIAS by aligning the Pump AB Assignment switch to the B position on CP-4.
CRS       Exit Tech Spec 3.1.2.4 and determine compliance with Tech Spec 3.8.1.1.d.
Crew must remain in TRM 3.1.2.4.
Examiner Note This event is complete after Charging Pump AB is aligned to replace Charging Pump B Or As directed by the Lead Evaluator Scenario 2, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 2 Page 4 of 16           Event
Appendix D                       Required Operator Actions                                 Form ES-D-2 Op Test No.:   NRC     Scenario #       2     Event #           2         Page     4     of     16 Event


== Description:==
== Description:==
Dry Cooling Tower Dry Fan 8A failure Time Position Applicant's Actions or Behavior Scenario 2, Revision 0  This failure is called in by the Outside Watch for the purpose of evaluating Tech Spec 3.7.4. The simulator operator will call the CRS on cue from the Lead Examiner. CRS On receiving information regarding DCT Fan 8A, evaluates Tech Spec 3.7.4.     Crew A member of the crew should determine that DCT Fan 8A is under the missile shield. CRS Determine that with a fan under the missile shield inoperable during a tornado watch (provided during the turnover), entry into Tech Spec 3.7.4.c is required. This is a 1 hour shutdown action. The tornado watch will not expire before this action is required. The crew will not perform a shutdown before the next malfunction is inserted. Examiner Note This event is complete when the CRS has completed addressing Tech Specs Or As directed by the Lead Evaluator  
Dry Cooling Tower Dry Fan 8A failure Time       Position                               Applicants Actions or Behavior This failure is called in by the Outside Watch for the purpose of evaluating Tech Spec 3.7.4. The simulator operator will call the CRS on cue from the Lead Examiner.
CRS         On receiving information regarding DCT Fan 8A, evaluates Tech Spec 3.7.4.
Crew       A member of the crew should determine that DCT Fan 8A is under the missile shield.
CRS         Determine that with a fan under the missile shield inoperable during a tornado watch (provided during the turnover), entry into Tech Spec 3.7.4.c is required.
This is a 1 hour shutdown action. The tornado watch will not expire before this action is required. The crew will not perform a shutdown before the next malfunction is inserted.
Examiner Note This event is complete when the CRS has completed addressing Tech Specs Or As directed by the Lead Evaluator Scenario 2, Revision 0


Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 5 of 16           Event
Appendix D                       Required Operator Actions                             Form ES-D-2 Op Test No.:   NRC   Scenario #         2   Event #           3         Page     5     of     16 Event


== Description:==
== Description:==
5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicant's Actions or Behavior Scenario 2, Revision 0  BOP Recognize and report indications of Heater 5A Normal Level Control Valve failure. Alarms:
5A Normal Level Control Valve Failure / Plant shutdown Time       Position                             Applicants Actions or Behavior BOP       Recognize and report indications of Heater 5A Normal Level Control Valve failure.
Heater 5A Level Hi-Hi (Cabinet A, B-8)
Alarms:
Heater 5A Level Hi/Lo (Cabinet A, C-8)
* Heater 5A Level Hi-Hi (Cabinet A, B-8)
Heater 5A Alt Drain Vlv Open (Cabinet A, D-8)     Indications:
* Heater 5A Level Hi/Lo (Cabinet A, C-8)
Heater 5A level rising on the Plant Monitoring Computer Heater 5A & 6A isolate when CD-189 A and CD-175 A close on CP-13   Examiner Note The annunciator response refers to OP-003-034, Feed Heater Vents and Drains. It directs a power reduction to 893 MWe, 72% power. BOP Report guidance from OP-500-001, Annunciator Response for Control Room Panel A: 1.4 Review OP-003-034, Feed Heater Vents and Drains, for Power Limitations associated with FHD Heater Strings out of service. CRS Refer to OP-003-034, Feed Heater Vents and Drains. CRS Limitation 3.2.1 Utilize the following table to determine the maximum allowed power level with the listed FW Heater(s) out of service. OOS Condition Bypass Open Bypass Closed Any Single IP or LP Heater (Note 1) 893 MWe (72%) 893 MWe (72%)
* Heater 5A Alt Drain Vlv Open (Cabinet A, D-8)
Indications:
* Heater 5A level rising on the Plant Monitoring Computer
* Heater 5A & 6A isolate when CD-189 A and CD-175 A close on CP-13 Examiner Note The annunciator response refers to OP-003-034, Feed Heater Vents and Drains. It directs a power reduction to 893 MWe, 72% power.
BOP       Report guidance from OP-500-001, Annunciator Response for Control Room Panel A:
1.4 Review OP-003-034, Feed Heater Vents and Drains, for Power Limitations associated with FHD Heater Strings out of service.
CRS       Refer to OP-003-034, Feed Heater Vents and Drains.
CRS       Limitation 3.2.1 Utilize the following table to determine the maximum allowed power level with the listed FW Heater(s) out of service.
OOS Condition             Bypass Open             Bypass Closed Any Single IP or LP Heater (Note 1)         893 MWe (72%)           893 MWe (72%)
CRS should conclude a power reduction to 72% is required.
CRS should conclude a power reduction to 72% is required.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 6 of 16           Event
Scenario 2, Revision 0
 
Appendix D                       Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC Scenario #       2   Event #             3       Page       6     of   16 Event


== Description:==
== Description:==
5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 CRS Enters OP-010-005, Plant Shutdown. CRS Procedure Note (1) Because of the absence of adequate airflow across the installed thermocouples while in this alignment, computer points A58010, A58011, and A58012 should not be used to monitor Isophase Bus return air for temperature. Utilize a Pyrometer or equivalent to measure Isophase Bus Air exhaust temperature. (2) Isophase Bus return air temperature should not be allowed to rise above 158 &deg;F. Note The CRS should direct the TGB Watch to perform steps 1.2 through 1.6. The watch will acknowledge the or der and reply that he will get the procedure and start walking down the evolution. This task will not get accomplished during the scenario. Crew 9.1.2 Prior to commencing power reduction, notify Load Dispatcher. Crew 9.1.3 Announce to Station Personnel that a power reduction is in progress over the Plant Paging System. Crew 9.1.4 Maintain RCS Cold Leg Temperature 536 &deg;F to 549 &deg;F. ATC 9.1.5 Perform Boron Equalization as follows:
5A Normal Level Control Valve Failure / Plant shutdown Time       Position                           Applicants Actions or Behavior CRS     Enters OP-010-005, Plant Shutdown.
Place available Pressurizer Pressure Backup Heater Control Switches to ON. Reduce Pressurizer Spray Valve Controller (RC-IHIC-0100) setpoint potentiometer to establish spray flow and maintain RCS pressure 2250 PSIA (2175 - 2265). This manipulation is performed at CP-2. Note There is a procedure note describing what power indications are preferred for certain power ranges. The CRS should review this note, but the power reduction will not be carried out long enough to see this exercised.
CRS     Procedure Note (1) Because of the absence of adequate airflow across the installed thermocouples while in this alignment, computer points A58010, A58011, and A58012 should not be used to monitor Isophase Bus return air for temperature. Utilize a Pyrometer or equivalent to measure Isophase Bus Air exhaust temperature.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 7 of 16           Event
(2) Isophase Bus return air temperature should not be allowed to rise above 158 &deg;F.
Note     The CRS should direct the TGB Watch to perform steps 1.2 through 1.6.
The watch will acknowledge the order and reply that he will get the procedure and start walking down the evolution. This task will not get accomplished during the scenario.
Crew     9.1.2 Prior to commencing power reduction, notify Load Dispatcher.
Crew     9.1.3 Announce to Station Personnel that a power reduction is in progress over the Plant Paging System.
Crew     9.1.4 Maintain RCS Cold Leg Temperature 536 &deg;F to 549 &deg;F.
ATC     9.1.5 Perform Boron Equalization as follows:
* Place available Pressurizer Pressure Backup Heater Control Switches to ON.
* Reduce Pressurizer Spray Valve Controller (RC-IHIC-0100) setpoint potentiometer to establish spray flow and maintain RCS pressure 2250 PSIA (2175 - 2265).
This manipulation is performed at CP-2.
Note     There is a procedure note describing what power indications are preferred for certain power ranges. The CRS should review this note, but the power reduction will not be carried out long enough to see this exercised.
Scenario 2, Revision 0
 
Appendix D                     Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC Scenario #       2     Event #             3         Page       7     of     16 Event


== Description:==
== Description:==
5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 ATC Begin Direct Boration as follows:   6.7.2 At SM/CRS discretion, calculate volume of Boric Acid to be added on Attachment 11.6, Calculation of Boric Acid Volume for Direct Boration or VCT Borate Makeup Mode. These manipulations are performed at CP-4. The ATC should use the Reactivity Worksheet to recommend a boron quantity to the CRS. 6.7.3 Set Boric Acid Makeup Batch Counter to volume of Boric Acid desired. The steps for setting the Boric Acid counter are not contained in this step. The ATC operator should press the UP arrow button, the ENTER button, enter the quantity of acid desired, press the ENTER button, and press the RESET button. 6.7.4 Verify Boric Acid Makeup Pumps selector switch aligned to desired Boric Acid Makeup Pump A(B). 6.7.5 Place Direct Boration Valve, BAM-143, control switch to AUTO. 6.7.6 Place Makeup Mode selector switch to BORATE. 6.7.7 Verify selected Boric Acid Makeup Pump A(B) Starts. 6.7.8 Verify Direct Boration Valve, BAM-143, Opens. Procedure Note The Boric Acid Flow Totalizer will not register below 3 GPM. The Boric Acid Flow Totalizer is most accurate in the range of 10 - 25 GPM. 6.7.9.1 Verify Boric Acid Flow controller, BAM-IFIC-0210Y, in Manual. 6.7.9.2 Adjust Boric Acid Flow controller, BAM-IFIC-0210Y, output to >3 GPM flow rate. 6.7.11 Verify Boric Acid Makeup Control Valve, BAM-141, Intermediate or Open. 6.7.12 Observe Boric Acid flow rate for proper indication.
5A Normal Level Control Valve Failure / Plant shutdown Time       Position                           Applicants Actions or Behavior ATC     Begin Direct Boration as follows:
BOP Commence Turbine load reduction by performing the following:
6.7.2 At SM/CRS discretion, calculate volume of Boric Acid to be added on Attachment 11.6, Calculation of Boric Acid Volume for Direct Boration or VCT Borate Makeup Mode.
These manipulations are performed at CP-4. The ATC should use the Reactivity Worksheet to recommend a boron quantity to the CRS.
6.7.3 Set Boric Acid Makeup Batch Counter to volume of Boric Acid desired.
The steps for setting the Boric Acid counter are not contained in this step. The ATC operator should press the UP arrow button, the ENTER button, enter the quantity of acid desired, press the ENTER button, and press the RESET button.
6.7.4 Verify Boric Acid Makeup Pumps selector switch aligned to desired Boric Acid Makeup Pump A(B).
6.7.5 Place Direct Boration Valve, BAM-143, control switch to AUTO.
6.7.6 Place Makeup Mode selector switch to BORATE.
6.7.7 Verify selected Boric Acid Makeup Pump A(B) Starts.
6.7.8 Verify Direct Boration Valve, BAM-143, Opens.
Procedure Note The Boric Acid Flow Totalizer will not register below 3 GPM. The Boric Acid Flow Totalizer is most accurate in the range of 10 - 25 GPM.
6.7.9.1 Verify Boric Acid Flow controller, BAM-IFIC-0210Y, in Manual.
6.7.9.2 Adjust Boric Acid Flow controller, BAM-IFIC-0210Y, output to >3 GPM flow rate.
6.7.11 Verify Boric Acid Makeup Control Valve, BAM-141, Intermediate or Open.
6.7.12 Observe Boric Acid flow rate for proper indication.
BOP     Commence Turbine load reduction by performing the following:
6.2.1.1 Depress LOAD/RATE MW/MIN pushbutton.
6.2.1.1 Depress LOAD/RATE MW/MIN pushbutton.
6.2.1.2 Depress appropriate numerical pushbuttons for desired load rate.
6.2.1.2 Depress appropriate numerical pushbuttons for desired load rate.
6.2.1.3 Depress ENTER pushbutton.
6.2.1.3 Depress ENTER pushbutton.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 8 of 16           Event
Scenario 2, Revision 0
 
Appendix D                     Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC Scenario #       2     Event #             3       Page       8     of   16 Event


== Description:==
== Description:==
5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 Procedure Note Prior to changing Reference Demand, Main Turbine load must not be changing.
5A Normal Level Control Valve Failure / Plant shutdown Time       Position                           Applicants Actions or Behavior Procedure Note Prior to changing Reference Demand, Main Turbine load must not be changing.
6.2.2.1 Depress REF pushbutton.
6.2.2.1 Depress REF pushbutton.
6.2.2.2 Depress appropriate numerical pushbuttons for desired MW load.
6.2.2.2 Depress appropriate numerical pushbuttons for desired MW load.
6.2.2.3 Depress ENTER pushbutton.
6.2.2.3 Depress ENTER pushbutton.
6.2.2.4 Depress GO pushbutton.
6.2.2.4 Depress GO pushbutton.
6.2.2.5 Verify Turbine load change stops at the desired MW load. This manipulation is performed at CP-1. These steps are from OP-005-007, Main Turbine and Generator. The BOP will set up the Main Turbine controls. The ATC will direct the BOP when to commence unloading the Main Turbine based on the drop in RCS Cold Leg temperature.
6.2.2.5 Verify Turbine load change stops at the desired MW load.
CRS / ATC Procedure Caution CONTROL RODS SHOULD NEVER BE WITHDRAWN OR MANUALLY INSERTED EXCEPT IN A DELIBERATE CAREFULLY CONTROLLED MANNER WHILE CLOSELY MONITORI NG THE REACTOR'S RESPONSE.
This manipulation is performed at CP-1. These steps are from OP-005-007, Main Turbine and Generator. The BOP will set up the Main Turbine controls. The ATC will direct the BOP when to commence unloading the Main Turbine based on the drop in RCS Cold Leg temperature.
ATC Operate CEAs to maintain ASI using CEA Reg. Group 6 or Group P Control Element Assemblies. Steps are contained in OP-004-005, Control Element Drive. Group P should be used first to a low limit of 120 inches, followed by CEA Group 6 to a low limit of 120 inches to comply with Tech Spec 3.1.3.6. This manipulation is performed at CP-2.
CRS / ATC   Procedure Caution CONTROL RODS SHOULD NEVER BE WITHDRAWN OR MANUALLY INSERTED EXCEPT IN A DELIBERATE CAREFULLY CONTROLLED MANNER WHILE CLOSELY MONITORING THE REACTORS RESPONSE.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 9 of 16           Event
ATC     Operate CEAs to maintain ASI using CEA Reg. Group 6 or Group P Control Element Assemblies.
Steps are contained in OP-004-005, Control Element Drive. Group P should be used first to a low limit of 120 inches, followed by CEA Group 6 to a low limit of 120 inches to comply with Tech Spec 3.1.3.6.
This manipulation is performed at CP-2.
Scenario 2, Revision 0
 
Appendix D                         Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC     Scenario #         2   Event #               3         Page       9   of   16 Event


== Description:==
== Description:==
5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 Operate CEAs in Manual Group mode as follows:   6.7.1 Verify Plant Monitoring Computer operable in accordance with OP-004-012, Plant Monitoring Computer. 6.7.2 Position Group Select switch to desired group. 6.7.3 Place Mode Select switch to MG and verify the following: White lights Illuminated on Group Selection Matrix for selected group MG light Illuminates   6.7.4 Operate CEA Manual Shim switch to INSERT group to desired height while monitoring the following: CEA Position Indicator selected CEA group is moving in desired directionIf Reactor is critical, then monitor the following: Reactor Power Reactor Coolant System (RCS) temperature Axial Shape Index (ASI)   Procedure Note The Operator should remain in the area in front of the CEA Drive Mechanism Control Panel when the Mode Select switch is not in OFF. 6.7.5 When desired set of moves have been completed, then place Mode Select switch to OFF. Crew 9.1.9 When reactor power consistently indicates less than 98% power, as indicated on computer point C24631, MAIN STEAM RAW POWER (MSBSRAW), or an alternate point provided by Reactor Engineering, then verify the value of C24648, BSCAL SMOOTHING VAL. APPLD (DUMOUT17), automatically changes to 1.
5A Normal Level Control Valve Failure / Plant shutdown Time       Position                             Applicants Actions or Behavior Operate CEAs in Manual Group mode as follows:
Examiner Note This event is complete when the desired power reduction has been accomplished Or As directed by the Lead Evaluator Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4 / 5 Page 10 of 16           Event
6.7.1 Verify Plant Monitoring Computer operable in accordance with OP-004-012, Plant Monitoring Computer.
6.7.2 Position Group Select switch to desired group.
6.7.3 Place Mode Select switch to MG and verify the following:
* White lights Illuminated on Group Selection Matrix for selected group
* MG light Illuminates 6.7.4 Operate CEA Manual Shim switch to INSERT group to desired height while monitoring the following:
* CEA Position Indicator selected CEA group is moving in desired direction If Reactor is critical, then monitor the following:
* Reactor Power
* Reactor Coolant System (RCS) temperature
* Axial Shape Index (ASI)
Procedure Note The Operator should remain in the area in front of the CEA Drive Mechanism Control Panel when the Mode Select switch is not in OFF.
6.7.5 When desired set of moves have been completed, then place Mode Select switch to OFF.
Crew       9.1.9 When reactor power consistently indicates less than 98% power, as indicated on computer point C24631, MAIN STEAM RAW POWER (MSBSRAW), or an alternate point provided by Reactor Engineering, then verify the value of C24648, BSCAL SMOOTHING VAL. APPLD (DUMOUT17), automatically changes to 1.
Examiner Note This event is complete when the desired power reduction has been accomplished Or As directed by the Lead Evaluator Scenario 2, Revision 0
 
Appendix D                         Required Operator Actions                                 Form ES-D-2 Op Test No.:     NRC     Scenario #       2   Event #           4/5         Page       10     of     16 Event


== Description:==
== Description:==
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip   Time Position Applicant's Actions or Behavior Scenario 2, Revision 0  ATC Recognize and report indications of Reactor Coolant Pump 2A shaft shear and failure of the automatic trip. Alarms:
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time       Position                               Applicants Actions or Behavior ATC         Recognize and report indications of Reactor Coolant Pump 2A shaft shear and failure of the automatic trip.
RCP 2A Vibration Hi (Cabinet H, A-8)
Alarms:
RCP 2A Lube Oil Pressure Lo (Cabinet H, E-7)
* RCP 2A Vibration Hi (Cabinet H, A-8)
RPS Channel Trip Local Power Density Hi (Cabinet K, A-11)
* RCP 2A Lube Oil Pressure Lo (Cabinet H, E-7)
RPS Channel Trip DNBR Lo (Cabinet K, A-12)
* RPS Channel Trip Local Power Density Hi (Cabinet K, A-11)
RPS Channel Trip Coolant Flow Lost (Cabinet K, D-12)     Indications:
* RPS Channel Trip DNBR Lo (Cabinet K, A-12)
RCP 2A  pressure and amps dropping All CEAs withdrawn 4 Reactor Trip Circuit Breakers closed   Critical Task Manually trip the Reactor.
* RPS Channel Trip Coolant Flow Lost (Cabinet K, D-12)
This task is satisfied by establishing manually tripping the reactor within 1 minute of the failure of the automatic trip.
Indications:
.      ATC Trip the Reactor using Diverse Reactor Trip pushbuttons at CP-2   The CRS may direct this operation, but the ATC operator should not request permission or wait for direction to perform this action. ATC Recognize and report indications of 2 CEAs failure to insert. Indications:
* RCP 2A  pressure and amps dropping
CEA 74 and CEA 68 rod bottom lights not illuminated CEA 74 and CEA 68 upper electrical limit lights illuminated Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4 / 5 Page 11 of 16           Event
* All CEAs withdrawn
* 4 Reactor Trip Circuit Breakers closed Critical Task Manually trip the Reactor.
This task is satisfied by establishing manually tripping the reactor within 1 minute of the failure of the automatic trip..
ATC         Trip the Reactor using Diverse Reactor Trip pushbuttons at CP-2 The CRS may direct this operation, but the ATC operator should not request permission or wait for direction to perform this action.
ATC         Recognize and report indications of 2 CEAs failure to insert.
Indications:
* CEA 74 and CEA 68 rod bottom lights not illuminated
* CEA 74 and CEA 68 upper electrical limit lights illuminated Scenario 2, Revision 0
 
Appendix D                         Required Operator Actions                             Form ES-D-2 Op Test No.:     NRC     Scenario #       2     Event #         4/5         Page   11   of     16 Event


== Description:==
== Description:==
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip   Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 CRS Direct direct ATC and BOP to carry out Standard Post trip Actions.
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time       Position                               Applicants Actions or Behavior CRS         Direct direct ATC and BOP to carry out Standard Post trip Actions.
ATC Determine Reactivity Control acceptance criteria are met: Check reactor power is dropping. Check startup rate is negative. Check less than TWO CEAs are NOT fully inserted. Critical Task Establish reactivity control.
ATC         Determine Reactivity Control acceptance criteria are met:
* Check reactor power is dropping.
* Check startup rate is negative.
* Check less than TWO CEAs are NOT fully inserted.
Critical Task Establish reactivity control.
This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification.
This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification.
ATC Determine 2 CEAs are stuck out and commence Emergency Boration:  
ATC         Determine 2 CEAs are stuck out and commence Emergency Boration:
: 1. Place Makeup Mode selector switch to MANUAL.  
: 1. Place Makeup Mode selector switch to MANUAL.
: 2. Align borated water source by performing one of the following:  
: 2. Align borated water source by performing one of the following:
: a. Initiate Emergency Boration using Boric Acid Pump as follows:
: a.       Initiate Emergency Boration using Boric Acid Pump as follows:
Open Emergency Boration Valve, BAM-133.
* Open Emergency Boration Valve, BAM-133.
Start one Boric Acid Pump.
* Start one Boric Acid Pump.
Close recirc valve for Boric Acid Pump started:
* Close recirc valve for Boric Acid Pump started:
o BAM-126A Boric Acid Makeup Pump Recirc Valve A o BAM-126B Boric Acid Makeup Pump Recirc Valve B OR   b. Initiate Emergency Boration using Gravity Feed as follows:
o   BAM-126A Boric Acid Makeup Pump Recirc Valve A o   BAM-126B Boric Acid Makeup Pump Recirc Valve B OR
Open the following Boric Acid Makeup Gravity Feed valves:
: b.       Initiate Emergency Boration using Gravity Feed as follows:
o BAM-113A Boric Acid Makeup Gravity Feed Valve A o BAM-113B Boric Acid Makeup Gravity Feed Valve B   3. Close VCT Disch Valve, CVC-183. 4. Verify at least one Charging Pump operating and Charging Header flow 40 GPM.
* Open the following Boric Acid Makeup Gravity Feed valves:
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4 / 5 Page 12 of 16           Event
o   BAM-113A Boric Acid Makeup Gravity Feed Valve A o   BAM-113B Boric Acid Makeup Gravity Feed Valve B
: 3. Close VCT Disch Valve, CVC-183.
: 4. Verify at least one Charging Pump operating and Charging Header flow 40 GPM.
Scenario 2, Revision 0
 
Appendix D                     Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC Scenario #       2     Event #         4/5         Page     12     of     16 Event


== Description:==
== Description:==
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip   Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 BOP Determine Maintenance of Vital Auxiliaries acceptance criteria are met: Check the Main Turbine is tripped: Governor valves closed Throttle valves closed     BOP Check the Main Generator is tripped: GENERATOR BREAKER A tripped GENERATOR BREAKER B tripped EXCITER FIELD BREAKER tripped     BOP Check station loads are energized from offsite electrical power as follows:
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time       Position                           Applicants Actions or Behavior BOP     Determine Maintenance of Vital Auxiliaries acceptance criteria are met:
Train A A1, 6.9 KV non safety bus A2, 4.16 KV non safety bus A3, 4.16 KV safety bus A-DC electrical bus A or C vital AC Instrument Channel  
Check the Main Turbine is tripped:
* Governor valves closed
* Throttle valves closed BOP     Check the Main Generator is tripped:
* GENERATOR BREAKER A tripped
* GENERATOR BREAKER B tripped
* EXCITER FIELD BREAKER tripped BOP     Check station loads are energized from offsite electrical power as follows:
Train A
* A1, 6.9 KV non safety bus
* A2, 4.16 KV non safety bus
* A3, 4.16 KV safety bus
* A-DC electrical bus
* A or C vital AC Instrument Channel Train B
* B1, 6.9 KV non safety bus
* B2, 4.16 KV non safety bus
* B3, 4.16 KV safety bus
* B-DC electrical bus B or D vital AC Instrument Channel ATC    Determine RCS Inventory Control acceptance criteria are met:
Check that the following conditions exist:
* Pressurizer level is 7% to 60%
* Pressurizer level is trending to 33% to 60%
* Check RCS subcooling is greater than or equal to 28&#xba;F.
Scenario 2, Revision 0


Train B  B1, 6.9 KV non safety bus  B2, 4.16 KV non safety bus  B3, 4.16 KV safety bus  B-DC electrical bus B or D vital AC Instrument Channel    ATC Determine RCS Inventory Control acceptance criteria are met: Check that the following conditions exist:  Pressurizer level is 7% to 60%  Pressurizer level is trending to 33% to 60%  Check RCS subcooling is greater than or equal to 28&#xba;F.
Appendix D                     Required Operator Actions                             Form ES-D-2 Op Test No.:     NRC Scenario #       2     Event #         4/5       Page     13   of   16 Event
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4 / 5 Page 13 of 16           Event


== Description:==
== Description:==
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip   Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 ATC Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist: Pressurizer pressure is 1750 psia to 2300 psia Pressurizer pressure is trending to 2125 psia to 2275 psia    ATC Determine Core Heat Removal acceptance criteria are met: Check at least one RCP is operating. Check operating loop T is less than 13&#xba;F. Check RCS subcooling is greater than or equal to 28&#xba;F. BOP Determine RCS Heat Removal acceptance criteria are met: Check that at least one steam generator has BOTH of the following: Steam generator level is 5% to 80% NR Main Feedwater is available to restore level within 50%-70% NR.
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time       Position                         Applicants Actions or Behavior ATC     Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist:
ATC Check RCS T C is 530&#xba;F to 550&#xba;F     BOP Check steam generator pressure is 885 psia to 1040 psia. BOP Check Feedwater Control in Reactor Trip Override: MAIN FW REG valves are closed STARTUP FW REG valves are 13% to 21% open Operating main Feedwater pumps are 3800 rpm to 4000 rpm     BOP Reset moisture separator reheaters, and check the temperature control valves closed.
* Pressurizer pressure is 1750 psia to 2300 psia
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4 / 5 Page 14 of 16           Event
* Pressurizer pressure is trending to 2125 psia to 2275 psia ATC     Determine Core Heat Removal acceptance criteria are met:
* Check at least one RCP is operating.
* Check operating loop T is less than 13&#xba;F.
* Check RCS subcooling is greater than or equal to 28&#xba;F.
BOP     Determine RCS Heat Removal acceptance criteria are met:
Check that at least one steam generator has BOTH of the following:
* Steam generator level is 5% to 80% NR
* Main Feedwater is available to restore level within 50%-70% NR.
ATC     Check RCS TC is 530&#xba;F to 550&#xba;F BOP     Check steam generator pressure is 885 psia to 1040 psia.
BOP     Check Feedwater Control in Reactor Trip Override:
* MAIN FW REG valves are closed
* STARTUP FW REG valves are 13% to 21% open
* Operating main Feedwater pumps are 3800 rpm to 4000 rpm BOP     Reset moisture separator reheaters, and check the temperature control valves closed.
Scenario 2, Revision 0
 
Appendix D                         Required Operator Actions                             Form ES-D-2 Op Test No.:     NRC   Scenario #         2     Event #         4/5       Page   14   of     16 Event


== Description:==
== Description:==
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip   Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 ATC Determine Containment Isolation acceptance criteria are met: Check containment pressure is less than 16.4 psia. Check NO containment area radiation monitor alarms OR unexplained rise in activity. Check NO steam plant activity monitor alarms OR unexplained rise in activity. BOP Determine Containment Temperature and Pressure Control acceptance criteria are met: Check containment temperature is less than or equal to 120&#xba;F. Check containment pressure is less than 16.4 psia.
RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time       Position                               Applicants Actions or Behavior ATC       Determine Containment Isolation acceptance criteria are met:
CRS After review of Standard Post Trip Actions, use Diagnostic Flow Chart of OP-902-009 to select appropriate optimal recovery procedure. Proper use of chart will resu lt in use of OP-902-001 Examiner Note This event is complete when the ATC and BOP operators report that they have completed Standard Post Trip Actions and when the CRS commences the review Or As directed by the Lead Evaluator.
* Check containment pressure is less than 16.4 psia.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 6 / 7 Page 15 of 16           Event
* Check NO containment area radiation monitor alarms OR unexplained rise in activity.
* Check NO steam plant activity monitor alarms OR unexplained rise in activity.
BOP       Determine Containment Temperature and Pressure Control acceptance criteria are met:
* Check containment temperature is less than or equal to 120&#xba;F.
* Check containment pressure is less than 16.4 psia.
CRS       After review of Standard Post Trip Actions, use Diagnostic Flow Chart of OP-902-009 to select appropriate optimal recovery procedure.
* Proper use of chart will result in use of OP-902-001 Examiner Note This event is complete when the ATC and BOP operators report that they have completed Standard Post Trip Actions and when the CRS commences the review Or As directed by the Lead Evaluator.
Scenario 2, Revision 0
 
Appendix D                       Required Operator Actions                               Form ES-D-2 Op Test No.:   NRC     Scenario #       2     Event #           6/7         Page   15     of     16 Event


== Description:==
== Description:==
Loss of Off Site Power / Failure of Emergency Diesel Generator B to Auto Start Time Position Applicant's Actions or Behavior Scenario 2, Revision 0  Crew Alarms Multiple alarms associated with Loss of Off Site Power     Indications Numerous alarms come in, all lights go off except for Control Room emergency lighting.
Loss of Off Site Power / Failure of Emergency Diesel Generator B to Auto Start Time       Position                               Applicants Actions or Behavior Crew       Alarms
Emergency Diesel Generator B control switch remains green.
* Multiple alarms associated with Loss of Off Site Power Indications
* Numerous alarms come in, all lights go off except for Control Room emergency lighting.
* Emergency Diesel Generator B control switch remains green.
Critical Task Energize at least one vital electrical AC bus.
Critical Task Energize at least one vital electrical AC bus.
This task is satisfied by starting Emergency Diesel Generator B.
This task is satisfied by starting Emergency Diesel Generator B.
BOP Start Emergency Diesel Generator B at CP-1. CRS Complete OP-902-009, Attachment 1, Diagnostic Flowchart. Proper use of chart will result in use of OP-902-003, Loss of Off Site Power/Loss of Forced Flow Recovery. Crew 1. Confirm diagnosis of a Loss of Offsite Power or a Loss of Forced Circulation by checking Safety Function Status Check Acceptance Criteria are satisfied. Crew 2. Announce a Loss of Offsite Power or a Loss of Forced Circulation is in progress using the plant page. CRS 3. Advise the Shift Manager to REFER TO EP-001-001, "Recognition & Classification of Emergency Condition" and implement the Emergency Plan. CRS 4. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps"   CRS should direct this action to a non-licensed operator.
BOP       Start Emergency Diesel Generator B at CP-1.
Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 6 / 7 Page 16 of 16           Event
CRS       Complete OP-902-009, Attachment 1, Diagnostic Flowchart.
* Proper use of chart will result in use of OP-902-003, Loss of Off Site Power/Loss of Forced Flow Recovery.
Crew       1. Confirm diagnosis of a Loss of Offsite Power or a Loss of Forced Circulation by checking Safety Function Status Check Acceptance Criteria are satisfied.
Crew       2. Announce a Loss of Offsite Power or a Loss of Forced Circulation is in progress using the plant page.
CRS       3. Advise the Shift Manager to REFER TO EP-001-001, "Recognition &
Classification of Emergency Condition" and implement the Emergency Plan.
CRS       4. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps" CRS should direct this action to a non-licensed operator.
Scenario 2, Revision 0
 
Appendix D                         Required Operator Actions                               Form ES-D-2 Op Test No.:     NRC   Scenario #       2     Event #         6/7         Page     16     of     16 Event


== Description:==
== Description:==
Loss of Off Site Power / Failure of Emergency Diesel Generator B to Auto Start Time Position Applicant's Actions or Behavior Scenario 2, Revision 0 BOP 6. IF offsite power has been lost, THEN verify the sequencer has timed out for at least one 4.16KV safety bus. BOP 7. Check a CCW pump is operating for each energized 4.16KV safety bus. CRS / BOP  
Loss of Off Site Power / Failure of Emergency Diesel Generator B to Auto Start Time       Position                             Applicants Actions or Behavior BOP       6. IF offsite power has been lost, THEN verify the sequencer has timed out for at least one 4.16KV safety bus.
: 8. IF offsite power has been lost, THEN: a. Verify MSIVs are closed.  
BOP       7. Check a CCW pump is operating for each energized 4.16KV safety bus.
: b. Verify following steam generator blowdown isolation valves are closed: BD 102A, SG BLOWDOWN ISOL STM GEN 1 (IN) BD 102B, SG BLOWDOWN ISOL STM GEN 2 (IN) BD 103A, SG BLOWDOWN ISOL STM GEN 1 (OUT) BD 103B, SG BLOWDOWN ISOL STM GEN 2 (OUT)   This step is marked such that the CRS can move this forward at his discretion. This step could be performed prior to directing the restoration of the Dry Cooling Tower Sump Pumps. Examiner Note This event is complete after directing performance of Appendix 20 to restore the Dry Cooing Tower Sump Pumps Or As directed by the Lead Evaluator.}}
CRS / BOP     8. IF offsite power has been lost, THEN:
: a. Verify MSIVs are closed.
: b. Verify following steam generator blowdown isolation valves are closed:
* BD 102A, SG BLOWDOWN ISOL STM GEN 1 (IN)
* BD 102B, SG BLOWDOWN ISOL STM GEN 2 (IN)
* BD 103A, SG BLOWDOWN ISOL STM GEN 1 (OUT)
* BD 103B, SG BLOWDOWN ISOL STM GEN 2 (OUT)
This step is marked such that the CRS can move this forward at his discretion. This step could be performed prior to directing the restoration of the Dry Cooling Tower Sump Pumps.
Examiner Note This event is complete after directing performance of Appendix 20 to restore the Dry Cooing Tower Sump Pumps Or As directed by the Lead Evaluator.
Scenario 2, Revision 0}}

Latest revision as of 07:41, 13 November 2019

2010-10-Draft Operating Test Comments
ML103080005
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/04/2010
From: Apger G
Operations Branch IV
To:
Entergy Operations
References
50-382/10-302 50-382/10-302
Download: ML103080005 (177)


Text

WT-2010-10 DRAFT OPERATING TEST COMMENTS ADMIN JPMS 6.

JPM# Explanation (See below for instructions)

SRO (A5) See markups on draft submittal.

SRO (A6) See markups on draft submittal. *** ALL COMMENTS WERE RESOLVED DURING and SRO (A7) See markups on draft submittal. FOLLOWING OPTEST VALIDATION ****

MARKUPS ATTACHED AT END SRO (A8) See markups on draft submittal.

SRO (A9) See markups on draft submittal.

Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
3. Check the appropriate box when an attribute weakness is identified:
  • The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
  • The JPM does not contain sufficient cues that are objective (not leading).
  • All critical steps (elements) have not been properly identified.
  • Scope of the task is either too narrow (N) or too broad (B).
  • Excessive overlap with other part of operating test or written examination.
4. Check the appropriate box when a job content error is identified:
  • Topics not linked to job content (e.g., disguised task, not required in real job).
  • Task is trivial and without safety significance.
5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 1 of 3 OBDI 202 - IOLE Process

WT-2010-10 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN-PLANT SYSTEMS JPMS 6.

JPM# Explanation (See below for instructions)

S1 One minor edit of JPM cue sheet. Also move this sheet to the end of the JPM.

S2 See markups on draft submittal.

S3 See markups on draft submittal.

S4 See markups on draft submittal.

S5 See markups on draft submittal.

S6 See markups on draft submittal.

S7 See markups on draft submittal.

GENERIC COMMENT: Need examiner cues for in-plants.

P1 See markups on draft submittal.

P2 See markups on draft submittal. Have another JPM for FPC system as indicated on the JPM markup.

P3 See markups on draft submittal. Examiner cues can be inferred from standards. No separate cues needed.

Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
3. Check the appropriate box when an attribute weakness is identified:

$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.

$ The JPM does not contain sufficient cues that are objective (not leading).

$ All critical steps (elements) have not been properly identified.

$ Scope of the task is either too narrow (N) or too broad (B).

$ Excessive overlap with other part of operating test or written examination.

4. Check the appropriate box when a job content error is identified:
  • Topics not linked to job content (e.g., disguised task, not required in real job).
  • Task is trivial and without safety significance.
5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
6. Provide a brief description of any U or E rating in the explanation column.
7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 2 of 3 OBDI 202 - IOLE Process

WT-2010-10 DRAFT OPERATING TEST COMMENTS SCENARIOS Scenario

10. Explanation (See below for instructions)

Set 1 See markups on draft submittal. Minor edits.

2 Minimal scenario that may be the backup. See markups on draft submittal. Minor edits on page 10 of 16 on D2.

3 No Comments Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.

1. ES: ES-301 checklists 4, 5, & 6 satisfied.
2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2.
4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions.
5. Pred: Scenario sequence and other factors avoid predictability issues.
6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions.
9. Based on the reviewer=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
10. Provide a brief description of problem in the explanation column.
11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 3 of 3 OBDI 202 - IOLE Process

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A1 Review Completed Surveillance for Approval EXAMINER REVIEW COMMENTS IN RED Applicant:

Examiner:

JPM A1 JOB PERFORMANCE MEASURE DATA PAGE Task: Review and approve surveillance OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check.

Task Standard: Applicants review discovered three errors as identified in the key.,

and Applicant also the applicant correctly evaluated Tech Specs in accordance with as identified in the key.

References:

OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check Time Critical: No Validation Time: 15 mins.

K/A 2.1.23, Ability to perform specific system and Importance Rating 4.4 integrated plant procedures during all modes of plant operation.

Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 6 2010 NRC SRO Exam

JPM A1 Revision 0 Page 3 of 6 2010 NRC SRO Exam

JPM A1 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-903-117, Emergency Diesel Generator Fuel Oil Transfer Pump Operability Check

==

Description:==

This JPM is performed in the simulator, but use of the simulator is not required. The applicant will be given a completed OP-903-117, Attachment 1 for EDG Fuel Oil Transfer Pump A. The key identifies indicates the errors that the applicant must identify. One of the errors will make EDG Fuel Oil Transfer Pump A inoperable. The applicant will be required to identify the correct Tech Spec.

READ TO APPLICANT DIRECTION TO APPLICANT:

Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.

Provide all answers on the sheets provided.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 4 of 6 2010 NRC SRO Exam

JPM A1 TASK ELEMENT 1 STANDARD The following errors must be identified:

  • The vibration meter and probe are past their calibration dates.
  • Pump differential pressure was calculated incorrectly.

Review Attachment 10.1 for accuracy. The corrected pressure is below the low limit of 70.7 PSID.

  • The flow calculation for EGF-109 A, Fuel Oil Transfer Pump A Discharge Check, was performed incorrectly.

The corrected flow is greater than the required 30 gpm.

Comment: Critical SAT / UNSAT TASK ELEMENT 2 STANDARD Tech Spec 3.8.1.1 b and d must be entered.

Actions include:

  • Restore EDG A within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
  • Restoration within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> may be extended to 10 days if a temporary emergency diesel generator is verified Determine applicable Tech Spec available.

associated with EDG Fuel Oil Transfer

  • Complete OP-903-066, Electrical Breaker Alignment Pump A being inoperable. Check, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and at least every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

The following must be satisfied within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

  • All required systems, subsystems, trains, components, and devices that depend on the remaining OPERABLE diesel generator as a source of emergency power must be OPERABLE

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 5 of 6 2010 NRC SRO Exam

JPM A1 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The completed attachment for the surveillance has been reviewed and is ready for SM/CRS review.

INITIATING CUES:

  • Review the provided surveillancethe attachment. Mark and provide any comments on this sheet.

Revision 0 Page 6 of 6 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A2 Review COLSS Constant Calculation in accordance with OP-004-005, Core Operating Limits Supervisory System Operation Applicant:

Examiner:

EXAMINER REVIEW COMMENTS IN RED

JPM A2 JOB PERFORMANCE MEASURE DATA PAGE Task: Review COLSS constant calculation in accordance with OP-004-005, Core Operating Limits Supervisory System Operation Task Standard: Applicant identified errors as identified in the key for Attachment 11.6, Calculation of Charging and Letdown Parameters.

References:

OP-004-005, Core Operating Limits Supervisory System Operation Time Critical: No Validation Time: 15 mins.

K/A 2.1.20, Ability to interpret and execute. Importance Rating 3.04.6 Change procedure steps 301-1 Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 7 2010 NRC SRO Exam

JPM A2 Revision 0 Page 3 of 7 2010 NRC SRO Exam

JPM A2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

Simulator / Plant Monitoring Computer OP-004-005, Core Operating Limits Supervisory System Operation

==

Description:==

This JPM is performed in the simulator and use of the Plant Monitoring Computer is required. The applicant will be given a completed OP-004-005, Attachment 11.6 for COLSS Charging and Letdown Constants. The key identifies errors that the applicant must identify. There will be a combination of data collection and procedure execution errors.

READ TO APPLICANT DIRECTION TO APPLICANT:

Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.

Provide all answers on the sheets provided.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 4 of 7 2010 NRC SRO Exam

JPM A2 Evaluator Note Provide the completed Attachment 11.6 on colored paper to the applicant.

TASK ELEMENT 1 STANDARD The following errors must be identified:

  • The data collected for PMC point A39103 was incorrect.

307.0 °F from point A39104 was recorded vice 354.38

°F. This affects the value of step 11.6.2.1. The correct value for step 11.6.2.1 is 329.0484.

Review Attachment 11.6 for accuracy.

  • Step 11.6.2.2 was calculated incorrectly. The parentheses were not used properly when the calculation was performed. The correct value for step 11.6.2.2 is 43705.72.
  • Step 11.6.2.4 was calculated incorrectly. The value 0.000031 was entered with too few characters. The correct value for step 11.6.2.4 is 0.021127.

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 5 of 7 2010 NRC SRO Exam

JPM A2 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Plant conditions are as you see on the Simulator. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable. You are not allowed to use any network computers.

Plant configuration was changed from 1 Charging Pump running to 2 Charging Pumps running.

You are the CRS and have been given a completed Attachment 11.6, Calculation of Charging and Letdown Parameters, from OP-004-005, Core Operating Limits Supervisory System Operation, to review.

Perform this review and mark any comments on this sheet.

Revision 0 Page 6 of 7 2010 NRC SRO Exam

JPM A2 Place this page before the JPM CUE sheet so that the page count does not confuse the applicant.

SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-190 After all simulator generated alarms are clear, place the simulator in FREEZE.

Verify the parameters on the PMC match the values on the key.

Revision 0 Page 7 of 7 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A3 Evaluate Low Pressure Safety Injection Train B Operability Applicant:

Examiner:

EXAMINER REVIEW COMMENTS IN RED

JPM A3 JOB PERFORMANCE MEASURE DATA PAGE Task: Evaluate the operability of Low Pressure Safety Injection Train B during the performance of OP-903-026, Emergency Core Cooling System Valve Lineup Verification.

Task Standard: Applicant determined the total gas volume for each of the 2 penetrations and determined that LPSI Train B became inoperable after the void was discovered at SI-134 B.

References:

OP-903-026, Emergency Core Cooling System Valve Lineup Verification Time Critical: No Validation Time: 20 mins.

K/A 2.2.40, Ability to apply Technical Importance Rating 4.7 Specifications for a system Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 5 2010 NRC Walk Through Exam

JPM A3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-903-026, Emergency Core Cooling System Valve Lineup Verification

==

Description:==

This JPM is performed in the simulator, but use of the simulator is not required. The applicant will be provided information describing the results of surveillance OP-903-026, Emergency Core Cooling System Valve Lineup Verification. He, and will be required to evaluate void size and location to determine what the total gas volume was in the 2 locations of importance. The applicant will also be required to determine when in the testing sequence Low Pressure Safety Injection Train B became inoperable.

READ TO APPLICANT DIRECTION TO APPLICANT:

Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.

Provide all answers on the sheets provided.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 5 2010 NRC SRO Exam

JPM A3 Evaluator Note The simulator is not required for this JPM. Provide the applicant with the colored cue sheet.

TASK ELEMENT 1 STANDARD Penetration 36, for SI-1412 B and SI-133 B = 1.71 ft3 A. What was the total gas volume applicable to each of the 2 penetrations? Penetration 37, for SI-1402 B and SI-134 B = 1.459 ft3 Comment: Critical SAT / UNSAT TASK ELEMENT 2 STANDARD B. At what point in the sequence did Low After the void was discovered Pressure Safety Injection Train B become at SI-134 B.

inoperable, if any?

Comment: Critical Low Pressure Safety Injection Train B remained SAT / UNSAT operable after SI-1412 B, SI-1402 B and SI-133 B voids were discovered. Low Pressure Safety Injection Train B was required to be declared inoperable after the void was discovered at SI-134 B.

After step 3 of the listed sequence, the total gas volume for SI-1412 B and SI-133 B was 1.71 ft3, less than the limit of 1.802 ft3 for that penetration.

After step 4 of the above sequence, the total gas volume for SI-1402 B and SI-134 B was 1.459 ft3, above the limit of 1.229 ft3 for that penetration.

END OF TASK Revision 0 Page 4 of 5 2010 NRC SRO Exam

JPM A3 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

OP-903-026, Emergency Core Cooling System Valve Lineup Verification, is in progress.

The RCA Watch has discovered voids during the performance of the surveillance.

After each void was discovered, actions were taken to fill that line before moving to the next location. The RCA Watch called in the following results in the order listed:

1. SI-1412 B, RC Loop 1A FCV Downstream Vent 9 inch arc
2. SI-1402 B, LPSI Header to RC Loop 1B FCV Downstream Vent 8 inch arc
3. SI-133 B, LPSI Pump B Discharge to RC Loop 2B Vent 10 inch arc
4. SI-134 B, RC Loop 1 SHDN Cooling Warm-up Line Vent 7 inch arc A. What was the total gas volume applicable to each of the 2 penetrations?

B. At what point in the sequence did Low Pressure Safety Injection Train B become inoperable, if any?

Record answers on this sheet.

A.

B.

Revision 0 Page 5 of 5 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A4 Review a Liquid Release Permit Applicant:

Examiner:

EXAMINER REVIEW COMMENTS IN RED

JPM A4 JOB PERFORMANCE MEASURE DATA PAGE Task: Review and approve a liquid release permit in accordance with OP-007-001, Boron Management.

Task Standard: Applicant identified errors in the permit according to the key.

References:

OP-007-001, Boron Management CE-003-514, Liquid Radioactive Release Permit EC-M84-001 Time Critical: No Validation Time: 20 mins.

K/A 2.3.6, Ability to approve release permits Importance Rating 3.8 Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 6 2010 NRC SRO Exam

JPM A4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-007-001, Boron Management EC-M84-001

==

Description:==

This JPM is performed in the simulator and use of the Plant Monitoring Computer and the RM-11 Radiation Monitoring Computer is required. The applicant will be given a release permit for Boric Acid Condensate Tank B to authorize. The key identifies errors that the applicant must identify. There will be a combination of data collection errors from both the PMC and RM-11. There are also plant conditions that are not properly reflected in the permit. The applicant will be able to gather this information from the control panel alignment.

READ TO APPLICANT DIRECTION TO APPLICANT:

Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.

Provide all answers on the sheets provided.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 6 2010 NRC SRO Exam

JPM A4 Evaluator Note Provide the Boric Acid Condensate Tank B Release Permit, printed on colored paper, to the applicant.

TASK ELEMENT 1 STANDARD The 3All of the [space] following errors must be identified:

  • The data collected for Boric Acid Condensate Tank B was incorrect. The level for Waste Condensate Tank B was recorded instead. The tank percent and tank volume in gallons reflect the level in Waste Condensate Tank B.

Review the Boric Acid Condensate Tank

  • The permit list that 4 Circulating Water Pumps are B Release Permit for accuracy. running, but only 3 are running.
  • The setpoint for the Boric Acid Condensate Radiation Monitor is reading 8.0 e-02 uCi/ml vice 6.50 e-01. This reading must be verified from the RM-11 computer.
  • The Boric Acid Condensate Radiation Monitor is listed as PRM-IRE-0647 on various locations of the permit.

The correct UNID number is PRM-IRE-0627.

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 4 of 6 2010 NRC SRO Exam

JPM A4 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Plant conditions are as you see on the Simulator. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable. You are not allowed to use any network computers.

Boric Acid Condensate Tank B is ready to be released and the Release Permit is in the Control Room for your review.

Perform this reviewReview the Release Permit and mark provide any comments on this sheet.

Revision 0 Page 5 of 6 2010 NRC SRO Exam

JPM A4 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-190 After all simulator generated alarms are clear, place the simulator in FREEZE.

Verify the parameters on the PMC and RM-11 match the values on the key.

PLACE THIS SHEET BEFORE THE APPLICANT CUE SHEET TO PREVENT PAGE SEQUENCE CONFUSION.

Revision 0 Page 6 of 6 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE A5 Classify Emergency Plan Entry Level Applicant:

Examiner:

EXAMINER REVIEW COMMENTS IN RED.

JPM A5 JOB PERFORMANCE MEASURE DATA PAGE Task: Classify Emergency Plan Entry Level Task Standard: Applicant determined correct Emergency Plan class and initiating condition.

References:

EP-001-001 Recognition and Classification of Emergency Conditions Time Critical: No Validation Time: 15 mins.

K/A 2.4.41, Knowledge of the emergency action Importance Rating 4.6 level thresholds and classifications.

Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 6 2010 NRC SRO Exam

JPM A5 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

EP-001-001 Recognition and Classification of Emergency Conditions

==

Description:==

This JPM is performed in the simulator and use of the Plant Monitoring Computer and the RM-11 Radiation Monitoring Computer is required. The applicant will be given plant conditions and directed to make the appropriate Emergency Plan class and initiating condition. The applicant will have to get data off of the RM-11 or Plant Monitoring computers to properly classify the event.

READ TO APPLICANT DIRECTION TO APPLICANT:

Each administrative JPM has a cue sheet with the instructions for that JPM. Each administrative JPM stands alone, and conditions from 1 JPM do not carry over to any other JPM. If you have any questions, raise your hand and I will come to your desk.

Provide all answers on the sheets provided.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 6 2010 NRC SRO Exam

JPM A5 TASK ELEMENT 1 STANDARD Applicant declares an Alert based on initiating condition AA1, any UNPLANNED release of gaseous or liquid radioactivity to the Determine the correct Emergency Plan class and environment that exceeds 200 times the initiating condition. radiological effluent ODCM limits for > 15 minutes.

Comment: Critical PLANT STACK Wide Range Gas Monitor PRM-IRE-0110, RE0110-4 will read > 1.51E+07 uCi/sec, the SAT / UNSAT Alert classification limit. It will be less than the Site Area Emergency limit of 2.55E+08 uCi/sec.

Plant Stack PIG Gas Channels, PRM-IRE-0100.1S or 2S, RE0100.1-1 or RE0100.2-1 will be > 3.45E-03 uCi/cc, the Unusual Event criteria. There is no criteria to upgrade from an Unusual Event to an Alert based on either Plant Stack PIG Gas Channel.

END OF TASK Revision 0 Page 4 of 6 2010 NRC SRO Exam

JPM A5 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

Plant conditions are as you see on the Simulator. Use of the Simulator, RM-11, and Plant Monitoring Computer is acceptable. You are not allowed to use any network computers.

A failure of the Gaseous Waste System has occurred. Conditions are as displayed on the simulator. These conditions have existed for 30 minutes.

You are the Shift Manager / Emergency Coordinator. Determine the appropriate Emergency Plan class and initiating condition.

Mark all of your conclusions on this sheet.

Revision 0 Page 5 of 6 2010 NRC SRO Exam

JPM A5 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-190 After all simulator generated alarms are clear, place the simulator in FREEZE.

Verify the parameters on the PMC match the values on the key.

PLACE BEFORE APPLICANT CUE SHEET TO ELIMINATE PAGE SEQUENCE CONFUSION.

Revision 0 Page 6 of 6 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S1 ATC Immediate Operator Actions on 2 Dropped CEAs Applicant:

Examiner:

JPM S1 JOB PERFORMANCE MEASURE DATA PAGE Task: ATC Immediate Operator Actions on 2 Dropped CEAs Task Standard: Applicant tripped the reactor using 32 A and 32 B breakers in accordance with OP-902-000 and completed the ATC operators Standard Post Trip Actions.

References:

OP-901-102, CEA or CEDMCS Malfunction OP-902-000, Standard Post Trip Actions Alternate Path: Yes Time Critical: No Validation Time: 5 mins.

K/A 001 A2.13, ATWS Importance Rating 4.4 / 4.6 RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 8 2010 NRC SRO Exam

JPM S1 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

None

==

Description:==

Applicant will position himself as the ATC operator at CP-2. CEAs 3 and 14 will drop into the core. The applicant should notice the condition, announce the condition, and trip the reactor without direction. The normal reactor trip pushbuttons will not function. The applicant should move to the first contingency and use the Diverse Reactor Trip pushbuttons. One of these buttons is faulted. The DRTS alarms will come in, but the CEA MG set load contactors will not open. The applicant should then move to the second contingency, and open both 32 Bus Feeder breakers, and reclose them 5 seconds later. The task should be stopped after the applicant completes the immediate operator actions for the ATC position.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 8 2010 NRC SRO Exam

JPM S1 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The plant is at 100% power.

INITIATING CUES:

  • Respond to conditions observed.
  • Perform actions as required by the ATC operator.

Revision 0 Page 4 of 8 2010 NRC SRO Exam

JPM S1 Evaluator Note

1. All of the listed steps are from OP-901-102, CEA or CEDMCS Malfunction, and OP-902-000, Standard Post Trip Actions, but the applicant is required to perform the listed steps from memory.
2. Direct simulator operator to initiate trigger 1 when ready to begin.

TASK ELEMENT 1 STANDARD Pushes both reactor trip D.1. Determines 2 CEAs have dropped, attempts to trip the reactor from pushbuttons on CP-2 or CP-2 or CP-8 CP-8.

Comment: Critical Trip pushbuttons are faulted and Reactor Trip Circuit Breakers will not open. SAT / UNSAT TASK ELEMENT 2 STANDARD Pushes both DRTS 1.a.1.2 Attempts to trip reactor using DRTS pushbuttons on CP-2.

pushbuttons on CP-2.

Comment: Critical 1 DRTS pushbutton is faulted and CEA MG set load contactors will not open. SAT / UNSAT TASK ELEMENT 3 STANDARD Opens SST A32 FEEDER 1.a.1.3 Open BOTH the following breakers for 5 seconds and close: and SST B32 FEEDER

  • SST A32 FEEDER breakers for 5 seconds and
  • SST B32 FEEDER then re-closes both breakers.

Comment: Critical Evaluator: If applicant stops after re-closing the A and B 32 Feeder breakers, prompt him as the CRS to perform his Standard Post Trip SAT / UNSAT Actions.

Revision 0 Page 5 of 8 2010 NRC SRO Exam

JPM S1 TASK ELEMENT 4 STANDARD

1. Determine Reactivity Control acceptance criteria are met:
  • Check reactor power is dropping.
  • Check startup rate is negative. Verifies listed parameters.
  • Check less than TWO CEAs are NOT fully inserted.

Comment: Critical SAT / UNSAT TASK ELEMENT 5 STANDARD

3. Determine RCS Inventory Control acceptance criteria are met:

Check that the following conditions exist:

  • Pressurizer level is 7% to 60%

Verifies listed parameters.

  • Pressurizer level is trending to 33% to 60%
  • Check RCS subcooling is greater than or equal to 28 ºF.

Comment: Critical SAT / UNSAT TASK ELEMENT 6 STANDARD

4. Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist:
  • Pressurizer pressure is 1750 psia to 2300 psia Verifies listed parameters.
  • Pressurizer pressure is trending to 2125 psia to 2275 psia Comment: Critical SAT / UNSAT Revision 0 Page 6 of 8 2010 NRC SRO Exam

JPM S1 TASK ELEMENT 7 STANDARD

5. Determine Core Heat Removal acceptance criteria are met:
  • Check at least one RCP is operating.
  • Check operating loop T is less than 13 ºF. Verifies listed parameters.
  • Check RCS subcooling is greater than or equal to 28 ºF.

Comment: Critical SAT / UNSAT TASK ELEMENT 8 STANDARD 6.b. Determine RCS Heat Removal acceptance criteria are met:

  • Check RCS TCOLD is 530 ºF to 550 ºF Verifies listed parameters.

Comment: Critical SAT / UNSAT TASK ELEMENT 9 STANDARD

7. Determine Containment Isolation acceptance criteria are met:
  • Check containment pressure is less than 16.4 psia.
  • Check NO containment area radiation monitor alarms OR unexplained rise in activity. Verifies listed parameters.
  • Check NO steam plant activity monitor alarms OR unexplained rise in activity.

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 7 of 8 2010 NRC SRO Exam

JPM S1 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-195 Verify the following Malfunctions:

  • No Trigger o rp01a, RPS manual pushbutton a o rp01b, RPS manual pushbutton b o rp01c, RPS manual pushbutton c o rp01d, RPS manual pushbutton d
  • Trigger 1:

o rd02a03, drop CEA 3 o rd02a14, drop CEA 14 Verify the following Overrides:

  • No Trigger o di-02a06s02-1, DRT pushbutton 1 of 2 Coordinate with examiner to initiate Trigger 1 on his cue.

Revision 0 Page 8 of 8 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S2 Failed Pressurizer Level Control due to Failed RCS Cold Leg Temperature Instrument and Pressurizer Level Control Applicant:

Examiner:

JPM S2 JOB PERFORMANCE MEASURE DATA PAGE Task: Perform actions associated with a faulted Pressurizer level setpoint in accordance with OP-901-110, Pressurizer Level Control Malfunction.

Task Standard: Faulted Reactor Coolant Cold Leg temperature instrument was removed from service in accordance with OP-901-110.

References:

OP-901-110, Pressurizer Level Control Malfunction Alternate Path: Yes Time Critical: No Validation Time: 15 mins.

004 A2.22, Mismatch of Charging and K/A Importance Rating 3.2 / 3.1 Letdown flows RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 9 2010 NRC SRO Exam

JPM S2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-901-110, Pressurizer Level Control Malfunction

==

Description:==

The applicant will be positioned as the ATC operator to start this task. The JPM will start with RCS Cold Leg temperature instrument RC-ITI-0111-Y failed high. The cue sheet will direct the applicant to match Charging and Letdown flow. This will be accomplished at CP-2. After the applicant reports that Charging and Letdown flows are matched and verifications made, the applicant will be directed to assume the role of the BOP operator and select the non-selected Cold Leg instrument. This is located behind CP-2. This selection will not function, requiring the applicant to remove the failed instrument from service at both Reactor Regulating drawers.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 9 2010 NRC SRO Exam

JPM S2 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Mode 1, 15% power
  • Main Turbine testing in planned for next shift INITIATING CUES:
  • You are the ATC operator
  • Annunciator B-1, Pressurizer Level Hi/Lo, on Panel H has come into alarm.
  • The CRS has entered OP-901-110, Pressurizer Level Control Malfunction, section E2, Pressurizer Level Setpoint Malfunction
  • The CRS has directed you to raise Letdown flow to 120 - 126 gpm to match Charging and Letdown flow in accordance with step 1.

Revision 0 Page 4 of 9 2010 NRC SRO Exam

JPM S2 Evaluator Note Direct the simulator operator to place the simulator in RUN when ready to start.

TASK ELEMENT 1 STANDARD

1. Place Pressurizer Level Controller (RC-ILIC-0110) in MAN AND adjust Letdown flow is raised to OUTPUT to slowly adjust letdown flow to restore Pressurizer level. 120 - 126 gpm..

Comment: Critical SAT / UNSAT Evaluator Note After the applicant reports that Charging and Letdown flows are approximately matched, direct him to perform steps 2 and 3.

TASK ELEMENT 2 STANDARD Hot and Cold Leg safety

2. Verify normal indications on ALL Safety Measurement Channel Hot temperature indicators are Leg AND Cold Leg temperature indicators.

verified on CP-7.

Comment:

SAT / UNSAT TASK ELEMENT 3 STANDARD

3. Determine affected channel(s) by checking Reactor Regulating System Both channels are identified (RRS) TAVG recorders (RC-ITR-0111 AND RC-ITR-0121). as affected by the failure.

Comment:

SAT / UNSAT Evaluator Note Inform the applicant that the CRS has completed steps 4 through 8. The CRS has directed him to evaluate steps 9 and 10.

The applicant may have already identified and reported the failed instrument prior to reaching this step.

Revision 0 Page 5 of 9 2010 NRC SRO Exam

JPM S2 TASK ELEMENT 4 STANDARD Procedure Note: Selecting the non-faulted channel may cause automatic Note reviewed.

actions to occur if actual level is not at program level.

Comment:

SAT / UNSAT TASK ELEMENT 5 STANDARD Hot Leg temperature

9. Check Reactor Regulating System (RRS) Hot Leg indicators (RC-ITI-indicators are verified to be 0111-X AND RC-ITI-0121-X) for abnormal readings.

reading normally.

Comment:

SAT / UNSAT TASK ELEMENT 6 STANDARD

10. Check Reactor Regulating System (RRS) Cold Leg indicators (RC- RC-ITI-0111-Y is identified ITI-0111-Y AND RC-ITI-0121-Y) for abnormal readings. as failed high.

Comment: Critical This is critical to identify failed instrument so that the correct procedure is performed. SAT / UNSAT Evaluator Cue Cue the applicant that he is now filling the role of the BOP operator and that another operator is filling the role of the ATC operator.

Revision 0 Page 6 of 9 2010 NRC SRO Exam

JPM S2 Evaluator Cue Direct the applicant as following based on his report:

If he correctly identifies that Loop 1 Cold Leg (RC-ITI-0111-Y) is failed, then cue:

Perform step 10.1 on for TCOLD LOOP 1 selector switch located behind CP-2 and verify setpoint restoration.

o If he incorrectly identifies that Loop 1 Hot Leg (RC-ITI-0111-X) is failed, then cue:

Perform step 9.1 and select LOOP 2 for TAVE LOOP SELECTOR on BOTH RRS local cabinets (CP-12A AND CP-12B) and verify setpoint restoration.

o If he incorrectly identifies that Loop 2 Hot Leg (RC-ITI-0121-X) is failed, then cue:

Perform step 9.2 and select LOOP 1 for TAVE LOOP SELECTOR on BOTH RRS local cabinets (CP-12A AND CP-12B) and verify setpoint restoration.

o If he incorrectly identifies that Loop 2 Cold Leg (RC-ITI-0121-Y) is failed, then cue:

Perform step 10.2 on for TCOLD LOOP 2 selector switch located behind CP-2 and verify setpoint restoration.

Evaluator Note Positioning the selector switch in the next step will not affect clear the malfunction. The applicant should detect and report this additional failure/problem. The indications that are applicable include:

  • Recorder RC-ILR-0110 Setpoint does not return to normal, ~ 33%
  • All 3 Charging Pumps continue operating
  • TAVE Recorders RC-ITR-0111 and 0121 do not return to normal, ~ 550 °F
  • Pressurizer Level Hi/Lo Annunciator H B-1 does not clear TASK ELEMENT 7 STANDARD 10.1 Select presently non-selected position (ALT OR NORM) on TCOLD Loop 1 selector switch is LOOP 1 selector switch located behind CP-2, Reactor Control placed in ALT.

Comment: Critical THIS STEP IS NOT CRITICAL SAT / UNSAT Revision 0 Page 7 of 9 2010 NRC SRO Exam

JPM S2 Evaluator Note The applicant should recommend removing the failed instrument at both Reactor Regulating panels.

Request this recommendation if it has not already been made.

Once recommended, direct the applicant to carry out this action.After the applicant recommends removing the failed instruments from the RRS, direct the applicant to remove the failed instrument at both RRS panels.

TASK ELEMENT 8 STANDARD 10.1 Select LOOP 2 on BOTH RRS local cabinets (CP-12A AND CP- LOOP 2 is selected on both 12B) Reactor Regulating cabinets.

Comment: Critical SAT / UNSAT Evaluator Note End task after the applicant verifies setpoint has been restored to normal, ~33%.

END OF TASK Revision 0 Page 8 of 9 2010 NRC SRO Exam

JPM S2 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-196 Verify the following Malfunctions:

  • RC18C set at 100% failure on Trigger 1.

Verify the following Overrides:

  • DI-02B1S-0 overridden to Normal Place the simulator in RUN Initiate Trigger 1 Acknowledge panel annunciators Place the simulator in FREEZE.

Place the simulator to RUN on direction from the evaluator.

Revision 0 Page 9 of 9 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S3 Reduce RCS Pressure and Establish Pressurizer Level on a Failure of All Charging Applicant:

Examiner:

JPM S3 JOB PERFORMANCE MEASURE DATA PAGE Task: Reduce RCS pressure with Main Spray and restore Pressurizer Level with High Pressure Safety Injection Task Standard: Applicant reduced RCS pressure to below HPSI Pump shutoff head and established Safety Injection System flow in accordance with OP-901-112, Charging or Letdown Malfunction.

References:

OP-901-112, Charging or Letdown Malfunction Alternate Path: No Time Critical: No Validation Time: 20 mins.

K/A 006 A1.18, Pressurizer level and pressure Importance Rating 4.0 / 4.3 RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 7 2010 NRC SRO Exam

JPM S3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-901-112, Charging or Letdown Malfunction

==

Description:==

The applicant will perform the roles of the ATC and BOP operators for this JPM.

The initial conditions describe that the plant has experienced a loss of all Charging capacity. The applicable off normal procedure directs tripping the reactor and lowering RCS pressure to < 1400 psia. The JPM begins with the reactor tripped and Standard Post Trip Actions complete. The RCS will be at normal post trip pressure, 2250 psia.

Main Spray will be used to accomplish the pressure reduction. After RCS pressure is below 1400 psia, a High Pressure Safety Injection Pump is started and flow established to restore Pressurizer level.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 7 2010 NRC SRO Exam

JPM S3 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The crew has entered OP-901-112, Charging or Letdown Malfunction, due to a piping weld failure downstream of CVC-209, Charging Pumps Header Isolation.
  • OP-902-000, Standard Post Trip Actions, have been completed.

INITIATING CUES:

  • The CRS directs you to perform all of the remaining portions of step 2 in sub-section E1, Charging Malfunction, and establish a RCS pressure of 1250 - 1350 psia and restoring Pressurizer level to 30% using HPSI Pump A.

Revision 0 Page 4 of 7 2010 NRC SRO Exam

JPM S3 Evaluator Note Direct the simulator operator to place the simulator in RUN when ready to start.

Evaluator Note The Pressurizer Pressure Low Trip setpoint will need to be reset on 2 different occasions during the reduction of RCS pressure to < 1400 PSIA. There is only 1 occasion listed.

This step becomes applicable when either annunciator K B-16 or K C-16 alarm.

TASK ELEMENT 1 STANDARD Pressurizer Pressure low 2.3 WHEN PZR PRESSURE LO PRETRIP annunciator alarms, THEN pressure setpoints are reset reset Pressurizer Pressure Low Trip setpoint on ALL FOUR channels. prior to receiving a Safety Injection Actuation Comment: Critical SAT / UNSAT Evaluator Note Since there is no Charging Flow, Pressurizer pressure must be reduced using Main Spray. Controller RC-IHIC-0100 at CP-2 should be taken to MANUAL and output raised to create Main Spray flow.

TASK ELEMENT 2 STANDARD Pressurizer pressure is 2.4 Reduce Pressurizer pressure to < 1400 PSIA. reduced to 1250 - 1350 PSIA using Main Spray.

Comment: Critical SAT / UNSAT Revision 0 Page 5 of 7 2010 NRC SRO Exam

JPM S3 Evaluator Note After Pressurizer pressure is < 1400 PSIA, the Main Spray valves should be throttled closed to prevent Pressurizer pressure from dropping below the minimum pressure for RCP operation, approximately 1250 PSIA.

TASK ELEMENT 2 STANDARD 2.5 Start ONE available HPSI Pump AND open associated valves as HPSI Pump A is running.

required to restore Pressurizer level:

Comment: Critical SAT / UNSAT TASK ELEMENT 3 STANDARD 2.5 Start ONE available HPSI Pump AND open associated valves as required to restore Pressurizer level:

At least 1 HPSI flow control

  • HPSI Train A valve is throttled open and
  • HPSI COLD LEG INJECTION 1A (SI 225A) Pressurizer level is restored
  • HPSI COLD LEG INJECTION 1B (SI 226A) to > 25%.
  • HPSI COLD LEG INJECTION 2A (SI 227A)
  • HPSI COLD LEG INJECTION 2B (SI 228A)

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 6 of 7 2010 NRC SRO Exam

JPM S3 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-199 There are no Malfunctions or Overrides for this JPM.

Revision 0 Page 7 of 7 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S4 Place Shutdown Cooling Train A in Service Applicant:

Examiner:

JPM S4 JOB PERFORMANCE MEASURE DATA PAGE Task: Place Shutdown Cooling Train A in Service Task Standard: Applicant placed Shutdown Cooling Train A in service in accordance with OP-009-005 and secured Low Pressure Safety Injection Pump A after SI-405 A failed closed.

References:

OP-009-005, Shutdown Cooling OP-901-131, Shutdown Cooling Malfunction Alternate Path: Yes Time Critical: No Validation Time: 30 mins.

K/A 005 A4.01, Controls and indication for RHR Importance Rating 3.6 / 3.4 pumps RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 11 2010 NRC SRO Exam

JPM S4 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-009-005, Shutdown Cooling

==

Description:==

This task is performed at CP-8. The applicant must place Shutdown Cooling Train A in service. The fault in this task is that SI-405 A, RC Loop 2 SDC Suction Inside Containment Isol, will fail closed, requiring the applicant to secure Low Pressure Safety Injection Pump A. The task can be stopped after LPSI Pump A is secured.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 11 2010 NRC SRO Exam

JPM S4 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • The plant is in Mode 4
  • Protected Train is A
  • RCS temperature is 280 °F
  • RCS pressure is 340 PSIA

INITIATING CUES:

  • The CRS has directed you to place Shutdown Cooling Train A in service in accordance with OP-009-005, section 6.1.

Revision 0 Page 4 of 11 2010 NRC SRO Exam

JPM S4 TASK ELEMENT 1 STANDARD Procedure Note: The Shutdown Cooling Train placed in service Note reviewed.

should be on the Protected Train.

Comment:

SAT / UNSAT TASK ELEMENT 2 STANDARD Procedure Caution: Following a design basis tornado event, delaying the initiation of Shutdown Cooling (SDC) for up to 7 days will be required to ensure the Component Cooling Water System is capable of removing Reactor Coolant System decay heat. The actual delay Caution reviewed.

time will depend on UHS damage and ambient temperature and will be determined by engineering. Emergency Feedwater supports decay heat removal until SDC can be initiated.

Comment:

SAT / UNSAT TASK ELEMENT 3 STANDARD 6.1.1: Verify Shutdown Cooling Train A has been aligned to Standby Cue sheet lists this as condition in accordance with Section 5.3, Alignment of Shutdown complete.

Cooling Train A to Standby Condition.

Comment:

SAT / UNSAT Evaluator Note Any Dry Fan started in SLOW must be declared inoperable and Tech Spec 3.7.4 addressed.

TASK ELEMENT 4 STANDARD 6.1.2: Verify sufficient number of Dry Cooling Tower Fans running to Any fans started must be accept increased heat load on CCW System. started in FAST.

Comment: Applicant may ask the CRS how man fans he wants running. If asked, respond to keep the fans in automatic and verify they cycle on as required. Any number of fans started is acceptable. SAT / UNSAT Revision 0 Page 5 of 11 2010 NRC SRO Exam

JPM S4 TASK ELEMENT 5 STANDARD Procedure Caution: CC-963A is required to be maintained open while in Mode 4 to preserve the design temperature basis of piping and associated components at the CCW outlet of shutdown cooling heat Caution reviewed.

exchanger A. With CC-963A open, flow through Shutdown Cooling Heat Exchanger A will be maintained above 2305 gpm.

Comment:

SAT / UNSAT TASK ELEMENT 6 STANDARD 6.1.3: Place Shutdown HX A CCW Flow Control, CC-963 A is opened.

CC-963A, control switch to Open.

Comment: Critical SAT / UNSAT TASK ELEMENT 7 STANDARD (1) The following Reactor Coolant System limits shall be met for Shutdown Cooling Entry:

RCS temperature limit: < 350 °F RCS pressure limit: < 392 psia (2) If Containment Spray Header A Isolation, CS-125 A, is open while Caution reviewed.

Shutdown Cooling Train A is operating, then Containment Spray A riser may fill and possibly spray water into Containment, due to leakage past Containment Spray Pump A discharge stop check, CS-117A.

Comment:

SAT / UNSAT Revision 0 Page 6 of 11 2010 NRC SRO Exam

JPM S4 TASK ELEMENT 8 STANDARD 6.1.4: Unlock and Open RC Loop 2 SDC Suction Outside SI-407 A is opened.

Containment Isol, SI-407A.

Comment: Critical Key 133 required.

SAT / UNSAT TASK ELEMENT 9 STANDARD 6.1.5: Notify Radiation Protection Department that Shutdown Cooling Call is made.

Train A is being placed in service.

Comment:

SAT / UNSAT TASK ELEMENT 10 STANDARD 6.1.6: Start LPSI Pump A. LPSI Pump A is started.

Comment: Critical Annunciator LPSI Pump A Flow Lost (Cabinet M, F-3) is expected. It will clear when the applicant raises flow > 2900 gpm. SAT / UNSAT TASK ELEMENT 11 STANDARD 6.1.7: Raise Shutdown Cooling flow by Manually adjusting LPSI Header Flow controller 2A/2B, SI-IFIC-0307, output until Shutdown Flow is raised to 4100 gpm.

Cooling Header A Flow indicates 4100 GPM, as indicated by RC Loop 2 Shdn Line Flow Indicator, SI-IFI-1307-A1.

Comment: Critical SAT / UNSAT TASK ELEMENT 12 STANDARD Setpoint potentiometer is set 6.1.8: Adjust LPSI Header Flow Controller 2A/2B, SI-IFIC-0307, to 73%, and controller is setpoint potentiometer to 73%, and place controller to AUTO.

placed in AUTO Comment: Critical SAT / UNSAT Revision 0 Page 7 of 11 2010 NRC SRO Exam

JPM S4 TASK ELEMENT 13 STANDARD 6.1.9: Verify LPSI Header Flow Controller 2A/2B, SI-IFIC-0307, is maintaining 4100 GPM Shutdown Cooling Header A flow, as indicated Flow is verified.

by RC Loop 2 Shdn Line Flow Indicator, SI-IFI-1307-A1.

Comment:

SAT / UNSAT TASK ELEMENT 14 STANDARD Procedure note: If a sample was drawn prior to shutdown and no interim shutdown has occurred where SDC was placed in service and Note reviewed.

boron concentration could have been reduced, then sampling is not required.

Comment:

SAT / UNSAT TASK ELEMENT 15 STANDARD 6.1.10: At SM/CRS discretion, direct Chemistry Department to sample None Shutdown Cooling Train A for boron concentration.

Comment:

Evaluator: When requested provide information to applicant that all required Chemistry requirements are met. SAT / UNSAT TASK ELEMENT 16 STANDARD Procedure Note: Shutdown Cooling Train A requires one operable Low Pressure Safety Injection Flow Control Valve for the train to be Note reviewed.

operable.

Comment:

SAT / UNSAT Revision 0 Page 8 of 11 2010 NRC SRO Exam

JPM S4 TASK ELEMENT 17 STANDARD Procedure Caution: The Reactor Coolant System shall not exceed the Caution reviewed.

100 °F per hour cooldown rate of Technical Specification 3.4.8.1.

Comment:

SAT / UNSAT TASK ELEMENT 18 STANDARD 6.1.11.1: Open the following valves:

SI-139 A and SI-138 A are

  • SI-139A LPSI Header to RC Loop 2A Flow Control open.
  • SI-138A LPSI Header to RC Loop 2B Flow Control Comment: Critical SAT / UNSAT TASK ELEMENT 19 STANDARD 6.1.11.2: Throttle Closed RC Loop 2 Shdn Cooling Warmup, SI-135A, until one of the following is within 100°F of Shutdown Cooling Train A temperature, as indicated by LPSI Pump A Discharge Header Temperature is within 100 °F Temperature Indicator, SI-ITI-0351X:

Hot Leg 2 temperature, as indicated by RC Loop 2 Hot Leg Temperature Indicator, RC-ITI-0122-HA Comment:

SI-135 A is a large gate valve with a very long stroke.

SAT / UNSAT Revision 0 Page 9 of 11 2010 NRC SRO Exam

JPM S4 TASK ELEMENT 20 STANDARD 6.1.11.3: Close RC Loop 2 Shdn Cooling Warmup, SI-135 A. SI-135 A is closed Comment: Critical SAT / UNSAT Evaluator Note Coordinate with the simulator operator to initiate trigger 1 to close SI-405 A.

TASK ELEMENT 21 STANDARD Secure LPSI Pump A LPSI Pump A is off.

Comment: Critical This is an immediate operator action IAW OP-901-131 D.1 SAT / UNSAT END OF TASK Revision 0 Page 10 of 11 2010 NRC SRO Exam

JPM S4 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-197 Verify the following Malfunctions:

  • Si23a for SI-405 A Coordinate with the examiner so that when SI-135 A is fully closed at step 6.1.11.3, Trigger 1 is initiated to close SI-405 A.

Revision 0 Page 11 of 11 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S5 Synchronize the Main Generator to the Grid Applicant:

Examiner:

JPM S5 JOB PERFORMANCE MEASURE DATA PAGE Task: Synchronize the Main Generator to the grid in accordance with OP-010-004, Power Operations.

Task Standard: The Main Generator was synchronized to the grid with both Output Breakers closed in accordance with OP-010-004, Power Operations.

References:

OP-010-004, Power Operations Alternate Path: Yes Time Critical: No Validation Time: 30 mins.

K/A 062 A4.07, Synchronizing and paralleling of Importance Rating 3.1 / 3.1 different AC supplies RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 14 2010 NRC SRO Exam

JPM S5 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-010-004, Power Operations

==

Description:==

This JPM takes place at CP-1. The applicant will start the task with all Main Turbine testing complete and the unit running at 1800 rpm. The cue will direct the applicant to perform an auto synchronization of the Main Generator. The auto synchronization will fail to close either Main Generator Output Breaker. The applicant will then perform a manual synchronization.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 14 2010 NRC SRO Exam

JPM S5 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Plant is in Mode 1 at 15% power following a refueling outage
  • Watch standers are standing by at the Main Transformers and the Generator Auxiliaries area.
  • The Load Dispatcher and Southern Control have been notified that we are coming on line.

INITIATING CUES:

  • You are directed to synchronize the Main Generator to the grid using the auto synchronization circuit in accordance with OP-010-004, Power Operations.

Revision 0 Page 4 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 1 STANDARD Procedure Note: Monitor Main Transformer A(B) during the initial energization and loading phases of the transformer for indications of static discharging as evidenced by unusual bumping, thudding, crackling, Note reviewed.

popping, or similar noises. Notify System Engineering immediately if any unusual noises are emanating from the transformer tank.

Comment:

SAT / UNSAT TASK ELEMENT 2 STANDARD 9.1.22 Close Generator Exciter Field Breaker on CP-1 to excite Breaker closed.

Generator field.

Comment: Critical SAT / UNSAT Evaluator Note Local watchstander reports no unusual noises at the Main Transformers.

TASK ELEMENT 3 STANDARD 9.1.23 Locally verify Main Transformer Cooling System operating with no Verification complete.

unusual noises.

Comment:

SAT / UNSAT Evaluator Note Local watchstander reports Isophase Bus Duct Cooling Fan is operating normally.

Revision 0 Page 5 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 4 STANDARD 9.1.24 Locally verify Generator Isophase Bus Duct Cooling Fan selected Verification complete.

to Auto has started.

Comment:

SAT / UNSAT TASK ELEMENT 5 STANDARD Procedure Caution: Do not leave synchronizer energized for longer than 5 minutes to prevent relay damage. Ensure that only one synchronizer Caution reviewed.

circuit is energized at any time to prevent synchronizer malfunction.

Comment:

SAT / UNSAT TASK ELEMENT 6 STANDARD 9.1.25 Place Synchronizer Switch for first Generator Output Breaker to First Generator Output Manual, and verify Generator Running, GEN-EM-2210A, and Incoming, Breaker is placed in GEN-EM-2210B, voltmeters indicate voltage. MANUAL.

Comment: Critical SAT / UNSAT TASK ELEMENT 7 STANDARD Procedure Note: Voltage Regulator operation should be in accordance with Attachment 9.8, Entergy Guidelines Regarding Generator Voltage Note reviewed.

Regulator and Abnormal Frequency Operation.

Comment:

SAT / UNSAT Revision 0 Page 6 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 8 STANDARD Procedure Caution: Exciter field amps shall not exceed 45 amps when Caution reviewed.

matching incoming and running voltages with the base voltage adjuster.

Comment:

SAT / UNSAT TASK ELEMENT 9 STANDARD 9.1.26 Using Base Voltage Adjust Switch, raise Incoming (Generator) voltage, GEN-EM-2210B, to match Running (Grid) voltage, GEN-EM- Voltage adjusted.

2210A.

Comment: Critical SAT / UNSAT TASK ELEMENT 10 STANDARD 9.1.27 Place Synchronizer Switch for first Generator Output Breaker in First Generator Output Off. Breaker is placed in OFF.

Comment: Critical It does not matter which breaker is closed first.

SAT / UNSAT TASK ELEMENT 11 STANDARD Voltage Regulator switch is 9.1.28 Place Auto Voltage Regulator switch in Test.

in TEST.

Comment: Critical SAT / UNSAT WHY IS THIS CRITICAL??? IF deviation already at zero then not performing this will not affect the JPM outcome.

Revision 0 Page 7 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 12 STANDARD 9.1.29 Verify Voltage Regulator Balance needle deviates from zero in both directions, by rotating Voltage Regulator Adjust switch clockwise Balance needle adjusted.

and counterclockwise.

Comment:

SAT / UNSAT TASK ELEMENT 13 STANDARD 9.1.30 Adjust Volt Reg Balance to zero, and place Auto Voltage Auto Voltage Regulator Regulator switch to On. switch is in ON.

Comment: Critical SAT / UNSAT TASK ELEMENT 14 STANDARD 9.1.31 Adjust Turbine speed to 1801-1802 RPM, at SM/CRS discretion, Speed verified.

in accordance with OP-005-007, Main Turbine Generator.

Comment:

IF asked provide a specific value SAT / UNSAT TASK ELEMENT 15 STANDARD 9.1.32 Notify Load Dispatcher and Southern Control unit is ready to go Notification given in cue.

on line.

Comment:

SAT / UNSAT TASK ELEMENT 16 STANDARD 9.1.33.1 Verify Auto Synchronization is disabled by placing Gen Bkr Auto Verification complete.

Synch Switch in Disable.

Comment:

SAT / UNSAT Revision 0 Page 8 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 17 STANDARD Procedure Note: Auto Synchronizer controls Generator voltage when an Auto Synchronizer circuit is placed in service. It may take several Note reviewed.

revolutions (~ three) of the synchroscope before the Synch lights illuminate to allow circuit to adjust voltage and frequency.

Comment:

SAT / UNSAT TASK ELEMENT 18 STANDARD 9.1.33.2 Place Synchronizer for first Generator Output Breaker to be Switch is in AUTO.

closed in Auto.

Comment: Critical SAT / UNSAT TASK ELEMENT 19 STANDARD Procedure Note: Main Generator Voltage is matched with Switchyard Voltage when Incoming and Running Voltage needles are opposite one Note reviewed.

another.

Comment:

SAT / UNSAT TASK ELEMENT 20 STANDARD 9.1.33.3 Verify proper operation of Main Generator Auto Synchronization circuit by all of the following:

  • Synchroscope rotating slowly in the fast direction. (< 1 rev per 10 sec) Verification complete.
  • Synch check lights are illuminated between 5 till and 12 oclock.
  • Incoming voltage, GEN-EM-2210B, approximately equal to running voltage, GEN-EM-2210A.

Comment:

SAT / UNSAT Revision 0 Page 9 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 21 STANDARD Procedure Note: Placing Gen Bkr Auto Synch switch in Enable allows Generator Output Breaker to close automatically. The Gen Bkr Auto Note reviewed.

Synch must be held in Enable until GOB closes.

Comment:

SAT / UNSAT TASK ELEMENT 22 STANDARD 9.1.33.4 When Synchroscope passes 15 after 12 oclock position and Synch Check lights are extinguished, then place and hold Gen Bkr Auto Switch is in ENABLE.

Synch switch in Enable.

Comment: Critical SAT / UNSAT Evaluator Note The fault will prevent the Generator Output Breaker from closing. The applicant should eventually release the Auto Sync Switch and report the failure to the CRS.

Direct the applicant as the CRS to sync the Main Generator in MANUAL in accordance with step 9.1.34.

TASK ELEMENT 23 STANDARD 9.1.33.7 Turn Synchronizer to OFF. Switch is in OFF.

Comment: Critical SAT / UNSAT TASK ELEMENT 24 STANDARD 9.1.34.1 Place Synchronizer in Manual. Switch is in MANUAL.

Comment: Critical SAT / UNSAT Revision 0 Page 10 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 25 STANDARD Procedure Note: Main Generator Voltage is matched with Switchyard Voltage when Incoming and Running voltage needles are opposite one Note reviewed.

another.

Comment:

SAT / UNSAT TASK ELEMENT 26 STANDARD 9.1.34.2 Verify Incoming voltage, GEN-EM-2210B, is slightly higher than Verification complete.

Running Voltage, GEN-EM-2210A.

Comment:

SAT / UNSAT TASK ELEMENT 27 STANDARD 9.1.34.3 Verify Synchroscope is rotating slowly in the fast direction. Verification complete.

Comment:

SAT / UNSAT TASK ELEMENT 28 STANDARD 9.1.34.4 Verify one complete revolution of the synchroscope every 15 seconds or greater, before attempting to close the Generator Output Verification complete.

Breaker.

Comment:

SAT / UNSAT TASK ELEMENT 29 STANDARD Procedure Caution: Attempt to close a generator output breaker only at 12 oclock. Failure to do this could result in paralleling the generator out Caution reviewed.

of phase.

Comment:

SAT / UNSAT Revision 0 Page 11 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 30 STANDARD 9.1.34.5 When Synchroscope reaches slightly before 12 o clock position Generator Output Breaker and Synch Check lights are On, then Close the first Generator Output is CLOSED.

Breaker.

Comment: Critical SAT / UNSAT TASK ELEMENT 31 STANDARD 9.1.34.6 Turn Synchronizer Switch to OFF. Switch is in OFF.

Comment: Critical SAT / UNSAT TASK ELEMENT 32 STANDARD 9.1.35 Verify Generator has picked up approximately 5% load ( 62 Verification complete.

Mwe).

Comment:

SAT / UNSAT TASK ELEMENT 33 STANDARD Procedure Note: Prior to closing the second Generator Output Breaker, wait at least 20 seconds after placing synchronizer in Manual to allow Note reviewed.

Synch Check Relay to realign.

Comment:

SAT / UNSAT TASK ELEMENT 34 STANDARD 9.1.36.1 Place Synchronizer in Manual for remaining Generator Output Switch is in MANUAL.

Breaker.

Comment: Critical SAT / UNSAT Revision 0 Page 12 of 14 2010 NRC SRO Exam

JPM S5 TASK ELEMENT 35 STANDARD Generator Output Breaker 9.1.36.2 Close the Generator Output Breaker.

is CLOSED.

Comment: Critical SAT / UNSAT TASK ELEMENT 36 STANDARD 9.1.36.3 Turn the Synchronizer switch to Off Switch is in OFF.

Comment: Critical Is this critical (i.e. damage to equipment)??

SAT / UNSAT END OF TASK Revision 0 Page 13 of 14 2010 NRC SRO Exam

JPM S5 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-196 There are no Malfunctions for this JPM.

Verify the following Overrides:

o DI-01A06S08-1 overridden to OFF Revision 0 Page 14 of 14 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S6 Reset Containment Spray Actuation Applicant:

Examiner:

JPM S6 JOB PERFORMANCE MEASURE DATA PAGE Task: Reset Containment Spray Actuation Task Standard: CSAS initiation and actuation were reset in accordance with OP-902-009, Standard Appendices, Appendix 5 - E.

References:

OP-902-009, Standard Appendices, Appendix 5 - E OP-902-004, Excess Steam Demand Recovery Alternate Path: No Time Critical: No Validation Time: 10 mins.

012 A4.04, Bistable, trips, reset and test K/A Importance Rating 3.3 / 3.3 switches RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 8 2010 NRC SRO Exam

JPM S6 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-902-009, Standard Appendices, Appendix 5 - E OP-902-004, Excess Steam Demand Recovery

==

Description:==

The JPM begins in an Excess Steam Demand event, after the applicable Steam Generator has blown dry. Containment Spray termination criteria are met. The applicant will be directed to reset CSAS. Actions for this task take place at CP-8, CP-10 A through D, and CP-33.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 8 2010 NRC SRO Exam

JPM S6 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • An Excess Steam Demand event has occurred.
  • The crew is implementing OP-902-004, Excess Steam Demand Recovery
  • The conditions of step 44 of OP-902-004 have been verified to be met. Do not give this. If the applicant wants, he can verify it in the control room using plant conditions (Step 27, not 44).

INITIATING CUES:

  • The CRS directs you, the BOP operator, to perform OP-902-009, Standard Appendices, Appendix 5 - E and reset CSAS.

Revision 0 Page 4 of 8 2010 NRC SRO Exam

JPM S6 Evaluator Note When Applicant is ready, cue the simulator operator to place the simulator in RUN.

TASK ELEMENT 1 STANDARD 1.1 Place control switches for the following valves to CLOSE:

  • CC-641, CCW RCP INLET OUTSIDE ISOL All 3 valve control switches
  • CC-710, CCW RCP OUTLET INSIDE ISOL are in CLOSED.
  • CC-713, CCW RCP OUTLET OUTSIDE ISOL Comment: Critical SAT / UNSAT Evaluator Note To Reset CSAS Initiation relays, the following 4 steps must be performed on Channels A, B, C, and D.

TASK ELEMENT 2 STANDARD The applicable Reset 1.2.a Place the Reset Permissive switch to "UNLK" position. (CP-10)

Permissive switch is in UNLK.

Comment: Critical Applicant will need key 218 for this manipulation. SAT / UNSAT TASK ELEMENT 3 STANDARD CSAS Reset pushbutton is 1.2.b Press CSAS Reset pushbutton.

pressed.

Comment: Critical SAT / UNSAT Revision 0 Page 5 of 8 2010 NRC SRO Exam

JPM S6 TASK ELEMENT 4 STANDARD 1.2.c Verify the initiation relay indicator lit on the ENGINEERED Verification complete.

SAFETY FEATURES SYSTEM mimic.

Comment:

SAT / UNSAT TASK ELEMENT 5 STANDARD The applicable Reset 1.2.d Place the Reset permissive switch to LK position Permissive switch is in the LK position.

Comment: Critical This sequence must be repeated for Channels A - D.

SAT / UNSAT TASK ELEMENT 6 STANDARD 1.3.a Reset CSAS actuation logic on BOTH trains as follows: CSAS Reset pushbuttons A

  • Press the CSAS Reset pushbuttons. (CP-33) & B have been de-pressed.

Comment: Critical There are 2 buttons on CP-33 that must be pressed, 1 for Train A and 1 for Train B. SAT / UNSAT TASK ELEMENT 7 STANDARD 1.3.b Verify the actuation relay indicator lit on the ENGINEERED CP-10 verification is SAFETY FEATURES SYSTEM mimic. (CP-10) complete.

Comment: SAT / UNSAT Revision 0 Page 6 of 8 2010 NRC SRO Exam

JPM S6 TASK ELEMENT 8 STANDARD One Containment Spray 1.4 Stop ONE CS pump at a time.

Pump is secured.

Comment: Critical SAT / UNSAT TASK ELEMENT 9 STANDARD Second Containment Spray 1.5 IF a CS pump is operating, THEN stop the remaining CS pump.

Pump is secured.

Comment: Critical SAT / UNSAT TASK ELEMENT 10 STANDARD 1.6 Close the following Containment Spray valves:

  • CS-125 A, CNTMT SPRAY HEADER A ISOL CS-125 A and CS-125 B
  • CS-125 B, CNTMT SPRAY HEADER B ISOL are closed.

Comment: Critical Control switch must be taken to OPEN and then to CLOSE.

SAT / UNSAT TASK ELEMENT 11 STANDARD Both Containment Spray 1.7 Place BOTH Containment Spray pump control switches to normal pump control switches are position.

in the normal position.

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 7 of 8 2010 NRC SRO Exam

JPM S6 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-198 Verify the following Malfunctions:

o Ms11b 25%

o Ch09 50%

Place the Simulator in Run on the lead examiners cue.

Revision 0 Page 8 of 8 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE S7 Waste Condensate Tank Discharge Applicant:

Examiner:

JPM S7 JOB PERFORMANCE MEASURE DATA PAGE Task: Waste Condensate Tank Discharge Task Standard: Applicant initiated Waste Condensate Tank release in accordance with OP-007-004, Liquid Waste Management System, and secured the release after the flow controller failed to maximum output.

References:

OP-007-004, Liquid Waste Management System CE-003-514, Liquid Radioactive Waste Release Permit (Computer)

Alternate Path: Yes Time Critical: No Validation Time: 15 mins.

K/A 068 A4.03, Stoppage of releases if limits Importance Rating 3.9 / 3.8 exceeded RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 7 2010 NRC SRO Exam

JPM S7 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-007-004, Liquid Waste Management System Discharge Permit for Waste Condensate Tank A

==

Description:==

The applicant will be tasked with initiating a discharge of Waste Condensate Tank A. The cue will provide indicate that the operator in the field has completed all required lineups and is standing by. When the applicant initiates flow, the flow controller output will fail high, causing discharge flow to exceed the 50 gpm permit flow limit. The flow controller will not be capable of securing flow. The applicant will stop discharge flow by closing the discharge isolation valves.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 7 2010 NRC SRO Exam

JPM S7 APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Waste Condensate Tank A has been prepared for discharge.
  • The RCA Watch reports that he has completed step 6.10.6 of OP-007-004, Liquid Waste Management System, and that Attachment 11.4, Waste Condensate Tank Discharge Checklist, is complete.

INITIATING CUES:

  • The RCA Watch reports that he has completed step 6.10.6 in OP-007-004, Liquid Waste Management System, and that Attachment 11.4, Waste Condensate Tank Discharge Checklist, is complete.
  • The Control Room Supervisor directs you to commence discharging Waste Condensate Tank A, starting at step 6.10.7 of OP-007-004 LWMS.

Revision 0 Page 4 of 7 2010 NRC SRO Exam

JPM S7 TASK ELEMENT 1 STANDARD 6.10.7 On CP-4, Reset Liquid Waste Discharge Flow Integrator to zero. Integrator is reset to zero.

Comment: Critical SAT / UNSAT TASK ELEMENT 2 STANDARD 6.10.8 Record WCT level and Liquid Waste Discharge Integrator reading Reading is recorded on the on Liquid Release Permit. Release Permit.

Comment: Critical SAT / UNSAT TASK ELEMENT 3 STANDARD 6.10.9 Verify Liquid Waste Discharge Flow Controller, LWM-IFIC-0647, Verification complete.

in Manual with 0% output.

Comment:

SAT / UNSAT TASK ELEMENT 4 STANDARD Procedure Caution: If Circulating Water flow is reduced to less than that required by the discharge permit, then discharge shall be secured Caution reviewed.

immediately.

Comment:

SAT / UNSAT Revision 0 Page 5 of 7 2010 NRC SRO Exam

JPM S7 Evaluator Note The combined control switch on CP-4 will open LWM-441 and give an open permissive to LWM-442.

LWM-442 is operated using controller LWM-IFIC-0647, also on CP-4. What about LWM-315 A(B) in the procedure step 6.10.10.1??

Evaluator Note When flow rises above the trigger setpoint, the output of the controller will fail in the raise position. Flow will rise above the Permit limit of 50 gpm. The applicant will not be able to secure flow with the controller. The applicant will be required to secure flow by closing LWM-441 and LWM-442 using the control switch.

TASK ELEMENT 5 STANDARD LWM-441 is opened using control switch.

6.10.10 To start discharging WCT, momentarily position Liquid Waste LWM-442 is throttled open Condensate Flow Control handswitch, LWM-441 and LWM-442, to Open using controller.??

and adjust flow using Liquid Waste Condensate Flow Controller, LWM- Procedure states: use IFIC-0647, not to exceed value specified on Liquid Release Permit. LWM-315 A(B) as necessary to achieve desired flow.

Comment: Critical The following step is the alternate path.

SAT / UNSAT Additional step: Attempt to stop flow using IFIC-0647 TASK ELEMENT 6 STANDARD Position Liquid Waste Condensate Flow Control Switch for LWM-441 and LWM-441 and LWM-442 LWM-442 to Closed and verify LWM-441 and LWM-442 are closed. are closed.

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 6 of 7 2010 NRC SRO Exam

JPM S7 SIMULATOR OPERATOR INSTRUCTIONS Reset to IC-197 There are no Malfunctions for this JPM.

Verify the following Overrides:

o DI-04A3A12C-3 is overridden to PUSH Verify the following Event Trigger settings:

Trigger 7 is set as zaowdlwmifif0647(1)>0.2 Revision 0 Page 7 of 7 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE P1 Reset Emergency Feedwater Pump AB Applicant:

Examiner:

JPM P1 JOB PERFORMANCE MEASURE DATA PAGE Task: Reset overspeed device on Emergency Feedwater Pump AB during a Station Blackout.

Task Standard: The overspeed device on Emergency Feedwater Pump AB was reset in accordance with OP-902-005, Station Blackout Recovery.

References:

OP-902-005, Station Blackout Recovery Alternate Path: No Time Critical: No Validation Time: 10 mins.

061 A2.04, Pump failure or improper K/A Importance Rating 3.4 / 3.8 operation RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 7 2010 NRC SRO Exam

JPM P1 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-902-005, Station Blackout Recovery

==

Description:==

This task takes place in the RCA. The task takes place during a simulated Station Blackout. This requires the applicant to simulate manual operation of MS-416, Emergency Feedwater Pump AB Trip Valve. All components are located on the -35 elevation. This JPM takes place in a location with numerous pipes and supports that are bump hazards, but no special PPE will be required for this task. There are no special radiological requirements to perform this task.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated, do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 7 2010 NRC SRO Exam

JPM P1 APPLICANT CUE SHEET Do Not Manipulate Any Plant Components (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • A Station Blackout event is in progress
  • The Control Room has closed MS-401 A and MS-401 B.
  • The Control Room has cycled MS-407 Open and Closed to depressurize the steam header. Remove this bullet if this step is done locally per 10.1.b.

INITIATING CUES:

  • The CRS directs you to reset Emergency Feedwater Pump AB in accordance with OP-902-005, Step 10 RNO.

Revision 0 Page 4 of 7 2010 NRC Walk Through Exam

JPM P1 TASK ELEMENT 1 STANDARD 10.1.a. Close BOTH PUMP AB TURB STM SUPPLY valves: MS-401 A Provided in the cue.

and MS-401 B.

Comment:

SAT / UNSAT TASK ELEMENT 2 STANDARD 10.1.b. Locally verify the steam supply header depressurized using MS-Provided in cue.

407, EFW Pump AB Drip Pot Normal Drain Bypass.

Comment:

10.1.b states locally. Should this be done locally by the applicant??

Provide examiner cue SAT / UNSAT Evaluator Note MS-416 trips closed on an overpseed. In a Station Blackout, MS-416 MOV must be manually operated in the closed direction to position the valve for reset. The physical indication as this operation is performed would be the trip bar moving from a low, tripped position up to the trip latch.

Evaluator Note MS-416 in the tripped position before and after MOV is manually operated:

Revision 0 Page 5 of 7 2010 NRC Walk Through Exam

JPM P1 TASK ELEMENT 3 STANDARD MS-416 is operated in the 10.1.c. Locally close MS 416, EFW Pump AB Turbine Stop Valve.

closed direction.

EXAMINER CUE: Valve latching mechanism is full up.

Comment: Critical SAT / UNSAT Evaluator Note The overspeed device is reset by moving the trip bar towards MS-416.

TASK ELEMENT 4 STANDARD 10.1.d. Verify mechanical Overspeed reset. Overspeed device is reset.

EXAMINER CUE: A cue to give to applicant for this task. OR A PICTURE.

Comment: Critical SAT / UNSAT Revision 0 Page 6 of 7 2010 NRC Walk Through Exam

JPM P1 TASK ELEMENT 5 STANDARD MS-416 is manually 10.1.e. Locally open MS 416, EFW Pump AB Turbine Stop Valve.

opened.

EXAMINER CUE: Valve is fully CCW and valve stem is up.

Comment: Critical SAT / UNSAT TASK ELEMENT 6 STANDARD 10.1.f. Open BOTH PUMP AB TURB STM SUPPLY valves.

Communication made to

  • MS 401A the Control Room.
  • MS 401B Comment:

SAT / UNSAT END OF TASK Revision 0 Page 7 of 7 2010 NRC Walk Through Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE P2 Aligning Spent Fuel Pool Purification Applicant:

Examiner:

THIS JPM DOES NOT SEEM DISCRIMINATING AND HAS A LOW IR.

PLEASE HAVE ANOTHER JPM AVAILABLE TO REPLACE THIS (SECURE FROM RWSP PURIFICATION OR PLACE FPC IN RWSP PURIFICATION). WE WILL RUN THIS AND THE REPLACEMENT DURING VALIDATION.

JPM P2 JOB PERFORMANCE MEASURE DATA PAGE Task: Place the Spent Fuel Pool on purification in accordance with OP-002-006, Fuel Pool Cooling and Purification Task Standard: The Spent Fuel Pool was aligned for purification in accordance with OP-002-006, Fuel Pool Cooling and Purification.

References:

OP-002-006, Fuel Pool Cooling and Purification Alternate Path: No Time Critical: No Validation Time: 15 mins.

K/A 033 K4.02, Maintenance of Spent Fuel Pool Importance Rating 2.5 / 2.7 cleanliness RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 8 2010 NRC SRO Exam

JPM P2 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-002-006, Fuel Pool Cooling and Purification

==

Description:==

This task takes place in the RCA, specific to the Fuel Handling Building. All components are located on the +1 elevation of the Fuel Handling Building. No special PPE will be required for this task. There are no special radiological requirements to perform this task.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated, do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 8 2010 NRC SRO Exam

JPM P2 APPLICANT CUE SHEET Do Not Manipulate Any Plant Components (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Refueling Water Storage Pool Purification has been in service for 2 days.
  • Refueling Water Storage Pool Purification was secured 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago.

INITIATING CUES:

  • The CRS directs you to place the Spent Fuel Pool on purification.
  • No system venting is required.

Revision 0 Page 4 of 8 2010 NRC SRO Exam

JPM P2 TASK ELEMENT 1 STANDARD 6.4.1 Verify Refueling Water Storage Pool Purification is secured in Provided in cue.

accordance with Section 6.7, Securing RWSP Purification.

Comment:

SAT / UNSAT TASK ELEMENT 2 STANDARD 6.4.2 Throttle Fuel Pool Purif Pump Discharge Isolation, FS-318, to 2 FS-318 is throttled 2 turns turns Open. open.

EXAMINER CUE: Valve fully clockwise and then CCW 2 turns.

Comment: Critical SAT / UNSAT TASK ELEMENT 3 STANDARD 6.4.3 Close Fuel Pool Purification Pump breaker, FS-EBKR-314A-5D. Breaker is closed.

EXAMINER CUE: Breaker ON (or up etc.)

Comment: Critical The 314 A Bus is located on the +1 elevation of the Fuel Handling Building. SAT / UNSAT TASK ELEMENT 4 STANDARD Procedure Note.

(1) Fuel Pool Purification Pump will not start if Fuel Pool level is <41' 6".

(2) Fuel Pool Purification components should be bypassed as necessary to maintain differential pressures less than or equal to the Maximum DP limit listed below. Chemistry Department should be notified when any of these components are bypassed (refer to Limitation 3.2.6 for applicable Note reviewed.

bypass valves):

  • Fuel Pool Purification Filter DP: 25 PSID
  • Fuel Pool Ion Exchanger Outlet Header Strainer DP: 10 PSID
  • Combined DP of Fuel Pool Ion Exchanger and Fuel Pool Ion Exchanger Outlet Header Strainer (aligned to sense differential pressure across both): 25 PSID Revision 0 Page 5 of 8 2010 NRC SRO Exam

JPM P2 Comment:

SAT / UNSAT Revision 0 Page 6 of 8 2010 NRC SRO Exam

JPM P2 TASK ELEMENT 5 STANDARD Procedure caution.

If the Spent Fuel Pool temperature (PMC PIDs A47004 and A47005) rises to > 135 °F at any time during purification, then the Fuel Pool Caution reviewed.

Purification Pump must be stopped or Fuel Pool ion exchanger resin damage may occur.

Comment:

SAT / UNSAT TASK ELEMENT 6 STANDARD 6.4.4 Start the Fuel Pool Purification Pump. Pump started.

EXAMINER CUE: Red light ON, pump amps, flow, noise etc.

Comment: Critical The control switch for the Fuel Pool Purification Pump is located in the Fuel Pool Purification cubicle. SAT / UNSAT TASK ELEMENT 7 STANDARD 6.4.5 If venting is required, then vent from the following valves:

  • FS-319 Fuel Pool Purif Pump Discharge Header Vent Provided in the cue.
  • FS-324 Fuel Pool Purif Filter Vent
  • FS-344 Fuel Pool Ion Exchanger Outlet Header Vent Comment:

SAT / UNSAT TASK ELEMENT 8 STANDARD 6.4.6 Open Fuel Pool Purif Pump Discharge Isolation, FS-318. FS-318 is full open.

EXAMINER CUE: Fully clockwise Comment: Critical SAT / UNSAT Revision 0 Page 7 of 8 2010 NRC SRO Exam

JPM P2 END OF TASK Revision 0 Page 8 of 8 2010 NRC SRO Exam

Waterford 3 2010 NRC SRO Exam JOB PERFORMANCE MEASURE P3 SUPS 014 AB Operation Applicant:

Examiner:

JPM P3 JOB PERFORMANCE MEASURE DATA PAGE Task: Transfer SUPS 014 AB from Alternate to Normal AC power Task Standard: SUPS 014 AB was transferred from Alternate to Normal AC alignment in accordance with OP-006-005, Inverters and Distribution.

References:

OP-006-005, Inverters and Distribution Alternate Path: Yes Time Critical: No Validation Time: 20 mins.

K/A 062 A3.04, Operation of inverter Importance Rating 2.7 / 2.9 RO / SRO Applicant:

Time Start: Time Finish:

Performance Time: minutes Performance Rating: SAT UNSAT Comments:

Examiner: Date:

Signature Revision 0 Page 2 of 9 2010 NRC SRO Exam

JPM P3 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

OP-006-005, Inverters and Distribution

==

Description:==

SUPS 014 AB will be simulated in the Alternate AC power alignment. Applicant will transfer SUPS 014 AB to the Normal AC alignment. All steps will be simulated in Switchgear Room A. No special PPE will be required for this task.

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All steps for this JPM will be simulated, do not manipulate any plant components. Make all necessary communications to me. I will provide initiating cues and reports on other actions when directed by you. Indicate to me when you understand your assigned task.

Read the Initial Condition and Cues from the colored Applicant Cue Sheet, and then give the cue sheet to the applicant.

Revision 0 Page 3 of 9 2010 NRC SRO Exam

JPM P3 APPLICANT CUE SHEET Do Not Manipulate Any Plant Components (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • SUPS 014 AB is in the Alternate AC alignment
  • The inverter was isolated in accordance with OP-006-005, Inverters and Distribution, steps Step 6.5.2.7.

INITIATING CUES:

  • The CRS directs you to place SUPS 014 AB in the Normal AC alignment in accordance with OP-006-005, Inverters and Distribution, section 6.5.3.

PLACE THIS SHEET AT END OF JPM Revision 0 Page 4 of 9 2010 NRC SRO Exam

JPM P3 TASK ELEMENT 1 STANDARD 6.5.3.1.1 Place Normal Feeder breaker to ON. Breaker is ON.

Comment: Critical SAT / UNSAT TASK ELEMENT 2 STANDARD 6.5.3.1.2 Verify Inverter Input Voltage > 121 VDC, then Breaker is ON.

place Emergency Feeder breaker to ON.

Comment: Critical SAT / UNSAT TASK ELEMENT 3 STANDARD Pushbutton is pressed 6.5.3.1.3 Depress and release Inverter Operate pushbutton.

and released.

Comment: Critical SAT / UNSAT TASK ELEMENT 4 STANDARD 6.5.3.2 Verify SUPS 014AB Static Switch Retransfer toggle Verification complete.

switch in INHIBIT.

Comment:

SAT / UNSAT Revision 0 Page 5 of 9 2010 NRC SRO Exam

JPM P3 TASK ELEMENT 5 STANDARD 6.5.3.3 Place SUPS 014AB Alternate Feeder breaker to Breaker is ON.

ON.

Comment: Critical SAT / UNSAT TASK ELEMENT 6 STANDARD Test pushbutton 6.5.3.4 Depress and release SUPS 014AB Static Switch depressed and Transfer Test pushbutton.

released.

Comment: Critical SAT / UNSAT TASK ELEMENT 7 STANDARD 6.5.3.4.1 Verify Static Switch On Reserve light Illuminates. Verification complete.

Comment:

SAT / UNSAT TASK ELEMENT 8 STANDARD 6.5.3.5 Depress and release SUPS 014AB Lamp Test/Reset Pushbutton depressed pushbutton. and released.

Comment: Critical SAT / UNSAT Revision 0 Page 6 of 9 2010 NRC SRO Exam

JPM P3 TASK ELEMENT 9 STANDARD 6.5.3.5.1 Verify Static Switch On Reserve light remains Verification complete.

Illuminated.

Comment: Critical SAT / UNSAT TASK ELEMENT 10 STANDARD 6.5.3.6 Place SUPS 014AB Output To PDP014AB breaker Breaker is ON.

to ON.

Comment: Critical SAT / UNSAT TASK ELEMENT 11 STANDARD 6.5.3.7 Place SUPS 014AB Bypass breaker to OFF. Breaker is OFF.

Comment: Critical SAT / UNSAT TASK ELEMENT 12 STANDARD 6.5.3.8 Place SUPS 014AB AC Voltage Select Switch to Select Switch is in INVERTER. INVERTER.

Comment: Critical SAT / UNSAT Revision 0 Page 7 of 9 2010 NRC SRO Exam

JPM P3 Evaluator Note When applicant observes the SUPS Output Voltage meter, provide indication of zero volts.

If the applicant presses the Operate pushbutton, provide the indications provided in Task Element 13.

If the applicant does not press the Operate pushbutton, then provide the indication that the Static Switch On Reserve light is still illuminated at Task Element 16.

TASK ELEMENT 13 STANDARD 6.5.3.9 If no voltage is indicated, then depress and release SUPS 014AB Inverter Operate pushbutton, and verify the following:

  • Inverter Phase Locked light Illuminated Observes no voltage
  • Inverter Output voltage CN ~120 VAC (118.8 to 121.2 and presses and VAC) releases the Operate
  • Inverter Output voltage AN ~120 VAC (118.8 to 121.2 pushbutton.

VAC)

  • Inverter Output voltage BN ~120 VAC (118.8 to 121.2 VAC)
  • Inverter Output frequency ~60 Hz (59.97 to 60.03 Hz)

Comment: Critical SAT / UNSAT TASK ELEMENT 14 STANDARD 6.5.3.10 Place SUPS 014AB Static Switch Retransfer toggle Toggle Switch is in switch to AUTO. Auto.

Comment: Critical SAT / UNSAT Revision 0 Page 8 of 9 2010 NRC SRO Exam

JPM P3 TASK ELEMENT 15 STANDARD 6.5.3.11 After approximately 30 seconds, depress and Pushbutton pressed release SUPS 014AB Lamp Test/Reset pushbutton. and released.

Comment: Critical SAT / UNSAT TASK ELEMENT 16 STANDARD 6.5.3.11.1 Verify Static Switch On Reserve light Verification complete.

Extinguished.

Comment: Critical SAT / UNSAT END OF TASK Revision 0 Page 9 of 9 2010 NRC SRO Exam

Appendix D Scenario Outline Form ES-D-1 Facility: WATERFORD 3 Scenario No.: 1 Op Test No.: NRC Examiners: Operators:

Initial Conditions:

  • 100%, 125 EFPD, AB buses aligned to Train B
  • Protected Train is B

Turnover:

  • Maintain 100 % power Event Malf. No. Event Event No. Type* Description 1 H_105 I - ATC Remove Reactor Power Cutback from service in I - SRO accordance with OP-004-015.

2 RC22F2 TS - SRO Pressurizer pressure instrument RC-IPI-0102 B I - SRO fails low.

3 SG01B TS - SRO Steam Generator 2 tube leakage CV02C C - SRO Charging Pump AB fails to auto start C - ATC 4 N/A R- ATC Rapid Plant Power Reduction due to Steam N-BOP Generator tube leakage.

N-SRO 5 RC08A C - ATC Reactor Coolant Pump 1A seal failure, manual RC09A C - SRO reactor trip RC10A 6 SG01B M-All Steam Generator Tube Rupture 7 RP08C C - ATC Containment Isolation CVC-401 fails to auto close C - SRO on CIAS 8 MS11B M - All Main Steam line break on Steam Generator 2 inside Containment.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario 1 Rev 1

Scenario Event Description NRC Scenario 1 The crew assumes the shift at 100% power with instructions to maintain 100% power.

After assuming the shift, annunciator H1005, Reactor Power Cutback Single Channel Trouble, alarms and Reactor Power Cutback auto actuation fails. The crew will be contacted by I&C maintenance after reviewing the annunciator response procedure describing a failure of Reactor Power Cutback, requiring Reactor Power Cutback be removed from service in accordance with OP-004-015, Reactor Power Cutback. This manipulation is performed by the ATC operator at CP-2 and CP-7.

After Reactor Power Cutback is removed from service, Pressurizer pressure instrument RC-IPI-0102 B fails low. The ATC operator will receive the annunciators for this failure.

The CRS should evaluate Tech Specs and enter Tech Spec 3.3.1 and 3.3.2 and determine that Plant Protection System bistable 6 for low Pressurizer pressure must be bypassed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> on Channel B. Tech Spec 3.3.3.5 and 3.3.3.6 should be referenced but not entered. Plant Monitoring Computer group SPDS indication of Pressurizer pressure is affected by this failure.

After the CRS evaluates Tech Specs but before bistable 6 is bypassed, a Steam Generator tube leak develops in Steam Generator 2. Charging Pump AB will be aligned as the first backup Charging Pump and it will fail to auto start on the lowering Pressurizer level. The ATC operator should make this diagnosis and start Charging Pump AB. The CRS should enter OP-901-202, Steam Generator Tube Leakage or High Activity. The size of the leak will require entering OP-901-212, Rapid Plant Power Reduction. For the power reduction, the ATC will perform Direct Boration to the RCS as well as Pressurizer boron equalization and ASI control with CEAs. The BOP will manipulate the controls to reduce Main Turbine load. The CRS should enter Tech Spec 3.4.5.2 for Steam Generator 2 leakage. The CRS may consider declaring Charging Pump AB inoperable due to its failure to auto start, but no Tech Spec entry is required.

Once the crew has commenced the power reduction and lowered power to ~ 90%, or at the lead examiners cue, RCP 1a will develop multiple seal failures. The second and third seal failures will be timed to occur 3 minutes after the initial seal failure. The crew should have time to get out off normal procedure OP-901-130, Reactor Coolant Pump Malfunction, before the subsequent seals fail. With the second and third seals failing, the crew will be required to trip the reactor.

When the reactor is tripped, the Steam Generator tube leak will degrade to a rupture.

The CRS should direct the ATC to initiate Safety Injection and Containment Isolation.

Containment Isolation valve CVC-401 at CP-4 will fail to close on the CIAS, requiring the ATC operator to close the valve.

Scenario 1 Rev 1

Scenario Event Description NRC Scenario 1 After the crew completes OP-902-000, Standard Post Trip Actions and the CRS diagnoses into OP-902-007, Steam Generator Tube Rupture Recovery, the CRS should direct a rapid RCS cooldown to less than 520 °F THOT. After this direction is given, a Main Steam Line break will develop on Steam Generator 2 inside Containment. The CRS should exit OP-902-007 and enter OP-902-008, Functional Recovery Procedure.

Prioritization in OP-902-008 should result in Containment Isolation being priority 1. The crew should address Containment Isolation by using the steps in the Heat Removal section to isolate Steam Generator 2.

The scenario can be terminated after Steam Generator 2 is isolated, or at the lead examiners discretion.

Scenario 1 Rev 1

Scenario Event Description NRC Scenario 1 Critical Tasks

1. Trip any RCP not satisfying RCP operating limits.

This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow. The required task becomes applicable after Containment Spray has been actuated. The time requirement of 3 minutes is based on the RCP operating limit of 3 minutes without CCW cooling.

2. Prevent Opening the Main Steam Safety Valves.

This task is satisfied by the crew taking action to maintain Steam Generator #2 pressure below the safety valve setpoint by taking action to reduce RCS pressure to < 945 psia.

Scenario Quantitative Attributes

1. Total malfunctions (5-8) 8
2. Malfunctions after EOP entry (1-2) 2
3. Abnormal events (2-4) 3
4. Major transients (1-2) 2
5. EOPs entered/requiring substantive actions (1-2) 2
6. EOP contingencies requiring substantive actions (0-2) 1
7. Critical tasks (2-3) 2 Scenario 1 Rev 1

NRC Scenario 1 Scenario Notes:

A. Reset Simulator to IC-191.

B. Verify the following Scenario Malfunctions are loaded:

1. rc22f2 for Pressurizer level instrument RC-ILI-0102 B
2. sg01B for Steam Generator #2 tube leak
3. cv02c for Charging Pump AB
4. rc08a, 09a, and 10a for RCP 1A
5. rp08c for CVC-401
6. ms11b for Steam Generator #2 steam line break
7. eg10a for EDG A overspeed device C. Verify the following remotes
1. egr27 for EDG B local alarm acknowledgement D. Verify the following overrides
1. di-08a05s14-1 for closing FP-601 A set to trigger 9
2. di-08a05s19-1 for closing IA-909 set to trigger 9
3. di-04a04s10-1 for closing CVC-109 set to trigger 9
4. di-02a05a2s34-0 for Reactor Power Cutback out of service set to trigger 1.
5. di-02a05a2s30-0 for Reactor Power Cutback lamp test.

E. Verify the following under Event Triggers:

1. zdirpciastrp(4).eq.1 is set on trigger 9 F. Verify the following Control Board Conditions:
1. Danger tag placed on EDG A control switch
2. Danger tag placed on EDG A Output Breaker G. Verify EDG A output breaker is racked out and place danger tags on EDG A and its output breaker.

H. Ensure Protected Train B sign is placed in SM office window.

I. Verify EOOS is 8.5 Yellow J. Complete the simulator setup checklist.

Scenario 1 Rev 1

NRC Scenario 1 Simulator Booth Instructions Event 1 Reactor Power Cutback Failure

1. On Lead Examiner's cue, initiate Event Trigger 1.
2. After the annunciator response procedure is referenced, call the CRS as the on shift I&C technician. Report that during planned data collection, the Reactor Power Cutback Channel A has locked up and will not respond to any commands or signals.
3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 2 Pressurizer Pressure Instrument RC-IPI-0102 B Fails Low

1. On Lead Examiner's cue, initiate Event Trigger 2.
2. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.
3. If sent to LCP-43, report RCS pressure indications are reading normal on all channels except for Channel B.

Event 3 / 4 Steam Generator #2 Tube Leak / Charging Pump AB Fails to Start / Rapid Plant Power Reduction

1. On Lead Examiner's cue, initiate Event Trigger 3.
2. If Chemistry or HP is called, acknowledge S/G tube leak and need to carry out the actions of UNT-005-032, Steam Generator Primary to Secondary Leakage.
3. If called as TGB watch to monitor Condensate System Polisher pressure, acknowledge and remove Polisher Vessel from service if necessary.
4. If called as the RCA Watch to check Charging Pump AB, report that it looks normal locally.

Event 5 Reactor Coolant Pump 1A seal failure

1. On Lead Examiner's cue, initiate Event Trigger 5.
2. If Engineering is called, acknowledge communication and report that engineering will investigate the RCP 1A failure.
3. If called as the RAB Watch to check RCP vibration in Switchgear room B, acknowledge communication, no report is necessary.

Scenario 1 Rev 1

NRC Scenario 1 Event 4 Steam Generator #2 Tube Rupture

1. On Lead Examiner's cue, initiate change the severity of malfunction SG01B to 7% and ramp it in over a 1 minute period.
2. If called as RAB watch to check Emergency Diesel Generator B, initiate Trigger 16, after EDG B Trouble alarm clear, report it is running satisfactorily.

Event 5 Steam Generator #2 Steam Line Break

1. After the crew has entered OP-902-007 and commenced the rapid cooldown and on the Lead Examiner's cue, initiate Event Trigger 7.

Event 6 High Pressure Safety Injection Pump A fails to start

1. If called to check the HPSI Pump A breaker, report all indications are normal.
2. If called to check the HPSI Pump A locally, report all indications are normal.

Scenario 1 Rev 1

NRC Scenario 1 Scenario Timeline:

Ramp Event Malfunction Severity Delay Trigger HH:MM:SS 1 H_L05 N/A N/A N/A 1 Remove Reactor Power Cutback from service 1 DI-02A05A2S34-0 N/A N/A N/A 1 Reactor Power Cutback Auto Actuate 1 DI-02A05A2S30-0 N/A N/A N/A 1 Remove Reactor Power Cutback Lamp Test 2 RC22F2 N/A N/A N/A 2 Pressurizer pressure instrument RC-IPI-0102 B fails low 3 SG01 B 0.6 % 00:3:00 NA 3 Steam Generator #2 Tube Leak 4 CV02C N/A N/A N/A N/A Charging Pump AB fails to auto start 5 RC08 A 100 % 00:30 N/A 5 RC09 00:30 03:00 RC10 00:30 03:15 Reactor Coolant Pump 1A seal failures 6 SG01 B 7.0 % 00:01:00 N/A N/A Steam Generator #2 Tube Rupture 7 RP08C N/A N/A N/A N/A CVC-401 fails to close on CIAS 8 MS11B 12 % 03:00 N/A 8 Main Steam Line Break S/G 2 Scenario 1 Rev 1

NRC Scenario 1

REFERENCES:

Event Procedures 1 OP-004-015, Reactor Power Cutback System 2 OP-009-007, Plant Protection System Tech Spec 3.3.1 and 3.3.2 3 OP-901-202, Steam Generator Tube Leakage or High Activity Tech Spec 3.4.5.2 4 OP-901-212, Rapid Plant Power Reduction Tech Spec 3.1.3.6 Regulating and Group P CEA Insertion Limits 5 OP-901-130, Reactor Coolant Pump Malfunction 6 OP-902-000, Standard Post Trip Actions OP-902-007, Steam Generator Tube Rupture Recovery OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart 8 OP-902-008, Safety Function Recovery Procedure OP-902-009, Standard Appendices, Appendix 13, Stabilize RCS Temperature Scenario 1 Rev 1

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 1 Page 1 of 23 Event

Description:

Remove Reactor Power Cutback from Service Time Position Applicants Actions or Behavior ATC Recognize and report indications of failed Cutback Channel.

Alarms:

  • Reactor Pwr Cutback Single Chnl Trouble (Cabinet H, L-5)

Indications:

  • Reactor Power Cutback AUTO ACTUATE OUT OF SERVICE pushbutton illuminated on CP-2 CRS After receiving phone call from I&C Maintenance, directs ATC to remove Reactor Power Cutback from service.

BOP Step 8.1.2.1 Verify 65% bistable lamps on all four Nuclear Instrumentation Test Drawers Illuminated.

  • Lamps are located behind the main panels on CP-10 A - D.

ATC Step 8.1.2.2 On CP-7, verify all four LOSS OF TURB BYPASS keyswitches in BYPASS and all four red BYPASS lamps Illuminated.

ATC Step 8.1.2.3 On CP-2, place LOSS OF TURBINE TRIP keyswitch to ENABLE.

ATC Step 8.1.2.4 On CP-7, place all four LOSS OF TURB BYPASS keyswitches to OFF and verify all four green OFF lamps Illuminate.

BOP Step 8.1.2.5 On Steam Bypass Control System Cabinet (IC-ECP-05), verify Reactor Power Cutback lamps Extinguished.

  • Lamps are located behind the main panels on CP-05, which is not modeled. Coach surrogate on this report.

ATC Step 8.1.2.6 On CP-2, place LOSS OF LOAD keyswitch to TURBINE TRIP.

CRS Step 8.1.2.7 Notify the Duty Plant Manager that Loss of Turbine Trip has been placed in service.

Examiner Note This event is complete after the ATC operator addresses the AUTO ACTUATE OUT OF SERVICE pushbutton at step 7.1.2 Or As directed by the Lead Evaluator Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 2 Page 2 of 23 Event

Description:

Pressurizer Pressure Instrument Failure Match title with D-1 Time Position Applicants Actions or Behavior ATC Recognize and report indications of failed channel.

Alarms:

  • RPS CHANNEL TRIP PZR PRESSURE LOW (Cabinet K, A-16)
  • PZR PRESSURE LO PRETRIP B/D (Cabinet K, C-16)
  • RPS CHANNEL B TROUBLE (Cabinet K, F-18)

Indications

  • Pressurizer pressure instrument RC-IPI-0102 B on CP-7 indicates pegged low.
  • Pressurizer pressure indication on the Plant Monitoring Computer mimic SPDS averages the failed indicator with valid pressure indication.
  • Pressurizer Pressure Lo trip and pre-trip lamps lit on CP-7 Channel B.

CRS Review Tech Specs based on the failed instrument.

  • Direct bypassing Channel B bistable 6 for Lo Pressurizer Pressure.

This is a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action.

Note OP-903-013, Monthly Channel Checks, does list this instrument for Tech Spec 3.3.3.5 and 3.3.3.6 applicability. Entry is not required, however, because the minimum channel requirements will still be met after the failure.

Examiner Note This event is complete after the CRS evaluates Tech Specs Or As directed by the Lead Evaluator Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 3 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior ATC Recognize and report indications of Steam Generator Tube Leakage.

Alarms:

  • RAD MONITORING SYS ACTIVITY HI-HI (Cabinet L, A-9)
  • VACUUM PUMPS EXHAUST ACTIVITY HI (Cabinet E, C-3)

Indications

  • Steam Generator tube leakage indication rising as indicated on PMC Group PSLR (PMC PID C48304).

CRS Enter and direct the implementation of OP-901-202, Steam Generator Tube Leakage or High Activity.

Examiner Note The following steps are from OP-901-202, Steam Generator Tube Leakage or High Activity.

CRS 1. IF Pressurizer level CANNOT be maintained with available Charging Pumps, THEN perform the following:

1.1 Manually trip Reactor.

1.2 Manually initiate Safety Injection Actuation (SIAS) AND Containment Isolation Actuation (CIAS).

1.3 GO TO OP-902-000, STANDARD POST TRIP ACTIONS.

CRS Procedure NOTE (1) The calculated Primary to Secondary Leak Rate values must be considered valid, unless the reading can be quickly diagnosed as incorrect due to an obvious malfunction of the PMC or AE Discharge Rad Monitor.

(2) The AE Discharge Rad Monitor is considered the primary Rad Monitor which has the sensitivity to measure small Primary to Secondary Leakage. The AE Discharge Rad Monitor reading inputs into the Primary to Secondary Leak Calculation on PMC Group PLSR. The MS Line N16 Rad Monitors may be used as verification of AE Discharge Rad Monitor or as primary indication if the AE Discharge Rad Monitor is OOS.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 4 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior CRS 2. Determine RCS leak rate using ANY of the following:

  • Calculated Steam Generator leakage displayed on PMC Group PSLR (PMC PID C48304)
  • Calculated Steam Generator leakage displayed on PMC PID C48251 (RE5501 CH1 LEAK RATE) and C48252 (RE5501 CH2 LEAK RATE)
  • Approximate RCS leak rate by subtracting total of Letdown flow AND RCP CBO flow from Charging Flow
  • Calculated Charging / Letdown Mismatch displayed on PMC Group Leakrate (PMC PID S13001)
  • Calculated steam generator leakage based upon chemistry sample, per CE-003-705, Determination Of Primary-To-Secondary Leak Rate CRS Procedure NOTE Any rise >30 GPD/HR followed by a subsequent lowering of the rate of change would indicate a spike and a rapid power reduction is not required.

CRS 3. IF Primary to Secondary Leakage in any Steam Generator is 75 GPD (~0.05 GPM) AND the rate of change is rising by 30 GPD/HR (~0.02 GPM/HR), THEN perform the following:

3.1 Commence a rapid plant shutdown in accordance with OP-901-212, RAPID PLANT POWER REDUCTION, AND concurrently with this Procedure, reduce Plant Power to 50% within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

3.2 WHEN Plant Power is 50%, THEN in accordance with OP-901-212, RAPID PLANT POWER REDUCTION, AND concurrently with this Procedure, be in Mode 3 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> AND Mode 5 in the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

  • These conditions will be met. The CRS should enter OP-901-212 and perform it concurrently with OP-901-202.
  • Steps 1 through 15 of Steam Generator Tube Leakage or High Activity are listed here. The CRS should begin the steps of Rapid Plant Power Reduction before working these steps. The steps of OP-901-212, Rapid Plant Power Reduction follow step 15 of OP-901-202.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 5 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior CRS 7. Notify Chemistry Department to perform the following:

7.1 Provide current Plant status including the following:

  • Primary to Secondary Leakrate
  • Primary to Secondary Leakage Rate of Change
  • Plant action(s) Operations is OR will be implementing (example:

plant shutdown, rapid plant shutdown, monitoring) 7.2 Carry out actions in accordance with UNT-005-032, STEAM GENERATOR PRIMARY-TO-SECONDARY LEAKAGE.

7.3 Begin sampling Steam Generators for activity.

7.4 Quantify Steam Generator Tube leakage.

CRS 8. Notify Radiation Protection to carry out the actions of UNT-005-032, STEAM GENERATOR PRIMARY-TO-SECONDARY LEAKAGE.

CRS / BOP 9. Verify BD-303, DISCHARGE TO WASTE, Locked Closed.

CRS / BOP 10. Verify BD-1162, BD FLASH TANK VENT, Closed.

CRS / BOP 11. Verify CD-145, CD DUMP TO WASTE POND, Closed.

11.1 Notify Chemistry prior to dumping Condensate from the Condenser Hotwell to the CST.

Crew 12. Establish AND monitor a PMC Trend of the following PMC points:

  • C48304 PRI TO SEC LEAKAGE
  • C48305 PRI TO SEC LEAK RATE CHANGE (GPD/HR)
  • C48251 RE5501 CH1 LEAK RATE
  • C48252 RE5501 CH2 LEAK RATE CRS Procedure NOTE Until arrangements are made for disposal of radioactively contaminated resin, Condensate Polisher Vessels should NOT be placed in service with resin loaded in the vessel.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 6 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior CRS 15. Remove from service ANY Condensate Polisher Vessels which are loaded with resin in accordance with OP-003-031, CONDENSATE POLISHER/BACKWASH TREATMENT.

15.1 Do not place in service any condensate polisher vessel loaded with resin without the coordination of Chemistry.

Examiner Note For the failure of Charging Pump AB failing to auto start on lowering level, this malfunction may occur before or after the Rapid Power Reduction is started, depending on the pace of the crew. Charging Pump AB would have auto started at ~ 53%, depending on power level.

ATC Recognize and report indications of Charging Pump AB Auto Start Failure.

Alarm (This alarm only comes in if Pressurizer Level drops to 3.9% below the Pressurizer Level Setpoint. If the ATC starts Charging Pump AB before this level, this alarm will not come in):

  • PRESSURIZER LEVEL HI/LO (Cabinet H, B-1)

Indications

  • Pressurizer level drops more than 2.5% below Pressurizer Level Setpoint and Charging Pump AB does not start.

ATC Start Charging Pump AB by taking the control switch on CP-2 to ON.

Examiner Note The following steps are from OP-901-212, Rapid Plant Power Reduction.

CRS NOTE (1) A rapid power reduction is defined as approximately 30 MW/minute load reduction on the main turbine.

(2) Power Reduction may be stopped at any point.

(3) Some Steps of this procedure may not be applicable due to plant conditions. In these cases SM/CRS may NA the step.

(4) Steps within this procedure may be performed concurrently or out of sequence with SM/CRS concurrence.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 7 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior ATC Begin RCS Boration by either of the following methods as directed by the CRS:

  • Direct Boration
  • Emergency Boration using one Charging Pump CRS Step 1: Begin RCS Boration by one of the following methods:

up to 340 EFPD:

Direct Boration or Emergency Boration using one Charging Pump ATC Steps for Direct Boration:

CAUTION (1) This section affects reactivity. This evolution should be crosschecked and completed prior to leaving CP-4.

(2) At least one reactor coolant pump in each loop should be operating prior to performing direct boration operations to ensure proper chemical mixing.

  • 6.7.1 Inform SM/CRS that this Section is being performed.

NOTE When performing a Plant down power where final RCS Boron Concentration needs to be determined, the following Plant Data Book figure(s) will assist the Operator in determining the required RCS Boron PPM change.

  • 1.2.1.1 Power Defect Vs Power Level
  • 6.7.2 At SM/CRS discretion, calculate volume of Boric Acid to be added on Attachment 11.6, Calculation of Boric Acid Volume for Direct Boration or VCT Borate Makeup Mode.
  • Should use Reactor Engineering Reactivity Worksheet
  • 6.7.4 Verify Boric Acid Makeup Pumps selector switch aligned to desired Boric Acid Makeup Pump A(B).

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 8 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior

  • 6.7.5 Place Direct Boration Valve, BAM-143, control switch to AUTO.
  • 6.7.6 Place Makeup Mode selector switch to BORATE.
  • 6.7.7 Verify selected Boric Acid Makeup Pump A(B) Starts.
  • 6.7.8 Verify Direct Boration Valve, BAM-143, Opens.
  • NOTE
  • The Boric Acid Flow Totalizer will not register below 3 GPM. The Boric Acid Flow Totalizer is most accurate in the range of 10 - 25 GPM.
  • 6.7.9 If manual control of Boric Acid flow is desired, then perform the following:
  • 6.7.9.1 Verify Boric Acid Flow controller, BAM-IFIC-0210Y, in Manual.
  • 6.7.9.2 Adjust Boric Acid Flow controller, BAM-IFIC-0210Y, output to >3 GPM flow rate.
  • 6.7.11 Verify Boric Acid Makeup Control Valve, BAM-141, Intermediate or Open.
  • 6.7.12 Observe Boric Acid flow rate for proper indication.

Note This manipulation is performed at CP-4. The ATC should use the Reactivity Worksheet to recommend a boron quantity to the CRS.

ATC Perform Boron Equalization as follows:

  • Place available Pressurizer Pressure Backup Heater Control Switches to ON.
  • Reduce Pressurizer Spray Valve Controller (RC-IHIC-0100) setpoint potentiometer to establish spray flow and maintain RCS pressure 2250 PSIA (2175 - 2265).

This manipulation is performed at CP-2.

ATC Operate CEAs to maintain ASI using CEA Reg. Group 6 or Group P Control Element Assemblies.

Operate CEAs in Manual Group mode as follows:

  • 6.7.1 Verify Plant Monitoring Computer operable in accordance with OP-004-012, Plant Monitoring Computer.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 9 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior

  • 6.7.2 Position Group Select switch to desired group.
  • 6.7.3 Place Mode Select switch to MG and verify the following:
  • White lights Illuminated on Group Selection Matrix for selected group
  • MG light Illuminates
  • 6.7.4 Operate CEA Manual Shim switch to INSERT group to desired height while monitoring the following:
  • CEA Position Indicator selected CEA group is moving in desired direction
  • If Reactor is critical, then monitor the following:
  • Reactor Power
  • Axial Shape Index (ASI)

NOTE The Operator should remain in the area in front of the CEA Drive Mechanism Control Panel when the Mode Select switch is not in OFF.

6.7.5 When desired set of moves have been completed, then place Mode Select switch to OFF.

Note CEA Group P should be used first to a low limit of 120 inches, followed by CEA Group 6 to a low limit of 120 inches to comply with Tech Spec 3.1.3.6.

  • This manipulation is performed at CP-2.

CRS Notify the Load Dispatcher (Woodlands) that a rapid power reduction is in progress.

CRS Announce to Station Personnel over the Plant Paging System that a rapid plant power reduction is in progress.

Crew Maintain RCS Cold Leg Temperature 536°F to 549°F.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 3/4 Page 10 of 23 Event

Description:

Steam Generator Tube Leakage / Charging Pump AB Fails to start / Rapid Plant Power Reduction Time Position Applicants Actions or Behavior BOP Commence Turbine load reduction by performing the following:

  • Depress LOAD RATE MW/MIN pushbutton.
  • Set selected rate in Display Demand Window.
  • Depress ENTER pushbutton.
  • Depress REFERENCE pushbutton.
  • Set desired load in Reference Demand Window.
  • Depress ENTER pushbutton.
  • Depress GO pushbutton.

This manipulation is performed at CP-1. The BOP will set up the Main Turbine controls. The ATC will direct the BOP when to commence unloading the Main Turbine based on the drop in RCS Cold Leg temperature.

CRS When Reactor Power consistently indicates less than 98% power, as indicated on PMC PID C24631 [MAIN STEAM RAW POWER (MSBSRAW)],

or an alternate point provided by Reactor Engineering, then verify the value of C24648 [BSCAL SMOOTHING VAL. APPLD (DUMOUT17)] automatically changes to 1.

Examiner Note This event is complete after power has been reduced to the satisfaction of the Lead Evaluator.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 5 Page 11 of 23 Event

Description:

Reactor Coolant Pump 1A Seal Failure Time Position Applicants Actions or Behavior ATC / BOP Recognize and report indications of RCP 1A seal failure.

Indications

  • RCP 1A seal bleed off flow and temperature rising on the Plant Monitoring Computer and CP-2.
  • RCP 1A seal pressures rising on the Plant Monitoring Computer and CP-2.

CRS Enter and direct the implementation of OP-901-130, Reactor Coolant Pump Malfunction.

CRS IF Reactor Coolant Pump Seal has failed, THEN GO TO section E1, Seal Failure.

Crew Procedure Note

1. RCP Seal pressure and Control Bleedoff temperature and flow are normally as follows (assuming normal operating RCS temperature and pressure):
  • Vapor Seal pressure: 25 to 45 PSIG
  • Upper Seal pressure: 585 to 915 PSIG
  • Middle Seal pressure: 1237 to 1815 PSIG
  • CBO temperature: 135° to 190°F
  • CBO flow: 1.2 to 1.8 GPM
2. (If only one Reactor Coolant Pump Seal has failed on a Reactor Coolant Pump, THEN pump operation may continue provided the seal package is monitored for further degradation.

Crew 1. Inform System Engineer of Reactor Coolant Pump Seal failure.

Crew Procedure Caution (1) CCW TEMPERATURES OF <75 F COULD LEAD TO ESSENTIAL CHILLER TRIPS ON EVAPORATOR LOW REFRIGERANT PRESSURE.

(2) CCW TEMPERATURE SHOULD BE CHANGED AT A RATE OF 10 °F IN ONE HOUR TO PREVENT DEGREDATION OF THE REACTOR COOLANT PUMP SEALS.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 5 Page 12 of 23 Event

Description:

Reactor Coolant Pump 1A Seal Failure Time Position Applicants Actions or Behavior CRS / BOP 2. IF Controlled Bleedoff temperature is rising, THEN lower Component Cooling Water temperature by ANY of the following:

  • Start Auxiliary Component Cooling Water Pump(s) AND associated Wet Cooling Tower Fans.
  • Start Auxiliary Component Cooling Water Pump(s) AND lower ACC-126A(B) setpoint.

Examiner Note Seals are timed such that the second seal will fail 3 minutes after the first.

3. IF TWO OR MORE seals fail in rapid succession, (within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) THEN perform the following:

ATC 3.1 Trip the Reactor.

ATC 3.2 Secure affected Reactor Coolant Pump.

  • Control switch is on CP-2.

Crew 3.3 GO TO OP-902-000, STANDARD POST TRIP ACTIONS.

Examiner Note This event is complete after the ATC operator trips the reactor. The severity of the SGTL should be updated upon reactor trip.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6/7 Page 13 of 23 Event

Description:

Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicants Actions or Behavior ATC / BOP Recognize and report indications of Steam Generator Tube Rupture.

Alarms

  • PRESSURIZER LEVEL HI/LO (Cabinet H, B-1)

Indications

  • Pressurizer level lowering > Charging Pump capacity.
  • Lowering Pressurizer pressure.
  • Charging Pump A auto-starts if not already started.

ATC If directed by CRS, trip Reactor using 2 Reactor Trip pushbuttons at CP-2.

ATC If directed by CRS, initiate Safety Injection Actuation (SIAS) and Containment Isolation Actuation (CIAS) at CP-7.

ATC Close CVC-401 after Containment isolation

  • This component is on CP-4 and receives a CIAS closure signal. This step becomes applicable after the CIAS is actuated.

BOP Start High Pressure Safety Injection Pump A This component is on CP-8 and receives a SIAS start signal. This step becomes applicable after the SIAS is actuated.

CRS Direct ATC and BOP to carry out Standard Post trip Actions.

ATC Determine Reactivity Control acceptance criteria are met:

  • Check reactor power is dropping.
  • Check startup rate is negative.
  • Check less than TWO CEAs are NOT fully inserted.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6/7 Page 14 of 23 Event

Description:

Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicants Actions or Behavior BOP Determine Maintenance of Vital Auxiliaries acceptance criteria are met:

Check the Main Turbine is tripped:

  • Governor valves closed
  • Throttle valves closed BOP Check the Main Generator is tripped:
  • GENERATOR BREAKER A tripped
  • GENERATOR BREAKER B tripped
  • EXCITER FIELD BREAKER tripped BOP Check station loads are energized from offsite electrical power as follows:

Train A

  • A1, 6.9 KV non safety bus
  • A-DC electrical bus
  • A or C vital AC Instrument Channel Train B
  • B1, 6.9 KV non safety bus
  • B-DC electrical bus B or D vital AC Instrument Channel ATC Determine RCS Inventory Control acceptance criteria are met:

Check that the following conditions exist:

  • Pressurizer level is 7% to 60%
  • Pressurizer level is trending to 33% to 60%
  • Check RCS subcooling is greater than or equal to 28ºF.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6/7 Page 15 of 23 Event

Description:

Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicants Actions or Behavior ATC Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist:

  • Pressurizer pressure is 1750 psia to 2300 psia
  • Pressurizer pressure is trending to 2125 psia to 2275 psia IF pressurizer pressure is less than 1684 psia, THEN verify the following have initiated.
  • CIAS ATC Determine Core Heat Removal acceptance criteria are met:
  • Check at least one RCP is operating.
  • Check operating loop T is less than 13ºF.
  • Check RCS subcooling is greater than or equal to 28ºF.

BOP Determine RCS Heat Removal acceptance criteria are met:

Check that at least one steam generator has BOTH of the following:

  • Main Feedwater is available to restore level within 50%-70% NR.

ATC Check RCS TC is 530 ºF to 550 ºF BOP Check steam generator pressure is 885 psia to 1040 psia.

BOP Check Feedwater Control in Reactor Trip Override:

  • MAIN FW REG valves are closed
  • STARTUP FW REG valves are 13% to 21% open
  • Operating main Feedwater pumps are 3800 rpm to 4000 rpm BOP Reset moisture separator reheaters, and check the temperature control valves closed.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6/7 Page 16 of 23 Event

Description:

Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicants Actions or Behavior ATC Determine Containment Isolation acceptance criteria are met:

  • Check containment pressure is less than 16.4 psia.
  • Check NO containment area radiation monitor alarms OR unexplained rise in activity.
  • Check NO steam plant activity monitor alarms OR unexplained rise in activity.

BOP Determine Containment Temperature and Pressure Control acceptance criteria are met:

  • Check containment temperature is less than or equal to 120ºF.
  • Check containment pressure is less than 16.4 psia.

BOP Secure AH-12 A or B on CRS direction after initiation of SIAS at CP-18.

CRS After review of Standard Post Trip Actions, use Appendix 1, Diagnostic Flow Chart of OP-902-009 to select appropriate optimal recovery procedure.

  • Proper use of chart will result in use of OP-902-007, Steam Generator Tube Rupture Recovery CRS Enter and direct the implementation of OP-902-007, Steam Generator Tube Rupture Recovery.

CRS 1. Confirm diagnosis of a SGTR:

a. Check Safety Function Status Check acceptance criteria are satisfied.
b. IF steam generator sample path is available, THEN direct Chemistry to sample BOTH steam generators for activity.

Crew 2. Announce a Steam Generator Tube Rupture is in progress using the plant page.

CRS 3. Advise the Shift Manager to REFER TO EP-001-001, "Recognition &

Classification of Emergency Condition", and implement the Emergency Plan.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6/7 Page 17 of 23 Event

Description:

Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicants Actions or Behavior CRS 4. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps".

  • Step is not applicable.

CRS 5. REFER TO Section 6.0, "Placekeeper", and record the time of the reactor trip.

CRS 6. IF Pressurizer pressure is less than 1684 psia, THEN verify SIAS has initiated.

CRS 7. IF SIAS has initiated, THEN:

a. Verify safety injection pumps have started.
b. Check safety injection flow is within the following:
  • Appendix 2-E, "HPSI Flow Curve"
  • Appendix 2-F, "LPSI Flow Curve"
c. Verify ALL available charging pumps are operating.

CRS / ATC 8. IF Pressurizer pressure is less than 1621 psia, AND SIAS is actuated, THEN:

a. Verify no more than two RCPs are operating.
b. IF Pressurizer pressure is less than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits", THEN stop ALL RCPs.
  • Step is not applicable.

CRS / BOP 9. IF RCPs are operating, THEN:

a. Verify CCW available to RCPs.
b. IF a CSAS is initiated, THEN stop ALL RCPs.
c. IF RCS TC is less than 382ºF, THEN verify no more than two RCPs are operating.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 6/7 Page 18 of 23 Event

Description:

Steam Generator Tube Rupture / CVC-401 Fails to Close Time Position Applicants Actions or Behavior BOP 10. Check a CCW pump is operating for each energized 4.16 KV safety bus.

CRS / BOP 11. Commence a rapid RCS cooldown to less than 520 °F THot using the steam bypass valves.

  • Since the Main Condenser is available at this point in the scenario, the CRS should direct the BOP to open Steam Bypass Valve #1 50% open to commence this rapid cooldown.
  • If the crew initiated a Main Steam Isolation Signal prior to this point, the rapid cooldown would be initiated by opening both Atmospheric Dump Valves 100% open.

ATC 13. IF MSIS is NOT present, THEN lower the automatic initiation setpoints as the cooldown and depressurization proceed for MSIS (low SG Pressure).

  • The CRS should direct the ATC to perform this action during the rapid cooldown to < 520 THOT.
  • Reset MSIS setpoints on all 4 channels at CP-7.

Examiner Note This event is complete after commencing the rapid cooldown.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 19 of 23 Event

Description:

Main Steam Line Break / Function Recovery Procedure Time Position Applicants Actions or Behavior ATC / BOP Recognize and report indications of Main Steam Line Break.

Alarms

  • Containment Water Leakage Hi (Cabinet N, L-20)
  • Containment Water Leakage Hi-Hi (Cabinet N, K-20)
  • Containment Pressure Hi / Lo (Cabinet M, H-4)
  • Containment Pressure Hi / Lo (Cabinet N, H-14)

Indications

  • Lowering Pressurizer level.
  • Lowering Pressurizer pressure.
  • Rising Containment pressure.

CRS Recognize the second event in progress. Exit OP-902-007 and enter OP-902-008, Functional Recovery procedure.

Crew 1. Announce that the Functional Recovery Procedure is in progress using the plant page.

CRS 2. Advise the Shift Manager to REFER TO EP-001-001, "Recognition &

Classification of Emergency Condition" and implement the Emergency Plan.

CRS 3. REFER TO the "Placekeeper" and record the time of the reactor trip.

ATC 4. IF pressurizer pressure is less than 1621 psia, AND SIAS is actuated, THEN:

a. Verify no more than two RCPs are operating.
b. IF pressurizer pressure is less than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits", THEN stop ALL RCPs.

ATC 5. IF RCPs are operating, THEN:

a. IF a CSAS is initiated, THEN stop ALL RCPs.
b. Verify CCW available to RCPs.
c. IF RCS TC is less than 382ºF [384ºF], THEN verify no more than two RCPs are operating.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 20 of 23 Event

Description:

Main Steam Line Break / Function Recovery Procedure Time Position Applicants Actions or Behavior Critical Task Trip any RCP not satisfying RCP operating limits.

This task is satisfied by securing all RCPs within 3 minutes of loss of CCW flow / CSAS.

ATC Following initiation of CSAS (auto or manual) secure all running Reactor Coolant Pumps as follows:

CRS 7. IF power is lost to both 3A and 3B safety buses and NOT expected to be restored within 30 minutes, THEN perform the following:

  • This step is not applicable due to no power loss.

CRS 8. IF power is lost to both 3A and 3B safety buses and NOT expected to be restored within 30 minutes, THEN perform the following to reduce unnecessary station loads:

  • This step is not applicable due to no power loss.

CRS 9. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps".

  • This step is not applicable due to no power loss.

BOP 10. Place Hydrogen Analyzers in service as follows:

  • Train A o Place Train A H2 ANALYZER CNTMT ISOL VALVE keyswitch to OPEN.

o Place H2 ANALYZER A POWER to ON.

o Check H2 ANALYZER A Pumps indicate ON.

  • Train B o Place Train B H2 ANALYZER CNTMT ISOL VALVE keyswitch to OPEN.

o Place H2 ANALYZER B POWER to ON.

o Check H2 ANALYZER B Pumps indicate ON.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 21 of 23 Event

Description:

Main Steam Line Break / Function Recovery Procedure Time Position Applicants Actions or Behavior CRS 11. Identify success paths to be used to satisfy each safety function using BOTH of the following:

  • Resource Assessment Trees
  • Safety Function Tracking Sheet Note
  • The CRS will perform the prioritization using the Resource Assessment Trees. The STA would use the Safety Function Tracking Sheets.

Proper prioritization will result in Containment Isolation being priority 1 and RCS Inventory Control being priority 2.

  • The CRS may request plant data from the ATC and BOP operators during his prioritization. The CRS may ask for the BOP to verify Safety Injection Pumps are meeting the flow curves of OP-902-009, Appendix
2. Both High and Low Pressure Safety Injection Pumps are meeting their flow curves.
  • The Containment Isolation section of OP-902-008 will direct the CRS to carry out the actions in the Heat Removal section, HR-2, steps 16-28.

These steps will direct reducing RCS pressure and Isolating S/G #2.

BOP 16.1 Commence a rapid RCS cooldown to less than 520 °F THOT using Steam Bypass valves.

  • The CRS should have already ordered this step in OP-902-007. Since the Main Steam Line Break is inside Containment, the Main Steam Isolation valves will now be closed. The CRS should now order the BOP to open both Atmospheric Dump Valves 100% to re-commence the rapid cooldown.
  • RCS temperature may already be < 520 °F due to the Excess Steam Demand. In that case, this step is not applicable.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 22 of 23 Event

Description:

Main Steam Line Break / Function Recovery Procedure Time Position Applicants Actions or Behavior Critical Task Prevent opening the Main Steam Safety Valves This task is satisfied by taking action to lower RCS pressure in accordance with step 17.

ATC 17. Depressurize the RCS by performing ALL of the following:

a. Maintain pressurizer pressure within ALL of the following criteria:
  • Less than 945 psia [915 psia]
  • Within Appendix 2A-D, "RCS Pressure and Temperature Limits"
  • IF RCPs are operating, greater than the minimum RCP NPSH of Appendix 2A-D, "RCS Pressure and Temperature Limits"
b. Operate main or auxiliary pressurizer spray.
c. IF HPSI throttle criteria are met, THEN perform ANY of the following:
  • Control charging and letdown flow
  • Throttle HPSI flow Note
  • The ATC operator should receive direction from the CRS to perform this step. He should evaluate plant conditions and decide on a minimum RCS pressure. The critical task is satisfied when the applicant takes action to start reducing RCS pressure (< 945 PSIA does not need to be reached in the scenario).
  • Auxiliary Spray will be required since all RCPs will be secured.
  • HPSI throttle criteria will not be met at this point.

BOP IF RCS THOT is less than 520 °F, THEN isolate the most affected SG:

BOP a. Place the ADV setpoint to 980 psig and verify controller in AUTO.

Scenario 1, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 1 Event # 8 Page 23 of 23 Event

Description:

Main Steam Line Break / Function Recovery Procedure Time Position Applicants Actions or Behavior BOP b. Verify the MSIV is closed.

BOP c. Verify the MFIV is closed.

BOP d. IF EFAS-2 is NOT initiated, THEN close EFW Isolation Valves:

BOP e. Place EFW Flow Control Valves in MAN and close:

BOP g. Close Main Steam Line 2 Drains:

  • MS 120B NORMAL
  • BD 103B STM GEN 2 (OUT)
  • BD 102B STM GEN 2 (IN)

BOP i. Check main steam safety valves are closed.

Examiner Note This event is complete after the CRS has directed Steam Generator #2 to be isolated AND The ATC operator has commenced reducing RCS pressure Or As directed by the Lead Evaluator.

Scenario 1, Revision 0

Appendix D Scenario Outline Form ES-D-1 Facility: WATERFORD 3 Scenario No.: 2 Op Test No.: NRC Examiners: Operators:

Initial Conditions:

  • 100%, 125 EFPD, AB buses aligned to Train B.
  • Protected Train is B

Turnover:

  • Maintain 100 % power
  • Severe Thunderstorm Warning and Tornado Watch and in effect Event Malf. No. Event Type* Event No. Description 1 CV01B TS - SRO Charging Pump B trips C - ATC C - SRO 2 N/A TS - SRO Dry Cooling Tower Fan 8A reported with no oil in sight glass.

3 FW27M R - ATC Heater 5 and 6 A isolate on high level.

FW28M N - BOP Normal plant power reduction to < 72%.

N - SRO 4 RC04C M - All RCP 2A Shaft Shear with automatic trip initiated RD24 but correct alignment of trip breakers do not open.

I - ATC A,B,E,F Manual reactor trip.

I - SRO 5 RD11A-44 C-ATC 3 CEAs stick out on trip requiring Emergency RD11A-74 Boration C - SRO RD11A-68 6 ED01 M-All Loss of Off Site Power A, B, C, D 7 EG08B C- BOP EDG B fails to auto-start C - SRO

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Scenario 2 Rev 1

Scenario Event Description NRC Scenario 2 The crew assumes the shift at 100% power with instructions to maintain 100% power.

Emergency Diesel Generator A is out of service due to a cracked lube oil strainer valve.

Tech Spec 3.8.1.1 b and d have been entered. The turnover will include that the site is under a Severe Thunderstorm Warning and a Tornado Watch. All of the necessary actions of OP-901-521, Severe Weather and Flooding, have been accomplished.

After taking the shift, Charging Pump B will trip on motor overload. The crew should start Charging Pump AB or A and enter OP-901-112, Charging or Letdown Malfunction.

The CRS should enter Tech Spec 3.1.2.4 and TRM 3.1.2.4. Additionally, the crew will no longer be in compliance with Tech Spec 3.8.1.1 d, requiring action within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The CRS should direct the ATC to align Charging Pump AB to replace Charging Pump B and exit Tech Spec 3.1.2.4, comply with Tech Spec 3.8.1.1.b, and remain in TRM 3.1.2.4.

After the ATC aligns Charging Pump AB or at the lead examiners direction, the Outside Watch will call and report that during his rounds in the Dry Cooling Tower Area, he has discovered Dry Cooling Tower Fan 8A has a cracked oil housing and no oil is visible in the sight glass. The CRS should declare Dry Cooling Tower Fan 8A inoperable and enter Tech Spec 3.7.4 action c, which, due to the tornado watch, requires a shutdown if not restored in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

After the CRS identifies the correct Tech Spec, Heater 5A Normal Level Control Valve will fail closed. The rising level will cause Heaters 5A and 6A to isolate. Based on guidance from OP-003-034, Feed Heater Vents and Drains, the crew should determine the need to commence a normal plant shutdown in accordance with OP-010-005, Plant Shutdown, to lower Main Generator load to less than 893 MWe, 72% power. The ATC will perform Pressurizer boron equalization, direct Boration to the RCS, as well as ASI control with CEAs. The BOP will manipulate the Main Turbine controls to reduce load.

Once the crew has commenced the power reduction and lowered power to ~ 90%, or at the lead examiners discretion, Reactor Coolant Pump 2A will have a sheared shaft failure. The Plant Protection System will actuate, but 4 Reactor Trip Breakers will fail to open automatically. The crew should manually trip the reactor using the Diverse Reactor Trip System. After the reactor trip, 3 CEAs will fail to insert. The ATC should commence Emergency Boration in accordance with OP-901-103, Emergency Boration.

The crew will carry out the immediate operator actions of OP-902-000, Standard Post Trip Actions.

During the review of Standard Post Trip Actions, a Loss of Off Site Power will occur.

EDG B will fail to automatically start and have to be started manually by the BOP operator. The CRS should enter OP-902-003, Loss of Off Site Power/Loss of Forced Circulation Recovery. Once in OP-902-003, the CRS should direct the performance of OP-902-009, Standard Appendices, Appendix 20, Operation of DCT Sump Pumps. The scenario can be terminated after the CRS orders the performance of OP-902-009 Appendix 20 or at the lead examiners discretion.

Scenario 2 Rev 1

Scenario Event Description NRC Scenario 2 Critical Tasks

1. Manually trip the Reactor.

This task is satisfied by manually tripping the reactor within 1 minute of the failure of the automatic trip. The required task becomes applicable after the annunciators are received associated with the RCP 2A sheared shaft.

2. Establish reactivity control.

This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification. The required task becomes applicable after the Reactor is tripped and 2 CEAs remain stuck out following event 5.

3. Energize at least one vital electrical AC bus.

This task is satisfied by starting Emergency Diesel Generator B. This task becomes applicable following the loss of off site power triggered in event 7.

Scenario Quantitative Attributes

1. Total malfunctions (5-8) 6
2. Malfunctions after EOP entry (1-2) 2
3. Abnormal events (2-4) 2
4. Major transients (1-2) 2
5. EOPs entered/requiring substantive actions (1-2) 1
6. EOP contingencies requiring substantive actions (0-2) 1
7. Critical tasks (2-3) 3 Scenario 2 Rev 1

NRC Scenario 2 Scenario Notes:

A. Reset Simulator to IC-192.

B. Verify the following Scenario Malfunctions:

1. cv01b for Charging Pump B trip
2. rc04c for RCP 2A sheared shaft
3. rd24a for Reactor Trip Circuit Breaker 1 fail to open
4. rd24b for Reactor Trip Circuit Breaker 2 fail to open
5. rd24efor Reactor Trip Circuit Breaker 5 fail to open
6. rd24f for Reactor Trip Circuit Breaker 6 fail to open
7. rd11a44 for CEA 44 stuck
8. rd11a68 for CEA 68 stuck
9. ed01a for Off Site Feeder Breaker 7172 trip
10. ed01b for Off Site Feeder Breaker 7176 trip
11. ed01c for Off Site Feeder Breaker 7182 trip
12. ed01d for Off Site Feeder Breaker 7186 trip
13. eg10a for EDG A overspeed device
14. eg08b for EDG B fail to auto start
15. fw27m for Heater 5A NLCV
16. fw28m for Heater 5A ALCV C. Verify the following Annunciators
1. b_e07 for Dry Cooling Tower 1 level high
2. b_e08 for Dry Cooling Tower 2 level high D. Verify the following Overrides
1. egr27 for EDG B local alarm acknowledgement E. Verify the following Control Board Conditions:
1. Danger tag placed on EDG A control switch
2. Danger tag placed on EDG A Output Breaker F. Verify EDG A output breaker is racked out and place danger tags on EDG A and its output breaker.

G. Ensure Protected Train B sign is placed in SM office window.

H. Complete the simulator setup checklist.

Scenario 2 Rev 1

NRC Scenario 2 Simulator Booth Instructions Event 1 Charging Pump A Trips

1. On Lead Examiner's cue, initiate Event Trigger 1.
2. If called, the RCA should report a scent of burnt electrical components at Charging Pump B.
3. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 2 Dry Cooling Tower Fan 8A Failure

1. On Lead Examiner's cue, call 4100 and report indication of a cracked oil housing on DCT Fan 8A reduction gear and that there is no oil visible in the sight glass.
2. If Work Week Manager is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 3 Heater 5A NLCV Failure / Normal Plant Power Reduction

1. On Lead Examiner's cue, initiate Event Trigger 3.
2. When called, have the TGB Watch report that Heater 5A NLCV is closed and that you do not know why. You will investigate and report back.
3. If Work Week Manager or I&C is called, inform the caller that a work package will be assembled and a team will be sent to the Control Room.

Event 4 Reactor Coolant Pump 2A Sheared Shaft / Trip Failure

1. On Lead Examiner's cue, initiate Event Trigger 4.
2. If the Work Week Manager or Duty Plant Manager is called, inform the caller that they will make the necessary calls.

Event 5 CEA 74 and 68 Fail to Insert / Emergency Boration

1. No calls for this malfunction should occur.

Scenario 2 Rev 1

NRC Scenario 2 Event 6 Loss of Off Site Power

1. After the crew has completed Standard Post Tip Actions and on the Lead Examiner's cue, initiate Event Trigger 6.
2. If called as OSW watch report that a steady rain has been falling all shift.
3. If called to come to the Control Room to get a copy of OP-902-009, Appendix 20 for aligning the DCT Sump Pumps, report that you have a copy at the 314 Bus.

Event 8 Emergency Diesel Generator B fails to start

1. If called as RAB watch to check EDG B, initiate Trigger 9, and when the EDG B Trouble alarm is clear, report that it is running satisfactorily.

Scenario 2 Rev 1

NRC Scenario 2 Scenario Timeline:

Ramp Event Malfunction Severity Delay Trigger HH:MM:SS EPR09 A 1.5 N/A N/A N/A Precipitation at 1.5 inches per hour EGR29 A N/A NA NA N/A EDG A output breaker racked out EG10 A N/A NA NA N/A EDG A overspeed device pulled 1 CV01 B N/A N/A N/A 1 Charging Pump B trip 2 N/A N/A N/A N/A N/A Dry Cooling Tower Fan 8A failure 3 FW27 M 0% N/A N/A 3 FW28 M 35%

Isophase Bus Fan failure 4 RC04 C N/A N/A N/A 4 RCP 2A Sheared Shaft 4 RD24 A, B, N/A N/A N/A N/A E, F Reactor Trip Breakers 1, 2, 5, & 6 fail to open 5 RD11A 44 N/A N/A N/A N/A CEA 44 stuck out after reactor trip 5 RD11A 68 N/A N/A N/A N/A CEA 68 stuck out after trip 6 ED01 A, B, N/A N/A N/A 6 C, D Loss of Off Site Power 7 EG08 B N/A N/A N/A N/A EDG B Fail to Auto-start B_E07 N/A N/A 00:02:30 6 B_E08 00:04:00 Dry Cooling Tower 1 & 2 high level alarm Scenario 2 Rev 1

NRC Scenario 2

REFERENCES:

Event Procedures 1 OP-901-112, Charging or Letdown Malfunction Tech Spec 3.1.2.4, 3.8.1.1 TRM 3.1.2.4 2 Tech Spec 3.7.4 3 OP-003-034, Feed Heater Vents and Drains OP-500-001, Annunciator Response for Control Room Cabinet A OP-010-005, Plant Shutdown 4 OP-902-000, Standard Post Trip Actions OP-902-009, Standard Appendices, Appendix 1, Diagnostic Flow Chart 5 OP-901-103, Emergency Boration 6 OP-902-003, Loss of Off Site Power/Loss of Forced Flow OP-902-009, Standard Appendices, Appendix 20, Operation of Dry Cooling Tower Sump Pumps Scenario 2 Rev 1

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 1 Page 1 of 16 Event

Description:

Charging Pump B Trip Time Position Applicants Actions or Behavior Note All controls for the Charging manipulations are on CP-4 ATC Recognize and report indications of Charging Pump B trip.

Alarms:

  • Charging Pump B Trip/Trouble (Cabinet G, B-6)
  • Charging Pumps Header Flow Lo (Cabinet G, H-5)
  • Charging Pump B Not Available (Cabinet G, A-6)

Indications:

  • Charging flow and Charging Header pressure drop
  • Charging Pump B control switch indicates stop Examiner Note There are steps in off normal OP-901-112, Charging or Letdown Malfunction, to manually start a standby Charging Pump after verifying a suction path. It is acceptable for the CRS to direct this action prior to entering OP-901-112 to avoid isolating the Charging and Letdown system on high temperature.

If this is directed, the CRS should still enter OP-901-112 even after a Charging Pump is running.

CRS Enter and direct the implementation of OP-901-112, Charging or Letdown Malfunction.

CRS 1. Stop turbine load changes.

CRS 3. IF a Charging Malfunction is indicated, THEN go to Subsection E1, Charging Malfunction.

CRS should evaluate E0 and go to sub-section E1.

CRS Procedure Note If all Charging Pumps are secured, then LETDOWN STOP VALVE (CVC 101) will close on high REGEN HX TUBE OUTLET temperature if RCS is 470°F.

This condition is applicable to the plant conditions. Regen Heat Exchanger temperature will rise to the 470 °F setpoint. Time is available for the crew to take action prior to isolation.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 1 Page 2 of 16 Event

Description:

Charging Pump B Trip Time Position Applicants Actions or Behavior CRS Procedure Caution THE REACTOR COOLANT SYSTEM WILL BE BORATED IF A CHARGING PUMP IS STARTED WITH THE RWSP AS THE MAKEUP WATER SOURCE.

ATC 1. IF Charging Pumps have tripped, THEN perform the following:

1.1 Verify open EITHER VCT DISCH VALVE (CVC 183) OR RWSP TO CHARGING PUMP (CVC 507).

1.2 IF Letdown has NOT isolated, THEN attempt to restart Charging Pump(s).

1.3 IF the Charging Pump can NOT be restarted, THEN verify closed LETDOWN STOP VALVE (CVC 101).

1.4 IF the reason for the Charging pump trip is corrected AND Pressurizer level is in normal operating band, THEN place Charging and Letdown in service in accordance with OP-002-005, CHEMICAL AND VOLUME CONTROL.

  • The ATC operator should verify a Charging Pump suction path via CVC-183 prior to starting another Charging Pump. Either Charging Pump A or AB can be started. This action is typically directed by the CRS.
  • If the crew does not start another Charging Pump prior to Letdown isolating at 470 °F, then the crew should reestablish Charging and Letdown in accordance with OP-002-005.

CRS 2. IF normal Charging flow can NOT be established AND Pressurizer level falls below minimum Pressurizer level for operation in accordance with Attachment 1, Pressurizer Level Versus Tave Curve, THEN perform the following:

This step should not be applicable due to the duration of the malfunction.

Crew 3. IF the PMC is available, THEN display PMC Group CVCS and monitor Charging System parameters to determine cause of Charging malfunction.

This data can be retrieved by any member of the crew. PMC point D39704, CVCS CHG PMP MTR B OVLD TRIP and D39702, CVCS CHG PMP MTR B TRP/TRBL will provide indication of the electrical failure of Charging Pump B.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 1 Page 3 of 16 Event

Description:

Charging Pump B Trip Time Position Applicants Actions or Behavior CRS Evaluates Tech Spec and TRM 3.1.2.4 and enters both. Additionally, with Emergency Diesel A out of service, the crew will no longer be in compliance with Tech Spec 3.8.1.1.d.

Tech Spec 3.1.2.4 can be exited and 3.8.1.1.d complied with by aligning Charging Pump AB to replace B for SIAS.

The CRS should remain in TRM 3.1.2.4 after this operation.

ATC Align Charging Pump AB to replace B on SIAS by aligning the Pump AB Assignment switch to the B position on CP-4.

CRS Exit Tech Spec 3.1.2.4 and determine compliance with Tech Spec 3.8.1.1.d.

Crew must remain in TRM 3.1.2.4.

Examiner Note This event is complete after Charging Pump AB is aligned to replace Charging Pump B Or As directed by the Lead Evaluator Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 2 Page 4 of 16 Event

Description:

Dry Cooling Tower Dry Fan 8A failure Time Position Applicants Actions or Behavior This failure is called in by the Outside Watch for the purpose of evaluating Tech Spec 3.7.4. The simulator operator will call the CRS on cue from the Lead Examiner.

CRS On receiving information regarding DCT Fan 8A, evaluates Tech Spec 3.7.4.

Crew A member of the crew should determine that DCT Fan 8A is under the missile shield.

CRS Determine that with a fan under the missile shield inoperable during a tornado watch (provided during the turnover), entry into Tech Spec 3.7.4.c is required.

This is a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> shutdown action. The tornado watch will not expire before this action is required. The crew will not perform a shutdown before the next malfunction is inserted.

Examiner Note This event is complete when the CRS has completed addressing Tech Specs Or As directed by the Lead Evaluator Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 5 of 16 Event

Description:

5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicants Actions or Behavior BOP Recognize and report indications of Heater 5A Normal Level Control Valve failure.

Alarms:

  • Heater 5A Level Hi-Hi (Cabinet A, B-8)
  • Heater 5A Level Hi/Lo (Cabinet A, C-8)
  • Heater 5A Alt Drain Vlv Open (Cabinet A, D-8)

Indications:

  • Heater 5A level rising on the Plant Monitoring Computer
  • Heater 5A & 6A isolate when CD-189 A and CD-175 A close on CP-13 Examiner Note The annunciator response refers to OP-003-034, Feed Heater Vents and Drains. It directs a power reduction to 893 MWe, 72% power.

BOP Report guidance from OP-500-001, Annunciator Response for Control Room Panel A:

1.4 Review OP-003-034, Feed Heater Vents and Drains, for Power Limitations associated with FHD Heater Strings out of service.

CRS Refer to OP-003-034, Feed Heater Vents and Drains.

CRS Limitation 3.2.1 Utilize the following table to determine the maximum allowed power level with the listed FW Heater(s) out of service.

OOS Condition Bypass Open Bypass Closed Any Single IP or LP Heater (Note 1) 893 MWe (72%) 893 MWe (72%)

CRS should conclude a power reduction to 72% is required.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 6 of 16 Event

Description:

5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicants Actions or Behavior CRS Enters OP-010-005, Plant Shutdown.

CRS Procedure Note (1) Because of the absence of adequate airflow across the installed thermocouples while in this alignment, computer points A58010, A58011, and A58012 should not be used to monitor Isophase Bus return air for temperature. Utilize a Pyrometer or equivalent to measure Isophase Bus Air exhaust temperature.

(2) Isophase Bus return air temperature should not be allowed to rise above 158 °F.

Note The CRS should direct the TGB Watch to perform steps 1.2 through 1.6.

The watch will acknowledge the order and reply that he will get the procedure and start walking down the evolution. This task will not get accomplished during the scenario.

Crew 9.1.2 Prior to commencing power reduction, notify Load Dispatcher.

Crew 9.1.3 Announce to Station Personnel that a power reduction is in progress over the Plant Paging System.

Crew 9.1.4 Maintain RCS Cold Leg Temperature 536 °F to 549 °F.

ATC 9.1.5 Perform Boron Equalization as follows:

  • Place available Pressurizer Pressure Backup Heater Control Switches to ON.
  • Reduce Pressurizer Spray Valve Controller (RC-IHIC-0100) setpoint potentiometer to establish spray flow and maintain RCS pressure 2250 PSIA (2175 - 2265).

This manipulation is performed at CP-2.

Note There is a procedure note describing what power indications are preferred for certain power ranges. The CRS should review this note, but the power reduction will not be carried out long enough to see this exercised.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 7 of 16 Event

Description:

5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicants Actions or Behavior ATC Begin Direct Boration as follows:

6.7.2 At SM/CRS discretion, calculate volume of Boric Acid to be added on Attachment 11.6, Calculation of Boric Acid Volume for Direct Boration or VCT Borate Makeup Mode.

These manipulations are performed at CP-4. The ATC should use the Reactivity Worksheet to recommend a boron quantity to the CRS.

6.7.3 Set Boric Acid Makeup Batch Counter to volume of Boric Acid desired.

The steps for setting the Boric Acid counter are not contained in this step. The ATC operator should press the UP arrow button, the ENTER button, enter the quantity of acid desired, press the ENTER button, and press the RESET button.

6.7.4 Verify Boric Acid Makeup Pumps selector switch aligned to desired Boric Acid Makeup Pump A(B).

6.7.5 Place Direct Boration Valve, BAM-143, control switch to AUTO.

6.7.6 Place Makeup Mode selector switch to BORATE.

6.7.7 Verify selected Boric Acid Makeup Pump A(B) Starts.

6.7.8 Verify Direct Boration Valve, BAM-143, Opens.

Procedure Note The Boric Acid Flow Totalizer will not register below 3 GPM. The Boric Acid Flow Totalizer is most accurate in the range of 10 - 25 GPM.

6.7.9.1 Verify Boric Acid Flow controller, BAM-IFIC-0210Y, in Manual.

6.7.9.2 Adjust Boric Acid Flow controller, BAM-IFIC-0210Y, output to >3 GPM flow rate.

6.7.11 Verify Boric Acid Makeup Control Valve, BAM-141, Intermediate or Open.

6.7.12 Observe Boric Acid flow rate for proper indication.

BOP Commence Turbine load reduction by performing the following:

6.2.1.1 Depress LOAD/RATE MW/MIN pushbutton.

6.2.1.2 Depress appropriate numerical pushbuttons for desired load rate.

6.2.1.3 Depress ENTER pushbutton.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 8 of 16 Event

Description:

5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicants Actions or Behavior Procedure Note Prior to changing Reference Demand, Main Turbine load must not be changing.

6.2.2.1 Depress REF pushbutton.

6.2.2.2 Depress appropriate numerical pushbuttons for desired MW load.

6.2.2.3 Depress ENTER pushbutton.

6.2.2.4 Depress GO pushbutton.

6.2.2.5 Verify Turbine load change stops at the desired MW load.

This manipulation is performed at CP-1. These steps are from OP-005-007, Main Turbine and Generator. The BOP will set up the Main Turbine controls. The ATC will direct the BOP when to commence unloading the Main Turbine based on the drop in RCS Cold Leg temperature.

CRS / ATC Procedure Caution CONTROL RODS SHOULD NEVER BE WITHDRAWN OR MANUALLY INSERTED EXCEPT IN A DELIBERATE CAREFULLY CONTROLLED MANNER WHILE CLOSELY MONITORING THE REACTORS RESPONSE.

ATC Operate CEAs to maintain ASI using CEA Reg. Group 6 or Group P Control Element Assemblies.

Steps are contained in OP-004-005, Control Element Drive. Group P should be used first to a low limit of 120 inches, followed by CEA Group 6 to a low limit of 120 inches to comply with Tech Spec 3.1.3.6.

This manipulation is performed at CP-2.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 3 Page 9 of 16 Event

Description:

5A Normal Level Control Valve Failure / Plant shutdown Time Position Applicants Actions or Behavior Operate CEAs in Manual Group mode as follows:

6.7.1 Verify Plant Monitoring Computer operable in accordance with OP-004-012, Plant Monitoring Computer.

6.7.2 Position Group Select switch to desired group.

6.7.3 Place Mode Select switch to MG and verify the following:

  • White lights Illuminated on Group Selection Matrix for selected group
  • MG light Illuminates 6.7.4 Operate CEA Manual Shim switch to INSERT group to desired height while monitoring the following:
  • CEA Position Indicator selected CEA group is moving in desired direction If Reactor is critical, then monitor the following:
  • Reactor Power
  • Axial Shape Index (ASI)

Procedure Note The Operator should remain in the area in front of the CEA Drive Mechanism Control Panel when the Mode Select switch is not in OFF.

6.7.5 When desired set of moves have been completed, then place Mode Select switch to OFF.

Crew 9.1.9 When reactor power consistently indicates less than 98% power, as indicated on computer point C24631, MAIN STEAM RAW POWER (MSBSRAW), or an alternate point provided by Reactor Engineering, then verify the value of C24648, BSCAL SMOOTHING VAL. APPLD (DUMOUT17), automatically changes to 1.

Examiner Note This event is complete when the desired power reduction has been accomplished Or As directed by the Lead Evaluator Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4/5 Page 10 of 16 Event

Description:

RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time Position Applicants Actions or Behavior ATC Recognize and report indications of Reactor Coolant Pump 2A shaft shear and failure of the automatic trip.

Alarms:

  • RCP 2A Vibration Hi (Cabinet H, A-8)
  • RPS Channel Trip Local Power Density Hi (Cabinet K, A-11)
  • RPS Channel Trip DNBR Lo (Cabinet K, A-12)
  • RPS Channel Trip Coolant Flow Lost (Cabinet K, D-12)

Indications:

  • RCP 2A pressure and amps dropping
  • 4 Reactor Trip Circuit Breakers closed Critical Task Manually trip the Reactor.

This task is satisfied by establishing manually tripping the reactor within 1 minute of the failure of the automatic trip..

ATC Trip the Reactor using Diverse Reactor Trip pushbuttons at CP-2 The CRS may direct this operation, but the ATC operator should not request permission or wait for direction to perform this action.

ATC Recognize and report indications of 2 CEAs failure to insert.

Indications:

  • CEA 74 and CEA 68 rod bottom lights not illuminated
  • CEA 74 and CEA 68 upper electrical limit lights illuminated Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4/5 Page 11 of 16 Event

Description:

RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time Position Applicants Actions or Behavior CRS Direct direct ATC and BOP to carry out Standard Post trip Actions.

ATC Determine Reactivity Control acceptance criteria are met:

  • Check reactor power is dropping.
  • Check startup rate is negative.
  • Check less than TWO CEAs are NOT fully inserted.

Critical Task Establish reactivity control.

This task is satisfied by establishing Emergency Boration prior to completing Standard Post Trip Actions Reactivity Control verification.

ATC Determine 2 CEAs are stuck out and commence Emergency Boration:

1. Place Makeup Mode selector switch to MANUAL.
2. Align borated water source by performing one of the following:
a. Initiate Emergency Boration using Boric Acid Pump as follows:
  • Open Emergency Boration Valve, BAM-133.

o BAM-126A Boric Acid Makeup Pump Recirc Valve A o BAM-126B Boric Acid Makeup Pump Recirc Valve B OR

b. Initiate Emergency Boration using Gravity Feed as follows:
  • Open the following Boric Acid Makeup Gravity Feed valves:

o BAM-113A Boric Acid Makeup Gravity Feed Valve A o BAM-113B Boric Acid Makeup Gravity Feed Valve B

3. Close VCT Disch Valve, CVC-183.
4. Verify at least one Charging Pump operating and Charging Header flow 40 GPM.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4/5 Page 12 of 16 Event

Description:

RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time Position Applicants Actions or Behavior BOP Determine Maintenance of Vital Auxiliaries acceptance criteria are met:

Check the Main Turbine is tripped:

  • Governor valves closed
  • Throttle valves closed BOP Check the Main Generator is tripped:
  • GENERATOR BREAKER A tripped
  • GENERATOR BREAKER B tripped
  • EXCITER FIELD BREAKER tripped BOP Check station loads are energized from offsite electrical power as follows:

Train A

  • A1, 6.9 KV non safety bus
  • A-DC electrical bus
  • A or C vital AC Instrument Channel Train B
  • B1, 6.9 KV non safety bus
  • B-DC electrical bus B or D vital AC Instrument Channel ATC Determine RCS Inventory Control acceptance criteria are met:

Check that the following conditions exist:

  • Pressurizer level is 7% to 60%
  • Pressurizer level is trending to 33% to 60%
  • Check RCS subcooling is greater than or equal to 28ºF.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4/5 Page 13 of 16 Event

Description:

RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time Position Applicants Actions or Behavior ATC Determine RCS Pressure Control acceptance criteria are met by checking that BOTH of the following conditions exist:

  • Pressurizer pressure is 1750 psia to 2300 psia
  • Pressurizer pressure is trending to 2125 psia to 2275 psia ATC Determine Core Heat Removal acceptance criteria are met:
  • Check at least one RCP is operating.
  • Check operating loop T is less than 13ºF.
  • Check RCS subcooling is greater than or equal to 28ºF.

BOP Determine RCS Heat Removal acceptance criteria are met:

Check that at least one steam generator has BOTH of the following:

  • Main Feedwater is available to restore level within 50%-70% NR.

ATC Check RCS TC is 530ºF to 550ºF BOP Check steam generator pressure is 885 psia to 1040 psia.

BOP Check Feedwater Control in Reactor Trip Override:

  • MAIN FW REG valves are closed
  • STARTUP FW REG valves are 13% to 21% open
  • Operating main Feedwater pumps are 3800 rpm to 4000 rpm BOP Reset moisture separator reheaters, and check the temperature control valves closed.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 4/5 Page 14 of 16 Event

Description:

RCP Shaft Shear with ATWS / Manual Reactor Trip / 2 CEAs Fail to Insert on Trip Time Position Applicants Actions or Behavior ATC Determine Containment Isolation acceptance criteria are met:

  • Check containment pressure is less than 16.4 psia.
  • Check NO containment area radiation monitor alarms OR unexplained rise in activity.
  • Check NO steam plant activity monitor alarms OR unexplained rise in activity.

BOP Determine Containment Temperature and Pressure Control acceptance criteria are met:

  • Check containment temperature is less than or equal to 120ºF.
  • Check containment pressure is less than 16.4 psia.

CRS After review of Standard Post Trip Actions, use Diagnostic Flow Chart of OP-902-009 to select appropriate optimal recovery procedure.

  • Proper use of chart will result in use of OP-902-001 Examiner Note This event is complete when the ATC and BOP operators report that they have completed Standard Post Trip Actions and when the CRS commences the review Or As directed by the Lead Evaluator.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 6/7 Page 15 of 16 Event

Description:

Loss of Off Site Power / Failure of Emergency Diesel Generator B to Auto Start Time Position Applicants Actions or Behavior Crew Alarms

  • Multiple alarms associated with Loss of Off Site Power Indications

Critical Task Energize at least one vital electrical AC bus.

This task is satisfied by starting Emergency Diesel Generator B.

BOP Start Emergency Diesel Generator B at CP-1.

CRS Complete OP-902-009, Attachment 1, Diagnostic Flowchart.

  • Proper use of chart will result in use of OP-902-003, Loss of Off Site Power/Loss of Forced Flow Recovery.

Crew 1. Confirm diagnosis of a Loss of Offsite Power or a Loss of Forced Circulation by checking Safety Function Status Check Acceptance Criteria are satisfied.

Crew 2. Announce a Loss of Offsite Power or a Loss of Forced Circulation is in progress using the plant page.

CRS 3. Advise the Shift Manager to REFER TO EP-001-001, "Recognition &

Classification of Emergency Condition" and implement the Emergency Plan.

CRS 4. IF power has been interrupted to either 3A or 3B safety buses, THEN perform Appendix 20, "Operation of DCT Sump Pumps" CRS should direct this action to a non-licensed operator.

Scenario 2, Revision 0

Appendix D Required Operator Actions Form ES-D-2 Op Test No.: NRC Scenario # 2 Event # 6/7 Page 16 of 16 Event

Description:

Loss of Off Site Power / Failure of Emergency Diesel Generator B to Auto Start Time Position Applicants Actions or Behavior BOP 6. IF offsite power has been lost, THEN verify the sequencer has timed out for at least one 4.16KV safety bus.

BOP 7. Check a CCW pump is operating for each energized 4.16KV safety bus.

CRS / BOP 8. IF offsite power has been lost, THEN:

a. Verify MSIVs are closed.
b. Verify following steam generator blowdown isolation valves are closed:
  • BD 102A, SG BLOWDOWN ISOL STM GEN 1 (IN)
  • BD 102B, SG BLOWDOWN ISOL STM GEN 2 (IN)
  • BD 103A, SG BLOWDOWN ISOL STM GEN 1 (OUT)
  • BD 103B, SG BLOWDOWN ISOL STM GEN 2 (OUT)

This step is marked such that the CRS can move this forward at his discretion. This step could be performed prior to directing the restoration of the Dry Cooling Tower Sump Pumps.

Examiner Note This event is complete after directing performance of Appendix 20 to restore the Dry Cooing Tower Sump Pumps Or As directed by the Lead Evaluator.

Scenario 2, Revision 0