ML17056B317: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/28/1989
| issue date = 02/28/1989
| title = Revised Monthly Operating Rept for Feb 1989 for Nine Mile Point Nuclear Station Unit 1
| title = Revised Monthly Operating Rept for Feb 1989 for Nine Mile Point Nuclear Station Unit 1
| author name = DAHLBERG K A
| author name = Dahlberg K
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: I/31/91 COMPLETED BY: K.A.Dahlberg TELEPHONE:
{{#Wiki_filter:OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
(315)349-2443 1.Unit Name: Nine Mle Point Unit//I 2.Reporting Period: 2/I/89 through 2/28/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum.Dependable Capacity (Net MWe): 610 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.,Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MGQ 17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Refuel outa e arted on anua 22 1 672.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each): 88.1,416.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 170,545.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.7 65.7 58.2 57.2 19.6 26.Unit is Test Status (Prior to Commercial Operation):
50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
Forecast Achieved INlTIAL CRITICALlTY IN1TIAL ELECTRIC1TY COMMERCIAL OPERATION'$'102200136 91020/PGR ADOCK 05000220 R PDR ag Vl ,'T~A f 4 V}}
(315) 349-2443
: 1. Unit Name: Nine Mle Point Unit //I
: 2. Reporting Period: 2/I/89 through 2/28/89
: 3. Licensed Thermal Power (MWt):
1850
: 4. Nameplate Rating (Gross MWe):
640
: 5. Design Electrical Rating (Net MWe):
620
: 6. Maximum Dependable Capacity (Gross MWe):
630
: 7. Maximum.Dependable Capacity (Net MWe):
610
: 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
: 9. Power Level To Which Restricted, IfAny (Net MWe):
: 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
: 11. Hours in Reporting Period
: 12. Number ofHours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours 14.,Hours Generator On-Line
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MGQ
: 17. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor
: 20. Unit AvailabilityFactor
: 21. Unit Capacity Factor (Using MDC Net)
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e
arted on anua 22 1
672.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each):
88.
1,416.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 170,545.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.7 65.7 58.2 57.2 19.6
: 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INlTIALCRITICALlTY IN1TIALELECTRIC1TY COMMERCIALOPERATION
'$'102200136 91020/
PGR ADOCK 05000220 R
PDR
 
ag Vl
,'T
~Af 4 V}}

Latest revision as of 12:23, 9 January 2025

Revised Monthly Operating Rept for Feb 1989 for Nine Mile Point Nuclear Station Unit 1
ML17056B317
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1989
From: Dahlberg K
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17056B295 List:
References
NUDOCS 9102200136
Download: ML17056B317 (2)


Text

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:

50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:

(315) 349-2443

1. Unit Name: Nine Mle Point Unit //I
2. Reporting Period: 2/I/89 through 2/28/89
3. Licensed Thermal Power (MWt):

1850

4. Nameplate Rating (Gross MWe):

640

5. Design Electrical Rating (Net MWe):

620

6. Maximum Dependable Capacity (Gross MWe):

630

7. Maximum.Dependable Capacity (Net MWe):

610

8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:

Notes

9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period
12. Number ofHours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 14.,Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MGQ
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months Refuel outa e

arted on anua 22 1

672.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each):

88.

1,416.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 170,545.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.7 65.7 58.2 57.2 19.6

26. Unit is Test Status (Prior to Commercial Operation):

Forecast Achieved INlTIALCRITICALlTY IN1TIALELECTRIC1TY COMMERCIALOPERATION

'$'102200136 91020/