| {{#Wiki_filter:From: Purnell, Blake Sent: Monday, June 13, 2022 2:18 PM To: Lashley, Phil H (EH) | | {{#Wiki_filter:From: Purnell, Blake Sent: Monday, June 13, 2022 2:18 PM To: Lashley, Phil H (EH) |
| Cc: Kathryn M Nesser (kmnesser@energyharbor.com); Salgado, Nancy; Wall, Scott | | Cc: Kathryn M Nesser (kmnesser@energyharbor.com); Salgado, Nancy; Wall, Scott |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan Attachments: RAI for DB ERO Staffing LAR.pdf Mr. Lashley, By application dated January 19, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22019A236), Energy Harbor Nuclear Corp. submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). | | Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan Attachments: RAI for DB ERO Staffing LAR.pdf |
| | |
| | Mr. Lashley, |
| | |
| | By application dated January 19, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22019A236), Energy Harbor Nuclear Corp. submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). |
| The proposed amendment would revise the emergency plan for Davis-Besse by changing the emergency response organization staffing requirements. | | The proposed amendment would revise the emergency plan for Davis-Besse by changing the emergency response organization staffing requirements. |
| | |
| The NRC staff is reviewing the application and has determined that additional information is needed to complete the review. A response to the attached request for additional information is requested to be provided within 30 days of the date of this email. This request was discussed with you on June 13, 2022. Please contact me if you have any questions. | | The NRC staff is reviewing the application and has determined that additional information is needed to complete the review. A response to the attached request for additional information is requested to be provided within 30 days of the date of this email. This request was discussed with you on June 13, 2022. Please contact me if you have any questions. |
| Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Docket No. 50-346 EPID L-2022-LLA-0013 OFFICE NRR/DORL/LPL3/PM NSIR/DPR/RLB/BC NRR/DORL/LPL3/BC NAME BPurnell JQuichocho NSalgado (JWiebe for)
| |
| DATE 6/13/22 6/3/22 6/6/22
| |
|
| |
|
| Hearing Identifier: NRR_DRMA Email Number: 1667 Mail Envelope Properties (BLAPR09MB6497B1BF986FCA1321312F67E6AB9) | | Sincerely, |
| | |
| | Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission |
| | |
| | Docket No. 50-346 |
| | |
| | EPID L-2022-LLA-0013 |
| | |
| | OFFICE NRR/DORL/LPL3/PM NSIR/DPR/RLB/BC NRR/DORL/LPL3/BC NAME BPurnell JQuichocho NSalgado (JWiebe for) |
| | DATE 6/13/22 6/3/22 6/6/22 |
| | |
| | Hearing Identifier: NRR_DRMA Email Number: 1667 |
| | |
| | Mail Envelope Properties (BLAPR09MB6497B1BF986FCA1321312F67E6AB9) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan Sent Date: 6/13/2022 2:17:40 PM Received Date: 6/13/2022 2:17:00 PM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients: | | Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan Sent Date: 6/13/2022 2:17:40 PM Received Date: 6/13/2022 2:17:00 PM From: Purnell, Blake |
| | |
| | Created By: Blake.Purnell@nrc.gov |
| | |
| | Recipients: |
| "Kathryn M Nesser (kmnesser@energyharbor.com)" <kmnesser@energyharbor.com> | | "Kathryn M Nesser (kmnesser@energyharbor.com)" <kmnesser@energyharbor.com> |
| Tracking Status: None "Salgado, Nancy" <Nancy.Salgado@nrc.gov> | | Tracking Status: None "Salgado, Nancy" <Nancy.Salgado@nrc.gov> |
| Tracking Status: None "Wall, Scott" <Scott.Wall@nrc.gov> | | Tracking Status: None "Wall, Scott" <Scott.Wall@nrc.gov> |
| Tracking Status: None "Lashley, Phil H (EH)" <phlashley@energyharbor.com> | | Tracking Status: None "Lashley, Phil H (EH)" <phlashley@energyharbor.com> |
| Tracking Status: None Post Office: BLAPR09MB6497.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1184 6/13/2022 2:17:00 PM RAI for DB ERO Staffing LAR.pdf 80881 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | | Tracking Status: None |
| | |
| | Post Office: BLAPR09MB6497.namprd09.prod.outlook.com |
| | |
| | Files Size Date & Time MESSAGE 1184 6/13/2022 2:17:00 PM RAI for DB ERO Staffing LAR.pdf 80881 |
| | |
| | Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION |
| | |
| | LICENSE AMENDMENT REQUEST TO REVISE THE EMERGENCY PLAN |
| | |
| | ENERGY HARBOR NUCLEAR GENERATION LLC |
| | |
| | ENERGY HARBOR NUCLEAR CORP. |
| | |
| | DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 |
|
| |
|
| REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE THE EMERGENCY PLAN ENERGY HARBOR NUCLEAR GENERATION LLC ENERGY HARBOR NUCLEAR CORP.
| | DOCKET NO. 50-346 |
| DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 DOCKET NO. 50-346 By application dated January 19, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22019A236), Energy Harbor Nuclear Corp. submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse).
| | |
| | By application dated January 19, 2022 ( Agencywide Documents Access and Management System (ADAMS) Accession No. ML22019A236), Energy Harbor Nuclear Corp. submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). |
| The proposed amendment would revise the emergency plan for Davis-Besse by changing the emergency response organization staffing requirements. | | The proposed amendment would revise the emergency plan for Davis-Besse by changing the emergency response organization staffing requirements. |
| | |
| The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing the application and has determined that the additional information below is needed for the staff to complete its review. | | The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing the application and has determined that the additional information below is needed for the staff to complete its review. |
|
| |
|
| ===Background=== | | === |
| Paragraph 50.47(b)(1) of Title 10 of the Code of Federal Regulations (10 CFR) requires, in part, that each principal response organization has staff to respond and to augment its initial response on a continuous basis. In addition, 10 CFR 50.47(b)(2) requires that the on-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified. | | Background=== |
| | Paragraph 50.47(b)(1) of Title 10 of the Code of Federal Regulations (10 CFR) requires, in part, that each principal response organization has staff to respond and to augment its initial response on a continuous basis. In addition, 10 CFR 50.47(b)(2) requires that the o n-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified. |
| | |
| In section 3.2.4 of the application (under Offsite Surveys Major Tasks), the licensee states that the proposed emergency plan would continue to require the dispatch of radiation monitoring teams (RMTs) to occur at declaration of an alert or higher classification. However, the number of RMTs would be reduced from three to two. RMTs would also be renamed field monitoring teams in the proposed emergency plan. | | In section 3.2.4 of the application (under Offsite Surveys Major Tasks), the licensee states that the proposed emergency plan would continue to require the dispatch of radiation monitoring teams (RMTs) to occur at declaration of an alert or higher classification. However, the number of RMTs would be reduced from three to two. RMTs would also be renamed field monitoring teams in the proposed emergency plan. |
| Request for Additional Information Describe the basis for the current number of RMTs. Provide a technical justification for reducing the number of RMTs from three to two. The justification should discuss any evaluations, drills, or training performed to validate that the use of two RMTs will be effective at performing the applicable offsite surveys major tasks for Davis-Besse.}} | | |
| | Request for Additional Information |
| | |
| | Describe the basis for the current number of RMTs. Provide a technical justification for reducing the number of RMTs from three to two. The justification should discuss any evaluations, drills, or training performed to validate that the use of two RMTs will be effective at performing the applicable offsite surveys major tasks for Davis-Besse.}} |
|
---|
Category:E-Mail
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234022023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22357A0302022-12-23023 December 2022 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000346/2023010 ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22214A7042022-08-0202 August 2022 Reissue - Davis-Besse Nuclear Power Station, Unit 1 Notification of Nrc Fire Protection Team Inspection Request for Information: Inspection Report 05000346/2022011 ML22187A0992022-07-0606 July 2022 Notification of NRC Supplemental Inspection (95001) and Request for Information ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 IR 05000346/20210912021-12-17017 December 2021 NRC Inspection Report (05000346/2021091) Preliminary Greater than Green Finding ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21301A0992021-10-28028 October 2021 Draft Request for Additional Information: Proposed Alternate for Examination of Steam Generator Welds - Energy Harbor Nuclear Corp., Davis-Besse Nuclear Power Station, Unit No. 1 ML21203A3252021-07-28028 July 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000346/2021011 ML21155A1952021-06-0404 June 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Davis Besse Nuclear Power Station ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20300A5592020-10-27027 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20133J9792020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18305B0192018-11-0101 November 2018 18 Davis-Besse Nuclear Power Station - Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information(Rdb) ML18201A4122018-07-19019 July 2018 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML18190A4902018-07-0909 July 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team), Inspection Report 05000346/2018011 (DRP-DXB) ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML17355A3722017-12-21021 December 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17257A1402017-09-14014 September 2017 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 ML17135A3612017-05-12012 May 2017 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection 05000346/2017010 (Jvb) ML17129A4112017-05-0909 May 2017 Request for Additional Information Regarding Evaluation Submitted in Response to License Renewal Commitment No. 54 ML17100A1732017-04-19019 April 2017 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 ML16364A2792017-01-23023 January 2017 Request for Additional Information Regarding License Renewal Commitment No. 42 ML16355A0352016-12-19019 December 2016 Ltr 12/19/16 Davis-Besse Nuclear Power Station, Unit 1 - Information Request for an NRC Post-Approval Site Inspection for License Renewal 05000346/2017009 (Bxj) ML16256A0662016-10-18018 October 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Associated Standard 805 2024-09-05
[Table view] |
Text
From: Purnell, Blake Sent: Monday, June 13, 2022 2:18 PM To: Lashley, Phil H (EH)
Cc: Kathryn M Nesser (kmnesser@energyharbor.com); Salgado, Nancy; Wall, Scott
Subject:
Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan Attachments: RAI for DB ERO Staffing LAR.pdf
Mr. Lashley,
By application dated January 19, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22019A236), Energy Harbor Nuclear Corp. submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse).
The proposed amendment would revise the emergency plan for Davis-Besse by changing the emergency response organization staffing requirements.
The NRC staff is reviewing the application and has determined that additional information is needed to complete the review. A response to the attached request for additional information is requested to be provided within 30 days of the date of this email. This request was discussed with you on June 13, 2022. Please contact me if you have any questions.
Sincerely,
Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
Docket No. 50-346
EPID L-2022-LLA-0013
OFFICE NRR/DORL/LPL3/PM NSIR/DPR/RLB/BC NRR/DORL/LPL3/BC NAME BPurnell JQuichocho NSalgado (JWiebe for)
DATE 6/13/22 6/3/22 6/6/22
Hearing Identifier: NRR_DRMA Email Number: 1667
Mail Envelope Properties (BLAPR09MB6497B1BF986FCA1321312F67E6AB9)
Subject:
Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan Sent Date: 6/13/2022 2:17:40 PM Received Date: 6/13/2022 2:17:00 PM From: Purnell, Blake
Created By: Blake.Purnell@nrc.gov
Recipients:
"Kathryn M Nesser (kmnesser@energyharbor.com)" <kmnesser@energyharbor.com>
Tracking Status: None "Salgado, Nancy" <Nancy.Salgado@nrc.gov>
Tracking Status: None "Wall, Scott" <Scott.Wall@nrc.gov>
Tracking Status: None "Lashley, Phil H (EH)" <phlashley@energyharbor.com>
Tracking Status: None
Post Office: BLAPR09MB6497.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 1184 6/13/2022 2:17:00 PM RAI for DB ERO Staffing LAR.pdf 80881
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION
LICENSE AMENDMENT REQUEST TO REVISE THE EMERGENCY PLAN
ENERGY HARBOR NUCLEAR GENERATION LLC
ENERGY HARBOR NUCLEAR CORP.
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1
DOCKET NO. 50-346
By application dated January 19, 2022 ( Agencywide Documents Access and Management System (ADAMS) Accession No. ML22019A236), Energy Harbor Nuclear Corp. submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse).
The proposed amendment would revise the emergency plan for Davis-Besse by changing the emergency response organization staffing requirements.
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing the application and has determined that the additional information below is needed for the staff to complete its review.
=
Background===
Paragraph 50.47(b)(1) of Title 10 of the Code of Federal Regulations (10 CFR) requires, in part, that each principal response organization has staff to respond and to augment its initial response on a continuous basis. In addition, 10 CFR 50.47(b)(2) requires that the o n-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
In section 3.2.4 of the application (under Offsite Surveys Major Tasks), the licensee states that the proposed emergency plan would continue to require the dispatch of radiation monitoring teams (RMTs) to occur at declaration of an alert or higher classification. However, the number of RMTs would be reduced from three to two. RMTs would also be renamed field monitoring teams in the proposed emergency plan.
Request for Additional Information
Describe the basis for the current number of RMTs. Provide a technical justification for reducing the number of RMTs from three to two. The justification should discuss any evaluations, drills, or training performed to validate that the use of two RMTs will be effective at performing the applicable offsite surveys major tasks for Davis-Besse.