ML15244B092: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION "Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled." OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION | {{#Wiki_filter:OFFICIAL USE ONLY | ||
-SECURITY-RELATED INFORMATION | |||
"Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this | |||
transmittal document is decontrolled." | |||
OFFICIAL USE ONLY | |||
-SECURITY-RELATED INFORMATION | |||
September 1, 2015 | |||
Mr. Fadi Diya, Senior Vice President | Mr. Fadi Diya, Senior Vice President | ||
and Chief Nuclear Officer | |||
Union Electric Company | |||
P.O. Box 620 | P.O. Box 620 | ||
Fulton, MO 65251 | Fulton, MO 65251 | ||
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT | SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT | ||
NUMBER 05000483/2015401) | NUMBER 05000483/2015401) | ||
Dear Mr. Diya: | Dear Mr. Diya: | ||
On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant. The results of that review have been | |||
On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant. The results of that review have been trans | |||
mitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related | |||
inspections at your facility. | inspections at your facility. | ||
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are | The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are | ||
tentative and may be revised at the next semiannual performance review. The NRC provides | tentative and may be revised at the next semiannual performance review. The NRC provides | ||
the inspection plan to allow for the resolution of any scheduling conflicts and personnel | the inspection plan to allow for the resolution of any scheduling conflicts and personnel | ||
availability issues. The NRC will contact you as soon as possible to | availability issues. The NRC will contact you as | ||
soon as possible to dis | |||
cuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence | |||
8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility. | |||
While we are fully committed to our goal of ensuring openness in our regulatory process, we | While we are fully committed to our goal of ensuring openness in our regulatory process, we | ||
must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and | must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and | ||
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION | UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 | ||
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified | OFFICIAL USE ONLY | ||
-SECURITY-RELATED INFORMATION | |||
F. Diya - 2 - | |||
OFFICIAL USE ONLY | |||
-SECURITY-RELATED INFORMATION | |||
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified | |||
Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | ||
Please contact me at (817) 200-1527 with any questions you have regarding this letter. Sincerely, | |||
Please contact me at (817) 200-1527 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | /RA/ | ||
Mark S. Haire, Chief | Mark S. Haire, Chief | ||
Plant Support Branch 1 | Plant Support Branch 1 | ||
Division of Reactor Safety Docket No. 50-483 License No. NPF-30 | |||
Division of Reactor Safety | |||
Docket No. 50-483 License No. NPF-30 | |||
Enclosure: | Enclosure: | ||
Inspection Plan | Inspection Plan | ||
cc w/encl: Mr. Eric Olson | |||
cc w/encl: | |||
Mr. Eric Olson | |||
Manager, Security | Manager, Security | ||
Callaway Nuclear Plant | Callaway Nuclear Plant | ||
P.O. Office Box 620 Fulton, MO 65251 | P.O. Office Box 620 Fulton, MO 65251 | ||
cc w/o encl: | cc w/o encl: | ||
Electronic Distribution for | Electronic Distribution for | ||
Callaway Plant | Callaway Plant | ||
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION | |||
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | OFFICIAL USE ONLY | ||
Please contact me at (817) 200-1527 with any questions you have regarding this letter. Sincerely, | -SECURITY-RELATED INFORMATION | ||
F. Diya - 2 - | |||
OFFICIAL USE ONLY | |||
-SECURITY-RELATED INFORMATION | |||
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | |||
Please contact me at (817) 200-1527 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | /RA/ | ||
Mark S. Haire, Chief | Mark S. Haire, Chief | ||
Plant Support Branch 1 | Plant Support Branch 1 | ||
Division of Reactor Safety Docket No. 50-483 License No. NPF-30 | |||
Division of Reactor Safety | |||
Docket No. 50-483 License No. NPF-30 | |||
Enclosure: | Enclosure: | ||
Inspection Plan | Inspection Plan | ||
cc w/encl: Mr. Eric Olson | |||
cc w/encl: | |||
Mr. Eric Olson | |||
Manager, Security | Manager, Security | ||
Callaway Nuclear Plant | Callaway Nuclear Plant | ||
P.O. Office Box 620 Fulton, MO 65251 | P.O. Office Box 620 Fulton, MO 65251 | ||
cc w/o encl: | cc w/o encl: | ||
Electronic Distribution for | Electronic Distribution for | ||
Callaway Plant Distribution: See next page | Callaway Plant | ||
ADAMS Accession Number: ML15244B092 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ DATE 9/1/15 OFFICIAL RECORD COPY | Distribution: See next page | ||
OFFICIAL USE ONLY-SECURITY-RELATED INFORMATION | |||
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401) | ADAMS Accession Number: ML15244B092 SUNSI Review By: MHaire | ||
Electronic Distribution by RIV w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov) | ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ DATE 9/1/15 OFFICIAL RECORD COPY | ||
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov) | OFFICIAL USE ONLY | ||
Electronic Distribution by RIV w/o enclosure: Regional Administrator (Marc.Dapas@nrc.gov) | -SECURITY-RELATED INFORMATION | ||
OFFICIAL USE ONLY | |||
-SECURITY-RELATED INFORMATION | |||
Letter to Mr. Fadi Diya from Mark Haire, dated September 1, 2015 | |||
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401) | |||
Electronic Distribution by RIV w/enclosure | |||
: Security Specialist/NSIR (Eric.Wharton@nrc.gov) | |||
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov) | |||
Electronic Distribution by RIV w/o enclosure | |||
: Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | ||
Line 86: | Line 150: | ||
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov) | Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
Revision as of 20:40, 30 June 2018
ML15244B092 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 09/01/2015 |
From: | Haire M S Plant Support Branch-1 |
To: | Diya F Union Electric Co |
References | |
IR 2015401 | |
Download: ML15244B092 (4) | |
See also: IR 05000483/2015401
Text
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
"Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
transmittal document is decontrolled."
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
September 1, 2015
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT
NUMBER 05000483/2015401)
Dear Mr. Diya:
On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant. The results of that review have been trans
mitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related
inspections at your facility.
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are
tentative and may be revised at the next semiannual performance review. The NRC provides
the inspection plan to allow for the resolution of any scheduling conflicts and personnel
availability issues. The NRC will contact you as
soon as possible to dis
cuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence
8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
While we are fully committed to our goal of ensuring openness in our regulatory process, we
must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
F. Diya - 2 -
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified
Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-483 License No. NPF-30
Enclosure:
Inspection Plan
cc w/encl:
Mr. Eric Olson
Manager, Security
Callaway Nuclear Plant
P.O. Office Box 620 Fulton, MO 65251
cc w/o encl:
Electronic Distribution for
Callaway Plant
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
F. Diya - 2 -
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-483 License No. NPF-30
Enclosure:
Inspection Plan
cc w/encl:
Mr. Eric Olson
Manager, Security
Callaway Nuclear Plant
P.O. Office Box 620 Fulton, MO 65251
cc w/o encl:
Electronic Distribution for
Callaway Plant
Distribution: See next page
ADAMS Accession Number: ML15244B092 SUNSI Review By: MHaire
ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ DATE 9/1/15 OFFICIAL RECORD COPY
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
Letter to Mr. Fadi Diya from Mark Haire, dated September 1, 2015
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401)
Electronic Distribution by RIV w/enclosure
- Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Electronic Distribution by RIV w/o enclosure
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Shawn.Money@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (John.Klos@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) ROPreports Resource