ML15244B092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML15244B092
| number = ML15244B092
| issue date = 09/01/2015
| issue date = 09/01/2015
| title = Non-Public Security Inspection Plan For Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015401)
| title = Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015401)
| author name = Haire M S
| author name = Haire M S
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1

Revision as of 00:08, 2 March 2018

Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015401)
ML15244B092
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/01/2015
From: Haire M S
Plant Support Branch-1
To: Diya F
Union Electric Co
References
IR 2015401
Download: ML15244B092 (4)


See also: IR 05000483/2015401

Text

" " September 1, 2015

Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401)

Dear Mr. Diya:

On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-483 License No. NPF-30

Enclosure:

Inspection Plan cc w/encl: Mr. Eric Olson Manager, Security Callaway Nuclear Plant P.O. Office Box 620 Fulton, MO 65251 cc w/o encl: