|
|
Line 13: |
Line 13: |
| | document type = Letter, License-Operator, Part 55 Examination Related Material | | | document type = Letter, License-Operator, Part 55 Examination Related Material |
| | page count = 4 | | | page count = 4 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter: |
| | |
| | 0CAN071603 July 18, 2016 |
| | |
| | U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
| | |
| | ==Subject:== |
| | Response to Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations" (ML16116A275) |
| | Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 |
| | |
| | ==Dear Sir or Madam:== |
| | |
| | Regulatory Issue Summary 2015-09 requests that licensees voluntarily update Operator licensing examination schedules and applicant estimates for calendar years 2017 through 2021. |
| | The requested information has been compiled by the Arkansas Nuclear One (ANO) Training Department for ANO Units 1 and 2 and is documented on the enclosed NRC Form 536. It should be noted that a separate NRC Form 536 was completed for each unit; therefore, there are two completed forms enclosed. |
| | |
| | There are no commitments contained in this submittal. Should you have any questions concerning this submittal, please contact Randal Martin at 479-858-6844. |
| | Sincerely, ORIGINAL SIGNED BY DAVID B. BICE FOR STEPHENIE L. PYLE |
| | |
| | SLP/mkh |
| | |
| | Enclosures Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 0CAN071603 Page 2 of 2 |
| | |
| | cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. Mark Haire, Chief Operations Branch Division of Reactor Safety U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request: 1 hour. This "'> information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy. and Information Collections Branch (T-5 0 < 0 F53). U.S. Nuclear Regulatory Commission. Washington. DC20555-0001. or by e-mail to c EXAMINATION DATA . " lnfocollects.Resource@nrc.gov. and to the Desk Officer. Office of Information and Regulatory Affairs, i;; ,,..,-t-,, NEOB-10202, (3150-0131). Office of Management and Budget. Washington. DC 20503. If a means ........ used to impose an information collection does not display a currently valid OMB control number. the NRG may not conduct or sponsor. and a person is not required to respond to. the information collection. FACILITY NRC REGION ARKANSAS NUCLEAR ONE, Unit 1 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------------NUMBER OF REACTOR 8 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR 4 4 0 4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 4 0 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 02/26/2018 08/26/2019 03/01/2021 ALTERNATE DATE 03/05/2018 09/09/2019 03/08/2021 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 6 6 6 6 CANDIDATES NRG FORM 536 (05-2016) |
| | NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request: 1 hour. This "'> information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy. and Information Collections Branch (T-5 0 < 0 F53). U.S. Nuclear Regulatory Commission. Washington. DC20555-0001. or by e-mail to c EXAMINATION DATA . " lnfocollects.Resource@nrc.gov. and to the Desk Officer. Office of Information and Regulatory Affairs, i;; ,,..,-t-,, NEOB-10202, (3150-0131). Office of Management and Budget. Washington. DC 20503. If a means ........ used to impose an information collection does not display a currently valid OMB control number. the NRG may not conduct or sponsor. and a person is not required to respond to. the information collection. FACILITY NRC REGION ARKANSAS NUCLEAR ONE, Unit 2 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------------NUMBER OF REACTOR 8 0 8 8 OPERATORS NUMBER OF SENIOR REACTOR 4 0 4 4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 0 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 08/06/2018 02/03/2020 08/09/2021 ALTERNATE DATE 08/20/2018 02/17/2020 08/16/2021 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 6 6 6 6 CANDIDATES NRG FORM 536 (05-2016) |
| }} | | }} |
Revision as of 11:55, 14 May 2018
|
---|
Category:Letter
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation 2024-09-09
[Table view] Category:License-Operator
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23114A1542023-03-23023 March 2023 03 Public Forms ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis 2024-09-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23114A1542023-03-23023 March 2023 03 Public Forms ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22147A1882022-04-13013 April 2022 04 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments 0CAN051701, Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-05-0303 May 2017 Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. 2024-09-09
[Table view] |
Text
0CAN071603 July 18, 2016
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Response to Regulatory Issue Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations" (ML16116A275)
Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
Regulatory Issue Summary 2015-09 requests that licensees voluntarily update Operator licensing examination schedules and applicant estimates for calendar years 2017 through 2021.
The requested information has been compiled by the Arkansas Nuclear One (ANO) Training Department for ANO Units 1 and 2 and is documented on the enclosed NRC Form 536. It should be noted that a separate NRC Form 536 was completed for each unit; therefore, there are two completed forms enclosed.
There are no commitments contained in this submittal. Should you have any questions concerning this submittal, please contact Randal Martin at 479-858-6844.
Sincerely, ORIGINAL SIGNED BY DAVID B. BICE FOR STEPHENIE L. PYLE
SLP/mkh
Enclosures Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 0CAN071603 Page 2 of 2
cc: Mr. Kriss Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. Mark Haire, Chief Operations Branch Division of Reactor Safety U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This "'> information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy. and Information Collections Branch (T-5 0 < 0 F53). U.S. Nuclear Regulatory Commission. Washington. DC20555-0001. or by e-mail to c EXAMINATION DATA . " lnfocollects.Resource@nrc.gov. and to the Desk Officer. Office of Information and Regulatory Affairs, i;; ,,..,-t-,, NEOB-10202, (3150-0131). Office of Management and Budget. Washington. DC 20503. If a means ........ used to impose an information collection does not display a currently valid OMB control number. the NRG may not conduct or sponsor. and a person is not required to respond to. the information collection. FACILITY NRC REGION ARKANSAS NUCLEAR ONE, Unit 1 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------------NUMBER OF REACTOR 8 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR 4 4 0 4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 4 0 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 02/26/2018 08/26/2019 03/01/2021 ALTERNATE DATE 03/05/2018 09/09/2019 03/08/2021 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 6 6 6 6 CANDIDATES NRG FORM 536 (05-2016)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This "'> information collection is used to plan budgets and resources for operator examinations. Send OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy. and Information Collections Branch (T-5 0 < 0 F53). U.S. Nuclear Regulatory Commission. Washington. DC20555-0001. or by e-mail to c EXAMINATION DATA . " lnfocollects.Resource@nrc.gov. and to the Desk Officer. Office of Information and Regulatory Affairs, i;; ,,..,-t-,, NEOB-10202, (3150-0131). Office of Management and Budget. Washington. DC 20503. If a means ........ used to impose an information collection does not display a currently valid OMB control number. the NRG may not conduct or sponsor. and a person is not required to respond to. the information collection. FACILITY NRC REGION ARKANSAS NUCLEAR ONE, Unit 2 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 -----------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ------------NUMBER OF REACTOR 8 0 8 8 OPERATORS NUMBER OF SENIOR REACTOR 4 0 4 4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 4 0 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 08/06/2018 02/03/2020 08/09/2021 ALTERNATE DATE 08/20/2018 02/17/2020 08/16/2021 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 6 6 6 6 CANDIDATES NRG FORM 536 (05-2016)