{{#Wiki_filter:OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION "Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this transmittal document is decontrolled."  OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION September 1, 2015   
{{#Wiki_filter:OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
"Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this  
transmittal document is decontrolled."  
  OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
  September 1, 2015  
    
   
   
   
   
Mr. Fadi Diya, Senior Vice President   and Chief Nuclear Officer Union Electric Company  
Mr. Fadi Diya, Senior Vice President
  and Chief Nuclear Officer  
Union Electric Company  
P.O. Box 620  
P.O. Box 620  
Fulton, MO  65251   
Fulton, MO  65251   
  SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT  
  SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT  
NUMBER 05000483/2015401)   
NUMBER 05000483/2015401)  
   
Dear Mr. Diya:  
Dear Mr. Diya:  
  On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant.  The results of that review have been transmitted to you separately in a publicly available assessment letter.  This letter informs you of the NRC's plans for future security-related  
 
  On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant.  The results of that review have been trans
mitted to you separately in a publicly available assessment letter.  This letter informs you of the NRC's plans for future security-related  
inspections at your facility.   
inspections at your facility.   
  The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017.  The inspections listed during the last nine months of the inspection plan are  
  The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017.  The inspections listed during the last nine months of the inspection plan are  
tentative and may be revised at the next semiannual performance review.  The NRC provides  
tentative and may be revised at the next semiannual performance review.  The NRC provides  
the inspection plan to allow for the resolution of any scheduling conflicts and personnel  
the inspection plan to allow for the resolution of any scheduling conflicts and personnel  
availability issues.  The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.  Routine force-on-force inspections are conducted approximately every 3 years.  You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.   
availability issues.  The NRC will contact you as  
soon as possible to dis
cuss changes to the inspection plan should circumstances warrant any changes.  Routine force-on-force inspections are conducted approximately every 3 years.  You will be notified by separate correspondence  
8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.  
   
While we are fully committed to our goal of ensuring openness in our regulatory process, we  
While we are fully committed to our goal of ensuring openness in our regulatory process, we  
must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.  Thus due to the security-related information contained in this correspondence, and   UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511   
must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.  Thus due to the security-related information contained in this correspondence, and
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION F. Diya - 2 -  
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511   
  OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified  
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
  F. Diya - 2 -  
 
  OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified  
Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  
Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  
  Please contact me at (817) 200-1527 with any questions you have regarding this letter.  Sincerely,  
 
  Please contact me at (817) 200-1527 with any questions you have regarding this letter.  
  Sincerely,  
 
  /RA/   
  /RA/   
  Mark S. Haire, Chief  
  Mark S. Haire, Chief  
Plant Support Branch 1  
Plant Support Branch 1  
Division of Reactor Safety  Docket No. 50-483 License No. NPF-30  
 
Division of Reactor Safety  
  Docket No. 50-483 License No. NPF-30  
 
   
   
Enclosure:  
Enclosure:  
Inspection Plan  
Inspection Plan  
  cc w/encl: Mr. Eric Olson  
 
  cc w/encl:  
Mr. Eric Olson  
 
Manager, Security   
Manager, Security   
Callaway Nuclear Plant  
Callaway Nuclear Plant  
P.O. Office Box 620 Fulton, MO 65251   
P.O. Office Box 620 Fulton, MO 65251  
   
cc w/o encl:  
cc w/o encl:  
Electronic Distribution for  
Electronic Distribution for  
Callaway Plant   
Callaway Plant  
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION F. Diya - 2 -  
    
   OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  
OFFICIAL USE ONLY
  Please contact me at (817) 200-1527 with any questions you have regarding this letter.  Sincerely,  
-SECURITY-RELATED INFORMATION
  F. Diya - 2 -  
 
   OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  
 
  Please contact me at (817) 200-1527 with any questions you have regarding this letter.  
  Sincerely,  
 
  /RA/   
  /RA/   
  Mark S. Haire, Chief  
  Mark S. Haire, Chief  
Plant Support Branch 1  
Plant Support Branch 1  
Division of Reactor Safety  Docket No. 50-483 License No. NPF-30  
 
Division of Reactor Safety  
  Docket No. 50-483 License No. NPF-30  
 
   
   
Enclosure:  
Enclosure:  
Inspection Plan  
Inspection Plan  
  cc w/encl: Mr. Eric Olson  
 
  cc w/encl:  
Mr. Eric Olson  
 
Manager, Security   
Manager, Security   
Callaway Nuclear Plant  
Callaway Nuclear Plant  
P.O. Office Box 620 Fulton, MO 65251   
P.O. Office Box 620 Fulton, MO 65251  
   
cc w/o encl:  
cc w/o encl:  
Electronic Distribution for  
Electronic Distribution for  
   Callaway Plant  Distribution:  See next page  
   Callaway Plant  
  ADAMS Accession Number:  ML15244B092  SUNSI Review By:  MHaire ADAMS Yes    No  Publicly Available Non-Publicly Available  Non-Sensitive  Sensitive Keyword:  RGN-002 OFFICE C:PSB1      NAME MHaire/dch      SIGNATURE /RA/      DATE 9/1/15      OFFICIAL RECORD COPY  
  Distribution:  See next page  
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION   OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION Letter to Mr. Fadi Diya from Mark Haire, dated September 1, 2015   
 
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401)   
  ADAMS Accession Number:  ML15244B092  SUNSI Review By:  MHaire  
Electronic Distribution by RIV w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov)  
ADAMS Yes    No  Publicly Available Non-Publicly Available  Non-Sensitive  Sensitive Keyword:  RGN-002 OFFICE C:PSB1      NAME MHaire/dch      SIGNATURE /RA/      DATE 9/1/15      OFFICIAL RECORD COPY  
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)   
OFFICIAL USE ONLY
Electronic Distribution by RIV w/o enclosure: Regional Administrator (Marc.Dapas@nrc.gov)  
-SECURITY-RELATED INFORMATION
  OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
Letter to Mr. Fadi Diya from Mark Haire, dated September 1, 2015  
   
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401)  
   
Electronic Distribution by RIV w/enclosure
: Security Specialist/NSIR (Eric.Wharton@nrc.gov)  
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)  
   
Electronic Distribution by RIV w/o enclosure
: Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)  
Line 86: Line 150:
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)  
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  

Revision as of 20:40, 30 June 2018

Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015401)
ML15244B092
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/01/2015
From: Haire M S
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2015401
Download: ML15244B092 (4)


See also: IR 05000483/2015401

Text

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

"Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled."

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

September 1, 2015

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT

NUMBER 05000483/2015401)

Dear Mr. Diya:

On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant. The results of that review have been trans

mitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related

inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are

tentative and may be revised at the next semiannual performance review. The NRC provides

the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as

soon as possible to dis

cuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence

8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we

must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

F. Diya - 2 -

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified

Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-483 License No. NPF-30

Enclosure:

Inspection Plan

cc w/encl:

Mr. Eric Olson

Manager, Security

Callaway Nuclear Plant

P.O. Office Box 620 Fulton, MO 65251

cc w/o encl:

Electronic Distribution for

Callaway Plant

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

F. Diya - 2 -

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-483 License No. NPF-30

Enclosure:

Inspection Plan

cc w/encl:

Mr. Eric Olson

Manager, Security

Callaway Nuclear Plant

P.O. Office Box 620 Fulton, MO 65251

cc w/o encl:

Electronic Distribution for

Callaway Plant

Distribution: See next page

ADAMS Accession Number: ML15244B092 SUNSI Review By: MHaire

ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ DATE 9/1/15 OFFICIAL RECORD COPY

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY

-SECURITY-RELATED INFORMATION

Letter to Mr. Fadi Diya from Mark Haire, dated September 1, 2015

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401)

Electronic Distribution by RIV w/enclosure

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Electronic Distribution by RIV w/o enclosure

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Shawn.Money@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

CWY Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (John.Klos@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) ROPreports Resource