ML17332A722: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Il/ | {{#Wiki_filter:Il/8 C~4~4&7~ZGF SuPPcp''JD | ||
~~~4' | ~~~4'Sl SyS%M 5H4LL, BE Cg~t-.-g~~i CONTAINMENT SY~S O~rj&oF wc=Cm~rauedf gurcgc~ys (5 RC4uj<c27 AR;Ple5u~Cadreac.~gulZA>gy CONTAINMENT VBiTILAT ION SYST<+~PI<<8<c. | ||
gulZA> | h'I<guA<zrp'ods(~ArzWs z~~</~y g~f~guet'vlcc,w&d T~ri LIMITING CONDITION FOR OPERATION A~8 AAiaznd+UM'cTiv'>>I~. | ||
h'I<guA<zrp'ods(~ArzWs z~~</~ | 3.6o1.7-whe s'o more than one purge supply path and one purge exhaust path shall be open at a time APPLICABILITY: | ||
3.6o1.7- | MODES 1, 2, 3, and 4o ACTION:&o With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position,.and, within 72 hours, either: 2)Restore the'inoperable valve to OPERABLE status, or,~.Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automat'c valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.c.OtherT<se, be in at least HOT STA%)BY within the next 6 hours and in COLD SiHFZEOWN within the following 30 hours.d.The provisions of Specification 3.0,4 are not appl'cable. | ||
P SURVEILLAf CE REQUIRE%'AATS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.0.C.COOK-UN ii 1 OOZIN P 3/4 6-9a Amendment Ho.~ | |||
.and, | |||
b.Operation | |||
CFiiTAZK il Sinai..S 3hSc.S 3/4.6.1.7 CONTRAIL~i PURGZ AHD~USi lSQLA~'ZQH VALV=S~i"s spec"<<icacioa aasuzes hac cha coacsi e" pu~e supply aad exhausc iaolacion valves aza closed Eoz che aa$oricy oi che c'-e dur'aoxmaL ope~c" oa.o~~O 4 (V O 4 u5'~)4~4 1 s t~54ems-The concaiamenc purge system is designed in accordance Wrh che requir~cs oi NRC Branch Technical Posicioa CS3 6-4, Rev.l.Thm fdalades, baa ds aae!deIdeed ea, ea eaelysds ae ehe Iaaeac ae/~aa ECCS pe ioz~ce, aa evaluacioa oi che radiological c eoueac s or a design basis accideac+hi'e+~Qgj, and limiciag operacioa co using no more chan one supply pach aad oae eWausc pach ac a c""e.The purge isolacion valves have been demonscraced capable oi closiag aga~c che dynamia iozces assooiaced sich a loss-oi-coolaac accideac aad a assured oi receivtag a Concainmenc VeacQacioa Isolacioa si~a&re-coal The uSe oP che pressuze zeliei (veac)line is allayed for coacainmeac pressure coaczol+Ops yq ey d>>'ld>>)7/~de~QPgtAi+~~T'yg@QQ TQ PlhPPorr P~cssut'e~40>P AlAR+)~+qc5Pic.A 8Lt AIR QgAc.o q CM5lb~~zg~ | |||
~40> | |||
~Pcd'sent)< | ~Pcd'sent)< | ||
I cnAkg)hh6&'urgci~wc< | |||
hemic,~d.vn~h~mce, | hemic,~d.vn~h~mce,~4@i'T>eh up W 29~4~~~CECA.ge0 C~~c4, tlat lT~oak-k~o huadzeo-(-M@-a | ||
~4@i'T>eh | %>>ee V 1''>>>>>>\~~e lt u 8~I%( | ||
%>> | CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYST~e C'mar~r+ue<C SuPr f~p/a+57~y p.j sifa~c 8e Cc.o s~~N~~d4~4riW oa'Hd Co&TAi&W~7 P~esc sVsr~is a~uj~s7 4-p~<<i~<>, gay ZMpl~BM'lp yugc.l>y p~sja~ari~~arlnaf~fy> | ||
CONTAINMENT | &rd+SuiVcsl/cWC8 geSM5 I IT NG CONDITION FOR OPERAT ON'~4(g~urpfeil~d ACvlJ(TIES'. | ||
~~arlnaf~fy> | 3.6.1.7 No more than one purge supply path and one purge exhaust path shall be open at a time.~CTI ON: a.With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either: 1)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.c.Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.d.The provisions of Specification 3.0.4 are not applicable. | ||
&rd+SuiVcsl/cWC8 | SURV~LANCE RE U REMENTS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 2 3/4 6-9a AMENDMENT NO.~ | ||
3.6.1. | V h~I~ | ||
b.Operation | 3LSZS T?LL5 spec~~enslwas Cha Ch4 cmt~e p~a ggypgy~czhaust DaQt~~valv~L-.S c14ecL 14x K~A ma/ox g ol the M dl=~~cawn.4 J O~Vg(Og.lJ 5 The cont~eat puzga system is designed~accoxdance M&the zaqMxaneats.,of IC Stanch Te~cal Pos" t'oa CS3&-4, Res.1-Th&~alaiss, bnt is nat~4tecE ta, sn tnslysm a8 tbs inptat af pg+an~ECCS pa@oznanca, an evaluacfan ol thlE xadialogca3. | ||
SURV~ | ccnuscquences oi a, Sation basis satiitnt nbi a pg~ann'imLtwg pj's apsxst'an ta ue~g ao moxa than one sapplf path ance one exhaust path at a t~e.Me yazga Bola~vahes have been decnst ates cayabl.a ot cLosMg agent 2a dye"I'4 foxcas assawtact vLth a 14ssw{<ookant a+Bent and axe asauzecL of xecatvtag a Ccnta'~art Ven~~Mon LloLa&cn sX~g$fl vh~~gal QS4 Ot.the pxessuze zaLiaZ (vent)Lfae W aLicved fox con~~eat pxassa e can~1.0 4~5~~~,am~~~6 W&P mr pomme rasplro.W. | ||
oi<<u.oui<c.~sibi~g.~,~~ | |||
~~~~~L~~~~~5AAlI~~S~<<ci IImCe<c~~md~a~M~c.e a.d-ivnieQ gP>o~>~~~rr r r~D.C.""CX-GZ Z Alleged"I@fit | |||
ccnuscquences | |||
oi<<u.oui< | |||
c.~sibi~g.~,~~ | |||
~~~~~L~~~~~5AAlI~~S~<< | |||
't0,~ | 't0,~ | ||
ATTACHMENT | ATTACHMENT 3 TO AEP:NRC:1185 PROPOSED REVISED TECHNICAL SPECIFICATION PAGES 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILI.ANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. | ||
No more than one purge supply path and one purge exhaust path shall be open at a time.APPLICABILITY: | |||
MODES 1, 2, 3, and 4.ACTION: With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either: 1)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.d.The provisions of Specification 3.0.4 are not applicable. | |||
b.Operation | SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9a J~~~ | ||
SURVEILLANCE | 3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1.7 CONTAINMENT PURGE AND EXHAUST ISOLATION VALVES This specification ensures that the containment purge supply and exhaust isolation valves are closed for the majority of the time during normal operation. | ||
3/ | It allows for containment PURGING to support pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities up to 240 hours each year for each unit.The containtnent purge system is designed in accordance with the requirements of NRC Branch Technical Position CSB 64, Rev.1.This includes, but is not limited to, an analysis of the impact of PURGING on ECCS performance, an evaluation of the radiological consequences of a design basis accident while PURGING, and limiting PURGE operation to using no more than one supply path and one exhaust path at a time.The purge isolation valves have been demonstrated capable of closing against the dynamic forces associated with a loss-of-coolant accident and are assured of receiving a Containment Ventilation Isolation signal.Therefore, the SITE BOUNDARY dose guidelines of 10 CFR 100 would not be exceeded in the event of an accident during containment PURGING operations. | ||
The use of the pressure relief (vent)line is allowed for containment pressure control.COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 6-2a<WIENDliIENT 66 V~ | |||
t t 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities. | |||
No more than one purge supply path and one purge exhaust path shall be open at a time.APPLICABILITY: | |||
ACTION: MODES 1,2,3, and4.a.With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours, either: 1)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.c.Otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.d.The provisions of Specification 3.0.4 are not applicable. | |||
ACTION: | SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-9a 3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1.7 CONTAINMENT PURGE AND EXHAUST ISOLATION VALVES This specification ensures that the containment purge supply and exhaust isolation valves are closed for the majority of the time during normal operation. | ||
b.Operation | It allows for containment PURGING to support pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities up to 240 hours each year for each unit.The containment purge system is designed in accordance with the requirements of NRC Branch Technical Position CSB 64, Rev.1.This includes, but is not limited to, an analysis of the impact of PURGING on ECCS performance, an evaluation of the radiological consequences of a design basis accident while PURGING, and limiting PURGE operation to using no more than one supply path and one exhaust path at a time.The purge isolation valves have been demonstrated capable of closing against the dynamic forces associated with a loss-of-coolant accident and are assured of receiving a Containment Ventilation Isolation signal.Therefore, the SITE BOUNDARY dose guidelines of 10 CFR 100 would not be exceeded in the event of an accident during containment PURGING operations. | ||
SURVEILLANCE | The use of the pressure relief (vent)line is allowed for containment pressure control.COOK iiUCLEAR PLANT-UNIT 2 Page B 3/4 6-2a AivtEiIDiMENT 47.}} | ||
Revision as of 07:11, 6 July 2018
ML17332A722 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 03/31/1995 |
From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
To: | |
Shared Package | |
ML17332A721 | List: |
References | |
NUDOCS 9504060201 | |
Download: ML17332A722 (14) | |
Text
Il/8 C~4~4&7~ZGF SuPPcpJD
~~~4'Sl SyS%M 5H4LL, BE Cg~t-.-g~~i CONTAINMENT SY~S O~rj&oF wc=Cm~rauedf gurcgc~ys (5 RC4uj<c27 AR;Ple5u~Cadreac.~gulZA>gy CONTAINMENT VBiTILAT ION SYST<+~PI<<8<c.
h'I<guA<zrp'ods(~ArzWs z~~</~y g~f~guet'vlcc,w&d T~ri LIMITING CONDITION FOR OPERATION A~8 AAiaznd+UM'cTiv'>>I~.
3.6o1.7-whe s'o more than one purge supply path and one purge exhaust path shall be open at a time APPLICABILITY:
MODES 1, 2, 3, and 4o ACTION:&o With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position,.and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either: 2)Restore the'inoperable valve to OPERABLE status, or,~.Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automat'c valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.c.OtherT<se, be in at least HOT STA%)BY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SiHFZEOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.d.The provisions of Specification 3.0,4 are not appl'cable.
P SURVEILLAf CE REQUIRE%'AATS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.0.C.COOK-UN ii 1 OOZIN P 3/4 6-9a Amendment Ho.~
CFiiTAZK il Sinai..S 3hSc.S 3/4.6.1.7 CONTRAIL~i PURGZ AHD~USi lSQLA~'ZQH VALV=S~i"s spec"<<icacioa aasuzes hac cha coacsi e" pu~e supply aad exhausc iaolacion valves aza closed Eoz che aa$oricy oi che c'-e dur'aoxmaL ope~c" oa.o~~O 4 (V O 4 u5'~)4~4 1 s t~54ems-The concaiamenc purge system is designed in accordance Wrh che requir~cs oi NRC Branch Technical Posicioa CS3 6-4, Rev.l.Thm fdalades, baa ds aae!deIdeed ea, ea eaelysds ae ehe Iaaeac ae/~aa ECCS pe ioz~ce, aa evaluacioa oi che radiological c eoueac s or a design basis accideac+hi'e+~Qgj, and limiciag operacioa co using no more chan one supply pach aad oae eWausc pach ac a c""e.The purge isolacion valves have been demonscraced capable oi closiag aga~c che dynamia iozces assooiaced sich a loss-oi-coolaac accideac aad a assured oi receivtag a Concainmenc VeacQacioa Isolacioa si~a&re-coal The uSe oP che pressuze zeliei (veac)line is allayed for coacainmeac pressure coaczol+Ops yq ey d>>'ld>>)7/~de~QPgtAi+~~T'yg@QQ TQ PlhPPorr P~cssut'e~40>P AlAR+)~+qc5Pic.A 8Lt AIR QgAc.o q CM5lb~~zg~
~Pcd'sent)<
I cnAkg)hh6&'urgci~wc<
hemic,~d.vn~h~mce,~4@i'T>eh up W 29~4~~~CECA.ge0 C~~c4, tlat lT~oak-k~o huadzeo-(-M@-a
%>>ee V 1>>>>>>\~~e lt u 8~I%(
CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYST~e C'mar~r+ue<C SuPr f~p/a+57~y p.j sifa~c 8e Cc.o s~~N~~d4~4riW oa'Hd Co&TAi&W~7 P~esc sVsr~is a~uj~s7 4-p~<<i~<>, gay ZMpl~BM'lp yugc.l>y p~sja~ari~~arlnaf~fy>
&rd+SuiVcsl/cWC8 geSM5 I IT NG CONDITION FOR OPERAT ON'~4(g~urpfeil~d ACvlJ(TIES'.
3.6.1.7 No more than one purge supply path and one purge exhaust path shall be open at a time.~CTI ON: a.With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either: 1)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.c.Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.d.The provisions of Specification 3.0.4 are not applicable.
SURV~LANCE RE U REMENTS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 2 3/4 6-9a AMENDMENT NO.~
V h~I~
3LSZS T?LL5 spec~~enslwas Cha Ch4 cmt~e p~a ggypgy~czhaust DaQt~~valv~L-.S c14ecL 14x K~A ma/ox g ol the M dl=~~cawn.4 J O~Vg(Og.lJ 5 The cont~eat puzga system is designed~accoxdance M&the zaqMxaneats.,of IC Stanch Te~cal Pos" t'oa CS3&-4, Res.1-Th&~alaiss, bnt is nat~4tecE ta, sn tnslysm a8 tbs inptat af pg+an~ECCS pa@oznanca, an evaluacfan ol thlE xadialogca3.
ccnuscquences oi a, Sation basis satiitnt nbi a pg~ann'imLtwg pj's apsxst'an ta ue~g ao moxa than one sapplf path ance one exhaust path at a t~e.Me yazga Bola~vahes have been decnst ates cayabl.a ot cLosMg agent 2a dye"I'4 foxcas assawtact vLth a 14ssw{<ookant a+Bent and axe asauzecL of xecatvtag a Ccnta'~art Ven~~Mon LloLa&cn sX~g$fl vh~~gal QS4 Ot.the pxessuze zaLiaZ (vent)Lfae W aLicved fox con~~eat pxassa e can~1.0 4~5~~~,am~~~6 W&P mr pomme rasplro.W.
oi<<u.oui<c.~sibi~g.~,~~
~~~~~L~~~~~5AAlI~~S~<<ci IImCe<c~~md~a~M~c.e a.d-ivnieQ gP>o~>~~~rr r r~D.C.""CX-GZ Z Alleged"I@fit
't0,~
ATTACHMENT 3 TO AEP:NRC:1185 PROPOSED REVISED TECHNICAL SPECIFICATION PAGES 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILI.ANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities.
No more than one purge supply path and one purge exhaust path shall be open at a time.APPLICABILITY:
MODES 1, 2, 3, and 4.ACTION: With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either: 1)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.d.The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 1 Page 3/4 6-9a J~~~
3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1.7 CONTAINMENT PURGE AND EXHAUST ISOLATION VALVES This specification ensures that the containment purge supply and exhaust isolation valves are closed for the majority of the time during normal operation.
It allows for containment PURGING to support pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities up to 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> each year for each unit.The containtnent purge system is designed in accordance with the requirements of NRC Branch Technical Position CSB 64, Rev.1.This includes, but is not limited to, an analysis of the impact of PURGING on ECCS performance, an evaluation of the radiological consequences of a design basis accident while PURGING, and limiting PURGE operation to using no more than one supply path and one exhaust path at a time.The purge isolation valves have been demonstrated capable of closing against the dynamic forces associated with a loss-of-coolant accident and are assured of receiving a Containment Ventilation Isolation signal.Therefore, the SITE BOUNDARY dose guidelines of 10 CFR 100 would not be exceeded in the event of an accident during containment PURGING operations.
The use of the pressure relief (vent)line is allowed for containment pressure control.COOK NUCLEAR PLANT-UNIT 1 Page B 3/4 6-2a<WIENDliIENT 66 V~
t t 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.6 CONTAINMENT SYSTEMS CONTAINMENT VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.6.1.7 The containment purge supply and exhaust system shall be closed except when operation of the containment purge system is required for pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities.
No more than one purge supply path and one purge exhaust path shall be open at a time.APPLICABILITY:
ACTION: MODES 1,2,3, and4.a.With one containment purge supply and/or one exhaust isolation valve inoperable, isolate the affected penetration by use of at least one automatic valve secured in the closed position, and, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either: 1)Restore the inoperable valve to OPERABLE status, or, 2)Deactivate the automatic valve secured in the closed position.b.Operation may then continue until performance of the next required valve test provided that the automatic valve secured in the closed position is verified to be deactivated in the closed position at least once per 31 days.c.Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.d.The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.6.1.7.1 The surveillance requirements of Technical Specification 3/4.6.3.1 apply.COOK NUCLEAR PLANT-UNIT 2 Page 3/4 6-9a 3/4 BASES 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1.7 CONTAINMENT PURGE AND EXHAUST ISOLATION VALVES This specification ensures that the containment purge supply and exhaust isolation valves are closed for the majority of the time during normal operation.
It allows for containment PURGING to support pressure control, ALARA, and respirable air quality considerations for personnel entry, and for surveillance testing and maintenance activities up to 240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> each year for each unit.The containment purge system is designed in accordance with the requirements of NRC Branch Technical Position CSB 64, Rev.1.This includes, but is not limited to, an analysis of the impact of PURGING on ECCS performance, an evaluation of the radiological consequences of a design basis accident while PURGING, and limiting PURGE operation to using no more than one supply path and one exhaust path at a time.The purge isolation valves have been demonstrated capable of closing against the dynamic forces associated with a loss-of-coolant accident and are assured of receiving a Containment Ventilation Isolation signal.Therefore, the SITE BOUNDARY dose guidelines of 10 CFR 100 would not be exceeded in the event of an accident during containment PURGING operations.
The use of the pressure relief (vent)line is allowed for containment pressure control.COOK iiUCLEAR PLANT-UNIT 2 Page B 3/4 6-2a AivtEiIDiMENT 47.