ML18101A042: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA  19406-2713 April 10, 2018   MEETING SUMMARY LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA  19406-2713  
FACILITY: MILLSTONE POWER STATION
 
April 10, 2018 MEETING SUMMARY  
 
LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.  
 
FACILITY: MILLSTONE POWER STATION  


==SUBJECT:==
==SUBJECT:==
Line 23: Line 28:
On April 4, 2018, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) met with the Connecticut Nuclear Energy Advisory Council (NEAC) at the Waterford Public Library in Waterford, Connecticut. The NRC conducted the meeting to discuss its assessment of the safety performance at Millstone Power Station for 2017.   
On April 4, 2018, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) met with the Connecticut Nuclear Energy Advisory Council (NEAC) at the Waterford Public Library in Waterford, Connecticut. The NRC conducted the meeting to discuss its assessment of the safety performance at Millstone Power Station for 2017.   


A notice of the NRC and NEAC meeting was issued on March 22, 2018, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18081A266. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC discussed its assessment of the safety performance of Millstone Power Station for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession Number ML18058A050). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:
A notice of the NRC and NEAC meeting was issued on March 22, 2018, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18081A266. ADAMS is accessible from the NRC Web page at:
https://www.nrc.gov/reactors/operating/oversight.html. Members of NEAC attended the meeting and were offered the opportunity to question the NRC regarding Dominion's performance and the role of the agency in ensuring safe plant operations.   
http://www.nrc.gov/reading-rm/adams.html
. The NRC discussed its assessment of the safety performance of Millstone Power Station for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession Number ML18058A050). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:
 
https://www.nrc.gov/reactors/operating/oversight.html
. Members of NEAC attended the meeting and were offered the opportunity to question the NRC regarding Dominion's performance and the role of the agency in ensuring safe plant operations.   
 
           /RA/    Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects  
           /RA/    Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects  


==SUBJECT:==
==SUBJECT:==
SUMMARY OF PUBLIC MEETING dated April 10, 2018 DISTRIBUTION: (via email) DSchroeder, DRP TSetzer, DRP MHenrion, DRP MRossi, DRP JFuller, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI RidsNrrPMMillstone Resource DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2018 Annual Assessment Meetings\Millstone\Millstone 2018 AAM Meeting Summary.docx ADAMS Accession Number:  ML18101A042     SUNSI Review   Non-Sensitive  Sensitive   Publicly Available  Non-Publicly Available OFFICE   RI/DRP RI/DRP    NAME TSetzer DSchroeder    DATE 4/10/18 4/10/18   OFFICIAL RECORD COPY}}
SUMMARY OF PUBLIC MEETING dated April 10, 2018  
 
DISTRIBUTION: (via email)
DSchroeder, DRP  
 
TSetzer, DRP MHenrion, DRP MRossi, DRP JFuller, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI RidsNrrPMMillstone Resource  
 
DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2018 Annual Assessment Meetings\Millstone\Millstone 2018 AAM Meeting Summary.docx ADAMS Accession Number:  ML18101A042 SUNSI Review Non-Sensitive  Sensitive Publicly Available  Non-Publicly Available OFFICE RI/DRP RI/DRP    NAME TSetzer DSchroeder    DATE 4/10/18 4/10/18 OFFICIAL RECORD COPY}}

Revision as of 23:47, 28 June 2018

Summary of Annual Assessment Meeting for Millstone Power Station Held on 4/4/18
ML18101A042
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/10/2018
From: Schroeder D L
Reactor Projects Branch 2
To:
Schroeder D L
References
Download: ML18101A042 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713

April 10, 2018 MEETING SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY OF PUBLIC MEETING

On April 4, 2018, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) met with the Connecticut Nuclear Energy Advisory Council (NEAC) at the Waterford Public Library in Waterford, Connecticut. The NRC conducted the meeting to discuss its assessment of the safety performance at Millstone Power Station for 2017.

A notice of the NRC and NEAC meeting was issued on March 22, 2018, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18081A266. ADAMS is accessible from the NRC Web page at:

http://www.nrc.gov/reading-rm/adams.html

. The NRC discussed its assessment of the safety performance of Millstone Power Station for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession Number ML18058A050). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:

https://www.nrc.gov/reactors/operating/oversight.html

. Members of NEAC attended the meeting and were offered the opportunity to question the NRC regarding Dominion's performance and the role of the agency in ensuring safe plant operations.

/RA/ Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects

SUBJECT:

SUMMARY OF PUBLIC MEETING dated April 10, 2018

DISTRIBUTION: (via email)

DSchroeder, DRP

TSetzer, DRP MHenrion, DRP MRossi, DRP JFuller, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI RidsNrrPMMillstone Resource

DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2018 Annual Assessment Meetings\Millstone\Millstone 2018 AAM Meeting Summary.docx ADAMS Accession Number: ML18101A042 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer DSchroeder DATE 4/10/18 4/10/18 OFFICIAL RECORD COPY