{{#Wiki_filter:September 14, 2015 NRC Supplement to NRC Letter - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION dated May 1, 2015 (Hereafter Items referred to are from this NRC Letter). Part A Items - NRC Information Requests- Point Beach Nuclear Plant The following information has not yet been provided and is needed upon arrival at the site. 1) ITEM A.2 of NRC Information Request Letter- NDE Procedures a. Procedure NDE-757 Visual Examination For Leakage Of Pressure Vessel Penetrations. 2) ITEM A.2 of NRC Information Request Letter- Welding Procedures a. Procedure Qualification Records (PQRs) supporting Weld Procedure Specification (WPS) No. FP-PE-B31-P1P1-GTSM-001. b. Certification by FPL Energy LLC for each PQR (reference ASME Code Section IX, QW 200.2) that supports WPS Nos. FP-PE-B31-P1P1-GTSM-001, FP-PE-B31-P1P8-GTSM-013, and FP-PE-B31-P8P8-GTSM-037. 3) ITEM A.12 of NRC Information Request Letter- SG Tube Assessment. a. Westinghouse Letter WEP-04-2, "Evaluation of Foreign Object in Unit 2A (Model D47F) RSG During Fall 2003 Outage, January 9, 2004. Part B Items (Onsite) - NRC Information Requests- Point Beach U2 Nuclear Plant 1) ITEM B.1 of NRC Information Request Letter- Welds Selected for review A. The following Code Class welds completed during prior outage. Work Order Code Class Description 40223237 2  Inst new piping for TDAFW Cross-tie 40098757 2  Inst new piping for TDAFW Cross-tie 40222999 2  Inst new piping for TDAFW Cross-tie 
ADAMS Accession Number ML15261A749 
: 2) ITEM B.2 of NRC Information Request Letter- ISI related corrective actions AR Number Description/Topic Supporting Docs 02013339 ANII CONCERN WITH UNTIMELY CORRECTIVE ACTION Copy of CR including each CA and supporting documents for the completed CAs. 01953205 SG A FOSAR RESULTS Copy of CR including each CA and supporting documents for the completed CAs. 01953734 SG B FOSAR RESULTS Copy of CR including each CA and supporting documents for the completed CAs. 01953805 INCORRECT CALIBRATION BLOCK UTILIZED FOR EXAMINATION Copy of CR including each CA and supporting documents for the completed CAs 01995919 U1R35 STEAM GENERATOR DEGRADATION ASSESSMENT Copy of CR including each CA and supporting documents for the completed CAs 01945128 DRESSER-RAND PART 21 Copy of CR including each CA and supporting documents for the completed CAs 3) ITEM B.3- of NRC Information Request Letter- ISI Relevant Indications a. No Relevant Indications and No Information is needed.}}

Revision as of 09:12, 6 June 2018

NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - NextEra Energy Point Beach Nuclear Plant (Msh)
ML15261A749
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/14/2015
From:
NRC/RGN-III
To:
References
Download: ML15261A749 (2)


Text

September 14, 2015 NRC Supplement to NRC Letter - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION dated May 1, 2015 (Hereafter Items referred to are from this NRC Letter). Part A Items - NRC Information Requests- Point Beach Nuclear Plant The following information has not yet been provided and is needed upon arrival at the site. 1) ITEM A.2 of NRC Information Request Letter- NDE Procedures a. Procedure NDE-757 Visual Examination For Leakage Of Pressure Vessel Penetrations. 2) ITEM A.2 of NRC Information Request Letter- Welding Procedures a. Procedure Qualification Records (PQRs) supporting Weld Procedure Specification (WPS) No. FP-PE-B31-P1P1-GTSM-001. b. Certification by FPL Energy LLC for each PQR (reference ASME Code Section IX, QW 200.2) that supports WPS Nos. FP-PE-B31-P1P1-GTSM-001, FP-PE-B31-P1P8-GTSM-013, and FP-PE-B31-P8P8-GTSM-037. 3) ITEM A.12 of NRC Information Request Letter- SG Tube Assessment. a. Westinghouse Letter WEP-04-2, "Evaluation of Foreign Object in Unit 2A (Model D47F) RSG During Fall 2003 Outage, January 9, 2004. Part B Items (Onsite) - NRC Information Requests- Point Beach U2 Nuclear Plant 1) ITEM B.1 of NRC Information Request Letter- Welds Selected for review A. The following Code Class welds completed during prior outage. Work Order Code Class Description 40223237 2 Inst new piping for TDAFW Cross-tie 40098757 2 Inst new piping for TDAFW Cross-tie 40222999 2 Inst new piping for TDAFW Cross-tie

ADAMS Accession Number ML15261A749

2) ITEM B.2 of NRC Information Request Letter- ISI related corrective actions AR Number Description/Topic Supporting Docs 02013339 ANII CONCERN WITH UNTIMELY CORRECTIVE ACTION Copy of CR including each CA and supporting documents for the completed CAs. 01953205 SG A FOSAR RESULTS Copy of CR including each CA and supporting documents for the completed CAs. 01953734 SG B FOSAR RESULTS Copy of CR including each CA and supporting documents for the completed CAs. 01953805 INCORRECT CALIBRATION BLOCK UTILIZED FOR EXAMINATION Copy of CR including each CA and supporting documents for the completed CAs 01995919 U1R35 STEAM GENERATOR DEGRADATION ASSESSMENT Copy of CR including each CA and supporting documents for the completed CAs 01945128 DRESSER-RAND PART 21 Copy of CR including each CA and supporting documents for the completed CAs 3) ITEM B.3- of NRC Information Request Letter- ISI Relevant Indications a. No Relevant Indications and No Information is needed.