IR 05000397/1993201

From kanterella
Jump to navigation Jump to search
Ack Receipt of Amended Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/93-201
ML17290A700
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/04/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9310260052
Download: ML17290A700 (6)


Text

Docket No. 50-397 Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99352-0968 Attention:

,

Hr. J.

V. Parrish Assistant Managing Director, Operations Gentlemen:

Thank you for your letter of August 31, 1993, amending your response to our Notice of Violation and Inspection Report No.93-201 dated April 27, 1993.

Your revised corrective actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sincerely, L. F. Hiller, Jr., Chief Reactor Safety Branch CC:

Hr. J.

K. Swailes, WNP-2 Plant Manager G.

E.

C.

Doupe, Esq.,

WPPSS Hr, Warren A. Bishop, Chairman, Energy Facility Site Evaluation Council Hr. Alan G. Kosler, Licensing Manager, WPPSS Hr.

G.

C. Sorensen, Manager, Regulatory Programs, WPPSS Chairman, Benton County Board of Commissioners H. K. Philips, Jr.,

Esq.,

Winston S. Strawn bcc w/copy of letter dated August 31, 1993:

Docket File Resident Inspector Project Inspector G.

Cook R.

Kuey B. Faulkenberry J. Zollicoffer bcc w/o copy of letter dated August 31, 1993:

H. Smith J. Bianchi 9310260052 931004 PDR ADOCK 05000397

PDR

N e i n V/ann PNarbut PJ nson 0 /l~/93

~@ p/egg R

Q S

COPY]

R Q

S NO YES NO to/ /

R Q

S YES

S

CS

0 PDR]

~YE

~YE N

~g AEGy, PO Op lv O0 I

!

+**++

UNITED STATES NUCLEAR REGULATORYCOMMISSION WEGION V 1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368 gay -4 f993 Docket No.

50-397 Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99352-0968 Attention:

Hr. J.

V. Parrish Assistant Managing Director, Operations Gentlemen:

Thank you for your letter of August 31, 1993, amending your. response to our Notice of Violation and Inspection Report No.93-201 dated April 27, 1993.

Your revised corrective actions will be verified during a future inspection.

Your cooperation with us is appreciated.

Sine ely, L. F. Hiller, Jr., Chief Reactor Safety Branch CC:

Mr. J.

H. Swailes, WNP-2 Plant Manager G.

E.

C. Doupe, Esq.,

WPPSS Mr. Warren A. Bishop, Chairman, Energy Facility Site Evaluation Council Hr. Alan G. Hosier, Licensing Manager, WPPSS Hr.

G.

C. Sorensen, Manager, Regulatory Programs, WPPSS Chairman, Benton County Board of Commissioners H.

H. Philips, Jr.,

Esq.,

Winston 5 Strawn