ML17264A147: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:IpRIORITY3.(ACCELERATEDRZDSPROCESSING)REGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)ACCESSIONNBR:9509070205DOC.DATE:95/09/01NOTARIZED:NODOCKETgFACIL:50-244RobertEmmetGinnaNuclearPlant,Unit1,RochesterG05000244PAUTH.NAMEAUTHORAFFILIATIONSTMARTIN,J.T.RochesterGas&ElectricCorp.MECREDY,R.C.RochesterGas&ElectricCorp.RECIP.NAMERECIPIENTAFFILIATIONJOHNSON,A.R.
{{#Wiki_filter:IpRIORITY 3.(ACCELERATED RZDSPROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9509070205 DOC.DATE:
95/09/01NOTARIZED:
NODOCKETgFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244PAUTH.NAMEAUTHORAFFILIATION STMARTIN,J.T.
Rochester Gas&ElectricCorp.MECREDY,R.C.
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.


==SUBJECT:==
==SUBJECT:==
LER95-007-00:on950803,lostpowerfrom34.5kVoffsiteowerCircuit751duetooffsiteelectrical'torm,resultingnautomaticstartofEDGB.Offsitepowerrestored,EDGBstopped&realigned&Circuit751cleared.W/950901ltr.DISTRIBUTIONCODE:IE22TCOPIESRECEIVED:LTRlENCL1SIZE:!lTITLE:50.73/50.9LicenseeEventReport(LER),IncidentRpt,etc.0RNOTES:LicenseExpdateinaccordancewith10CFR2,2.109(9/19/72).05000244TRECIPIENTIDCODE/NAMEPD1-1PDINTERNAL:AE~O/SZD/~B~ILECENTER~Rim-BNRR/DISP/PIPBNRR/DRCH/HICBNRR/DRPM/PECBNRR/DSSA/SPSB/BRES/DSIR/EIBEXTERNAL:LSTLOBBY.WARDNOACMURPHY,G.ANRCPDRCOPIESLTTRENCL112211111111111111111111RECIPIENTIDCODE/NAMEJOHNSON,AAEOD/SPD/RRABNRR/DE/ECGBNRR/DE/EMEBNRR/DRCH/HHFBNRR/DRCH/HOLBNRR/DSSA/SPLBNRR/DSSA/SRXBRGN1FILE01LITCOBRYCE,JHNOACPOORE,W.NUDOCSFULLTXTCOPIESLTTRENCL1'1111111111111111221111D,'M)NNOTETOALL"RZDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFN5D8(415-2083)TOELIMINATEYOURNAMEFROMDISTRIBUTION.LISTSFORDOCUMENTSYOUDON'TNEED!FULLTEXTCONVERSIONREQUIREDTOTALNUMBEROFCOPIESREQUIRED:LTTR26ENCL26 ANDROCHESTERGASANDElECTRTCCORPORATTON+89EASTAVENUE,ROCHESTER,MY14649.0001AREACODE71654'6-27NROBERTC.MECREDYVicePresidentNvcleorOperotionsSeptember1,1995U.S.NuclearRegulatoryCommissionDocumentControlDeskAttn:AllenR.JohnsonPWRProjectDirectorateI-1Washington,D.C.20555
LER95-007-00:on 950803,lost powerfrom34.5kVoffsiteowerCircuit751duetooffsiteelectrical'torm, resulting nautomatic startofEDGB.Offsite powerrestored,EDG Bstopped&realigned
&Circuit751cleared.W/950901 ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTRl ENCL1SIZE:!lTITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.0RNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
05000244TRECIPIENT IDCODE/NAME PD1-1PDINTERNAL:
AE~O/SZD/~B
~ILECENTER~Rim-BNRR/DISP/PIPB NRR/DRCH/HICB NRR/DRPM/PECB NRR/DSSA/SPSB/B RES/DSIR/EIB EXTERNAL:
LSTLOBBY.WARDNOACMURPHY,G.A NRCPDRCOPIESLTTRENCL112211111111111111111111RECIPIENT IDCODE/NAME JOHNSON,A AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/SPLB NRR/DSSA/SRXB RGN1FILE01LITCOBRYCE,JHNOACPOORE,W.NUDOCSFULLTXTCOPIESLTTRENCL1'1111111111111111221111D,'M)NNOTETOALL"RZDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFN5D8(415-2083)
TOELIMINATE YOURNAMEFROMDISTRIBUTION
.LISTSFORDOCUMENTS YOUDON'TNEED!FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
LTTR26ENCL26 ANDROCHESTER GASANDElECTRTCCORPORATTON
+89EASTAVENUE, ROCHESTER, MY14649.0001 AREACODE71654'6-27NROBERTC.MECREDYVicePresident NvcleorOperotions September 1,1995U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonPWRProjectDirectorate I-1Washington, D.C.20555


==Subject:==
==Subject:==
LER95-007,Lossof34.5KVOffsitePowerCircuit751,DuetoOffsiteElectricalStorm,ResultsinAutomaticStartof"B"EmergencyDieselGeneratorR.E.GinnaNuclearPowerPlantDocketNo.50-244Inaccordancewith10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorconditionthatresultedinamanualorautomaticactuationofanyengineeredsafetyfeature(ESF),includingthereactorprotectionsystem(RPS)",theattachedLicenseeEventReportLER95-007isherebysubmitted.Thiseventhasinnowayaffectedthepublic'shealthandsafety.Verytrulyyours,RobertC.Mecredyxc:U.S.NuclearRegulatoryCommissionMr.AllenR.Johnson(MailStop14B2)PWRProjectDirectorateI-1Washington,D.C.20555U.S.NuclearRegulatoryCommissionRegionI475AllendaleRoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspectort.(E<~950'90702059'50'st01PDRADOCK05000244~gpssl)  
LER95-007,Lossof34.5KVOffsitePowerCircuit751,DuetoOffsiteElectrical Storm,ResultsinAutomatic Startof"B"Emergency DieselGenerator R.E.GinnaNuclearPowerPlantDocketNo.50-244Inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorcondition thatresultedinamanualorautomatic actuation ofanyengineered safetyfeature(ESF),including thereactorprotection system(RPS)",theattachedLicenseeEventReportLER95-007isherebysubmitted.
Thiseventhasinnowayaffectedthepublic'shealthandsafety.Verytrulyyours,RobertC.Mecredyxc:U.S.NuclearRegulatory Commission Mr.AllenR.Johnson(MailStop14B2)PWRProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector t.(E<~950'9070205 9'50'st01 PDRADOCK05000244~gpssl)  


HRCFORM366(5-92)U.S.NUCLEARREGULATORYIXNHISSIOHAPPROVEDBYNHO.3150-0104EXPIRES5/31/95LICENSEEEVENTREPORT(LER)(Seereverseforrequirednumberofdigits/charactersforeachblock)ESTIHATEDBURDEHPERRESPONSETOCOHPLYWITHTHISINFORHATIONCOLLECTIOHREQUEST:50.0HRS.FOR'WARDCOMMENTSREGARDINGBURDENESTIHATETOTHEINFORMATIONANDRECORDSMANAGEMENTBRANCH(HNBB7714),U.S.NUCLEARREGULATORYCOHHISSION,WASHINGTON,DC20555-0001ANDTOTHEPAPERWORKREDUCTION"PROJECT(31800104),OFFICEOFHAHAGEHEHTANDBUDGETWASHINGTONDC20503.FAGILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETNNIBER(2)05000244PAGE(3)10F10TITLE(4)Lossof34.5KVOffsitePoMerCircuit751,DuetoOffsiteElectricalStorm,ResultsinAutomaticStartof<<B<<EmergencyDieselGeneratorEVEHTDATE(5)LERNUMBER(6)REPORTDATE(7)OTHERFACILITIESINVOLVED(S)HOHTHDAYYEARYEARSEQUENTIALREVISIONMONTHNUMBERNUHBERDAYFACILITYHAHEYEARDOCKETNUMBER.08039595--007--000901FACILITYNAMEDOCKETHUMBEROPERATINGH(NE(9)NTHISREPORTISSUBHITTEDPURSUANTTOTHEREQUIREMENTSOF10CFR5.(Checkoneormore)(11)20.402(b)50.73(a)(2)(iv)20.405(c)73.71(b)POWERLEVEL(10)09720405(a)(1)(i)20.405(a)(l)(ii)20.405(a)(1)(iii)20.405(a)(1)(iv)20.405(a)(1)(v)50.36(c)(1)50.36(c)(2)50.73(a)(2)(i)50.73(a)(2)(ii)50'3(a)(2)(iii)LICENSEECONTACTFORTHISLER(12)50.73(a)(2)(v)50.73(a)(2)(vii)50.73(a)(2)(viii)(A)50.73(a)(2)(viii)(B)50.73(a)(2)(x)73.71(c)OTHER(SpecifyinAbstractbelowandinText,HRCForm366A)HAMEJohnT.St.Martin-TechnicalAssistantTELEPHONENUMBER(includeAreaCode)(716)771-3641CNIPLETEONELINEFOREACHCOMPONENTFAILUREDESCRIBEDINTHISREPORT(13)CAUSESYSTEHCOMPONENTEACBL5HANUFACTURERX000REPORTABLETONPRDSN,CAUSESYSTEHCOHPOHENTHANUFACTURERREPORTABLETONP)DSSUPPLEHENTALREPORTEXPECTED(14)YES(Ifyes,completeEXPECTEDSUBHISSIONDATE).XHOEXPECTEDSUSHISSIOHDATE(15)MONTHDAYYEARABSTRACT(Limitto1400spaces,i.e.,approximately15single-spacedtypegrittenlines)(16)OnAugust3,1995,atapproximately1526EDST,withthereactoratapproximately97%steadystatepower,powerfromCircuit751(34.5KVoffsitepowersource)waslost.Thisresultedindeenergizationof4160Voltbus12Band"B"train480Voltsafeguardsbuses16and17.The"B"EmergencyDieselGenerator(D/G)automaticallystarted'ndreenergizedbuses16and17asperdesign.Therewasnochangeinreactorpowerorturbineload.ImmediatecorrectiveactionwastoperformtheappropriateactionsofAbnormalProcedureAP-ELEC.1(Lossof12AAnd/Or12BBusses)tostabilizetheplantandtoverifythatthe"B"EmergencyD/Ghadstartedandreenergizedbuses16and17.ThecauseofthelossofpowerfromCircuit751wasdeterminedtobeelectricalstormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneousovercurrentprotectiverelayforCircuit751(atStation204),deenergizingthecircuit.ThiseventisNUREG-1022CauseCode(C).HRCFORH366(5-92)
HRCFORM366(5-92)U.S.NUCLEARREGULATORY IXNHISSIOH APPROVEDBYNHO.3150-0104 EXPIRES5/31/95LICENSEEEVENTREPORT(LER)(Seereverseforrequirednumberofdigits/characters foreachblock)ESTIHATED BURDEHPERRESPONSETOCOHPLYWITHTHISINFORHATION COLLECTIOH REQUEST:50.0HRS.FOR'WARDCOMMENTSREGARDING BURDENESTIHATETOTHEINFORMATION ANDRECORDSMANAGEMENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COHHISSION, WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION" PROJECT(31800104),OFFICEOFHAHAGEHEHT ANDBUDGETWASHINGTON DC20503.FAGILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETNNIBER(2)05000244PAGE(3)10F10TITLE(4)Lossof34.5KVOffsitePoMerCircuit751,DuetoOffsiteElectrical Storm,ResultsinAutomatic Startof<<B<<Emergency DieselGenerator EVEHTDATE(5)LERNUMBER(6)REPORTDATE(7)OTHERFACILITIES INVOLVED(S)HOHTHDAYYEARYEARSEQUENTIAL REVISION MONTHNUMBERNUHBERDAYFACILITYHAHEYEARDOCKETNUMBER.08039595--007--000901FACILITYNAMEDOCKETHUMBEROPERATING H(NE(9)NTHISREPORTISSUBHITTED PURSUANTTOTHEREQUIREMENTS OF10CFR5.(Checkoneormore)(11)20.402(b) 50.73(a)(2)(iv) 20.405(c) 73.71(b)POWERLEVEL(10)09720405(a)(1)(i)20.405(a)(l)(ii) 20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v) 50.36(c)(1) 50.36(c)(2) 50.73(a)(2)(i) 50.73(a)(2)(ii) 50'3(a)(2)(iii)
HRCFORN366A(5-92)U.S.NUCLEARREGULATORYC(NHISSIOHLICENSEEEVENTREPORT(LER)TEXTCONTINUATIONAPPROVEDBYOIBHO-3150-0104EXPIRES5/31/95ESTIHATEOBURDENPERRESPONSETOCOHPLYWITHTHISINFORHATIOHCOLLECTIONREQUEST:50.0BR'ORWARDCOHHEHTSREGARDINGBURDENESTINATETOTHEINFORNATIONANDRECORDSHANAGEHENTBRANCH(HNBB7714),U.S.NUCLEARREGULATORYC(WNISSION~WASHINGTON,DC20555-0001ANDTOTHEPAPERWORKREDUCTIONPROJECT(3150-0104),OFFICEOFNANAGENENTANDBUDGETWASHIHGTONDC20503-FACILITYHAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNWBER(2)05000244LERNIMBER(6)SEQUENTIALNUHBER--007--REVISIONHUNBER00PAGE(3)2OF10TEXT(lfmorespaceisrequired,useadditionalcopiesofHRCForm366A)(17)I.PRE-EVENTPLANTCONDITIONSTheplantwasatapproximately97%steadystatereactorpower.The"B"EmergencyDieselGenerator(D/G)hadbeenremovedfromserviceearlieronAugust3toperformplannedmaintenance(andhadbeendeclaredinoperableat0422EDSTtoperformthismaintenance).Bymid-afternoononAugust3,themaintenancehadbeencompleted,butthe"B"EmergencyD/Gwasstillconsideredinoperable,pendingcompletionofpost-maintenancetesting.Duetoweatherconditions(a'hunderstormwasinprogressinthevicinityoftheplant),testingwasbeingdeferreduntilthethunderstormpassed.ThePlantManagerrecommendedthatthe"B"EmergencyD/Gbealignedforautostandby(althoughstillinoperablefromanadministrativeviewpoint)tobeanavailablesourceofpowerintheeventofalossofoffsitepowerduringthethunderstorm.Therefore,the"B"EmergencyD/Gwasalignedforautostandby.Theoffsitepowerconfigurationtotheplantwasinthealternate"50%/50%"offsitepowerlineup.ThisconfigurationusesCircuit767(insteadofCircuit751)tosupplypowertothe"A"trainofsafeguardsequipment:oCircuit751(34.5KVoffsitepowersource)wassupplyingpowertothe"B"train480Voltsafeguardsbuses16and17through34.5KVto4160Volttransformer12A(12Atransformer),viaCircuitBreaker52/12AX,to4160Voltbus12B,andthroughthesafeguardsbus4160Voltto480Volttransformers.oCircuit767(34.5KVoffsitepowersource)wassupplyingpowertothe"A"train480Voltsafeguardsbuses14and18through34.5KVto4160Volttransformer12B(12Btransformer),viaCircuitBreaker52/12BY,to4160Voltbus12A,andthroughthesafeguardsbus4160Voltto480Volttransformers.Seetheattachedsketchoftheoffsitepowerdistributionsystem.II.DESCRIPTIONOFEVENTA.DATESANDAPPROXIMATETIMESOFMAJOROCCURRENCES:oAugust3,1995,1526EDST:Eventdateandtime.August3,1995,1526EDST:Discoverydateandtime.HRCFORN366A(5-92)
LICENSEECONTACTFORTHISLER(12)50.73(a)(2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(x) 73.71(c)OTHER(SpecifyinAbstractbelowandinText,HRCForm366A)HAMEJohnT.St.Martin-Technical Assistant TELEPHONE NUMBER(includeAreaCode)(716)771-3641CNIPLETEONELINEFOREACHCOMPONENT FAILUREDESCRIBED INTHISREPORT(13)CAUSESYSTEHCOMPONENT EACBL5HANUFACTURER X000REPORTABLE TONPRDSN,CAUSESYSTEHCOHPOHENT HANUFACTURER REPORTABLE TONP)DSSUPPLEHENTAL REPORTEXPECTED(14)YES(Ifyes,completeEXPECTEDSUBHISSION DATE).XHOEXPECTEDSUSHISSIOHDATE(15)MONTHDAYYEARABSTRACT(Limitto1400spaces,i.e.,approximately 15single-spaced typegrittenlines)(16)OnAugust3,1995,atapproximately 1526EDST,withthereactoratapproximately 97%steadystatepower,powerfromCircuit751(34.5KVoffsitepowersource)waslost.Thisresultedindeenergization of4160Voltbus12Band"B"train480Voltsafeguards buses16and17.The"B"Emergency DieselGenerator (D/G)automatically started'nd reenergized buses16and17asperdesign.Therewasnochangeinreactorpowerorturbineload.Immediate corrective actionwastoperformtheappropriate actionsofAbnormalProcedure AP-ELEC.1 (Lossof12AAnd/Or12BBusses)tostabilize theplantandtoverifythatthe"B"Emergency D/Ghadstartedandreenergized buses16and17.ThecauseofthelossofpowerfromCircuit751wasdetermined tobeelectrical stormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneous overcurrent protective relayforCircuit751(atStation204),deenergizing thecircuit.ThiseventisNUREG-1022 CauseCode(C).HRCFORH366(5-92)
NRCFORH366A(5-92)U.S.NUCLEARREGULATORYCQQIISSIOHLICENSEEEVENTREPORT(LER)TEXTCONTINUATIONAPPROVEDBYQIBNO.3150-0104EXPIRES5/31/95ESTIHATEDBURDENPERRESPONSETOCONPLYWITHTHISINFORHATIONCOLLECTIONREQUEST:50.0HRS~FORWARDCONNENTSREGARDINGBURDENESTIHATETOTHEIHFORHATIONANDRECORDSHANAGEHENTBRANCH(HNBB7714)~U.S.NUCLEARREGULATORYCOHNISSIOH~WASHINGTON,DC20555-0001ANDTOTHEPAPERWORKREDUCTIONPROJECT(3150.0104),OFFICEOFHANAGEHENTANDBUDGETWASHINGTONDC20503.FACILITYNAKE(1)R.E.GinnaNuclearPowerPlantDOCKETNIHIBER(2)05000244LERNQIBER(6SEQUENTIALNUHBER95--007--REVISIONNUHBER00PAGE(3)30F10TEXT(Ifmorespaceisrequired,useadditionalcopiesofHRCForm366A)(17)August3,1995,1526EDST:ControlRoomoperatorsverifythe"B"EmergencyDieselGenerator(D/G)operationandthatsafeguardsbuses16and17areenergized.August3,1995,1628EDST:Safeguardsbuses16and17weretransferredtoCircuit767fromthe"B"EmergencyD/G.August3,1995,1635EDST:The"B"EmergencyD/Gwasstoppedandrealignedforautostandby.oAugust3,1995,1644EDST:Circuit751wasdeclaredoperable.August7,1995,1228EDST:Offsitepowerconfigurationwasrestoredtothealternate"50%/50%"lineup.B.EVENT:OnAugust3,1995,atapproximately1526EDST,withthereactoratapproximately97%steadystatefullpower,theControlRoomreceivednumerousMainControlBoardannunciatoralarms.AmongthesealarmswereL-20(12AXFMROR12ABUSTROUBLE),J-5(IllORg12TRANSFORMEROUTOFSYNCH)iJ7(480VMAINORTIEBREAKERTRIP),J-9(SAFEGUARDBREAKERTRIP),andJ-32(EMERGENCYDIESELGEN1BPANEL).TheControlRoomoperatorsdeterminedthatthefollowingeventshadoccurred:oCircuit751(34.5KVoffsitepowersource)wasdeenergizedo"B"train480Voltsafeguardsbuses16and17hadlosttheirpowersupplyfrom4160Voltbus12B(buses16and17hadbeenmomentarilydeenergized)oThe"B"EmergencyD/Ghadautomaticallystartedandwastiedtosafeguardsbuses16and17TheControlRoomoperatorsverifiedthatreactorcoolantsystemtemperatureandpressurewerestable,andthattherewasnochangeinreactorpowerorturbineload.TheyperformedtheappropriateactionsofAbnormalProcedureAP-ELEC.1(Lossof12AAnd/Or12BBusses)tostabilizetheplant.Theyverifiedthatthe"B"EmergencyD/Gwasoperatingandthatsafeguardsbuses16and17wereenergized.TheControlRoomoperatorsobservedthatCircuit751andbus12Bdisplayedzero(0)voltage.NRCFORH366A(5-92)
HRCFORN366A(5-92)U.S.NUCLEARREGULATORY C(NHISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOIBHO-3150-0104 EXPIRES5/31/95ESTIHATEO BURDENPERRESPONSETOCOHPLYWITHTHISINFORHATIOH COLLECTION REQUEST:50.0BR'ORWARD COHHEHTSREGARDING BURDENESTINATETOTHEINFORNATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY C(WNISSION
NRCFORH366A(5-92)U.S.NUCLEARREGULATORYCQIIISSIOHLICENSEEEVENTREPORT(LER)TEXTCONTINUATIONAPPROVEDBYQIBNO.3150-0104EXPIRES5/31/95ESTIHATEDBURDENPERRESPONSETOCOHPLYWITHTHISINFORHATIONCOLLECTIONREQUEST:50.0HRS.FORWARDCQDIENTSREGARDINGBURDENESTIHATETOTHEIHFORHATIONANDRECORDSHANAGEHENTBRANCH(HNBB7714),U.S.NUCLEARREGULATORYCOHHISSIOH,WASHIHGTOH,DC20555-0001ANDTOTHEPAPERWORKREDUCTIONPROJECT(3180-0104)~OFFICEOFHANAGEHENTANDBUDGETWASHIHGTOHDC20503.FACILITYNAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNWER(2)YEAR0500024495LERNWBER(6)SEQUENTIALNUMBER-007--REVISIONNUNBER00PAGE(3)4OF10TEXT(Ifmorespaceisrequired,useadditionalcopiesofNRCForm366A)(17)ThelossofpowerfromCircuit751resultedinundervoltageonsafeguardsbuses16and17,andthe"B"EmergencyD/Gautomaticallystartedwithinten(10)secondsasperdesignandreenergizedthesebuses.EnergyOperationspersonnelalsoidentifiedthelossofpowerfromCircuit751,andpromptlynotifiedGinnaControlRoomoperatorsof.thelossofpowerfromCircuit751,whichappearedtobecausedbyanoffsitelightningstrikethataffectedCircuit751.TheControlRoomoperatorsreferredtoEquipmentRestorationprocedureER-ELEC.1(RestorationofOffsitePower)torestoreoffsitepowerto4160Voltbus12Band480Voltsafeguardsbuses16and17.TheControlRoomoperatorsclosed4160Voltcircuitbreaker52/12BXtoenergizebus12BfromCircuit767,viathe12Btransformer,atapproximately1602EDST.Atapproximately1628EDST,safeguardsbuses16and17weretransferredtoCircuit767fromthe"B"EmergencyD/G.(Circuit767hadremainedinoperation,supplying"A"train480Voltsafeguardsbuses14and18,throughouttheevent.)Atapproximately1635EDST,August3;1995,the"B"EmergencyD/Gwasstoppedandrealignedforautostandby,pendingperformanceofthepost-maintenancetesting.EnergyOperationssubsequentlycontactedtheControlRoomoperatorsandconfirmedthatthelossofpowerfromCircuit751wascausedbyelectricalstormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneousovercurrentprotectiverelayforCircuit751(atStation204),deenergizingthecircuit.RelayshadbeenresetatStation204,andCircuit751wasreenergizedanddeclaredoperableatapproximately1644EDST.Circuit751wasnotimmediately'lineduptosupplyplantloads,butwasmaintainedastheplant'sbackupsupplyofoffsitepowerratherthanrealigningtheelectricalsystemduringthethunderstormconditions.C.INOPERABLESTRUCTURES,COMPONENTS'RSYSTEMSTHATCONTRIBUTEDTOTHEEVENT:NoneNRCFORH366A(5-92)
~WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(3150-0104),
NRCFORM366A(5-92)U.SNUCLEARREGULATORYCOMMISSIONAPPROVEOBYQNINO.3150-0104EXPIRES5/31/95LICENSEEEVENTREPORT(LER)TEXTCONTINUATIONFACILITYMANE(1)R.E.GinnaNuclearPowerPlantDOCKETNQIBER(2)05000244PAGE(3)5OF10LERNIBIBER(6)SEQUENTIALNUMBERREVISIONNUMBERYEAR00--007--ESTIMATEDBURDENPERRESPONSETOCOMPLYMITHTHISINFORMATIONCOLLECTIOHREQUEST:500HRS.FORMARDCOMMENTSREGARDINGBURDENESTIMATETOTHEINFORMATIONANDRECORDSMAHAGEMEHTBRANCH(MMBB7714),U.S.NUCLEARREGULATORYCOMMISSION,NASHIHGTOH,DC20555-0001ANDTOTHEPAPERMORKREDUCTIONPROJECT(3180-0104),OFFICEOFMANAGEMENTANDBUDGETiJASHINGTONDC20503.TEXT(Ifmorespaceisrequired,useadditionalcopiesofMRCForm366A)(17)D.OTHERSYSTEMSORSECONDARYFUNCTIONSAFFECTED:Thethunderstormconditionsalsoaffectedsome.telephoneservice.Atapproximately1539EDST,theEmergencyNotificationSystem(ENS)lineforGinnaStationbecameinoperable.TheShiftTechnicalAdvisornotifiedtheNRCOperationsCenterandtheUSNRCGinnaSeniorResidentInspectorofthelossoftheENSatapproximately1544EDST.(TheENSwassubsequentlyrestoredtooperablestatusatapproximately1401EDSTonAugust4.)E.METHODOFDISCOVERY:ThiseventwasimmediatelyapparentduetonumerousMainControlBoardalarmsandotherindicationsintheControlRoomwhenpowerfromCircuit751waslost.F.OPERATORACTION:Following'heundervoltageconditiononbuses'16and17,the"B"EmergencyD/Gautomaticallystartedandreenergizedthesebuses.TheControlRoomoperatorsperformedtheappropriateactionstoverifythatthe"B"EmergencyD/Gwasoperatingandsafeguardsbuses16and17wereenergized.TheControlRoomoperatorsmanuallyrestartedthe"B"and"C"containmentrecirculationfans,whichhadtrippedduetothelossofbus16.Themomentarylossofpowertobuses16and17causedthetripofthecommonsamplepumpformonitoringofthecontainment(CNMT)atmospherebychannelsR-10A(iodine),R-11(particulate)andR-12(noblegas).TheControlRoomoperatormanuallyrestartedthecommonsamplepumpatapproximately1535EDST.TheControlRoomoperatorsrestoredoffsitepower(fromCircuit767)tobuses16and17,stoppedthe"B"EmergencyD/G,andrealigneditforautostandby,priortostartingpost-maintenancetestingoftheD/G.Subsequently,theShiftSupervisornotifiedtheNRCatapproximately1748EDSTper10CFR50.72(b)(2)(ii),non-emergencyfourhournotification.HRCFORM366A(5-92)
OFFICEOFNANAGENENT ANDBUDGETWASHIHGTON DC20503-FACILITYHAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNWBER(2)05000244LERNIMBER(6)SEQUENTIAL NUHBER--007--REVISIONHUNBER00PAGE(3)2OF10TEXT(lfmorespaceisrequired, useadditional copiesofHRCForm366A)(17)I.PRE-EVENT PLANTCONDITIONS Theplantwasatapproximately 97%steadystatereactorpower.The"B"Emergency DieselGenerator (D/G)hadbeenremovedfromserviceearlieronAugust3toperformplannedmaintenance (andhadbeendeclaredinoperable at0422EDSTtoperformthismaintenance).
NRCFORH.366A(5-92)U.S.NUCLEARREGULATORYCOHHISSIOHLICENSEEEVENTREPORT(LER)TEXTCONTINUATIONAPPROVEDBYOHBHO.3150-0104EXPIRES5/31/95ESTIHATEDBURDENPERRESPOHSETOCOHPLYWITHTHISINFORHATIOHCOLLECTIONREQUEST:50.0HRS.FORWARDCOHHENTSREGARDINGBURDENESTIHATETOTHEINFORHATIOHANDRECORDSNANAGEHENTBRANCH(HNBB7714),U.S.HUCLEARREGULATORYCOHHISSIOH,'WASHINGTON,OC20555-0001ANDTOTHEPAPERWORKREDUCTIONPROJECT(31500104),OFFICEOFHAHAGENENTANDBUDGETWASHINGTONDC20503.FACILITYHAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNINBER(2)05000244LERNIIIBER(6)SEDUENTIALNUHBER--007--REVISIONHUNGER00PAGE(3)6OF10TEXT(Ifmorespaceisrequired,useadditionalcopiesofNRCForm366A)(17)G.SAFETYSYSTEMRESPONSES:Allsafeguardsequipmentfunctionedproperly.The"B"EmergencyD/Gautomaticallystartedduetotheundervoltageconditiononbuses16and17,displayedpropervoltageandfrequency,andreenergizedsafeguardsbuses16and17tosupplyemergencypower.Runningcontainmentrecirculationfansonbus16trippedasdesignedandweremanuallyrestartedasneededtorestorenormalcoolingtotheContainment.Therunningservicewater,pumponbus17trippedasdesignedandthepumpselectedforautostartstartedwhenpowerwasrestoredtobus17.III.CAUSEOFEVENTA.,IMMEDIATECAUSE:Theautomaticactuationofthe"B"EmergencyD/Gwasduetoundervoltageonsafeguardsbuses16and17.B.INTERMEDIATECAUSE:Theundervoltageonsafeguardsbuses16and17wasduetothelossofpowerfromCircuit751.C.ROOTCAUSE:TheunderlyingcauseofthelossofpowerfromCircuit751waselectricalstormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneousovercurrentprotectiverelayforCircuit751(atStation204),deenergizingCircuit751.ThiseventisNUREG-1022CauseCode(C),"ExternalCause".ThislossofpowerandsubsequentstartofanEmergencyD/GdoesnotmeettheNUMARC93-01,"IndustryGuidelineforMonitoringtheEffectivenessofMaintenanceatNuclearPowerPlants",definitionofa"MaintenancePreventableFunctionalFailure".HRCFORH366A(5-92)
Bymid-afternoon onAugust3,themaintenance hadbeencompleted, butthe"B"Emergency D/Gwasstillconsidered inoperable, pendingcompletion ofpost-maintenance testing.Duetoweatherconditions (a'hunderstorm wasinprogressinthevicinityoftheplant),testingwasbeingdeferreduntilthethunderstorm passed.ThePlantManagerrecommended thatthe"B"Emergency D/Gbealignedforautostandby(although stillinoperable fromanadministrative viewpoint) tobeanavailable sourceofpowerintheeventofalossofoffsitepowerduringthethunderstorm.
NRCFORM366A(5-92)U.S.NUCLEARREGULATORYC(HHISSIOMLICENSEEEVENTREPORT(LER)TEXTCONTINUATIONAPPROVEDBYOHBNO.3150-0104EXPIRES5/31/95ESTIMATEDBURDENPERRESPOHSETOCOMPLYNITHTHISINFORMATIONCOLLECTIONREQUEST:50.0HRS.FORIIARDCOMMENTSREGARDIHGBURDENESTIMATETOTHEINFORMATIONANDRECORDSNAMAGEMENTBRANCH(HNBB7714),U.S.NUCLEARREGULATORYCOMMISSION/IIASHIMGTOH,DC20555-0001ANDTOTHEPAPERNORKREDUCTIONPROJECT(3150.0104),OFFICEOFMANAGEMENTANDBUDGETMASHINGTOMDC20503.FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETMINBER(2)05000244LERMINBER(6SEQUENTIALNUMBER95--007--REVISIONNUMBER00PAGE(3)7OF10TEXT(Ifmorespaceisrequired,useadditionalcopiesofNRCForm366A)(17)IV.ANALYSISOFEVENT:Thiseventisreportableinaccordancewith10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorconditionthatresultedinamanualorautomaticactuationofanyengineeredsafetyfeature(ESF),includingthereactorprotectionsystem(RPS)",inthatthestartingofthe"B"EmergencyD/GwasanautomaticactuationofanESFsystem.Anassessmentwasperformedconsideringboththesafetyconsequencesandimplicationsofthiseventwiththefollowingresultsandconclusions:TherewerenooperationalorsafetyconsequencesorimplicationsattributedtothelossofCircuit751andstartoftheEmergencyD/Gbecause:Allreactorcontrolandprotectionsystemsperformedasdesigned.Althoughthemaintenanceworkforthe"B"EmergencyD/Ghadbeencompleted,the"B"EmergencyD/Gremainedadministrativelyinoperable.Itwasavailableforoperationandsubsequentlyfunctionedasdesignedtoreenergize"B"trainsafeguardsbuses16and17.Whi'leinthiscondition,theplantelectricalpowersystem(offsitepowersourcesandtheEmergencyD/Gs)remainedwithintherequirementsoftheLimitingConditionforOperation(LCO)ofTechnicalSpecification(TS)3.7.2.2.b.l,whichrequiresthatthe"A"EmergencyD/Gbedemonstratedoperablewithin'nehourofthe"B"EmergencyD/Gbeinginoperableandatleastonceper24hoursthereafter.The"A"EmergencyD/Ghadbeendemonstratedoperablewithinonehourof0422EDSTonAugust3,sonofurtheractionswererequiredbyTSfortheshorttimethat,Circuit751wasalsoinoperableonAugust3;Circuit767remainedinoperationsupplyingpowertothe"A"trainsafeguardsbuses;subsequently,Circuit767waslineduptosupplypowertothe"B"trainsafeguardsbusesalso,aspermittedbyTS.HRCFORM366A(5-92)
Therefore, the"B"Emergency D/Gwasalignedforautostandby.Theoffsitepowerconfiguration totheplantwasinthealternate "50%/50%"offsitepowerlineup.Thisconfiguration usesCircuit767(insteadofCircuit751)tosupplypowertothe"A"trainofsafeguards equipment:
NRCFORM366A(5-92)U.S.NUCLEARREGULATORYCQNISSIONLICENSEEEVENTREPORT(LER)TEXTCONTINUATIONAPPROVEDBYOMBNO.3150-0104EXPIRES5/31/95ESTIMATEDBURDENPERRESPONSETOCOMPLYMITHTHISINFORHATIONCOLLECTIOHREQUEST:50.0HRS.FORNARDCOHHEHTSREGARDINGBURDENESTIHATETOTHEIHFORHATIONANDRECORDSMANAGEHENTBRANCH(MNBB7714),U.S.NUCLEARREGULATORYCOMMISSION/MASHINGTOH,DC20555-0001ANDTOTHEPAPERNORKREDUCTIONPROJECT(3140-0104),OFFICEOFMANAGEMENTANDBUDGETMASHINGTONDC20503FACILITYNAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNQlBER(2)05000244YEARLERNIIIBER(6)SEQUENTIALNUHBER-007-REVISIOHNUHBER00PAGE(3)8OF10TEXT(Ifmorespaceisrequired,useadditionalcopiesofHRCForm366A)(17)oRadiationmonitorchannelsR-10A,R-11,andR-12weretemporarilylost.Thecommonsamplepumpwasmanuallyrestartedwithinafewminutes,whichiswithintherequiredactiontimeofTS3.1.5.1.2toobtainagrabsampleatleastonceevery24hours.Basedon.theabove,itcanbeconcludedthatthepublic'shealthandsafetywasassuredatalltimes.V.CORRECTIVEACTIONA.ACTIONTAKENTORETURNAFFECTEDSYSTEMSTOPRE-EVENTNORMALSTATUS:oOffsitepowerwasrestoredtosafeguardsbuses16and17fromCircuit767,andthe"B"EmergencyD/Gwasstoppedandrealignedforautostandby,priortothestartofpost-maintenancetestingofthe"B"EmergencyD/G.oCircuit751wasclearedforusebyEnergyOperations,protectiverelaysforCircuit751(atStation204)wereresetbyEnergyOperations,andCircuit751wasreenergizedandrestoredtooperablestatus.B.ACTIONTAKENORPINNEDTOPREVENTRECURRENCE:AsstatedinLER95-006,optionsforoffsitepowerconfigurationtotheplantwillbereevaluatedtooptimizereliabilityduringadverseweatherconditions.(RefertoLER95-006,Revision0,DocketNo.50-244.)Theprimaryoptioncurrentlybeingevaluatedwouldusean100%/0%"offsitepowerconfigurationasthepreferredconfiguration,withCircuit767normallysupplyingpowertoboththe"A"and"B"trainsafeguardsbuses.NRCFORM366A(5-92)
oCircuit751(34.5KVoffsitepowersource)wassupplying powertothe"B"train480Voltsafeguards buses16and17through34.5KVto4160Volttransformer 12A(12Atransformer),
NRCFORH366A(5-92)U.S.NUCLEARREGULATORYCOMMISSIONLICENSEEEVENTREPORT(LER)TEXTCONTINUATIONAPPROVEDBYOMBNO.3150-0104EXPIRES5/31/95ESTIMATEDBURDENPERRESPONSETOCOMPLYllITHTHISINFORHATIOHCOLLECTIOHREGUEST:50.0MRS'ORHARDCOMMENTSREGARDINGBURDENESTIMATETOTHEINFORMATIONAHDREQ)RDSMANAGEMENTBRANCH(MHBB7714),U.S.NUCLEARREGULATORYCOMMISSION,lIASHIHGTON,DC20555-0001ANDTOTHEPAPERlSRKREDUCTIONPROJECT(3180-0104),OFFICEOFMANAGEMENTANDBUDGETMASHINGTONDC20503.FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETHWBER(2)0500024495LERMQIBER(6)SEQUENTIALNUMBER-007--REVISIONHUMBER00PAGE(3)9OF10TEXT(Ifmorespaceisrequired,useadditionalcopiesofHRCForm366A)(17)VI.ADDITIONALINFORMATIONA.FAILEDCOMPONENTS:NoneB.PREVIOUSLERsONSIMILAREVENTS:AsimilarLEReventhistoricalsearchwasconductedwiththefollowingresults:LERs91-002,92-007,94-012,and95-006weresimilareventswithsimilarrootcauses(startofanEmergencyD/Gduetolossofoffsitepowerfromexternalcauses).C.SPECIALCOMMENTS:NoneHRC'ORM366A(5-92)  
viaCircuitBreaker52/12AX,to4160Voltbus12B,andthroughthesafeguards bus4160Voltto480Volttransformers.
~MRCFORM366A(5.92)U.S.MUCI.EARREGULATORYCOWISSIOMAPPROVEDBYQGIHO.3150-0104EXPIRES5/31/95LICENSEEEVENTREPORT(LER)TEXTCONTINUATIONFACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETNQIBER(2)LERNLNBER(6)PAGE(3)10OF10SEQUENTIALNUMBERREVISIONNUMBERYEAR05000244g500--007--ESTIMATEDBURDENPERRESPOHSETOCOMPLYMITHTHISINFORMATIONCOLLECTIOHREQUESTS50.0FORMARDCOMMENTSREGARDINGBURDENESTIMATETOTNEINFORMATIONAllORECORDSMANAGEMENTBRANCH(liHBB7714),U.S.NUCLEARREGULATORYCOMMISSION,llASNIHGTOH,DC20555-0001AMDTOTHEPAPERUORKREDUCTIONPROJECT(3150.0104)IOFFICEOFNAMAGENEHTAMDBUDGETMASHINGTONDC20503.TEXT(Ifmorespaceisrequired,useadditionaLcopiesofNRCForm366A)(17)SI>>Ilail14CN$1$IN~QfONUW>>ICI>>>>1St/>>ICI$1aYONS1Sll41>>~IWSI.SCC~I>>~ICO>>IIO>>1$111Sl/~$1111\~OilISt>>ANICNCNONCO14$>>.SIC~ICC~ICC>>CtlCIOCI4>>~O&/$Sl/ISOSSt/CCSO/SCPS>>/CSt/14$ISO>>or/Oalto/Is11$CSCOTSCCNCOOI/OU$14/llI4tCOON~Sl/41$1$$/IC11StICSt/O/tltO/lt$1/441SO/tCICSSIC~IRSt/ONS14/I1St/OI$14/IS~>>I11$$NC$1/1I$14/I~11$$ICCI~ic>>11IIO10~CI,CIC~&#x17d;~I>>IRNICCICC~ICC>>COIC>>COCAIC>>Sl/OISI1/II~I~KSt/O>>II1/IICCCI~IIRINNC:OCS~SNCNIC>>ONCSSCISt>>CC$1/~ISII/IOSI~ICSt/Ohl>>/ICCall>>lNO$1/OltItlttOIIICSt/NNCNCIC1$1IC(I)CORNO'$1/OI$11/SICICIllIR~CCIOIS11St/CNSIC/lICCCNtAC(I)CCIN>>IICNC$1/41111/11~I~NCHRCFORM366A(5-92)}}
oCircuit767(34.5KVoffsitepowersource)wassupplying powertothe"A"train480Voltsafeguards buses14and18through34.5KVto4160Volttransformer 12B(12Btransformer),
viaCircuitBreaker52/12BY,to4160Voltbus12A,andthroughthesafeguards bus4160Voltto480Volttransformers.
Seetheattachedsketchoftheoffsitepowerdistribution system.II.DESCRIPTION OFEVENTA.DATESANDAPPROXIMATE TIMESOFMAJOROCCURRENCES:
oAugust3,1995,1526EDST:Eventdateandtime.August3,1995,1526EDST:Discovery dateandtime.HRCFORN366A(5-92)
NRCFORH366A(5-92)U.S.NUCLEARREGULATORY CQQIISSIOHLICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYQIBNO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCONPLYWITHTHISINFORHATION COLLECTION REQUEST:50.0HRS~FORWARDCONNENTSREGARDING BURDENESTIHATETOTHEIHFORHATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714)~U.S.NUCLEARREGULATORY COHNISSIOH
~WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(3150.0104),
OFFICEOFHANAGEHENT ANDBUDGETWASHINGTON DC20503.FACILITYNAKE(1)R.E.GinnaNuclearPowerPlantDOCKETNIHIBER(2)05000244LERNQIBER(6SEQUENTIAL NUHBER95--007--REVISIONNUHBER00PAGE(3)30F10TEXT(Ifmorespaceisrequired, useadditional copiesofHRCForm366A)(17)August3,1995,1526EDST:ControlRoomoperators verifythe"B"Emergency DieselGenerator (D/G)operation andthatsafeguards buses16and17areenergized.
August3,1995,1628EDST:Safeguards buses16and17weretransferred toCircuit767fromthe"B"Emergency D/G.August3,1995,1635EDST:The"B"Emergency D/Gwasstoppedandrealigned forautostandby.oAugust3,1995,1644EDST:Circuit751wasdeclaredoperable.
August7,1995,1228EDST:Offsitepowerconfiguration wasrestoredtothealternate "50%/50%"lineup.B.EVENT:OnAugust3,1995,atapproximately 1526EDST,withthereactoratapproximately 97%steadystatefullpower,theControlRoomreceivednumerousMainControlBoardannunciator alarms.AmongthesealarmswereL-20(12AXFMROR12ABUSTROUBLE),
J-5(IllORg12TRANSFORMER OUTOFSYNCH)iJ7(480VMAINORTIEBREAKERTRIP),J-9(SAFEGUARD BREAKERTRIP),andJ-32(EMERGENCY DIESELGEN1BPANEL).TheControlRoomoperators determined thatthefollowing eventshadoccurred:
oCircuit751(34.5KVoffsitepowersource)wasdeenergized o"B"train480Voltsafeguards buses16and17hadlosttheirpowersupplyfrom4160Voltbus12B(buses16and17hadbeenmomentarily deenergized) oThe"B"Emergency D/Ghadautomatically startedandwastiedtosafeguards buses16and17TheControlRoomoperators verifiedthatreactorcoolantsystemtemperature andpressurewerestable,andthattherewasnochangeinreactorpowerorturbineload.Theyperformed theappropriate actionsofAbnormalProcedure AP-ELEC.1 (Lossof12AAnd/Or12BBusses)tostabilize theplant.Theyverifiedthatthe"B"Emergency D/Gwasoperating andthatsafeguards buses16and17wereenergized.
TheControlRoomoperators observedthatCircuit751andbus12Bdisplayed zero(0)voltage.NRCFORH366A(5-92)
NRCFORH366A(5-92)U.S.NUCLEARREGULATORY CQIIISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYQIBNO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCOHPLYWITHTHISINFORHATIONCOLLECTIONREQUEST:50.0HRS.FORWARDCQDIENTSREGARDING BURDENESTIHATETOTHEIHFORHATIONANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COHHISSIOH, WASHIHGTOH, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(3180-0104)
~OFFICEOFHANAGEHENT ANDBUDGETWASHIHGTOH DC20503.FACILITYNAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNWER(2)YEAR0500024495LERNWBER(6)SEQUENTIAL NUMBER-007--REVISIONNUNBER00PAGE(3)4OF10TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)ThelossofpowerfromCircuit751resultedinundervoltage onsafeguards buses16and17,andthe"B"Emergency D/Gautomatically startedwithinten(10)secondsasperdesignandreenergized thesebuses.EnergyOperations personnel alsoidentified thelossofpowerfromCircuit751,andpromptlynotifiedGinnaControlRoomoperators of.thelossofpowerfromCircuit751,whichappearedtobecausedbyanoffsitelightning strikethataffectedCircuit751.TheControlRoomoperators referredtoEquipment Restoration procedure ER-ELEC.1 (Restoration ofOffsitePower)torestoreoffsitepowerto4160Voltbus12Band480Voltsafeguards buses16and17.TheControlRoomoperators closed4160Voltcircuitbreaker52/12BXtoenergizebus12BfromCircuit767,viathe12Btransformer, atapproximately 1602EDST.Atapproximately 1628EDST,safeguards buses16and17weretransferred toCircuit767fromthe"B"Emergency D/G.(Circuit767hadremainedinoperation, supplying "A"train480Voltsafeguards buses14and18,throughout theevent.)Atapproximately 1635EDST,August3;1995,the"B"Emergency D/Gwasstoppedandrealigned forautostandby,pendingperformance ofthepost-maintenance testing.EnergyOperations subsequently contacted theControlRoomoperators andconfirmed thatthelossofpowerfromCircuit751wascausedbyelectrical stormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneous overcurrent protective relayforCircuit751(atStation204),deenergizing thecircuit.RelayshadbeenresetatStation204,andCircuit751wasreenergized anddeclaredoperableatapproximately 1644EDST.Circuit751wasnotimmediately
'lineduptosupplyplantloads,butwasmaintained astheplant'sbackupsupplyofoffsitepowerratherthanrealigning theelectrical systemduringthethunderstorm conditions.
C.INOPERABLE STRUCTURES, COMPONENTS'R SYSTEMSTHATCONTRIBUTED TOTHEEVENT:NoneNRCFORH366A(5-92)
NRCFORM366A(5-92)U.SNUCLEARREGULATORY COMMISSION APPROVEOBYQNINO.3150-0104 EXPIRES5/31/95LICENSEEEVENTREPORT(LER)TEXTCONTINUATION FACILITYMANE(1)R.E.GinnaNuclearPowerPlantDOCKETNQIBER(2)05000244PAGE(3)5OF10LERNIBIBER(6)SEQUENTIAL NUMBERREVISIONNUMBERYEAR00--007--ESTIMATED BURDENPERRESPONSETOCOMPLYMITHTHISINFORMATION COLLECTIOH REQUEST:500HRS.FORMARDCOMMENTSREGARDING BURDENESTIMATETOTHEINFORMATION ANDRECORDSMAHAGEMEHT BRANCH(MMBB7714),U.S.NUCLEARREGULATORY COMMISSION, NASHIHGTOH, DC20555-0001 ANDTOTHEPAPERMORK REDUCTION PROJECT(3180-0104),
OFFICEOFMANAGEMENT ANDBUDGETiJASHINGTON DC20503.TEXT(Ifmorespaceisrequired, useadditional copiesofMRCForm366A)(17)D.OTHERSYSTEMSORSECONDARY FUNCTIONS AFFECTED:
Thethunderstorm conditions alsoaffectedsome.telephone service.Atapproximately 1539EDST,theEmergency Notification System(ENS)lineforGinnaStationbecameinoperable.
TheShiftTechnical AdvisornotifiedtheNRCOperations CenterandtheUSNRCGinnaSeniorResidentInspector ofthelossoftheENSatapproximately 1544EDST.(TheENSwassubsequently restoredtooperablestatusatapproximately 1401EDSTonAugust4.)E.METHODOFDISCOVERY:
Thiseventwasimmediately apparentduetonumerousMainControlBoardalarmsandotherindications intheControlRoomwhenpowerfromCircuit751waslost.F.OPERATORACTION:Following'he undervoltage condition onbuses'16and17,the"B"Emergency D/Gautomatically startedandreenergized thesebuses.TheControlRoomoperators performed theappropriate actionstoverifythatthe"B"Emergency D/Gwasoperating andsafeguards buses16and17wereenergized.
TheControlRoomoperators manuallyrestarted the"B"and"C"containment recirculation fans,whichhadtrippedduetothelossofbus16.Themomentary lossofpowertobuses16and17causedthetripofthecommonsamplepumpformonitoring ofthecontainment (CNMT)atmosphere bychannelsR-10A(iodine),
R-11(particulate) andR-12(noblegas).TheControlRoomoperatormanuallyrestarted thecommonsamplepumpatapproximately 1535EDST.TheControlRoomoperators restoredoffsitepower(fromCircuit767)tobuses16and17,stoppedthe"B"Emergency D/G,andrealigned itforautostandby,priortostartingpost-maintenance testingoftheD/G.Subsequently, theShiftSupervisor notifiedtheNRCatapproximately 1748EDSTper10CFR50.72(b)(2)(ii),non-emergency fourhournotification.
HRCFORM366A(5-92)
NRCFORH.366A (5-92)U.S.NUCLEARREGULATORY COHHISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOHBHO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPOHSETOCOHPLYWITHTHISINFORHATIOH COLLECTION REQUEST:50.0HRS.FORWARDCOHHENTSREGARDING BURDENESTIHATETOTHEINFORHATIOH ANDRECORDSNANAGEHENT BRANCH(HNBB7714),U.S.HUCLEARREGULATORY COHHISSIOH,
'WASHINGTON, OC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(31500104),OFFICEOFHAHAGENENT ANDBUDGETWASHINGTON DC20503.FACILITYHAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNINBER(2)05000244LERNIIIBER(6)SEDUENTIALNUHBER--007--REVISIONHUNGER00PAGE(3)6OF10TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)G.SAFETYSYSTEMRESPONSES:
Allsafeguards equipment functioned properly.
The"B"Emergency D/Gautomatically startedduetotheundervoltage condition onbuses16and17,displayed propervoltageandfrequency, andreenergized safeguards buses16and17tosupplyemergency power.Runningcontainment recirculation fansonbus16trippedasdesignedandweremanuallyrestarted asneededtorestorenormalcoolingtotheContainment.
Therunningservicewater,pumponbus17trippedasdesignedandthepumpselectedforautostart startedwhenpowerwasrestoredtobus17.III.CAUSEOFEVENTA.,IMMEDIATE CAUSE:Theautomatic actuation ofthe"B"Emergency D/Gwasduetoundervoltage onsafeguards buses16and17.B.INTERMEDIATE CAUSE:Theundervoltage onsafeguards buses16and17wasduetothelossofpowerfromCircuit751.C.ROOTCAUSE:Theunderlying causeofthelossofpowerfromCircuit751waselectrical stormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneous overcurrent protective relayforCircuit751(atStation204),deenergizing Circuit751.ThiseventisNUREG-1022 CauseCode(C),"External Cause".Thislossofpowerandsubsequent startofanEmergency D/GdoesnotmeettheNUMARC93-01,"Industry Guideline forMonitoring theEffectiveness ofMaintenance atNuclearPowerPlants",definition ofa"Maintenance Preventable Functional Failure".
HRCFORH366A(5-92)
NRCFORM366A(5-92)U.S.NUCLEARREGULATORY C(HHISSIOM LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOHBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPOHSETOCOMPLYNITHTHISINFORMATION COLLECTION REQUEST:50.0HRS.FORIIARDCOMMENTSREGARDIHG BURDENESTIMATETOTHEINFORMATION ANDRECORDSNAMAGEMENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COMMISSION/
IIASHIMGTOH, DC20555-0001 ANDTOTHEPAPERNORK REDUCTION PROJECT(3150.0104),
OFFICEOFMANAGEMENT ANDBUDGETMASHINGTOM DC20503.FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETMINBER(2)05000244LERMINBER(6SEQUENTIAL NUMBER95--007--REVISIONNUMBER00PAGE(3)7OF10TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)IV.ANALYSISOFEVENT:Thiseventisreportable inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorcondition thatresultedinamanualorautomatic actuation ofanyengineered safetyfeature(ESF),including thereactorprotection system(RPS)",inthatthestartingofthe"B"Emergency D/Gwasanautomatic actuation ofanESFsystem.Anassessment wasperformed considering boththesafetyconsequences andimplications ofthiseventwiththefollowing resultsandconclusions:
Therewerenooperational orsafetyconsequences orimplications attributed tothelossofCircuit751andstartoftheEmergency D/Gbecause:Allreactorcontrolandprotection systemsperformed asdesigned.
Althoughthemaintenance workforthe"B"Emergency D/Ghadbeencompleted, the"B"Emergency D/Gremainedadministratively inoperable.
Itwasavailable foroperation andsubsequently functioned asdesignedtoreenergize "B"trainsafeguards buses16and17.Whi'leinthiscondition, theplantelectrical powersystem(offsitepowersourcesandtheEmergency D/Gs)remainedwithintherequirements oftheLimitingCondition forOperation (LCO)ofTechnical Specification (TS)3.7.2.2.b.l, whichrequiresthatthe"A"Emergency D/Gbedemonstrated operablewithin'ne hourofthe"B"Emergency D/Gbeinginoperable andatleastonceper24hoursthereafter.
The"A"Emergency D/Ghadbeendemonstrated operablewithinonehourof0422EDSTonAugust3,sonofurtheractionswererequiredbyTSfortheshorttimethat,Circuit751wasalsoinoperable onAugust3;Circuit767remainedinoperation supplying powertothe"A"trainsafeguards buses;subsequently, Circuit767waslineduptosupplypowertothe"B"trainsafeguards busesalso,aspermitted byTS.HRCFORM366A(5-92)
NRCFORM366A(5-92)U.S.NUCLEARREGULATORY CQNISSIONLICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYMITHTHISINFORHATION COLLECTIOH REQUEST:50.0HRS.FORNARDCOHHEHTSREGARDING BURDENESTIHATETOTHEIHFORHATION ANDRECORDSMANAGEHENT BRANCH(MNBB7714),U.S.NUCLEARREGULATORY COMMISSION/
MASHINGTOH, DC20555-0001 ANDTOTHEPAPERNORK REDUCTION PROJECT(3140-0104),
OFFICEOFMANAGEMENT ANDBUDGETMASHINGTON DC20503FACILITYNAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNQlBER(2)05000244YEARLERNIIIBER(6)SEQUENTIAL NUHBER-007-REVISIOHNUHBER00PAGE(3)8OF10TEXT(Ifmorespaceisrequired, useadditional copiesofHRCForm366A)(17)oRadiation monitorchannelsR-10A,R-11,andR-12weretemporarily lost.Thecommonsamplepumpwasmanuallyrestarted withinafewminutes,whichiswithintherequiredactiontimeofTS3.1.5.1.2 toobtainagrabsampleatleastonceevery24hours.Basedon.theabove,itcanbeconcluded thatthepublic'shealthandsafetywasassuredatalltimes.V.CORRECTIVE ACTIONA.ACTIONTAKENTORETURNAFFECTEDSYSTEMSTOPRE-EVENT NORMALSTATUS:oOffsitepowerwasrestoredtosafeguards buses16and17fromCircuit767,andthe"B"Emergency D/Gwasstoppedandrealigned forautostandby,priortothestartofpost-maintenance testingofthe"B"Emergency D/G.oCircuit751wasclearedforusebyEnergyOperations, protective relaysforCircuit751(atStation204)wereresetbyEnergyOperations, andCircuit751wasreenergized andrestoredtooperablestatus.B.ACTIONTAKENORPINNEDTOPREVENTRECURRENCE:
AsstatedinLER95-006,optionsforoffsitepowerconfiguration totheplantwillbereevaluated tooptimizereliability duringadverseweatherconditions.
(RefertoLER95-006,Revision0,DocketNo.50-244.)Theprimaryoptioncurrently beingevaluated wouldusean100%/0%"offsitepowerconfiguration asthepreferred configuration, withCircuit767normallysupplying powertoboththe"A"and"B"trainsafeguards buses.NRCFORM366A(5-92)
NRCFORH366A(5-92)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYllITHTHISINFORHATIOH COLLECTIOH REGUEST:50.0MRS'ORHARD COMMENTSREGARDING BURDENESTIMATETOTHEINFORMATION AHDREQ)RDSMANAGEMENT BRANCH(MHBB7714),U.S.NUCLEARREGULATORY COMMISSION, lIASHIHGTON, DC20555-0001 ANDTOTHEPAPERlSRK REDUCTION PROJECT(3180-0104),
OFFICEOFMANAGEMENT ANDBUDGETMASHINGTON DC20503.FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETHWBER(2)0500024495LERMQIBER(6)SEQUENTIAL NUMBER-007--REVISIONHUMBER00PAGE(3)9OF10TEXT(Ifmorespaceisrequired, useadditional copiesofHRCForm366A)(17)VI.ADDITIONAL INFORMATION A.FAILEDCOMPONENTS:
NoneB.PREVIOUSLERsONSIMILAREVENTS:AsimilarLEReventhistorical searchwasconducted withthefollowing results:LERs91-002,92-007,94-012,and95-006weresimilareventswithsimilarrootcauses(startofanEmergency D/Gduetolossofoffsitepowerfromexternalcauses).C.SPECIALCOMMENTS:
NoneHRC'ORM366A(5-92)  
~MRCFORM366A(5.92)U.S.MUCI.EARREGULATORY COWISSIOM APPROVEDBYQGIHO.3150-0104 EXPIRES5/31/95LICENSEEEVENTREPORT(LER)TEXTCONTINUATION FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETNQIBER(2)LERNLNBER(6)PAGE(3)10OF10SEQUENTIAL NUMBERREVISIONNUMBERYEAR05000244g500--007--ESTIMATED BURDENPERRESPOHSETOCOMPLYMITHTHISINFORMATION COLLECTIOH REQUESTS50.0FORMARDCOMMENTSREGARDING BURDENESTIMATETOTNEINFORMATION AllORECORDSMANAGEMENT BRANCH(liHBB7714),U.S.NUCLEARREGULATORY COMMISSION, llASNIHGTOH, DC20555-0001 AMDTOTHEPAPERUORK REDUCTION PROJECT(3150.0104)
IOFFICEOFNAMAGENEHT AMDBUDGETMASHINGTON DC20503.TEXT(Ifmorespaceisrequired, useadditionaL copiesofNRCForm366A)(17)SI>>Ilail14CN$1$IN~QfONUW>>ICI>>>>1St/>>ICI$1aYONS1Sll41>>~IWSI.SCC~I>>~ICO>>IIO>>1$111Sl/~$1111\~OilISt>>ANICNCNONCO 14$>>.SIC~ICC~ICC>>CtlCIOCI4>>~O&/$Sl/ISOSSt/CCSO/SCPS>>/CSt/14$ISO>>or/Oalto/Is11$CSCOTSCCNCOOI/OU$14/llI4tCOON~Sl/41$1$$/IC11StICSt/O/tltO/lt
$1/441SO/tCICSSIC~IRSt/ONS14/I1St/OI$14/IS~>>I11$$NC$1/1I$14/I~11$$ICCI~ic>>11IIO10~CI,CIC~&#x17d;~I>>IRNICCICC~ICC>>COIC>>COCAIC>>Sl/OISI1/II~I~KSt/O>>II1/IICCCI~IIRINNC:OCS~SNCNIC>>ONCSSCISt>>CC$1/~ISII/IOSI~ICSt/Ohl>>/ICCall>>lNO$1/OltItlttOIIICSt/NNCNCIC1$1IC(I)CORNO'$1/OI$11/SICICIllIR~CCIOIS11St/CNSIC/lICCCNtAC(I)CCIN>>IICN C$1/41111/11~I~NCHRCFORM366A(5-92)}}

Revision as of 11:51, 29 June 2018

LER 95-007-00:on 950803,lost Power from 34.5 Kv Offsite Power Circuit 751 Due to Offsite Electrical Storm,Resulting in Automatic Start of EDG B.Offsite Power Restored,Edg B Stopped & Realigned & Circuit 751 cleared.W/950901 Ltr
ML17264A147
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/01/1995
From: MECREDY R C, ST MARTIN J T
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-95-007, LER-95-7, NUDOCS 9509070205
Download: ML17264A147 (13)


Text

IpRIORITY 3.(ACCELERATED RZDSPROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9509070205 DOC.DATE:

95/09/01NOTARIZED:

NODOCKETgFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244PAUTH.NAMEAUTHORAFFILIATION STMARTIN,J.T.

Rochester Gas&ElectricCorp.MECREDY,R.C.

Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

SUBJECT:

LER95-007-00:on 950803,lost powerfrom34.5kVoffsiteowerCircuit751duetooffsiteelectrical'torm, resulting nautomatic startofEDGB.Offsite powerrestored,EDG Bstopped&realigned

&Circuit751cleared.W/950901 ltr.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTRl ENCL1SIZE:!lTITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.0RNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

05000244TRECIPIENT IDCODE/NAME PD1-1PDINTERNAL:

AE~O/SZD/~B

~ILECENTER~Rim-BNRR/DISP/PIPB NRR/DRCH/HICB NRR/DRPM/PECB NRR/DSSA/SPSB/B RES/DSIR/EIB EXTERNAL:

LSTLOBBY.WARDNOACMURPHY,G.A NRCPDRCOPIESLTTRENCL112211111111111111111111RECIPIENT IDCODE/NAME JOHNSON,A AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/SPLB NRR/DSSA/SRXB RGN1FILE01LITCOBRYCE,JHNOACPOORE,W.NUDOCSFULLTXTCOPIESLTTRENCL1'1111111111111111221111D,'M)NNOTETOALL"RZDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFN5D8(415-2083)

TOELIMINATE YOURNAMEFROMDISTRIBUTION

.LISTSFORDOCUMENTS YOUDON'TNEED!FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:

LTTR26ENCL26 ANDROCHESTER GASANDElECTRTCCORPORATTON

+89EASTAVENUE, ROCHESTER, MY14649.0001 AREACODE71654'6-27NROBERTC.MECREDYVicePresident NvcleorOperotions September 1,1995U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonPWRProjectDirectorate I-1Washington, D.C.20555

Subject:

LER95-007,Lossof34.5KVOffsitePowerCircuit751,DuetoOffsiteElectrical Storm,ResultsinAutomatic Startof"B"Emergency DieselGenerator R.E.GinnaNuclearPowerPlantDocketNo.50-244Inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorcondition thatresultedinamanualorautomatic actuation ofanyengineered safetyfeature(ESF),including thereactorprotection system(RPS)",theattachedLicenseeEventReportLER95-007isherebysubmitted.

Thiseventhasinnowayaffectedthepublic'shealthandsafety.Verytrulyyours,RobertC.Mecredyxc:U.S.NuclearRegulatory Commission Mr.AllenR.Johnson(MailStop14B2)PWRProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector t.(E<~950'9070205 9'50'st01 PDRADOCK05000244~gpssl)

HRCFORM366(5-92)U.S.NUCLEARREGULATORY IXNHISSIOH APPROVEDBYNHO.3150-0104 EXPIRES5/31/95LICENSEEEVENTREPORT(LER)(Seereverseforrequirednumberofdigits/characters foreachblock)ESTIHATED BURDEHPERRESPONSETOCOHPLYWITHTHISINFORHATION COLLECTIOH REQUEST:50.0HRS.FOR'WARDCOMMENTSREGARDING BURDENESTIHATETOTHEINFORMATION ANDRECORDSMANAGEMENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COHHISSION, WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION" PROJECT(31800104),OFFICEOFHAHAGEHEHT ANDBUDGETWASHINGTON DC20503.FAGILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETNNIBER(2)05000244PAGE(3)10F10TITLE(4)Lossof34.5KVOffsitePoMerCircuit751,DuetoOffsiteElectrical Storm,ResultsinAutomatic Startof<<B<<Emergency DieselGenerator EVEHTDATE(5)LERNUMBER(6)REPORTDATE(7)OTHERFACILITIES INVOLVED(S)HOHTHDAYYEARYEARSEQUENTIAL REVISION MONTHNUMBERNUHBERDAYFACILITYHAHEYEARDOCKETNUMBER.08039595--007--000901FACILITYNAMEDOCKETHUMBEROPERATING H(NE(9)NTHISREPORTISSUBHITTED PURSUANTTOTHEREQUIREMENTS OF10CFR5.(Checkoneormore)(11)20.402(b) 50.73(a)(2)(iv) 20.405(c) 73.71(b)POWERLEVEL(10)09720405(a)(1)(i)20.405(a)(l)(ii) 20.405(a)(1)(iii) 20.405(a)(1)(iv) 20.405(a)(1)(v) 50.36(c)(1) 50.36(c)(2) 50.73(a)(2)(i) 50.73(a)(2)(ii) 50'3(a)(2)(iii)

LICENSEECONTACTFORTHISLER(12)50.73(a)(2)(v) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(x) 73.71(c)OTHER(SpecifyinAbstractbelowandinText,HRCForm366A)HAMEJohnT.St.Martin-Technical Assistant TELEPHONE NUMBER(includeAreaCode)(716)771-3641CNIPLETEONELINEFOREACHCOMPONENT FAILUREDESCRIBED INTHISREPORT(13)CAUSESYSTEHCOMPONENT EACBL5HANUFACTURER X000REPORTABLE TONPRDSN,CAUSESYSTEHCOHPOHENT HANUFACTURER REPORTABLE TONP)DSSUPPLEHENTAL REPORTEXPECTED(14)YES(Ifyes,completeEXPECTEDSUBHISSION DATE).XHOEXPECTEDSUSHISSIOHDATE(15)MONTHDAYYEARABSTRACT(Limitto1400spaces,i.e.,approximately 15single-spaced typegrittenlines)(16)OnAugust3,1995,atapproximately 1526EDST,withthereactoratapproximately 97%steadystatepower,powerfromCircuit751(34.5KVoffsitepowersource)waslost.Thisresultedindeenergization of4160Voltbus12Band"B"train480Voltsafeguards buses16and17.The"B"Emergency DieselGenerator (D/G)automatically started'nd reenergized buses16and17asperdesign.Therewasnochangeinreactorpowerorturbineload.Immediate corrective actionwastoperformtheappropriate actionsofAbnormalProcedure AP-ELEC.1 (Lossof12AAnd/Or12BBusses)tostabilize theplantandtoverifythatthe"B"Emergency D/Ghadstartedandreenergized buses16and17.ThecauseofthelossofpowerfromCircuit751wasdetermined tobeelectrical stormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneous overcurrent protective relayforCircuit751(atStation204),deenergizing thecircuit.ThiseventisNUREG-1022 CauseCode(C).HRCFORH366(5-92)

HRCFORN366A(5-92)U.S.NUCLEARREGULATORY C(NHISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOIBHO-3150-0104 EXPIRES5/31/95ESTIHATEO BURDENPERRESPONSETOCOHPLYWITHTHISINFORHATIOH COLLECTION REQUEST:50.0BR'ORWARD COHHEHTSREGARDING BURDENESTINATETOTHEINFORNATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY C(WNISSION

~WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(3150-0104),

OFFICEOFNANAGENENT ANDBUDGETWASHIHGTON DC20503-FACILITYHAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNWBER(2)05000244LERNIMBER(6)SEQUENTIAL NUHBER--007--REVISIONHUNBER00PAGE(3)2OF10TEXT(lfmorespaceisrequired, useadditional copiesofHRCForm366A)(17)I.PRE-EVENT PLANTCONDITIONS Theplantwasatapproximately 97%steadystatereactorpower.The"B"Emergency DieselGenerator (D/G)hadbeenremovedfromserviceearlieronAugust3toperformplannedmaintenance (andhadbeendeclaredinoperable at0422EDSTtoperformthismaintenance).

Bymid-afternoon onAugust3,themaintenance hadbeencompleted, butthe"B"Emergency D/Gwasstillconsidered inoperable, pendingcompletion ofpost-maintenance testing.Duetoweatherconditions (a'hunderstorm wasinprogressinthevicinityoftheplant),testingwasbeingdeferreduntilthethunderstorm passed.ThePlantManagerrecommended thatthe"B"Emergency D/Gbealignedforautostandby(although stillinoperable fromanadministrative viewpoint) tobeanavailable sourceofpowerintheeventofalossofoffsitepowerduringthethunderstorm.

Therefore, the"B"Emergency D/Gwasalignedforautostandby.Theoffsitepowerconfiguration totheplantwasinthealternate "50%/50%"offsitepowerlineup.Thisconfiguration usesCircuit767(insteadofCircuit751)tosupplypowertothe"A"trainofsafeguards equipment:

oCircuit751(34.5KVoffsitepowersource)wassupplying powertothe"B"train480Voltsafeguards buses16and17through34.5KVto4160Volttransformer 12A(12Atransformer),

viaCircuitBreaker52/12AX,to4160Voltbus12B,andthroughthesafeguards bus4160Voltto480Volttransformers.

oCircuit767(34.5KVoffsitepowersource)wassupplying powertothe"A"train480Voltsafeguards buses14and18through34.5KVto4160Volttransformer 12B(12Btransformer),

viaCircuitBreaker52/12BY,to4160Voltbus12A,andthroughthesafeguards bus4160Voltto480Volttransformers.

Seetheattachedsketchoftheoffsitepowerdistribution system.II.DESCRIPTION OFEVENTA.DATESANDAPPROXIMATE TIMESOFMAJOROCCURRENCES:

oAugust3,1995,1526EDST:Eventdateandtime.August3,1995,1526EDST:Discovery dateandtime.HRCFORN366A(5-92)

NRCFORH366A(5-92)U.S.NUCLEARREGULATORY CQQIISSIOHLICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYQIBNO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCONPLYWITHTHISINFORHATION COLLECTION REQUEST:50.0HRS~FORWARDCONNENTSREGARDING BURDENESTIHATETOTHEIHFORHATION ANDRECORDSHANAGEHENT BRANCH(HNBB7714)~U.S.NUCLEARREGULATORY COHNISSIOH

~WASHINGTON, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(3150.0104),

OFFICEOFHANAGEHENT ANDBUDGETWASHINGTON DC20503.FACILITYNAKE(1)R.E.GinnaNuclearPowerPlantDOCKETNIHIBER(2)05000244LERNQIBER(6SEQUENTIAL NUHBER95--007--REVISIONNUHBER00PAGE(3)30F10TEXT(Ifmorespaceisrequired, useadditional copiesofHRCForm366A)(17)August3,1995,1526EDST:ControlRoomoperators verifythe"B"Emergency DieselGenerator (D/G)operation andthatsafeguards buses16and17areenergized.

August3,1995,1628EDST:Safeguards buses16and17weretransferred toCircuit767fromthe"B"Emergency D/G.August3,1995,1635EDST:The"B"Emergency D/Gwasstoppedandrealigned forautostandby.oAugust3,1995,1644EDST:Circuit751wasdeclaredoperable.

August7,1995,1228EDST:Offsitepowerconfiguration wasrestoredtothealternate "50%/50%"lineup.B.EVENT:OnAugust3,1995,atapproximately 1526EDST,withthereactoratapproximately 97%steadystatefullpower,theControlRoomreceivednumerousMainControlBoardannunciator alarms.AmongthesealarmswereL-20(12AXFMROR12ABUSTROUBLE),

J-5(IllORg12TRANSFORMER OUTOFSYNCH)iJ7(480VMAINORTIEBREAKERTRIP),J-9(SAFEGUARD BREAKERTRIP),andJ-32(EMERGENCY DIESELGEN1BPANEL).TheControlRoomoperators determined thatthefollowing eventshadoccurred:

oCircuit751(34.5KVoffsitepowersource)wasdeenergized o"B"train480Voltsafeguards buses16and17hadlosttheirpowersupplyfrom4160Voltbus12B(buses16and17hadbeenmomentarily deenergized) oThe"B"Emergency D/Ghadautomatically startedandwastiedtosafeguards buses16and17TheControlRoomoperators verifiedthatreactorcoolantsystemtemperature andpressurewerestable,andthattherewasnochangeinreactorpowerorturbineload.Theyperformed theappropriate actionsofAbnormalProcedure AP-ELEC.1 (Lossof12AAnd/Or12BBusses)tostabilize theplant.Theyverifiedthatthe"B"Emergency D/Gwasoperating andthatsafeguards buses16and17wereenergized.

TheControlRoomoperators observedthatCircuit751andbus12Bdisplayed zero(0)voltage.NRCFORH366A(5-92)

NRCFORH366A(5-92)U.S.NUCLEARREGULATORY CQIIISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYQIBNO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPONSETOCOHPLYWITHTHISINFORHATIONCOLLECTIONREQUEST:50.0HRS.FORWARDCQDIENTSREGARDING BURDENESTIHATETOTHEIHFORHATIONANDRECORDSHANAGEHENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COHHISSIOH, WASHIHGTOH, DC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(3180-0104)

~OFFICEOFHANAGEHENT ANDBUDGETWASHIHGTOH DC20503.FACILITYNAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNWER(2)YEAR0500024495LERNWBER(6)SEQUENTIAL NUMBER-007--REVISIONNUNBER00PAGE(3)4OF10TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)ThelossofpowerfromCircuit751resultedinundervoltage onsafeguards buses16and17,andthe"B"Emergency D/Gautomatically startedwithinten(10)secondsasperdesignandreenergized thesebuses.EnergyOperations personnel alsoidentified thelossofpowerfromCircuit751,andpromptlynotifiedGinnaControlRoomoperators of.thelossofpowerfromCircuit751,whichappearedtobecausedbyanoffsitelightning strikethataffectedCircuit751.TheControlRoomoperators referredtoEquipment Restoration procedure ER-ELEC.1 (Restoration ofOffsitePower)torestoreoffsitepowerto4160Voltbus12Band480Voltsafeguards buses16and17.TheControlRoomoperators closed4160Voltcircuitbreaker52/12BXtoenergizebus12BfromCircuit767,viathe12Btransformer, atapproximately 1602EDST.Atapproximately 1628EDST,safeguards buses16and17weretransferred toCircuit767fromthe"B"Emergency D/G.(Circuit767hadremainedinoperation, supplying "A"train480Voltsafeguards buses14and18,throughout theevent.)Atapproximately 1635EDST,August3;1995,the"B"Emergency D/Gwasstoppedandrealigned forautostandby,pendingperformance ofthepost-maintenance testing.EnergyOperations subsequently contacted theControlRoomoperators andconfirmed thatthelossofpowerfromCircuit751wascausedbyelectrical stormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneous overcurrent protective relayforCircuit751(atStation204),deenergizing thecircuit.RelayshadbeenresetatStation204,andCircuit751wasreenergized anddeclaredoperableatapproximately 1644EDST.Circuit751wasnotimmediately

'lineduptosupplyplantloads,butwasmaintained astheplant'sbackupsupplyofoffsitepowerratherthanrealigning theelectrical systemduringthethunderstorm conditions.

C.INOPERABLE STRUCTURES, COMPONENTS'R SYSTEMSTHATCONTRIBUTED TOTHEEVENT:NoneNRCFORH366A(5-92)

NRCFORM366A(5-92)U.SNUCLEARREGULATORY COMMISSION APPROVEOBYQNINO.3150-0104 EXPIRES5/31/95LICENSEEEVENTREPORT(LER)TEXTCONTINUATION FACILITYMANE(1)R.E.GinnaNuclearPowerPlantDOCKETNQIBER(2)05000244PAGE(3)5OF10LERNIBIBER(6)SEQUENTIAL NUMBERREVISIONNUMBERYEAR00--007--ESTIMATED BURDENPERRESPONSETOCOMPLYMITHTHISINFORMATION COLLECTIOH REQUEST:500HRS.FORMARDCOMMENTSREGARDING BURDENESTIMATETOTHEINFORMATION ANDRECORDSMAHAGEMEHT BRANCH(MMBB7714),U.S.NUCLEARREGULATORY COMMISSION, NASHIHGTOH, DC20555-0001 ANDTOTHEPAPERMORK REDUCTION PROJECT(3180-0104),

OFFICEOFMANAGEMENT ANDBUDGETiJASHINGTON DC20503.TEXT(Ifmorespaceisrequired, useadditional copiesofMRCForm366A)(17)D.OTHERSYSTEMSORSECONDARY FUNCTIONS AFFECTED:

Thethunderstorm conditions alsoaffectedsome.telephone service.Atapproximately 1539EDST,theEmergency Notification System(ENS)lineforGinnaStationbecameinoperable.

TheShiftTechnical AdvisornotifiedtheNRCOperations CenterandtheUSNRCGinnaSeniorResidentInspector ofthelossoftheENSatapproximately 1544EDST.(TheENSwassubsequently restoredtooperablestatusatapproximately 1401EDSTonAugust4.)E.METHODOFDISCOVERY:

Thiseventwasimmediately apparentduetonumerousMainControlBoardalarmsandotherindications intheControlRoomwhenpowerfromCircuit751waslost.F.OPERATORACTION:Following'he undervoltage condition onbuses'16and17,the"B"Emergency D/Gautomatically startedandreenergized thesebuses.TheControlRoomoperators performed theappropriate actionstoverifythatthe"B"Emergency D/Gwasoperating andsafeguards buses16and17wereenergized.

TheControlRoomoperators manuallyrestarted the"B"and"C"containment recirculation fans,whichhadtrippedduetothelossofbus16.Themomentary lossofpowertobuses16and17causedthetripofthecommonsamplepumpformonitoring ofthecontainment (CNMT)atmosphere bychannelsR-10A(iodine),

R-11(particulate) andR-12(noblegas).TheControlRoomoperatormanuallyrestarted thecommonsamplepumpatapproximately 1535EDST.TheControlRoomoperators restoredoffsitepower(fromCircuit767)tobuses16and17,stoppedthe"B"Emergency D/G,andrealigned itforautostandby,priortostartingpost-maintenance testingoftheD/G.Subsequently, theShiftSupervisor notifiedtheNRCatapproximately 1748EDSTper10CFR50.72(b)(2)(ii),non-emergency fourhournotification.

HRCFORM366A(5-92)

NRCFORH.366A (5-92)U.S.NUCLEARREGULATORY COHHISSIOH LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOHBHO.3150-0104 EXPIRES5/31/95ESTIHATED BURDENPERRESPOHSETOCOHPLYWITHTHISINFORHATIOH COLLECTION REQUEST:50.0HRS.FORWARDCOHHENTSREGARDING BURDENESTIHATETOTHEINFORHATIOH ANDRECORDSNANAGEHENT BRANCH(HNBB7714),U.S.HUCLEARREGULATORY COHHISSIOH,

'WASHINGTON, OC20555-0001 ANDTOTHEPAPERWORK REDUCTION PROJECT(31500104),OFFICEOFHAHAGENENT ANDBUDGETWASHINGTON DC20503.FACILITYHAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNINBER(2)05000244LERNIIIBER(6)SEDUENTIALNUHBER--007--REVISIONHUNGER00PAGE(3)6OF10TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)G.SAFETYSYSTEMRESPONSES:

Allsafeguards equipment functioned properly.

The"B"Emergency D/Gautomatically startedduetotheundervoltage condition onbuses16and17,displayed propervoltageandfrequency, andreenergized safeguards buses16and17tosupplyemergency power.Runningcontainment recirculation fansonbus16trippedasdesignedandweremanuallyrestarted asneededtorestorenormalcoolingtotheContainment.

Therunningservicewater,pumponbus17trippedasdesignedandthepumpselectedforautostart startedwhenpowerwasrestoredtobus17.III.CAUSEOFEVENTA.,IMMEDIATE CAUSE:Theautomatic actuation ofthe"B"Emergency D/Gwasduetoundervoltage onsafeguards buses16and17.B.INTERMEDIATE CAUSE:Theundervoltage onsafeguards buses16and17wasduetothelossofpowerfromCircuit751.C.ROOTCAUSE:Theunderlying causeofthelossofpowerfromCircuit751waselectrical stormactivitythataffectedcircuitsatoffsiteStation204andtrippedthe"C"phaseinstantaneous overcurrent protective relayforCircuit751(atStation204),deenergizing Circuit751.ThiseventisNUREG-1022 CauseCode(C),"External Cause".Thislossofpowerandsubsequent startofanEmergency D/GdoesnotmeettheNUMARC93-01,"Industry Guideline forMonitoring theEffectiveness ofMaintenance atNuclearPowerPlants",definition ofa"Maintenance Preventable Functional Failure".

HRCFORH366A(5-92)

NRCFORM366A(5-92)U.S.NUCLEARREGULATORY C(HHISSIOM LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOHBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPOHSETOCOMPLYNITHTHISINFORMATION COLLECTION REQUEST:50.0HRS.FORIIARDCOMMENTSREGARDIHG BURDENESTIMATETOTHEINFORMATION ANDRECORDSNAMAGEMENT BRANCH(HNBB7714),U.S.NUCLEARREGULATORY COMMISSION/

IIASHIMGTOH, DC20555-0001 ANDTOTHEPAPERNORK REDUCTION PROJECT(3150.0104),

OFFICEOFMANAGEMENT ANDBUDGETMASHINGTOM DC20503.FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETMINBER(2)05000244LERMINBER(6SEQUENTIAL NUMBER95--007--REVISIONNUMBER00PAGE(3)7OF10TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm366A)(17)IV.ANALYSISOFEVENT:Thiseventisreportable inaccordance with10CFR50.73,LicenseeEventReportSystem,item(a)(2)(iv),whichrequiresareportof,"Anyeventorcondition thatresultedinamanualorautomatic actuation ofanyengineered safetyfeature(ESF),including thereactorprotection system(RPS)",inthatthestartingofthe"B"Emergency D/Gwasanautomatic actuation ofanESFsystem.Anassessment wasperformed considering boththesafetyconsequences andimplications ofthiseventwiththefollowing resultsandconclusions:

Therewerenooperational orsafetyconsequences orimplications attributed tothelossofCircuit751andstartoftheEmergency D/Gbecause:Allreactorcontrolandprotection systemsperformed asdesigned.

Althoughthemaintenance workforthe"B"Emergency D/Ghadbeencompleted, the"B"Emergency D/Gremainedadministratively inoperable.

Itwasavailable foroperation andsubsequently functioned asdesignedtoreenergize "B"trainsafeguards buses16and17.Whi'leinthiscondition, theplantelectrical powersystem(offsitepowersourcesandtheEmergency D/Gs)remainedwithintherequirements oftheLimitingCondition forOperation (LCO)ofTechnical Specification (TS)3.7.2.2.b.l, whichrequiresthatthe"A"Emergency D/Gbedemonstrated operablewithin'ne hourofthe"B"Emergency D/Gbeinginoperable andatleastonceper24hoursthereafter.

The"A"Emergency D/Ghadbeendemonstrated operablewithinonehourof0422EDSTonAugust3,sonofurtheractionswererequiredbyTSfortheshorttimethat,Circuit751wasalsoinoperable onAugust3;Circuit767remainedinoperation supplying powertothe"A"trainsafeguards buses;subsequently, Circuit767waslineduptosupplypowertothe"B"trainsafeguards busesalso,aspermitted byTS.HRCFORM366A(5-92)

NRCFORM366A(5-92)U.S.NUCLEARREGULATORY CQNISSIONLICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYMITHTHISINFORHATION COLLECTIOH REQUEST:50.0HRS.FORNARDCOHHEHTSREGARDING BURDENESTIHATETOTHEIHFORHATION ANDRECORDSMANAGEHENT BRANCH(MNBB7714),U.S.NUCLEARREGULATORY COMMISSION/

MASHINGTOH, DC20555-0001 ANDTOTHEPAPERNORK REDUCTION PROJECT(3140-0104),

OFFICEOFMANAGEMENT ANDBUDGETMASHINGTON DC20503FACILITYNAHE(1)R.E.GinnaNuclearPowerPlantDOCKETNQlBER(2)05000244YEARLERNIIIBER(6)SEQUENTIAL NUHBER-007-REVISIOHNUHBER00PAGE(3)8OF10TEXT(Ifmorespaceisrequired, useadditional copiesofHRCForm366A)(17)oRadiation monitorchannelsR-10A,R-11,andR-12weretemporarily lost.Thecommonsamplepumpwasmanuallyrestarted withinafewminutes,whichiswithintherequiredactiontimeofTS3.1.5.1.2 toobtainagrabsampleatleastonceevery24hours.Basedon.theabove,itcanbeconcluded thatthepublic'shealthandsafetywasassuredatalltimes.V.CORRECTIVE ACTIONA.ACTIONTAKENTORETURNAFFECTEDSYSTEMSTOPRE-EVENT NORMALSTATUS:oOffsitepowerwasrestoredtosafeguards buses16and17fromCircuit767,andthe"B"Emergency D/Gwasstoppedandrealigned forautostandby,priortothestartofpost-maintenance testingofthe"B"Emergency D/G.oCircuit751wasclearedforusebyEnergyOperations, protective relaysforCircuit751(atStation204)wereresetbyEnergyOperations, andCircuit751wasreenergized andrestoredtooperablestatus.B.ACTIONTAKENORPINNEDTOPREVENTRECURRENCE:

AsstatedinLER95-006,optionsforoffsitepowerconfiguration totheplantwillbereevaluated tooptimizereliability duringadverseweatherconditions.

(RefertoLER95-006,Revision0,DocketNo.50-244.)Theprimaryoptioncurrently beingevaluated wouldusean100%/0%"offsitepowerconfiguration asthepreferred configuration, withCircuit767normallysupplying powertoboththe"A"and"B"trainsafeguards buses.NRCFORM366A(5-92)

NRCFORH366A(5-92)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)TEXTCONTINUATION APPROVEDBYOMBNO.3150-0104 EXPIRES5/31/95ESTIMATED BURDENPERRESPONSETOCOMPLYllITHTHISINFORHATIOH COLLECTIOH REGUEST:50.0MRS'ORHARD COMMENTSREGARDING BURDENESTIMATETOTHEINFORMATION AHDREQ)RDSMANAGEMENT BRANCH(MHBB7714),U.S.NUCLEARREGULATORY COMMISSION, lIASHIHGTON, DC20555-0001 ANDTOTHEPAPERlSRK REDUCTION PROJECT(3180-0104),

OFFICEOFMANAGEMENT ANDBUDGETMASHINGTON DC20503.FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETHWBER(2)0500024495LERMQIBER(6)SEQUENTIAL NUMBER-007--REVISIONHUMBER00PAGE(3)9OF10TEXT(Ifmorespaceisrequired, useadditional copiesofHRCForm366A)(17)VI.ADDITIONAL INFORMATION A.FAILEDCOMPONENTS:

NoneB.PREVIOUSLERsONSIMILAREVENTS:AsimilarLEReventhistorical searchwasconducted withthefollowing results:LERs91-002,92-007,94-012,and95-006weresimilareventswithsimilarrootcauses(startofanEmergency D/Gduetolossofoffsitepowerfromexternalcauses).C.SPECIALCOMMENTS:

NoneHRC'ORM366A(5-92)

~MRCFORM366A(5.92)U.S.MUCI.EARREGULATORY COWISSIOM APPROVEDBYQGIHO.3150-0104 EXPIRES5/31/95LICENSEEEVENTREPORT(LER)TEXTCONTINUATION FACILITYNAME(1)R.E.GinnaNuclearPowerPlantDOCKETNQIBER(2)LERNLNBER(6)PAGE(3)10OF10SEQUENTIAL NUMBERREVISIONNUMBERYEAR05000244g500--007--ESTIMATED BURDENPERRESPOHSETOCOMPLYMITHTHISINFORMATION COLLECTIOH REQUESTS50.0FORMARDCOMMENTSREGARDING BURDENESTIMATETOTNEINFORMATION AllORECORDSMANAGEMENT BRANCH(liHBB7714),U.S.NUCLEARREGULATORY COMMISSION, llASNIHGTOH, DC20555-0001 AMDTOTHEPAPERUORK REDUCTION PROJECT(3150.0104)

IOFFICEOFNAMAGENEHT AMDBUDGETMASHINGTON DC20503.TEXT(Ifmorespaceisrequired, useadditionaL copiesofNRCForm366A)(17)SI>>Ilail14CN$1$IN~QfONUW>>ICI>>>>1St/>>ICI$1aYONS1Sll41>>~IWSI.SCC~I>>~ICO>>IIO>>1$111Sl/~$1111\~OilISt>>ANICNCNONCO 14$>>.SIC~ICC~ICC>>CtlCIOCI4>>~O&/$Sl/ISOSSt/CCSO/SCPS>>/CSt/14$ISO>>or/Oalto/Is11$CSCOTSCCNCOOI/OU$14/llI4tCOON~Sl/41$1$$/IC11StICSt/O/tltO/lt

$1/441SO/tCICSSIC~IRSt/ONS14/I1St/OI$14/IS~>>I11$$NC$1/1I$14/I~11$$ICCI~ic>>11IIO10~CI,CIC~Ž~I>>IRNICCICC~ICC>>COIC>>COCAIC>>Sl/OISI1/II~I~KSt/O>>II1/IICCCI~IIRINNC:OCS~SNCNIC>>ONCSSCISt>>CC$1/~ISII/IOSI~ICSt/Ohl>>/ICCall>>lNO$1/OltItlttOIIICSt/NNCNCIC1$1IC(I)CORNO'$1/OI$11/SICICIllIR~CCIOIS11St/CNSIC/lICCCNtAC(I)CCIN>>IICN C$1/41111/11~I~NCHRCFORM366A(5-92)