==Dear Ms. Aitken:==
==Dear Ms. Aitken:==


By letter dated January 22, 2020 (Agencywide Documents Access and Management System Package Accession No. ML20028D492), the Virginia Electric and Power Company (Dominion Energy Virginia), submitted a request for alternatives to the requirements of the ASME OM Code the North Anna Power Station (NAPS), Units 1 and 2. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
By {{letter dated|date=January 22, 2020|text=letter dated January 22, 2020}} (Agencywide Documents Access and Management System Package Accession No. ML20028D492), the Virginia Electric and Power Company (Dominion Energy Virginia), submitted a request for alternatives to the requirements of the ASME OM Code the North Anna Power Station (NAPS), Units 1 and 2. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified in requests for additional information despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified in requests for additional information despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this LAR will take approximately 400 hours to complete (EPID L-2020-LLR-0023). The NRC staff expects to compete this review in approximately 11 months from the submittal of your request, which is December 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they would change, due to several factors including requests for additional information, unanticipated addition of scope to review, and review by NRC advisory committees or hearing-related activities.
Based on the information provided in your submittal, the NRC staff has estimated that this LAR will take approximately 400 hours to complete (EPID L-2020-LLR-0023). The NRC staff expects to compete this review in approximately 11 months from the submittal of your request, which is December 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they would change, due to several factors including requests for additional information, unanticipated addition of scope to review, and review by NRC advisory committees or hearing-related activities.

Latest revision as of 03:42, 13 November 2023

NRR E-mail Capture - North Anna Power Station, Units 1 and 2 - Acceptance Review
ML20056F366
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/25/2020
From: Geoffrey Miller
NRC/NRR/DORL/LPL2-1
To: Aitken D
Dominion Generation
References
Download: ML20056F366 (2)


Text

From: Miller, Ed Sent: Tuesday, February 25, 2020 3:18 PM To: Diane Aitken

Subject:

NORTH ANNA POWER STATION, UNITS 1 AND 2 - ACCEPTANCE REVIEW

Dear Ms. Aitken:

By letter dated January 22, 2020 (Agencywide Documents Access and Management System Package Accession No. ML20028D492), the Virginia Electric and Power Company (Dominion Energy Virginia), submitted a request for alternatives to the requirements of the ASME OM Code the North Anna Power Station (NAPS), Units 1 and 2. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified in requests for additional information despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this LAR will take approximately 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> to complete (EPID L-2020-LLR-0023). The NRC staff expects to compete this review in approximately 11 months from the submittal of your request, which is December 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they would change, due to several factors including requests for additional information, unanticipated addition of scope to review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me on (301) 415-2481.

G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier: NRR_DRMA Email Number: 455 Mail Envelope Properties (DM6PR09MB5110FA209EE2B46CE4E4165DE9ED0)

Subject:

NORTH ANNA POWER STATION, UNITS 1 AND 2 - ACCEPTANCE REVIEW Sent Date: 2/25/2020 3:18:14 PM Received Date: 2/25/2020 3:18:00 PM From: Miller, Ed Created By: Ed.Miller@nrc.gov Recipients:

"Diane Aitken" <diane.aitken@dominionenergy.com>

Tracking Status: None Post Office: DM6PR09MB5110.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2743 2/25/2020 3:18:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: