ML16126A194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 20: Line 20:


==Subject:==
==Subject:==
 
R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 50-244 Report of Facility Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04 The subject report is hereby submitted as required by 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 50-244 Report of Facility  
: Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04 The subject report is hereby submitted as required by 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
The enclosed report (Attachment  
The enclosed report (Attachment  
: 1) contains descriptions and summaries of the 1 O CFR 50.59 or 1 O CFR 72.48 evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from July 2014 through March 2016, performed under the provisions of 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
: 1) contains descriptions and summaries of the 1 O CFR 50.59 or 1 O CFR 72.48 evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from July 2014 through March 2016, performed under the provisions of 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
Also included is a report with a summary of commitment changes performed in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment changes" during the period from July 2014 through March 2016 that have not been previously provided to the NRC. There are no new regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at (315) 791-5219.
Also included is a report with a summary of commitment changes performed in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment changes" during the period from July 2014 through March 2016 that have not been previously provided to the NRC. There are no new regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at (315) 791-5219.
JP/kh Attachments:  
JP/kh Attachments:  
(1) Report of Facility  
(1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 1 O CFR 72.48 (2) Report of Commitment Changes from July 2014 through Performed in Accordance with NEI 99-04 March 2016 YJRZ April 29, 2016 Page2 cc: NRG Regional Administrator, Region 1 NRG Project Manager, Ginna NRG Resident Inspector, Ginna Attachment (1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRG Approval from July 2014 through March 2016, under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: 5059EVAL-2014-0001 Title of Change: Containment Air Temperature Increase and Associated  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 1 O CFR 72.48 (2) Report of Commitment Changes from July 2014 through Performed in Accordance with NEI 99-04 March 2016 YJRZ April 29, 2016 Page2 cc: NRG Regional Administrator, Region 1 NRG Project Manager, Ginna NRG Resident Inspector, Ginna Attachment (1) Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRG Approval from July 2014 through March 2016, under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: 5059EVAL-2014-0001 Title of Change: Containment Air Temperature Increase and Associated  
---Charfges ----Implementation Document:
---Charfges ----Implementation Document:
ECP-13-000048 Description of Change: ECP-13-000048 increa$ed the allowable containment average air temperature during normal operation from. 120 °F to 125 °F, which was addressed in NRC safety evaluation for Ginna License Amendment 116. This current 50.59 evaluation specifically evaluates changes and impacts that were not addressed in the NRC safety evaluation for Ginna License Amendment 116. Evaluation Summary:
ECP-13-000048 Description of Change: ECP-13-000048 increa$ed the allowable containment average air temperature during normal operation from. 120 °F to 125 °F, which was addressed in NRC safety evaluation for Ginna License Amendment 116. This current 50.59 evaluation specifically evaluates changes and impacts that were not addressed in the NRC safety evaluation for Ginna License Amendment 116. Evaluation Summary: The Ginna reactor containment average air temperature limit during n*ormal operation was increased from 120°F to 125°F. The allowable minimum containment spray flow rate was reduced, and updates to the EQ and LBLOCA dose analyses were made to accommodate the former changes and inaccurate spray removal coefficients.
The Ginna reactor containment average air temperature limit during n*ormal operation was increased from 120°F to 125°F. The allowable minimum containment spray flow rate was reduced, and updates to the EQ and LBLOCA dose analyses were made to accommodate the former changes and inaccurate spray removal coefficients.
The increase in temperature from 120°F to 125°F was subject to NRC approval.
The increase in temperature from 120°F to 125°F was subject to NRC approval.
For the changes not approved by the NRC, evaluations have been completed to ensure all systems, structures and components that are in containment or interact with containment or the containment spray system will continue to perform the specified design function as described within the UFSAR. In addition, evaluations have demonstrated that no Design Basis limits will be exceeded, and the changes are consistent with UFSAR methods of evaluation.
For the changes not approved by the NRC, evaluations have been completed to ensure all systems, structures and components that are in containment or interact with containment or the containment spray system will continue to perform the specified design function as described within the UFSAR. In addition, evaluations have demonstrated that no Design Basis limits will be exceeded, and the changes are consistent with UFSAR methods of evaluation.
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 1of4 Report of Facility  
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 1of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-001 Title of Change: Turbine Stop, Intercept, and Reheater Stop Valve Testing Extension Implementation Document:
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-001 Title of Change: Turbine Stop, Intercept, and Reheater Stop Valve Testing Extension Implementation Document:
ECP-15-000379 Description of Change: The activity extends the operational testing interval of the high-pressure turbine stop valves and the reheater intercept and reheater stop valves from 12 months to a frequency of 440 days. Evaluation Summary: Ginna has established an UFSAR specified regulatory commitment to test high-pressure turbine stop valves, reheater intercept valves, and reheater stop valves annually (i.e. 12 months). MPR Calculation 0236-0070-01 concluded that the overall probability of a turbine missile ejection event as a function of 14.5 month testing (i.e. 441.3 days) is at the NRC acceptance criterion of 1 E-05 (Yr. -1 ). Regulatory Guide 1.115 requires that plants maintain an annual turbine missile probability less than 1 E-05 (Yr.-1 ). Therefore, turbine valve testing shall occur at a frequency of 440 days. Maintaining a turbine missile probability less than *1 E-05 (Yr.-1) provides assurance that the turbine overspeed protection system will function as designed thereby limiting the likelihood of overspeed past design conditions.
ECP-15-000379 Description of Change: The activity extends the operational testing interval of the high-pressure turbine stop valves and the reheater intercept and reheater stop valves from 12 months to a frequency of 440 days. Evaluation Summary:
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 2 of 4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-002 Title of Change: Implementation of WCAP-12610-P-A  
Ginna has established an UFSAR specified regulatory commitment to test high-pressure turbine stop valves, reheater intercept valves, and reheater stop valves annually (i.e. 12 months).
MPR Calculation 0236-0070-01 concluded that the overall probability of a turbine missile ejection event as a function of 14.5 month testing (i.e. 441.3 days) is at the NRC acceptance criterion of 1 E-05 (Yr. -1 ). Regulatory Guide 1.115 requires that plants maintain an annual turbine missile probability less than 1 E-05 (Yr.-1 ). Therefore, turbine valve testing shall occur at a frequency of 440 days. Maintaining a turbine missile probability less than *1 E-05 (Yr.-1) provides assurance that the turbine overspeed protection system will function as designed thereby limiting the likelihood of overspeed past design conditions.
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 2 of 4 Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-002 Title of Change: Implementation of WCAP-12610-P-A  
& CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO" Implementation Document:
& CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO" Implementation Document:
ECP-15-000081 Description of Change: This activity implements an updated Nuclear Regulatory Commission (NRG) approved Integral Form ZIRLO Cladding Corrosion Model as described in Westinghouse WCAP-12610-P-A  
ECP-15-000081 Description of Change: This activity implements an updated Nuclear Regulatory Commission (NRG) approved Integral Form ZIRLO Cladding Corrosion Model as described in Westinghouse WCAP-12610-P-A  
&
&
* CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO," October 2013. The new model replaces the cladding corrosion model that was referred to in WCAP-15063-P-A, Revision 1, With Errata and more accurately reflects the temperature profile in the boiling region required to predict the measured oxides. The new clad corrosion model as described in the Topical Report will replace the current corrosion models one for one in the corrosion model applications.
* CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO," October 2013. The new model replaces the cladding corrosion model that was referred to in WCAP-15063-P-A, Revision 1, With Errata and more accurately reflects the temperature profile in the boiling region required to predict the measured oxides. The new clad corrosion model as described in the Topical Report will replace the current corrosion models one for one in the corrosion model applications.
The new corrosion model will be used according to the currently licensed methodologies for Wes.tinghouse NSSS plants. Evaluation Summary:
The new corrosion model will be used according to the currently licensed methodologies for Wes.tinghouse NSSS plants. Evaluation Summary: The corro$ion model described in WCAP-12610-P-A  
The corro$ion model described in WCAP-12610-P-A  
& CENPD-404-P-A Addendum 2-A has been approved by the NRG. Ginna meets the limitations and conditions of Section 5.0 of the NRG SER for implementation of the newcorrosion model for ZIRLO and Optimized ZIRLO cladding.
& CENPD-404-P-A Addendum 2-A has been approved by the NRG. Ginna meets the limitations and conditions of Section 5.0 of the NRG SER for implementation of the newcorrosion model for ZIRLO and Optimized ZIRLO cladding.
The new clad corrosion model does not constitute a departure from a method of evaluation.
The new clad corrosion model does not constitute a departure from a method of evaluation.
described in the UFSAR used in establishing the design bases or in the safety analyses, and thus does not require NRG approval prior to its use. The Evaluation concluded that the new clad corrosion model has been approved by the NRG for use on a forward fit basis, within the constraints described in the associated SER. WCAP-12610-P-A  
described in the UFSAR used in establishing the design bases or in the safety analyses, and thus does not require NRG approval prior to its use. The Evaluation concluded that the new clad corrosion model has been approved by the NRG for use on a forward fit basis, within the constraints described in the associated SER. WCAP-12610-P-A  
& CENPD-404-P-A Addendum 2-A is acceptable for Ginna since the new clad corrosion model has been approved by the NRG for all Westinghouse NSSS plants that use ZI RLO for their cladding material with consideration of the conditions as described in Section 5.0 of the SER. Additionally, Technical Specification changes are not required since the Ginna Technical Specification Section does not contain the corrosion model related topical report. The new corrosion model topical report does not define the technical basis for a Core Operating Limits Report (COLR) limit. Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear.
& CENPD-404-P-A Addendum 2-A is acceptable for Ginna since the new clad corrosion model has been approved by the NRG for all Westinghouse NSSS plants that use ZI RLO for their cladding material with consideration of the conditions as described in Section 5.0 of the SER. Additionally, Technical Specification changes are not required since the Ginna Technical Specification Section does not contain the corrosion model related topical report. The new corrosion model topical report does not define the technical basis for a Core Operating Limits Report (COLR) limit. Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear. Regulatory Commission permission was not required to make the change. Page 3of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 10 CFR 72.48 50.59 Evaluation No: C-2016-001 Title of Change: Revision of Ginna SFP Criticality Analysis for EPU Conditions and Pu-241 Half-Life Corrections Implementation Document:
Regulatory Commission permission was not required to make the change. Page 3of4 Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 10 CFR 72.48 50.59 Evaluation No: C-2016-001 Title of Change: Revision of Ginna SFP Criticality Analysis for EPU Conditions and Pu-241 Half-Life Corrections Implementation Document:
ECP-15-000283 Description of Change: The purpose of this activity is to revise calculation A-RGE-FE-003 Rev. 000 to include two conditions:  
ECP-15-000283 Description of Change: The purpose of this activity is to revise calculation A-RGE-FE-003 Rev. 000 to include two conditions:  
: 1) apply the current Pu-241 half-life, as established by the Journal of Hadioanalytical and Nuclear Chemistry, to pre-Extended Power Uprate (EPU) burned fuel and document the impact of said change on Spent Fuel Pool .(SFP) criticality and 2) apply the current Pu-241 life and updated isotopic number densities to EPU burned fuel and document the impact of said change on SFP criticality.
: 1) apply the current Pu-241 half-life, as established by the Journal of Hadioanalytical and Nuclear Chemistry, to pre-Extended Power Uprate (EPU) burned fuel and document the impact of said change on Spent Fuel Pool .(SFP) criticality and 2) apply the current Pu-241 life and updated isotopic number densities to EPU burned fuel and document the impact of said change on SFP criticality.
Evaluation Summary:
Evaluation Summary: Although the revised analysis uses the same methodology as the existing analysis of record, changes to design inputs and elements of the methodology were required.
Although the revised analysis uses the same methodology as the existing analysis of record, changes to design inputs and elements of the methodology were required.
The following is a list of design inputs and elements of the methodology that are impacted:
The following is a list of design inputs and elements of the methodology that are impacted:
the change from SCALE 4.3 to SCALE 4.4; application of the double contingency principle; changes to target Keff; EPU inputs; and the change in Pu-241 half-life.
the change from SCALE 4.3 to SCALE 4.4; application of the double contingency principle; changes to target Keff; EPU inputs; and the change in Pu-241 half-life.
A 50.59 Evaluation was performed and concluded*
A 50.59 Evaluation was performed and concluded*
that the changes to the associated design inputs and elements of the methodology are acceptable as they do not result in a departure from a method of evaluation described in the UFSAR used to establish design bases or used in safety analyses.
that the changes to the associated design inputs and elements of the methodology are acceptable as they do not result in a departure from a method of evaluation described in the UFSAR used to establish design bases or used in safety analyses.
In addition as specified in the NRC Safety Evaluation related to Ginna Amendment No. 79, when analyzing SFP criticality the NRC allows for crediting the existing soluble boron within the SFP (i.e. 2300ppm maintained per TS 3.7.12).
In addition as specified in the NRC Safety Evaluation related to Ginna Amendment No. 79, when analyzing SFP criticality the NRC allows for crediting the existing soluble boron within the SFP (i.e. 2300ppm maintained per TS 3.7.12). It was concluded in the aforementioned Safety Evaluation that the minimum SFP boron concentration value of 2300ppm required by TS 3.7.12 is more than sufficient to maintain Kett less than or equal to 0.95 for the most limiting accident condition within the pool. By virtue of the double contingency principle, which has been endorsed by the NRC, two unlikely independent and concurrent events are-beyond the scope of the required analysis.
It was concluded in the aforementioned Safety Evaluation that the minimum SFP boron concentration value of 2300ppm required by TS 3.7.12 is more than sufficient to maintain Kett less than or equal to 0.95 for the most limiting accident condition within the pool. By virtue of the double contingency principle, which has been endorsed by the NRC, two unlikely independent and concurrent events are-beyond the scope of the required analysis.
Therefore, credit for the presence of the entire 2300ppm of soluble boron may be assumed in evaluating the most limiting accident conditions (i.e. fuel misplacement).
Therefore, credit for the presence of the entire 2300ppm of soluble boron may be assumed in evaluating the most limiting accident conditions (i.e. fuel misplacement).
As a result, the current total design basis soluble boron concentration for achieving a 95/95 value of Keff less than or equal to 0.95 (i.e. 975ppm) remains bounding for pre-EPU arid EPU conditions using a Pu-241 half-life of 14.4 years, Based on these conclusions it was determined that this activity shall be implemented per plant procedures without obtaining a License Amendment.
As a result, the current total design basis soluble boron concentration for achieving a 95/95 value of Keff less than or equal to 0.95 (i.e. 975ppm) remains bounding for pre-EPU arid EPU conditions using a Pu-241 half-life of 14.4 years, Based on these conclusions it was determined that this activity shall be implemented per plant procedures without obtaining a License Amendment.
Line 71: Line 56:
Original Commitment:
Original Commitment:
Revised Commitment:
Revised Commitment:
Justification Summary:
Justification Summary: Ginna correspondence, WPLNRC-RG005481, "Letter from R. W. Kober, RG&E, to D. M. Crutchfield, NRG,  
Ginna correspondence, WPLNRC-RG005481, "Letter from R. W. Kober, RG&E, to D. M. Crutchfield, NRG,  


==Subject:==
==Subject:==
Control of Heavy Loads, dated March 26, 1984," Section . 2.4-1. Section 2.4-1 states, "RG&E has investigated the operation of the upper intermediate building monorail during plant operation and has restricted the use of this monorail to periods of time when the plant is in a cold shutdown mode. The following exception is being made to the requirement to only use the monorail during cold shutdown:  
Control of Heavy Loads, dated March 26, 1984," Section . 2.4-1. Section 2.4-1 states, "RG&E has investigated the operation of the upper intermediate building monorail during plant operation and has restricted the use of this monorail to periods of time when the plant is in a cold shutdown mode. The following exception is being made to the requirement to only use the monorail during cold shutdown:  
''The upper intermediate building monorail shall only be used during cold shutdown except for lifts that can be demonstrated to meet one of the following  
''The upper intermediate building monorail shall only be used during cold shutdown except for lifts that can be demonstrated to meet one of the following criteria, as required by NUREG-0612: 1. A single failure-proof handling system is utilized.  
: criteria, as required by NUREG-0612: 1. A single failure-proof handling system is utilized.  
: 2. Analysis of the effects of a load drop ensures that a load drop will not cause a loss of safe shutdown equipment.  
: 2. Analysis of the effects of a load drop ensures that a load drop will not cause a loss of safe shutdown equipment.  
: 3. Procedures and interlocks are used to keep loads away from safe shutdown equipment."
: 3. Procedures and interlocks are used to keep loads away from safe shutdown equipment." Ginna committed to restricting use of the monorail in modes higher than cold shutdown in response to NRG Generic Letter 80-113 to ensure compliance with NUREG-0612.
Ginna committed to restricting use of the monorail in modes higher than cold shutdown in response to NRG Generic Letter 80-113 to ensure compliance with NUREG-0612.
This broad restriction was made because the Safety Functions of the equipment below the monorail are only required in operational modes higher than cold shutdown.
This broad restriction was made because the Safety Functions of the equipment below the monorail are only required in operational modes higher than cold shutdown.
At the time the commitment was made, the monorail was not anticipated to be needed during any higher modes, since the majority of equipment inside the Intermediate Building is required to be in-service during higher modes. This commitment change is being implemented to make an exception to this restriction, so that the monorail can be used during higher modes of operation.
At the time the commitment was made, the monorail was not anticipated to be needed during any higher modes, since the majority of equipment inside the Intermediate Building is required to be in-service during higher modes. This commitment change is being implemented to make an exception to this restriction, so that the monorail can be used during higher modes of operation.
Line 90: Line 71:


==Subject:==
==Subject:==
 
R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 50-244 Report of Facility Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04 The subject report is hereby submitted as required by 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 50-244 Report of Facility  
: Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04 The subject report is hereby submitted as required by 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
The enclosed report (Attachment  
The enclosed report (Attachment  
: 1) contains descriptions and summaries of the 1 O CFR 50.59 or 1 O CFR 72.48 evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from July 2014 through March 2016, performed under the provisions of 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
: 1) contains descriptions and summaries of the 1 O CFR 50.59 or 1 O CFR 72.48 evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from July 2014 through March 2016, performed under the provisions of 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).
Also included is a report with a summary of commitment changes performed in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment changes" during the period from July 2014 through March 2016 that have not been previously provided to the NRC. There are no new regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at (315) 791-5219.
Also included is a report with a summary of commitment changes performed in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment changes" during the period from July 2014 through March 2016 that have not been previously provided to the NRC. There are no new regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at (315) 791-5219.
JP/kh Attachments:  
JP/kh Attachments:  
(1) Report of Facility  
(1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 1 O CFR 72.48 (2) Report of Commitment Changes from July 2014 through Performed in Accordance with NEI 99-04 March 2016 YJRZ April 29, 2016 Page2 cc: NRG Regional Administrator, Region 1 NRG Project Manager, Ginna NRG Resident Inspector, Ginna Attachment (1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRG Approval from July 2014 through March 2016, under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: 5059EVAL-2014-0001 Title of Change: Containment Air Temperature Increase and Associated  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 1 O CFR 72.48 (2) Report of Commitment Changes from July 2014 through Performed in Accordance with NEI 99-04 March 2016 YJRZ April 29, 2016 Page2 cc: NRG Regional Administrator, Region 1 NRG Project Manager, Ginna NRG Resident Inspector, Ginna Attachment (1) Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRG Approval from July 2014 through March 2016, under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: 5059EVAL-2014-0001 Title of Change: Containment Air Temperature Increase and Associated  
---Charfges ----Implementation Document:
---Charfges ----Implementation Document:
ECP-13-000048 Description of Change: ECP-13-000048 increa$ed the allowable containment average air temperature during normal operation from. 120 °F to 125 °F, which was addressed in NRC safety evaluation for Ginna License Amendment 116. This current 50.59 evaluation specifically evaluates changes and impacts that were not addressed in the NRC safety evaluation for Ginna License Amendment 116. Evaluation Summary:
ECP-13-000048 Description of Change: ECP-13-000048 increa$ed the allowable containment average air temperature during normal operation from. 120 °F to 125 °F, which was addressed in NRC safety evaluation for Ginna License Amendment 116. This current 50.59 evaluation specifically evaluates changes and impacts that were not addressed in the NRC safety evaluation for Ginna License Amendment 116. Evaluation Summary: The Ginna reactor containment average air temperature limit during n*ormal operation was increased from 120°F to 125°F. The allowable minimum containment spray flow rate was reduced, and updates to the EQ and LBLOCA dose analyses were made to accommodate the former changes and inaccurate spray removal coefficients.
The Ginna reactor containment average air temperature limit during n*ormal operation was increased from 120°F to 125°F. The allowable minimum containment spray flow rate was reduced, and updates to the EQ and LBLOCA dose analyses were made to accommodate the former changes and inaccurate spray removal coefficients.
The increase in temperature from 120°F to 125°F was subject to NRC approval.
The increase in temperature from 120°F to 125°F was subject to NRC approval.
For the changes not approved by the NRC, evaluations have been completed to ensure all systems, structures and components that are in containment or interact with containment or the containment spray system will continue to perform the specified design function as described within the UFSAR. In addition, evaluations have demonstrated that no Design Basis limits will be exceeded, and the changes are consistent with UFSAR methods of evaluation.
For the changes not approved by the NRC, evaluations have been completed to ensure all systems, structures and components that are in containment or interact with containment or the containment spray system will continue to perform the specified design function as described within the UFSAR. In addition, evaluations have demonstrated that no Design Basis limits will be exceeded, and the changes are consistent with UFSAR methods of evaluation.
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 1of4 Report of Facility  
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 1of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-001 Title of Change: Turbine Stop, Intercept, and Reheater Stop Valve Testing Extension Implementation Document:
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-001 Title of Change: Turbine Stop, Intercept, and Reheater Stop Valve Testing Extension Implementation Document:
ECP-15-000379 Description of Change: The activity extends the operational testing interval of the high-pressure turbine stop valves and the reheater intercept and reheater stop valves from 12 months to a frequency of 440 days. Evaluation Summary: Ginna has established an UFSAR specified regulatory commitment to test high-pressure turbine stop valves, reheater intercept valves, and reheater stop valves annually (i.e. 12 months). MPR Calculation 0236-0070-01 concluded that the overall probability of a turbine missile ejection event as a function of 14.5 month testing (i.e. 441.3 days) is at the NRC acceptance criterion of 1 E-05 (Yr. -1 ). Regulatory Guide 1.115 requires that plants maintain an annual turbine missile probability less than 1 E-05 (Yr.-1 ). Therefore, turbine valve testing shall occur at a frequency of 440 days. Maintaining a turbine missile probability less than *1 E-05 (Yr.-1) provides assurance that the turbine overspeed protection system will function as designed thereby limiting the likelihood of overspeed past design conditions.
ECP-15-000379 Description of Change: The activity extends the operational testing interval of the high-pressure turbine stop valves and the reheater intercept and reheater stop valves from 12 months to a frequency of 440 days. Evaluation Summary:
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 2 of 4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-002 Title of Change: Implementation of WCAP-12610-P-A  
Ginna has established an UFSAR specified regulatory commitment to test high-pressure turbine stop valves, reheater intercept valves, and reheater stop valves annually (i.e. 12 months).
MPR Calculation 0236-0070-01 concluded that the overall probability of a turbine missile ejection event as a function of 14.5 month testing (i.e. 441.3 days) is at the NRC acceptance criterion of 1 E-05 (Yr. -1 ). Regulatory Guide 1.115 requires that plants maintain an annual turbine missile probability less than 1 E-05 (Yr.-1 ). Therefore, turbine valve testing shall occur at a frequency of 440 days. Maintaining a turbine missile probability less than *1 E-05 (Yr.-1) provides assurance that the turbine overspeed protection system will function as designed thereby limiting the likelihood of overspeed past design conditions.
Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 2 of 4 Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-002 Title of Change: Implementation of WCAP-12610-P-A  
& CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO" Implementation Document:
& CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO" Implementation Document:
ECP-15-000081 Description of Change: This activity implements an updated Nuclear Regulatory Commission (NRG) approved Integral Form ZIRLO Cladding Corrosion Model as described in Westinghouse WCAP-12610-P-A  
ECP-15-000081 Description of Change: This activity implements an updated Nuclear Regulatory Commission (NRG) approved Integral Form ZIRLO Cladding Corrosion Model as described in Westinghouse WCAP-12610-P-A  
&
&
* CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO," October 2013. The new model replaces the cladding corrosion model that was referred to in WCAP-15063-P-A, Revision 1, With Errata and more accurately reflects the temperature profile in the boiling region required to predict the measured oxides. The new clad corrosion model as described in the Topical Report will replace the current corrosion models one for one in the corrosion model applications.
* CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO," October 2013. The new model replaces the cladding corrosion model that was referred to in WCAP-15063-P-A, Revision 1, With Errata and more accurately reflects the temperature profile in the boiling region required to predict the measured oxides. The new clad corrosion model as described in the Topical Report will replace the current corrosion models one for one in the corrosion model applications.
The new corrosion model will be used according to the currently licensed methodologies for Wes.tinghouse NSSS plants. Evaluation Summary:
The new corrosion model will be used according to the currently licensed methodologies for Wes.tinghouse NSSS plants. Evaluation Summary: The corro$ion model described in WCAP-12610-P-A  
The corro$ion model described in WCAP-12610-P-A  
& CENPD-404-P-A Addendum 2-A has been approved by the NRG. Ginna meets the limitations and conditions of Section 5.0 of the NRG SER for implementation of the newcorrosion model for ZIRLO and Optimized ZIRLO cladding.
& CENPD-404-P-A Addendum 2-A has been approved by the NRG. Ginna meets the limitations and conditions of Section 5.0 of the NRG SER for implementation of the newcorrosion model for ZIRLO and Optimized ZIRLO cladding.
The new clad corrosion model does not constitute a departure from a method of evaluation.
The new clad corrosion model does not constitute a departure from a method of evaluation.
described in the UFSAR used in establishing the design bases or in the safety analyses, and thus does not require NRG approval prior to its use. The Evaluation concluded that the new clad corrosion model has been approved by the NRG for use on a forward fit basis, within the constraints described in the associated SER. WCAP-12610-P-A  
described in the UFSAR used in establishing the design bases or in the safety analyses, and thus does not require NRG approval prior to its use. The Evaluation concluded that the new clad corrosion model has been approved by the NRG for use on a forward fit basis, within the constraints described in the associated SER. WCAP-12610-P-A  
& CENPD-404-P-A Addendum 2-A is acceptable for Ginna since the new clad corrosion model has been approved by the NRG for all Westinghouse NSSS plants that use ZI RLO for their cladding material with consideration of the conditions as described in Section 5.0 of the SER. Additionally, Technical Specification changes are not required since the Ginna Technical Specification Section does not contain the corrosion model related topical report. The new corrosion model topical report does not define the technical basis for a Core Operating Limits Report (COLR) limit. Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear.
& CENPD-404-P-A Addendum 2-A is acceptable for Ginna since the new clad corrosion model has been approved by the NRG for all Westinghouse NSSS plants that use ZI RLO for their cladding material with consideration of the conditions as described in Section 5.0 of the SER. Additionally, Technical Specification changes are not required since the Ginna Technical Specification Section does not contain the corrosion model related topical report. The new corrosion model topical report does not define the technical basis for a Core Operating Limits Report (COLR) limit. Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear. Regulatory Commission permission was not required to make the change. Page 3of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 10 CFR 72.48 50.59 Evaluation No: C-2016-001 Title of Change: Revision of Ginna SFP Criticality Analysis for EPU Conditions and Pu-241 Half-Life Corrections Implementation Document:
Regulatory Commission permission was not required to make the change. Page 3of4 Report of Facility  
: Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 10 CFR 72.48 50.59 Evaluation No: C-2016-001 Title of Change: Revision of Ginna SFP Criticality Analysis for EPU Conditions and Pu-241 Half-Life Corrections Implementation Document:
ECP-15-000283 Description of Change: The purpose of this activity is to revise calculation A-RGE-FE-003 Rev. 000 to include two conditions:  
ECP-15-000283 Description of Change: The purpose of this activity is to revise calculation A-RGE-FE-003 Rev. 000 to include two conditions:  
: 1) apply the current Pu-241 half-life, as established by the Journal of Hadioanalytical and Nuclear Chemistry, to pre-Extended Power Uprate (EPU) burned fuel and document the impact of said change on Spent Fuel Pool .(SFP) criticality and 2) apply the current Pu-241 life and updated isotopic number densities to EPU burned fuel and document the impact of said change on SFP criticality.
: 1) apply the current Pu-241 half-life, as established by the Journal of Hadioanalytical and Nuclear Chemistry, to pre-Extended Power Uprate (EPU) burned fuel and document the impact of said change on Spent Fuel Pool .(SFP) criticality and 2) apply the current Pu-241 life and updated isotopic number densities to EPU burned fuel and document the impact of said change on SFP criticality.
Evaluation Summary:
Evaluation Summary: Although the revised analysis uses the same methodology as the existing analysis of record, changes to design inputs and elements of the methodology were required.
Although the revised analysis uses the same methodology as the existing analysis of record, changes to design inputs and elements of the methodology were required.
The following is a list of design inputs and elements of the methodology that are impacted:
The following is a list of design inputs and elements of the methodology that are impacted:
the change from SCALE 4.3 to SCALE 4.4; application of the double contingency principle; changes to target Keff; EPU inputs; and the change in Pu-241 half-life.
the change from SCALE 4.3 to SCALE 4.4; application of the double contingency principle; changes to target Keff; EPU inputs; and the change in Pu-241 half-life.
A 50.59 Evaluation was performed and concluded*
A 50.59 Evaluation was performed and concluded*
that the changes to the associated design inputs and elements of the methodology are acceptable as they do not result in a departure from a method of evaluation described in the UFSAR used to establish design bases or used in safety analyses.
that the changes to the associated design inputs and elements of the methodology are acceptable as they do not result in a departure from a method of evaluation described in the UFSAR used to establish design bases or used in safety analyses.
In addition as specified in the NRC Safety Evaluation related to Ginna Amendment No. 79, when analyzing SFP criticality the NRC allows for crediting the existing soluble boron within the SFP (i.e. 2300ppm maintained per TS 3.7.12).
In addition as specified in the NRC Safety Evaluation related to Ginna Amendment No. 79, when analyzing SFP criticality the NRC allows for crediting the existing soluble boron within the SFP (i.e. 2300ppm maintained per TS 3.7.12). It was concluded in the aforementioned Safety Evaluation that the minimum SFP boron concentration value of 2300ppm required by TS 3.7.12 is more than sufficient to maintain Kett less than or equal to 0.95 for the most limiting accident condition within the pool. By virtue of the double contingency principle, which has been endorsed by the NRC, two unlikely independent and concurrent events are-beyond the scope of the required analysis.
It was concluded in the aforementioned Safety Evaluation that the minimum SFP boron concentration value of 2300ppm required by TS 3.7.12 is more than sufficient to maintain Kett less than or equal to 0.95 for the most limiting accident condition within the pool. By virtue of the double contingency principle, which has been endorsed by the NRC, two unlikely independent and concurrent events are-beyond the scope of the required analysis.
Therefore, credit for the presence of the entire 2300ppm of soluble boron may be assumed in evaluating the most limiting accident conditions (i.e. fuel misplacement).
Therefore, credit for the presence of the entire 2300ppm of soluble boron may be assumed in evaluating the most limiting accident conditions (i.e. fuel misplacement).
As a result, the current total design basis soluble boron concentration for achieving a 95/95 value of Keff less than or equal to 0.95 (i.e. 975ppm) remains bounding for pre-EPU arid EPU conditions using a Pu-241 half-life of 14.4 years, Based on these conclusions it was determined that this activity shall be implemented per plant procedures without obtaining a License Amendment.
As a result, the current total design basis soluble boron concentration for achieving a 95/95 value of Keff less than or equal to 0.95 (i.e. 975ppm) remains bounding for pre-EPU arid EPU conditions using a Pu-241 half-life of 14.4 years, Based on these conclusions it was determined that this activity shall be implemented per plant procedures without obtaining a License Amendment.
Line 141: Line 107:
Original Commitment:
Original Commitment:
Revised Commitment:
Revised Commitment:
Justification Summary:
Justification Summary: Ginna correspondence, WPLNRC-RG005481, "Letter from R. W. Kober, RG&E, to D. M. Crutchfield, NRG,  
Ginna correspondence, WPLNRC-RG005481, "Letter from R. W. Kober, RG&E, to D. M. Crutchfield, NRG,  


==Subject:==
==Subject:==
Control of Heavy Loads, dated March 26, 1984," Section . 2.4-1. Section 2.4-1 states, "RG&E has investigated the operation of the upper intermediate building monorail during plant operation and has restricted the use of this monorail to periods of time when the plant is in a cold shutdown mode. The following exception is being made to the requirement to only use the monorail during cold shutdown:  
Control of Heavy Loads, dated March 26, 1984," Section . 2.4-1. Section 2.4-1 states, "RG&E has investigated the operation of the upper intermediate building monorail during plant operation and has restricted the use of this monorail to periods of time when the plant is in a cold shutdown mode. The following exception is being made to the requirement to only use the monorail during cold shutdown:  
''The upper intermediate building monorail shall only be used during cold shutdown except for lifts that can be demonstrated to meet one of the following  
''The upper intermediate building monorail shall only be used during cold shutdown except for lifts that can be demonstrated to meet one of the following criteria, as required by NUREG-0612: 1. A single failure-proof handling system is utilized.  
: criteria, as required by NUREG-0612: 1. A single failure-proof handling system is utilized.  
: 2. Analysis of the effects of a load drop ensures that a load drop will not cause a loss of safe shutdown equipment.  
: 2. Analysis of the effects of a load drop ensures that a load drop will not cause a loss of safe shutdown equipment.  
: 3. Procedures and interlocks are used to keep loads away from safe shutdown equipment."
: 3. Procedures and interlocks are used to keep loads away from safe shutdown equipment." Ginna committed to restricting use of the monorail in modes higher than cold shutdown in response to NRG Generic Letter 80-113 to ensure compliance with NUREG-0612.
Ginna committed to restricting use of the monorail in modes higher than cold shutdown in response to NRG Generic Letter 80-113 to ensure compliance with NUREG-0612.
This broad restriction was made because the Safety Functions of the equipment below the monorail are only required in operational modes higher than cold shutdown.
This broad restriction was made because the Safety Functions of the equipment below the monorail are only required in operational modes higher than cold shutdown.
At the time the commitment was made, the monorail was not anticipated to be needed during any higher modes, since the majority of equipment inside the Intermediate Building is required to be in-service during higher modes. This commitment change is being implemented to make an exception to this restriction, so that the monorail can be used during higher modes of operation.
At the time the commitment was made, the monorail was not anticipated to be needed during any higher modes, since the majority of equipment inside the Intermediate Building is required to be in-service during higher modes. This commitment change is being implemented to make an exception to this restriction, so that the monorail can be used during higher modes of operation.
This exception maintains the requirements of NUREG-0612.
This exception maintains the requirements of NUREG-0612.
The exception precludes the loss of Safety-Related equipment by load drops.}}
The exception precludes the loss of Safety-Related equipment by load drops.}}

Revision as of 11:01, 8 July 2018

R.E. Ginna - Report of Facility Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04
ML16126A194
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/29/2016
From: Joseph Pacher
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
WDLNRC-1003072
Download: ML16126A194 (9)


Text

--,. Joe Pacher Site Vice President Exelon Generation R.E. Ginna Nuclear Power Plant 1503 Lake Rd. Ontario, NY 14519 315.791.5200 Office www.exeloncorp.com joseph.pacher@exeloncorp.com April 29, 2016 1 OCFR50.59(d)(2) 1 OCFR72.48(d)(2)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 50-244 Report of Facility Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04 The subject report is hereby submitted as required by 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).

The enclosed report (Attachment

1) contains descriptions and summaries of the 1 O CFR 50.59 or 1 O CFR 72.48 evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from July 2014 through March 2016, performed under the provisions of 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).

Also included is a report with a summary of commitment changes performed in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment changes" during the period from July 2014 through March 2016 that have not been previously provided to the NRC. There are no new regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at (315) 791-5219.

JP/kh Attachments:

(1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 1 O CFR 72.48 (2) Report of Commitment Changes from July 2014 through Performed in Accordance with NEI 99-04 March 2016 YJRZ April 29, 2016 Page2 cc: NRG Regional Administrator, Region 1 NRG Project Manager, Ginna NRG Resident Inspector, Ginna Attachment (1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRG Approval from July 2014 through March 2016, under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: 5059EVAL-2014-0001 Title of Change: Containment Air Temperature Increase and Associated

---Charfges ----Implementation Document:

ECP-13-000048 Description of Change: ECP-13-000048 increa$ed the allowable containment average air temperature during normal operation from. 120 °F to 125 °F, which was addressed in NRC safety evaluation for Ginna License Amendment 116. This current 50.59 evaluation specifically evaluates changes and impacts that were not addressed in the NRC safety evaluation for Ginna License Amendment 116. Evaluation Summary: The Ginna reactor containment average air temperature limit during n*ormal operation was increased from 120°F to 125°F. The allowable minimum containment spray flow rate was reduced, and updates to the EQ and LBLOCA dose analyses were made to accommodate the former changes and inaccurate spray removal coefficients.

The increase in temperature from 120°F to 125°F was subject to NRC approval.

For the changes not approved by the NRC, evaluations have been completed to ensure all systems, structures and components that are in containment or interact with containment or the containment spray system will continue to perform the specified design function as described within the UFSAR. In addition, evaluations have demonstrated that no Design Basis limits will be exceeded, and the changes are consistent with UFSAR methods of evaluation.

Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 1of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-001 Title of Change: Turbine Stop, Intercept, and Reheater Stop Valve Testing Extension Implementation Document:

ECP-15-000379 Description of Change: The activity extends the operational testing interval of the high-pressure turbine stop valves and the reheater intercept and reheater stop valves from 12 months to a frequency of 440 days. Evaluation Summary: Ginna has established an UFSAR specified regulatory commitment to test high-pressure turbine stop valves, reheater intercept valves, and reheater stop valves annually (i.e. 12 months). MPR Calculation 0236-0070-01 concluded that the overall probability of a turbine missile ejection event as a function of 14.5 month testing (i.e. 441.3 days) is at the NRC acceptance criterion of 1 E-05 (Yr. -1 ). Regulatory Guide 1.115 requires that plants maintain an annual turbine missile probability less than 1 E-05 (Yr.-1 ). Therefore, turbine valve testing shall occur at a frequency of 440 days. Maintaining a turbine missile probability less than *1 E-05 (Yr.-1) provides assurance that the turbine overspeed protection system will function as designed thereby limiting the likelihood of overspeed past design conditions.

Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 2 of 4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-002 Title of Change: Implementation of WCAP-12610-P-A

& CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO" Implementation Document:

ECP-15-000081 Description of Change: This activity implements an updated Nuclear Regulatory Commission (NRG) approved Integral Form ZIRLO Cladding Corrosion Model as described in Westinghouse WCAP-12610-P-A

&

  • CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO," October 2013. The new model replaces the cladding corrosion model that was referred to in WCAP-15063-P-A, Revision 1, With Errata and more accurately reflects the temperature profile in the boiling region required to predict the measured oxides. The new clad corrosion model as described in the Topical Report will replace the current corrosion models one for one in the corrosion model applications.

The new corrosion model will be used according to the currently licensed methodologies for Wes.tinghouse NSSS plants. Evaluation Summary: The corro$ion model described in WCAP-12610-P-A

& CENPD-404-P-A Addendum 2-A has been approved by the NRG. Ginna meets the limitations and conditions of Section 5.0 of the NRG SER for implementation of the newcorrosion model for ZIRLO and Optimized ZIRLO cladding.

The new clad corrosion model does not constitute a departure from a method of evaluation.

described in the UFSAR used in establishing the design bases or in the safety analyses, and thus does not require NRG approval prior to its use. The Evaluation concluded that the new clad corrosion model has been approved by the NRG for use on a forward fit basis, within the constraints described in the associated SER. WCAP-12610-P-A

& CENPD-404-P-A Addendum 2-A is acceptable for Ginna since the new clad corrosion model has been approved by the NRG for all Westinghouse NSSS plants that use ZI RLO for their cladding material with consideration of the conditions as described in Section 5.0 of the SER. Additionally, Technical Specification changes are not required since the Ginna Technical Specification Section does not contain the corrosion model related topical report. The new corrosion model topical report does not define the technical basis for a Core Operating Limits Report (COLR) limit. Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear. Regulatory Commission permission was not required to make the change. Page 3of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 10 CFR 72.48 50.59 Evaluation No: C-2016-001 Title of Change: Revision of Ginna SFP Criticality Analysis for EPU Conditions and Pu-241 Half-Life Corrections Implementation Document:

ECP-15-000283 Description of Change: The purpose of this activity is to revise calculation A-RGE-FE-003 Rev. 000 to include two conditions:

1) apply the current Pu-241 half-life, as established by the Journal of Hadioanalytical and Nuclear Chemistry, to pre-Extended Power Uprate (EPU) burned fuel and document the impact of said change on Spent Fuel Pool .(SFP) criticality and 2) apply the current Pu-241 life and updated isotopic number densities to EPU burned fuel and document the impact of said change on SFP criticality.

Evaluation Summary: Although the revised analysis uses the same methodology as the existing analysis of record, changes to design inputs and elements of the methodology were required.

The following is a list of design inputs and elements of the methodology that are impacted:

the change from SCALE 4.3 to SCALE 4.4; application of the double contingency principle; changes to target Keff; EPU inputs; and the change in Pu-241 half-life.

A 50.59 Evaluation was performed and concluded*

that the changes to the associated design inputs and elements of the methodology are acceptable as they do not result in a departure from a method of evaluation described in the UFSAR used to establish design bases or used in safety analyses.

In addition as specified in the NRC Safety Evaluation related to Ginna Amendment No. 79, when analyzing SFP criticality the NRC allows for crediting the existing soluble boron within the SFP (i.e. 2300ppm maintained per TS 3.7.12). It was concluded in the aforementioned Safety Evaluation that the minimum SFP boron concentration value of 2300ppm required by TS 3.7.12 is more than sufficient to maintain Kett less than or equal to 0.95 for the most limiting accident condition within the pool. By virtue of the double contingency principle, which has been endorsed by the NRC, two unlikely independent and concurrent events are-beyond the scope of the required analysis.

Therefore, credit for the presence of the entire 2300ppm of soluble boron may be assumed in evaluating the most limiting accident conditions (i.e. fuel misplacement).

As a result, the current total design basis soluble boron concentration for achieving a 95/95 value of Keff less than or equal to 0.95 (i.e. 975ppm) remains bounding for pre-EPU arid EPU conditions using a Pu-241 half-life of 14.4 years, Based on these conclusions it was determined that this activity shall be implemented per plant procedures without obtaining a License Amendment.

Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 4 of 4 Attachment (2) Report of Commitment Changes from July 2014 through March 2016 Performed in Accordance with NEI 99-04.

Report of Commitment Changes from July 2014 through March 2016 Performed In Accordance With NEl-99-04 Commitment Change Evaluation No.: 2015-01 Source Document:

Original Commitment:

Revised Commitment:

Justification Summary: Ginna correspondence, WPLNRC-RG005481, "Letter from R. W. Kober, RG&E, to D. M. Crutchfield, NRG,

Subject:

Control of Heavy Loads, dated March 26, 1984," Section . 2.4-1. Section 2.4-1 states, "RG&E has investigated the operation of the upper intermediate building monorail during plant operation and has restricted the use of this monorail to periods of time when the plant is in a cold shutdown mode. The following exception is being made to the requirement to only use the monorail during cold shutdown:

The upper intermediate building monorail shall only be used during cold shutdown except for lifts that can be demonstrated to meet one of the following criteria, as required by NUREG-0612: 1. A single failure-proof handling system is utilized.

2. Analysis of the effects of a load drop ensures that a load drop will not cause a loss of safe shutdown equipment.
3. Procedures and interlocks are used to keep loads away from safe shutdown equipment." Ginna committed to restricting use of the monorail in modes higher than cold shutdown in response to NRG Generic Letter 80-113 to ensure compliance with NUREG-0612.

This broad restriction was made because the Safety Functions of the equipment below the monorail are only required in operational modes higher than cold shutdown.

At the time the commitment was made, the monorail was not anticipated to be needed during any higher modes, since the majority of equipment inside the Intermediate Building is required to be in-service during higher modes. This commitment change is being implemented to make an exception to this restriction, so that the monorail can be used during higher modes of operation.

This exception maintains the requirements of NUREG-0612.

The exception precludes the loss of Safety-Related equipment by load drops.

--,. Joe Pacher Site Vice President Exelon Generation R.E. Ginna Nuclear Power Plant 1503 Lake Rd. Ontario, NY 14519 315.791.5200 Office www.exeloncorp.com joseph.pacher@exeloncorp.com April 29, 2016 1 OCFR50.59(d)(2) 1 OCFR72.48(d)(2)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

R.E. Ginna Nuclear Power Plant Facility Operating License No. DPR-18 NRC Docket No. 50-244 Report of Facility Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04 The subject report is hereby submitted as required by 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).

The enclosed report (Attachment

1) contains descriptions and summaries of the 1 O CFR 50.59 or 1 O CFR 72.48 evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from July 2014 through March 2016, performed under the provisions of 1 O CFR 50.59(d)(2) and 1 O CFR 72.48(d)(2).

Also included is a report with a summary of commitment changes performed in accordance with NEI 99-04, "Guidelines for Managing NRC Commitment changes" during the period from July 2014 through March 2016 that have not been previously provided to the NRC. There are no new regulatory commitments contained in this letter. Should you have any questions regarding this submittal, please contact Thomas Harding at (315) 791-5219.

JP/kh Attachments:

(1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 1 O CFR 72.48 (2) Report of Commitment Changes from July 2014 through Performed in Accordance with NEI 99-04 March 2016 YJRZ April 29, 2016 Page2 cc: NRG Regional Administrator, Region 1 NRG Project Manager, Ginna NRG Resident Inspector, Ginna Attachment (1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRG Approval from July 2014 through March 2016, under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: 5059EVAL-2014-0001 Title of Change: Containment Air Temperature Increase and Associated

---Charfges ----Implementation Document:

ECP-13-000048 Description of Change: ECP-13-000048 increa$ed the allowable containment average air temperature during normal operation from. 120 °F to 125 °F, which was addressed in NRC safety evaluation for Ginna License Amendment 116. This current 50.59 evaluation specifically evaluates changes and impacts that were not addressed in the NRC safety evaluation for Ginna License Amendment 116. Evaluation Summary: The Ginna reactor containment average air temperature limit during n*ormal operation was increased from 120°F to 125°F. The allowable minimum containment spray flow rate was reduced, and updates to the EQ and LBLOCA dose analyses were made to accommodate the former changes and inaccurate spray removal coefficients.

The increase in temperature from 120°F to 125°F was subject to NRC approval.

For the changes not approved by the NRC, evaluations have been completed to ensure all systems, structures and components that are in containment or interact with containment or the containment spray system will continue to perform the specified design function as described within the UFSAR. In addition, evaluations have demonstrated that no Design Basis limits will be exceeded, and the changes are consistent with UFSAR methods of evaluation.

Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 1of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-001 Title of Change: Turbine Stop, Intercept, and Reheater Stop Valve Testing Extension Implementation Document:

ECP-15-000379 Description of Change: The activity extends the operational testing interval of the high-pressure turbine stop valves and the reheater intercept and reheater stop valves from 12 months to a frequency of 440 days. Evaluation Summary: Ginna has established an UFSAR specified regulatory commitment to test high-pressure turbine stop valves, reheater intercept valves, and reheater stop valves annually (i.e. 12 months). MPR Calculation 0236-0070-01 concluded that the overall probability of a turbine missile ejection event as a function of 14.5 month testing (i.e. 441.3 days) is at the NRC acceptance criterion of 1 E-05 (Yr. -1 ). Regulatory Guide 1.115 requires that plants maintain an annual turbine missile probability less than 1 E-05 (Yr.-1 ). Therefore, turbine valve testing shall occur at a frequency of 440 days. Maintaining a turbine missile probability less than *1 E-05 (Yr.-1) provides assurance that the turbine overspeed protection system will function as designed thereby limiting the likelihood of overspeed past design conditions.

Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 2 of 4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 1 O CFR 50.59 or 1 O CFR 72.48 50.59 Evaluation No: C-2015-002 Title of Change: Implementation of WCAP-12610-P-A

& CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO" Implementation Document:

ECP-15-000081 Description of Change: This activity implements an updated Nuclear Regulatory Commission (NRG) approved Integral Form ZIRLO Cladding Corrosion Model as described in Westinghouse WCAP-12610-P-A

&

  • CENPD-404-P-A Addendum 2-A, 'Westinghouse Clad Corrosion Model for ZIRLO and Optimized ZIRLO," October 2013. The new model replaces the cladding corrosion model that was referred to in WCAP-15063-P-A, Revision 1, With Errata and more accurately reflects the temperature profile in the boiling region required to predict the measured oxides. The new clad corrosion model as described in the Topical Report will replace the current corrosion models one for one in the corrosion model applications.

The new corrosion model will be used according to the currently licensed methodologies for Wes.tinghouse NSSS plants. Evaluation Summary: The corro$ion model described in WCAP-12610-P-A

& CENPD-404-P-A Addendum 2-A has been approved by the NRG. Ginna meets the limitations and conditions of Section 5.0 of the NRG SER for implementation of the newcorrosion model for ZIRLO and Optimized ZIRLO cladding.

The new clad corrosion model does not constitute a departure from a method of evaluation.

described in the UFSAR used in establishing the design bases or in the safety analyses, and thus does not require NRG approval prior to its use. The Evaluation concluded that the new clad corrosion model has been approved by the NRG for use on a forward fit basis, within the constraints described in the associated SER. WCAP-12610-P-A

& CENPD-404-P-A Addendum 2-A is acceptable for Ginna since the new clad corrosion model has been approved by the NRG for all Westinghouse NSSS plants that use ZI RLO for their cladding material with consideration of the conditions as described in Section 5.0 of the SER. Additionally, Technical Specification changes are not required since the Ginna Technical Specification Section does not contain the corrosion model related topical report. The new corrosion model topical report does not define the technical basis for a Core Operating Limits Report (COLR) limit. Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear. Regulatory Commission permission was not required to make the change. Page 3of4 Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval from July 2014 through March 2016 under the Provisions of 10 CFR 50.59 or 10 CFR 72.48 50.59 Evaluation No: C-2016-001 Title of Change: Revision of Ginna SFP Criticality Analysis for EPU Conditions and Pu-241 Half-Life Corrections Implementation Document:

ECP-15-000283 Description of Change: The purpose of this activity is to revise calculation A-RGE-FE-003 Rev. 000 to include two conditions:

1) apply the current Pu-241 half-life, as established by the Journal of Hadioanalytical and Nuclear Chemistry, to pre-Extended Power Uprate (EPU) burned fuel and document the impact of said change on Spent Fuel Pool .(SFP) criticality and 2) apply the current Pu-241 life and updated isotopic number densities to EPU burned fuel and document the impact of said change on SFP criticality.

Evaluation Summary: Although the revised analysis uses the same methodology as the existing analysis of record, changes to design inputs and elements of the methodology were required.

The following is a list of design inputs and elements of the methodology that are impacted:

the change from SCALE 4.3 to SCALE 4.4; application of the double contingency principle; changes to target Keff; EPU inputs; and the change in Pu-241 half-life.

A 50.59 Evaluation was performed and concluded*

that the changes to the associated design inputs and elements of the methodology are acceptable as they do not result in a departure from a method of evaluation described in the UFSAR used to establish design bases or used in safety analyses.

In addition as specified in the NRC Safety Evaluation related to Ginna Amendment No. 79, when analyzing SFP criticality the NRC allows for crediting the existing soluble boron within the SFP (i.e. 2300ppm maintained per TS 3.7.12). It was concluded in the aforementioned Safety Evaluation that the minimum SFP boron concentration value of 2300ppm required by TS 3.7.12 is more than sufficient to maintain Kett less than or equal to 0.95 for the most limiting accident condition within the pool. By virtue of the double contingency principle, which has been endorsed by the NRC, two unlikely independent and concurrent events are-beyond the scope of the required analysis.

Therefore, credit for the presence of the entire 2300ppm of soluble boron may be assumed in evaluating the most limiting accident conditions (i.e. fuel misplacement).

As a result, the current total design basis soluble boron concentration for achieving a 95/95 value of Keff less than or equal to 0.95 (i.e. 975ppm) remains bounding for pre-EPU arid EPU conditions using a Pu-241 half-life of 14.4 years, Based on these conclusions it was determined that this activity shall be implemented per plant procedures without obtaining a License Amendment.

Each of the eight questions in 1 O CFR50.59(c)(2)(i) through 1 O CFR 50.59(c)(2)(viii) were answered "NO" such that Nuclear Regulatory Commission permission was not required to make the change. Page 4 of 4 Attachment (2) Report of Commitment Changes from July 2014 through March 2016 Performed in Accordance with NEI 99-04.

Report of Commitment Changes from July 2014 through March 2016 Performed In Accordance With NEl-99-04 Commitment Change Evaluation No.: 2015-01 Source Document:

Original Commitment:

Revised Commitment:

Justification Summary: Ginna correspondence, WPLNRC-RG005481, "Letter from R. W. Kober, RG&E, to D. M. Crutchfield, NRG,

Subject:

Control of Heavy Loads, dated March 26, 1984," Section . 2.4-1. Section 2.4-1 states, "RG&E has investigated the operation of the upper intermediate building monorail during plant operation and has restricted the use of this monorail to periods of time when the plant is in a cold shutdown mode. The following exception is being made to the requirement to only use the monorail during cold shutdown:

The upper intermediate building monorail shall only be used during cold shutdown except for lifts that can be demonstrated to meet one of the following criteria, as required by NUREG-0612: 1. A single failure-proof handling system is utilized.

2. Analysis of the effects of a load drop ensures that a load drop will not cause a loss of safe shutdown equipment.
3. Procedures and interlocks are used to keep loads away from safe shutdown equipment." Ginna committed to restricting use of the monorail in modes higher than cold shutdown in response to NRG Generic Letter 80-113 to ensure compliance with NUREG-0612.

This broad restriction was made because the Safety Functions of the equipment below the monorail are only required in operational modes higher than cold shutdown.

At the time the commitment was made, the monorail was not anticipated to be needed during any higher modes, since the majority of equipment inside the Intermediate Building is required to be in-service during higher modes. This commitment change is being implemented to make an exception to this restriction, so that the monorail can be used during higher modes of operation.

This exception maintains the requirements of NUREG-0612.

The exception precludes the loss of Safety-Related equipment by load drops.