ML16257A158: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:WSES-FSAR-UNIT-3 17- | {{#Wiki_filter:WSES-FSAR-UNIT-3 17-i CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTSSectionTitle Page17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-3 17.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to FSAR. | ||
WSES-FSAR-UNIT-3 17.2-117.2QUALITY ASSURANCE DURING OPERATIONS This section is covered in a separate Quality Assurance Program Manual which has been submitted to the NRC.}} | WSES-FSAR-UNIT-3 17.2-117.2QUALITY ASSURANCE DURING OPERATIONS This section is covered in a separate Quality Assurance Program Manual which has been submitted to the NRC.}} |
Revision as of 05:55, 8 July 2018
ML16257A158 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/25/2016 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16256A115 | List:
|
References | |
W3F1-2016-0053 | |
Download: ML16257A158 (3) | |
Text
WSES-FSAR-UNIT-3 17-i CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTSSectionTitle Page17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-3 17.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to FSAR.
WSES-FSAR-UNIT-3 17.2-117.2QUALITY ASSURANCE DURING OPERATIONS This section is covered in a separate Quality Assurance Program Manual which has been submitted to the NRC.