IR 05000397/1993048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML17290A969
| number = ML20059A262
| issue date = 02/01/1994
| issue date = 12/15/1993
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/93-48
| title = Forwards Insp Rept 50-397/93-48 on 931116-23 & Nov.Violation of Concern Because It Appears to Be Repeat of Previous Problems.Encls Withheld (Ref 10CFR2.790)
| author name = Pate R
| author name = Pate R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 9402230028
| document report number = NUDOCS 9312300072
| title reference date = 01-14-1994
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 10
| page count = 3
}}
}}


Line 19: Line 18:


=Text=
=Text=
{{#Wiki_filter:SUBJECT:
{{#Wiki_filter:-...
Ack receipt of 940114 ltr informing NRC of steps taken correct violations noted in insp rept 50-397/93-48.
.
.
.
. -
-
-
-
b,
.
.
:
.s i
_ [**%
UNITED STATES'


DISTRIBUTION CODE:
-
IE04D COPIES RECEIVED:LTR ENCL SIZE:
NUCLEAR REGULATORY COMMISSION C
TITLE: Safeguards Inspection Rpt/NOV Response (
,
0 DKT)
~,
ublicly to
g i
 
Avax able S/
F NOTES:
RECIPIENT ID CODE/NAME PDV PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J COPIES LTTR ENCL
'0 REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)
ACCESSION NBR:9402230028 DOC.DATE: 94/02/01 NOTARIZED: NO DOCKET N
ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PATE,R.J.
 
Region 5 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.
 
Washington Public Power Supply System R
INTERNAL: ACRS NRR/DRSS/PSGB9D UDQC BSTRACT REG FILE
 
AEOD/DOA NRR/PMAS/ILRB12 OE DIR RGN5 FILE
 
EXTERNAL: NRC PDR NSIC NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
 
ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
 
ENCL
 
,e,a ate>>
e (%-
Mp0 v!y,
>>>>*e 4 UNITED STATES NUCLEAR REGULATORYCOMMISSION


==REGION V==
==REGION V==
1450 MARIALANE WALNUTCREEK, CAUFORNIA94596-5368 FE8 -1 i99<
j
Docket 50-397 License NPF-21 Washington Public Power Supply System P.O.
#
1450 MARIA LANE-i
-
WALNUT CREEK, CALIFORNIA 94596-5368 ll
_
:DEC 151993 l
L;
:


Box 968 Richland, Mashington 99352 Attention:
Docket 50-397 License NPF-21
J.. V. Parrish Assistant Managing Director, Operations SUBJECT:
~i Washington Public Power Supply System
RESPONSE TO NOTICE OF VIOLATION NRC INSPECTION REPORT 50-397/93-48 Thank you for your letter dated January 14, 1994, in response to our Notice of Violation and NRC Inspection Report No. 50-397/93-48 dated December 15, 1993, informing us of the steps you have taken to correct the items we brought to your attention.
.j P. O. Box 968
+
Richland, Washington 99352 j
'
Attention:
J. V. Parrish
-
Assistant Managing Director, Operations
;
:
Subject: NOTICE OF VIOLATION
!
NRC INSPECTION REPORT 50-397/93-48
.j
:
This refers to the inspection conducted by L. R. Norderhaug of.this office on l
November 16 through 23, 1993. The inspection included a review of activities
!
authorized for your Washington Nuclear Project, Number 2.


The implementation of your corrective actions wi11 be verified during the course of future inspections.
At the' conclusion l
 
of the inspection, the findings were discussed with those members of your i
Your cooperation with us is appreciated.
staff identified in the enclosed report. The report also refers to-
 
;
Sincerely, y~ c Robert J.
subsequent in-office review of documentation provided during.the inspection.
 
Pate, Chief Safeguards, Emergency Preparedness and Non-Power Reactor Branch CC:
D.
 
M. Coleman, Acting Manager, Regulatory Programs, WPPSS J.
 
W. Swailes, WNP-2 Plant Manager, WPPSS H. E. Kook, Licensing Manager, WPPSS G.
 
E. Doupe, Esq.,
WPPSS Chairman, Benton County Board of Commissioners M. H. Phillips, Esq.,
Winston 5 Strawn Warren A. Bishop, Energy Facility Site Evaluation Council 9402230028 940201 PDR ADOCK 05000397 PDR


Docket 50-397 License NPF-21 Fi-.B -
visit.
E iog'ashington Public Power Supply System P.O.


Box 968 Richland, Washington 99352 Attention:
'
J.


V. Parrish Assistant Hanaging Director, Operations SUBJECT:
RESPONSE TO NOTICE OF 'VIOLATION NRC INSPECTION REPORT 50-397/93-48 Thank you for your letter dated January 14, 1994, in response to our'Notice of Violation and NRC Inspection Report No. 50-397/93-48 dated December 15, 1993, informing us of the steps you have taken to correct the items we brought to your attention.
The implementation of you} corrective actions will be verified during the course of future inspections.
Your cooperation with us is appreciated.
Sincerely
;
;
Robert J.
,
Areas examined during the inspection are identified in the report. Within
,
these areas, the inspection consisted of selective examinations of procedures a
and representative records, interviews with facility and contract personnel,
:


Pate, Chief Safeguards, Emergency Preparedness and Non-Power Reactor Branch CC:
and observations of activities in progress. The~ inspection findings.are documented in the enclosed inspection report.
D.
::
 
Based on'the results of this inspection, certain of your activities-appeared'
W. Coleman, Acting Hanager, Regulatory Programs, WPPSS J.
!
 
to be in violation of NRC requirements, as specified. in the enclosed Notice o
W. Swailes, WNP-2 Plant Hanager, WPPSS H.
of Violation (Notice).. The violation pertains to your failure to maintain j
 
E. Kook, Licensing Hanager, WPPSS G.
 
E.
 
Doupe, Esq.,
WPPSS Chairman, Benton County Board of Commissioners H. H. Phillips, Esq'.,
Winston
& Strawn Warren A. Bishop, Energy Facility Site Evaluation Council
'h bcc w/o copy of letter dated January 14, 1994:
Docket File Resident Inspector Project Inspector G.
 
Cook K. Perkins D. Clevenger H. Smith Region V/ann LNorderhaug RPate gl i i))~~ Z.l> V ES /
NO
]
YES /
NO
]
YES /
NO ]
YES /
NO ]
 
~$ 4ECy~
/p +)t*++
UNITED STATES NUCLEAR REGULATORYCOMMISSION
 
==REGION V==
1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368 Fpg-1894
-"- Docket 50-397 License NPF-21 Washington Public Power Supply System P. 0.
 
Box 968 Richland, Washington 99352 Attention:
J.
 
V. Parrish Assistant Hanaging Director, Operations Subject:
RESPONSE TO NOTICE OF VIOLATION NRC INSPECTION REPORT 50-397/93-48 Thank you for your letter dated January 14, 1994, in response to our Notice of Violation and NRC Inspection Report No. 50-275/93-48 dated December 15, 1993, informing us of the steps you have taken to correct the items we brought to your attention.
 
The implementation of your corrective actions will be verified during the course of future inspections.
 
Your cooperation with us is appreciated.
 
Sincerely, Robert J.
 
Pate, Chief Safeguards, Emergency Preparedness and Non-Power Reactor Branch CC:
D. Coleman, Acting Hanager, Regulatory Programs, WPPSS J.
 
W. Swailes, WNP-2 Plant Hanager, WPPSS Hr. A. G. Hosier, Licensing Manager, WPPSS
'.
E. Doupe, Esq.,
WPPSS Chairman, Benton County. Board of Commissioners H. H. Phillips, Esq.,
Winston
& Strawn Warren A. Bishop, Energy Facility Site Evaluation Council
 
lg I J'
~
~
e
the random selection pool for Fitness' for Duty testing as required. While.


Docket 50-397 License NPF-21 Washington Public Power Supply System P. 0.
Ei this failure was identified by your Quality Assurance Program,-it is of
!
particular concern ~ because it appears to be a repeat'of a similar problem
;
-
identiified previously by your QA organization. Also,.while various!
l corrective measures were being considered, the final corrective actions deemed necessary to assure no recurrence of the problem were not available i
for inspector review at the time of the' inspection.


Box 968 Richland, Washington 99352 Attention:
You are required to respond to this letter and should follow the instructionsL j
J.
specified in the' enclosed Notice when preparing'your response.


V. Parrish Assistant Managing Director, Operations Subject:
In your I
RESPONSE TO NOTICE OF VIOLATION NRC INSPECTION REPORT 50-397/93-48 Thank you for your letter dated January 14, 1994, in response to our Notice of Violation and NRC Inspection Report No. 50-275/93-48 dated December 15, 1993, informing us of the steps you have taken to correct the items we brought to your attention.
response, you should document the specific actions taken and any additional actions you plan to' prevent recurrence. After. reviewing your, response to-this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further.NRC enforcement
,
action is necessary to ensure compliance with NRC regulatory requirements.


The implementation of your corrective actions will be verified during the course of future inspections.
H WERW, TPMSMm!D HEEmrH ctmpc
")
280037 m monumes s
9312300072 931215
-
i go$
j PDR ADOCK 05000397
-
G'
PDR'


Your cooperation with us is appreciated.
.
.,
;
'
The response directed by this letter and the enclosed Notice is not subject
.'to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96-511.


Sincerely, Robert J.
!
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
!
Title 10, Code of Federal Regulations, documentation of the findings of your programs and procedures for safeguarding special nuclear material are exempt j
;
from public disclosure; therefore, the enclosure-to this letter will not be placed in the NRC Public Document Room.


Pate, Chief Safeguards, Emergency Preparedness and Non-Power Reactor Branch cc w/o letter dated January 14, 1994:
j
D. Coleman, Acting Manager, Regulatory Programs, WPPSS J.
'


W. Swailes, WNP-2 Plant Manager, WPPSS Hr. A. G. Hosier, Licensing Manager, WPPSS G.
Sincerely,
&O i
,
j Robert J. Pate, Chief r
Safeguards, Emergency Preparedness and
'
-
Non-Power Reactor Branch


E. Doupe, Esq.,
===Enclosures:===
WPPSS Chairman, Benton County Board of Commissioners H. H. Phillips, Esq.,
A.
Winston S. Strawn Warren A. Bishop, Energy Facility Site Evaluation Council bcc w/copy of letter dated January 14, 1994:
Docket File K. Perkins bcc w/o copy of letter dated January 14, 1994:
Resident Inspector Project Inspector G.


Cook M. Smith D. Clevenger Region V/ann
Notice of Violation i
B.


C
Inspection Report No. 50-397/93-48
.P


LRNorderhaug 02/ ) /94 RJPate 02/ 1 /94
REGION V/
.'
LNorderhaug PJ n
RH e RPa
-
12/i /93 12/6/93 12/ /93 12/f/93
&hf 0% w DG b22vf n PM,
.


ES NO ESi NO ES NO YES NO
l
}}
}}

Latest revision as of 17:13, 26 May 2025

Forwards Insp Rept 50-397/93-48 on 931116-23 & Nov.Violation of Concern Because It Appears to Be Repeat of Previous Problems.Encls Withheld (Ref 10CFR2.790)
ML20059A262
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/15/1993
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9312300072
Download: ML20059A262 (3)


Text

-...

.

.

.

. -

-

-

-

b,

.

.

.s i

_ [**%

UNITED STATES'

-

NUCLEAR REGULATORY COMMISSION C

,

~,

g i

REGION V

j

1450 MARIA LANE-i

-

WALNUT CREEK, CALIFORNIA 94596-5368 ll

_

DEC 151993 l

L;

Docket 50-397 License NPF-21

~i Washington Public Power Supply System

.j P. O. Box 968

+

Richland, Washington 99352 j

'

Attention:

J. V. Parrish

-

Assistant Managing Director, Operations

Subject: NOTICE OF VIOLATION

!

NRC INSPECTION REPORT 50-397/93-48

.j

This refers to the inspection conducted by L. R. Norderhaug of.this office on l

November 16 through 23, 1993. The inspection included a review of activities

!

authorized for your Washington Nuclear Project, Number 2.

At the' conclusion l

of the inspection, the findings were discussed with those members of your i

staff identified in the enclosed report. The report also refers to-

subsequent in-office review of documentation provided during.the inspection.

visit.

'

,

Areas examined during the inspection are identified in the report. Within

,

these areas, the inspection consisted of selective examinations of procedures a

and representative records, interviews with facility and contract personnel,

and observations of activities in progress. The~ inspection findings.are documented in the enclosed inspection report.

Based on'the results of this inspection, certain of your activities-appeared'

!

to be in violation of NRC requirements, as specified. in the enclosed Notice o

of Violation (Notice).. The violation pertains to your failure to maintain j

~

the random selection pool for Fitness' for Duty testing as required. While.

Ei this failure was identified by your Quality Assurance Program,-it is of

!

particular concern ~ because it appears to be a repeat'of a similar problem

-

identiified previously by your QA organization. Also,.while various!

l corrective measures were being considered, the final corrective actions deemed necessary to assure no recurrence of the problem were not available i

for inspector review at the time of the' inspection.

You are required to respond to this letter and should follow the instructionsL j

specified in the' enclosed Notice when preparing'your response.

In your I

response, you should document the specific actions taken and any additional actions you plan to' prevent recurrence. After. reviewing your, response to-this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further.NRC enforcement

,

action is necessary to ensure compliance with NRC regulatory requirements.

H WERW, TPMSMm!D HEEmrH ctmpc

")

280037 m monumes s

9312300072 931215

-

i go$

j PDR ADOCK 05000397

-

G'

PDR'

.

.,

'

The response directed by this letter and the enclosed Notice is not subject

.'to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

!

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

!

Title 10, Code of Federal Regulations, documentation of the findings of your programs and procedures for safeguarding special nuclear material are exempt j

from public disclosure; therefore, the enclosure-to this letter will not be placed in the NRC Public Document Room.

j

'

Sincerely,

&O i

,

j Robert J. Pate, Chief r

Safeguards, Emergency Preparedness and

'

-

Non-Power Reactor Branch

Enclosures:

A.

Notice of Violation i

B.

Inspection Report No. 50-397/93-48

REGION V/

.'

LNorderhaug PJ n

RH e RPa

-

12/i /93 12/6/93 12/ /93 12/f/93

&hf 0% w DG b22vf n PM,

.

l