IR 05000397/1993015
| ML17290A660 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/27/1993 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 9310130215 | |
| Download: ML17290A660 (5) | |
Text
REGULATORY INFORMATION DISTRIBUT10N SYSTEM (RIDS)
CESSION NBR:9310130215 DOC.DATE: 93/09/27 NOTARIZED: NO DOCKET CIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 UTH.NAME AUTHOR AFFILIATION MILLER,L.F.
Region 5 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION.
PARRISH,J.V.
Washington Public Power Supply System SUBJECT:
Ack receipt of 930913 ltr informing NRC of steps taken to correct violations noted in insp rept 50-397/93-15.
DISTRIBUTION CODE-IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT ID CODE/NAME PDV PD INTERNAL: ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPBl NUDOCS-ABSTRACT OGC/HDS1 RES/HFB E TERNAL: EG6rG/BRYCE,J.H.
NSIC COPIES LTTR ENCL
1
2
1
1
1
1
1
1
1
1
1
1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/DEIB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE D
GN FILE
NRC PDR COPIES LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1 NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
h
'
H
<gAS'pg
+4
~p i~
pp A
'; e p r qO
+a*++
UNITED STATES NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368
$ F.P 5 "l 19%
Docket No. 50-397 Washington Public Power Supply System 3000 George Washington Way P. 0.
Box 968 Richland, Washington 99352 Attention:
Mr. J.
V. Parrish Assistant Managing Director for Operations Gentlemen:
Thank you for your letter of September 13, 1993, in response to our Notice of Violation and Inspection Report No. 50-397/93-15, dated August 16, 1993, informing us of the steps you have taken to correct the items which we brought to your attention.
Your corrective, actions will be verified during a future 1nspect1on.
Your cooperation with us is appreciated.
Sine rely,
. F. Miller, Jr.,
Chi Reactor Safety Bran CC:
Hr. J.
H. Swailes, WNP-2 Plant Manager G.
E.
C. Doupe, Esq.,
WPPSS Hr. Warren A. Bishop, Chairman, Energy Facility Site Evaluation Council Hr. Alan G. Hosier, Licensing Manager, WPPSS Hr.
G.
C. Sorensen, Manager, Regulatory Programs, WPPSS Chairman, Benton County Board of Commissioners M. H. Philips, Jr.,
Esq.,
Winston
& Strawn 9310130215 930927 PDR ADDCK 05000397
Docket No. 50-397 Washington Public Power Supply System 3000 George Washington Way P. 0.
Box 968 Richland, Washington 99352 Attention:
Hr. J.
V. Parrish Assistant Managing Director for Operations Gentlemen:
Thank you for your letter of September 13, 1993, in response to our Notice of Violation and Inspection Report No. 50-397/93-15, dated August 16, 1993, informing us of the steps you have taken to correct the items which we brought to your attention.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, K. E. Perkins, Jr., Director Division of Reactor Safety and Projects CC:
Hr. J.
H. Swailes, WNP-2 Plant Manager G.
E.
C. Doupe, Esq.,
WPPSS Hr. Warren A. Bishop, Chairman, Energy Facility Site Evaluation Council Hr. Alan G. Hosier, Licensing Manager, WPPSS Mr. G.
C. Sorensen, Manager, Regulatory Programs, WPPSS Chairman, Benton County Board of Commissioners H.
H. Philips, Jr.,
Esq.,
Winston
& Strawn bcc w/copy of letter dated September 13, 1993:
Docket File Resident Inspector Project Inspector G.
Cook R.
Huey B. Faulkenberry J. Zollicoffer bcc w/o copy of letter dated M. Smith Regions/enn PMorrill LHiller g /oi'//<'J
/
SRichards
/ /
KPerkins
/ /
September 13, 1993:
S COP Q
S ES NO YES NO S
CO YES NO S
CO YES NO
]
ES NO
F J