{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Sreenivas, VSent:Thursday, August 13, 2015 4:05 PMTo:Sreenivas, V
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Sreenivas, V Sent:Thursday, August 13, 2015 4:05 PM To:Sreenivas, V


==Subject:==
==Subject:==
Request for additional information, North Anna Power Station, N1-14-SPT-006, pressure test, TAC MF6250Copy to File From: Sreenivas, V  Sent: Thursday, August 13, 2015 8:45 AM To: 'david.heacock@dom.com' (david.heacock@dom.com) Cc: Diane Aitken (Generation - 6) (diane.aitken@dom.com) ; Craig D Sly (Generation - 6) (craig.d.sly@dom.com) ; Jay Leberstien (jay.leberstien@dom.com) ; Pascarelli, Robert   
Request for additional information, North Anna Po wer Station, N1-14-SPT-006, pressure test, TAC MF6250 Copy to File From: Sreenivas, V  Sent: Thursday, August 13, 2015 8:45 AM To: 'david.heacock@dom.com' (david.heacock@dom.com)
Cc: Diane Aitken (Generation - 6) (diane.aitken@dom.com) ; Craig D Sly (Generation - 6) (craig.d.sly@dom.com) ; Jay Leberstien (jay.leberstien@dom.com) ; Pascarelli, Robert   


==Subject:==
==Subject:==
Request for additional information, North Anna Power Station, N1-14-SPT-006, pressure test, TAC MF6250 By letter dated May 19, 2015, (Agencywide Document Access and Management System (ADAMS) Accession No. ML15147A016), VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION or the licensee) submitted relief requests for the fourth 10-year in-service inspection (lSI) interval program at North Anna Power Station, Unit No.1 (NAPS Unit 1). Dominion requested use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI requirements. Included in this submittal was Relief Request N1-I4-SPT-006 which proposed to use alternative system leakage testing pressure criteria for a specific Class 1 pipe segment at or near the end of the inspection interval.
Request for additional information, North Anna Power Station, N1-14-SPT-006, pressure test, TAC MF6250 By letter dated May 19, 2015, (Agencywide Document Access and Management Sy stem (ADAMS) Accession No. ML15147A016), VIRGINIA ELECTRIC AND POWER COMP ANY (DOMINION or the licen see) submitted relief requests for the fourth 10-year in-service inspection (lSI
The NRC staff reviewed N1-I4-SPT-006 and determined that additional information is needed for the safety evaluation. If you have any questions please contact me at 301-415-2597. Please submit the response by September 14, 2015. ATTACHMENT TO E-MAIL: REQUEST FOR ADDITIONAL INFORMATION REQUEST FOR ALTERNATIVE N1-I4-SPT-006, REGARDING SYSTEM LEAKAGE TESTING ON CLASS 1 AUXILIARY SPRAY PIPING VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) NORTH ANNA POWER STATION, UNIT 1 DOCKET NUMBER 50-338    By letter dated May 19, 2015, (Agencywide Document Access and Management System (ADAMS) Accession No. ML15147A016), VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION or the licensee) submitted relief requests for the fourth 10-year in-service inspection (lSI) interval program at North Anna Power Station, Unit No.1 (NAPS Unit 1). Dominion requested use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI requirements. Included in this submittal was Relief Request N1-I4-SPT-006 which proposed to use alternative system leakage testing pressure criteria for a specific Class 1 pipe segment at or near the end of the inspection interval. The NRC staff reviewed N1-I4-SPT-006 and determined that the following additional information is needed for the safety evaluation.  
) interval program at North Anna Power Station, Unit No.1 (NAPS Unit 1). Dominion requested use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI requirements. Included in this submittal was Relief Request N1-I4-SPT-006 which proposed to use alternative system leakage testing pressure criteria for a specific Class 1 pipe segment at or near the end of the inspection interval.  


2 1. Please provide a drawing of the auxiliary spray piping segment. The drawing is listed on the Relief Request as 11715-CBM-095C-4, Sheet 1 of 2, but was not included with the request. 2. Please provide a list of materials for the auxiliary spray piping and discuss the pipe construction.  
The NRC staff reviewed N1-I4-SPT-006 and determined that additional information is needed for the safety evaluation. If you have any questions please contact me at 301-415-2597. Please submit the response by September 14, 2015.
: 3. Are there any welded connections (e.g., butt or socket) in the auxiliary spray piping? Discuss any industry or plant specific operating experience regarding potential degradation of the welded connections in the subject components by mechanism such as fatigue or stress corrosion cracking?   4. If there are welded connections in the subject piping segment, have they been volumetrically examined during current or past intervals? 5. Is there any current or past history of leakage in the subject piping segment? If so, please discuss the leakage and what corrective actions were taken. What are the leakage detection capabilities at the plant?  
ATTACHMENT TO E-MAIL:
REQUEST FOR ADDITIONAL INFORMATION REQUEST FOR ALTERNATIVE N1-I4-SPT-006, REGARDING SYSTEM LEAKAGE TESTING ON CLASS 1 AUXILIARY SPRAY PIPING VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION, UNIT 1 DOCKET NUMBER 50-338 By letter dated May 19, 2015, (Agencywide Document Access and Management Sy stem (ADAMS) Accession No. ML15147A016), VIRGINIA ELECTRIC AND POWER COMP ANY (DOMINION or the licen see) submitted relief requests for the fourth 10-year in-service inspection (lSI
) interval program at North Anna Power Station, Unit No.1 (NAPS Unit 1). Dominion requested use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI requirements. Included in this submittal was Relief Request N1-I4-SPT-006 which proposed to use alternative system leakage testing pressure criteria for a specific Class 1 pipe segment at or near the end of the inspection interval.
The NRC staff reviewed N1-I4-SPT-006 and determined that the following additional information is needed for the safety evaluation.
 
2 1. Please provide a drawing of the auxiliary spra y piping segment. The drawing is listed on the Relief Request as 11715-CBM-095C-4, Sheet 1 of 2, but was not included with the request.  
: 2. Please provide a list of materials for the auxiliary spray piping and discuss the pipe construction.  
: 3. Are there any welded connections (e.g., butt or socket) in the auxiliary spray piping? Discuss any industry or plant specific operating experience regarding potential degradation of the welded connections in the subject components by mechanism such as fatigue or stress corrosion cracking?
: 4. If there are welded connections in the subject piping segment, have they been volumetrically examined during current or past intervals?  
: 5. Is there any current or past history of leak age in the subject piping segment? If so, please discuss the leakage and what corrective actions were taken. What are the leakage detection capabilities at the plant?  
: 6. Are any segments of the auxiliary spray piping insulated or inaccessible in a manner that would prevent a complete VT-2 examination? If so, discuss methods planned to examine these sections.  
: 6. Are any segments of the auxiliary spray piping insulated or inaccessible in a manner that would prevent a complete VT-2 examination? If so, discuss methods planned to examine these sections.  
: 7. Will there be any retained pressure in the pipe during the VT-2 Examinations? If so, provide the retained pressure values in the pipe and what will be in the pipe (i.e., RCS coolant or air?) 8. Discuss whether or not it is possible to pressure test the auxiliary spray piping segment with an external pump.  
: 7. Will there be any retained pressure in the pipe during the VT-2 Examinations? If so, provide the retained pressure values in the pipe and what will be in the pipe (i.e., RCS coolant or air?)  
: 9. Are there any other factors such as excessive dosage that should be considered in this evaluation?
: 8. Discuss whether or not it is possible to pressure test the auxiliary spra y piping segment with an external pump.  
Hearing Identifier:  NRR_PMDA Email Number:  2297  Mail Envelope Properties  (V.Sreenivas@nrc.gov20150813160500)  
: 9. Are there any other factors such as excessive dosage that should be considered in this evaluation?  
 
Hearing Identifier:  NRR_PMDA Email Number:  2297  Mail Envelope Properties  (V.Sreenivas@nrc.gov20150813160500)


==Subject:==
==Subject:==
Request for additional information, North Anna Power Station, N1-14-SPT-006, pressure test, TAC MF6250  Sent Date:  8/13/2015 4:05:00 PM  Received Date:  8/13/2015 4:05:00 PM From:    Sreenivas, V Created By:  V.Sreenivas@nrc.gov Recipients:    "Sreenivas, V" <V.Sreenivas@nrc.gov>  Tracking Status: None  
Request for additional information, North Anna Power Station, N1-14-SPT-006, pressure test, TAC MF6250  Sent Date:  8/13/2015 4:05:00 PM  Received Date:  8/13/2015 4:05:00 PM From:    Sreenivas, V Created By:  V.Sreenivas@nrc.gov Recipients:    "Sreenivas, V" <V.Sreenivas@nrc.gov>  Tracking Status: None  


Post Office:      Files    Size      Date & Time MESSAGE    4231      8/13/2015 4:05:00 PM   Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}
Post Office:      Files    Size      Date & Time MESSAGE    4231      8/13/2015 4:05:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 22:05, 30 June 2018

2015/08/13 NRR E-mail Capture - Request for Additional Information, North Anna Power Station, N1-14-SPT-006, Pressure Test, TAC MF6250
ML15226A464
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/13/2015
From: V Sreenivas
Plant Licensing Branch II
To: Heacock D A
Office of Nuclear Reactor Regulation
References
TAC MF6250
Download: ML15226A464 (3)


Text

1NRR-PMDAPEm Resource From:Sreenivas, V Sent:Thursday, August 13, 2015 4:05 PM To:Sreenivas, V

Subject:

Request for additional information, North Anna Po wer Station, N1-14-SPT-006, pressure test, TAC MF6250 Copy to File From: Sreenivas, V Sent: Thursday, August 13, 2015 8:45 AM To: 'david.heacock@dom.com' (david.heacock@dom.com)

Cc: Diane Aitken (Generation - 6) (diane.aitken@dom.com) ; Craig D Sly (Generation - 6) (craig.d.sly@dom.com) ; Jay Leberstien (jay.leberstien@dom.com) ; Pascarelli, Robert

Subject:

Request for additional information, North Anna Power Station, N1-14-SPT-006, pressure test, TAC MF6250 By letter dated May 19, 2015, (Agencywide Document Access and Management Sy stem (ADAMS) Accession No. ML15147A016), VIRGINIA ELECTRIC AND POWER COMP ANY (DOMINION or the licen see) submitted relief requests for the fourth 10-year in-service inspection (lSI

) interval program at North Anna Power Station, Unit No.1 (NAPS Unit 1). Dominion requested use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI requirements. Included in this submittal was Relief Request N1-I4-SPT-006 which proposed to use alternative system leakage testing pressure criteria for a specific Class 1 pipe segment at or near the end of the inspection interval.

The NRC staff reviewed N1-I4-SPT-006 and determined that additional information is needed for the safety evaluation. If you have any questions please contact me at 301-415-2597. Please submit the response by September 14, 2015.

ATTACHMENT TO E-MAIL:

REQUEST FOR ADDITIONAL INFORMATION REQUEST FOR ALTERNATIVE N1-I4-SPT-006, REGARDING SYSTEM LEAKAGE TESTING ON CLASS 1 AUXILIARY SPRAY PIPING VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION, UNIT 1 DOCKET NUMBER 50-338 By letter dated May 19, 2015, (Agencywide Document Access and Management Sy stem (ADAMS) Accession No. ML15147A016), VIRGINIA ELECTRIC AND POWER COMP ANY (DOMINION or the licen see) submitted relief requests for the fourth 10-year in-service inspection (lSI

) interval program at North Anna Power Station, Unit No.1 (NAPS Unit 1). Dominion requested use of alternatives to certain American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI requirements. Included in this submittal was Relief Request N1-I4-SPT-006 which proposed to use alternative system leakage testing pressure criteria for a specific Class 1 pipe segment at or near the end of the inspection interval.

The NRC staff reviewed N1-I4-SPT-006 and determined that the following additional information is needed for the safety evaluation.

2 1. Please provide a drawing of the auxiliary spra y piping segment. The drawing is listed on the Relief Request as 11715-CBM-095C-4, Sheet 1 of 2, but was not included with the request.

2. Please provide a list of materials for the auxiliary spray piping and discuss the pipe construction.
3. Are there any welded connections (e.g., butt or socket) in the auxiliary spray piping? Discuss any industry or plant specific operating experience regarding potential degradation of the welded connections in the subject components by mechanism such as fatigue or stress corrosion cracking?
4. If there are welded connections in the subject piping segment, have they been volumetrically examined during current or past intervals?
5. Is there any current or past history of leak age in the subject piping segment? If so, please discuss the leakage and what corrective actions were taken. What are the leakage detection capabilities at the plant?
6. Are any segments of the auxiliary spray piping insulated or inaccessible in a manner that would prevent a complete VT-2 examination? If so, discuss methods planned to examine these sections.
7. Will there be any retained pressure in the pipe during the VT-2 Examinations? If so, provide the retained pressure values in the pipe and what will be in the pipe (i.e., RCS coolant or air?)
8. Discuss whether or not it is possible to pressure test the auxiliary spra y piping segment with an external pump.
9. Are there any other factors such as excessive dosage that should be considered in this evaluation?

Hearing Identifier: NRR_PMDA Email Number: 2297 Mail Envelope Properties (V.Sreenivas@nrc.gov20150813160500)

Subject:

Request for additional information, North Anna Power Station, N1-14-SPT-006, pressure test, TAC MF6250 Sent Date: 8/13/2015 4:05:00 PM Received Date: 8/13/2015 4:05:00 PM From: Sreenivas, V Created By: V.Sreenivas@nrc.gov Recipients: "Sreenivas, V" <V.Sreenivas@nrc.gov> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 4231 8/13/2015 4:05:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: