IR 05000321/2014001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 37: Line 37:


===Enclosure:===
===Enclosure:===
Hatch Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ
Hatch Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ  
 
_____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE /RA By CWR1/ /RA By JDA/ NAME C. Rapp J. Austin . DATE 3/4/2015 3/4/2015 E-MAIL COPY? YES NO YES NO Page 1 of 203/04/201509:40:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHatchInspection / Activity Plan03/01/2015-06/30/2016ASM EP-2015 EP ASM & RES BASELINE31,2 IPDrill Evaluation711140601/01/201512/31/2015OL EXAM-INITIAL LICENSE EXAM31 HATCH/MARCH 2015 INITIAL EXAM AT POWER FACILITIESV2342603/23/201504/03/2015CDBI-COMPONENT DESIGN BASES INSPECTION71,2 IPComponent Design Bases Inspection711112108/31/201509/04/20151,2 IPComponent Design Bases Inspection711112109/21/201509/25/20151,2 IPComponent Design Bases Inspection711112110/05/201510/09/20151,2 IPComponent Design Bases Inspection711112110/19/201510/23/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B11/16/201511/20/20151,2 IPProblem Identification and Resolution71152B12/07/201512/11/2015EP-EP EXERCISE81,2 IPExercise Evaluation711140112/07/201512/11/20151,2 IPEmergency Action Level and Emergency Plan Changes711140412/07/201512/11/20151,2 IPPerformance Indicator Verification7115112/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE31,2 IPDrill Evaluation711140601/01/201612/31/2016RP-RAD HAZARDS AND TRANSPORTATION21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/08/201602/12/20161,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/08/201602/12/2016ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G02/29/201603/04/2016TFPI-TRIENNIAL FIRE PROTECTION INSPECTION41,2 IPFire Protection [Triennial]7111105T04/04/201604/08/20161,2 IPFire Protection [Triennial]7111105T04/18/201604/22/2016HS-TRIENNIAL HEAT SINK PERFORMANCE11,2 IPHeat Sink Performance7111107T05/16/201605/20/2016RP-RP PUBLIC RAD SAFETY BASELINE21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/16/201605/20/20161,2 IPRadiological Environmental Monitoring Program71124.0705/16/201605/20/20161,2 IPPerformance Indicator Verification7115105/16/201605/20/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 203/04/201509:40:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHatchInspection / Activity Plan03/01/2015-06/30/2016OL EXAM-INITIAL LICENSE EXAM PREP31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIESV2347305/23/201605/27/2016MODS-PLANT MODIFICATIONS INSPECTION31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/2016OL EXAM-INITIAL LICENSE EXAM31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIESV2347306/20/201607/01/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 12:53, 14 June 2018

Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2014001 and 05000366/2014001)
ML15063A573
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/04/2015
From: Austin J D
NRC/RGN-II/DRP/RPB4
To: Vineyard D R
Southern Nuclear Operating Co
References
IR 2014001
Download: ML15063A573 (5)


Text

March 4, 2015

Mr. David Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: ANNUAL ASSESSMENT LETTER FOR EDWIN I. HATCH NUCLEAR PLANT UNIT 1 AND UNIT 2 (NRC INSPECTION REPORT 05000321/2014001 AND 05000366/2014001)

Dear Mr. Vineyard:

On February 12, 2015, the NRC completed its end-of-cycle performance review of Edwin I. Hatch Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Hatch Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hatch Unit 1 and Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (i.e., Green), and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will conduct reactor operator initial licensing examinations. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence.

Additionally, an NRC audit of licensee efforts towards compliance with Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" is ongoing for various sites. The audit includes an onsite visit for the NRC staff to evaluate mitigating strategies as described in the licensee submittals and to receive and review information relative to associated open items. This onsite audit will occur prior to the first unit at the site achieving compliance with the Orders and the audit will aid NRC staff in developing a final Safety Evaluation for the site. The audit at your site will occur in the Fall of 2015. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4482 with any questions you have regarding this letter.

Sincerely,/RA/ Joseph Austin, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: NPF-57, NPF-5

Enclosure:

Hatch Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via ListServ

_____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE /RA By CWR1/ /RA By JDA/ NAME C. Rapp J. Austin . DATE 3/4/2015 3/4/2015 E-MAIL COPY? YES NO YES NO Page 1 of 203/04/201509:40:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHatchInspection / Activity Plan03/01/2015-06/30/2016ASM EP-2015 EP ASM & RES BASELINE31,2 IPDrill Evaluation711140601/01/201512/31/2015OL EXAM-INITIAL LICENSE EXAM31 HATCH/MARCH 2015 INITIAL EXAM AT POWER FACILITIESV2342603/23/201504/03/2015CDBI-COMPONENT DESIGN BASES INSPECTION71,2 IPComponent Design Bases Inspection711112108/31/201509/04/20151,2 IPComponent Design Bases Inspection711112109/21/201509/25/20151,2 IPComponent Design Bases Inspection711112110/05/201510/09/20151,2 IPComponent Design Bases Inspection711112110/19/201510/23/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION41,2 IPProblem Identification and Resolution71152B11/16/201511/20/20151,2 IPProblem Identification and Resolution71152B12/07/201512/11/2015EP-EP EXERCISE81,2 IPExercise Evaluation711140112/07/201512/11/20151,2 IPEmergency Action Level and Emergency Plan Changes711140412/07/201512/11/20151,2 IPPerformance Indicator Verification7115112/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE31,2 IPDrill Evaluation711140601/01/201612/31/2016RP-RAD HAZARDS AND TRANSPORTATION21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/08/201602/12/20161,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/08/201602/12/2016ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G02/29/201603/04/2016TFPI-TRIENNIAL FIRE PROTECTION INSPECTION41,2 IPFire Protection [Triennial]7111105T04/04/201604/08/20161,2 IPFire Protection [Triennial]7111105T04/18/201604/22/2016HS-TRIENNIAL HEAT SINK PERFORMANCE11,2 IPHeat Sink Performance7111107T05/16/201605/20/2016RP-RP PUBLIC RAD SAFETY BASELINE21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/16/201605/20/20161,2 IPRadiological Environmental Monitoring Program71124.0705/16/201605/20/20161,2 IPPerformance Indicator Verification7115105/16/201605/20/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 203/04/201509:40:34Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHatchInspection / Activity Plan03/01/2015-06/30/2016OL EXAM-INITIAL LICENSE EXAM PREP31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIESV2347305/23/201605/27/2016MODS-PLANT MODIFICATIONS INSPECTION31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/2016OL EXAM-INITIAL LICENSE EXAM31 HATCH JUNE 2016 INITIAL EXAM AT POWER FACILITIESV2347306/20/201607/01/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.