ML16257A099: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:WSES-FSAR-UNIT 3     13.7-1Revision 308 (11/17)  (LBDCR 13-015, R308) 13.7  EMERGENCY PREPAREDNESS  
{{#Wiki_filter:WSES-FSAR-UNIT 3 13.7-1Revision 308 (11/17)  
   (LBDCR 13-015, R308) 13.7  EMERGENCY PREPAREDNESS  


13.7.1 Emergency Plan In accordance with 10 CFR 50.54 (q), a document titled "Waterford 3 SES Emergency Plan" is maintained and submitted by Entergy to the NRC.  
13.7.1 Emergency Plan  
 
In accordance with 10 CFR 50.54 (q), a docum ent titled "Waterford 3 SES Emergency Plan" is maintained and submitted by Entergy to the NRC.
 
13.7.2 Emergency Response Facilities
 
The Emergency Operations Facility (EOF) provides for the management of overall emergency response, coordination of radiological and environmental a ssessments, and determination of recommended public protective actions. An alternat e Emergency Operations Facility is located outside of the 10-mile emergency planning zone.  


13.7.2 Emergency Response Facilities The Emergency Operations Facility (EOF) provides for the management of overall emergency response, coordination of radiological and environmental assessments, and determination of recommended public protective actions. An alternate Emergency Operations Facility is located outside of the 10-mile emergency planning zone.
  (LBDCR 13-015, R308)}}
  (LBDCR 13-015, R308)}}

Revision as of 04:11, 30 June 2018

Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.7
ML16257A099
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A099 (1)


Text

WSES-FSAR-UNIT 3 13.7-1Revision 308 (11/17)

(LBDCR 13-015, R308) 13.7 EMERGENCY PREPAREDNESS

13.7.1 Emergency Plan

In accordance with 10 CFR 50.54 (q), a docum ent titled "Waterford 3 SES Emergency Plan" is maintained and submitted by Entergy to the NRC.

13.7.2 Emergency Response Facilities

The Emergency Operations Facility (EOF) provides for the management of overall emergency response, coordination of radiological and environmental a ssessments, and determination of recommended public protective actions. An alternat e Emergency Operations Facility is located outside of the 10-mile emergency planning zone.

(LBDCR 13-015, R308)