I In the interim, to ensure compliance with the Technical Specifications and conformance with the                                l' safety analyses, Farley has implen=darl adnumstrative controls. 'Ihe potential non-conservative NIS calibration issue and the proposed Technical Specif*w=tinas changes are applicable to other Westmghouse Pressurized Water Reactors (PWRs). Farley is the lead plant for the Westinghouse Owner's Group (WOG) concerning this issue.                                                                                l The proposed Current Technical Specifications (CTS) change is provided in A**=rkeat I. b proposed CTS change, including the supposting technical basis and significant hazards
I In the interim, to ensure compliance with the Technical Specifications and conformance with the                                l' safety analyses, Farley has implen=darl adnumstrative controls. 'Ihe potential non-conservative NIS calibration issue and the proposed Technical Specif*w=tinas changes are applicable to other Westmghouse Pressurized Water Reactors (PWRs). Farley is the lead plant for the Westinghouse Owner's Group (WOG) concerning this issue.                                                                                l The proposed Current Technical Specifications (CTS) change is provided in A**=rkeat I. b proposed CTS change, including the supposting technical basis and significant hazards
                                                                                                                                       / g)//
                                                                                                                                       / g)//
consideration, is also applicable to the proposed Farley Improved Technical Specifications (ITS) changes provided by SNC letter dated March 12,1998. h proposedITS version of this CTS
consideration, is also applicable to the proposed Farley Improved Technical Specifications (ITS) changes provided by SNC {{letter dated|date=March 12, 1998|text=letter dated March 12,1998}}. h proposedITS version of this CTS
                 -aA=a-* request is provided in Attachment II. Review and approval of this licensing amendment change request is applicable to the ITS version as well, which will be incorporated into the ITS submittal when approved h safety analysis which explains the tecimical basis for the change is provided in Attachment III.
                 -aA=a-* request is provided in Attachment II. Review and approval of this licensing amendment change request is applicable to the ITS version as well, which will be incorporated into the ITS submittal when approved h safety analysis which explains the tecimical basis for the change is provided in Attachment III.
                                                                   ''',,p#
                                                                   ''',,p#

Latest revision as of 19:34, 9 December 2021

Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement
ML20155J439
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/06/1998
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155J445 List:
References
NUDOCS 9811120161
Download: ML20155J439 (3)


Text

- - . ~ - - . . . . - - . . - ,. . . _ . . - . . ~ ~ - . . . . - .--

I i

Dave Morey Southern Nuclear '

Vice President Operating Company

- Farley Project P.O. Box 1295

)

y. 4 Birmingham Alabama 35201 1

~

Tel 205.992.5131 November 6, 1998 EM COMPANY l Energy ro Serve nurWorld*

Docket Nos.: 50-348 10 CFR 50.90 50-364-U. S. Nuclear Pagal=*=y cwa ion A'ITN.: De-* Control Desk l Wa '-yna. DC 20555 Joseph M. Farley Nuclear Plant l Techmcal Speci6 cations Change Request NIS Power Panaa (%=1 Daily Survaillanca Paan6nant Ladies and Ca*lanan-In acevid.uce with 10 CFR 50.90, Southern Nuclear Operstmg Company (SNC) proposes to amend the Farley Nuclear Plant Unit I and Unit 2 Technical SpecifL: sons Nuclear Instrumentation System (NIS) Power Range daily surveillance requirement When operatmg above 15% Rated 'Ihermal Power (RTP), the Technical Sparirwatina. require the adjustment of the Power Range channel (s) when the absolute difference between Power Range indicated power and secondary side calonmetnc power is greater than 2% RTP. Compliance with this Techmcal  !

Specifications requirement may result in non-conservative channel calibration during reduced j power operations. b proposed Technical Specifications change will resolve this undesirable i condation by requiring adjustment of the NIS Power Range channel (s) only when the calorimetric calculated power exceeds the Power Range indicated power by more than + 2% RTP. .

I In the interim, to ensure compliance with the Technical Specifications and conformance with the l' safety analyses, Farley has implen=darl adnumstrative controls. 'Ihe potential non-conservative NIS calibration issue and the proposed Technical Specif*w=tinas changes are applicable to other Westmghouse Pressurized Water Reactors (PWRs). Farley is the lead plant for the Westinghouse Owner's Group (WOG) concerning this issue. l The proposed Current Technical Specifications (CTS) change is provided in A**=rkeat I. b proposed CTS change, including the supposting technical basis and significant hazards

/ g)//

consideration, is also applicable to the proposed Farley Improved Technical Specifications (ITS) changes provided by SNC letter dated March 12,1998. h proposedITS version of this CTS

-aA=a-* request is provided in Attachment II. Review and approval of this licensing amendment change request is applicable to the ITS version as well, which will be incorporated into the ITS submittal when approved h safety analysis which explains the tecimical basis for the change is provided in Attachment III.

,,p#

9811120161 PDR 981106 D P

ADOCK 05000348:

PDR3

,. 4 U. S. Nuclear Regulatory Commission Page 2 SNC has determmed that the proposed change to the Technical Specifications does not involve a significant hazards consideration as defined by 10 CFR 50.92. The significant hazards evaluation is provided in Attachment IV. In addition, SNC has determined that the proposed change will not significantly affect the quality of the human environment. In accordance with 10 CFR 50.91 (bXI), a copy of the proposed change has been sent to Dr. D. E. Williamson, the Alabama State Designce.

Because a current non-conservatism exists in the Technical Specifications, SNC believes that this change request should be reviewed by the staffin a timely manner and requests approval within the next twelve months. If you have any questions, please advise.

Mr. D. N. Morey states that he is a Vice President of Southern Nuclear Operating Company and is authorized to execute this oath on behalf of Southern Nuclear Operatmg Company and that, to the best of his knowledge and belief, the facts set forth in this letter and =*=rhments are true.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY f E{rt Dave Morey Sworn I andsubscribedbefore me this b 5day of 62r k 1998

, g/M.( . &#

aryPublic My ommission Expires: 9N% %

MGE:maf nisprts5. doc Attachments:

I. Current Technical Specifications Marked-up and Typed Pages II. Improved Technical Specifications Marked-up and Typed Pages III. Safety Analysis IV. Significant IIazards Evaluation ec: Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. P. Johnson, FNP Senior Resident Inspector Dr. D. E. Williamson, State Department of Public Health l

A.

1 1

,t -

. ATTACHMENTI FARLEY NUCLEAR PLANT CURRENT TECHNICAL SPECIFICATIONS CHANGE REQUEST NIS POWER RANGE CHANNEL DAILY SURVEILLANCE REQUIREMENT FNP Unit i Technical Specifications Changed Page List FNP Unit i Technical Specifications Marked-up Page I

FNP Unit Technical Specifications Typed Page FNP Unit 2 Technical Specificatioas Changed Page List FNP Unit 2 Technical Specifications Marked-up Page FNP Unit 2 Technical Specifications Typed Page i