ML13347B319: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:December 16, 2013 | |||
Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817 | |||
==SUBJECT:== | |||
DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION | |||
==Dear Mr. Berg:== | |||
On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter. | |||
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html | |||
. | |||
Sincerely, | |||
/RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs | |||
Docket No.: 50-409 | |||
==Enclosure:== | |||
Request for Additional Information | |||
cc: La Crosse Boiling Water Reactor Service List Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817 | |||
==SUBJECT:== | |||
DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION | |||
==Dear Mr. Berg:== | |||
On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter. | |||
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html | |||
. Sincerely, | |||
/RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs | |||
Docket No.: 50-409 | |||
==Enclosure:== | |||
Request for Additional Information | |||
cc: La Crosse Boiling Water Reactor Service List | |||
DISTRIBUTION | |||
: ROrlikowski RIII AKock, NRR KLois, NRR ML13347B319 OFC DWMEP:PM DWMEP:LA DWMEP:BC DWMEP:PM NAME JHickman CHolston BWatson JHickman DATE 12 /16/ 2013 12 /16/ 2013 12 /16/ 2013 12 /16 / 2013 OFFICIAL RECORD COPY | |||
La Crosse Boiling Water Reactor Service List | |||
Mr. William L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817 | |||
Mr. Thomas Zaremba Wheeler, Van Sickle and Anderson | |||
Suite 801 25 West Main Street Madison, WI 53703-3398 | |||
Mr. George Kruck Chairman, Town of Genoa S5277 Mound Ridge Road Genoa, WI 54632 | |||
Mr. Jeffery Kitsembel Electric Division | |||
Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 | |||
Mr. Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 | |||
Mr. Don G. Egge, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 | |||
Mr. Jeff McRill, Technical Support Engineer La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 | |||
Regional Administrator Region III U.S. Nuclear Regulatory Commission | |||
2443 Warrenville Road Lisle, IL 60532-4352 | |||
Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR LA CROSSE BOILING WATER REACTOR | |||
The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Lacrosse Boiling Water Reactor. On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). | |||
RAI #1: Decommissioning Costs On March 27, 2013, Dairyland Power Cooperative did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year. | |||
Per 10 CFR 50.82(a)(8)(v), | |||
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based. Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.}} |
Revision as of 10:26, 3 July 2018
ML13347B319 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 12/16/2013 |
From: | Hickman J B NRC/FSME/DWMEP/DURLD/RDB |
To: | Berg W L Dairyland Power Cooperative |
Hickman J | |
References | |
Download: ML13347B319 (4) | |
Text
December 16, 2013
Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817
SUBJECT:
DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Berg:
On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.
Sincerely,
/RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs
Docket No.: 50-409
Enclosure:
Request for Additional Information
cc: La Crosse Boiling Water Reactor Service List Mr. W. L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817
SUBJECT:
DAIRYLAND POWER COOPERATIVE, LA CROSSE BOILING WATER REACTOR DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Berg:
On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your Decommissioning Funding Status report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
. Sincerely,
/RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs
Docket No.: 50-409
Enclosure:
Request for Additional Information
cc: La Crosse Boiling Water Reactor Service List
DISTRIBUTION
- ROrlikowski RIII AKock, NRR KLois, NRR ML13347B319 OFC DWMEP:PM DWMEP:LA DWMEP:BC DWMEP:PM NAME JHickman CHolston BWatson JHickman DATE 12 /16/ 2013 12 /16/ 2013 12 /16/ 2013 12 /16 / 2013 OFFICIAL RECORD COPY
La Crosse Boiling Water Reactor Service List
Mr. William L. Berg President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817
Mr. Thomas Zaremba Wheeler, Van Sickle and Anderson
Suite 801 25 West Main Street Madison, WI 53703-3398
Mr. George Kruck Chairman, Town of Genoa S5277 Mound Ridge Road Genoa, WI 54632
Mr. Jeffery Kitsembel Electric Division
Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854
Mr. Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659
Mr. Don G. Egge, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846
Mr. Jeff McRill, Technical Support Engineer La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846
Regional Administrator Region III U.S. Nuclear Regulatory Commission
2443 Warrenville Road Lisle, IL 60532-4352
Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2013 DECOMMISSIONING FUNDING STATUS REPORT FOR LA CROSSE BOILING WATER REACTOR
The request for additional information (RAI) is in response to the 2013 Decommissioning Funding Status (DFS) report for Lacrosse Boiling Water Reactor. On March 27, 2013, Dairyland Power Cooperative submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning Funding Status (DFS) report for the Lacrosse Boiling Water Reactor, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1: Decommissioning Costs On March 27, 2013, Dairyland Power Cooperative did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based. Provide the difference between actual and estimated costs for decommissioning work performed during the previous year.