ML17056B317: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 02/28/1989 | | issue date = 02/28/1989 | ||
| title = Revised Monthly Operating Rept for Feb 1989 for Nine Mile Point Nuclear Station Unit 1 | | title = Revised Monthly Operating Rept for Feb 1989 for Nine Mile Point Nuclear Station Unit 1 | ||
| author name = | | author name = Dahlberg K | ||
| author affiliation = NIAGARA MOHAWK POWER CORP. | | author affiliation = NIAGARA MOHAWK POWER CORP. | ||
| addressee name = | | addressee name = | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OPERATING STATUS OPERATING | {{#Wiki_filter:OPERATING STATUS OPERATING DATAREPORT DOCKET NO.: | ||
(315)349-2443 1.Unit Name: Nine Mle Point Unit//I 2.Reporting Period: 2/I/89 through 2/28/89 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 640 5.Design Electrical Rating (Net MWe): 620 6.Maximum Dependable Capacity (Gross MWe): 630 7.Maximum.Dependable Capacity (Net MWe): 610 8. | 50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE: | ||
Forecast Achieved | (315) 349-2443 | ||
: 1. Unit Name: Nine Mle Point Unit //I | |||
: 2. Reporting Period: 2/I/89 through 2/28/89 | |||
: 3. Licensed Thermal Power (MWt): | |||
1850 | |||
: 4. Nameplate Rating (Gross MWe): | |||
640 | |||
: 5. Design Electrical Rating (Net MWe): | |||
620 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
630 | |||
: 7. Maximum.Dependable Capacity (Net MWe): | |||
610 | |||
: 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons: | |||
Notes | |||
: 9. Power Level To Which Restricted, IfAny (Net MWe): | |||
: 10. Reasons For Restrictions, IfAny: | |||
This Month Yr-to-Date Cumulative | |||
: 11. Hours in Reporting Period | |||
: 12. Number ofHours Reactor Was Critical | |||
: 13. Reactor Reserve Shutdown Hours 14.,Hours Generator On-Line | |||
: 15. Unit Reserve Shutdown Hours | |||
: 16. Gross Thermal Energy Generated (MGQ | |||
: 17. Gross Electrical Energy Generated (MWH) | |||
: 18. Net Electrical Energy Generated (MWH) | |||
: 19. Unit Service Factor | |||
: 20. Unit AvailabilityFactor | |||
: 21. Unit Capacity Factor (Using MDC Net) | |||
: 22. Unit Capacity Factor (Using DER Net) | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e | |||
arted on anua 22 1 | |||
672.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each): | |||
88. | |||
1,416.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 170,545.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.7 65.7 58.2 57.2 19.6 | |||
: 26. Unit is Test Status (Prior to Commercial Operation): | |||
Forecast Achieved INlTIALCRITICALlTY IN1TIALELECTRIC1TY COMMERCIALOPERATION | |||
'$'102200136 91020/ | |||
PGR ADOCK 05000220 R | |||
PDR | |||
ag Vl | |||
,'T | |||
~Af 4 V}} | |||
Latest revision as of 12:23, 9 January 2025
| ML17056B317 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 02/28/1989 |
| From: | Dahlberg K NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML17056B295 | List: |
| References | |
| NUDOCS 9102200136 | |
| Download: ML17056B317 (2) | |
Text
OPERATING STATUS OPERATING DATAREPORT DOCKET NO.:
50-220 DATE: I/31/91 COMPLETED BY: K. A. Dahlberg TELEPHONE:
(315) 349-2443
- 1. Unit Name: Nine Mle Point Unit //I
- 2. Reporting Period: 2/I/89 through 2/28/89
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross MWe):
640
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
630
- 7. Maximum.Dependable Capacity (Net MWe):
610
- 8. IfChanges Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
Notes
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period
- 12. Number ofHours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.,Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MGQ
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months Refuel outa e
arted on anua 22 1
672.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 (Type, Date and Duration of Each):
88.
1,416.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 170,545.2 115,234.3 1,204.2 112,117.2 20.4 188,473,132.0 62,473,070.0 60,524,382.0 65.7 65.7 58.2 57.2 19.6
- 26. Unit is Test Status (Prior to Commercial Operation):
Forecast Achieved INlTIALCRITICALlTY IN1TIALELECTRIC1TY COMMERCIALOPERATION
'$'102200136 91020/
PGR ADOCK 05000220 R
ag Vl
,'T
~Af 4 V