ML17335A212: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.7PLANTSYSTEMSSURVElLANCEREUIREMENTS Continued 4.7.1.2Eachauxiliary feedwater pumpshallbedemonstrated OPERABLEwhentestedpursuanttoSpecification 4.0.5by:a.Verifying thateachmotordrivenauxiliary feedwater pump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped head.b.Verifying thattheturbinedrivenauxiliary feedwater pump'sdeveloped headatthetest'Theprovisions ofSpecification
{{#Wiki_filter:3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEl LANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test'The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.C.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.'I g.i Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.
 
COOK NUCLEAR PLANT-UNIT I Page 3/4 7-6 AMENDMENT 400, 434, 444, 444, 203 9809ii0034 97080i eOa aOOCV 050003is P PDR e
==4.0. 4arenotapplicable==
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEIL'LANCE'E UlREMENTS 4.7.1.2 Each a'uxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test'The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.d.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam'enerator level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.g Verifying at least once per 18 months during shutdown that each auxiliaty feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling,'tlie valves will be verified to be in their closed positions.
forentryintoMODE3.C.Verifying thateachnon-automatic valveintheflowpaththatisnotlocked,sealed,orotherwise securedinpositionisinitscorrectposition.
COOK NUCLEAR PLANT-UNIT 2 Page 3/4 7-6 AMENDMENT VV,%, 446, 484, 449,~, 489, 188 ATTACHMENT 3 TO AEP:NRC:0906H PROPOSED REVISED TECHNICAL SPECIFICATION PAGES V
Verifying thateachautomatic valveintheflowpathisinthefullyopenpositionwhenevertheauxiliary feedwater systemisplacedinautomatic controlorwhenabove10%RATEDTHERMALPOWER.Thisrequirement isnotapplicable forthoseportionsoftheauxiliary feedwater systembeingusedintermittently tomaintainsteamgenerator waterlevel.Verifying atleastonceper18monthsduringshutdownthateachautomatic valveintheflowpathactuatestoitscorrectpositionuponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.Verifying atleastonceper18monthsduringshutdownthateachauxiliary feedwater pumpstartsasdesignedautomatically uponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.'Ig.iVerifying atleastonceper18monthsduringshutdownthattheunitcross-tie valvescancyclefulltravel.Following cycling,thevalveswillbeverifiedtobeintheirclosedpositions.
0~3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliaty feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliaty feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is'not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.
COOKNUCLEARPLANT-UNIT IPage3/47-6AMENDMENT 400,434,444,444,2039809ii0034 97080ieOaaOOCV050003isPPDR e
COOK NUCLEAR PLANT-UNIT I Page 3/4 7A AMENDMENT 400, 48k, 444, 444, t'
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.7PLANTSYSTEMSSURVEIL'LANCE'E UlREMENTS 4.7.1.2Eacha'uxiliary feedwater pumpshallbedemonstrated OPERABLEwhentestedpursuanttoSpecification 4.0.5by:a.Verifying thateachmotordrivenauxiliary feedpump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped head.b.Verifying thattheturbinedrivenauxiliary feedwater pump'sdeveloped headatthetest'Theprovisions ofSpecification
3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.1.2 Each auxiliary fecdwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.c.'erifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator level.e.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.
 
COOK NUCLIDE PLANT-UNIT 2 Page 3/4 7A AMENDMENT W, 97, 4','484, 449, 4$8, 489, 48S,}}
==4.0. 4arenotapplicable==
forentryintoMODE3.Verifying thateachnon-automatic valveintheflowpaththatisnotlocked,sealed,orotherwise securedinpositionisinitscorrectposition.
d.Verifying thateachautomatic valveintheflowpathisinthefullyopenpositionwhenevertheauxiliary feedwater systemisplacedinautomatic controlorwhenabove10%RATEDTHERMALPOWER.Thisrequirement isnotapplicable forthoseportionsoftheauxiliary feedwater systembeingusedintermittently tomaintainsteam'enerator level.Verifying atleastonceper18monthsduringshutdownthateachautomatic valveintheflowpathactuatestoitscorrectpositionuponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.gVerifying atleastonceper18monthsduringshutdownthateachauxiliaty feedwater pumpstartsasdesignedautomatically uponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.Verifying atleastonceper18monthsduringshutdownthattheunitcross-tie valvescancyclefulltravel.Following cycling,'tlie valveswillbeverifiedtobeintheirclosedpositions.
COOKNUCLEARPLANT-UNIT 2Page3/47-6AMENDMENT VV,%,446,484,449,~,489,188 ATTACHMENT 3TOAEP:NRC:0906H PROPOSEDREVISEDTECHNICAL SPECIFICATION PAGES V
0~3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.7PLANTSYSTEMSSURVEILLANCE REUIREMENTS Continued 4.7.1.2Eachauxiliaty feedwater pumpshallbedemonstrated OPERABLEwhentestedpursuanttoSpecification 4.0.5by:Verifying thateachmotordrivenauxiliary feedwater pump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped head.Verifying thattheturbinedrivenauxiliary feedwater pump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped head.Theprovisions ofSpecification
 
==4.0. 4arenotapplicable==
forentryintoMODE3.Verifying thateachnon-automatic valveintheflowpaththatisnotlocked,sealed,orotherwise securedinpositionisinitscorrectposition.
Verifying thateachautomatic valveintheflowpathisinthefullyopenpositionwhenevertheauxiliaty feedwater systemisplacedinautomatic controlorwhenabove10%RATEDTHERMALPOWER.Thisrequirement is'notapplicable forthoseportionsoftheauxiliary feedwater systembeingusedintermittently tomaintainsteamgenerator waterlevel.Verifying atleastonceper18monthsduringshutdownthateachautomatic valveintheflowpathactuatestoitscorrectpositionuponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.Verifying atleastonceper18monthsduringshutdownthateachauxiliary feedwater pumpstartsasdesignedautomatically uponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.Verifying atleastonceper18monthsduringshutdownthattheunitcross-tie valvescancyclefulltravel.Following cycling,thevalveswillbeverifiedtobeintheirclosedpositions.
COOKNUCLEARPLANT-UNIT IPage3/47AAMENDMENT 400,48k,444,444, t'
3/4LIMITINGCONDITIONS FOROPERATION ANDSURVEILLANCE REQUIREMENTS 3/4.7PLANTSYSTEMSSURVEILLANCE REUIREMENTS 4.7.1.2Eachauxiliary fecdwater pumpshallbedemonstrated OPERABLEwhentestedpursuanttoSpecification 4.0.5by:a.Verifying thateachmotordrivenauxiliary feedpump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped head.b.Verifying thattheturbinedrivenauxiliary feedwater pump'sdeveloped headatthetestflowpointisgreaterthanorequaltotherequireddeveloped head.Theprovisions ofSpecification
 
==4.0. 4arenotapplicable==
forentryintoMODE3.c.'erifying thateachnon-automatic valveintheflowpaththatisnotlocked,sealed,orotherwise securedinpositionisinitscorrectposition.
Verifying thateachautomatic valveintheflowpathisinthefullyopenpositionwhenevertheauxiliary feedwater systemisplacedinautomatic controlorwhenabove10%RATEDTHERMALPOWER.Thisrequirement isnotapplicable forthoseportionsoftheauxiliary feedwater systembeingusedintermittently tomaintainsteamgenerator level.e.Verifying atleastonceper18monthsduringshutdownthateachautomatic valveintheflowpathactuatestoitscorrectpositionuponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.Verifying atleastonceper18monthsduringshutdownthateachauxiliary feedwater pumpstartsasdesignedautomatically uponreceiptoftheappropriate engineered safetyfeaturesactuation testsignalrequiredbySpecification 3/4.3.2.Verifying atleastonceper18monthsduringshutdownthattheunitcross-tie valvescancyclefulltravel.Following cycling,thevalveswillbeverifiedtobeintheirclosedpositions.
COOKNUCLIDEPLANT-UNIT 2Page3/47AAMENDMENT W,97,4','484,449,4$8,489,48S,}}

Revision as of 07:07, 6 July 2018

Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig.
ML17335A212
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/1997
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17335A211 List:
References
NUDOCS 9809110034
Download: ML17335A212 (9)


Text

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEl LANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test'The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.C.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.'I g.i Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNIT I Page 3/4 7-6 AMENDMENT 400, 434, 444, 444, 203 9809ii0034 97080i eOa aOOCV 050003is P PDR e

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEIL'LANCE'E UlREMENTS 4.7.1.2 Each a'uxiliary feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test'The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.d.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam'enerator level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.g Verifying at least once per 18 months during shutdown that each auxiliaty feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling,'tlie valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNIT 2 Page 3/4 7-6 AMENDMENT VV,%, 446, 484, 449,~, 489, 188 ATTACHMENT 3 TO AEP:NRC:0906H PROPOSED REVISED TECHNICAL SPECIFICATION PAGES V

0~3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.1.2 Each auxiliaty feedwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: Verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.Verifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliaty feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is'not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator water level.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNIT I Page 3/4 7A AMENDMENT 400, 48k, 444, 444, t'

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.1.2 Each auxiliary fecdwater pump shall be demonstrated OPERABLE when tested pursuant to Specification 4.0.5 by: a.Verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to the required developed head.b.Verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.c.'erifying that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.Verifying that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10%RATED THERMAL POWER.This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator level.e.Verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.Verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel.Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLIDE PLANT-UNIT 2 Page 3/4 7A AMENDMENT W, 97, 4','484, 449, 4$8, 489, 48S,