ML22003A056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:January 10, 2022 LICENSEE:       Entergy Operations, Inc.
{{#Wiki_filter:January 10, 2022
FACILITY:       Arkansas Nuclear One, Unit 1
 
LICENSEE: Entergy Operations, Inc.
 
FACILITY: Arkansas Nuclear One, Unit 1


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF DECEMBER 16, 2021, PRESUBMITTAL TELECONFERENCE WITH ENTERGY OPERATIONS, INC. TO DISCUSS PROPOSED AMENDMENT REQUEST CONCERNING TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM] LOOPS, MODES 1 AND 2, FOR ARKANSAS NUCLEAR ONE, UNIT 1 (EPID L-2021-LRM-0120)
OF DECEMBER 16, 2021, PRESUBMITTAL TELECONFERENCE WITH ENTERGY OPERATIONS, INC. TO DISCUSS PROPOSED AMENDMENT REQUEST CONCERNING TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM] LOOPS, MODES 1 AND 2, FOR ARKANSAS NUCLEAR ONE, UNIT 1 (EPID L-2021-LRM-0120)
On December 16, 2021, an Observation presubmittal meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc. (the licensee) via teleconference. The purpose of the meeting was to discuss the licensees forthcoming license amendment request (LAR) regarding proposed technical specification (TS) changes for TS 3.4.4, RCS [Reactor Coolant System] Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 (ANO-1). The meeting notice and agenda dated December 3, 2021, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML21337A087. A list of meeting participants is provided in the enclosure.
During the meeting, the licensee presented information (ADAMS Accession No. ML21348A126) regarding its forthcoming LAR. The licensee provided background information concerning the reason for the planned LAR and a detailed description of the proposed changes to the ANO-1 TSs, and identified some precedent LARs. The licensee informed the NRC staff that it expected to submit the LAR in January 2022.
The NRC staff queried the licensee throughout the presentation. The NRC staff did not make any regulatory decisions or commitments at the meeting. Members of the public participated in the teleconference. Public Meeting Feedback forms were not received.


Please direct any inquiries to me at 301-415-4037, or via e-mail to Thomas.Wengert@nrc.gov.
On December 16, 2021, an Observation presubmittal meeting was h eld between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc. (the licensee) via teleconference. The purpose of the meeting was to discuss the licensees forthcoming license amendment request (LAR) regarding proposed technical specification (TS) changes for TS 3.4.4, RCS [Reactor Coolant System] Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 (ANO-1). The meeting notice and agenda dated December 3, 2021, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML21337A087. A list of meeting participants is provided in the enclosure.
                                            /RA/
 
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313
During the meeting, the licensee presented information (ADAMS Accession No. ML21348A126) regarding its forthcoming LAR. The licensee provided backgroun d information concerning the reason for the planned LAR and a detailed description of the pr oposed changes to the ANO-1 TSs, and identified some precedent LARs. The licensee informed the NRC staff that it expected to submit the LAR in January 2022.
 
The NRC staff queried the licensee throughout the presentation. The NRC staff did not make any regulatory decisions or commitments at the meeting. Member s of the public participated in the teleconference. Public Meeting Feedback forms were not rec eived.
- 2 -
 
Please direct any inquiries to me at 301-415-4037, or via e-mai l to Thomas.Wengert@nrc.gov.
 
/RA/
 
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket No. 50-313


==Enclosure:==
==Enclosure:==
List of Attendees
cc: Listserv LIST OF ATTENDEES
DECEMBER 16, 2021, TELECONFERENCE MEETING
WITH ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNIT 1
FORTHCOMING LICENSE AMENDMENT REQUEST REGARDING
TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM]
LOOPS, MODES 1 AND 2
U.S. Nuclear Regulatory Commission Fred Forsaty, NRR1/DSS2 Santosh Bhatt, NRR/DSS Vic Cusumano, NRR/DSS Calvin Cheung, NRR/DEX3 Jennifer Dixon-Herrity, NRR/DORL4 Tom Wengert, NRR/DORL
Entergy Operations, Inc.
Clint Alday Corporate Manager, Nuclear Fuels Analysis Matt Bindeman Arkansas Nuclear One (ANO) Safety Analysis Terrence Brimfield Corporate Supervisor, Safety Analysis Bob Clark ANO Regulatory Assurance Phil Couture Corporate Senior Manager, Regulatory Assurance Ron Gaston Corporate Director, Regulatory Compliance Michael Hall ANO Regulatory Assurance Riley Keele Manager, ANO Regulatory Assurance Kenyon McNeaill ANO Manager, Assistant Operations Mark Reid ANO Regulatory Assurance Chris Walker ANO Safety Analysis
State of Arkansas Bernie Bevill Section Chief, Arkansas Department of Health, Ra diation Control Section


List of Attendees cc: Listserv
1 Office of Nuclear Reactor Regulation 2 Division of Safety Systems 3 Division of Engineering and External Hazards 4 Division of Operating Reactor Licensing


LIST OF ATTENDEES DECEMBER 16, 2021, TELECONFERENCE MEETING WITH ENTERGY OPERATIONS, INC.
Enclosure
ARKANSAS NUCLEAR ONE, UNIT 1 FORTHCOMING LICENSE AMENDMENT REQUEST REGARDING TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM]
LOOPS, MODES 1 AND 2 U.S. Nuclear Regulatory Commission Fred Forsaty, NRR1/DSS2 Santosh Bhatt, NRR/DSS Vic Cusumano, NRR/DSS Calvin Cheung, NRR/DEX3 Jennifer Dixon-Herrity, NRR/DORL4 Tom Wengert, NRR/DORL Entergy Operations, Inc.
Clint Alday              Corporate Manager, Nuclear Fuels Analysis Matt Bindeman            Arkansas Nuclear One (ANO) Safety Analysis Terrence Brimfield      Corporate Supervisor, Safety Analysis Bob Clark                ANO Regulatory Assurance Phil Couture            Corporate Senior Manager, Regulatory Assurance Ron Gaston              Corporate Director, Regulatory Compliance Michael Hall            ANO Regulatory Assurance Riley Keele              Manager, ANO Regulatory Assurance Kenyon McNeaill          ANO Manager, Assistant Operations Mark Reid                ANO Regulatory Assurance Chris Walker            ANO Safety Analysis State of Arkansas Bernie Bevill            Section Chief, Arkansas Department of Health, Radiation Control Section 1
Office of Nuclear Reactor Regulation 2
Division of Safety Systems 3
Division of Engineering and External Hazards 4
Division of Operating Reactor Licensing Enclosure


ML22003A056                           *by e-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC*     NRR/DORL/LPL4/PM*
ML22003A056 *bye-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME TWengert             PBlechman         JDixon-Herrity       TWengert (WOrders for)
NAME TWengert PBlechman JDixon-Herrity TWengert (WOrders for)
DATE 1/10/2022           1/3/2022           1/10/2022           1/10/2022}}
DATE 1/10/2022 1/3/2022 1/10/2022 1/10/2022}}

Latest revision as of 00:35, 19 November 2024

Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1
ML22003A056
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/10/2022
From: Thomas Wengert
Plant Licensing Branch IV
To:
Entergy Operations
Wengert T
References
EPID L-2021-LRM-0120
Download: ML22003A056 (4)


Text

January 10, 2022

LICENSEE: Entergy Operations, Inc.

FACILITY: Arkansas Nuclear One, Unit 1

SUBJECT:

SUMMARY

OF DECEMBER 16, 2021, PRESUBMITTAL TELECONFERENCE WITH ENTERGY OPERATIONS, INC. TO DISCUSS PROPOSED AMENDMENT REQUEST CONCERNING TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM] LOOPS, MODES 1 AND 2, FOR ARKANSAS NUCLEAR ONE, UNIT 1 (EPID L-2021-LRM-0120)

On December 16, 2021, an Observation presubmittal meeting was h eld between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc. (the licensee) via teleconference. The purpose of the meeting was to discuss the licensees forthcoming license amendment request (LAR) regarding proposed technical specification (TS) changes for TS 3.4.4, RCS [Reactor Coolant System] Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 (ANO-1). The meeting notice and agenda dated December 3, 2021, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML21337A087. A list of meeting participants is provided in the enclosure.

During the meeting, the licensee presented information (ADAMS Accession No. ML21348A126) regarding its forthcoming LAR. The licensee provided backgroun d information concerning the reason for the planned LAR and a detailed description of the pr oposed changes to the ANO-1 TSs, and identified some precedent LARs. The licensee informed the NRC staff that it expected to submit the LAR in January 2022.

The NRC staff queried the licensee throughout the presentation. The NRC staff did not make any regulatory decisions or commitments at the meeting. Member s of the public participated in the teleconference. Public Meeting Feedback forms were not rec eived.

- 2 -

Please direct any inquiries to me at 301-415-4037, or via e-mai l to Thomas.Wengert@nrc.gov.

/RA/

Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-313

Enclosure:

List of Attendees

cc: Listserv LIST OF ATTENDEES

DECEMBER 16, 2021, TELECONFERENCE MEETING

WITH ENTERGY OPERATIONS, INC.

ARKANSAS NUCLEAR ONE, UNIT 1

FORTHCOMING LICENSE AMENDMENT REQUEST REGARDING

TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM]

LOOPS, MODES 1 AND 2

U.S. Nuclear Regulatory Commission Fred Forsaty, NRR1/DSS2 Santosh Bhatt, NRR/DSS Vic Cusumano, NRR/DSS Calvin Cheung, NRR/DEX3 Jennifer Dixon-Herrity, NRR/DORL4 Tom Wengert, NRR/DORL

Entergy Operations, Inc.

Clint Alday Corporate Manager, Nuclear Fuels Analysis Matt Bindeman Arkansas Nuclear One (ANO) Safety Analysis Terrence Brimfield Corporate Supervisor, Safety Analysis Bob Clark ANO Regulatory Assurance Phil Couture Corporate Senior Manager, Regulatory Assurance Ron Gaston Corporate Director, Regulatory Compliance Michael Hall ANO Regulatory Assurance Riley Keele Manager, ANO Regulatory Assurance Kenyon McNeaill ANO Manager, Assistant Operations Mark Reid ANO Regulatory Assurance Chris Walker ANO Safety Analysis

State of Arkansas Bernie Bevill Section Chief, Arkansas Department of Health, Ra diation Control Section

1 Office of Nuclear Reactor Regulation 2 Division of Safety Systems 3 Division of Engineering and External Hazards 4 Division of Operating Reactor Licensing

Enclosure

ML22003A056 *bye-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*

NAME TWengert PBlechman JDixon-Herrity TWengert (WOrders for)

DATE 1/10/2022 1/3/2022 1/10/2022 1/10/2022