ML14239A029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:PUBLIC SUBMISSION 6 Page 1 of 1 As of: August 22, 2014 Received:
August 21, 2014 Status: PendingPost Tracking No. ljy-8dxa-nioi Comments Due: August 21, 2014 Submission Type: Web Docket: NRC-2014-0169 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Comment On: NRC-2014-0169-0001 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Document:
NRC-2014-0169-DRAFT-0001 Comment on FR Doc # 2014-17257 Submitter Information Name: Anthony Leshinskie Address: State of Vermont, Public Service Department 112 State Street Montpelier, VT, 05620-2601 Email: Anthony.Leshinskie
@state.vt.us
~17ýTnD NJ NJ"-'1 m:, General Comment See attached PDF for comments.Attachments ENVY BVY 14-018 Public Period Comments PSD-ARL to NRC SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 Add= -;,n https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=0900006481839cf8&for...
08/22/2014 4V142?P.V VERMONT State of Vermont Department of Public Service [phone] 802-828-2811 112 State Street [fax] 802-828-2342 Drawer 20 [tty] 800-734-8390 Montpelier, VT 05620-2601 http://www.publicservice.vermont.gov August 21, 2014 Docket ID NRC-2014-0169 Comments from the Vermont Public Service Department regarding the following License Amendment Request published in the Federal Register on July 22, 2014: ENTERGY NUCLEAR VERMONT YANKEE, LLC & ENTERGY NUCLEAR OPERATIONS, INC., DOCKET NO. 50-271, VERMONT YANKEE NUCLEAR POWER STATION, VERNON, VT.Date of amendment request: March 24, 2014. A publicly available version is in ADAMS under Accession No. ML14085A257.
Description of amendment request: The proposed amendment would revise the site emergency plan for the permanently defueled condition to reflect changes in the on-shift staffing and Emergency Response Organization staffing.Gentlemen:
The subject Vermont Yankee License Amendment Request (LAR) has been reviewed by the State Nuclear Engineer and Decommissioning Coordinator on behalf of the State of Vermont and its Public Service Department.
Comments from this review are summarized in the table included in this letter and are respectfully submitted for Nuclear Regulatory Commission consideration as it examines the merits of this LAR as part of the Safety Evaluation Report process for Vermont Yankee.Please note that this review of the LAR was made with regard only to the interactions of the Public Service Department with Vermont Yankee On-Shift and Emergency Response Organization staff during an Emergency Response Condition.
It is likely that other State of Vermont Agencies (e.g. the Division of Emergency Management and Homeland Security or the Department of Health) that also interact with the Vermont Yankee On-Shift and Emergency Response Organization staff will provide their own comments on this LAR.The Public Service Department comments on the LAR (ADAMS Accession No. ML14085A257) are as follows: A Comment Attachment Section # /# # Description Comment 1 1 5.2.4.2 In justifying elimination of the Technical Support Center (TSC) Reactor Engineer position, the first Analysis paragraph implies that the Reactor Engineer's function can be performed by the Shift Technical Advisor (STA). The STA position is also being eliminated (per Section 5.2.4.1).Eliminating the Reactor Engineer position should not rely on another ERO or On-Shift Staffing position that is also being eliminated.
Provide an alternate justification or reinstate the TSC Reactor Engineer position.2 1 1 The discussion that identifies the post-shutdown on-shift staff positions describes a total of 6 positions.
Subsequent discussion in Sections I & II of Attachment 4 (&Figure 8.1 of Attachment
: 3) indicates that the minimum post-shutdown number of staff is 7 or 8, depending upon whether 1 of 2 Fire Brigade positions is assigned to Radiation Protection Technician.
Attachment 1 makes no mention of the 2 required Fire Brigade positions in its on-shift staff summary.To avoid confusion on the minimum staff requirements, either mention these positions in the Attachment 1 summary or at least note that additional minimum required positions are discussed in Attachments 3 & 4. (This comment also applies to Attachment 2, Pages 4 & 6 text and Attachment 3, Section 8.1 text.)3 2 Table 8.4 -Do the 2 Fire Brigade positions noted in Comment #2 need to Page 2 of 2 be noted here?text 4 4 Sections While the Station Blackout (SBO) rule clearly applies to IV.C.1 & VI operating power reactors, a brief statement indicating that the Control Room and Spent Fuel Pool-related systems at the permanently shut down Vermont Yankee station will have a means to receive electric power in the event of a loss of offsite electric power is still necessary.
This statement should indicate what on-site systems will remain available to supply this back-up power source (e.g. the SBO Diesel Generator).
Alternatively, indicate what subsequent documentation will discuss back-up power sources.5 4 Sections While I concur that the described Control Room fire is the IV.C.2 & VI limiting scenario for this type of design basis accident, some discussion is necessary to demonstrate that fire protection remains in place for the entire Vermont Yankee site to assure that the Spent Fuel Pool and its associated support systems are not compromised in the event of a fire anywhere on-site.Alternatively, indicate what subsequent documentation will discuss on-site fire protection..oJ ERMor Comment Attachment Section # /# # Description Comment 6 4 I1.C.9 & The Time Motion Studies (TMS) included in this Attachment Subsequent assume that Vermont Yankee's Emergency Response Data E-Plan System (ERDS) link to the NRC will not be operational in the Tables permanently shut down and defueled condition.
ERDS is specifically identified in Vermont's Radiological Emergency Response Plan (RERP) as the means for the Public Service Coordinator, located at the State Emergency Operations Center (SEOC) during an emergency response condition, to assess Vermont Yankee conditions as part of Vermont's protective action decision-making process. While it is recognized that many of the ERDS parameters (e.g. those related to the Reactor Coolant System and Safety Injection) are meaningless once Vermont Yankee is in a permanently shut down and defueled condition, the ERDS Radiation Monitoring System, Meteorological Data and Containment parameters related to the Spent Fuel Pool will still provide meaningful information.
As a result, the State of Vermont requires that either 1) the ERDS link to the NRC be retained during Vermont Yankee's permanently shut down and defueled period or 2) an alternate means similar to ERDS is made available to provide equivalent Radiation Monitoring System, Meteorological information and Containment parameters relevant to the Spent Fuel Pool conditions for as long as fuel remains within the Spent Fuel Pool.NRC or Vermont Yankee questions regarding these comments may be directed to the Vermont State Nuclear Engineer and Decommissioning Coordinator via the contact information included with the electronic signature below.Regards, Is/ Anthony R. Leshinskie Anthony R. Leshinskie State Nuclear Engineer & Decommissioning Coordinator State of Vermont Public Service Department 112 State Street Montpelier, VT 05620-2601 Anthony. Leshinskie@state.vt.us JIIII'1,V
ýYERM, r}}

Latest revision as of 13:30, 9 July 2018

Comment (1) of Anthony Leshinskie on Behalf of State of VT, Dept of Public Service, on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
ML14239A029
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/21/2014
From: Leshinakie A R
State of VT, Dept of Public Service
To:
Rules, Announcements, and Directives Branch
SECY RAS
References
79FR42539 00001, NRC-2014-0169
Download: ML14239A029 (4)


Text

PUBLIC SUBMISSION 6 Page 1 of 1 As of: August 22, 2014 Received:

August 21, 2014 Status: PendingPost Tracking No. ljy-8dxa-nioi Comments Due: August 21, 2014 Submission Type: Web Docket: NRC-2014-0169 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Comment On: NRC-2014-0169-0001 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Document:

NRC-2014-0169-DRAFT-0001 Comment on FR Doc # 2014-17257 Submitter Information Name: Anthony Leshinskie Address: State of Vermont, Public Service Department 112 State Street Montpelier, VT, 05620-2601 Email: Anthony.Leshinskie

@state.vt.us

~17ýTnD NJ NJ"-'1 m:, General Comment See attached PDF for comments.Attachments ENVY BVY 14-018 Public Period Comments PSD-ARL to NRC SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 Add= -;,n https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=0900006481839cf8&for...

08/22/2014 4V142?P.V VERMONT State of Vermont Department of Public Service [phone] 802-828-2811 112 State Street [fax] 802-828-2342 Drawer 20 [tty] 800-734-8390 Montpelier, VT 05620-2601 http://www.publicservice.vermont.gov August 21, 2014 Docket ID NRC-2014-0169 Comments from the Vermont Public Service Department regarding the following License Amendment Request published in the Federal Register on July 22, 2014: ENTERGY NUCLEAR VERMONT YANKEE, LLC & ENTERGY NUCLEAR OPERATIONS, INC., DOCKET NO. 50-271, VERMONT YANKEE NUCLEAR POWER STATION, VERNON, VT.Date of amendment request: March 24, 2014. A publicly available version is in ADAMS under Accession No. ML14085A257.

Description of amendment request: The proposed amendment would revise the site emergency plan for the permanently defueled condition to reflect changes in the on-shift staffing and Emergency Response Organization staffing.Gentlemen:

The subject Vermont Yankee License Amendment Request (LAR) has been reviewed by the State Nuclear Engineer and Decommissioning Coordinator on behalf of the State of Vermont and its Public Service Department.

Comments from this review are summarized in the table included in this letter and are respectfully submitted for Nuclear Regulatory Commission consideration as it examines the merits of this LAR as part of the Safety Evaluation Report process for Vermont Yankee.Please note that this review of the LAR was made with regard only to the interactions of the Public Service Department with Vermont Yankee On-Shift and Emergency Response Organization staff during an Emergency Response Condition.

It is likely that other State of Vermont Agencies (e.g. the Division of Emergency Management and Homeland Security or the Department of Health) that also interact with the Vermont Yankee On-Shift and Emergency Response Organization staff will provide their own comments on this LAR.The Public Service Department comments on the LAR (ADAMS Accession No. ML14085A257) are as follows: A Comment Attachment Section # /# # Description Comment 1 1 5.2.4.2 In justifying elimination of the Technical Support Center (TSC) Reactor Engineer position, the first Analysis paragraph implies that the Reactor Engineer's function can be performed by the Shift Technical Advisor (STA). The STA position is also being eliminated (per Section 5.2.4.1).Eliminating the Reactor Engineer position should not rely on another ERO or On-Shift Staffing position that is also being eliminated.

Provide an alternate justification or reinstate the TSC Reactor Engineer position.2 1 1 The discussion that identifies the post-shutdown on-shift staff positions describes a total of 6 positions.

Subsequent discussion in Sections I & II of Attachment 4 (&Figure 8.1 of Attachment

3) indicates that the minimum post-shutdown number of staff is 7 or 8, depending upon whether 1 of 2 Fire Brigade positions is assigned to Radiation Protection Technician.

Attachment 1 makes no mention of the 2 required Fire Brigade positions in its on-shift staff summary.To avoid confusion on the minimum staff requirements, either mention these positions in the Attachment 1 summary or at least note that additional minimum required positions are discussed in Attachments 3 & 4. (This comment also applies to Attachment 2, Pages 4 & 6 text and Attachment 3, Section 8.1 text.)3 2 Table 8.4 -Do the 2 Fire Brigade positions noted in Comment #2 need to Page 2 of 2 be noted here?text 4 4 Sections While the Station Blackout (SBO) rule clearly applies to IV.C.1 & VI operating power reactors, a brief statement indicating that the Control Room and Spent Fuel Pool-related systems at the permanently shut down Vermont Yankee station will have a means to receive electric power in the event of a loss of offsite electric power is still necessary.

This statement should indicate what on-site systems will remain available to supply this back-up power source (e.g. the SBO Diesel Generator).

Alternatively, indicate what subsequent documentation will discuss back-up power sources.5 4 Sections While I concur that the described Control Room fire is the IV.C.2 & VI limiting scenario for this type of design basis accident, some discussion is necessary to demonstrate that fire protection remains in place for the entire Vermont Yankee site to assure that the Spent Fuel Pool and its associated support systems are not compromised in the event of a fire anywhere on-site.Alternatively, indicate what subsequent documentation will discuss on-site fire protection..oJ ERMor Comment Attachment Section # /# # Description Comment 6 4 I1.C.9 & The Time Motion Studies (TMS) included in this Attachment Subsequent assume that Vermont Yankee's Emergency Response Data E-Plan System (ERDS) link to the NRC will not be operational in the Tables permanently shut down and defueled condition.

ERDS is specifically identified in Vermont's Radiological Emergency Response Plan (RERP) as the means for the Public Service Coordinator, located at the State Emergency Operations Center (SEOC) during an emergency response condition, to assess Vermont Yankee conditions as part of Vermont's protective action decision-making process. While it is recognized that many of the ERDS parameters (e.g. those related to the Reactor Coolant System and Safety Injection) are meaningless once Vermont Yankee is in a permanently shut down and defueled condition, the ERDS Radiation Monitoring System, Meteorological Data and Containment parameters related to the Spent Fuel Pool will still provide meaningful information.

As a result, the State of Vermont requires that either 1) the ERDS link to the NRC be retained during Vermont Yankee's permanently shut down and defueled period or 2) an alternate means similar to ERDS is made available to provide equivalent Radiation Monitoring System, Meteorological information and Containment parameters relevant to the Spent Fuel Pool conditions for as long as fuel remains within the Spent Fuel Pool.NRC or Vermont Yankee questions regarding these comments may be directed to the Vermont State Nuclear Engineer and Decommissioning Coordinator via the contact information included with the electronic signature below.Regards, Is/ Anthony R. Leshinskie Anthony R. Leshinskie State Nuclear Engineer & Decommissioning Coordinator State of Vermont Public Service Department 112 State Street Montpelier, VT 05620-2601 Anthony. Leshinskie@state.vt.us JIIII'1,V